36C25518R0342-A00002001.pdf

PDF 78 KB Posted

Attached to
657-17-185JC Renovate Gastroenterology Procedure Room and Support Space
Solicitation number
36C25518R0342
Issued by

About this file

36C25518R0342 A00002 S05 - PRE-BID RFI'S-ANSWERS - 657-17-185JC.pdf

View the file

Other files

File Type Posted
36C25518C0158-000.docx DOCX document
36C25518R0342-A00003002.pdf PDF
36C25518R0342-A00003000.docx DOCX document
36C25518R0342-A00003001.pdf PDF
36C25518R0342-A00002003.pdf PDF
36C25518R0342-A00002005.pdf PDF
36C25518R0342-A00002002.pdf PDF
36C25518R0342-A00002000.docx DOCX document
36C25518R0342-A00002004.pdf PDF
36C25518R0342-A00001001.pdf PDF
36C25518R0342-A00001000.docx DOCX document
36C25518R0342-003.pdf PDF
36C25518R0342-002.pdf PDF
36C25518R0342-001.docx DOCX document
36C25518R0342-000.docx DOCX document
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Renovate GI Procedure Room and Support Space

657-17-185JC

Pre-Bid RFI’s

1. On Sheet 1-A-200 detail 10. Can you confirm the existing structure is like drawing shows and if it’s not correct can you provide a new one?

a. This detail is being revised

2. What are the working hours for this project?

a. Normal working hours are Monday through Friday, 7:00 a.m. through 5:00 p.m., except during Federal Holidays. For working outside the normal working hours, a request must be submitted to the COR at least five (5) days in advance of the requested work date.

All shutdowns/outage/disruptions to the facility must be coordinate minimum 21 days in advance. All work above 85bd will need to be coordinated and performed outside of normal hospital hours.

b. Refer to 01 00 00 General Requirements section for additional information.

3. Will deliveries of materials and equipment we allowed while the GI Department is open?

a. Deliveries are required to be coordinated with the COR and hospital service 5 days in advance of requested time. Deliveries which will not affect the hospital operations will be allowed during normal business hours. If delivery affect hospital function these deliveries must be performed after normal hours.

4. Can you show where we will be exhausting air in room A610A for ICRA requirements?

a. Intent is for negative air exhaust to be routed above ceiling in the corridor to room A608 and exhausted out existing window. Field coordination is required.

5. Will this project be phased in any way?

a. Refer to the General requirements specifications.

6. Will we be required to make the existing corridor walls 1 hour rated?

a. No. This is a smoke tight corridor wall which is achieved with lay-in ceilings.

7. What class ICRA will be used for the 5th floor?

a. Class IV is indicated in spec section 013526 item 1.12 B

b. See attached ICRA / ILSM

8. What is the SOW on this project? We don't see anything on the solicitation with a section for the statement of work. If so, can you point us in the right direction.

a. See attached

9. Drawing sheet 1-A-100 has been updated. Please see attached.