This document set comprises bid documents for a federal construction project at Jesse Brown Veterans Affairs Medical Center in Chicago, Illinois. The project (537-26-200) involves the replacement of mechanical HVAC systems serving the nutrition and food service areas on the third floor of Building 1-B (Damen Building). The work scope includes demolition of existing equipment, installation of new air handling units, fan coil units, reheat coils, exhaust fans, piping systems, and associated mechanical components; replacement of thermostats and control systems; testing and balancing of ductwork and ventilation systems; and upgrades to the building management system integration.
Key technical specifications include: replacement of 19 two-pipe fan coil units with new 2-pipe units incorporating DDC controllers and direct digital control integration into the building management system; replacement of fin tube radiator systems with control valves and thermostatic traps; five kitchen reheat coils; a steam pressure reducing station (20 to 5 PSIG); kitchen exhaust fans E-2 and RV-16; and supply air handler AC-21 located on the building roof. The contractor must conduct pre-demolition ductwork testing, complete all required repairs and corrections including pressure testing, perform post-installation system TAB (test and balance), and reuse existing power feeds and thermostat communication wiring where possible. The drawings include detailed mechanical schedules for fan coil units (19 units specified), fin tube radiators (18 units), reheat coils, fans, pumps, and heat exchangers, along with comprehensive piping diagrams, control system architecture, and ventilation flow rate requirements for approximately 3,657 CFM through the affected spaces.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TITLE SHEET AND LOCATION PLAN
DUCTWORK TRANSITION SECTION
INDEX OF DRAWINGS:
G-1 TITLE SHEET AND LOCATION PLAN
G-2 GENERAL NOTES AND CONDITIONS
MD-1 DEMOLITION OF FAN COIL AND FIN TUBE RADIATION SYSTEMS
MD-2 MECHANICAL DEMOLITION BUILDING 1-B ROOF
MD-3 PHOTOGRAPHS - MECHANICAL DEMOLITION
M-1 PIPING NOTES AND MECHANICAL SCHEDULE I
M-2 MECHANICAL SCHEDULE II
M-3 MECHANICAL SCHEDULE III
M-4 MECHANICAL DETAILS I
M-5 MECHANICAL DETAILS II
M-6 HOT WATER PIPING DIAGRAMS
M-7 GENERAL LAYOUT FOR NEW AHU AC-21
M-8 REVISIONS TO HYDRONIC PIPING
TC-1 TEMPERATURE CONTROL DIAGRAMS I
TC-2 TEMPERATURE CONTROL DIAGRAMS II
V-1 VENTILATION FLOW RATES
Department of Veterans Affairs
JESSE BROWN VETERANS AFFAIRS MEDICAL CENTER
820 SOUTH DAMEN AVENUE
CHICAGO, IL 60612
PROJECT 537-26-200
BID DOCUMENTS
G-1
WORK AREA - BLDG 1-B, 3RD FLOOR
NTS
APPLICABLE CODES AND STANDARDS
ALL WORK SHALL COMPLY TO:
1. ALL VA POLICIES
2. VA HVAC DESIGN MANUAL, March 1, 2024
3. ASHRAE 170-2017 VENTILATION OF HEALTH CARE FACILITIES
4. VA CONSTRUCTION SAFETY
5. VA INFECTION CONTROL POLICIES
6. VA CODES & STANDARDS, VA DIRECTIVES AND EXECUTIVE ORDERS FOUND AT:
http://www.cfm.va.gov/til/
7. 2023 INTERNATIONAL MECHANICAL CODE
8. 2023 INTERNATIONAL ENERGY CODE
9. 2024 NFPA-70, NATIONAL ELECTRIC CODE
ZONE 500
SOUTH DAMEN AVENUE
OGDEN AVENUE
TA
YLO
R
STR
EET
P O
LK
STR
EET
BUILDING
LOCATION
FACILITY MAP
NTS
north
WORK AREA
AHU-AC21 REPLACEMENT SERVING NUTRITION FOOD AND SERVICE
DESIGN, 3RD FLOOR DAMEN BUILDING 1-B
GENERAL NOTES AND CONDITIONS
GENERAL NOTES & CONDITIONS
1. CONTRACTORS SHALL PROVIDE ALL LABOR, MATERIALS, EQUIPMENT, AND SERVICES NECESSARY TO COMPLETE THE WORK INDICATED IN THE
CONTRACTED BID DOCUMENTS, INCLUDING THE STATEMENT OF WORK (SOW). WORKMANSHIP SHALL BE COMPLETE IN EVERY ASPECT, TESTED, APPROVED, SATISFACTORY TO JESSE BROWN VA MEDICAL CENTER (JB VAMC), AND IN ACCORDANCE WITH VA CODES AND STANDARDS, VHA
DIRECTIVES, FEDERAL LAWS, AND STATE AND LOCAL REGULATIONS.
2. THE DRAWINGS INDICATE DIAGRAMMATICALLY THE EXTENT AND LOCATION OF THE WORK INCLUDED. WORK INDICATED, BUT HAVING MINOR DETAILS OBVIOUSLY OMITTED, SHALL BE PROVIDED, INCLUDING THESE DETAILS, WITHOUT EXTRA COST.
3. CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL NECESSARY APPROVALS AND PERMITS REQUIRED FROM JB VAMC BEFORE STARTING
ANY WORK.
4. THE WORK ON THESE DRAWINGS IS INTENDED TO CONVEY THE SCOPE OF WORK AND INDICATE THE GENERAL ARRANGEMENT OF EQUIPMENT
AND FINAL LAYOUT.
5. THE CLAUSE ENTITLED “SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION “ IN FAR 52.236-21 (APRIL 2019) IS SUPPLEMENTED AS FOLLOWS:
(a) THE CONTRACTING OFFICER'S INTERPRETATION OF THE DRAWINGS AND SPECIFICATIONS WILL BE FINAL, SUBJECT TO THE DISPUTES
CLAUSE.
(b) THE CONTRACTOR SHALL:
a. CHECK ALL DRAWINGS AND SPECIFICATIONS FURNISHED IMMEDIATELY UPON RECEIPT.
b. COMPARE ALL DRAWINGS AND SPECIFICATIONS AND VERIFY THE FIGURES BEFORE LAYING OUT THE WORK.
c. PROMPTLY NOTIFY THE CONTRACTING OFFICER OF ANY DISCREPANCIES.
d. BE RESPONSIBLE FOR ANY ERRORS THAT MAY HAVE BEEN AVOIDED BY COMPLYING WITH PARAGRAPH (b); AND
e. REPRODUCE AND PRINT CONTRACT DRAWINGS AND SPECIFICATIONS AS NEEDED.
(a) IN GENERAL:
a. DRAWINGS OF GREATER DETAIL SHALL GOVERN DRAWINGS OF LESSER DETAIL UNLESS SPECIFICALLY NOTED OTHERWISE; AND
b. FIGURES AND NUMERICAL QUANTITIES NOTED ON DRAWINGS GOVERN OVER SCALE MEASUREMENTS.
(a) OMISSIONS FROM THE DRAWINGS OR SPECIFICATIONS OR THE MISDESCRIPTION OF DETAILS OF WORK THAT ARE MANIFESTLY NECESSARY TO CARRY OUT THE INTENT OF THE DRAWINGS AND SPECIFICATIONS, OR THAT ARE CUSTOMARILY PERFORMED, SHALL NOT RELIEVE THE CONTRACTOR FROM PERFORMING SUCH OMITTED OR MISDESCRIBED DETAILS OF THE WORK. THE CONTRACTOR SHALL PERFORM SUCH DETAILS AS IF FULLY AND CORRECTLY SET FORTH AND DESCRIBED IN THE DRAWINGS AND SPECIFICATIONS.
6. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AND LOCATION OF NEW CONSTRUCTION WITH EXISTING WALLS, FLOORS, CEILINGS, COLUMNS, MECHANICAL AND ELECTRICAL EQUIPMENT, AND EXISTING CONDITIONS.
7. CONTRACTORS ARE RESPONSIBLE FOR CHECKING FIELD CONDITIONS PRIOR TO THE COMMENCEMENT OF WORK. CONTRACTORS SHALL REPORT ANY PROBLEMS/CONFLICTS TO THE VA COR WITHIN TWO (2) DAYS OF DISCOVERY. CONTRACTOR IS RESPONSIBLE FOR ANY CHANGES RESULTING FROM CONDITIONS ARISING IN THE FIELD WHICH ARE NOT BROUGHT TO THE ATTENTION OF THE VA COR AND MADE BY THE
CONTRACTOR AT NO ADDITIONAL COST TO VA JESSE BROWN MEDICAL CENTER .
8. FINAL LOCATION OF HVAC COMPONENTS AND EQUIPMENT SHALL BE APPROVED BY THE VA COR.
9. CONTRACTORS SHALL WARRANT ALL WORK TO BE PERFORMED AND ALL MATERIALS TO BE FURNISHED UNDER THIS CONTRACT AGAINST
DEFECTS IN WORKMANSHIP IN ACCORDANCE WITH VA'S STANDARD DOCUMENTS FOR CONSTRUCTION.
10. IN ACCORDANCE WITH GENERAL CONSTRUCTION PRACTICES, CONTRACTORS SHALL BE SOLELY RESPONSIBLE FOR WORKING CONDITIONS AT THE
JOB SITE.
11. CONTRACTORS SHALL ARRANGE FOR THE PREMISES TO BE MAINTAINED IN A CLEAN AND ORDERLY MANNER THROUGHOUT THE COURSE OF THE
CONSTRUCTION. DO NOT BLOCK ENTRANCES, EXITS, LOBBIES, ETC. LEAVE AREAS CLEAN AND FREE OF DEBRIS AT THE END OF EACH DAY.
12. CONTRACTORS SHALL BE RESPONSIBLE FOR REMOVING ALL LEFT-OVER MATERIALS, DEBRIS, AND EQUIPMENT INVOLVED IN HIS OPERATIONS AT
THE CONCLUSION OF THE PROJECT. ALL PROJECT AREAS AND SURROUNDING AREAS AFFECTED BY THE CONSTRUCTION SHALL BE LEFT CLEAN
AND IN GOOD CONDITION.
13. CONTRACTORS SHALL TAKE PRECAUTIONARY MEASURES TO ENSURE THAT ALL PROPERTIES, EQUIPMENT, AND DEVICES AT THE PROJECT SITE ARE PROTECTED DURING THE CONSTRUCTION PERIOD. ANY DAMAGE TO EXISTING CONSTRUCTION, EQUIPMENT AND DEVICES SHALL BE REPAIRED AND RESTORED TO A CONDITION EQUAL TO THAT EXISTING AT THE COMMENCEMENT OF WORK.
14. ALL FINISH WORK THAT IS DAMAGED OR STAINED SHALL BE REPAIRED OR REPLACED IF NECESSARY AT NO ADDITIONAL EXPENSE TO JB VAMC.
15. CONTRACTORS SHALL IMMEDIATELY REPORT ANY ENCOUNTERED UNKNOWN OR SUSPECTING HAZARDOUS MATERIAL TO THE VA COR FOR
TESTING.
16. ALL PIPING TO NEW EQUIPMENT SHALL BE THOROUGHLY FLUSHED BEFORE CONNECTING TO NEW EQUIPMENT.
G-2
Drawing Title Project Title
Date:
Location
Checked:
Building Number
Project Number
Drawing Number
Prepared:
Dwg. ofRevisions: Date
JESSE BROWN VAMC
537-26-200
October 30, 2025
1-B
Office of Planning and Construction
Revisions Continued: Date A. Nguyen
062-050406
LICENSED
PROFESSIONAL
ENGINEER
OF
EXPIRES NOV. 30, 2025
TO
N
A NGUYEN
S T
O
ATE
F I L L I NO
I
S
G T.
FULLY SPRINKLERED
Approved Project Director
FULLY SPRINKLERED
D. Moreau
NOTE: CONTRACTOR SHALL OBTA IN AND VERIFY ALL DIMENSIONS AND CONDITIONS AT JOB SITE AND BE FULLY RESPONSIBLE FOR SAME. BRIDGING DOCUMENTS, DRAW INGS AND NARRATIVES ARE PROVIDED FOR DESIGN INTENT.
THE DESIGN-BUILD ENTITY IS RESPONSIBLE FOR THE COMPLETE DESIGN OF A PROJECT THAT ADHERES TO ALL SCOPE OF WORK REQUIREMENTS, CODES, STATE AND FEDERAL REGULATIONS AND GUIDELINES.
Phase
BID DOCUMENTS AHU-AC21 REPLACEMENT SERVING
NUTRITION FOOD AND SERVICE
SCOPE OF WORK NOTES
1. CONTRACTOR SHALL INSPECT THE INTEGRITY OF THE SUPPLY AND EXHAUST DUCT WORK AND COMPLETE ALL REQUIRED REPAIRS AND CORRECTIONS, INCLUDING PRESSURE TESTING. THE EXISTING DUCTWORK IS SERVED BY SUPPLY AIR HANDLER AC-1, KITCHEN EXHAUST FANS E-2, AND RV-16. CONTRACTOR SHALL INSPECT, REPAIR, AND REPLACE
SECTIONS OF DUCTWORK, DAMPERS, AND BRACH CONNNECTIONS, AS NECESSARY.
2. THE CONTRACTOR SHALL REPLACED THE 19 TWO-PIPE FAN COIL UNITS SHOWN ON THIS DRAWING. THE NEW FAN COIL UNITS SHALL BE OF THE 2-PIPE TYPE AND SHALL INCLUDE THE REQUIRED CONTROL VALVES AND DDC CONTROLLER/SENSORS. THE NEW DDC CONTROL SYSTEM I N THIS PROJECT SHALL BE INCORPORATED INTO THE BUILDING MANAGEMENT SYSTEM (BMS) AT JESSE BROWN VAMC ECC. THE PROJECT ALSO CALLS FOR THE REPLACEMENT OF FIN TUBE RADIATOR SYSTEM, INCLUDING CONTROL VALVES AND THERMOSTATIC TRAPS, FIVE KITCHEN REHEAT COILS, AND A STEAM PRESSURE REDUCING STATION ( 20 TO 5 PSIG) BY THE POT WASHING AREA (Rm 3495A). WORK ALSO CALLS FOR THE REPLACEMENT OF THE KITCHEN EXHAUST FANS E-2 AND RV-16, AND THE SUPPLY AIR HANDLER AC-21, LOCATED ON THE ROOF OF BUILDING 1-B.
3. WORK ALSO INCLUDES THE DEMOLITION OF AHU AC-35 AND ASSOCIATED DUCTWORK AND EQUIPMENT IDENTIFIED ON DWG MD-3, PHOTOGRAPH # 9.
4. ALL EXISTING THERMOSTATS SHALL BE REMOVED AND REPLACED AT THEIR CURRENT LOCATIONS. ALL THERMOSTAT COMMUNICATION WIRING TO REMAIN AND BE REUSE D
WITH THE NEW THERMOSTATS.
5. THE EXISTING DUSTWORK SYTEMS MUST BE TESTED BEFORE THE START OF THE DEMOLITION AND IDENTIFY AREAS OF CORRECTIONS . AFTER THE INSTALLATION IS COMPLETED, THE SYSTEM MUST BE TAB TO VERIFY COMPLIANCE WITH THE DESIGN DOCUMENTS.
FCU
FCU
FCU
FCU
FCU
FCU
FCU
FCU
FCU
9 FCU
FCU
FCU
FCU
FCU
FCU
FCU
18FCU
Food Storage
Food Supply Staft Assistant
Director Office
Conference Room Dietician Staff
Office Dietician Staff
Office 3561/63 3569
Admin Office
Director Office
Cafeteria
35COB
Stair #4
Dishwasher Area
Kitchen
RHC
RHC
RHC
RHC
RHC
Kitchen
Preparation Area
6" Ø 8" Ø
10x8
10x6
6x4 8x6
16x14
8" Ø
18x14
24x16
14" Ø 14" Ø
20x18 22x18
8x6
8" Ø 8" Ø 8" Ø
28x18 28x16
14" Ø 6x6
26x16 24x16
20x16 20x16 18x16
18x12 16x12 16x10
22x16 18x12 14x10 12x8 10x6 8x6
REPLACEMENT OF FAN COIL AND
FIN TUBE RADIATOR SYSTEMS
MD-1
GENERAL DEMOLITION NOTES
1. CONTRACTOR SHALL REVIEW THE DRAWINGS AND SPECIFICATIONS, IN PARTICULAR SECTION 02 41 00 DEMOLITION, AND LAYOUT HIS WORK IN A COMPATIBLE AND COMPLEMENTARY MANNER, REMOVE ALL EQUIPMENT, SUPPORT, CONTROL ACCESSORIES, ETC, AND MECHANICAL ITEMS MADE OBSOLETE BY THESE ALTERATIONS AS SHOWN IN
THE MECHANICAL DRAWINGS.
2. PREPARE A DEMOLITION PLAN AND SUBMIT PROPOSED DEMOLITION AND REMOVAL PROCEDURES FOR APPROVAL BEFORE WORK IS STARTED. PLAN SHALL BE APPROVED BY THE COR BEFORE THE START OF WORK. DO NOT BEGIN DEMOLITION UNTIL AUTHORIZATION IS RECEIVED.
3. BEFORE THE START OF THE DEMOLITION, THE CONTRACTOR SHALL SURVEY THE SITE AND EXAMINE THE DRAWINGS AND SPECIFICATIONS TO DETERMINE THE EXTENT OF THE WORK. RECORD EXISTING CONDITIONS IN THE PRESENCE OF THE COR. IDENTIFY CONDITIONS OF STRUCTURES AND OTHER FACILITIES ADJACENT TO THE AREAS OF ALTERATIONS OR REMOVAL. IT IS THE CONTRACTOR'S RESPONSIBILITY TO VERIFY AND DOCUMENT ALL WHICH WILL BE REQUIRED DURING THE COURSE OF THE WORK, AND TO NOTE THESE ON THE
RECORD DOCUMENTS.
4. ALL EQUIPMENTS AND DEVICES SHALL REMAIN UNLESS SPECIFICALLY NOTED FOR REMOVAL.
5. ALL MATERIALS AND EQUIPMENT REMOVED AND NOT REUSED OR SALVAGED SHALL BECOME THE PROPERTY OF THE CONTRACTOR AND SHALL BE REMOVED FROM SITE.
6. THESE DRAWINGS ARE COMPILED BY THE VA FROM VA'S RECORD DRAWINGS AND LIMITED FIELD VERIFICATION OF EXISTING CONDITIONS FOR THE PURPOSE OF INDICATING THE WORK REQUIRED AND ARE BELIEVED TO BE CORRECT, NOTWITHSTANDING, THE CONTRACTOR SHALL VERIFY EQUIPMENT LOCATIONS, DIMENSIONS, AND ALL FIELD CONDITIONS
AFFECTING HIS WORK.
7. DO NOT INTERRUPT EXISTING UTILITIES SERVICING OCCUPIED OR USED FACILITIES, EXCEPT WHEN APPROVED IN WRITING BY THE COR AND THEN ONLY AFTER TEMPORARY UTILITY
SERVICES HAVE BEEN APPROVED AND PROVIDED.
FTR
FTR
FTR
FTR
FTR
FTR
FTR
FTR
FTR
FTR
FTR
FTR
FTR
FTR
FTR
FTR
FTR
FTR
FCU
FCU
FCU
X
8" Ø3560A Serving Kitchen
Stair #4
North
DEMOLITION WORK - BLDG 1-B, 3RD FLOOR
SCALE: 18" = 1Ft
3495E
3495G
RM
AN
Polygon
A.N.
Polygon
A.N.
Text Box Revisions as per Addendum No. 1
MECHANICAL DEMOLITION
BUILDING 1-B ROOF
MD-2
GENERAL DEMOLITION NOTES
1. CONTRACTOR SHALL REVIEW THE DRAWINGS AND SPECIFICATIONS, IN
PARTICULAR SECTION 23 02 21 41 00 - HVAC DEMOLITION AND
LAYOUT HIS WORK IN A COMPATIBLE AND COMPLEMENTARY
MANNER. REMOVE ALL EQUIPMENT. SUPPORT, CONTROL
ACCESSORIES, ETC, AND MECHANICAL ITEMS MADE OBSOLETE BY
THESE ALTERATIONS AS SHOWN IN THE MECHANICAL DRAWINGS.
2. PREPARE A DEMOLITION PLAN AND SUBMIT PROPOSED DEMOLITION
AND REMOVAL PROCEDURES FOR APPROVAL BEFORE WORK IS
STARTED. PLAN SHALL BE APPROVED BY THE COR BEFORE THE START
OF WORK. DO NOT BEGIN DEMOLITION UNTIL AUTHORIZATION IS
RECEIVED.
3. BEFORE THE START OF THE DEMOLITION, THE CONTRACTOR SHALL
SURVEY THE SITE AND EXAMINE THE DRAWINGS AND SPECIFICATIONS
TO DETERMINE THE EXTENT OF THE WORK. RECORD EXISTING
CONDITIONS IN THE PRESENCE OF THE COR. IDENTIFY CONDITIONS OF
STRUCTURES AND OTHER FACILITIES ADJACENT TO THE AREAS OF
ALTERATIONS OR REMOVAL. IT IS THE RESPONSIBILITY OF THE
CONTRACTOR'S RESPONSIBILITY TO TO VERIFY AND DOCUMENT ALL
WHICH WILL BE REQUIRED DURING THE COURSE OF THE WORK, AND
TO NOTE THESE OUTAGES ON THE RECORD DOCUMENTS.
4. ALL EQUIPMENTS AND DEVICES SHALL REMAIN UNLESS SPECIFICALLY
NOTED FOR REMOVAL.
5. ALL MATERIALS AND EQUIPMENT REMOVED AND NOT REUSED OR
SALVAGED SHALL BECOME THE PROPERTY OF THE CONTRACTOR AND
SHALL BE REMOVED FROM SITE.
6. THESE DRAWINGS ARE COMPILED BY THE COR FROM VA'S RECORD
DRAWINGS AND LIMITED FIELD VERIFICATION OF EXISTING
CONDITIONS FOR THE PURPOSE OF INDICATING THE WORK REQUIRED
AND ARE BELIEVED TO BE CORRECT. NOTWITHSTANDING, THE
CONTRACTOR THE CONTRACTOR SHALL VERIFY EQUIPMENT
LOCATIONS, DIMENSIONS AND ALL FIELD CONDITIONS AFFECTING HIS
WORK.
7.
8.
DO NOT INTERRUPT EXISTING UTILITIES SERVICING OCCUPIED OR
USED FACILITIES, EXCEPT WHEN APPROVED IN WRITING BY THE COR
AND THEN ONLY AFTER TEMPORARY UTILITY SERVICES HAVE BEEN
APPROVED AND PROVIDED. REMOVAL OF EQUIPMENT REQUIRES THE
DISCONNECT OF ELECTRICAL POWER AND THE TERMINATION OF THE
ELECTRICAL FEEDERS IN A WEATHER PROOF, WALL MOUNTED, JB BOX.
EQUIPMENT MUST BE DENERGIZED AT THE SERVICE PANELS BEFORE IT
IS REMOVED. TERMINATE POWER LEADS AT THE BUILDING WALL IN
WEATHER PROOF IN NEMA 3R ENCLOSURES.
EQUIPMENT ASSOCIATED WITH AC-21 PROJECT TO BE REMOVED AND REPLACED
1. EXHAUST FAN E-2, DUCTWORK TO REMAIN.
2. REMOVE AND REPLACE EXHAUST FAN RV-16 AND FAN INLET DUCTWORK, THE HORIZONTAL
RUN OF THE DUCTWORK IS 33"x25". THE VERTICAL RUN (DOWN THROUGH THE ROOF) IS 33"x20". SIZE THE ELBOW TO THE FAN AS PER THE DIMENSIONS OF THE FAN INLET.
3. HOT WATER PUMPS P-1 & P-2 AND HOUSEKEEPING PADS.
4. HEAT EXCHANGER HX-1.
5. AIR SEPARATOR AS-1.
6. EXPANSION TANK EX-1.
7. BUILDING AUTOMATION CONTROL BAC.
8. CHEMICAL POT CPT-1.
9. PRESSURE FILL SYSTEM PFS-1.
10. ELECTRIC UNIT HEATER EUH-1.
11. AIR HANDLER AC-21.
12. FAN VARIABLE FREQUENCY DRIVE.
13. ELECTRICAL PANEL & PUMP STARTERS.
14. CONDENSER & ASSOCIATED ELECTRICAL COMPONENTS.
15. DISPOSE AIR HANDLER/DX COIL & SUPPLY/RETURN DUCTWORK & ELECTRICAL COMPONENTS.
16. AFTER REMOVAL OF DUCTWORK, CONTRACTOR SHALL INSTAL AN INSULATED ALUMINUM
WALL COVER AT THE POINT OF PENETRATION INTO THE BUILDING.
EXISTING E-25
TO REMAIN EXISTING RE-59
TO REMAIN
D R
A
IN
P A
N
IN
TE
R N
ED
IA
TE
D
R A
IN
P
A N
C O
O
LI
N G
C O
IL
H
EA
TI
N
G C
O
IL
FI
LT
ER
O U
TS
ID
E A
IR
EXISTING PIPING
CWR
STM
COND
EXPOSED PIPING
SHALL BE HEAT
TRACED
HWR
HWSSTM
COND
H W
R
IM
S
ST
M C
O N
D
1 2
H W
S
H W
R D
N . T
O B
EL
O
W
CWS
NorthDEMOLITION WORK- BLDG 1-B, ROOF
NTS
14 15
EXHAUST FAN RV-16
EXHAUST FAN E-2
16 16
S S
S S
AC
RV
EF
E-2
EF
25 RE
F
S
A.N.
Polygon
A.N.
Text Box Revisions as per Addendum No. 1
A.N.
Polygon
PHOTOGRAPHS - MECHANICAL
DEMOLITION
MD-3
NORTH EAST VIEW OF ROOF
AHU AC-21
EXHAUST FAN RV-16
EXHAUST FAN E-2
CONDENSER AND
ASSOCIATED FAN (DX COIL)
FAN COIL UNITS TO BE REPLACED
PIPING MISSING INSULATION
EXAMPLE OF 26"x18"x20"DEEP COOLING
EQUIPMENT LOUVERS ON NEW AHU
AC-21
SOUTH VIEW OF ROOF
SUPPLY PIPING TO AHU AC21 CONDENSATE PIPING UNDER
AHU AC-21 TO BE REUSED
HOT WATER PUMPS P-1 & P-2
OPERATING INSIDE AHU AC21
EXAUST FAN RV-16, SERVICE
PIPING & S/R DUCTWORK
EXHAUST FAN E-2
CONDENSER ASSOCIATED
AHU-S1 TO BE
DEMOLISHED.
MISSING INSULATION
WEST VIEW OF BUILDNG B ROOF
EXHAUST FAN AND
ASSOCIATED DUCTWORK
BE DEMOLISHED.
DUCTWORK. CAP
DUCTWORK AT THE
BUILDNG.
REMOVE AND DISPOSE OF AHU AC-35
AND ASSOCIATED S/R DUCTWORK,
PIPING, & ELECTRICAL SERVICE. CAP
DUCTWORK AT BUILDING.
1 2 3
NOTES:
1. REMOVE AND DISPOSE OF EQUIPMENT IN PHOTOGRAPHS.
2. REMOVE DAMAGED INSULATION AND REINSULATE PIPING.
3. REPLACE FLEXIBLE CONNECTORS ON NEW FAN COIL UNITS.
4. TYPE OF OA LOUVER TO COOL EQUIPMENT IN THE NEW AHU AC-21.
5. EQUIPMENT TO REMAIN IN PLACE.
6. REMOVE NON-LOAD BEARING STEEL FRAME.
1 2 1
AHU AC-35
7 8
AHU AC-355
REMOVE VALVES, INSTALL
BLIND FLANGES, & REMOVE
PIPING TO AHU AC-35.
REMOVE AND
DISPOSED OF
CWS/CWR PIPING
TO AHU AC-35,
REFER TO PHOTO #7
THIS DWG.
CWS/CWR PIPING TO AHU
AC-35 TO BE REMOVED, SEE
PHOTO #9 ON THIS DWG.
AN
Line
AN
Line
A.N.
Polygon
A.N.
Callout Revisions as per Addendum No. 1
A.N.
Polygon
A.N.
Inserted Text
A.N.
Line
A.N.
Polygon
A.N.
PIPING NOTES AND
MECHANICAL SCHEDULES I
M-1
HOT WATER FIN TUBE RADIATION SCHEDULE
MARK LOCATION TYPE
ENCLOSURE
TYPE MOUNTING
FT
FT-1
ENCLOSURE
LENGTH
FINS/FT
FT FT FT
PIPE FINS
BTUHR/FT
@ 215 F
STEAM TEMP.
ROWS OF
FIN TUBE REMARKS
RM 3545
FT-2 RM 3545
FT-3 RM 3547
FT-4 RM 3549
FT-5 RM 3553
FT-6 RM 35611/63
FT-7 RM 3565
FT-8 RM 3569
FT-9 RM 3568
FT-10 RM 3560
FT-11 RM 3560
FT-12 RM 3560A
FT-13 RM 3595
FT-14 RM 3595
FT-15 RM 3595
FT-16 RM 3595
FT-17 RM 3595
FT-18 RM 3595
SLOPED TOP WALL
SINGLE
ROW 1 1 14" Diam STEEL 40 15405'-5"
15'-8"
6'-4"
6'-7"
15'-9"
6'-4"
16'-7"
16'-3"
15'-6"
15'-9"
15'-6"
6'-4"
6'-7"
6'-9"
6'-9"
6'-9"
6'-9"
6'-9"
a. CONTRACTOR TO FIELD
VERIFY LENGTHS OF
ENCLOSURE
VENTILATION SCHEDULE
ROOM
NO.
USE OF SPACE ROOM
PRESSURE
FLOOR
AREA
(SQ FT)
CEILING
HEIGHT
(FT)
ROOM
VOLUME
(CU FT)
MINIMUM
REQUIRED
(ACPH)
MINIMUM REQUIRED ACTUAL
SUPPLY
(CFM)
EXHAUST
(CFM)
SUPPLY
(CFM)
EXHAUST
(CFM)
REMARKS
3495A
3495G
3535/35A
3460A 3561/63
KITCHEN
DISHWASHER
JAN. CLOSET
POT WASHING
KITCHEN OFFICE
CORRIDOR
DIR. OFFICE
ADM. OFFICE
CORRIDOR
OFFICE
STORAGE
CAN FOOD STORAG.
FOOD SUPPLY STAFF
ASSIST DIR OFFICE
CONFERENCE RM.
SERVING KITCHEN
DIETICIAN STAFF OFC.
OFFICE
DIETICIAN STAFF OFC.
ADM. OFFICE
OFFICE SUPPLIES
3530 OFFICE
NOUR. STORAGE
CAFETERIA DINING RM
8 22080
N/R
(0)
(0)
(0)
(0) (0)
(0)
(0)
(0) (0) (0)
(0)
(0)
(0) (0)
(0)
3680 4232
173 199
27 27
94 94
0 0 153 153
307 353
48 48
123 123
437 437 70 70
331 331 56 85
171 171 1045 1202
56 85
293 337 171 171
164 960
59 59
43 43
41 91
58 58
21 21
AC-21 SYSTEM230 142
A.N.
Polygon
A.N.
M-2
HEAT EXCHANGER SCHEDULE
HEAT LOAD
MARK
CAPACITY
(PPH)
PRESSURE
(PSIG)
FLOW
GPM
TEMPERATURE
INLET OUTLET
PRESSURE DROP
(FT/WATER)
HX-1 STEAM 10 WATER 345 160 180
FLUID FLUID
SHELLSIDE
LOAD
TUBESIDE
0.67
MAX. OVERLL
LENGTH (IN.)
44 3/4 B7G MODEL SU143-2
BASED ON
30% GLYCOL
REMARKS
REHEAT COIL SCHEDULE
MARK
RHC-1
AREA
SERVED
OFFICE 3350 & 3351
CORRIDOR 3570
RHC-2
KITCHEN
3495B & 3495D
RHC-3
KITCHWN
RHC-4
KITCHEN
3495G
RHC-5
KITCHEN OFFICE
HEAT
TYPE
TOTAL CAPACITY
(MBH)
HOT
WATER
AIR FLOW
(CFM)
FLOW
(GPM)
WPD
(FT)
AIR FRICT
(INCH WG)
ROW/FPI LAT
(°F)
BASED ON REMARKS
94.5
13.6
12x15
48x36
30x30
24x18
12x10
2.4
23.6
10.1
4.8
1.5
2.7
2.3
0.5
0.4
0.7
0.15
0.13
0.13
0.29
0.17
2/8
1/14
CARRIER BH COILS 30% GLYCOL
SIZE WxH
(INCH)
1/14
1/14
1/14
EAT= 70°F, EWT= 180°F, ΔT= 20°F
FAN SCHEDULE
TAG
E-2
RV-16
SERVICE
GEN. EXHAUST
KITCHEN EXHAUST
LOCATION
ROOF
ROOF MTD
TYPE
UTILITY FAN
CENTRIFUGAL
CAPACITY
CFM
22,000
3,100
TOTAL
S.P, WC
IN
1.1
0.85
FAN
RPM
DRIVE HP VOLTS PHASE CYCLE
UNIT
WEIGHT
LBS
DIRECT
DRIVE
BELT
BASED ON REMARKS
GREENHECK MODEL SFB-27
GREENHECK MODEL GB-141
ELECTRIC UNIT HEATER SCHEDULE
MARK
EUH-1
ROOM SERVED
INSIDE AHU AC-21
LOAD, KW
REMARKS
TRANE UHXA
ELECTRICAL
REQUIREMENTS
208/3/60
MARK
EX-1
HYDRONIC SPECIALTIES SCHEDULE
QUANTITY SERVICE DESCRIPTION REQUIREMENTS REMARKS
1 HOT WATER EXPANSION TANK DIAPHRAM; 132 GALS, 46 GAL CAPACITY B&G MODEL; D-240
TDV-1 2 TRIPLE DUTY VALVE LINE SIZE
AS-1 1 AIR SEPARATOR LINE SIZE
CPT-1 1 CHEM. POT FEEDER 5 GALLONS
PFS-1 1 COLD WATER PRESS. FILL SYSTEM 1/ HP, 208/3/60 B&G: BPF-5H3-55M
MECHANICAL SCHEDULES II
TAG
AC-21
AHU AC-21 SCHEDULE
LOCATION
RM No.
FAN
CFM
EXT,
S.P.
TOTAL
S.P.
BHP
HP
PRESSURE
IN. W.G.
PRESSURE
IN, WG, MOTOR
VOLTS/PH/HZ DIAM
IN RPM TYPE
FACE AREA
SQ FT
EAT
DB/WB
SC
MBH
No OF
ROW/FPI
LAT
DB/WB
EWT
°F
LWT
°F
FAN COOLING COIL
FACE AREA
SQ FT
EWT
°F
LWT
°F
No OF
ROW/FPI
EAT
°F
LAT
°F
ROOF 28,740 208/3ɸ/60 PLUG
FAN
95/75 53.5/53.5 1375
TC
MBH
2190 8/11 40 55 180 160 8/11 -10 88.1
HEATING COIL
CAPACITY
MBH
GPM AIR FRICT.
INCH WG
WTR FRICT.
FT. WG
Pre Filter PF-1 Merv 7 PF-2 Merv 13
FACE AREA BASED ON REMARKS
30% GLYCOL
CARRIER 39M OUTDOOR AHU
TEMTROL PF SERIES AHU YORK
CUSTOM MADE AHU
3248 3253.5" 6.47"
GPM
A.N.
Polygon
A.N.
Callout Revisions as per Addendum No. 1
A.N.
Polygon
A.N.
Sticky Note
Line
FCU-1
FCU-2
FCU-3
FCU-4
FCU-5
FCU-6
FCU-7
FCU-8
FCU-9
FCU-10
FCU-11
FCU-12
FCU-13
FCU-14
FCU-15
FCU-16
FCU-17
FCU-18
FCU-19
RM 3544 25.4
RM 3445
RM 3545
RM 3547
RM 3549
RM 3553
RM 3553
RM 3561
RM 3563
RM 3565
RM 3569
RM 3568
RM 3561
RM 3563
RM 3565
RM 3566
RM 3575
RM 3560
RM 3560
RM 3560
RM 3560A
MARK AREA
SERVED
DESIGN
CFM
FAN COIL UNIT SCHEDULE
HOT WATER HEATING COIL
(EAT:60°F)
CHILLED WTR COOLING COIL
(EAT: 80/67°F)
HTG CAPACITY
TOTAL MBH
15.8
43.5
62.6
43.5
62.6
25.4
68.2
81.1
FLOW
(GPM)
ΔP
(FT.)
EWT
(°F)
ΔT
(°F)
CLG CAPACITY
TOTAL (MBH) SENSIBLE (MBH)
FLOW
(GPM)
ΔP
(FT.)
EWT
(°F)
ΔT
(°F)
ELECTRICAL
REQUIREMENTS
WATTS RPM DRIVE
FAN DATA
115/1/60 BELT40 1540
5.0
5.0
3.6
3.6
5.0
5.0
4.9
2.1
2.1
5.3
6.3
5.0
5.0
5.0
5.0
3.6
5.3
5.3
5.0
5.0
3.6
3.6
5.0
5.0
4.9
2.1
2.1
5.3
6.3
5.0
5.0
5.0
5.0
3.6
5.3
5.3
5.0
5.0
3.6
3.6
5.0
5.0
4.9
2.1
2.1
5.3
6.3
5.0
5.0
5.0
5.0
3.6
5.3
5.3
15.8
43.5
62.6
62.6
62.6
62.6
62.6
68.2
68.2
25.425.4
4.9
3.6
3.6
4.9
2.1
6.1
5.3
4.9
4.9
4.9
4.9
4.9
4.9
2.1
5.3
5.3
5.3
5.3
MARK
P-1
P-2
SERVICE
LOCATION SERVICE
CENTRIF
END SUCT.
HW
208/3/60
208/3/60
PUMP SCHEDULE
FLOW
(GPM)
TDH
(FT. of H20)
MOTOR
HP
RPM VOLT/ɸ/HZ
ELEC. CHAR.
MARK
AIR SEPARATOR SCHEDULE
SERVICE
LOCATION
HW HTG SYSTEM
AC-21
AS-1
FLOW RATE
(GPM)
CONN. SIZE
(IN) REMARKS
40 2-1/2 SEE NOTE 1
NOTE 1 INSTALLATION TO INCLUDE INTEGRAL STRAINER
PUMP DATA
REMARKS
NOTES:
1. COOLING COIL SHALL BE SELECTED AT A MINIMUM OF 14°F TEMPERATURE RISE
2. HEATING COIL SHALL BE SELECTED AT A MINIMUM 20°F TEMPERATURE RISE
ROOF (INSIDE AC-21)
ROOF (INSIDE AC-21)
TYPE
HW
CENTRIF
END SUCT.
BASIS OF DESIGN
BELL & GOSSETT: 1510
BELL & GOSSETT: 1510
REMARKS
STANDBY
MECHANICAL SCHEDULES III
M-3
NOTE:1; PUMP PERFORMANCE TO BE BASED ON A 30% GLYCOL MIXTURE
SEE NOTE 1
A.N.
Polygon
A.N.
MECHANICAL DETAILS I
M-4
D
D
FLASH TANK SCHEDULE
CONDENSATE
PUMP
CAPACITY-
[GPM]
APPROX. CAPACITY
OF FLASH TANK-L
[GALLONS]
SIZE OF FLASH TANK- mm [in]
0 THRU 15 61[16]
356mm DIA X 610mm LONG
[14 DIA. X 24 LONG]
16 THRU 22 91[24]
365mm DIA X 914mm LONG
[14 DIA. X 36 LONG]
23 THRU 30 117[31]
406mm DIA X 914mm LONG
[16 DIA. X 36 LONG]
31 THRU 37 140[37]
406mm DIA X 1067mm LONG
[16 DIA. X 42 LONG]
DIELECTRIC FITTING
(WHEN RETURN IS COPPER)
RETURN
51mm [2"] VENT TO OUTSIDE OF BUILDING
FLOOR
MECHANICAL DETAILS II
M-5
HOT WATER PIPING DIAGRAMS
M-6
6" CONCRETE PAD
TRIPLE
DUTY
VALVE
6" CONCRETE PAD
HOT WATER PUMP
FLEXFLEX
(P-1)(P-2)
HOT WATER PUMP
CPT-1
AIR SEPARATOR
AS-1
4" HWS
4" HWR
HWS
4" HWS PRESSURE
RELIEF
EXPANSION TANK
EX-1
CONVERTOR
NEW
HEAT EXCHANGER
(HX-1)
EXISTING VACUUM
STEAM CONDENSATE
RETURN
4" HWR 4" HWS
MANUAL BYPASS
1" EXPANSION
LINE
EXISTING 1"
CW MAKE-UP
WATER
4" HWS
STEAM TO HOT WATER
HEAT EXCHANGER
FROM EXISTING STEAM SYSTEM
CONDENSATE RETURN
TO HOT WATER
DISTRIBUTION
STEAM TO HOT WATER
HEAT EXCHANGER
FROM HOT WATER
DISTRIBUTION
TO HOT WATER
DISTRIBUTION
DI
DI
DO
INPUT
POINT SYMBOL DESCRIPTION
AI.1 OAT OUTSIDE AIR TEMPERATURE
AI.2 OAH OUTSIDE AIR HUMIDITY
AI.4 HWRT HOT WATER RETURN TEMPERATURE
DI.5 HWP1FLW HOT WATER PUMP P-1 FLOW STATUS
DI.6 HWP2FLW HOT WATER PUMP P-2 FLOW STATUS
AI.7 HWDP HOT WATER DIFFERENTIAL PRESSURE
OUTPUT
POINT SYMBOL DESCRIPTION
AO.1 STCV STEAM CONTROL VALVE
DO.2 HWP1 HOT WATER P-1 START/STOP
DO.3 HWP1 HOT WATER P-2 START/STOP
AI
OAH
AI
OAT
AO
STCV
AI
HWRT
AI
HWDP
HWP1FLW
HWP2FLW
HWP1
DO
HWP2
AI
HWST
6"
5"
5"
2 12"
4" 4"
2. THE TRIPLE DUTY VALVE OR BALANCING VALVE IS PRIMARILY INTENDED FOR FLOW MEASUEMENTS DURING TAB WORK. THESE VALVES MUST BE KEPT FULLY OPEN ONCE THE TAB IS COMPLETED. THROTTLED VALVES AT THE PUMPS ARE NOT PERMITTED.
A.N.
Polygon
A.N.
Text Box Revisions as per Addendum No. 1
A.N.
Polygon
A.N.
GENERAL LAYOUT FOR NEW AHU AC-21
M-7
GENERAL INSTALLATION NOTES
1. CONTRACTOR SHALL REPLACE THE EXISTING AIR HANDLER AC-1 WITH
A PERFORMANCE AS REQUIRED IN THE AHU AC-21 SCHEDULE. TO
DWG M-2. INFORMATION ON THE REQUIRED PERFORMANCE FOR E-2
AND RV-16 IS ALSO FOUND ON DWG M-2. THE CONTRACTOR IS
REQUIRED TO REVIEW AND COMPLY WITH SPEC SECTIONS:
23 07 11 HVAC AND BOILER PLANT INSULATION
23 21 13 HYDRONIC PIPING
23 21 23 HYDRONIC PUMPS
23 22 13 STEAM AND CONDENSATE HEATING PIPING
23 74 13 PACKAGED, OUTDOOR, CENTRAL-STATION AIR-HANDLING
UNITS
2. PREPARE A CONSTRUCTION SCHEDULE AND SUBMIT PROPOSED
SCHEDULE TO THE COR FOR REVIEW AND APPROVAL.NO WORK CAN
BE STARTED UNTIL THE SCHEDULE IS APPROVED BY THE COR.
3. DO NOT INTERRUPT EXISTING UTILITIES SERVICING OCCUPIED OR
USED FACILITIES, EXCEPT WHEN APPROVED IN WRITING BY THE COR
AND THEN ONLY AFTER TEMPORARY UTILITY SERVICES HAVE BEEN
APPROVED AND PROVIDED.
AHU AC-21 AND NEW ASSOCIATED EQUIPMENT TO BE INSTALLED ON THIS PROJECT
1. NEW EXHAUST FAN E-2.
2.
3. HOT WATER PUMPS P-1 & P-2 AND HOUSEKEEPING PADS.
4. HEAT EXCHANGER HX-1.
5. AIR SEPARATOR AS-1.
6. EXPANSION TANK EX-1.
7. BUILDING AUTOMATION CONTROL BAC.
8. CHEMICAL POT CPT-1.
9. PRESSURE FILL SYSTEM PFS-1.
10. ELECTRIC UNIT HEATER EUH-1.
11. AIR HANDLER AC-21.
12. FAN VARIABLE FREQUENCY DRIVE.
13. ELECTRICAL PANEL AND MOTOR STARTERS FOR P-1 & P-2.
EXISTING E-25
TO REMAIN EXISTING RE-59
TO REMAIN
D R
A
IN
P A
N
IN
TE
R N
ED
IA
TE
D
R A
IN
P
A N
C O
O
LI
N G
C O
IL
H
EA
TI
N
G C
O
IL
FI
LT
ER
O U
TS
ID
E A
IR
STM
CWR
STM
COND
EXPOSED PIPING
SHALL BE HEAT
TRACED
HWR
HWSSTM
COND
H W
R
IM
S ST
M
C O
N D
2 12 HWS & HWR
DN. TO FLOOR
BELOW
CWS
NorthREPLACEMENT FOR AHU AC-21- BLDG 1-B, ROOF SCALE: 18' = 1 Ft
NEW EXHAUST FAN RV-16
NEW EXHAUST FAN E-2
S S
S S
AC
RV
EF
E-2
EF
25 RE
S
PROVIDE ACCESS PANELS TO FACILITY THE
MAINTENACE OF THE EQUIPMENT
STORED IN AHU AC-21
PROVIDE ADJUSTABLE OA 26" x 18" x 20"
DEEP LOUVERS TO FACILITATE THE
COOLING OF THE EQUIPMENT STORED IN
THE AIR HANDLER. REFER TO NOTE 4,
DWG MD-3.
CONTRACTOR MAY EXTEND THE
FOOT PRINT OF THE AIR
HANDLER TO GAIN ROOM TO
STORE THE EQUIPMENT
ASSOCIATED WITH AC-21.
1 12" COND & 5"
STM PIPING
FROM BELOW
ST
M
NEW INLET
DUCTWORK
NEW EXHAUST FAN RV-16, INCLUDING NEW INLET D UCTWORK.
A.N.
Line
A.N.
Line
A.N.
Polygon
A.N.
Text Box Revisions as per Addendum No. 1
A.N.
Polygon
A.N.
Text Box Revisions as per Addendum No. 1
A.N.
Polygon
A.N.
Text Box Revisions as per Addendum No. 1
FCU
FCU
FCU
FCU
FCU
FCU
FCU
FCU
FCU
FCU
FCU
11 FCU
FCU
FCU
FCU
FCU
Food Storage 3457
Food Supply Staft
Assistant Director Office
Conference Room
Dietician Staff Office
3561/63 3569
Admin Office
Director Office
3500 B
STAIR #4
CAFETERIA
3560A
SERVING
KITCHEN
3495G
3474Dishwasher Area
Kitchen
RHC
RHC
RHC
RHC
RHC
kitchen
Preparation Area
Pot Washing
FCU
REVISIONS TO HYDRONIC PIPING
M-8
FTR
FTR
FTR
FTR
FTR
FTR
FTR
FTR
FTR
FTR
FTR
FTR
FTR
FTR
FTR
FTR
FTR
FTR
PARTIAL THIRD FLOOR HYDRONIC PIPING
T
STAIR #3
North
T
T
T
T
T
Office
2"
3 / 4"
2"
1 1/2 "
1 1/4 "
1"
3/4 "
1" HWS & HWR PIPING
FROM ROOF, SEE M-7.
EXISTING 2" COND. & 5"
STEAM PIPING TO ROOF,
REFER TO DWG M-7.
T/S T/S T/ST/S T/S
T/ST/S
T/S
T/S
T/S
T/ST/S
T/S
T/S
T/S
T/S
T/S
D
1" 2" 2"
D
1"
SW
S
SW
R
HWS
HWR
SWS
SWS
3"
HWS
SWS
SWR
2"
HWR
SW
S
SW
S
SW
S
3"
SWS
3" 3"
D
SWS
SWR
T/S
FCU
FCU
T/S
GENERAL NOTES & CONDITIONS
1. EXISTING PIPING FOR THE 2-PIPE FAN COIL SYSTEM SHALL BE REUSED IN THE INSTALLATION OF THE 4-PIPE FAN COIL UNITS. NEW PIPING TO BE INSULATED AS PER SPEC SECTION 23 07 11, HVAC AND BOILER PLANT INSULATION. NEW FAN COIL PIPING TO RUN SIDE-BY-SIDE WITH THE EXISTING PIPING AND BE OF THE SAME SIZE AS THE EXISTING PIPING. PIPING SHALL INCLUDE CIRCUIT SETTERS FOR FLOW BALANCING PURPOSES. FAN COIL UNITS TO INCLUDE FACTORY
INSTALLED CONTROL VALVES.
2. REFER TO PIPE HANGER DETAIL DRAWING FOR THE INSTALLATION OF THE NEW HYDRONIC PIPING.
3. CONTRACTOR SHALL INCLUDE NEW FLEXIBLE CONNECTORS ON THE NEW FAN COIL UNITS. NEW UNITS SHALL REUSE EXISTING POWER FEEDERS AND SHALL
BE ABLE TO OPERATE WITH A MINIMUM OF THREE SPEED SETTING.
4. AIL THERMOSTATS SHALL BE REPLACED AT THEIR CURRENT LOCATIONS, THE COMMUNICATION WIRING SHALL REMAIN.
5. CONTRACTOR SHALL FURNISH AND INSTALL NEW CONTROL AND ISOLATION VALVES ON THE NEW REHEAT COILS. EXISTING CONTROL VALVE WIRING SHALL
BE REUSED. THE REHEAT COILS MUST INCLUDE BALANCING VALVE FOR FLOW DISTRIBUTION.
6. CONTRACTOR SHALL REUSE EXISTING HOT WATER PIPING ON THE NEW REHEAT COILS. MISSING OR DAMAGED INSULATION ON EXISTING PIPING MUST NE
REPLACED OR REPAIRED
7. CONTRACTOR MUST UPGRADE THE GRAPHIC REPRESENTATIONS FOR THE 2-PIPE FAN COIL SYSTEM ON THE BUILDING AUTOMATION SYSTEM.
8. AREA THERMOSTATS MUST CONTROL THE FIN TUBE RADIATORS.
9. FIN TUBE RADIATORS MUST INCLUDE FACTORY MOUNTED CONTROL VALVES.
10. EXISTING PIPING MUST BE FLUSHED BEFORE IT IS CONNECTED TO THE NEW EQUIPMENT.
SCALE: 1/8 " = 1 Ft
Dietician Staff Office
Rm.
2 1/2"
3"
STEAM
CONDENSATE
20# 5#
NEW
PRESSURE
REDUCING
STATION
A.N.
Text Box Revisions as per Addendum No. 1
TC-1
. TEMPERATURE CONTROL GENERAL NOTES
1. CONTROL COMPONENTS AND EQUIPMENT ARE SHOWN IN SCHEMATIC FORM. LOCATE COMPONENTS AND EQUIPMENT AS REQUIRED TO PROVIDE MANUFACTURER RECOMMENDED SERVICE CLEARANCES.
2. PROVIDE FIRE STOPPING, W ITH NO EXCEPTION, WHERE FIRE AND/OR SMOKE WALLS ARE PENETRATED.
3. COORDINATE EXACT LOCATIONS OF EQUIPMENT BETW EEN TRADES. MAINTAIN NEC REQUIRED WORKING CLEARANCE TO ALL ELECTRICAL COMPONENTS.
4. WALL THERMOSTATS AND/OR TEMPERATURE SENSORS SHALL BE INSTALLED AT 48" TO 54" ABOVE FLOOR ADJACENT TO OR ABOVE LIGHT CONTROL DEVICE.
5. UNLESS OTHERW ISE NOTED, TEMPERATURE CONTROL W IRING/PIPING SHALL BE CONCEALED ABOVE CEILINGS, IN W ALLS, OR INSIDE CHASES.
6. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ADEQUATE SUPPORTING SYSTEMS FOR TEMPERATURE CONTROL WIRING/PIPING, EQUIPMENT, AND ACCESSORIES.
7. SPECIFICATION FOR CONTROLS AND INSTRUMENTATION REQUIREMENTS AND THE SEQUENCE OF OPERATION FOR EQUIPMENT.
8. TEMPERATURE CONTROL CABLING SHALL BE LOW CAPACITANCE 24 GA TW ISTED SHIELDED PAIR W ITH HARD JACKET.
9. ALL CONTROLS CABLING SHALL BE PLENUM RATED.
TEMPERATURE CONTROL LEGEND
SYMBOL
AFF
RTU-#
BLN
MAU-#
MBC
NC
NO
TYP.
UH-#
VFD
VSD
DESCRIPTION
ABOVE FINISHED FLOOR
ROOFTOP UNIT
BUILDING LEVEL NETWORK
MAKEUP AIR UNI
MAIN BUILDING CONTROLLER
NORMALLY CLOSED
NORMALLY OPEN
TYPICAL
UNIT HEATER
VARIABLE FREQUENCY DRIVE
VARIABLE SPEED DRIVE
TTHERMOSTAT
TS
CO
NO2
Tr
CO SENSOR
NO2 SENSOR
REVERSE ACTING THERMOSTAT
TEMPERATURE SENSOR
1. THE INFORMATION CONTAINED W ITHIN THIS DIAGRAM IS FOR GENERAL ARRANGEMENT OF THE DIRECT DIGITAL CONTROL SYSTEM ONLY, THE ACTUAL SYSTEM ARCHITECTURE SHALL BE DESIGNED FULLY BY THE TEMPERATURE CONTROLS CONTRACTOR IN CONSULTATION W ITH THE VA COR.
2. WHEN ADDITIONAL TEMPERATURE CONTROL PANELS REQUIRING 120V ELECTRICAL POW ER ARE PROVIDED, COORDINATE LOCATION W ITH THE
ELECTRICAL CONTRACTOR.
SYSTEM ARCHITECTURE NOTES
CONTROL SYMBOLS
T
TEMPERATURE CONTROL NOTES I
18,960
A.N.
Polygon
A.N.
Polygon
A.N.
Text Box Revisions as per Addendum No. 1
A.N.
ADDRESS
POINTS LIST (PER EACH FAN)
POINT TYPEPOINT
DESCRIPTOR
EF S/S
EF STATUS
SPACE TEMP
EF SPEED
EA DAMPER POSITION
OA DAMPER POSITION
AO EA DAMPER POSITION
DI AI DO AO VP
SEQUENCE OF OPERATION
REMARKS 1. WHEN SPACE IS OCCUPIED, THE INTAKE AIR DAMPER SHALL
OPEN. ONCE DAMPER POSITION IS PROVEN, THE EXHAUST
AIR DAMPER SHALL OPEN AND THE EXHAUST FAN SHALL
RUN.
A. WHEN THE SPACE TEMPERATURE IS ABOVE 80F
(ADJ), THE FAN SHALL RUN AT HIGH SPEED.
B. WHEN THE SPACE TEMPERATURE IS BELOW 80F
(ADJ), THE FAN SHALL RUN AT LOW SPEED
2. WHEN SPACE IS UNOCCUPIED, FAN SHALL SHUT OFF AND
DAMPERS SHALL CLOSE.
EXHAUST
AIR
KITCHEN
EXHAUST
VSD
T
AI SPACE TEMP
AO EF S/S
AI EF STATUS
AO EF SPEED
MD
NO
KITCHEN EXHAUST FAN: E - 2
N.T.S.
AI FTR STATUS
RADIANT TUBE HEATER
ADDRESS
POINT
POINTS LIST
POINT TYPE
DESCRIPTOR
SPACE TEMP
HTR STATUS
AI SPACE TEMP
SEQUENCE OF OPERATION
1.
DI AI DO AO
REMARKS
BELOW 55 F OUTSIDE AIR TEMPERATURE, RADIANT TUBE
HEATER SHALL MAINTAIN 55 F (ADJ.).
2. ABOVE 55 F OUTSIDE AIR TEMPERATURE, THE UNIT SHALL BE
OFF.
TS#
FIN TUBE RADIATOR
N.T.S.
SUPPLY
AIR
TEMPERATURE CONTROL NOTES II
TC-2
DISCHARGE AIR TEMP
MIXED AIR TEMP
SMOKE DETECTOR
SPACE HUMIDITY
SPACE TEMP
FAN STATUS
FREEZE STAT
FAN HIGH SPEED
FAN MEDIUM SPEED
FAN LOW SPEED
COOLING SETPOINT
HEATING SETPOINT
HIGH DISCHARGE TEMP
HIGH MIXED AIR TEMP
HIGH SPACE HUMIDITY
HIGH SPACE TEMP
LOW DISCHARGE TEMP
LOW MIXED AIR TEMP
LOW SPACE TEMP
x x x x x x x x x x x x x x
FAN FAILURE x x
CHANGEOVER HTG/CLG x
SCHEDULE x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x
POINT NAME AI
2-PIPE FCU HARDWARE POINTS SOFTWARE POINTS
AO BI BO AV BV LOOP SCHEDTREND ALARMGRAPHIC
x xx
TOTALS x xx x x x x x x x x
FAN COIL SEQUENCE OF OPERATION
ROOF MOUNTED FAN POINTS LIST (PER EACH FAN)
ADDRESS
POINT
DESCRIPTOR
EF STATUS
EF S/S
SEQUENCE OF OPERATION
1. OCCUPIED MODE: FAN SHALL RUN CONTINUOUSLY.
2. UNOCCUPIED MODE: FAN SHALL STOP.
POINT TYPE
DI AI DO AO
REMARKS
EXHAUST
AIR
AI EF STATUS
AO EF S/S
ROOF-MOUNTED EXHAUST FAN: RV-16
N.T.S.
A.N.
Polygon
A.N.
FCU
FCU
FCU
FCU
FCU
FCU
FCU
FCU
FCU
9 FCU
FCU
FCU
FCU
FCU
16 FCU
FCU
FCU
18FCU
Food Storage 3457
Food Supply Staff
Assistant Director Office
Conference Room
Dietician Staff Office
Dietician Staff Office
3561/63 3569
Admin Office
Director Office
3500 B
STAIR #4
CAFETERIA
3560A
SERVING
KITCHEN
3495G
Dishwasher Area
345 cfm kitchen
RHC
RHC
RHC
RHC
RHC
kitchen
Preparation Area
Pot Washing
FCU
6" Ø 8" Ø
10x8
10x6
6x4 8x6
16x14
8" Ø
18x14
24x16
14" Ø 14" Ø
20x18 22x18
8x6
8" Ø 8" Ø 8" Ø
28x18 28x16
14" Ø 6x6
26x16 24x16
20x16 20x16 18x16
18x12 16x12 16x10
22x16 18x12 14x10 12x8 10x6 8x6
VENTILATION FLOW RATES
V-1
GENERAL NOTES
1. CONTRACTOR SHALL MAKE USE OF THE EXITING HOT WATER PIPING TO AND FROM THE REHEAT COILS. CONTRACTOR SHALL REPLACE THE EXISTING REHEAT CONTROL AND ISOLATION
VALVES.
2. SINCE THE INSTALLATION IS CALLING FOR NEW TWO-PIPE FAN COIL UNITS, THE CONTRACTOR SHALL MAKE USE OF THE EXISTING PIPING TO THE UNITS . PIPING HAS TO BE FLUSHED
BEFORE CONNECTING TO THE NEW EQUIPMENT.
3. EXISTING FLEXIBLE CONNECTIONS TO THE FAN COIL UNITS SHALL NOT BE REUSED.
4. MISSING BALANCING VENTILATION DAMPERS SHALL INSTALLED.
5. AL EXISTING SUPPLY AND RETURN DIFFUSERS SHALL BE REUSED.
6. DO NOT INTERRUPT EXISTING UTILITIES SERVICING OCCUPIED OR USED FACILITIES, EXCEPT WHEN APPROVED IN WRITING BY THE COR AND THEN ONLY AFTER TEMPORARY UTILITY
SERVICES HAVE BEEN APPROVED AND PROVIDED.
7. CONTRACTOR MUST TEST & BALANCE THE INSTALLATION AS PART OF THE PROJECT SUBSTANTIAL COMPLETION AND MAKE ALL NECESSARY FLOW ADJUSTMENTS .
8. EXISTING POWER FEEDS TO THE NEW FAN COIL UNITS SHALL BE REUSED.
FTR
FTR
FTR
FTR
FTR
FTR
FTR
FTR
FTR
FTR
FTR
FTR
FTR
FTR
FTR
FTR
FTR
FTR
6" Ø
172 cfm
172 cfm
100 cfm
200 cfm
150 cfm
500 cfm
3657 cfm
228 cfm 70 cfm
172 cfm 275cfm
189 cfm
189 cfm
189 cfm
189 cfm
268 cfm
160 cfm
500 cfm
192 cfm
197 cfm
197 cfm
172 cfm
186 cfm
186 cfm
160 cfm 118 cfm
214 CFM
214 CFM
172 cfm
R 275cfm
275cfm
275cfm
172 cfm
R R R R
R256 cfm
256 cfm 256 cfm
256 cfm
256 cfm
256 cfm
256 cfm
256 cfm
256 cfm
256 cfm
160 cfm
160 cfm
256 cfm
256 cfm
70 CFM
70 CFM
R
R
R R R
RR
R
220 cfm 172 cfm
268 cfm
268 cfm
230 cfm
192 cfm
192 cfm
192 cfm
192 cfm 192 cfm
192 cfm 192 cfm
3657 cfm 3657 cfm
3657 cfm
3657 cfm
3657 cfm
345 cfm
345 cfm
345 cfm 345 cfm
T
T T T
T
T T T T T T T
T
T
T
TTT
T
T
STAIR #3
126 cfm
R
192 cfm
North
VENTILATION FLOW RATES - BLDG 1-B, 3RD FLOOR
SCALE: 18" = 1Ft
| 1_1000_Drawing G-1 (R) Model (1) |
| 2_1000_Drawing G-2 (R) Model (1) |
| 3_3000_MD-1 (Rev) Model (1) |
| 4_4000_MD-2 Model (1) |
| 5_5000_MD-3 Photographs-Demolition Model (1) |
| 6_6000_M-1 Schedule I Model (1) |
| 7_7000_M2-Schedule 2 Model (1) |
| 8_8000_M-3 Schedule 3 Model (1) |
| 9_M -4 mechanical Details Model (1) |
| 10_M -5 Mech Detail Model (1) |
| 11_10000_M-6 Hot Water Distribution II Model (1) |
| 12_7000_M7 Model (1) |
| 13_13000_M 8888 - Revisions to Hydronic Piping Model (1) |
| 14_14000_TC-1 Model (1) |
| 15_15000_TC-2 Model (1) |
| 16_16000_V - 1 Model (1) |