The file "Audio Project Floor Plan.docx" is a technical diagram illustrating the existing and proposed audio/visual infrastructure for the Tomah VA Medical Center Chapel. The floor plan depicts multiple color-coded points indicating the current locations of cabling paths, headend equipment (in the Bell Tower), network switches, cameras, microphones, and a proposed new headend installation location with a remote control panel outside room 002. The associated federal contract opportunity (Solicitation 36C25225Q0555) seeks a comprehensive audio-visual system upgrade for the chapel, requiring the contractor to provide consulting, design services, project management, equipment procurement, delivery, installation, programming, sound system equalization, low voltage wiring, and all necessary hardware and cabling. The project is being conducted by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 12, with the goal of improving the chapel's audio-visual capabilities for presentations, meetings, and musical performances.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25225Q0555 0004.docx | DOCX document | |
| 36C25225Q0555 0003.docx | DOCX document | |
| 36C25225Q0555 0002.docx | DOCX document | |
| B425 Chapel and OEF-OIF 8-23-23 to scale floor plan.pdf | ||
| 36C25225Q0555 0001.docx | DOCX document | |
| Chapel images of equipment.docx | DOCX document | |
| TOMAH Chapel Photos.docx | DOCX document | |
| P07 - Monroe County WI WD 2015-4929 Rev-28 dated 05122025.pdf | ||
| 36C25225Q0555.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Blue Line indicates existing cabling path.
Green Dot indicates location of existing headend equipment – Inside the Bell Tower
Red Dot indicates location of existing network switch / camera view switch
Blue Dot indicates location of existing cameras
Brown Dot indicates the location of existing wired/mounted microphones
Yellow Dot indicates the location of NEW Headend installation location w/remote control panel outside of room 002 image3.png image4.png image5.png image6.png image1.png image2.png