S02 - Att2 Insert A BID SCHEDULE.pdf

PDF 115 KB Posted

Attached to
Z1DA--578-18-024 SCI Recreation Area Outdoor Construction
Solicitation number
36C25224B0013
Issued by

About this file

This document is a Bid Schedule for Solicitation 36C25224B0013 for the SCI Recreation Area Outdoor Construction project at the Edward Hines Jr. VA Hospital in Hines, IL.

The scope of work includes all labor, equipment, supplies, and materials necessary to construct a multi-sport recreational court between Buildings 221 and 1. The Base Bid requires the work to be completed within 240 calendar days, with a Lump Sum price requested. An Alternate Bid 1 is also included to provide separate pricing for removing work associated with a new structural canopy over an accessibility ramp, to be completed within 226 calendar days.

The solicitation states that award will be made to the responsible bidder submitting the lowest responsive bid, either on the Base Bid or Alternate Bid 1 if the Base Bid exceeds available funding. Bidders must submit a cost-loaded, approved Critical Path Method (CPM) construction schedule prior to starting work. The contracting agency is the Department of Veterans Affairs, Veterans Health Administration, Veterans Integrated Service Network 12.

View the file

Other files

File Type Posted
S02 - Att2 Snip of Physical Therapy Space.png PNG image
36C25224B0013 0005.docx DOCX document
S02 - Att1 CS101 Sheet Plan photos.pdf PDF
S02 - Att5 Insert A BID SCHEDULE.pdf PDF
S02 - Att1 IMG_3364.jpg JPG image
S02 - Att2 IMG_3365.jpg JPG image
S02 - Att3 CS101 Sheet Plan photos.pdf PDF
S02 - Att4 Site Visit Sign-in.pdf PDF
36C25224B0013 0004.docx DOCX document
S02 - Att1 SOW Revised RFI Update.pdf PDF
S02 - Att3 Site Visit 1 Sign-in.pdf PDF
36C25224B0013 0003.docx DOCX document
36C25224B0013 0002.docx DOCX document
36C25224B0013 0001.docx DOCX document
S02 - 8 Pre-Construction Risk Assessment PCRA.pdf PDF
36C25224B0013_1.docx DOCX document
S02 - 12 Contractor Parking.pdf PDF
S02 - 14 578-18-024 Specifications.pdf PDF
S02 - Att 19 Final SOW 578-18-024.pdf PDF
S02 - 1 Hines VA Campus Site Plan.pdf PDF
S02 - 9 Interim Life Safety Measures ILSM.pdf PDF
S02 - 10 Infection Control Risk Assessment ICRA.pdf PDF
S02 - 17 Photos Current Conditions.pdf PDF
S02 - 13 OIT Horizontal Cable Requirements 02.pdf PDF
S02 - 15 578-18-024 BOD.pdf PDF
S02 - 7 Above Ceiling Entry and Wall Construction Permits.pdf PDF
S02 - 4 Safety and Health During Construction Activities.pdf PDF
S02 - 16 578-18-024 Bid Documents P1.pdf PDF
S02 - 2 Hines Underground Utility Plan.pdf PDF
S02 - 16 578-18-024 Bid Documents P2.pdf PDF
S02 - Att 18 Wage Rate IL20240009 07.26.2024.pdf PDF
S02 - 5 Cutting Welding and Other Hot Work.pdf PDF
S02 - 3 Pre-Construction Checklist.pdf PDF
S02 - 11 Contractor PIV Instructions and Form.pdf PDF
S02 - 6 Dig Permit SOP Form.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID SCHEDULE

SOLICITATION: 36C25224B0013

PROJECT: SCI Recreation Area Outdoor Construction

STATEMENT OF BID ITEM(S)

The Scope of Work for this project includes all labor, management, equipment, supplies and materials necessary for constructing a multi-sport recreational court between Building 221 and Building 1. All measurements/dimensions are approximate, and the Contractor shall verify all measurements/dimensions.

Work location is on the campus of the Edward Hines Jr. VA Hospital at 5000 S. Fifth Avenue, Hines, IL 60141.

BASE BID:

All work shall be completed within 240 calendar days after receipt of the Notice to Proceed.

All-Inclusive Base Bid LUMP SUM: $ ___________________________

ALTERNATE BID 1:

Contractor shall provide separate pricing for the following alternate:

Remove all work associated with new structural canopy to be installed over the existing accessibility ramp leading into B221.

All work shall be completed within 226 calendar days after receipt of the Notice to Proceed.

All-Inclusive Alternate Bid 1 LUMP SUM: $ ___________________________

NOTICE TO BIDDERS: Award will be made to the responsible bidder who submitted the lowest responsive bid. A single award will be made on Base Bid, but in the event the offer exceeds the funds available, a single award will be made on Alternate Bid Item 1 based on available funding.

Offerors should quote a price on each item listed. Only one award will be made as a result of this solicitation.

For Bid Deducts, bidders should ensure that the all-inclusive price after the deductions are subtracted has been entered. Do not enter the amount of the deduction.

NOTICE TO BIDDERS: Work shall not commence until all required submittals are approved by the Contracting Officer or the Contracting Officer’s Representative (COR). An approved cost-loaded, Critical Path Method (CPM) construction schedule is required prior to commencement of construction. See specifications for details. CPM schedule shall be approved by the Contracting Officer or the Contracting Officer’s Representative. See specifications for details.

BID SCHEDULE