This document is a solicitation amendment (Amendment A0005) for Solicitation 36C25224B0013 for the project "SCI Recreational Area" at the Edward Hines Jr. VA Hospital. The amendment provides responses to Requests for Information (RFIs) from contractors, including clarification that the Superintendent can serve as either the Quality Control Manager (QCM) or the Site Safety and Health Officer (SSHO), and details on tree protection requirements and the drainage system. The amendment also extends the bid due date to October 15, 2024 at 11:00 AM CST. The solicitation is for outdoor construction work, and interested contractors are instructed to send all questions to the specified Contracting Officer. The amendment includes attachments with further details on the project.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION 36C25224B0013
AMENDMENT A0004
| PROJECT: SCI Reactional Area | DATE: October 9, 2024 | |
| PROJECT #: 578-18-024 | LOCATION: Edward Hines Jr. VA Hospital |
5. PROJECT NUMBER (if applicable)
CODE
7.
ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF
PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:
Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED
STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF
CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF
SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
578-25-1-6802-0001 578-25-1-6802-0001 578-18-024 Department of Veterans Affairs
GLAC (69D)
115 South 84th Street, Suite 101 Milwaukee WI 53214-1476 Department of Veterans Affairs
GLAC-MILWAUKEE (69D)
Great Lakes Acquisition Center - HC 115 South 84th Street, Suite 101 Milwaukee WI 53214-1476 To all Offerors/Bidders
36C25224B0013 10-09-2024
X X X ** HOUR & DATE for Receipt of Offers is EXTENDED to: October 15, at 11:00 a m CST
PROJECT: 578-18-024 SCI Recreational Area Amendment A0005 hereby incorporates the details listed below into the solicitation requirements.
"""See Continuation Page 2" A: RFI Questions / Responses
B. BID DATE EXTENDED
Roniece Ambrose Contracting Officer
| RFI # |
| RFI |
| REFERENCE |
| RESPONSE |
| Contractor 3 |
| 1) Can the Superintendent fulfill the Quality Control Manager (QCM) role? |
Superintendent can be EITHER QCM or SSHO.
2) If the Super cannot fulfill this role, the average ADDITIONAL cost for a dedicated QCM is approximately $26,500 per month (salary, labor burden, per diem, housing, company vehicle, monthly return trips home, company phone, etc). We expect the construction of this project to be 7 months long, and the bid is expected to increase by $185,500 Please confirm a dedicated QCM is still required.
Superintendent can be EITHER QCM or SSHO.
3) Can the Superintendent fulfill the Site Safety & Health (SSHO) role?
Superintendent can be EITHER QCM or SSHO.
4) If the Super cannot fulfill this role, the average ADDITIONAL cost for a dedicated SSHO is approximately $26,500 per month (salary, labor burden, per diem, housing, company vehicle, monthly return trips home, company phone, etc). We expect the construction of this project to be 7 months long, and the bid is expected to increase by $185,500. Please confirm a dedicated SSHO is still required.
Superintendent can be EITHER QCM or SSHO.
5) Our interpretation of 01 35 26, 1.7 in its reference to FAR 52.236-6 is that the prime contractor would be in compliance with this section if we have a Superintendent on-site during construction, as FAR 52.236-6 does not require (or mention for that matter) an SSHO and explicitly covers the prime contractor's Superintendent only. In short, an onsite SSHO is not a requirement per FAR 52.236-6. Please confirm.
Superintendent can be EITHER QCM or SSHO.
6) Is tuberculosis testing required before contractors can commence work onsite?
No TB Screening necessary
7) Where will the Infection Control Barrier (ICB) need to be installed?
3) and 4) For electrical and plumbing installations, accommodating selective demolition and repair/replacement of finishes, the use of plastic zip-walls as short-term barriers can be utilized along with containment carts for above ceiling work in areas with suspended ceilings. Barriers shall be removed when work is not being performed and work area where activities are ongoing should be fully cleaned and disinfected or covered with plastic prior to removal of ICRA barriers. The containment area shall be defined by the contractor based upon the extents of the work to be completed within a single shift and submitted to the Owner on a plan indicating location(s) of barriers, phases (if necessary) and duration of the barrier placement to complete the scope. Use of negative air and hepa filtration will be required within the containment area during active construction.
8) Will drawings for the location of ICB be provided?
3) and 4) For electrical and plumbing installations, accommodating selective demolition and repair/replacement of finishes, the use of plastic zip-walls as short-term barriers can be utilized along with containment carts for above ceiling work in areas with suspended ceilings. Barriers shall be removed when work is not being performed and work area where activities are ongoing should be fully cleaned and disinfected or covered with plastic prior to removal of ICRA barriers. The containment area shall be defined by the contractor based upon the extents of the work to be completed within a single shift and submitted to the Owner on a plan indicating location(s) of barriers, phases (if necessary) and duration of the barrier placement to complete the scope. Use of negative air and hepa filtration will be required within the containment area during active construction.
9) What types of ceilings will need to be removed to install the waterline in Building 221 for the bottle filler?
Panel ceiling see attachment
10) What types of ceilings will need to be removed to install the electrical wiring in Building 221 for the bottle filler?
Panel ceiling see attachment
11) What types of ceilings will need to be removed for the new electrical wiring circuits?
Panel ceiling see attachment
12) Please provide details on the tree protection materials.
Tree Protection detail added to CJ501 on attached drawing. In accordance with section 01 57 19 Temporary Environmental Controls 1.4 Submittals, Contractor will submit an Environmental Protection Plan describing Methods for protection of features to be preserved within authorize work areas including trees, shrubs, vines, grasses, ground cover, landscape features, air, and water quality. Fid and wildlife, soil, historical and archaeological and culture resources. EPP to be approved by COR.
13 Should the trees be protected with 2” x 4” Douglas Fir boards tied to their trunks?
Tree Protection detail added to CJ501 that is an acceptable method for your environmental protection plan submittal
14) Please confirm that ST-11 Manhole IE=617.00(SW) is at a lower elevation than the IE=618.97 (N) and that the existing (SW) line will not be able to properly drain into ST-11 and will hold water and likely clog and backup until it overflows at another existing location.
The outfall point for the site (ST 01) has an invert of 917.40. To ensure the proper function of the proposed drainage system, an approximate 2-foot deep sump will be required at ST 11. The current drainage system at the site, as surveyed, shows that the receiving storm manhole at the north end of the site has an invert elevation that is above the invert of the storm drain at the south end of the site. This existing manhole is the only point that the storm drainage for the site can drained to. This will result in the storm system for the site not operating optimally. The storm system is to be built based on the provided inverts.
| Contractor 4 |
| 15) Please confirm the staffing requirements for this project. Can one individual fill the role of Superintendent, SSHO, and QCM? |
Super CAN be either QCM or SSHO
16) Would appreciate some clarity for the “Fabric Canopy” design intent. Is this fabric intended to be waterproof or sun resistant? We can find no reference on drawings related to Key Note 13 (Canvas Awning) and need to confirm this is related to Fabric Canopy. Specification does not specify any Canvas Material. Only specifies PVC, PTFE and HDPE (as a substitute if specified). We understand what is required if the intent is to shade the area utilizing HDPE fabric as a shade structure. Otherwise we require additional details to properly price this structure.
VA and Guidon confirmed that sufficient information was provided in the specifications and basis of design materials.
17) On plan page SF501, Detail 7 shows the foundation section for the new canopy. The concrete pier has a depth of 15’-9”. Please confirm this is the required depth. This seems very deep for the required canopy.
Footings are conservatively designed due to unknown geotechnical information and variability in anticipated loading. Contractor to bid and install as shown on the contract drawings.
B. Bid Date extended:
Proposal Due DATE / TIME: October 15, 2024, at 11:00 a.m. CST.
ALL QUESTIONS REGARDING THIS SOLICITATION SHALL BE SENT TO THE FOLLOWING INDIVIDUALS:
Donita Grace -- Donita.Grace@va.gov This solicitation can be monitored on the https://sam.gov/content/opportunities Contractors shall ensure all amendments are acknowledged on Page 2 of the SF-1442.
See attached document: S02 - Att1 CS101 Sheet Plan photos.
See attached document: S02 - Att2 Snip of Physical Therapy Space.