36C25223B0026 0002.docx
DOCX document 29 KB Posted
- Solicitation number
- 36C25223B0026
About this file
This document is an amendment to a federal solicitation for roof repairs at three buildings on a Veterans Affairs campus. The solicitation is seeking replacement roofing on Buildings 113, 128, and 220. Responses to requests for information are provided, clarifying that formal drawings will not be issued, walkway pads do not need to be included, and aluminum sheet metal should be a minimum of 0.032 gauge. One loading dock bay can be used for work in shifts with one week's notice, and an alternate off-site area is available for longer-term use. The site superintendent must be on-site during work, and separate safety, quality control, and supervisory personnel are required. The response due date is extended to November 15, 2023, with requests for information due by October 25, 2023. The soliciting agency is the Department of Veterans Affairs Veterans Health Administration VISN 12.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:
Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 10-18-2023 578-24-1-6817-0001 578-23-010 36C252 Department of Veterans Affairs Great Lakes Acquisition Center (GLAC) 115 S. 84th Street, Suite 101 Milwaukee WI 53214-1476 36C252 Department of Veterans Affairs Great Lakes Acquisition Center (GLAC) 115 S. 84th Street, Suite 101 Milwaukee WI 53214-1476 To all Offerors/Bidders
36C25223B0026 09-05-2023
X X X November 15, 2023, 3:00 PM CST
578-3640162-6817-B54200-3220 23NR3MA32
X 578-23-010 (CON) Roof Repairs - Bldgs 113,128, & 220 This amendment is issued for the solicitation referenced in block 9A above. The reason for the amendment is to answer RFI's and extend the due date.
RFI's are due 3:00 PM CST on October 25, 2023.
Proposals are due 3:00 PM CST on November 15, 2023.
As a reminder, please submit via eCMS Vendor Portal.
RFI’s #2: (IFB) Solicitation 36C25223B0026 578-23-010 (CON) Roof Repairs - Bldgs 113,128, & 220
1. There is a reference to walkway pads in the spec but since there are no plans I'm not sure where they would be needed. Should we include an allowance (maybe "X" amount of lineal feet) in our bid? No.
2. There is a reference in the spec for field, perimeter, & comer pressures of 60 lbf/sq ft and also a reference to a lA-105 windstorm classification. Please clarify what is being expected. 1-60 or better
3. In the sheet metal specifications, I see they are looking for aluminum matreials. Can you clarify what gauge of aluminum is being expected (.032, .040, .050 or .063) per piece? .032 or better.
4. This was listed as a roof restoration but wanted to confirm with you that these buildings are all specified for replacement- is this correct? Yes.
5. Also is it possible to use a fluid applied roof system on qualified roof sections? No.
6. Please confirm if we are able to shut down the third bay of the loading dock for this work. One of bays of the loading dock can be used for 1 shift at a time if needed, provided there is one week notice given to the COR. The bay will not be available uninterruptedly for the duration of the project. It will be limited availability. The space across the street from the bays will be available to use for a prolonged uninterrupted period.
7. Will formal drawings be issued for this project? No.
8. How many full-time individuals will GC be required to have onsite during performance of work? GC needs to have a site superintendent on-site during performance of work.
9. Do SSHO and QC need to be separate individuals? Yes. SSHO and Site Superintendent can be same person. But QC must be a separate individual.
a. Or can SSHO & QC be same person? No. SSHO and Site Superintendent can be same person. But QC must be a separate individual.
See attached document: P07 Wage Determination 9.22.23.
578-23-010 (CON) Roof Repairs - Bldgs 113,128, & 220
File details come from the government source that posted it. Updated .