36C25223B0026 0001.docx
DOCX document 1004 KB Posted
- Solicitation number
- 36C25223B0026
About this file
This solicitation is for roof repair services at three buildings on the Edward Hines Jr. VA Hospital campus in Hines, Illinois. The selected contractor will remove and replace the existing roof systems on Buildings 113, 128, and 220 with new thermoplastic polyolefin (TPO) single-ply membrane roofs. The total area of roofing to be replaced is approximately 132,500 square feet. Bids are requested for a base scope of work including all three buildings, as well as an alternate scope for Buildings 113 and 220 only. The project is to be completed within 385 calendar days of the notice to proceed. Interested offerors must submit bids for both the base and alternate scopes by November 1, 2023.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 10-4-2023 578-24-1-6817-0001 578-23-010 36C252 Department of Veterans Affairs Great Lakes Acquisition Center (GLAC) 115 S. 84th Street, Suite 101 Milwaukee WI 53214-1476 36C252 Department of Veterans Affairs Great Lakes Acquisition Center (GLAC) 115 S. 84th Street, Suite 101 Milwaukee WI 53214-1476 To all Offerors/Bidders
36C25223B0026 09-05-2023
X November 1, 2023, 3:00 PM CST
578-3640162-6817-B54200-3220 23NR3MA32
X 578-23-010 (CON) Roof Repairs - Bldgs 113,128, & 220 This amendment is issued for the solicitation referenced in block 9A above. The reason for the amendment is to answer RFI's, provide new Bid Schedule, updated SOW, and extend the due date.
RFI's are due 3:00 PM CST on October 11, 2023.
Proposals are due 3:00 PM CST on November 1, 2023.
As a reminder, please submit via eCMS Vendor Portal.
BID SCHEDULE
578-23-010 (CON) Roof Repairs – Bldg 113, 128, & 220 Solicitation Number 36C25223B0026
BASE BID
Contractor shall provide for and furnish all labor, materials, equipment, tools, supervision, and all other items designated in this task order in accordance with the scope of work, drawings, and specifications to complete Project 578-23-010 (CON) Roof Repairs - Bldgs 113,128, & 220 at Hines VA Hospital, Hines, Illinois 60141.
Work includes general construction, alterations, removal of the existing roofing system and replace with a new roof. Including roofing structure repairs, debris removal, and protection of the existing roof to prevent leaks into the buildings 113, 128 and 220 during demolition and reconstruction at Edward Hines Jr. VA campus.
All work shall be completed within 385 Calendar Days after the issuance of the Notice to Proceed.
BASE BID: Location 1 – Building 113, Location 2 – Building 220, Location 3 – Building 128
Base Bid Lump Sum $______________________ ALTERNATE BID ITEM 1: Includes all work in the Base Bid, except deleting Location 3 – Building 128.
All work shall be completed within 325 Calendar Days after the issuance of the Notice to Proceed.
Alternate Bid Item 1 Lump Sum $______________________ NOTICE TO BIDDERS: Award will be made to the responsible bidder who submitted the lowest responsive bid. A single award will be made on Base Bid, but in the event the offer exceeds the funds available, a single award will be made on Alternate Bid Item 1, based on available funding. Offerors should quote a price on each item listed. Only one award will be made as a result of this solicitation.
For Bid Deducts, bidders should ensure that the all-inclusive price after the deductions are subtracted has been entered. Do not enter the amount of the deduction. All offerors must submit an offer for both the Base and Alternate Bid Item, or they will be determined non-responsive.
Work shall not commence until all required submittals are approved by the Contracting Officer or the Contracting Officer’s Representative (COR). An approved cost-loaded, Critical Path Method (CPM) construction schedule is required prior to commencement of construction. See specifications for details.
Statement of Work
Roof Repairs - Buildings 113, 128, & 220 Project 578-23-010
October 3, 2023
| Attachments: | 1) | Hines VA Campus Site Plan |
| 2) | Pre-Construction Checklist | |
| 3) | Safety and Health during Construction Activities | |
| A | Pre-construction/Safety Risk Assessment (PCRA) | |
| B | National Environmental Protection Act Assessment (NEPA) | |
| C | Construction Safety Checklist | |
| D | GEMS Awareness Competent Person Training | |
| E | Construction Project Waste Minimization Report | |
| F | Hines VAH Contractor Safety Disciplinary Procedure | |
| G | Hines VAH COR Letter of Concern for Safety Non-Compliance | |
| H | OSHA Required Competent Person Inspections | |
| I | Crane Operation and Minimum Criteria On-Site Inspection Checklist | |
| J | Hines VA Hospital Planned Critical Lift Plan & Crane Permit | |
| 4) | Cutting Welding and Other Hot Work | |
| 5) | Pre-Construction Risk Assessment (PCRA) | |
| 6) | Interim Life Safety Measures (ILSM) | |
| 7) | Infection Control Risk Assessment (ICRA) | |
| 8) | Contractor PIV Instructions and Form | |
| 9) | Contractor Parking | |
| 10) | Specifications Book | |
| 11) | No Smoking Policy 10-1-19 | |
| 12) | Hines COVID-19 Guidelines | |
| 13) | Existing Photos | |
| 14) | Hines roof core samples | |
| 15) | Building 220 Lower | |
| 15) | SAT Bldg 113, 128, 220 |
| References: | 1) | VA’s Technical Information Library (TIL) |
| 2) | Master Construction Specifications (PG-18-1) | |
| 3) | Standard Details (PG-18-4) | |
| 4) | Environmental Planning Guidance (PG-18-17) |
A) Mission.
Engineering Service’s mission is the total oversight and management of the environment of care, as it pertains to the physical infrastructure and base plant operations, at the Edward Hines VA Hospital. Engineering support is for customers that include, but are not limited to, patients, visitors, clinic staff and administrative employees.
B) Goals.
The goal of this project is to provide all the necessary equipment, management, labor, travel, tools, materials, and supplies to replace the existing roof systems in buildings 113, 128, and 220.
C) Current Conditions.
Currently, the condition of roofs at building 113, 128, 220 has exceeded its life expectancy, and is now in a state of failure. The 2022 facility condition assessment (FCA) has issued a grade of “D” for building 113 (16159) and for building 128 (161605).
D) Justification.
There is approximately 27,000 square feet of roof space on building 113, approximately 53,500 square feet of roof space on building 128, and approximately 52,000 square feet of roof space on building 220. By exceeding the life expectancy of these roofs, leaks and deterioration has increased, and is causing an inconvenience to patients, staff, and visitors.
E) Objectives.
The objectives of this project are to:
1. Remove existing roofing system entirely. The contractor is responsible for disposal.
2. Repair any damaged infrastructure or equipment if damaged during removal.
3. Install new roofing.
4. Ensure roofing is installed correctly around equipment, curbs, and parapet walls to prevent leaks.
F) Acronyms and Definitions.
The following is a listing of acronyms and/or definitions to terms that may be used in this document.
| CO | Contracting Officer | |
| COR | Contracting Officers Representative as delegated by the CO | |
| CS | Contracting Specialist assigned by the CO | |
| EHVAH | Edward Hines Veterans Affairs Hospital | |
| GC | General Contractor (firm) | |
| IDIQ | Indefinite Delivery Indefinite Quantity | |
| LF | Linear or Lineal Feet | |
| NTP | Notice to Proceed | |
| OIT | Office of Information & Technology | |
| PDT | Project Delivery Team – Typically comprised of the CO/CS, the COR, and EHVAH staff | |
| RFI | Request for Information | |
| SF | Square Feet | |
| VA | Department of Veteran Affairs |
G) Requirements.
Where a conflict exists between the Statement of Work (SOW) requirements and the requirements of other associated contract documents, the SOW requirements shall prevail.
This SOW presumes the Contractor will not need access to the Hines LAN or any VA Sensitive Information to execute the contract.
The awarded Contractor will adhere to all codes, standards, guidelines, and design requirements found in the VA’s Technical Information Library (TIL) including but not limited to the following:
1) Pre-bid site visit:
a. A pre-construction site walk through is encouraged and should be coordinated by the CO. The intent of this walkthrough is to give the Contractor access to the project site so that an accurate evaluation of the project requirements and site assessment can be made.
b. The Contractor shall coordinate with the CO to schedule the site visit seven (7) calendar days prior to the requested date. See Clause 52.236-27 Site Visit for Pre-Bid Site visit information.
2) RFI Submittals:
a. The Contractor shall submit any RFI’s resulting from the site visit within five (5) working days after the inspection to the CO.
b. Unless otherwise stated the Contractor shall allow the COR and CO ten (10) working days to respond to an RFI.
3) The Contractor shall post and maintain the final signed PCRA, ICRA, ILSM and Emergency Contact Information (when issued) at the entrance to each roof for the duration of the project. The Contractor will update the postings when new documents are issued.
4) Lead time:
a. The contractor shall make an informed bid submission by working with suppliers and considering all potential long-lead items involved with the project reasonably known or considered to impact the start, performance, and completion of the project.
b. The contractor shall bear the cost of temporary materials, equipment, labor, and services for the time period between the end of the period of performance and the final installation of the contract’s specified materials and equipment.
c. Lead times line shall be incorporated into the project schedule and used in conjunction with the baseline for the project start date.
5) EHVAH Permits:
a. Unless otherwise stated the Contractor shall submit for all required VA permits (i.e. above ceiling or dig) fourteen (14) calendar days prior to the event based on the approved project schedule with the COR.
6) Project Pay Applications:
a. All submitted project pay applications require certified payroll and waste report documents to be current with each pay submission.
b. Certified payroll documents shall be submitted to the COR weekly.
c. Approval of all invoices will require documents to be current.
7) Work outside of normal business hours or weekends:
a. All work performed after hours or on weekends requires coordination with the COR and shall be requested fourteen (14) calendar days prior in writing or e-mail to the COR for approval.
b. No work shall take place without written or e-mail confirmation from the project COR.
8) Utility Shutdowns:
a. The Contractor shall provide twenty-one (21) calendar days’ advance notice for any planned utility shutdowns to all allow the station to notify staff/visitors and prepare contingency plans if necessary.
b. Planned utility shutdowns should be indicated on the project schedule.
9) Submittals and Shop Drawings:
a. Unless otherwise stated the Contractor shall provide shop drawings and equipment submittals for review and approval by the COR seven (7) calendar days prior to the start of construction.
b. No work shall be started prior to review and approval by the COR.
10) Certifications:
a. When applicable, the Contractor shall provide certifications for all personnel performing any welding and shall certify all welds prior to the start-up of any of the units.
b. These certifications shall be supplied to the COR and retained as a permanent record of the project folder.
c. Personnel certifications shall be provided to the COR prior to the start of construction.
d. All weld certifications shall be provided to the COR at the end of every work week when applicable.
11) OSHA Certification:
a. The Contractor shall have an OSHA certified site superintendent on site whenever any work is being performed.
b. A copy of the OSHA certification shall be supplied to the COR prior to the start of any work and retained as part of the project folder.
12) Post-Award meeting:
a. The meeting shall be coordinated through the COR and CS/CO.
b. The Notice to Proceed will be issued at this meeting.
H) Scope of Work.
1) Continued Use – The Medical Center maintains operations 24 hours a day, 7 days a week. Therefore, any interruption in service must be scheduled and coordinated with the COR to ensure that no lapses in operation occur. It is the Contractor’s responsibility to develop a work plan and schedule detailing, at a minimum, the procedures to be employed, the equipment and materials to be used, the interim life safety measure to be used during the work, and a schedule defining the duration of the work with milestone subtasks.
2) General Notes:
a. The Contractor shall provide all the necessary equipment, management, labor, travel, tools, materials, and supplies to repair and upgrade the roofing system at building 113, 128 and 220 at Hines VA campus.
b. The Contractor shall inspect the area under contract prior to commencing work and identify any pre-existing damage and provide an Existing Site Conditions report with related photos to the Contracting Officer for review and approval.
c. The contractor shall be responsible for debris removal, and protection of the existing roof to prevent leaks into the building while work is in progress.
d. The contractor shall be responsible for protecting the surrounding areas and grounds while work is in progress; and shall restore any damaged areas to its original state.
e. Any deviation from this scope of work requires the express authorization of the Contracting Officer. The Contracting Officer Representative (COR) does not hold the authority to authorize changes to this scope of work.
f. The contractor will remove the existing roofing system and replace with a new roof and material outlined below.
g. All measurements/dimensions are approximate. The Contractor must verify all measurements/dimensions.
h. The contractor shall follow the manufacturer installation guidelines and recommendation for installation.
i. At project completion the contractor shall provide closeout documents including manufacturer data, maintenance information and roof warranty documents.
3) Locations – The project work has three (3) locations. See Attachment 1.
a. Location 1 – Building 113
b. Location 2 – Building 220
c. Location 3 – Building 128
4) Bids—The contractor shall submit bids for the following bid categories. The project may be awarded for the complete Base Bid or for the Alternate Bid depending upon the availability of funds.
| a. Base Bid: | Location 1, Location 2, and Location 3. |
| b. Alternate Bid 1: | Location 1 and Location 2. |
5) Location 1 – Building 113
a. Demolition:
1. Remove aluminum flashing and coping. Save coping for reinstallation. Contractor to replace coping that cannot be salvaged.
2. Remove lightning rods, clamps, and cable, save for reinstallation, and deliver to Hines Engineering.
3. Remove all existing roofing system materials, down to the structural deck. Roof is comprised of EPDM, two (2) layers of 2-inch insulation, and vapor barrier over a concrete deck. Concrete will stay in place.
b. Installation:
1. Install new vapor barrier, two (2) layers of 2-inch insulation, tapered insulation at drain locations, and ½” cover board. Contractor to ensure sufficient drainage flow to minimize ponding on the roof. Contractor to follow manufacturer’s instructions for adhering.
2. Install new roof membrane. Roof membrane to be Thermoplastic Polyolefin (TPO), white, and 80 mil.
3. Install new flashing. Flashing to be white.
4. Install coping that was removed during demolition phase.
5. Install lightning rods and cable that was removed during demolition phase.
4. Install new coping that was removed during demolition phase
6) Location 2 – Building 220
a. Demolition:
1. Remove aluminum flashing.
2. Remove all existing roofing system materials comprised of ballast stone, EPDM, 2-inch insulation, and vapor barrier, down to the concrete deck. (Please note that lower roof is comprised of metal deck with no concrete underlayment)
b. Installation:
1. Install new vapor barrier, 2-inch insulation, tapered insulation at drains, and ½ inch cover board. (Please note that lower roof requires a 5/8-inch underlayment between metal deck and vapor barrier) Contractor to ensure sufficient drainage flow to minimize ponding on the roof. Contractor to follow manufacturer’s instructions for installation.
2. Install new roof membrane. Roof membrane to be TPO, white, and 80 mil.
3. Install new dark brown flashing, ES-1 rated metal edging, with proper securing and caulking.
7) Location 3 – Building 128
a. Demolition:
1. Remove aluminum flashing and coping. Save coping for reinstallation. Contractor to replace coping that cannot be salvaged.
2. Remove lightning rods, clamps, and cable, save for reinstallation. and deliver to Hines Engineering.
3. Remove gutters.
4. Remove all existing roofing system materials, down to the structural deck. Roof is comprised of EPDM, two (2) layers of 2-inch insulation, and vapor barrier over a concrete deck. Concrete will stay in place.
b. Installation:
1. Install new vapor barrier, two (2) layers of 2-inch insulation, tapered insulation at drain locations, and ½” cover board. Contractor to ensure sufficient drainage flow to minimize ponding on the roof. Contractor to follow manufacturer’s instructions for adhering.
2. Install new roof membrane. Roof membrane to be TPO, white, and 80 mil.
3. Install new flashing. Flashing to be white.
4. Install new gutters at the locations they were removed.
5. Install coping that was removed during demolition phase.
6. Install lightning rods and cable that was removed during demolition phase.
Install new coping that was removed during demolition phase.
I) Constraints.
1) Work hours for EHVAH staff are from 6:30 am until 5:00 pm, Monday through Friday.
2) Photographs may be taken of the work performed at the jobsite. However, photographs containing patients and/or staff are a violation of the Patient Privacy and hospital policy. Both violations are subject to penalties and dismissal. Permission from the EHVAH Public Affairs Officer (PAO) is required and should be coordinated with the project COR.
3) Exploratory demolition is permitted but must be coordinated with the COR.
4) VHA Directive 1085 implements a smoke-free policy for patients, visitors, contractors, volunteers, and vendors at VA health care facilities.
5) Maximizing Use of American-Made Goods, Products, and Materials
a. The Buy American Act required the United States government to prefer U.S.-made products in its purchases.
b. It is the policy of the United States to buy American and to maximize, consistent with law, the use of goods, products, and materials produced in the United States.
c. Material purchases should adhere to this policy to the greatest extent possible.
6) All Contractors visiting the jobsite will need to receive a temporary PIV badge. The procedure to follow is:
a. Contractors must FIRST get their fingerprints done by Human Resources located in Building 17.
b. It takes between 3-5 days at least for fingerprints clear.
c. Once fingerprints have cleared the person requesting a badge can be sponsored.
d. The Contractor must then complete a “Request for a PIV card” form. See Attachment 8 and then turn in to the Engineering Services.
e. The Contractor can then be sponsored upon verification the fingerprints have been cleared.
f. Once the Contractor has been sponsored the COR, they can call PIV (708) 202-5170 to arrangement for issuance of a PIV for badge.
J) Tasks and Responsibilities.
A pre-construction (kick-off) meeting between the Contracting Officer (CO) or Contracting Specialist (CS), the Contracting Officers Representative (COR), and key GC team members will be conducted to review project objectives, scope, deliverables, communication, site access, schedule, and responsibilities. During this meeting the Notice to Proceed (NTP) should be signed. After this meeting the awarded GC firm shall provide their services according to the approved project schedule.
1) Preconstruction Period: The Contractor shall provide the following:
a. Logistics Plan: A comprehensive narrative describing the chronological planned development of the project. The Logistics Plan includes an organizational chart, hourly rates, staging plan, description of means and methods, and hours of work.
b. Construction Security Plan: Defines both physical and administrative security.
c. Construction Phasing Plan: It is the Contractor’s responsibility to develop a work plan and schedule detailing, at a minimum, the procedures to be employed, the equipment and materials to be used, the interim life safety measure to be used during the work, and a schedule defining the duration of the work with milestone subtasks.
d. Submittal Registry: The Submittal Registry shall include a listing of all documentation required for pre-approved submissions including shop drawings, technical data, product performance information, calculations, and samples.
e. Accident Prevention Plan: The APP (aka Construction Safety & Health Plan) shall interface with the Contractor's overall safety and health program.
f. Activity Hazard Analyses: AHAs are also known as Job Hazard Analyses, Job Safety Analyses, and Activity Safety Analyses.
g. Construction Schedule: WBS schedule including start/end dates, duration, and sequencing, preferably in MS Project or Primavera format (include floats).
h. Schedule of Values: A detailed Breakdown for Payment, including design stages, work performed, and work invoiced per Progress Payment submission.
i. Existing Conditions Survey: Before any work is started, the Contractor shall make a thorough survey with the COR of the buildings or areas of buildings in which alterations occur and areas which are anticipated routes of access, and furnish a report, signed by both, to the Contracting Officer.
j. Infection Control Plan (ICP): Narrative description of the dust control and debris disposal process including disposal destination and methodology.
k. Quality Control Plan (QCP): Describes the methods by which the Contractor will ensure all work is being accomplished in accordance with specifications and this SOW.
l. Environmental Protection Plan: The Contractor shall meet with the COR to discuss the proposed Environmental Protection Plan and to develop mutual understanding relative to details of environmental protection.
m. Document Submissions. All documents included as Attachments to this SOW that are required to be filled out and signed or jointly signed by the Contractor.
n. Demolition Debris Management Plan.
o. Certificates, Licenses, and Training Documents.
p. Obtain PIV badges.
q. RFI’s: Other than those resulting directly from demolition or construction.
2) Construction Period: The Contractor shall provide the following during construction services:
a. Display the signed PCRA, ICRA, ILSM and Emergency Contact Information in a location coordinated with the COR.
b. Attending biweekly construction meetings which are facilitated by the COR.
c. Submit RFI’s during construction as necessary.
d. Issue biweekly field reports of construction progress to the COR.
e. Attend field inspections and punch list inspections as requested by the COR.
3) Construction Close-out Period:
a. The Contractor shall provide the following:
1. Inspection and Approval by the COR and/or the CO.
2. Final Approval and Beneficial Occupancy when applicable.
3. Warranties documents and O&M Manuals.
4. As-built drawings and record submittals.
5. Staff training when applicable.
6. Contractor Release of Claims.
7. All Waste Reports submitted per Safety and Health during Construction Activities.
8. Existing Conditions Re-survey.
b. The COR shall review the Contractor’s close-out submissions for thoroughness and conformance with the contract document requirements. The COR shall also review field-marked as-built drawings for conformance with final installations.
c. The COR shall utilize these as-built drawings and specifications from the Contractor and generate as recorded drawings and specifications.
K) Deliverables.
1) The Contractor shall provide all submittals required by the Specifications Book.
L) Time Frames.
1) This project shall be completed within Three Hundred Eighty-Five (385) calendar days once NTP is issued.
a. Phasing – This project shall be executed in up to three phases.
i. Contractor will be allowed to work at multiple locations at once.
b. Pre-construction (kick-off) Meeting is when the Notice to Proceed (NTP) is signed.
c. Pre-Construction Period duration is NTP + 30 calendar days. Within this period the Contractor shall provide all materials included under Tasks and Responsibilities and the following:
1. Logistics Plan.
2. Construction Security Plan.
3. Construction Phasing Plan.
4. Submittal Registry.
5. Accident Prevention Plan.
6. Activity Hazard Analyses.
7. Construction Schedule.
8. Schedule of Values.
9. Existing Conditions Survey.
10. Infection Control Plan.
11. Quality Control Plan.
12. Environmental Protection Plan.
13. Document Submissions.
14. Demolition Debris Management Plan.
15. Certificates, Licenses, and Training Documents.
16. Obtain PIV badges.
d. Construction Period - To be determined based upon the approved schedule for construction. The estimated construction period is 180 calendar days (60 days per roof) with all product submittals to be delivered prior to the start of construction to the COR for review and approval. No demolition or construction shall be started without the review and approval from the COR for those items listed in the Pre-Construction Period unless authorized in writing by the COR or the CO. All construction is subject to outside weather conditions with no cost work suspensions during winter months December, January, February, and March; all rain days with no active, outdoor workers; all cold days when materials/adhesives go against manufacturers recommendations.
e. Construction Closeout Period duration is NTP + 385 calendar days. The Contractor shall submit within 30 calendar days from EHVAH acceptance of the completed punch list items and commissioning reports (if applicable). Within this period the Contractor shall provide all materials included under Tasks and Responsibilities and the following:
1. Inspection and Approval by the COR and/or the CO.
2. Final Approval and Beneficial Occupancy when applicable.
3. Warranties documents and O&M Manuals.
4. As-built drawings and record submittals.
5. Staff training when applicable.
6. Contractor Release of Claims.
7. Waste Reports.
8. Existing Conditions Re-survey.
M) Performance Monitoring.
The Government will periodically evaluate the Contractor’s performance by appointing a representative(s) to monitor such performance and ensure services are received. The Government representative will evaluate the Contractor’s performance through intermittent on-site inspections of the Contractor's performance.
N) Other Pertinent Information or Special Considerations.
1) All Contractor personnel shall be certified by appropriate federal and state regulatory agencies to meet federal and local certification requirements as applicable. All licenses, permits, and welding certifications shall be kept current throughout the period of performance of the contract. The Contractor shall provide the Government copies of such certificates.
2) Per VA Information Security Program policy – VA Directive and Handbook 6500 and 6500.6, Appendix A, contractor storage, generation, transmission or exchanging of VA sensitive information during this construction project is not acceptable.
3) All work shall be scheduled to meet requirements of EHVAH. All work shall be coordinated through the Contracting Officer. Local coordination shall be routed through the Contracting Officer’s Representative.
4) The Contractor shall provide to the Contracting Officer record of work certifications for all trade’s relative to this contract 5 calendar days prior to beginning work. Certifications shall include welders, pipe installers, machine operators, etc.
5) The Contractor is responsible for repairing any damages to existing utilities incurred during construction or demolition.
6) Utilities within the area and identified on existing drawings are not to be interpreted as the exact location, or as the only existing site conditions. The Contractor shall verify all existing conditions and proceed with caution around any anticipated obstructions.
7) Where any work disturbs the grass areas, sod, walls, ceilings, floors, windows, entrances or building structures, etc. or where new and old work join, the Contractor shall restore, repair, or refinish affected areas or surfaces to their original condition, or as existed before the commencement of this project. Upon completion of the contract, the Contractor shall deliver all work complete and undamaged. Any damage that may be caused by the Contractor or his work crews or subcontractors to any existing structure, grounds and utilities shall be repaired or replaced to their original condition.
8) Should a conflict exist between VA requirements and VA adopted nationally recognized codes and standards, the conflict shall be brought to the attention of the Contracting Officer. The resolution of the conflict shall be made by the authority having jurisdiction for VA to ensure system-wide consistency. All work conducted under this scope of work shall comply with the Department of Veterans Affairs Master Specifications and all applicable state and federal regulations and codes.
O) Risk Control.
1) Refer to the attached ICRA form.
P) Government Furnished Equipment (GFE)/Government Furnished Information (GFI).
1) GFE.
a. None
2) GFI.
a. Hines is responsible for re-installation of lightning rods removed from Bldgs 113 and 128.
b. Hines will ensure areas of material storage, dumpster space, and crane/lifts be provided per building for adequate movement and safety of contractor and Hines patients/staff.
Q) Point of Contact at the EHVAH.
1) Samir Qaisar Healthcare Engineer, Project Planning Section Engineering Service Edward Hines Jr. VA Hospital 5000 S. Fifth Avenue Building 2, Room 121 Hines, IL 60141 Samir.qaisar@va.gov Phone: 708-202-8387 ext. 21153
2) Jason Sareny Project Manager EHVAH, Building 2, Room 011a Jason.Sareny@va.gov 708 506-4329
RFI’s ~ (IFB) Solicitation 36C25223B0026 578-23-010 (CON) Roof Repairs - Bldgs 113,128, & 220
1. Solicitation states “The project magnitude price range is between $5,000,000 and $10,000,000. The North American Industry Classification Code (NAICS) for this procurement is 238160 (Roofing Contractors); SBA Size Standard $45 Million.” SBA states the size limitation on this NAICS code is $14 Million. Please clarify.
A. Correction on Page 1: The North American Industry Classification Code (NAICS) for this procurement is 238160 (Roofing Contractors); SBA Size Standard $19 Million. Please see Table of Size Standards_Effective March 17, 2023 (2).pdf (sba.gov)
2. There is a conflict between the TPO spec and the SOW for membrane and insulation thickness. Are we to follow what is described in the SOW?
A. Yes, the SOW supersedes specifications.
3. Please verify whether we will be able to use the south most loading dock at building 220 for crane and dumpster staging.
Yes, please see Att 1 – SAT Bldg 113, 128, 220. Location and timing of placing the dumpster and crane to be coordinated with the COR after the project is awarded.
4. Can the roof deck types be verified on the upper and lower roofs at Building 220 thank you?
A. Upper roof has concrete structure over metal. Lower roof does not have concrete structure under vapor barrier and insulation, just corrugated metal.
5. There is new power ventilation equipment installed on roof 128 which is to rigid to reroof around without them being removed and reinstalled. Will Hines shut down, remove and reinstall these power vents?
A. Exhaust system on roof to remain operational through construction. Contractor shall provide temporary support for the ducting/filter box and then install the new supports before removing the temporary supports.
6. There is some lightning protection on buildings #113 & #128 that will need to be removed and reinstalled to accommodate the re-roofing project. I have 2 questions. Removal and delivery to Hines Engineering only. Hines will be responsible for re-installation.
a. Is there a "preferred contractor" that the hospital uses for lightning protection? No
b. Does the lightning protection need to be re-certified after reinstallation? No
7. I am a bit confused with the insulation spec/expectations.
a. Are you looking for a full tapered insulation package per roof area?
No, only small areas of tapered insulation at roof drains.
b. Or should we just include flat insulation to meet the stated overall average R-Value of R 36? “in-kind” insulation to match existing.
c. Are we to include roof sumps at the roof drains? No.
8. The new insulation will be higher than the existing insulation which will raise the height at roof curbs and perimeter edges. New roof will only be ¼”-3/8” higher than existing roof line. EXCEPTION: Lower roof of Bldg 220 will become 1 1/8”-1 1/4” higher due to need of 5/8” underlayment to corrugated metal structure.
a. How will the mechanical, electrical, & plumbing dis-connect and re-connects be handled? Hines Engineering is responsible.
b. Does the hospital have "in house" contractors that will handle this part of the work? Yes, Engineering will do a walk through and physically mark penetrations in roofs that can be reduced and inspect areas of mechanicals that can possibly be affected. Any affected areas/eliminations will be handled by Hines in-house engineering staff.
c. Or is there an allowance we should figure so everyone is on the same level playing field? No
9. Can you provide the areas we will have available for set-up so we can figure out how we will get materials, equipment, and debris removal to and from the roof areas? Yes, please see Att 1 – SAT Bldg 113, 128, 220. Location and timing of placing the dumpster to be coordinated with the COR after the project is awarded.
10. Can you clarify if the TPO roof membrane is to be fleece back or bare back? Bare Back.
11. It appears to me that the intention of the insulation system is as follows:
· Furnish and install a base layer of 5/8" gyp board mechanically attached to the roof deck and then furnish and install a fully adhered self-sealing vapor barrier. Only at lower roof of Bldg 220. Structural concrete on all other roof locations do not need 5/8” underlayment. Structural Concrete will remain throughout.
· Above the vapor barrier we will furnish and install the roof insulation, after clarification of question #2 above, (with an average R-value of R=36) and a coverboard of 5/8" gyp board. The SOW specifies ½” coverboard, not gyp board.
a. My question is, is it the intent to adhere all layers (insulation and coverboard) above the vapor barrier? Yes, fully adhered.
b. Or will it be acceptable to mechanically attach all layers simultaneously thru the vapor barrier and into the roof deck? All layers Fully Adhered. Exception: Lower roof of Bldg 220 will require mechanical fastening for 5/8” underlayment and specifications from manufacturers requirements MUST be followed on all materials approved through Hines Engineers.
12. In the specs it is calling out for the vapor barrier over the concrete roof deck to be a 2-ply Type IV felts set in hot asphalt. Would it be acceptable to use the fully adhered self-sealing vapor barrier in lieu of the 2 ply Type VI felts? Yes. 40mil self-adhering is preferred.
13. Solicitation is unclear if walk pads are needed? No.
a. Are we to follow the current walk pad layout on the roofs? No.
b. Please identify where walk pads are required by the VA. No walk-pads are required. The addition of ½” coverboard diminishes the need for walk pads.
14. None of the existing roofs currently meet energy code requirements. Please confirm that the insulation is to be replaced "in kind". Yes “in-kind” insulation. EXCEPTION: Vapor Barriers and coverboards will be upgraded from existing.
15. Please confirm that we are to temporarily remove the lightning protection and re-install to original locations. Yes on removal, no for reinstall.
a. And that no certification of the system is required. No, removal only.
16. The existing copings on bldgs. 113 and 128 are to be salvaged for re-installation. Are we to provide a unit cost for replacement of any damaged or deteriorated sections? All existing coping is to be replaced.
17. Is a pre-manufactured, prefinished ES-1 rated metal edge at bldg. 220 to be installed? Yes.
a. If it is than the metal edge product would be included in the manufacturer’s warranty. Yes
18. Potential areas were discussed at the walk through, please provide lay down/dumpster locations at each building. See Att 1 – SAT Bldg 113, 128, 220. Location and timing of placing the dumpster to be coordinated with the COR after the project is awarded.
19. Based on temperature sensitivity, would it be acceptable to use a low VOC bonding adhesive, which meets low VOC requirements as stated in the bid documents in lieu of water based adhesive? Yes.
20. The building at various locations have small condenser units including 2 Communicable disease contaminated air units. These will have to be disconnected for the roofing project. Will the VA be responsible for the disconnect and reconnect?
A. Please clarify which Bldg you are referring to for the condenser units.
21. The specs state to meet current R value SOW says to replace current insulation with currently in place. Which is correct the SOW or the Specifications. SOW
22. It is not apparent from the bid documents is the VA looking for replacement of roof with the current height of the insulation, a full tapered insulation package per roof area that achieves R-Value of 36? Replacement will be “in-kind” of insulation with small areas of tapered insulation at drain locations and the addition of thicker coverboard.
a. Or flat insulation to meet the stated overall average R-Value of R=36? Replacement will be “in-kind” of insulation with small areas of tapered insulation at drain locations and the addition of thicker coverboard.
b. Are roof sumps to be included? No roof sumps.
23. If new insulation needs to have an R-Value R=36 the new insulation will be higher than the existing insulation which will raise the height at roof curbs and perimeter edges. New roof will only be ¼”-3/8” higher than existing roof line. EXCEPTION: Lower roof of Bldg 220 will become 1”-1 1/8” higher due to need of 5/8” underlayment to corrugated metal structure.
a. How will the mechanical, electrical, & plumbing dis-connect and re-connects be handled? Engineering will do a walk through and physically mark penetrations in roofs that can be reduced and inspect areas of mechanicals that can possibly be affected. Any affected areas/eliminations will be handled by Hines in-house engineering staff.
24. Will the VA handle all the disconnects? Yes.
a. Or is this to be included in the bid? No
25. Can you clarification be provided if the TPO roof membrane is to be fleece back or bare back? Bare back.
26. Is the VA's intent to adhere all layers (insulation and coverboard) above the vapor barrier? All layers Fully Adhered. Exception: Lower roof of Bldg 220 will require mechanical fastening for 5/8” underlayment and specifications from manufacturers requirements MUST be followed on all materials approved through the COR.
a. Or will it be acceptable to mechanically attach all layers simultaneously thru the vapor barrier and into the roof deck? All layers Fully Adhered. Exception: Lower roof of Bldg 220 will require mechanical fastening for 5/8” underlayment and specifications from manufacturers requirements MUST be followed on all materials approved through COR.
27. In the specs it is calling out for the vapor barrier over the concrete roof deck to be a 2-ply Type IV felts set in hot asphalt. Would it be acceptable to use the fully adhered self-sealing vapor barrier in lieu of the 2 ply Type VI felts? Yes. 40mil self-adhering is preferred.
28. There is a reference in the spec for field, perimeter, & corner pressures of 60 )bf/sq ft and also a reference to a lA-105 windstorm classification. Please clarify what is being expected. International Bldg Code ES 1 - Rated edge metal. The documents/calculations to be submitted to COR before commencing the installation. Installation will proceed upon COR’s approval.
29. In the specifications it is unclear what type of metal to use at counterflashing and perimeter metal. Please clarify.
Picture below represents current system.
a. If aluminum materials are to be used please clarify what gauge of aluminum is being expected (.032, .040, .050 or .063) per piece?
.032 or better.
30. What color is expected for the counterflashing, gravel stop/drip edges, & coping sheet metal (standard color, metallic color, or custom color)? Standard colors approved through Hines Engineers that “match” existing.
31. During the site visit it was observed that some court yards had small canopy roofs are those to be included in the project? Yes, Bldg 113 front entrance and (2) small courtyard canopy roofs shall be included.
32. Building 113 has a large canopy roof to the North is this included in the project? Bldg 113 front entrance and (2) small courtyard canopy roofs shall be included.
See attached document: 15) SAT Bldg 113_128_ 220 578-23-010 (CON) Roof Repairs - Bldgs 113,128, & 220
Template Version 1 2 image2.png image3.png image4.jpeg image1.jpeg