This document provides details for a federal contract solicitation to replace the roof of Building 48 at the Edward Hines Jr. VA Hospital in Hines, Illinois. The solicitation will require removing existing exhaust fans and skylights, and the coal tar roof assembly, and installing a new roof assembly. The period of performance is 120 calendar days from notice to proceed. A pre-bid conference will be held and details will be in the solicitation package. The requirement is between $500,000 to $1 million. The NAICS code is 238160 for roofing contractors and the size standard is $16.5 million. The solicitation is set aside for Service-Disabled Veteran-Owned Small Businesses and firms must be registered and verified in the VIP database. The solicitation will issue on or around July 16th with bids due on or around August 17th. Firms should monitor SAM.gov for any amendments.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Continuation Page(s) - 36C25221B0025 0001
5. PROJECT NUMBER (if applicable)
CODE
7.
ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF
PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE
OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:
Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERE
D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED
STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF
CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF
SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 578-21-4-6985-0300 578-21-028 36C252 Department of Veterans Affairs Great Lakes Acquisition Center (GLAC) 115 S 84th Street, Suite 101 Milwaukee WI 53214-1476 36C252 Department of Veterans Affairs Great Lakes Acquisition Center (GLAC) 115 S 84th Street, Suite 101 Milwaukee WI 53214-1476 To all Offerors/Bidders
36C25221B0025 07-19-2021
X X X
The purpose of this amendment is to incorporate responses to RFIs.
The bid due date remains unchanged on August 18, 2021 at 11:00 AM (CST).
Kristi Kluck Contracting Officer
SOLICITATION 36C25221B0025
AMENDMENT 0001
07/30/2021
PROJECT: 578-21-028
LOCATION: Edward Hines Jr VA Hospital, Hines, IL
Amendment 00001 hereby incorporates the following clarifications/change(s) into the solicitation package:
A. VENDOR QUESTIONS:
1) CONTRACTOR QUESTION: The roof calls for rubberized asphalt for the roof, can Carlisle waterproofing be added to the list of manufacturers for the waterproofing material?
VA REPLY: Yes, if the product meets requirements in the spec 07 14 00.
2) CONTRACTOR QUESTION: The proposed scope of work removes the existing skylight structure and closes the opening with a metal roof. The problem with this solution is that numerous potential failure points are created. A better solution would be to create a monolithic roof surface by framing in the opening. Elimination of the metal roof and going with a monolithic system would reduce project cost, reduce maintenance cost and provide for a better quality finished product.
VA REPLY: The opening in the deck is large enough that a structural engineer is required to design the infill. The solution shown was drawn with that in mind. Infilling the deck flat will require more engineering than what is shown and will require additional trades be added to the project.
3) CONTRACTOR QUESTION: The proposed scope of work removes the existing roof system and replaces it with an inverted roof system. This system buries the waterproof membrane under the overburden of insulation and concrete pavers. This type of system is very expensive and is often utilized on roofs with extremely heavy foot traffic The system is expensive to install and also very expensive to maintain (when leaks occur, technicians must remove the overburden to access the roof membrane to make repairs. Also weeds will grow in the cracks between the pavers which will be a constant maintenance issue.) Furthermore, it is extremely difficult to add penetrations into the proposed system. The scope of work removes a ton of abandoned HVAC equipment. I imagine new equipment will need to be added at some point in the future as this building is repurposed. A better solution would be to utilize polyisocyanurate insulation, ½” HD coverboard and a single ply membrane (TPO and PVC both allow very low slope).
VA REPLY: The goal of this project is to re-roof the building. The existing roof is a coal tar roof with minimal slope. If we go with a single ply roof at the ¼” per foot required by code we will need to raise the height of all the masonry parapets adding significant scope and cost to the building. The exterior walls are not in good shape and raising the parapets will open Hines up to significant hidden conditions risks. Hines currently has the IRMA system shown on the drawings on the roof of the main hospital building, it has not been a problem.
4) CONTRACTOR QUESTION: Coal Tar roofs often contain asbestos. Has asbestos testing been performed?
VA REPLY: Yes, see attached asbestos testing results and summary. Also reference attachment S06 – Att 01 – STC - 02 82 11.
5) CONTRACTOR QUESTION: Please provide a copy of the hazardous material report referenced in spec section 02 41 00 1.9.B
VA REPLY: See attached asbestos testing results and summary. S06 – Att 02 – Inspection Summary Report Bldg 48 – 2010 and S06 – Att 03 – BLD REEVALUATION 2010
6) CONTRACTOR QUESTION: Please provide a repair detail for the anticipated concrete deck repairs.
VA REPLY: Repairs anticipated to be minor and standard. Details of such repairs are outlined in spec 03 01 00.
7) CONTRACTOR QUESTION: Please provide a repair detail for the masonry infill at the scupper removal areas.
VA REPLY: All removed scuppers are to be replaced with new scuppers. There will be no masonry infill at removed scupper locations. See Detail 5, in drwg A-102.
Attachments:
S06 - Att 01 - STC-028211.
S06 - Att 02 - Inspection Summary Report Bldg 48 - 2010.
S06 - Att 03 - BLDG 48 REEVALUATION 2010.
File details come from the government source that posted it. Updated .