16) Hines COVID-19 Guidelines.pdf

PDF 313 KB Posted

Attached to
Z1DA--578-21-028 Replace Building 48 Roof System (VA-21-00077419)
Solicitation number
36C25221B0025
Issued by

About this file

This document contains a pre-solicitation notice and related federal contract opportunity. The pre-solicitation notice is for project 578-21-028 located at the Edward Hines Jr. VA Hospital in Hines, Illinois, to replace the roof of building 48 and restore it to its original condition. The objectives are to remove the existing exhaust fan roof units, skylights, coal tar roof assembly, and scuppers along the roof perimeter, and install a new roof assembly. The period of performance is 120 calendar days from notice to proceed. The solicitation will be issued on or about July 16, 2021 with bids due on or about August 17, 2021. The estimated value is between $500,000 and $1,000,000. The opportunity is set aside for service-disabled veteran-owned small businesses. The North American Industry Classification code is 238160 for roofing contractors with a $16.5 million small business size standard. The federal agency is the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 12.

View the file

Other files

File Type Posted
36C25221B0025 0003.docx DOCX document
S06 - Att 01 - Wage Determination 08_13_2021.pdf PDF
36C25221B0025 0002.docx DOCX document
S06 - Att 02 - 22 14 00.pdf PDF
S06 - Att 01 - Wage Determination 07_30_2021.pdf PDF
S06 - Att 01 - STC-028211.pdf PDF
S06 - Att 03 - BLDG 48 REEVALUATION 2010.pdf PDF
36C25221B0025 0001.docx DOCX document
S06 - Att 02 - Inspection Summary Report Bldg 48 - 2010.pdf PDF
14) No Smoking Policy 10-1-19.pdf PDF
1) Hines VA Campus Site Plan.pdf PDF
SOW 578-21-028 Replace Building 48 Roof System.pdf PDF
17) Drawing Specifications 578-21-028.pdf PDF
11) Contractor Parking.pdf PDF
4) Safety and Health During Construction Activities.pdf PDF
10) Contractor PIV Instructions and Form.pdf PDF
6) Above Ceiling Entry and Wall Construction Permits.pdf PDF
15) Infection Control Barrier Sample.pdf PDF
P07 Wage Determination.txt TXT text file
Wage Determination 7-14-2021.pdf PDF
12) OIT Horizontal Cable Requirements.pdf PDF
36C25221B0025.docx DOCX document
3) Pre-Construction Checklist.pdf PDF
2) Hines Underground Utility Plan.pdf PDF
13) Specifications Book.pdf PDF
18) Pre-Existing Site Photos.pdf PDF
8) Interim Life Safety Measures (ILSM).pdf PDF
5) Cutting Welding and Other Hot Work.pdf PDF
7) Pre-Construction Risk Assessment (PCRA).pdf PDF
9) Infection Control Risk Assessment (ICRA).pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Hines COVID-19 Guidelines The following are rules set in place to control the spread of the Coronavirus at the Hines hospital, all buildings on the campus, and the Community Based Outpatient Clinics (CBOCs).

General

A) Masks or face coverings are required to be worn at Hines.

B) All contractors need to have their PIV cards on their person.

C) All the doors on Hines campus close at 4:30 PM except the Emergency Department and the main lobby of Building 200. Once the doors on campus are secured at 4:30 PM, the only entrances to enter the facility are the Emergency Department and the main lobby of Building 200. Unauthorized entry to any other doors that have been secured will be enforced by the VA Police.

Upon Arrival at the Station

A) The station has four main entry points for COVID screening.

1. The main lobby of Building 200

2. The Atrium just north of Building 45

3. C-Section east entrance to Building 1

4. The main lobby of Building 217

B) Everyone entering the screening points will have their temperature checked and symptoms queried daily.

C) You will be given a sticker to place on you PIV card showing you have been screened for the day.

Exiting and Re-entry

A) You may exit any building from any normal door leading to the exterior. Please be sure the door is fully closed behind you after exiting.

B) If you need to re-enter the facility, you will need to go to one of the screening points. If you have already been screened you need only show the dated sticker showing you were screened earlier in the day.

C) After 4:30 PM, only the main lobby in Building 200 and the Emergency Department may be used for re-entry.

D) Propping open doors and allowing unscreened individuals to enter will result in immediate removal from the station and other penalties.

File details come from the government source that posted it. Updated .