S06 - Specs 000110 TOC 18-401.pdf

PDF 114 KB Posted

Attached to
Z1DA--537-19-101 Taylor Elevator Modernization Federal contract opportunity
Solicitation number
36C25220R0063
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 12

About this file

This document is a table of contents for specifications related to an elevator modernization project at the Jesse Brown VA Medical Center in Chicago, Illinois. The project, numbered 537-19-101A, will require work on traction elevators, fire suppression systems, plumbing, HVAC, electrical systems, communications infrastructure, and security and alarm systems. The solicitation for the project is numbered 36C25220R0063 and is being conducted by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 12. The specifications cover demolition, masonry, metals, woodwork, thermal and moisture protection, doors and windows, finishes, conveying equipment, plumbing, HVAC, electrical systems, communications, and electronic safety and security.

View the file

Other files for this federal contract opportunity

Other files attached to Z1DA--537-19-101 Taylor Elevator Modernization, newest first.
File Type Posted
36C25220R0063_8.docx DOCX document
36C25220R0063 0003.docx DOCX document
S06 - Specs 000115 List of Drawings.pdf PDF
36C25220R0063_7.docx DOCX document
S06 - Addendum1.pdf PDF
S06 - Specs 024119 SelectiveDemolition.pdf PDF
S06 - FA-001 Addendum 1.pdf PDF
S06 - Specs 014500 QualityControl.pdf PDF
S06 - Consolidated RFI Response 537-19-101.pdf PDF
S06 - A-402_Addendum 1.pdf PDF
S06 - A-601_Addendum 1.pdf PDF
36C25220R0063_6.docx DOCX document
36C25220R0063-068.pdf PDF
36C25220R0063-067.docx DOCX document
36C25220R0063-066.pdf PDF
36C25220R0063-060.pdf PDF
36C25220R0063-059.docx DOCX document
36C25220R0063-061.pdf PDF
36C25220R0063-063.pdf PDF
36C25220R0063-065.pdf PDF
36C25220R0063-064.pdf PDF
36C25220R0063-062.pdf PDF
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Jesse Brown VAMC May 18, 2020 Elevator Modernization Addendum 1 Chicago, IL 60612 Project No. 537-19-101A

00 01 10-1

DEPARTMENT OF VETERANS AFFAIRS

VHA MASTER SPECIFICATIONS

TABLE OF CONTENTS

Section 00 01 10

DIVISION 00 - SPECIAL SECTIONS DATE

00 01 15 List of Drawing Sheets 07-15

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00 General Requirements 12-18 01 32 16.15 Project Schedules 02-15 01 33 23 Shop Drawings, Product Data, and Samples 05-17 01 35 26 Safety Requirements 02-17 01 45 00 Quality Control 03-19 01 58 16 Temporary Interior Signage 07-15 01 74 19 Construction Waste Management 09-13 01 81 13 Sustainable Construction Requirements 10-17

DIVISION 02 – EXISTING CONDITIONS

02 41 00 Demolition 08-17 02 41 19 Selective Demolition

DIVISION 04 – MASONRY

04 01 00 Maintenance of Masonry 02-16 04 05 13 Masonry Mortaring 10-17

DIVISION 05 – METALS

05 50 00 Metal Fabrications 08-18

DIVISION 06 – WOOD, PLASTICS AND COMPOSITES

06 10 00 Rough Carpentry 10-17 06 16 63 Cementitious Sheathing 02-16

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 22 00 Roof and Deck Insulation 02-16 07 81 00 Applied Fireproofing 10-17 07 84 00 Firestopping 02-16 07 92 00 Joint Sealants 10-17

DIVISION 08 - OPENINGS

08 11 13 Hollow Metal Doors and Frames 08-16

00 01 10-2

08 71 00 Door Hardware 05-19

DIVISION 09 – FINISHES

09 06 00 Schedule for Finishes 04-15 09 29 00 Gypsum Board 06-18 09 65 19 Resilient Tile Flooring 05-18 09 67 23.60 Resinous (Urethane and Epoxy Mortar) Flooring 07-14 09 91 00 Painting 01-16

DIVISION 14– CONVEYING EQUIPEMENT

14 21 00 Traction Elevators 10-18

DIVISION 21- FIRE SUPPRESSION

21 13 13 Wet-Pipe Sprinkler Systems 06-15

DIVISION 22 – PLUMBING

22 05 11 Common Work Results for Plumbing 07-16 22 05 12 General Motor Requirements for Plumbing Equipment 09-15 22 05 19 Meters and Gages for Plumbing Piping 09-15 22 05 23 General-Duty Valves for Plumbing Piping 09-15 22 13 00 Facility Sanitary and Vent Piping 09-15 22 14 29 Sump Pumps 09-15

DIVISION 23 – HEATING, VENTILATING, AND AIR

CONDITIONING (HVAC)

23 05 11 Common Work Results for HVAC 08-17 23 05 12 General Motor Requirements for HVAC and Steam

Generation Equipment 08-17

23 05 41 Noise and Vibration Control for HVAC Piping and Equipment

02-15

23 05 93 Testing, Adjusting, and Balancing for HVAC 02-15 23 07 11 HVAC and Boiler Plant Insulation 02-15 23 09 23 Direct-Digital Control System for HVAC 09-11 23 22 13 Steam and Condensate Heating Piping 08-17 23 31 00 HVAC Ducts and Casings 03-13 23 37 00 Air Outlets and Inlets 02-15 23 40 00 HVAC Air Cleaning Devices 02-12 23 81 00 Decentralized Unitary HVAC Equipment 02-11 23 82 00 Convection Heating and Cooling Units 04-11 23 82 16 Air Coils 04-11

DIVISION 26 – ELECTRICAL

26 05 11 Requirements for Electrical Installations 01-16 26 05 19 Low-Voltage Electrical Power Conductors and Cables 01-17 26 05 26 Grounding and Bonding for Electrical Systems 01-17 26 05 33 Raceway and Boxes for Electrical Systems 01-18

00 01 10-3

26 08 00 Commissioning of Electrical Systems 11-16 26 22 00 Low-Voltage Transformers 01-18 26 24 16 Panelboards 01-18 26 27 26 Wiring Devices 01-18 26 36 23 Automatic Transfer Switches 01-17 26 43 13 Surge Protective Devices 01-17 26 51 00 Interior Lighting 01-18

DIVISION 27 – COMMUNICATIONS

27 05 11 Requirements for Communications Installations 06-15 27 05 33 Raceways and Boxes for Communications Systems 10-18 27 15 00 Communications Structured Cabling 01-16

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

28 05 00 Common Work Results for Electronic Safety and Security 04-18 28 05 28.33 Conduits and Backboxes for Electronic Safety and

Security 09-11

28 13 00 Physical Access Control System 10-11 28 31 00 Fire Detection and Alarm 10-11