36C25220R0063-062.pdf

PDF Posted

Attached to
Z1DA--537-19-101 Taylor Elevator Modernization Federal contract opportunity
Solicitation number
36C25220R0063
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 12

About this file

This package includes construction documents and specifications for elevator modernization work at the Jesse Brown VA Medical Center in Chicago, Illinois. The project involves upgrading seven passenger elevators and three service elevators across nine floors. Bidders are advised to carefully review the drawings and specifications, which provide details on demolition requirements, infection control protocols during construction, and notes regarding deliveries and staging. The solicitation number for this opportunity is 36C25220R0063, and it was issued by the Department of Veterans Affairs Veterans Health Administration VISN 12. Bids are due by February 12, 2020 according to the cover sheet.

36C25220R0063 S02 - Attchmt3 - Drawings 1 of 3 537-19-101.pdf

View the file

Other files for this federal contract opportunity

Other files attached to Z1DA--537-19-101 Taylor Elevator Modernization, newest first.
File Type Posted
36C25220R0063_8.docx DOCX document
36C25220R0063 0003.docx DOCX document
S06 - FA-001 Addendum 1.pdf PDF
S06 - Specs 014500 QualityControl.pdf PDF
S06 - Specs 000115 List of Drawings.pdf PDF
36C25220R0063_7.docx DOCX document
S06 - Addendum1.pdf PDF
S06 - Specs 024119 SelectiveDemolition.pdf PDF
S06 - A-402_Addendum 1.pdf PDF
S06 - A-601_Addendum 1.pdf PDF
S06 - Consolidated RFI Response 537-19-101.pdf PDF
S06 - Specs 000110 TOC 18-401.pdf PDF
36C25220R0063_6.docx DOCX document
36C25220R0063-068.pdf PDF
36C25220R0063-067.docx DOCX document
36C25220R0063-060.pdf PDF
36C25220R0063-059.docx DOCX document
36C25220R0063-066.pdf PDF
36C25220R0063-064.pdf PDF
36C25220R0063-061.pdf PDF
36C25220R0063-063.pdf PDF
36C25220R0063-065.pdf PDF
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A

LA

R

E GI H,NC

S

G O 52644

P E

N

CO

LU IT

E

NG

RG

U O

A

P ,P

R E

G I

S T

E R

E D

A R

C H I T E C T U R

A L

C O

R P

O T

I O

N

N O

R T H C A R O L

I N A

A R

JE

FFREY A BROOKS

11296R

EG

IS

TERED ARCHITECT

N O

R

T H

C A R O L

I N

ARA

LE

IGH , NORT H CAROL

I N

A

Engineers Architects

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

PROJECT SITE MAP PROJECT LOCATION MAP

MICHAEL BLADES & ASSOCIATES, CTO-ELEVATOR CONSULTANTS

/1

/2

:4

:1

P

M

G-001

COVER

1 2ANP

ELEVATOR MODERNIZATION

JESSE BROWN VA MEDICAL CENTER

820 S. DAMEN AVENUE

CHICAGO, ILLINOIS 60612 02/12/2020

ISSUED FOR BID AND CONSTRUCTION

537-19-101A18-401

11A

ELEVATOR MODERNIZATION

JESSE BROWN VA MEDICAL CENTER

820 S. DAMEN AVENUE

CHICAGO, ILLINOIS 60612

VA PROJECT #: 537-19-101A

JAB

DRAWING LIST

GENERAL

G-001 COVER 1 2

G-101 FIRST FLOOR ICRA PLAN 2 2

ARCHITECTURAL

A-001 ARCHITECTURAL SYMBOLS, ABBREVIATIONS AND NOTES 1 12

AD001 PASSENGER AND SERVICE ELEVATOR IMAGES 2 12

A-100 NAMING CONVENTION LAYOUT 3 12

A-101 BASEMENT FLOOR AND FIRST FLOOR PLANS 4 12

A-102 SECOND FLOOR AND THIRD FLOOR PLANS 5 12

A-103 FOURTH FLOOR AND FIFTH FLOOR PLANS 6 12

A-104 SIXTH FLOOR AND SEVENTH FLOOR PLANS 7 12

A-105 EIGHTH FLOOR AND NINTH FLOOR PLAN 8 12

A-401 ENLARGED EXISTING FLOOR PLANS 9 12

A-402 ENLARGED EXISTING FLOOR PLANS & ELEVATOR RISER DIAGRAM 10 12

A-601 EXISTING PLAN AND ELEVATION 11 12

A-602 FLOOR AND CEILING FINISHES 12 12

FIRE PROTECTION

FX001 FIRE PROTECTION GENERAL INFORMATION 1 3

FX101 GROUND FLOOR FIRE PROTECTION PLAN 2 3

FX102 NINTH FLOOR FIRE PROTECTION PLAN 3 3

PLUMBING

P-001 PLUMBING GENERAL INFORMATION 1 2

PW100 GROUND FLOOR DRAIN, WASTE, AND VENT PLAN 2 2

MECHANICAL

M-001 MECHANICAL GENERAL INFORMATION 1 6

MD101 NINTH FLOOR MECHANICAL DEMOLITION PLAN 2 6

MH101 NINTH FLOOR MECHANICAL PLAN 3 6

M-501 MECHANICAL DETAILS 4 6

M-502 MECHANICAL CONTROLS 5 6

M-601 MECHANICAL SCHEDULES 6 6

ELECTRICAL

E-001 ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS 1 11

E-101 ELECTRICAL FLOOR PLANS GROUND AND NINTH FLOOR 2 11

E-102 ELECTIRCAL FLOOR PLANS FIRST FLOOR 3 11

E-201 HOISTWAY SECTIONS 4 11

ED401 ELECTRICAL DEMOLITION ENLARGEMENTS 5 11

ED402 ELECTRICAL DEMOLITION ENLARGEMENTS 6 11

E-401 ELECTRICAL ENLARGEMENTS 7 11

EM401 MECHANICAL POWER ENLARGEMENTS 8 11

E-501 ELECTRICAL DETAILS 9 11

E-601 ELECTRICAL SINGLE-LINE AND SCHEDULES 10 11

E-602 ELECTRICAL SCHEDULES 11 11

TECHNOLOGY

T-001 TECHNOLOGY GENERAL NOTES, SYMBOL LEGEND, AND ABBREVIATIONS 1 9

T-101 SYSTEMS FLOOR PLANS GROUND AND FIRST FLOOR 2 9

T-102 SYSTEMS FLOOR PLANS SECOND AND THIRD FLOOR 3 9

T-103 SYSTEMS FLOOR PLANS FOURTH AND FIFTH FLOOR 4 9

T-104 SYSTEMS FLOOR PLANS SIXTH AND SEVENTH FLOOR 5 9

T-105 SYSTEMS FLOOR PLANS NINTH FLOOR 6 9

T-401 SYSTEMS ENLARGEMENTS 7 9

T-402 SYSTEMS ENLARGEMENTS 8 9

T-501 TECHNOLOGY DETAILS 9 9

FIRE ALARM

FA001 FIRE ALARM GENERAL NOTES, SYMBOLE LEGEND, AND RISER 1 3

FA101 FIRE ALARM PLAN - ELEVATOR LOBBIES 2 3

FA102 FIRE ALARM PLAN - ELEVATOR EQUIPMENT ROOM 3 3

ISSUED FOR BID AND CONSTRUCTION

MICHAEL BLADES & ASSOCIATES, CTO-ELEVATOR CONSULTANTS

PROJECT

LOCATION

JESSE BROWN

VAMC CHICAGO,

ILLINOIS

DocuSign Envelope ID: DB6390C2-326C-4F6F-95FC-61D9C19491B1

2/12/2020

EX

EX

EX

CLEAN

STORAGE

ALCOVE

1266A

WHEELCHAIR

STORAGE

1249A

1329A

13E5

ELECTRICAL

13E4

PNEUMATIC

TUBE

MICRO

CONTROLLER

FAC

1210A

FAC

ELECTRICAL

12E4

ELECTRICAL

12E2

CORRIDOR

CORRIDOR

C1301

MAIN ENTRANCE

CORRIDOR

C1203

CORRIDOR

C1204

CORRIDOR

CHAIR STATION

CUBICLES

1259A

HALLWAY

TEMPORARY

NURSES

STATION

PATIENT

WAITING AREA

PATIENT TOILET

(BARIATRIC)

BIO-MED REPAIR

CLEAN

STORAGE (WET)

CLEAN

STORAGE (DRY)

NURSE

MANAGER

CHIEF

PHYSICIAN

SOCIAL

WORKER

CHAIR STATION

CUBICLES

STAFF TOILET

LOCKERS

1264A

CONFERENCE

LUNCH RM

VESTIBULE

RECEPTION

CHECK-IN

RECEPTION

CHECK-IN

1294A

SKYLIGHT

CORRIDOR

C1104

CORRIDOR

CORRIDOR

C1305

1302C

CORRIDOR

C1302

CORRIDOR

C1303

WAITING RM

OUTPATIENT

SPECIMEN LAB

REST RM

REST RM

WOMENS REST

RM

MALE REST RM

CORRIDOR

C1304

SOILED UTILITY

RM

MRI SUITE

1345 IMAGING SUPV

OFFICE

1345A

VIEW

1345C

IP HOLDING

1345E

HAC

FUTURE

ELEVATOR

ELEVATOR

P-7B

STAIR

NO 7

TEL PHONE/

DATA RM

13T1

WOMENS

TOILET

ELEVATOR

P-8B

ELEVATOR

P-9B

ELEVATOR

S-10B

HAC

SUPV BLOOD

DRAW OFFICE

1363A

MULTI

PURPOSE RM

OUTPATIENT

SPECIMEN LAB

1363C

OUTPATIENT

RADIOLOGY

WAITING AREA

CORRIDOR

REST RM

DRESSING RM

DRESSING RM

ULTRASOUND

OUTPATIENT

RADIOLOGY

EXAM/

TREATMENT RM

CONTROL RM

STAIR

NO 6

HOLDING AREA

FIRE RISER

1390A

DRESSING RM

1390B

DRESSING RM

MRI CONTROL

RM

MRI SCAN RM

MECH RM

MRI EQUIP

1390D

MRI GANTRY RM

1345I

CONTROL RM

1345G

SUPPORT

ALCOVE

1345H

STAGING

1345F

DRESS

1345D

OFFICE

TOILET

1345B

MOHS LAB

CANTEEN

RETAIL

STORAGE

DECON

EQUIPMENT

CORRIDOR

ELECTRICAL

13E2

CORRIDOR

PHOTO

THERAPY

WAITING

PROCEDURE

RM-A

PROCEDURE

RM-B

ACCESSIBLE

STAFF TOILET

STORAGE

13E3

STAIR

NO 8

PHYSICIAN

OFFICE

EXAM RM-6

EXAM RM-5

EXAM RM-4

EXAM RM-3

EXAM RM-2

EXAM

RM -1

INTAKE NURSE

CLERICAL

SUPPORT

TRANSFORMER

RM

CORRIDOR

C1205

LOADING DOCK

RADIOACTIVE

STORAGE

FLAMABLE

STORAGE

CORRIDOR

C1202

CORRIDOR

C1201

OFFICE

1302A

STAIR

NO 9

CANTEEN

DINING AREA

FOOD SVC

VENDING

KITCHEN

KITCHEN

OFFICE

ELECTRICAL

12E3

STORAGE

DISH WASHING

HAC

CANTEEN

STORAGE

REFR

REFR

CORRIDOR

C1206

MAIL RM

CANTEEN

STORAGE

WAREHOUSE

IRM STORAGE

MECH

BIO-MED REPAIR

EXIST SHAFT

STAIR

NO 10

MECH RM

WATER

TREATMENT

STORAGE

IRM

12T1

TELEPHONE

ELEVATOR

ST1

ELEVATOR

ELEVATOR

PT2

STAIR

NO 11

ELEVATOR

PT4

ELEVATOR

PT3

CORRIDOR

C1207

OUTPATIENT

PHARMACY

FEMALE TOILET

STORAGE

MALE TOILET

UNISEX TOILET

NARCOTIC

VAULT

EMS HAC

PHARMACY

OFFICE STAFF

OPERATIONS

MGR

PROCUREMENT

PHARMACIST

OFFICE

CHIEF

STORAGE

1213A

COPIER /

STORAGE

CONFERENCE

RM

ELECTRICAL

CLOSET

12E1

OFFICE STAFF

OFFICE STAFF

OFFICE

OFFICE STAFF

STAIR

NO 12

LOUNGE

1209 HAC

1207 SUPV OFFICE

WAITING

WAITING

WAITING

WAITING

WAITING

OFFICE

CONSULT

OFFICE

TELECOM

12T2

CORRIDOR

C1115

CORRIDOR

C1114

CORRIDOR

C1112

CORRIDOR

C1111

CORRIDOR

C1110

CORRIDOR

C1109

CORRIDOR

C1107

CORRIDOR

C1106

CORRIDOR

C1105

CORRIDOR

C1108

CORRIDOR

C1113

DIETICIAN

OFFICE

PHARMACY

CONSULTATION

1195A

CASHIER

STORAGE

AGENT CASHIER

PHARMACY

STAFF

1195B

ELECTRICAL

11E4

NURSE

TELEPHONE RM

SUPV CLINIC

SUPPORT

OFFICE

STORAGE/

COPIER

DERMATOLOGY

EXAM RM

NURSE OFFICE

NURSE OFFICE

URGENT CARE

EXAM RM

NURSE OFFICE

URGENT CARE

EXAM RM

NURSE RM

GU NURSE

URGENT CARE

EXAM RM

EXAM RM

1181B

EXAM RM

1181A

MENS TOILET

WOMENS

TOILET

ELECTRICAL

11E3

EXAM RM

GREEN CLINIC

ATTENDING

OFFICE

EXAM RM

URGENT CARE

EXAM RM

EXAM RM

URGENT CARE

CONSULTATION

RM

NURSE OFFICE

NURSE OFFICE

NURSE OFFICE

GREEN CLINIC

EXAM RM

EXAM RM

GREEN CLINIC

EXAM RM

EXAM RM

EXAM RM BLUE

CLINIC

NURSE RM

EXAM RM

MENS TOILET

WOMENS

TOILET

ELECTRICAL

11E2

EXAM RM

EXAM RM

EXAM RM

EXAM RM

EXAM RM

URGENT CARE

CONSULTATION

RM

NURSE OFFICE

NURSE OFFICE

EXAM RM

UROLOGY

EXAM RM

EXAM /

SCREENING

EXAM RM

EXAM /

SCREENING

EXAM RM

EXAM /

SCREENING

MENS TOILET

TOILET

ELECTRICAL

11E1

UROLOGY

EXAM RM

EXAM /

SCREENING

GU CLINIC

EXAM RM

EXAM /

SCREENING

GU CLINIC

EXAM RM

CONSULTATION

RM

NURSE INTAKE

NURSE INTAKE

TOILET

TELECOM

11T1

NURSE OFFICE

GU

PHARMACIST

EXAM RM

CHANGING RM

CLEAN SUPPLY

DIRTY UTILITIES

LOUNGE

RN OFFICE

1200A

BEHAVIORAL

HEALTH LAB

1200B

CONFERENCE

RM

MENTAL

HEALTH

URGENT CARE

EXAM RM

1182A

URGENT CARE

EXAM RM

1182B

URGENT CARE

EXAM RM

1162A

EXAM RM

EXAM RM

1161B

EXAM RM

1161A

EXAM RM

URGENT MAINT

VACANT

TOILET

1139A

URODYNAMIC

AND

ULTRASOUND

UROLOGY

TREATMENT

PROCEDURE

EXAM /

SCREENING-6

BREAK RM

TOILET

HAC

ELECTRICAL

STORAGE

MECH SPACE

VESTIBULE

COOKING AREA

FIRE CLOSET

ELECTRICAL

CLOSET

EQUIP CLOSET

TOOL STORAGE

FIRE CLOSET

PATHOLOGY

LAB

RETAIL

STORAGE

CORRIDOR

PHONE CLOSET

CORRIDOR

CORRIDOR

1210C

PT1

1275A

1280A

STAIRS/TRANSFORMER

1345J

1376A

P-6B

1361A

1191 1128

C1204

C1203

RESIDENT

TEAM

1225A

CORRIDOR

GENERATOR RM

1300A

STAIR

CHIEF OFFICE

1302B

URGENT CARE

EXAM RM

URGENT CARE

EXAM RM

ELECTRICAL

13E1

OFFICE

CLOSET

1394A

TAYLOR STREET

TAYLOR STREET

SOUTH DAMEN AVENUE

METAL

DOOR

PICK UP WINDOW

R

AM

P

OVERHEAD DOOR

PLATFORM

CONCRETE

OVERHEAD DOOR

OVERHEAD DOOR

OVERHEAD DOOR

OVERHEAD DOOR

OVERHEAD DOOROVERHEAD DOOR

LOUVER WINDOW

HIGH MAGNET AREA

HALL MODULE-F HALL MODULE-C

MODULE-E MODULE-CMODULE-D MODULE-B MODULE-A

HALL MODULE-E

MODULE-H MODULE-GMODULE-I MODULE-F

HALL MODULE-H HALL MODULE-G

DIABETES CLINIC

HALL MODULE-A

HALL MODULE-BHALL MODULE-D

PICK UP WINDOW

7 6 5 4 3

R

F

(CUBICLE)

F

F

F

F

F

F

F

F

F

F

F

(CUBICLE)

FEC

FEC

WALL

GUARD

WALL

GUARD

WALL

GUARD

RAMP DN

LANDING

RAMP DN

WALL

GUARD

F

F

WALL

GUARD

WALL

GUARD

SIDE WALK

FEC

DN UP

III/IVLOW Risk Group 1

Class III

Note: Infection Control approval will be required when the Construction Activity and Risk Level indicate that

It is the Contractor's Responsibility to provide the following Infection Control Precautions depending upon the Area Class Designation

II

I

III

MEDIUM Risk Group 2

HIGH Risk Group 3

HIGHEST Risk Group 4 IV

IV

IV

III/IV

III/IV

III

III/IV

I

III

Patient Risk Group Table

Infection Control Matrix - Class of Precautions: Construction Project by Patient Risk

TYPE A

Construction Project Type

Major demolition and construction projects

Includes, but is not limited to:

- activities which require consecutive work shifts

- requires heavy demolition or removal of a complete ceiling system

- new construction

Work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies

Includes, but is not limited to:

- sanding of walls for painting or wall covering

- removal of floor coverings, ceiling tiles and casework

- new wall construction

- minor duct work or electrical work above ceilings

- major cabling activities

- any activity which cannot be completed within a single work shift

Small scale, short duration activities which create minimal dust

Includes, but is not limited to:

- installation of telephone and computer cabling

- access to chase spaces

- cutting of walls or ceiling where dust migration can be controlled

Inspection and Non-Invasive Activities

Includes, but is not limited to:

- removal of ceiling tiles for visual inspection limited to 1 tile to 50 square feet

- painting (but not sanding), wall covering

- electrical trim work, minor plumbing, and activities which do not generate dust or require cutting of walls or access to ceilings other than for visual inspection

Type of Construction / Project Activity Table

Group 2 Medium Risk

Group 1 Low Risk

- Bldg. #69 Therapy areas

- Respiratory Therapy

- Outpatient Clinics

- CBOC's

- Mental Health Units

- VACANT AREA ADJACENT TO

OCCUPIED AREA

- Office areas (non-clinical)

- Hallways

- FES/EMS areas

I

Patient Risk Group

TYPE D

TYPE C

TYPE B

TYPE A

Group 4 Highest Risk

Group 3 High Risk

- Pharmacy

- Radiology/ CT Scanner

- Urgent Care

- Laboratories

- CLCs (1B Med, 59B, 138A, 138B)

- SPD; AMCU; 1B Medicine;

- Respiratory Isolation Rooms

III

TYPE DTYPE CTYPE B

Class IVor control procedures are necessary.

C

LA

S S

IV

C

LA

S

S

II

During Construction Project

C L-

I C

LA

S

S

II

I

1. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.

2. Contain construction waste before transport in tightly covered containers.

3. Cover transport receptacles or carts. Tape covering

4. Vacuum work area with HEPA filtered vacuums.

5. Wet mop area with disinfectant after barriers are removed.

6. Remove or isolate HVAC system in areas where work was being performed.

1. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.

2. Contain construction waste before transport in tightly covered containers.

3. Cover transport receptacles or carts. Tape covering.

4. Vacuum work with HEPA-filtered vacuums.

5. Wet mop with disinfectant.

6. Remove isolation of HVAC system in areas where work is being performed.

1. Wipe surfaces to remove dust.

Upon Completion of Project

1. Wipe work surfaces with disinfectant.

2. Contain construction waste before transport in tightly covered containers.

3. Wet mop and/or vacuum work area with HEPA filtered vacuum before leaving work areas.

4. Remove isolation of HVAC system in areas where work is being performed.

1. Includes all activities required by Class II

2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities

Management Maintenance and Engineering department before construction begins.

3. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.

4. Complete all critical barriers before construction begins or implement control cube method.

5. Maintain negative air pressure within work site utilizing HEPA-equipped air filtration units.

6. Contain construction waste before transport in tightly covered containers.

7. Cover transport receptacles or carts. Tape covers.

8. Wet mop and/or vacuum with HEPA filtered vacuum before leaving work areas.

9. Remove isolation of HVAC system in areas where work is being performed.

1. Execute work by methods to minimize raising dust from construction operations.

2. Immediately replace a ceiling tile displaced for visual inspection.

1. Includes all activities required by Class I

2. Provide active means to prevent airborne dust from dispersing into atmosphere.

3. Water mist work surfaces to control dust while cutting.

4. Seal unused doors with duct tape.

5. Block off and seal air vents.

6. Replace adhesive walk-off mats at entrance and exit of work area. Replace used mats in accordance with manufacturer's recommendations.

7. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.

1. Includes all activities required by Class III

2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities

Management Maintenance and Engineering department before construction begins.

3. Isolate HVAC system in areas where work is being done to prevent contamination of duct system.

4. Complete all critical barriers or implement control cube method before construction begins.

5. Maintain negative air pressure within work site utilizing HEPA equipped air filtration units.

6. Seal holes, pipes, conduits, and punctures appropriately.

7. Construct anteroom and require all personnel to pass through this room so they can be vacuumed sing a HEPA vacuum cleaner before leaving work site or they can wear cloth or paper coveralls that re removed each time they leave the work site.

8. All personnel entering work site are required to wear shoe covers. Shoe covers must be changed each time the worker exits the work area.

9. Place adhesive walk-off mats at entrance to work area within anteroom.

10. Replace per manufacturer's recommendations. Do not remove barriers from work area until completed project is inspected each by the Hospital Safety Officer, Facilities Management Maintenance and Engineering Department and thoroughly cleaned by the Hospital Environmental Services Department or their contracted Environmental Service Company Contain construction waste before transport in tightly covered containers.

11. Cover transport receptacles or carts. Tape covering

12. Vacuum work area with HEPA filtered vacuums.

13. Wet mop with disinfectant after barriers are removed.

14. Remove isolation of HVAC system in areas where work is being performed.

INFECTION CONTROL RISK MITIGATION RECOMMENDATIONS MATRIX OF

PRECAUTIONS FOR CONSTRUCTION AND RENOVATION

3-5/8" STEEL STUD @ 16"

O.C., MIN. 18 GAUGE

ONE LAYER 5/8" GYPSUM

WALLBOARD EA. SIDE

CEILING - SEE RCP

STOP GYPSUM WALL

BOARD 1/2" ABOVE

FLOOR. SEAL EACH SIDE

WITH STC 63 SMOKE AND

ACOUSTIC SEALANT.

SECURE BOTTOM

RUNNER TO FLOOR SLAB

MINERAL WOOL FILLING

FLUTES, FLUSH WITH WALL

SURFACE

APPLY 1/8" DEEP SMOKE

AND ACOUSTIC SEALANT

OVER MINERAL WOOL,

OVERLAPPING 1/2" ONTO

DECK AND WALL

SUBSTRATES.

UL U465 STC 40

3" MINERAL WOOL BATT

INSULATION

BASE TO

MATCH EXISTING

SILL

PLAN

HEAD

DECK

SECURE TOP DEFLECTION

TRACK TO UNDERSIDE OF

DECK. NEST TOP TRACK,

BUT DO NOT ATTACH TO

DEFLECTION TRACK

0201 04

CONSTRUCTION

ACCESS

W T

A Y

L O

R S

T R

E E

T

SOUTH DAMEN AVENUE

CRANE LOCATION FOR ALL EQUIPMENT

TAYLOR DOCK

Crane Lifts may only be on Sundays between the hours of 6:00 AM thru 6:00 PM

DELIVERIES AT TAYLOR DOCK WILL BE

ALLOWED FROM 6 PM TO 10 PM ONLY.

ALL OTHER EQUIPMENT AND MATERIAL

DELIVERIES DURING THE HOURS OF 7 AM - 5 PM

MUST BE SCHEDULED WITH THE CR AT THE

POLK STREET DOCK.

A

LA

R

E GI H,NC

S

G O 52644

P E

N

CO

LU IT

E

NG

RG

U O

A

P ,P

R E

G I

S T

E R

E D

A R

C H I T E C T U R

A L

C O

R P

O T

I O

N

N O

R T H C A R O L

I N A

A R

JE

FFREY A BROOKS

11296R

EG

IS

TERED ARCHITECT

N O

R

T H

C A R O L

I N

ARA

LE

IGH , NORT H CAROL

I N

A

Engineers Architects

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

MICHAEL BLADES & ASSOCIATES, CTO-ELEVATOR CONSULTANTS

/1

/2

:4

:1

P

M

G-101

FIRST FLOOR ICRA PLAN

2 2ANP

ELEVATOR MODERNIZATION

JESSE BROWN VA MEDICAL CENTER

820 S. DAMEN AVENUE

CHICAGO, ILLINOIS 60612 02/12/2020

ISSUED FOR BID AND CONSTRUCTION

537-19-101A18-401

11A

JAB

0 8 16 32 N

O R

T H

PLAN

01 PROVIDE TEMPORARY PROTECTIVE PLASTIC BARRIER

WITH ZIPPER ENTRY TO THE BOTTOM OF CEILING

02 STICKY MAT AT ALL CONSTRUCTION ACCESS POINT

03 CONSTRUCTION ROUTE - CONSTRUCTION MATERIALS

ROUTE IS THROUGH THE BASEMENT LEVEL (GROUND

FLOOR) AND ELEVATOR SHAFTS. (FOR UPPER FLOORS,

CONTRACTOR TO COORDINATE WITH COR) - MAINTAIN A

MINIMUM OF 5'-0" CLEAR WIDTH IN CORRIDORS AT ALL

TIMES

04 USE PORTABLE DUST EXTRACTOR AND AIR SCRUBBER

WITH HEPA FILTRATION SYSTEM. VERIFY DISCHARGE

LOCATION WITH COR

05 REFER TO INFECTION CONTROL RISK ASSESSMENT

PACKAGE FOR MORE INFORMATION

06 AREA OF WORK

## KEY NOTES

ICRA GENERAL NOTES

A. NO MAJOR EQUIPMENT ACCESS THROUGH THE

BUILDING BETWEEN 7AM TO 5PM. CONTRACTOR TO

COORDINATE WITH VA COR.

B. ALL LOBBY WORK SHALL BE COMPLETED DURING

AFTER HOURS 4:00 PM TO 11:00 PM.

INFECTION CONTROL KEYNOTES

PROVIDE CONSTRUCTION FENCING TO PREVENT

ACCESS DURING CONSTRUCTION. CONTRACTOR

TO PROVIDE DRAWING SHOWING LIMITS TO VA PRIOR

TO CONSTRUCTION OF EACH PHASE.

WALL TO FLIP TO EITHER SIDE TO FACILITATE THE

EGRESS DURINGCONSTRUCTION. ALLOW

MAX. 3'-0" FOR CONSTRUCTION SIDE.AREA

OF FLOOR, CEILING AND ACTUALINSTALLATION

OF DOOR TO BE CONSTRUCTED AFTER HOURS.

COORDINATE SCHEDULE WITH VA.

Scale: 3/4" = 1'-0"

ICRA BARRIER WALL TYPE

IC1

IC2

Scale: 1/16" = 1'-0"

FIRST FLOOR PLAN OVERALL

AFF ABOVE FINISHED FLOOR

ACP/APC ACOUSTIC CEILING PANEL/

ACOUSTIC PANEL CEILING

ACT ACOUSTIC(AL) TILE

ADJ ADJUSTABLE

ADT'L ADDITIONAL

AGG AGGREGATE

ALT ALTERNATE

AL ALUMINUM

APPROX APPROXIMATE(LY)

ASPH ASPHALT

AUTO AUTOMATIC

B/O BOTTOM OF

BD BOARD

BLDG BUILDING

BLKG BLOCKING

BOT BOTTOM

BRG BEARING

CENTERLINE

C/C CENTER TO CENTER

CJ CONTROL JOINT

CLL CONTRACT LIMIT LINE

CEM CEMENT(ITIOUS)

CMU CONCRETE MASONRY UNIT

CLG CEILING

CLR CLEAR

COL COLUMN

CONC CONCRETE

CONST CONSTRUCTION

CONT CONTINUOUS

CPT CARPET

CT CERAMIC TILE

CTR CENTER(ED)

DF DRINKING FOUNTAIN

DS DOWNSPOUT

DBL DOUBLE

DEG DEGREE

DEMO DEMOLITION

DET/DTL DETAIL

DIA DIAMETER

DIM DIMENSION

DN DOWN

DWG(S) DRAWING(S)

E EAST

EC ELECTRICAL CONTRACTOR

EHO ELECTRICAL HOLD OPEN

EJ EXPANSION JOINT

EW EACH WAY

EA EACH

EIFS EXTERIOR INSULATION

FINISH SYSTEM

EL ELEVATION

ELEC ELECTRIC(AL)

ELEV ELEVATOR

EMER EMERGENCY

EQ EQUAL

EQUIP EQUIPMENT

EXIST EXISTING

EXT EXTERIOR

EWC ELECTRIC WATER COOLER

FD FLOOR DRAIN

FE FIRE EXTINGUISHER

FFE FINISH FLOOR ELEVATION

FV FIELD VERIFY

FEC FIRE EXTINGUISHER CABINET

FDN FOUNDATION

FIN FINISH

FLSHG FLASHING

FLR FLOOR

FRMG FRAMING

FT FOOT/FEET

FTG FOOTING

GC GENERAL CONTRACTOR

GA GAUGE

GALV GALVANIZED

GEN GENERAL

GYP GYPSUM

HM HOLLOW METAL

HDWR HARDWARE

HOL HOLLOW

HOR HORIZONTAL

HT HEIGHT

HVAC HEATING/VENTILATION/AIR

CONDITIONING

IDPH ILLINOIS DEPARTMENT OF

PUBLIC HEALTH

ID INSIDE DIAMETER

IN INCH

INCL INCLUDING

INSUL INSULATION

INT INTERIOR

JAN JANITOR

JT JOINT

LAV LAVATORY

LB(S) POUND(S)

L/S LANDSCAPE

LT LIGHT

MO MASONRY OPENING

MAS MASONRY

MAT'L MATERIAL

MAX MAXIMUM

MECH MECHANICAL

MFR MANUFACTURER

MIN MINIMUM

MISC MISCELLANEOUS

MTD MOUNTED

MTL METAL

N NORTH

NIC NOT IN CONTRACT

NTS NOT TO SCALE

NOM NOMINAL

OC ON CENTER

OD OUTSIDE DIAMETER

O TO O OUT TO OUT

OPNG OPENING

OPP OPPOSITE

OVHD OVERHEAD

PEB PRE-ENGINEERED BUILDING

PJF PREFORMED JOINT FILLER

PT PRESSURE TREATED

PERIM PERIMETER

PL PLATE

PLAM PLASTIC LAMINATE

PLBG PLUMBING

PLYWD PLYWOOD

PNT PAINT

PR PAIR

PTD PAINTED

PWR POWER

RB RUBBER BASE

RD ROOF DRAIN

RO ROUGH OPENING

RAD RADIUS

REC RECESSED

REINF REINFORCED

REQ'D REQUIRED

REV REVISED (REVISION)

RM ROOM

S SOUTH

SB SPLASH BLOCK

SF SQUARE FEET

SS STAINLESS STEEL

SIM SIMILAR

SPEC SPECIFICATIONS

SQ SQUARE

STD STANDARD

STL STEEL

STOR STORAGE

STRUCT STRUCTURAL

SUSP SUSPENDED

T&G TONGUE AND GROOVE

T/O TOP OF

TELE TELEPHONE

TRTD TREATED

TS TUBE STEEL

TYP TYPICAL

UNFIN UNFINISHED

UNO UNLESS NOTED OTHERWISE

VCT VINYL COMPOSITION TILE

VIF VERIFY IN FIELD

VERT VERTICAL

W WEST

W/ WITH

W/O WITHOUT

WC WATER CLOSET

WWF WELDED WIRE FABRIC

WD WOOD

WH WATER HEATER

WT WEIGHT

CL

DEMOLITION KEYNOTE

WINDOW TYPE

TOILET ACCESSORY

WALL TYPE

ROOF PITCH SYMBOL

DOOR NUMBER

TYPICAL KEYNOTE CEILING/ SOFFIT

HEIGHT

MATL

1'-0"

-1

GENERAL DRAWING NOTES

1. INDICATIONS OF PROJECT LIMITS OR LINES OF DEMARCATION ARE SHOWN FOR GENERAL SCOPE DEFINITION AND REFLECT THE UNDERSTANDING OF THE DESIGNER AS TO THE LIMITATIONS OF THE WORK AREA IN AN OCCUPIED AREA. ACTUAL CONTRACT LIMITS ARE TO BE DETERMINED BY AGREEMENT BETWEEN THE COR AND

CONTRACTOR BEFORE THE START OF THE WORK.

2. DRAWINGS ARE PREPARED USING DIMENSIONS AND PRODUCT DRAWINGS ARE PREPARED USING DIMENSIONS AND PRODUCT AND DETAILS FOR SPECIFIC PRODUCTS MAY CHANGE BEFORE THEY ARE AND DETAILS FOR SPECIFIC PRODUCTS MAY CHANGE BEFORE THEY ARE ACTUALLY INCORPORATED INTO THE WORK, AND PRODUCTS BY OTHER MANUFACTURERS ARE ALSO ACCEPTABLE. THEREFORE, ACTUAL INSTALLATION DETAILS AND DIMENSIONS MAY DIFFER FROM THOSE SHOWN. CONTRACTOR SHALL VERIFY INSTALLATION REQUIREMENTS FOR ALL PRODUCTS TO BE INCORPORATED IN THE WORK (INCLUDING THICKNESS FOR RECESSED OR SEMI-RECESSED PRODUCTS) AND IS RESPONSIBLE FOR ACCOMMODATING AND COORDINATING CHANGES TO OTHER MATERIALS OR PRODUCTS THAT ARE NECESSARY BECAUSE OF THESE DIFFERENCES.

3. THE DRAWINGS AND SPECIFICATIONS ARE SEPARATED INTO DISCIPLINES FOR CONVENIENCE. THE SEPARATIONS USED ARE USED ONLY FOR THE PURPOSES OF CONVENIENCE AND REFERENCE AND IN NO WAY DO THEY DEFINE OR LIMIT THE SCOPE OR INTENT OF ANY PART OF THE DRAWINGS, OR OF THE DRAWINGS AND SPECIFICATIONS AS A WHOLE. THE FACT THAT THE DRAWINGS ARE SEPARATED IN NO WAY SUGGESTS THAT THE WORK IS NOT TO BE CONSTRUCTED AS A COMPLETE, INTEGRATED AND UNIFIED WHOLE.

4. THE DRAWINGS AND SPECIFICATIONS, INCLUDING DRAWINGS PREPARED BY SPECIFIC ENGINEERING DISCIPLINES ARE COMPLEMENTARY; ITEMS SHOWN IN ANY ONE LOCATION IN THE DRAWINGS SHALL BE CONSIDERED TO BE REQUIREMENTS OF THE CONTRACT FOR CONSTRUCTION. IN THE EVENT OF AN INCONSISTENCY BETWEEN THE DRAWINGS AND SPECIFICATIONS, OR WITHIN EITHER DOCUMENT, THE CONTRACTOR SHALL SEEK CLARIFICATION OR INTERPRETATION FROM THE COR PRIOR TO BIDDING. WHERE INCONSISTENCIES ARE NOT CLARIFIED PRIOR TO BIDDING, AND WHERE THE ACTUAL SOLUTION OR INTENT CANNOT BE REASONABLY INFERRED, THE CONTRACTOR SHALL PROVIDE THE BETTER QUALITY OR GREATER

QUANTITY OF WORK.

5. USE OF THE WORD "VERIFY" POINTS OUT A SITUATION WHICH MUST BE CONFIRMED PRIOR TO PROCEEDING WITH THE WORK, FABRICATION OF EQUIPMENT, OR ORDERING MATERIAL. NOTIFY THE COR OF ANY

DISCREPANCY DISCOVERED.

6. THE CONTRACTOR SHALL NOTIFY THE COR IMMEDIATELY SHOULD DISCREPANCIES BE FOUND IN THE

DRAWINGS AND SPECIFICATIONS.

7. THE CONTRACTOR IS RESPONSIBLE FOR CHECKING ALL FIELD CONDITIONS AND DIMENSIONS AS THEY RELATE TO THIS PROJECT. SHOULD DISCREPANCIES EXIST BETWEEN THE WORK INDICATED AND ACTUAL FIELD

CONDITIONS NOTIFY THE COR PRIOR TO PROCEEDING WITH THE WORK.

8. DO NOT SCALE THE DRAWINGS. DRAWING SCALES AS INDICATED ARE FOR REFERENCE ONLY AND ARE NOT INTENDED TO ACCURATELY DEPICT ACTUAL OR DESIGNATED CONDITIONS. WRITTEN DIMENSIONS SHALL

GOVERN.

9. COORDINATE WORK OF ALL TRADES PRIOR TO STARTING CONSTRUCTION.

10. THE CONTRACTOR AND SUBCONTRACTORS INVOLVED IN THIS PROJECT SHALL BE RESPONSIBLE FOR DESIGNING AND INSTALLING THEIR RESPECTIVE WORK AND SYSTEMS TO MEET ALL APPLICABLE FEDERAL, STATE, AND LOCAL CODES, LAWS, SAFETY REGULATIONS, HAZARDOUS WASTE LAWS, ETC. THE CONTRACTOR

SHALL FURNISH ALL NECESSARY PERMITS.

11. THE CONTRACTOR SHALL REVIEW THE DRAWINGS AND UNDERSTAND THE SCOPE OF THE DRAWINGS TO BE THE FOLLOWING: THESE CONSTRUCTION DOCUMENTS (DRAWINGS, SPECIFICATIONS, ADDENDA, ETC.)

INDICATE THE GENERAL SCOPE OF THE PROJECT IN TERMS OF ARCHITECTURAL DESIGN CONCEPTS, THE DIMENSIONS OF THE BUILDING, THE MAJOR ARCHITECTURAL ELEMENTS, AND THE MAJOR STRUCTURAL, MECHANICAL, ELECTRICAL, AND DATA SYSTEMS. THE DOCUMENTS DO NOT AND ARE NOT INTENDED TO INDICATE OR DESCRIBE IN DETAIL ALL THE NECESSARY WORK REQUIRED FOR FULL PERFORMANCE OF, AND COMPLETION OF THE REQUIREMENTS OF THE CONTRACT. ON THE BASIS OF THE GENERAL SCOPE INDICATED IN THESE DOCUMENTS, THE TRADE CONTRACTORS SHALL FURNISH ALL ITEMS REQUIRED FOR THE PROPER EXECUTION AND COMPLETION OF THEIR WORK. ALL WORK SHALL BE COMPLETE IN EVERY DETAIL AND THE CONTRACTORS SHALL PROVIDE A ONE YEAR WARRANTY FOR THEIR WORK UNLESS A LONGER WARRANTY IS

INDICATED IN THE SPECIFICATIONS.

12. CONTRACTORS SHALL FOLLOW AND OBEY ALL CITY OF CHICAGO ELEVATOR REQUIREMENTS.

13. SEE RELATED WORK IN ELEVATOR SPECIFICATIONS, SECTION 14 00 00.

DEMOLITION NOTES

A. KEY NOTES AND DRAWINGS ARE INTENDED TO GRAPHICALLY REPRESENT

GENERAL WORK AND DO NOT PORTRAY FULL SCOPE OF THE PROJECT. SEE

SPECIFICATIONS FOR DETAILED REQUIREMENTS.

B. REMOVE EXISTING CONSTRUCTION AS DESIGNATED HEREIN AND CLEAR AREA

OF DEBRIS PRIOR TO PROCEEDING WITH NEW CONSTRUCTION.

C. EXISTING EQUIPMENT REMOVED SHALL BE PROPERLY DISPOSED OFF MEDICAL

CENTER GROUNDS.

D. PATCH WALL OPENING SHALL MATCH THE INTEGRITY OF ADJACENT

CONSTRUCTION UNLESS INDICATED OTHERWISE.

E. NOTIFY COR OF ANY DEMOLITION REQUIRED AND NOT INDICATED FOR

INSTALLATION OF ELECTRICAL OR DATA ITEMS. AFTER SUCH DEMOLITION AND

INSTALLATION, PATCH OR REPLACE MATERIALS AND FINISHES TO MATCH

EXISTING.

F. THE INFORMATION CONTAINED IN THESE DEMOLITION DOCUMENTS DEFINES

GENERAL SCOPE ONLY AND DOES NOT RELIEVE THE CONTRACTOR OF THE

RESPONSIBILITY OF PROVIDING ALL DEMOLITION REQUIRED FOR THE

COMPLETION OF THE PROJECT.

G. REFER TO THE ELECTRICAL DRAWINGS FOR FURTHER INFORMATION

REGARDING DEMOLITION OF ELECTRICAL SYSTEMS.

H. BEFORE THE START OF WORK, IDENTIFY ANY REQUIRED DEMOLITION BEYOND

THE IDENTIFIED PROJECT SCOPE WHETHER ABOVE, BELOW OR OUTSIDE

PROJECT AREA. NOTIFY AND COORDINATE WITH THE COR, PROVIDE

DEMOLITION OF THESE AREAS AND PATCH THE SAME AS A PART OF THE

SCOPE OF THE PROJECT.

I. ALL DEMOLITION WORK SHALL BE PERFORMED WITH DUE CARE AND

DILIGENCE IN ORDER TO PREVENT ARBITRARY DAMAGE OR INTERRUPTION OF

SERVICE OR CONCEALED UTILITIES INTENDED TO REMAIN IN SERVICE.

DISCOVERY OF UTILITIES OR CONDITIONS LOCATED DIFFERENTLY FROM THAT

INDICATED OR THAT ARE NOT IDENTIFIED. SHALL BE REPORTED TO THE

CONTRACTING OFFICER.

J. COORDINATE DUMPSTER WITH VA COR FOR CONSTRUCTION ACCESS ROUTE

AND LOCATIONS OF AREA. COORDINATE WITH COR FOR SCHEDULE OF USE OF

ACCESS ROUTE FOR WASTE REMOVAL AND CONTRACTOR USE OF FREIGHT

ELEVATOR.

ARCHITECTURAL GENERAL NOTES

A. REFER TO PLUMBING, ELECTRICAL, AND MECHANICAL DRAWINGS FOR

ADDITIONAL INFORMATION.

B. CONTRACTOR SHALL PROVIDE BLOCKING AT PARTITIONS AS REQUIRED FOR

MOUNTING OF WALL-MOUNTED ITEMS.

C. CONTRACTOR SHALL PROVIDE SUPPLEMENTAL FRAMING AT WALL OPENINGS

INCLUDING KING STUDS, JACK STUDS, AND CRIPPLE STUDS, AS REQUIRED FOR

COMPLETION OF THE WORK.

D. CONTRACTOR SHALL COORDINATE THE WORK OF TRADES PRIOR TO THE

START OF CONSTRUCTION.

E. CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS PRIOR TO THE

START OF WORK FOR EACH PHASE.

F. CONTRACTOR SHALL NOTIFY THE COR OF DISCREPANCIES IN THE DRAWINGS

AND SPECS PRIOR TO THE START OF WORK.

G. DIMENSIONS SHOWN ARE TO FACE OF STUD FRAMING, FACE OF

CONCRETE/MASONRY WALLS, OR FINISHED FACE OF EXISTING WALL SURFACE.

H. ALL WOOD IN CONTACT WITH CONCRETE SHALL BE PRESSURE TREATED.

I. CONTRACTOR SHALL INSTALL ALL WORK IN ACCORDANCE WITH CURRENT

APPLICABLE CODES AND PUBLISHED STANDARDS.

J. INDICATIONS OF PROJECT LIMITS OR LINES OF DEMARCATION ARE SHOWN

FOR GENERAL SCOPE DEFINITION AND REFLECT THE UNDERSTANDING OF

THE DESIGNER AS TO THE LIMITATIONS OF THE WORK AREA IN AN OCCUPIED

AREA. ACTUAL CONTRACT LIMITS ARE TO BE DETERMINED BY AGREEMENT

BETWEEN THE COR AND CONTRACTOR BEFORE THE START OF THE WORK.

K. THE DRAWINGS AND SPECIFICATIONS ARE SEPARATED INTO DISCIPLINES FOR

CONVENIENCE. THE SEPARATIONS USED ARE USED ONLY FOR THE PURPOSES

OF CONVENIENCE AND REFERENCE AND IN NO WAY DO THEY DEFINE OR LIMIT

THE SCOPE OR INTENT OF ANY PART OF THE DRAWINGS, OR OF THE

DRAWINGS AND SPECIFICATIONS AS A WHOLE. THE FACT THAT THE DRAWINGS

ARE SEPARATED IN NO WAY SUGGESTS THAT THE WORK IS NOT TO BE

CONSTRUCTED AS A COMPLETE, INTEGRATED AND UNIFIED WHOLE.

L. THE DRAWINGS AND SPECIFICATIONS, INCLUDING DRAWINGS PREPARED BY

SPECIFIC ENGINEERING DISCIPLINES ARE COMPLEMENTARY; ITEMS SHOWN IN

ANY ONE LOCATION IN THE DRAWINGS SHALL BE CONSIDERED TO BE

REQUIREMENTS OF THE CONTRACT FOR CONSTRUCTION.

M. DO NOT SCALE THE DRAWINGS. DRAWING SCALES AS INDICATED ARE FOR

REFERENCE ONLY AND ARE NOT INTENDED TO ACCURATELY DEPICT ACTUAL

OR DESIGNATED CONDITIONS. WRITTEN DIMENSIONS SHALL GOVERN.

N. AT AREAS INDICATED TO BE PATCHED AND REPAIRED, THE CONSTRUCTION

AND ASSEMBLY OF THE PATCH OR REPAIR SHALL MATCH THE ASSEMBLY AND

INTEGRITY OF THE ADJACENT EXISTING CONSTRUCTION, FOR FIRE RATING,

MATERIALS, FINISH, THICKNESS, AND QUALITY.

O. ALL DELIVERIES OF EQUIPMENT AND SUPPLIES TO THE PROJECT SHALL BE

LOCATED AT THE ???? DOCK.

P. THE GENERAL CONTRACTOR SHALL COORDINATE THE FINAL LAY DOWN AREA

AND A 10' X 20' MATERIAL STORAGE AREA LOCATION WITH THE COR PRIOR TO

STARTING WORK.

A

LA

R

E GI H,NC

S

G O 52644

P E

N

CO

LU IT

E

NG

RG

U O

A

P ,P

R E

G I

S T

E R

E D

A R

C H I T E C T U R

A L

C O

R P

O T

I O

N

N O

R T H C A R O L

I N A

A R

JE

FFREY A BROOKS

11296R

EG

IS

TERED ARCHITECT

N O

R

T H

C A R O L

I N

ARA

LE

IGH , NORT H CAROL

I N

A

Engineers Architects

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

MICHAEL BLADES & ASSOCIATES, CTO-ELEVATOR CONSULTANTS

/1

/2

:4

:4

P

M

A-001

ARCHITECTURAL SYMBOLS,

ABBREVIATIONS AND NOTES

1 12ANP

ELEVATOR MODERNIZATION

JESSE BROWN VA MEDICAL CENTER

820 S. DAMEN AVENUE

CHICAGO, ILLINOIS 60612 02/12/2020

ISSUED FOR BID AND CONSTRUCTION

537-19-101A18-401

11A

JAB

ABBREVIATIONS

ARCHITECTURAL SYMBOL LEGEND

MICHAEL BLADES & ASSOCIATES, CTO-ELEVATOR CONSULTANTS

01-GEN_AND_ARCH-BID_REDATE
Sheets
G-001 - COVER
G-101 - FIRST FLOOR ICRA PLAN
A-001 - ARCHITECTURAL SYMBOLS, ABBREVIATIONS AND NOTES
AD001 - PASSENGER AND SERVICE ELEVATOR IMAGES
A-100 - NAMING CONVENTION LAYOUT
A-101 - BASEMENT FLOOR AND FIRST FLOOR PLANS
A-102 - SECOND FLOOR AND THIRD FLOOR PLANS
A-103 - FOURTH FLOOR AND FIFTH FLOOR PLANS
A-104 - SIXTH FLOOR AND SEVENTH FLOOR PLANS
A-105 - EIGHTH FLOOR AND NINTH FLOOR PLAN
A-401 - ENLARGED EXISTING FLOOR PLANS
A-402 - ENLARGED EXISTING FLOOR PLANS & ELEVATOR RISER DIAGRAM
05-ELEC,_TECH,_FA-BID
E-18-401-Q23-VA Chicago-JB-Elev Modernization IL_jwbeezley@acg-pa - Sheet - E-001 - ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS
Sheets
E-001 - ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS
E-101 - ELECTRICAL FLOOR PLANS GROUND AND NINTH FLOOR
E-102 - ELECTIRCAL FLOOR PLANS FIRST FLOOR
E-201 - HOISTWAY SECTIONS
E-401 - ELECTRICAL ENLARGEMENTS
E-402 - ELECTRICAL ENLARGEMENTS
E-501 - ELECTRICAL DETAILS
E-602 - ELECTRICAL SCHEDULES
ED401 - ELECTRICAL DEMOLITION ENLARGEMENTS
ED402 - ELECTRICAL DEMOLITION ENLARGEMENTS
EM401 - MECHANICAL POWER ENLARGEMENTS
FA001 - FIRE ALARM GENERAL NOTES, SYMBOLE LEGEND, AND RISER
FA101 - FIRE ALARM PLAN - ELEVATOR LOBBIES
FA102 - FIRE ALARM PLAN - ELEVATOR EQUIPMENT ROOM
T-001 - TECHNOLOGY GENERAL NOTES, SYMBOL LEGEND, AND ABBREVIATIONS
T-101 - SYSTEMS FLOOR PLANS GROUND AND FIRST FLOOR
T-102 - SYSTEMS FLOOR PLANS SECOND AND THIRD FLOOR
T-103 - SYSTEMS FLOOR PLANS FOURTH AND FIFTH FLOOR
T-104 - SYSTEMS FLOOR PLANS SIXTH AND SEVENTH FLOOR
T-105 - SYSTEMS FLOOR PLANS NINTH FLOOR
T-401 - SYSTEMS ENLARGEMENTS
T-402 - SYSTEMS ENLARGEMENTS
T-501 - TECHNOLOGY DETAILS
E-18-401-Q23-VA Chicago-JB-Elev Modernization IL_jwbeezley@acg-pa - Sheet - E-101 - ELECTRICAL FLOOR PLANS GROUND AND NINTH FLOOR
Sheets
E-001 - ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS
E-101 - ELECTRICAL FLOOR PLANS GROUND AND NINTH FLOOR
E-102 - ELECTIRCAL FLOOR PLANS FIRST FLOOR
E-201 - HOISTWAY SECTIONS
E-401 - ELECTRICAL ENLARGEMENTS
E-402 - ELECTRICAL ENLARGEMENTS
E-501 - ELECTRICAL DETAILS
E-602 - ELECTRICAL SCHEDULES
ED401 - ELECTRICAL DEMOLITION ENLARGEMENTS
ED402 - ELECTRICAL DEMOLITION ENLARGEMENTS
EM401 - MECHANICAL POWER ENLARGEMENTS
FA001 - FIRE ALARM GENERAL NOTES, SYMBOLE LEGEND, AND RISER
FA101 - FIRE ALARM PLAN - ELEVATOR LOBBIES
FA102 - FIRE ALARM PLAN - ELEVATOR EQUIPMENT ROOM
T-001 - TECHNOLOGY GENERAL NOTES, SYMBOL LEGEND, AND ABBREVIATIONS
T-101 - SYSTEMS FLOOR PLANS GROUND AND FIRST FLOOR
T-102 - SYSTEMS FLOOR PLANS SECOND AND THIRD FLOOR
T-103 - SYSTEMS FLOOR PLANS FOURTH AND FIFTH FLOOR
T-104 - SYSTEMS FLOOR PLANS SIXTH AND SEVENTH FLOOR
T-105 - SYSTEMS FLOOR PLANS NINTH FLOOR
T-401 - SYSTEMS ENLARGEMENTS
T-402 - SYSTEMS ENLARGEMENTS
T-501 - TECHNOLOGY DETAILS
E-18-401-Q23-VA Chicago-JB-Elev Modernization IL_jwbeezley@acg-pa - Sheet - E-102 - ELECTIRCAL FLOOR PLANS FIRST FLOOR
Sheets
E-001 - ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS
E-101 - ELECTRICAL FLOOR PLANS GROUND AND NINTH FLOOR
E-102 - ELECTIRCAL FLOOR PLANS FIRST FLOOR
E-201 - HOISTWAY SECTIONS
E-401 - ELECTRICAL ENLARGEMENTS
E-402 - ELECTRICAL ENLARGEMENTS
E-501 - ELECTRICAL DETAILS
E-602 - ELECTRICAL SCHEDULES
ED401 - ELECTRICAL DEMOLITION ENLARGEMENTS
ED402 - ELECTRICAL DEMOLITION ENLARGEMENTS
EM401 - MECHANICAL POWER ENLARGEMENTS
FA001 - FIRE ALARM GENERAL NOTES, SYMBOLE LEGEND, AND RISER
FA101 - FIRE ALARM PLAN - ELEVATOR LOBBIES
FA102 - FIRE ALARM PLAN - ELEVATOR EQUIPMENT ROOM
T-001 - TECHNOLOGY GENERAL NOTES, SYMBOL LEGEND, AND ABBREVIATIONS
T-101 - SYSTEMS FLOOR PLANS GROUND AND FIRST FLOOR
T-102 - SYSTEMS FLOOR PLANS SECOND AND THIRD FLOOR
T-103 - SYSTEMS FLOOR PLANS FOURTH AND FIFTH FLOOR
T-104 - SYSTEMS FLOOR PLANS SIXTH AND SEVENTH FLOOR
T-105 - SYSTEMS FLOOR PLANS NINTH FLOOR
T-401 - SYSTEMS ENLARGEMENTS
T-402 - SYSTEMS ENLARGEMENTS
T-501 - TECHNOLOGY DETAILS
E-18-401-Q23-VA Chicago-JB-Elev Modernization IL_jwbeezley@acg-pa - Sheet - E-201 - HOISTWAY SECTIONS
Sheets
E-001 - ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS
E-101 - ELECTRICAL FLOOR PLANS GROUND AND NINTH FLOOR
E-102 - ELECTIRCAL FLOOR PLANS FIRST FLOOR
E-201 - HOISTWAY SECTIONS
E-401 - ELECTRICAL ENLARGEMENTS
E-402 - ELECTRICAL ENLARGEMENTS
E-501 - ELECTRICAL DETAILS
E-602 - ELECTRICAL SCHEDULES
ED401 - ELECTRICAL DEMOLITION ENLARGEMENTS
ED402 - ELECTRICAL DEMOLITION ENLARGEMENTS
EM401 - MECHANICAL POWER ENLARGEMENTS
FA001 - FIRE ALARM GENERAL NOTES, SYMBOLE LEGEND, AND RISER
FA101 - FIRE ALARM PLAN - ELEVATOR LOBBIES
FA102 - FIRE ALARM PLAN - ELEVATOR EQUIPMENT ROOM
T-001 - TECHNOLOGY GENERAL NOTES, SYMBOL LEGEND, AND ABBREVIATIONS
T-101 - SYSTEMS FLOOR PLANS GROUND AND FIRST FLOOR
T-102 - SYSTEMS FLOOR PLANS SECOND AND THIRD FLOOR
T-103 - SYSTEMS FLOOR PLANS FOURTH AND FIFTH FLOOR
T-104 - SYSTEMS FLOOR PLANS SIXTH AND SEVENTH FLOOR
T-105 - SYSTEMS FLOOR PLANS NINTH FLOOR
T-401 - SYSTEMS ENLARGEMENTS
T-402 - SYSTEMS ENLARGEMENTS
T-501 - TECHNOLOGY DETAILS
E-18-401-Q23-VA Chicago-JB-Elev Modernization IL_jwbeezley@acg-pa - Sheet - ED401 - ELECTRICAL DEMOLITION ENLARGEMENTS
Sheets
E-001 - ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS
E-101 - ELECTRICAL FLOOR PLANS GROUND AND NINTH FLOOR
E-102 - ELECTIRCAL FLOOR PLANS FIRST FLOOR
E-201 - HOISTWAY SECTIONS
E-401 - ELECTRICAL ENLARGEMENTS
E-402 - ELECTRICAL ENLARGEMENTS
E-501 - ELECTRICAL DETAILS
E-602 - ELECTRICAL SCHEDULES
ED401 - ELECTRICAL DEMOLITION ENLARGEMENTS
ED402 - ELECTRICAL DEMOLITION ENLARGEMENTS
EM401 - MECHANICAL POWER ENLARGEMENTS
FA001 - FIRE ALARM GENERAL NOTES, SYMBOLE LEGEND, AND RISER
FA101 - FIRE ALARM PLAN - ELEVATOR LOBBIES
FA102 - FIRE ALARM PLAN - ELEVATOR EQUIPMENT ROOM
T-001 - TECHNOLOGY GENERAL NOTES, SYMBOL LEGEND, AND ABBREVIATIONS
T-101 - SYSTEMS FLOOR PLANS GROUND AND FIRST FLOOR
T-102 - SYSTEMS FLOOR PLANS SECOND AND THIRD FLOOR
T-103 - SYSTEMS FLOOR PLANS FOURTH AND FIFTH FLOOR
T-104 - SYSTEMS FLOOR PLANS SIXTH AND SEVENTH FLOOR
T-105 - SYSTEMS FLOOR PLANS NINTH FLOOR
T-401 - SYSTEMS ENLARGEMENTS
T-402 - SYSTEMS ENLARGEMENTS
T-501 - TECHNOLOGY DETAILS
E-18-401-Q23-VA Chicago-JB-Elev Modernization IL_jwbeezley@acg-pa - Sheet - ED402 - ELECTRICAL DEMOLITION ENLARGEMENTS
Sheets
E-001 - ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS
E-101 - ELECTRICAL FLOOR PLANS GROUND AND NINTH FLOOR
E-102 - ELECTIRCAL FLOOR PLANS FIRST FLOOR
E-201 - HOISTWAY SECTIONS
E-401 - ELECTRICAL ENLARGEMENTS
E-402 - ELECTRICAL ENLARGEMENTS
E-501 - ELECTRICAL DETAILS
E-602 - ELECTRICAL SCHEDULES
ED401 - ELECTRICAL DEMOLITION ENLARGEMENTS
ED402 - ELECTRICAL DEMOLITION ENLARGEMENTS
EM401 - MECHANICAL POWER ENLARGEMENTS
FA001 - FIRE ALARM GENERAL NOTES, SYMBOLE LEGEND, AND RISER
FA101 - FIRE ALARM PLAN - ELEVATOR LOBBIES
FA102 - FIRE ALARM PLAN - ELEVATOR EQUIPMENT ROOM
T-001 - TECHNOLOGY GENERAL NOTES, SYMBOL LEGEND, AND ABBREVIATIONS
T-101 - SYSTEMS FLOOR PLANS GROUND AND FIRST FLOOR
T-102 - SYSTEMS FLOOR PLANS SECOND AND THIRD FLOOR
T-103 - SYSTEMS FLOOR PLANS FOURTH AND FIFTH FLOOR
T-104 - SYSTEMS FLOOR PLANS SIXTH AND SEVENTH FLOOR
T-105 - SYSTEMS FLOOR PLANS NINTH FLOOR
T-401 - SYSTEMS ENLARGEMENTS
T-402 - SYSTEMS ENLARGEMENTS
T-501 - TECHNOLOGY DETAILS
E-18-401-Q23-VA Chicago-JB-Elev Modernization IL_jwbeezley@acg-pa - Sheet - E-401 - ELECTRICAL ENLARGEMENTS
Sheets
E-001 - ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS
E-101 - ELECTRICAL FLOOR PLANS GROUND AND NINTH FLOOR
E-102 - ELECTIRCAL FLOOR PLANS FIRST FLOOR
E-201 - HOISTWAY SECTIONS
E-401 - ELECTRICAL ENLARGEMENTS
E-402 - ELECTRICAL ENLARGEMENTS
E-501 - ELECTRICAL DETAILS
E-602 - ELECTRICAL SCHEDULES
ED401 - ELECTRICAL DEMOLITION ENLARGEMENTS
ED402 - ELECTRICAL DEMOLITION ENLARGEMENTS
EM401 - MECHANICAL POWER ENLARGEMENTS
FA001 - FIRE ALARM GENERAL NOTES, SYMBOLE LEGEND, AND RISER
FA101 - FIRE ALARM PLAN - ELEVATOR LOBBIES
FA102 - FIRE ALARM PLAN - ELEVATOR EQUIPMENT ROOM
T-001 - TECHNOLOGY GENERAL NOTES, SYMBOL LEGEND, AND ABBREVIATIONS
T-101 - SYSTEMS FLOOR PLANS GROUND AND FIRST FLOOR
T-102 - SYSTEMS FLOOR PLANS SECOND AND THIRD FLOOR
T-103 - SYSTEMS FLOOR PLANS FOURTH AND FIFTH FLOOR
T-104 - SYSTEMS FLOOR PLANS SIXTH AND SEVENTH FLOOR
T-105 - SYSTEMS FLOOR PLANS NINTH FLOOR
T-401 - SYSTEMS ENLARGEMENTS
T-402 - SYSTEMS ENLARGEMENTS
T-501 - TECHNOLOGY DETAILS
E-18-401-Q23-VA Chicago-JB-Elev Modernization IL_jwbeezley@acg-pa - Sheet - E-402 - ELECTRICAL ENLARGEMENTS
Sheets
E-001 - ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS
E-101 - ELECTRICAL FLOOR PLANS GROUND AND NINTH FLOOR
E-102 - ELECTIRCAL FLOOR PLANS FIRST FLOOR
E-201 - HOISTWAY SECTIONS
E-401 - ELECTRICAL ENLARGEMENTS
E-402 - ELECTRICAL ENLARGEMENTS
E-501 - ELECTRICAL DETAILS
E-602 - ELECTRICAL SCHEDULES
ED401 - ELECTRICAL DEMOLITION ENLARGEMENTS
ED402 - ELECTRICAL DEMOLITION ENLARGEMENTS
EM401 - MECHANICAL POWER ENLARGEMENTS
FA001 - FIRE ALARM GENERAL NOTES, SYMBOLE LEGEND, AND RISER
FA101 - FIRE ALARM PLAN - ELEVATOR LOBBIES
FA102 - FIRE ALARM PLAN - ELEVATOR EQUIPMENT ROOM
T-001 - TECHNOLOGY GENERAL NOTES, SYMBOL LEGEND, AND ABBREVIATIONS
T-101 - SYSTEMS FLOOR PLANS GROUND AND FIRST FLOOR
T-102 - SYSTEMS FLOOR PLANS SECOND AND THIRD FLOOR
T-103 - SYSTEMS FLOOR PLANS FOURTH AND FIFTH FLOOR
T-104 - SYSTEMS FLOOR PLANS SIXTH AND SEVENTH FLOOR
T-105 - SYSTEMS FLOOR PLANS NINTH FLOOR
T-401 - SYSTEMS ENLARGEMENTS
T-402 - SYSTEMS ENLARGEMENTS
T-501 - TECHNOLOGY DETAILS
E-18-401-Q23-VA Chicago-JB-Elev Modernization IL_jwbeezley@acg-pa - Sheet - EM401 - MECHANICAL POWER ENLARGEMENTS
Sheets
E-001 - ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS
E-101 - ELECTRICAL FLOOR PLANS GROUND AND NINTH FLOOR
E-102 - ELECTIRCAL FLOOR PLANS FIRST FLOOR
E-201 - HOISTWAY SECTIONS
E-401 - ELECTRICAL ENLARGEMENTS
E-402 - ELECTRICAL ENLARGEMENTS
E-501 - ELECTRICAL DETAILS
E-602 - ELECTRICAL SCHEDULES
ED401 - ELECTRICAL DEMOLITION ENLARGEMENTS
ED402 - ELECTRICAL DEMOLITION ENLARGEMENTS
EM401 - MECHANICAL POWER ENLARGEMENTS
FA001 - FIRE ALARM GENERAL NOTES, SYMBOLE LEGEND, AND RISER
FA101 - FIRE ALARM PLAN - ELEVATOR LOBBIES
FA102 - FIRE ALARM PLAN - ELEVATOR EQUIPMENT ROOM
T-001 - TECHNOLOGY GENERAL NOTES, SYMBOL LEGEND, AND ABBREVIATIONS
T-101 - SYSTEMS FLOOR PLANS GROUND AND FIRST FLOOR
T-102 - SYSTEMS FLOOR PLANS SECOND AND THIRD FLOOR
T-103 - SYSTEMS FLOOR PLANS FOURTH AND FIFTH FLOOR
T-104 - SYSTEMS FLOOR PLANS SIXTH AND SEVENTH FLOOR
T-105 - SYSTEMS FLOOR PLANS NINTH FLOOR
T-401 - SYSTEMS ENLARGEMENTS
T-402 - SYSTEMS ENLARGEMENTS
T-501 - TECHNOLOGY DETAILS
E-18-401-Q23-VA Chicago-JB-Elev Modernization IL_jwbeezley@acg-pa - Sheet - E-501 - ELECTRICAL DETAILS
Sheets
E-001 - ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS
E-101 - ELECTRICAL FLOOR PLANS GROUND AND NINTH FLOOR
E-102 - ELECTIRCAL FLOOR PLANS FIRST FLOOR
E-201 - HOISTWAY SECTIONS
E-401 - ELECTRICAL ENLARGEMENTS
E-402 - ELECTRICAL ENLARGEMENTS
E-501 - ELECTRICAL DETAILS
E-602 - ELECTRICAL SCHEDULES
ED401 - ELECTRICAL DEMOLITION ENLARGEMENTS
ED402 - ELECTRICAL DEMOLITION ENLARGEMENTS
EM401 - MECHANICAL POWER ENLARGEMENTS
FA001 - FIRE ALARM GENERAL NOTES, SYMBOLE LEGEND, AND RISER
FA101 - FIRE ALARM PLAN - ELEVATOR LOBBIES
FA102 - FIRE ALARM PLAN - ELEVATOR EQUIPMENT ROOM
T-001 - TECHNOLOGY GENERAL NOTES, SYMBOL LEGEND, AND ABBREVIATIONS
T-101 - SYSTEMS FLOOR PLANS GROUND AND FIRST FLOOR
T-102 - SYSTEMS FLOOR PLANS SECOND AND THIRD FLOOR
T-103 - SYSTEMS FLOOR PLANS FOURTH AND FIFTH FLOOR
T-104 - SYSTEMS FLOOR PLANS SIXTH AND SEVENTH FLOOR
T-105 - SYSTEMS FLOOR PLANS NINTH FLOOR
T-401 - SYSTEMS ENLARGEMENTS
T-402 - SYSTEMS ENLARGEMENTS
T-501 - TECHNOLOGY DETAILS
E-18-401-Q23-VA Chicago-JB-Elev Modernization IL_jwbeezley@acg-pa - Sheet - E-602 - ELECTRICAL SCHEDULES
Sheets
E-001 - ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS
E-101 - ELECTRICAL FLOOR PLANS GROUND AND NINTH FLOOR
E-102 - ELECTIRCAL FLOOR PLANS FIRST FLOOR
E-201 - HOISTWAY SECTIONS
E-401 - ELECTRICAL ENLARGEMENTS
E-402 - ELECTRICAL ENLARGEMENTS
E-501 - ELECTRICAL DETAILS
E-602 - ELECTRICAL SCHEDULES
ED401 - ELECTRICAL DEMOLITION ENLARGEMENTS
ED402 - ELECTRICAL DEMOLITION ENLARGEMENTS
EM401 - MECHANICAL POWER ENLARGEMENTS
FA001 - FIRE ALARM GENERAL NOTES, SYMBOLE LEGEND, AND RISER
FA101 - FIRE ALARM PLAN - ELEVATOR LOBBIES
FA102 - FIRE ALARM PLAN - ELEVATOR EQUIPMENT ROOM
T-001 - TECHNOLOGY GENERAL NOTES, SYMBOL LEGEND, AND ABBREVIATIONS
T-101 - SYSTEMS FLOOR PLANS GROUND AND FIRST FLOOR
T-102 - SYSTEMS FLOOR PLANS SECOND AND THIRD FLOOR
T-103 - SYSTEMS FLOOR PLANS FOURTH AND FIFTH FLOOR
T-104 - SYSTEMS FLOOR PLANS SIXTH AND SEVENTH FLOOR
T-105 - SYSTEMS FLOOR PLANS NINTH FLOOR
T-401 - SYSTEMS ENLARGEMENTS
T-402 - SYSTEMS ENLARGEMENTS
T-501 - TECHNOLOGY DETAILS
E-18-401-Q23-VA Chicago-JB-Elev Modernization IL_jwbeezley@acg-pa - Sheet - T-001 - TECHNOLOGY GENERAL NOTES, SYMBOL LEGEND, AND ABBREVIATIONS
Sheets
E-001 - ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS
E-101 - ELECTRICAL FLOOR PLANS GROUND AND NINTH FLOOR
E-102 - ELECTIRCAL FLOOR PLANS FIRST FLOOR
E-201 - HOISTWAY SECTIONS
E-401 - ELECTRICAL ENLARGEMENTS
E-402 - ELECTRICAL ENLARGEMENTS
E-501 - ELECTRICAL DETAILS
E-602 - ELECTRICAL SCHEDULES
ED401 - ELECTRICAL DEMOLITION ENLARGEMENTS
ED402 - ELECTRICAL DEMOLITION ENLARGEMENTS
EM401 - MECHANICAL POWER ENLARGEMENTS
FA001 - FIRE ALARM GENERAL NOTES, SYMBOLE LEGEND, AND RISER
FA101 - FIRE ALARM PLAN - ELEVATOR LOBBIES
FA102 - FIRE ALARM PLAN - ELEVATOR EQUIPMENT ROOM
T-001 - TECHNOLOGY GENERAL NOTES, SYMBOL LEGEND, AND ABBREVIATIONS
T-101 - SYSTEMS FLOOR PLANS GROUND AND FIRST FLOOR
T-102 - SYSTEMS FLOOR PLANS SECOND AND THIRD FLOOR
T-103 - SYSTEMS FLOOR PLANS FOURTH AND FIFTH FLOOR
T-104 - SYSTEMS FLOOR PLANS SIXTH AND SEVENTH FLOOR
T-105 - SYSTEMS FLOOR PLANS NINTH FLOOR
T-401 - SYSTEMS ENLARGEMENTS
T-402 - SYSTEMS ENLARGEMENTS
T-501 - TECHNOLOGY DETAILS
E-18-401-Q23-VA Chicago-JB-Elev Modernization IL_jwbeezley@acg-pa - Sheet - T-101 - SYSTEMS FLOOR PLANS GROUND AND FIRST FLOOR
Sheets
E-001 - ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS
E-101 - ELECTRICAL FLOOR PLANS GROUND AND NINTH FLOOR
E-102 - ELECTIRCAL FLOOR PLANS FIRST FLOOR
E-201 - HOISTWAY SECTIONS
E-401 - ELECTRICAL ENLARGEMENTS
E-402 - ELECTRICAL ENLARGEMENTS
E-501 - ELECTRICAL DETAILS
E-602 - ELECTRICAL SCHEDULES
ED401 - ELECTRICAL DEMOLITION ENLARGEMENTS
ED402 - ELECTRICAL DEMOLITION ENLARGEMENTS
EM401 - MECHANICAL POWER ENLARGEMENTS
FA001 - FIRE ALARM GENERAL NOTES, SYMBOLE LEGEND, AND RISER
FA101 - FIRE ALARM PLAN - ELEVATOR LOBBIES
FA102 - FIRE ALARM PLAN - ELEVATOR EQUIPMENT ROOM
T-001 - TECHNOLOGY GENERAL NOTES, SYMBOL LEGEND, AND ABBREVIATIONS
T-101 - SYSTEMS FLOOR PLANS GROUND AND FIRST FLOOR
T-102 - SYSTEMS FLOOR PLANS SECOND AND THIRD FLOOR
T-103 - SYSTEMS FLOOR PLANS FOURTH AND FIFTH FLOOR
T-104 - SYSTEMS FLOOR PLANS SIXTH AND SEVENTH FLOOR
T-105 - SYSTEMS FLOOR PLANS NINTH FLOOR
T-401 - SYSTEMS ENLARGEMENTS
T-402 - SYSTEMS ENLARGEMENTS
T-501 - TECHNOLOGY DETAILS
E-18-401-Q23-VA Chicago-JB-Elev Modernization IL_jwbeezley@acg-pa - Sheet - T-102 - SYSTEMS FLOOR PLANS SECOND AND THIRD FLOOR
Sheets
E-001 - ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS
E-101 - ELECTRICAL FLOOR PLANS GROUND AND NINTH FLOOR
E-102 - ELECTIRCAL FLOOR PLANS FIRST FLOOR
E-201 - HOISTWAY SECTIONS
E-401 - ELECTRICAL ENLARGEMENTS
E-402 - ELECTRICAL ENLARGEMENTS
E-501 - ELECTRICAL DETAILS
E-602 - ELECTRICAL SCHEDULES
ED401 - ELECTRICAL DEMOLITION ENLARGEMENTS
ED402 - ELECTRICAL DEMOLITION ENLARGEMENTS
EM401 - MECHANICAL POWER ENLARGEMENTS
FA001 - FIRE ALARM GENERAL NOTES, SYMBOLE LEGEND, AND RISER
FA101 - FIRE ALARM PLAN - ELEVATOR LOBBIES
FA102 - FIRE ALARM PLAN - ELEVATOR EQUIPMENT ROOM
T-001 - TECHNOLOGY GENERAL NOTES, SYMBOL LEGEND, AND ABBREVIATIONS
T-101 - SYSTEMS FLOOR PLANS GROUND AND FIRST FLOOR
T-102 - SYSTEMS FLOOR PLANS SECOND AND THIRD FLOOR
T-103 - SYSTEMS FLOOR PLANS FOURTH AND FIFTH FLOOR
T-104 - SYSTEMS FLOOR PLANS SIXTH AND SEVENTH FLOOR
T-105 - SYSTEMS FLOOR PLANS NINTH FLOOR
T-401 - SYSTEMS ENLARGEMENTS
T-402 - SYSTEMS ENLARGEMENTS
T-501 - TECHNOLOGY DETAILS
E-18-401-Q23-VA Chicago-JB-Elev Modernization IL_jwbeezley@acg-pa - Sheet - T-103 - SYSTEMS FLOOR PLANS FOURTH AND FIFTH FLOOR
Sheets
E-001 - ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS
E-101 - ELECTRICAL FLOOR PLANS GROUND AND NINTH FLOOR
E-102 - ELECTIRCAL FLOOR PLANS FIRST FLOOR
E-201 - HOISTWAY SECTIONS
E-401 - ELECTRICAL ENLARGEMENTS
E-402 - ELECTRICAL ENLARGEMENTS
E-501 - ELECTRICAL DETAILS
E-602 - ELECTRICAL SCHEDULES
ED401 - ELECTRICAL DEMOLITION ENLARGEMENTS
ED402 - ELECTRICAL DEMOLITION ENLARGEMENTS
EM401 - MECHANICAL POWER ENLARGEMENTS
FA001 - FIRE ALARM GENERAL NOTES, SYMBOLE LEGEND, AND RISER
FA101 - FIRE ALARM PLAN - ELEVATOR LOBBIES
FA102 - FIRE ALARM PLAN - ELEVATOR EQUIPMENT ROOM
T-001 - TECHNOLOGY GENERAL NOTES, SYMBOL LEGEND, AND ABBREVIATIONS
T-101 - SYSTEMS FLOOR PLANS GROUND AND FIRST FLOOR
T-102 - SYSTEMS FLOOR PLANS SECOND AND THIRD FLOOR
T-103 - SYSTEMS FLOOR PLANS FOURTH AND FIFTH FLOOR
T-104 - SYSTEMS FLOOR PLANS SIXTH AND SEVENTH FLOOR
T-105 - SYSTEMS FLOOR PLANS NINTH FLOOR
T-401 - SYSTEMS ENLARGEMENTS
T-402 - SYSTEMS ENLARGEMENTS
T-501 - TECHNOLOGY DETAILS
E-18-401-Q23-VA Chicago-JB-Elev Modernization IL_jwbeezley@acg-pa - Sheet - T-104 - SYSTEMS FLOOR PLANS SIXTH AND SEVENTH FLOOR
Sheets
E-001 - ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS
E-101 - ELECTRICAL FLOOR PLANS GROUND AND NINTH FLOOR
E-102 - ELECTIRCAL FLOOR PLANS FIRST FLOOR
E-201 - HOISTWAY SECTIONS
E-401 - ELECTRICAL ENLARGEMENTS
E-402 - ELECTRICAL ENLARGEMENTS
E-501 - ELECTRICAL DETAILS
E-602 - ELECTRICAL SCHEDULES
ED401 - ELECTRICAL DEMOLITION ENLARGEMENTS
ED402 - ELECTRICAL DEMOLITION ENLARGEMENTS
EM401 - MECHANICAL POWER ENLARGEMENTS
FA001 - FIRE ALARM GENERAL NOTES, SYMBOLE LEGEND, AND RISER
FA101 - FIRE ALARM PLAN - ELEVATOR LOBBIES
FA102 - FIRE ALARM PLAN - ELEVATOR EQUIPMENT ROOM
T-001 - TECHNOLOGY GENERAL NOTES, SYMBOL LEGEND, AND ABBREVIATIONS
T-101 - SYSTEMS FLOOR PLANS GROUND AND FIRST FLOOR
T-102 - SYSTEMS FLOOR PLANS SECOND AND THIRD FLOOR
T-103 - SYSTEMS FLOOR PLANS FOURTH AND FIFTH FLOOR
T-104 - SYSTEMS FLOOR PLANS SIXTH AND SEVENTH FLOOR
T-105 - SYSTEMS FLOOR PLANS NINTH FLOOR
T-401 - SYSTEMS ENLARGEMENTS
T-402 - SYSTEMS ENLARGEMENTS
T-501 - TECHNOLOGY DETAILS
E-18-401-Q23-VA Chicago-JB-Elev Modernization IL_jwbeezley@acg-pa - Sheet - T-105 - SYSTEMS FLOOR PLANS NINTH FLOOR
Sheets
E-001 - ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS
E-101 - ELECTRICAL FLOOR PLANS GROUND AND NINTH FLOOR
E-102 - ELECTIRCAL FLOOR PLANS FIRST FLOOR
E-201 - HOISTWAY SECTIONS
E-401 - ELECTRICAL ENLARGEMENTS
E-402 - ELECTRICAL ENLARGEMENTS
E-501 - ELECTRICAL DETAILS
E-602 - ELECTRICAL SCHEDULES
ED401 - ELECTRICAL DEMOLITION ENLARGEMENTS
ED402 - ELECTRICAL DEMOLITION ENLARGEMENTS
EM401 - MECHANICAL POWER ENLARGEMENTS
FA001 - FIRE ALARM GENERAL NOTES, SYMBOLE LEGEND, AND RISER
FA101 - FIRE ALARM PLAN - ELEVATOR LOBBIES
FA102 - FIRE ALARM PLAN - ELEVATOR EQUIPMENT ROOM
T-001 - TECHNOLOGY GENERAL NOTES, SYMBOL LEGEND, AND ABBREVIATIONS
T-101 - SYSTEMS FLOOR PLANS GROUND AND FIRST FLOOR
T-102 - SYSTEMS FLOOR PLANS SECOND AND THIRD FLOOR
T-103 - SYSTEMS FLOOR PLANS FOURTH AND FIFTH FLOOR
T-104 - SYSTEMS FLOOR PLANS SIXTH AND SEVENTH FLOOR
T-105 - SYSTEMS FLOOR PLANS NINTH FLOOR
T-401 - SYSTEMS ENLARGEMENTS
T-402 - SYSTEMS ENLARGEMENTS
T-501 - TECHNOLOGY DETAILS
E-18-401-Q23-VA Chicago-JB-Elev Modernization IL_jwbeezley@acg-pa - Sheet - T-401 - SYSTEMS ENLARGEMENTS
Sheets
E-001 - ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS
E-101 - ELECTRICAL FLOOR PLANS GROUND AND NINTH FLOOR
E-102 - ELECTIRCAL FLOOR PLANS FIRST FLOOR
E-201 - HOISTWAY SECTIONS
E-401 - ELECTRICAL ENLARGEMENTS
E-402 - ELECTRICAL ENLARGEMENTS
E-501 - ELECTRICAL DETAILS
E-602 - ELECTRICAL SCHEDULES
ED401 - ELECTRICAL DEMOLITION ENLARGEMENTS
ED402 - ELECTRICAL DEMOLITION ENLARGEMENTS
EM401 - MECHANICAL POWER ENLARGEMENTS
FA001 - FIRE ALARM GENERAL NOTES, SYMBOLE LEGEND, AND RISER
FA101 - FIRE ALARM PLAN - ELEVATOR LOBBIES
FA102 - FIRE ALARM PLAN - ELEVATOR EQUIPMENT ROOM

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .