36C25220R0063-062.pdf
PDF Posted
- Attached to
- Z1DA--537-19-101 Taylor Elevator Modernization Federal contract opportunity
- Solicitation number
- 36C25220R0063
About this file
This package includes construction documents and specifications for elevator modernization work at the Jesse Brown VA Medical Center in Chicago, Illinois. The project involves upgrading seven passenger elevators and three service elevators across nine floors. Bidders are advised to carefully review the drawings and specifications, which provide details on demolition requirements, infection control protocols during construction, and notes regarding deliveries and staging. The solicitation number for this opportunity is 36C25220R0063, and it was issued by the Department of Veterans Affairs Veterans Health Administration VISN 12. Bids are due by February 12, 2020 according to the cover sheet.
36C25220R0063 S02 - Attchmt3 - Drawings 1 of 3 537-19-101.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25220R0063_8.docx | DOCX document | |
| 36C25220R0063 0003.docx | DOCX document | |
| S06 - FA-001 Addendum 1.pdf | ||
| S06 - Specs 014500 QualityControl.pdf | ||
| S06 - Specs 000115 List of Drawings.pdf | ||
| 36C25220R0063_7.docx | DOCX document | |
| S06 - Addendum1.pdf | ||
| S06 - Specs 024119 SelectiveDemolition.pdf | ||
| S06 - A-402_Addendum 1.pdf | ||
| S06 - A-601_Addendum 1.pdf | ||
| S06 - Consolidated RFI Response 537-19-101.pdf | ||
| S06 - Specs 000110 TOC 18-401.pdf | ||
| 36C25220R0063_6.docx | DOCX document | |
| 36C25220R0063-068.pdf | ||
| 36C25220R0063-067.docx | DOCX document | |
| 36C25220R0063-060.pdf | ||
| 36C25220R0063-059.docx | DOCX document | |
| 36C25220R0063-066.pdf | ||
| 36C25220R0063-064.pdf | ||
| 36C25220R0063-061.pdf | ||
| 36C25220R0063-063.pdf | ||
| 36C25220R0063-065.pdf |
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A
LA
R
E GI H,NC
S
G O 52644
P E
N
CO
LU IT
E
NG
RG
U O
A
P ,P
R E
G I
S T
E R
E D
A R
C H I T E C T U R
A L
C O
R P
O T
I O
N
N O
R T H C A R O L
I N A
A R
JE
FFREY A BROOKS
11296R
EG
IS
TERED ARCHITECT
N O
R
T H
C A R O L
I N
ARA
LE
IGH , NORT H CAROL
I N
A
Engineers Architects
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
PROJECT SITE MAP PROJECT LOCATION MAP
MICHAEL BLADES & ASSOCIATES, CTO-ELEVATOR CONSULTANTS
/1
/2
:4
:1
P
M
G-001
COVER
1 2ANP
ELEVATOR MODERNIZATION
JESSE BROWN VA MEDICAL CENTER
820 S. DAMEN AVENUE
CHICAGO, ILLINOIS 60612 02/12/2020
ISSUED FOR BID AND CONSTRUCTION
537-19-101A18-401
11A
ELEVATOR MODERNIZATION
JESSE BROWN VA MEDICAL CENTER
820 S. DAMEN AVENUE
CHICAGO, ILLINOIS 60612
VA PROJECT #: 537-19-101A
JAB
DRAWING LIST
GENERAL
G-001 COVER 1 2
G-101 FIRST FLOOR ICRA PLAN 2 2
ARCHITECTURAL
A-001 ARCHITECTURAL SYMBOLS, ABBREVIATIONS AND NOTES 1 12
AD001 PASSENGER AND SERVICE ELEVATOR IMAGES 2 12
A-100 NAMING CONVENTION LAYOUT 3 12
A-101 BASEMENT FLOOR AND FIRST FLOOR PLANS 4 12
A-102 SECOND FLOOR AND THIRD FLOOR PLANS 5 12
A-103 FOURTH FLOOR AND FIFTH FLOOR PLANS 6 12
A-104 SIXTH FLOOR AND SEVENTH FLOOR PLANS 7 12
A-105 EIGHTH FLOOR AND NINTH FLOOR PLAN 8 12
A-401 ENLARGED EXISTING FLOOR PLANS 9 12
A-402 ENLARGED EXISTING FLOOR PLANS & ELEVATOR RISER DIAGRAM 10 12
A-601 EXISTING PLAN AND ELEVATION 11 12
A-602 FLOOR AND CEILING FINISHES 12 12
FIRE PROTECTION
FX001 FIRE PROTECTION GENERAL INFORMATION 1 3
FX101 GROUND FLOOR FIRE PROTECTION PLAN 2 3
FX102 NINTH FLOOR FIRE PROTECTION PLAN 3 3
PLUMBING
P-001 PLUMBING GENERAL INFORMATION 1 2
PW100 GROUND FLOOR DRAIN, WASTE, AND VENT PLAN 2 2
MECHANICAL
M-001 MECHANICAL GENERAL INFORMATION 1 6
MD101 NINTH FLOOR MECHANICAL DEMOLITION PLAN 2 6
MH101 NINTH FLOOR MECHANICAL PLAN 3 6
M-501 MECHANICAL DETAILS 4 6
M-502 MECHANICAL CONTROLS 5 6
M-601 MECHANICAL SCHEDULES 6 6
ELECTRICAL
E-001 ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS 1 11
E-101 ELECTRICAL FLOOR PLANS GROUND AND NINTH FLOOR 2 11
E-102 ELECTIRCAL FLOOR PLANS FIRST FLOOR 3 11
E-201 HOISTWAY SECTIONS 4 11
ED401 ELECTRICAL DEMOLITION ENLARGEMENTS 5 11
ED402 ELECTRICAL DEMOLITION ENLARGEMENTS 6 11
E-401 ELECTRICAL ENLARGEMENTS 7 11
EM401 MECHANICAL POWER ENLARGEMENTS 8 11
E-501 ELECTRICAL DETAILS 9 11
E-601 ELECTRICAL SINGLE-LINE AND SCHEDULES 10 11
E-602 ELECTRICAL SCHEDULES 11 11
TECHNOLOGY
T-001 TECHNOLOGY GENERAL NOTES, SYMBOL LEGEND, AND ABBREVIATIONS 1 9
T-101 SYSTEMS FLOOR PLANS GROUND AND FIRST FLOOR 2 9
T-102 SYSTEMS FLOOR PLANS SECOND AND THIRD FLOOR 3 9
T-103 SYSTEMS FLOOR PLANS FOURTH AND FIFTH FLOOR 4 9
T-104 SYSTEMS FLOOR PLANS SIXTH AND SEVENTH FLOOR 5 9
T-105 SYSTEMS FLOOR PLANS NINTH FLOOR 6 9
T-401 SYSTEMS ENLARGEMENTS 7 9
T-402 SYSTEMS ENLARGEMENTS 8 9
T-501 TECHNOLOGY DETAILS 9 9
FIRE ALARM
FA001 FIRE ALARM GENERAL NOTES, SYMBOLE LEGEND, AND RISER 1 3
FA101 FIRE ALARM PLAN - ELEVATOR LOBBIES 2 3
FA102 FIRE ALARM PLAN - ELEVATOR EQUIPMENT ROOM 3 3
ISSUED FOR BID AND CONSTRUCTION
MICHAEL BLADES & ASSOCIATES, CTO-ELEVATOR CONSULTANTS
PROJECT
LOCATION
JESSE BROWN
VAMC CHICAGO,
ILLINOIS
DocuSign Envelope ID: DB6390C2-326C-4F6F-95FC-61D9C19491B1
2/12/2020
EX
EX
EX
CLEAN
STORAGE
ALCOVE
1266A
WHEELCHAIR
STORAGE
1249A
1329A
13E5
ELECTRICAL
13E4
PNEUMATIC
TUBE
MICRO
CONTROLLER
FAC
1210A
FAC
ELECTRICAL
12E4
ELECTRICAL
12E2
CORRIDOR
CORRIDOR
C1301
MAIN ENTRANCE
CORRIDOR
C1203
CORRIDOR
C1204
CORRIDOR
CHAIR STATION
CUBICLES
1259A
HALLWAY
TEMPORARY
NURSES
STATION
PATIENT
WAITING AREA
PATIENT TOILET
(BARIATRIC)
BIO-MED REPAIR
CLEAN
STORAGE (WET)
CLEAN
STORAGE (DRY)
NURSE
MANAGER
CHIEF
PHYSICIAN
SOCIAL
WORKER
CHAIR STATION
CUBICLES
STAFF TOILET
LOCKERS
1264A
CONFERENCE
LUNCH RM
VESTIBULE
RECEPTION
CHECK-IN
RECEPTION
CHECK-IN
1294A
SKYLIGHT
CORRIDOR
C1104
CORRIDOR
CORRIDOR
C1305
1302C
CORRIDOR
C1302
CORRIDOR
C1303
WAITING RM
OUTPATIENT
SPECIMEN LAB
REST RM
REST RM
WOMENS REST
RM
MALE REST RM
CORRIDOR
C1304
SOILED UTILITY
RM
MRI SUITE
1345 IMAGING SUPV
OFFICE
1345A
VIEW
1345C
IP HOLDING
1345E
HAC
FUTURE
ELEVATOR
ELEVATOR
P-7B
STAIR
NO 7
TEL PHONE/
DATA RM
13T1
WOMENS
TOILET
ELEVATOR
P-8B
ELEVATOR
P-9B
ELEVATOR
S-10B
HAC
SUPV BLOOD
DRAW OFFICE
1363A
MULTI
PURPOSE RM
OUTPATIENT
SPECIMEN LAB
1363C
OUTPATIENT
RADIOLOGY
WAITING AREA
CORRIDOR
REST RM
DRESSING RM
DRESSING RM
ULTRASOUND
OUTPATIENT
RADIOLOGY
EXAM/
TREATMENT RM
CONTROL RM
STAIR
NO 6
HOLDING AREA
FIRE RISER
1390A
DRESSING RM
1390B
DRESSING RM
MRI CONTROL
RM
MRI SCAN RM
MECH RM
MRI EQUIP
1390D
MRI GANTRY RM
1345I
CONTROL RM
1345G
SUPPORT
ALCOVE
1345H
STAGING
1345F
DRESS
1345D
OFFICE
TOILET
1345B
MOHS LAB
CANTEEN
RETAIL
STORAGE
DECON
EQUIPMENT
CORRIDOR
ELECTRICAL
13E2
CORRIDOR
PHOTO
THERAPY
WAITING
PROCEDURE
RM-A
PROCEDURE
RM-B
ACCESSIBLE
STAFF TOILET
STORAGE
13E3
STAIR
NO 8
PHYSICIAN
OFFICE
EXAM RM-6
EXAM RM-5
EXAM RM-4
EXAM RM-3
EXAM RM-2
EXAM
RM -1
INTAKE NURSE
CLERICAL
SUPPORT
TRANSFORMER
RM
CORRIDOR
C1205
LOADING DOCK
RADIOACTIVE
STORAGE
FLAMABLE
STORAGE
CORRIDOR
C1202
CORRIDOR
C1201
OFFICE
1302A
STAIR
NO 9
CANTEEN
DINING AREA
FOOD SVC
VENDING
KITCHEN
KITCHEN
OFFICE
ELECTRICAL
12E3
STORAGE
DISH WASHING
HAC
CANTEEN
STORAGE
REFR
REFR
CORRIDOR
C1206
MAIL RM
CANTEEN
STORAGE
WAREHOUSE
IRM STORAGE
MECH
BIO-MED REPAIR
EXIST SHAFT
STAIR
NO 10
MECH RM
WATER
TREATMENT
STORAGE
IRM
12T1
TELEPHONE
ELEVATOR
ST1
ELEVATOR
ELEVATOR
PT2
STAIR
NO 11
ELEVATOR
PT4
ELEVATOR
PT3
CORRIDOR
C1207
OUTPATIENT
PHARMACY
FEMALE TOILET
STORAGE
MALE TOILET
UNISEX TOILET
NARCOTIC
VAULT
EMS HAC
PHARMACY
OFFICE STAFF
OPERATIONS
MGR
PROCUREMENT
PHARMACIST
OFFICE
CHIEF
STORAGE
1213A
COPIER /
STORAGE
CONFERENCE
RM
ELECTRICAL
CLOSET
12E1
OFFICE STAFF
OFFICE STAFF
OFFICE
OFFICE STAFF
STAIR
NO 12
LOUNGE
1209 HAC
1207 SUPV OFFICE
WAITING
WAITING
WAITING
WAITING
WAITING
OFFICE
CONSULT
OFFICE
TELECOM
12T2
CORRIDOR
C1115
CORRIDOR
C1114
CORRIDOR
C1112
CORRIDOR
C1111
CORRIDOR
C1110
CORRIDOR
C1109
CORRIDOR
C1107
CORRIDOR
C1106
CORRIDOR
C1105
CORRIDOR
C1108
CORRIDOR
C1113
DIETICIAN
OFFICE
PHARMACY
CONSULTATION
1195A
CASHIER
STORAGE
AGENT CASHIER
PHARMACY
STAFF
1195B
ELECTRICAL
11E4
NURSE
TELEPHONE RM
SUPV CLINIC
SUPPORT
OFFICE
STORAGE/
COPIER
DERMATOLOGY
EXAM RM
NURSE OFFICE
NURSE OFFICE
URGENT CARE
EXAM RM
NURSE OFFICE
URGENT CARE
EXAM RM
NURSE RM
GU NURSE
URGENT CARE
EXAM RM
EXAM RM
1181B
EXAM RM
1181A
MENS TOILET
WOMENS
TOILET
ELECTRICAL
11E3
EXAM RM
GREEN CLINIC
ATTENDING
OFFICE
EXAM RM
URGENT CARE
EXAM RM
EXAM RM
URGENT CARE
CONSULTATION
RM
NURSE OFFICE
NURSE OFFICE
NURSE OFFICE
GREEN CLINIC
EXAM RM
EXAM RM
GREEN CLINIC
EXAM RM
EXAM RM
EXAM RM BLUE
CLINIC
NURSE RM
EXAM RM
MENS TOILET
WOMENS
TOILET
ELECTRICAL
11E2
EXAM RM
EXAM RM
EXAM RM
EXAM RM
EXAM RM
URGENT CARE
CONSULTATION
RM
NURSE OFFICE
NURSE OFFICE
EXAM RM
UROLOGY
EXAM RM
EXAM /
SCREENING
EXAM RM
EXAM /
SCREENING
EXAM RM
EXAM /
SCREENING
MENS TOILET
TOILET
ELECTRICAL
11E1
UROLOGY
EXAM RM
EXAM /
SCREENING
GU CLINIC
EXAM RM
EXAM /
SCREENING
GU CLINIC
EXAM RM
CONSULTATION
RM
NURSE INTAKE
NURSE INTAKE
TOILET
TELECOM
11T1
NURSE OFFICE
GU
PHARMACIST
EXAM RM
CHANGING RM
CLEAN SUPPLY
DIRTY UTILITIES
LOUNGE
RN OFFICE
1200A
BEHAVIORAL
HEALTH LAB
1200B
CONFERENCE
RM
MENTAL
HEALTH
URGENT CARE
EXAM RM
1182A
URGENT CARE
EXAM RM
1182B
URGENT CARE
EXAM RM
1162A
EXAM RM
EXAM RM
1161B
EXAM RM
1161A
EXAM RM
URGENT MAINT
VACANT
TOILET
1139A
URODYNAMIC
AND
ULTRASOUND
UROLOGY
TREATMENT
PROCEDURE
EXAM /
SCREENING-6
BREAK RM
TOILET
HAC
ELECTRICAL
STORAGE
MECH SPACE
VESTIBULE
COOKING AREA
FIRE CLOSET
ELECTRICAL
CLOSET
EQUIP CLOSET
TOOL STORAGE
FIRE CLOSET
PATHOLOGY
LAB
RETAIL
STORAGE
CORRIDOR
PHONE CLOSET
CORRIDOR
CORRIDOR
1210C
PT1
1275A
1280A
STAIRS/TRANSFORMER
1345J
1376A
P-6B
1361A
1191 1128
C1204
C1203
RESIDENT
TEAM
1225A
CORRIDOR
GENERATOR RM
1300A
STAIR
CHIEF OFFICE
1302B
URGENT CARE
EXAM RM
URGENT CARE
EXAM RM
ELECTRICAL
13E1
OFFICE
CLOSET
1394A
TAYLOR STREET
TAYLOR STREET
SOUTH DAMEN AVENUE
METAL
DOOR
PICK UP WINDOW
R
AM
P
OVERHEAD DOOR
PLATFORM
CONCRETE
OVERHEAD DOOR
OVERHEAD DOOR
OVERHEAD DOOR
OVERHEAD DOOR
OVERHEAD DOOROVERHEAD DOOR
LOUVER WINDOW
HIGH MAGNET AREA
HALL MODULE-F HALL MODULE-C
MODULE-E MODULE-CMODULE-D MODULE-B MODULE-A
HALL MODULE-E
MODULE-H MODULE-GMODULE-I MODULE-F
HALL MODULE-H HALL MODULE-G
DIABETES CLINIC
HALL MODULE-A
HALL MODULE-BHALL MODULE-D
PICK UP WINDOW
7 6 5 4 3
R
F
(CUBICLE)
F
F
F
F
F
F
F
F
F
F
F
(CUBICLE)
FEC
FEC
WALL
GUARD
WALL
GUARD
WALL
GUARD
RAMP DN
LANDING
RAMP DN
WALL
GUARD
F
F
WALL
GUARD
WALL
GUARD
SIDE WALK
FEC
DN UP
III/IVLOW Risk Group 1
Class III
Note: Infection Control approval will be required when the Construction Activity and Risk Level indicate that
It is the Contractor's Responsibility to provide the following Infection Control Precautions depending upon the Area Class Designation
II
I
III
MEDIUM Risk Group 2
HIGH Risk Group 3
HIGHEST Risk Group 4 IV
IV
IV
III/IV
III/IV
III
III/IV
I
III
Patient Risk Group Table
Infection Control Matrix - Class of Precautions: Construction Project by Patient Risk
TYPE A
Construction Project Type
Major demolition and construction projects
Includes, but is not limited to:
- activities which require consecutive work shifts
- requires heavy demolition or removal of a complete ceiling system
- new construction
Work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies
Includes, but is not limited to:
- sanding of walls for painting or wall covering
- removal of floor coverings, ceiling tiles and casework
- new wall construction
- minor duct work or electrical work above ceilings
- major cabling activities
- any activity which cannot be completed within a single work shift
Small scale, short duration activities which create minimal dust
Includes, but is not limited to:
- installation of telephone and computer cabling
- access to chase spaces
- cutting of walls or ceiling where dust migration can be controlled
Inspection and Non-Invasive Activities
Includes, but is not limited to:
- removal of ceiling tiles for visual inspection limited to 1 tile to 50 square feet
- painting (but not sanding), wall covering
- electrical trim work, minor plumbing, and activities which do not generate dust or require cutting of walls or access to ceilings other than for visual inspection
Type of Construction / Project Activity Table
Group 2 Medium Risk
Group 1 Low Risk
- Bldg. #69 Therapy areas
- Respiratory Therapy
- Outpatient Clinics
- CBOC's
- Mental Health Units
- VACANT AREA ADJACENT TO
OCCUPIED AREA
- Office areas (non-clinical)
- Hallways
- FES/EMS areas
I
Patient Risk Group
TYPE D
TYPE C
TYPE B
TYPE A
Group 4 Highest Risk
Group 3 High Risk
- Pharmacy
- Radiology/ CT Scanner
- Urgent Care
- Laboratories
- CLCs (1B Med, 59B, 138A, 138B)
- SPD; AMCU; 1B Medicine;
- Respiratory Isolation Rooms
III
TYPE DTYPE CTYPE B
Class IVor control procedures are necessary.
C
LA
S S
IV
C
LA
S
S
II
During Construction Project
C L-
I C
LA
S
S
II
I
1. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.
2. Contain construction waste before transport in tightly covered containers.
3. Cover transport receptacles or carts. Tape covering
4. Vacuum work area with HEPA filtered vacuums.
5. Wet mop area with disinfectant after barriers are removed.
6. Remove or isolate HVAC system in areas where work was being performed.
1. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.
2. Contain construction waste before transport in tightly covered containers.
3. Cover transport receptacles or carts. Tape covering.
4. Vacuum work with HEPA-filtered vacuums.
5. Wet mop with disinfectant.
6. Remove isolation of HVAC system in areas where work is being performed.
1. Wipe surfaces to remove dust.
Upon Completion of Project
1. Wipe work surfaces with disinfectant.
2. Contain construction waste before transport in tightly covered containers.
3. Wet mop and/or vacuum work area with HEPA filtered vacuum before leaving work areas.
4. Remove isolation of HVAC system in areas where work is being performed.
1. Includes all activities required by Class II
2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities
Management Maintenance and Engineering department before construction begins.
3. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.
4. Complete all critical barriers before construction begins or implement control cube method.
5. Maintain negative air pressure within work site utilizing HEPA-equipped air filtration units.
6. Contain construction waste before transport in tightly covered containers.
7. Cover transport receptacles or carts. Tape covers.
8. Wet mop and/or vacuum with HEPA filtered vacuum before leaving work areas.
9. Remove isolation of HVAC system in areas where work is being performed.
1. Execute work by methods to minimize raising dust from construction operations.
2. Immediately replace a ceiling tile displaced for visual inspection.
1. Includes all activities required by Class I
2. Provide active means to prevent airborne dust from dispersing into atmosphere.
3. Water mist work surfaces to control dust while cutting.
4. Seal unused doors with duct tape.
5. Block off and seal air vents.
6. Replace adhesive walk-off mats at entrance and exit of work area. Replace used mats in accordance with manufacturer's recommendations.
7. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.
1. Includes all activities required by Class III
2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities
Management Maintenance and Engineering department before construction begins.
3. Isolate HVAC system in areas where work is being done to prevent contamination of duct system.
4. Complete all critical barriers or implement control cube method before construction begins.
5. Maintain negative air pressure within work site utilizing HEPA equipped air filtration units.
6. Seal holes, pipes, conduits, and punctures appropriately.
7. Construct anteroom and require all personnel to pass through this room so they can be vacuumed sing a HEPA vacuum cleaner before leaving work site or they can wear cloth or paper coveralls that re removed each time they leave the work site.
8. All personnel entering work site are required to wear shoe covers. Shoe covers must be changed each time the worker exits the work area.
9. Place adhesive walk-off mats at entrance to work area within anteroom.
10. Replace per manufacturer's recommendations. Do not remove barriers from work area until completed project is inspected each by the Hospital Safety Officer, Facilities Management Maintenance and Engineering Department and thoroughly cleaned by the Hospital Environmental Services Department or their contracted Environmental Service Company Contain construction waste before transport in tightly covered containers.
11. Cover transport receptacles or carts. Tape covering
12. Vacuum work area with HEPA filtered vacuums.
13. Wet mop with disinfectant after barriers are removed.
14. Remove isolation of HVAC system in areas where work is being performed.
INFECTION CONTROL RISK MITIGATION RECOMMENDATIONS MATRIX OF
PRECAUTIONS FOR CONSTRUCTION AND RENOVATION
3-5/8" STEEL STUD @ 16"
O.C., MIN. 18 GAUGE
ONE LAYER 5/8" GYPSUM
WALLBOARD EA. SIDE
CEILING - SEE RCP
STOP GYPSUM WALL
BOARD 1/2" ABOVE
FLOOR. SEAL EACH SIDE
WITH STC 63 SMOKE AND
ACOUSTIC SEALANT.
SECURE BOTTOM
RUNNER TO FLOOR SLAB
MINERAL WOOL FILLING
FLUTES, FLUSH WITH WALL
SURFACE
APPLY 1/8" DEEP SMOKE
AND ACOUSTIC SEALANT
OVER MINERAL WOOL,
OVERLAPPING 1/2" ONTO
DECK AND WALL
SUBSTRATES.
UL U465 STC 40
3" MINERAL WOOL BATT
INSULATION
BASE TO
MATCH EXISTING
SILL
PLAN
HEAD
DECK
SECURE TOP DEFLECTION
TRACK TO UNDERSIDE OF
DECK. NEST TOP TRACK,
BUT DO NOT ATTACH TO
DEFLECTION TRACK
0201 04
CONSTRUCTION
ACCESS
W T
A Y
L O
R S
T R
E E
T
SOUTH DAMEN AVENUE
CRANE LOCATION FOR ALL EQUIPMENT
TAYLOR DOCK
Crane Lifts may only be on Sundays between the hours of 6:00 AM thru 6:00 PM
DELIVERIES AT TAYLOR DOCK WILL BE
ALLOWED FROM 6 PM TO 10 PM ONLY.
ALL OTHER EQUIPMENT AND MATERIAL
DELIVERIES DURING THE HOURS OF 7 AM - 5 PM
MUST BE SCHEDULED WITH THE CR AT THE
POLK STREET DOCK.
A
LA
R
E GI H,NC
S
G O 52644
P E
N
CO
LU IT
E
NG
RG
U O
A
P ,P
R E
G I
S T
E R
E D
A R
C H I T E C T U R
A L
C O
R P
O T
I O
N
N O
R T H C A R O L
I N A
A R
JE
FFREY A BROOKS
11296R
EG
IS
TERED ARCHITECT
N O
R
T H
C A R O L
I N
ARA
LE
IGH , NORT H CAROL
I N
A
Engineers Architects
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
MICHAEL BLADES & ASSOCIATES, CTO-ELEVATOR CONSULTANTS
/1
/2
:4
:1
P
M
G-101
FIRST FLOOR ICRA PLAN
2 2ANP
ELEVATOR MODERNIZATION
JESSE BROWN VA MEDICAL CENTER
820 S. DAMEN AVENUE
CHICAGO, ILLINOIS 60612 02/12/2020
ISSUED FOR BID AND CONSTRUCTION
537-19-101A18-401
11A
JAB
0 8 16 32 N
O R
T H
PLAN
01 PROVIDE TEMPORARY PROTECTIVE PLASTIC BARRIER
WITH ZIPPER ENTRY TO THE BOTTOM OF CEILING
02 STICKY MAT AT ALL CONSTRUCTION ACCESS POINT
03 CONSTRUCTION ROUTE - CONSTRUCTION MATERIALS
ROUTE IS THROUGH THE BASEMENT LEVEL (GROUND
FLOOR) AND ELEVATOR SHAFTS. (FOR UPPER FLOORS,
CONTRACTOR TO COORDINATE WITH COR) - MAINTAIN A
MINIMUM OF 5'-0" CLEAR WIDTH IN CORRIDORS AT ALL
TIMES
04 USE PORTABLE DUST EXTRACTOR AND AIR SCRUBBER
WITH HEPA FILTRATION SYSTEM. VERIFY DISCHARGE
LOCATION WITH COR
05 REFER TO INFECTION CONTROL RISK ASSESSMENT
PACKAGE FOR MORE INFORMATION
06 AREA OF WORK
## KEY NOTES
ICRA GENERAL NOTES
A. NO MAJOR EQUIPMENT ACCESS THROUGH THE
BUILDING BETWEEN 7AM TO 5PM. CONTRACTOR TO
COORDINATE WITH VA COR.
B. ALL LOBBY WORK SHALL BE COMPLETED DURING
AFTER HOURS 4:00 PM TO 11:00 PM.
INFECTION CONTROL KEYNOTES
PROVIDE CONSTRUCTION FENCING TO PREVENT
ACCESS DURING CONSTRUCTION. CONTRACTOR
TO PROVIDE DRAWING SHOWING LIMITS TO VA PRIOR
TO CONSTRUCTION OF EACH PHASE.
WALL TO FLIP TO EITHER SIDE TO FACILITATE THE
EGRESS DURINGCONSTRUCTION. ALLOW
MAX. 3'-0" FOR CONSTRUCTION SIDE.AREA
OF FLOOR, CEILING AND ACTUALINSTALLATION
OF DOOR TO BE CONSTRUCTED AFTER HOURS.
COORDINATE SCHEDULE WITH VA.
Scale: 3/4" = 1'-0"
ICRA BARRIER WALL TYPE
IC1
IC2
Scale: 1/16" = 1'-0"
FIRST FLOOR PLAN OVERALL
AFF ABOVE FINISHED FLOOR
ACP/APC ACOUSTIC CEILING PANEL/
ACOUSTIC PANEL CEILING
ACT ACOUSTIC(AL) TILE
ADJ ADJUSTABLE
ADT'L ADDITIONAL
AGG AGGREGATE
ALT ALTERNATE
AL ALUMINUM
APPROX APPROXIMATE(LY)
ASPH ASPHALT
AUTO AUTOMATIC
B/O BOTTOM OF
BD BOARD
BLDG BUILDING
BLKG BLOCKING
BOT BOTTOM
BRG BEARING
CENTERLINE
C/C CENTER TO CENTER
CJ CONTROL JOINT
CLL CONTRACT LIMIT LINE
CEM CEMENT(ITIOUS)
CMU CONCRETE MASONRY UNIT
CLG CEILING
CLR CLEAR
COL COLUMN
CONC CONCRETE
CONST CONSTRUCTION
CONT CONTINUOUS
CPT CARPET
CT CERAMIC TILE
CTR CENTER(ED)
DF DRINKING FOUNTAIN
DS DOWNSPOUT
DBL DOUBLE
DEG DEGREE
DEMO DEMOLITION
DET/DTL DETAIL
DIA DIAMETER
DIM DIMENSION
DN DOWN
DWG(S) DRAWING(S)
E EAST
EC ELECTRICAL CONTRACTOR
EHO ELECTRICAL HOLD OPEN
EJ EXPANSION JOINT
EW EACH WAY
EA EACH
EIFS EXTERIOR INSULATION
FINISH SYSTEM
EL ELEVATION
ELEC ELECTRIC(AL)
ELEV ELEVATOR
EMER EMERGENCY
EQ EQUAL
EQUIP EQUIPMENT
EXIST EXISTING
EXT EXTERIOR
EWC ELECTRIC WATER COOLER
FD FLOOR DRAIN
FE FIRE EXTINGUISHER
FFE FINISH FLOOR ELEVATION
FV FIELD VERIFY
FEC FIRE EXTINGUISHER CABINET
FDN FOUNDATION
FIN FINISH
FLSHG FLASHING
FLR FLOOR
FRMG FRAMING
FT FOOT/FEET
FTG FOOTING
GC GENERAL CONTRACTOR
GA GAUGE
GALV GALVANIZED
GEN GENERAL
GYP GYPSUM
HM HOLLOW METAL
HDWR HARDWARE
HOL HOLLOW
HOR HORIZONTAL
HT HEIGHT
HVAC HEATING/VENTILATION/AIR
CONDITIONING
IDPH ILLINOIS DEPARTMENT OF
PUBLIC HEALTH
ID INSIDE DIAMETER
IN INCH
INCL INCLUDING
INSUL INSULATION
INT INTERIOR
JAN JANITOR
JT JOINT
LAV LAVATORY
LB(S) POUND(S)
L/S LANDSCAPE
LT LIGHT
MO MASONRY OPENING
MAS MASONRY
MAT'L MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MTD MOUNTED
MTL METAL
N NORTH
NIC NOT IN CONTRACT
NTS NOT TO SCALE
NOM NOMINAL
OC ON CENTER
OD OUTSIDE DIAMETER
O TO O OUT TO OUT
OPNG OPENING
OPP OPPOSITE
OVHD OVERHEAD
PEB PRE-ENGINEERED BUILDING
PJF PREFORMED JOINT FILLER
PT PRESSURE TREATED
PERIM PERIMETER
PL PLATE
PLAM PLASTIC LAMINATE
PLBG PLUMBING
PLYWD PLYWOOD
PNT PAINT
PR PAIR
PTD PAINTED
PWR POWER
RB RUBBER BASE
RD ROOF DRAIN
RO ROUGH OPENING
RAD RADIUS
REC RECESSED
REINF REINFORCED
REQ'D REQUIRED
REV REVISED (REVISION)
RM ROOM
S SOUTH
SB SPLASH BLOCK
SF SQUARE FEET
SS STAINLESS STEEL
SIM SIMILAR
SPEC SPECIFICATIONS
SQ SQUARE
STD STANDARD
STL STEEL
STOR STORAGE
STRUCT STRUCTURAL
SUSP SUSPENDED
T&G TONGUE AND GROOVE
T/O TOP OF
TELE TELEPHONE
TRTD TREATED
TS TUBE STEEL
TYP TYPICAL
UNFIN UNFINISHED
UNO UNLESS NOTED OTHERWISE
VCT VINYL COMPOSITION TILE
VIF VERIFY IN FIELD
VERT VERTICAL
W WEST
W/ WITH
W/O WITHOUT
WC WATER CLOSET
WWF WELDED WIRE FABRIC
WD WOOD
WH WATER HEATER
WT WEIGHT
CL
DEMOLITION KEYNOTE
WINDOW TYPE
TOILET ACCESSORY
WALL TYPE
ROOF PITCH SYMBOL
DOOR NUMBER
TYPICAL KEYNOTE CEILING/ SOFFIT
HEIGHT
MATL
1'-0"
-1
GENERAL DRAWING NOTES
1. INDICATIONS OF PROJECT LIMITS OR LINES OF DEMARCATION ARE SHOWN FOR GENERAL SCOPE DEFINITION AND REFLECT THE UNDERSTANDING OF THE DESIGNER AS TO THE LIMITATIONS OF THE WORK AREA IN AN OCCUPIED AREA. ACTUAL CONTRACT LIMITS ARE TO BE DETERMINED BY AGREEMENT BETWEEN THE COR AND
CONTRACTOR BEFORE THE START OF THE WORK.
2. DRAWINGS ARE PREPARED USING DIMENSIONS AND PRODUCT DRAWINGS ARE PREPARED USING DIMENSIONS AND PRODUCT AND DETAILS FOR SPECIFIC PRODUCTS MAY CHANGE BEFORE THEY ARE AND DETAILS FOR SPECIFIC PRODUCTS MAY CHANGE BEFORE THEY ARE ACTUALLY INCORPORATED INTO THE WORK, AND PRODUCTS BY OTHER MANUFACTURERS ARE ALSO ACCEPTABLE. THEREFORE, ACTUAL INSTALLATION DETAILS AND DIMENSIONS MAY DIFFER FROM THOSE SHOWN. CONTRACTOR SHALL VERIFY INSTALLATION REQUIREMENTS FOR ALL PRODUCTS TO BE INCORPORATED IN THE WORK (INCLUDING THICKNESS FOR RECESSED OR SEMI-RECESSED PRODUCTS) AND IS RESPONSIBLE FOR ACCOMMODATING AND COORDINATING CHANGES TO OTHER MATERIALS OR PRODUCTS THAT ARE NECESSARY BECAUSE OF THESE DIFFERENCES.
3. THE DRAWINGS AND SPECIFICATIONS ARE SEPARATED INTO DISCIPLINES FOR CONVENIENCE. THE SEPARATIONS USED ARE USED ONLY FOR THE PURPOSES OF CONVENIENCE AND REFERENCE AND IN NO WAY DO THEY DEFINE OR LIMIT THE SCOPE OR INTENT OF ANY PART OF THE DRAWINGS, OR OF THE DRAWINGS AND SPECIFICATIONS AS A WHOLE. THE FACT THAT THE DRAWINGS ARE SEPARATED IN NO WAY SUGGESTS THAT THE WORK IS NOT TO BE CONSTRUCTED AS A COMPLETE, INTEGRATED AND UNIFIED WHOLE.
4. THE DRAWINGS AND SPECIFICATIONS, INCLUDING DRAWINGS PREPARED BY SPECIFIC ENGINEERING DISCIPLINES ARE COMPLEMENTARY; ITEMS SHOWN IN ANY ONE LOCATION IN THE DRAWINGS SHALL BE CONSIDERED TO BE REQUIREMENTS OF THE CONTRACT FOR CONSTRUCTION. IN THE EVENT OF AN INCONSISTENCY BETWEEN THE DRAWINGS AND SPECIFICATIONS, OR WITHIN EITHER DOCUMENT, THE CONTRACTOR SHALL SEEK CLARIFICATION OR INTERPRETATION FROM THE COR PRIOR TO BIDDING. WHERE INCONSISTENCIES ARE NOT CLARIFIED PRIOR TO BIDDING, AND WHERE THE ACTUAL SOLUTION OR INTENT CANNOT BE REASONABLY INFERRED, THE CONTRACTOR SHALL PROVIDE THE BETTER QUALITY OR GREATER
QUANTITY OF WORK.
5. USE OF THE WORD "VERIFY" POINTS OUT A SITUATION WHICH MUST BE CONFIRMED PRIOR TO PROCEEDING WITH THE WORK, FABRICATION OF EQUIPMENT, OR ORDERING MATERIAL. NOTIFY THE COR OF ANY
DISCREPANCY DISCOVERED.
6. THE CONTRACTOR SHALL NOTIFY THE COR IMMEDIATELY SHOULD DISCREPANCIES BE FOUND IN THE
DRAWINGS AND SPECIFICATIONS.
7. THE CONTRACTOR IS RESPONSIBLE FOR CHECKING ALL FIELD CONDITIONS AND DIMENSIONS AS THEY RELATE TO THIS PROJECT. SHOULD DISCREPANCIES EXIST BETWEEN THE WORK INDICATED AND ACTUAL FIELD
CONDITIONS NOTIFY THE COR PRIOR TO PROCEEDING WITH THE WORK.
8. DO NOT SCALE THE DRAWINGS. DRAWING SCALES AS INDICATED ARE FOR REFERENCE ONLY AND ARE NOT INTENDED TO ACCURATELY DEPICT ACTUAL OR DESIGNATED CONDITIONS. WRITTEN DIMENSIONS SHALL
GOVERN.
9. COORDINATE WORK OF ALL TRADES PRIOR TO STARTING CONSTRUCTION.
10. THE CONTRACTOR AND SUBCONTRACTORS INVOLVED IN THIS PROJECT SHALL BE RESPONSIBLE FOR DESIGNING AND INSTALLING THEIR RESPECTIVE WORK AND SYSTEMS TO MEET ALL APPLICABLE FEDERAL, STATE, AND LOCAL CODES, LAWS, SAFETY REGULATIONS, HAZARDOUS WASTE LAWS, ETC. THE CONTRACTOR
SHALL FURNISH ALL NECESSARY PERMITS.
11. THE CONTRACTOR SHALL REVIEW THE DRAWINGS AND UNDERSTAND THE SCOPE OF THE DRAWINGS TO BE THE FOLLOWING: THESE CONSTRUCTION DOCUMENTS (DRAWINGS, SPECIFICATIONS, ADDENDA, ETC.)
INDICATE THE GENERAL SCOPE OF THE PROJECT IN TERMS OF ARCHITECTURAL DESIGN CONCEPTS, THE DIMENSIONS OF THE BUILDING, THE MAJOR ARCHITECTURAL ELEMENTS, AND THE MAJOR STRUCTURAL, MECHANICAL, ELECTRICAL, AND DATA SYSTEMS. THE DOCUMENTS DO NOT AND ARE NOT INTENDED TO INDICATE OR DESCRIBE IN DETAIL ALL THE NECESSARY WORK REQUIRED FOR FULL PERFORMANCE OF, AND COMPLETION OF THE REQUIREMENTS OF THE CONTRACT. ON THE BASIS OF THE GENERAL SCOPE INDICATED IN THESE DOCUMENTS, THE TRADE CONTRACTORS SHALL FURNISH ALL ITEMS REQUIRED FOR THE PROPER EXECUTION AND COMPLETION OF THEIR WORK. ALL WORK SHALL BE COMPLETE IN EVERY DETAIL AND THE CONTRACTORS SHALL PROVIDE A ONE YEAR WARRANTY FOR THEIR WORK UNLESS A LONGER WARRANTY IS
INDICATED IN THE SPECIFICATIONS.
12. CONTRACTORS SHALL FOLLOW AND OBEY ALL CITY OF CHICAGO ELEVATOR REQUIREMENTS.
13. SEE RELATED WORK IN ELEVATOR SPECIFICATIONS, SECTION 14 00 00.
DEMOLITION NOTES
A. KEY NOTES AND DRAWINGS ARE INTENDED TO GRAPHICALLY REPRESENT
GENERAL WORK AND DO NOT PORTRAY FULL SCOPE OF THE PROJECT. SEE
SPECIFICATIONS FOR DETAILED REQUIREMENTS.
B. REMOVE EXISTING CONSTRUCTION AS DESIGNATED HEREIN AND CLEAR AREA
OF DEBRIS PRIOR TO PROCEEDING WITH NEW CONSTRUCTION.
C. EXISTING EQUIPMENT REMOVED SHALL BE PROPERLY DISPOSED OFF MEDICAL
CENTER GROUNDS.
D. PATCH WALL OPENING SHALL MATCH THE INTEGRITY OF ADJACENT
CONSTRUCTION UNLESS INDICATED OTHERWISE.
E. NOTIFY COR OF ANY DEMOLITION REQUIRED AND NOT INDICATED FOR
INSTALLATION OF ELECTRICAL OR DATA ITEMS. AFTER SUCH DEMOLITION AND
INSTALLATION, PATCH OR REPLACE MATERIALS AND FINISHES TO MATCH
EXISTING.
F. THE INFORMATION CONTAINED IN THESE DEMOLITION DOCUMENTS DEFINES
GENERAL SCOPE ONLY AND DOES NOT RELIEVE THE CONTRACTOR OF THE
RESPONSIBILITY OF PROVIDING ALL DEMOLITION REQUIRED FOR THE
COMPLETION OF THE PROJECT.
G. REFER TO THE ELECTRICAL DRAWINGS FOR FURTHER INFORMATION
REGARDING DEMOLITION OF ELECTRICAL SYSTEMS.
H. BEFORE THE START OF WORK, IDENTIFY ANY REQUIRED DEMOLITION BEYOND
THE IDENTIFIED PROJECT SCOPE WHETHER ABOVE, BELOW OR OUTSIDE
PROJECT AREA. NOTIFY AND COORDINATE WITH THE COR, PROVIDE
DEMOLITION OF THESE AREAS AND PATCH THE SAME AS A PART OF THE
SCOPE OF THE PROJECT.
I. ALL DEMOLITION WORK SHALL BE PERFORMED WITH DUE CARE AND
DILIGENCE IN ORDER TO PREVENT ARBITRARY DAMAGE OR INTERRUPTION OF
SERVICE OR CONCEALED UTILITIES INTENDED TO REMAIN IN SERVICE.
DISCOVERY OF UTILITIES OR CONDITIONS LOCATED DIFFERENTLY FROM THAT
INDICATED OR THAT ARE NOT IDENTIFIED. SHALL BE REPORTED TO THE
CONTRACTING OFFICER.
J. COORDINATE DUMPSTER WITH VA COR FOR CONSTRUCTION ACCESS ROUTE
AND LOCATIONS OF AREA. COORDINATE WITH COR FOR SCHEDULE OF USE OF
ACCESS ROUTE FOR WASTE REMOVAL AND CONTRACTOR USE OF FREIGHT
ELEVATOR.
ARCHITECTURAL GENERAL NOTES
A. REFER TO PLUMBING, ELECTRICAL, AND MECHANICAL DRAWINGS FOR
ADDITIONAL INFORMATION.
B. CONTRACTOR SHALL PROVIDE BLOCKING AT PARTITIONS AS REQUIRED FOR
MOUNTING OF WALL-MOUNTED ITEMS.
C. CONTRACTOR SHALL PROVIDE SUPPLEMENTAL FRAMING AT WALL OPENINGS
INCLUDING KING STUDS, JACK STUDS, AND CRIPPLE STUDS, AS REQUIRED FOR
COMPLETION OF THE WORK.
D. CONTRACTOR SHALL COORDINATE THE WORK OF TRADES PRIOR TO THE
START OF CONSTRUCTION.
E. CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS PRIOR TO THE
START OF WORK FOR EACH PHASE.
F. CONTRACTOR SHALL NOTIFY THE COR OF DISCREPANCIES IN THE DRAWINGS
AND SPECS PRIOR TO THE START OF WORK.
G. DIMENSIONS SHOWN ARE TO FACE OF STUD FRAMING, FACE OF
CONCRETE/MASONRY WALLS, OR FINISHED FACE OF EXISTING WALL SURFACE.
H. ALL WOOD IN CONTACT WITH CONCRETE SHALL BE PRESSURE TREATED.
I. CONTRACTOR SHALL INSTALL ALL WORK IN ACCORDANCE WITH CURRENT
APPLICABLE CODES AND PUBLISHED STANDARDS.
J. INDICATIONS OF PROJECT LIMITS OR LINES OF DEMARCATION ARE SHOWN
FOR GENERAL SCOPE DEFINITION AND REFLECT THE UNDERSTANDING OF
THE DESIGNER AS TO THE LIMITATIONS OF THE WORK AREA IN AN OCCUPIED
AREA. ACTUAL CONTRACT LIMITS ARE TO BE DETERMINED BY AGREEMENT
BETWEEN THE COR AND CONTRACTOR BEFORE THE START OF THE WORK.
K. THE DRAWINGS AND SPECIFICATIONS ARE SEPARATED INTO DISCIPLINES FOR
CONVENIENCE. THE SEPARATIONS USED ARE USED ONLY FOR THE PURPOSES
OF CONVENIENCE AND REFERENCE AND IN NO WAY DO THEY DEFINE OR LIMIT
THE SCOPE OR INTENT OF ANY PART OF THE DRAWINGS, OR OF THE
DRAWINGS AND SPECIFICATIONS AS A WHOLE. THE FACT THAT THE DRAWINGS
ARE SEPARATED IN NO WAY SUGGESTS THAT THE WORK IS NOT TO BE
CONSTRUCTED AS A COMPLETE, INTEGRATED AND UNIFIED WHOLE.
L. THE DRAWINGS AND SPECIFICATIONS, INCLUDING DRAWINGS PREPARED BY
SPECIFIC ENGINEERING DISCIPLINES ARE COMPLEMENTARY; ITEMS SHOWN IN
ANY ONE LOCATION IN THE DRAWINGS SHALL BE CONSIDERED TO BE
REQUIREMENTS OF THE CONTRACT FOR CONSTRUCTION.
M. DO NOT SCALE THE DRAWINGS. DRAWING SCALES AS INDICATED ARE FOR
REFERENCE ONLY AND ARE NOT INTENDED TO ACCURATELY DEPICT ACTUAL
OR DESIGNATED CONDITIONS. WRITTEN DIMENSIONS SHALL GOVERN.
N. AT AREAS INDICATED TO BE PATCHED AND REPAIRED, THE CONSTRUCTION
AND ASSEMBLY OF THE PATCH OR REPAIR SHALL MATCH THE ASSEMBLY AND
INTEGRITY OF THE ADJACENT EXISTING CONSTRUCTION, FOR FIRE RATING,
MATERIALS, FINISH, THICKNESS, AND QUALITY.
O. ALL DELIVERIES OF EQUIPMENT AND SUPPLIES TO THE PROJECT SHALL BE
LOCATED AT THE ???? DOCK.
P. THE GENERAL CONTRACTOR SHALL COORDINATE THE FINAL LAY DOWN AREA
AND A 10' X 20' MATERIAL STORAGE AREA LOCATION WITH THE COR PRIOR TO
STARTING WORK.
A
LA
R
E GI H,NC
S
G O 52644
P E
N
CO
LU IT
E
NG
RG
U O
A
P ,P
R E
G I
S T
E R
E D
A R
C H I T E C T U R
A L
C O
R P
O T
I O
N
N O
R T H C A R O L
I N A
A R
JE
FFREY A BROOKS
11296R
EG
IS
TERED ARCHITECT
N O
R
T H
C A R O L
I N
ARA
LE
IGH , NORT H CAROL
I N
A
Engineers Architects
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
MICHAEL BLADES & ASSOCIATES, CTO-ELEVATOR CONSULTANTS
/1
/2
:4
:4
P
M
A-001
ARCHITECTURAL SYMBOLS,
ABBREVIATIONS AND NOTES
1 12ANP
ELEVATOR MODERNIZATION
JESSE BROWN VA MEDICAL CENTER
820 S. DAMEN AVENUE
CHICAGO, ILLINOIS 60612 02/12/2020
ISSUED FOR BID AND CONSTRUCTION
537-19-101A18-401
11A
JAB
ABBREVIATIONS
ARCHITECTURAL SYMBOL LEGEND
MICHAEL BLADES & ASSOCIATES, CTO-ELEVATOR CONSULTANTS
| 01-GEN_AND_ARCH-BID_REDATE |
| Sheets |
| G-001 - COVER |
| G-101 - FIRST FLOOR ICRA PLAN |
| A-001 - ARCHITECTURAL SYMBOLS, ABBREVIATIONS AND NOTES |
| AD001 - PASSENGER AND SERVICE ELEVATOR IMAGES |
| A-100 - NAMING CONVENTION LAYOUT |
| A-101 - BASEMENT FLOOR AND FIRST FLOOR PLANS |
| A-102 - SECOND FLOOR AND THIRD FLOOR PLANS |
| A-103 - FOURTH FLOOR AND FIFTH FLOOR PLANS |
| A-104 - SIXTH FLOOR AND SEVENTH FLOOR PLANS |
| A-105 - EIGHTH FLOOR AND NINTH FLOOR PLAN |
| A-401 - ENLARGED EXISTING FLOOR PLANS |
| A-402 - ENLARGED EXISTING FLOOR PLANS & ELEVATOR RISER DIAGRAM |
| 05-ELEC,_TECH,_FA-BID |
| E-18-401-Q23-VA Chicago-JB-Elev Modernization IL_jwbeezley@acg-pa - Sheet - E-001 - ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS |
| Sheets |
| E-001 - ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS |
| E-101 - ELECTRICAL FLOOR PLANS GROUND AND NINTH FLOOR |
| E-102 - ELECTIRCAL FLOOR PLANS FIRST FLOOR |
| E-201 - HOISTWAY SECTIONS |
| E-401 - ELECTRICAL ENLARGEMENTS |
| E-402 - ELECTRICAL ENLARGEMENTS |
| E-501 - ELECTRICAL DETAILS |
| E-602 - ELECTRICAL SCHEDULES |
| ED401 - ELECTRICAL DEMOLITION ENLARGEMENTS |
| ED402 - ELECTRICAL DEMOLITION ENLARGEMENTS |
| EM401 - MECHANICAL POWER ENLARGEMENTS |
| FA001 - FIRE ALARM GENERAL NOTES, SYMBOLE LEGEND, AND RISER |
| FA101 - FIRE ALARM PLAN - ELEVATOR LOBBIES |
| FA102 - FIRE ALARM PLAN - ELEVATOR EQUIPMENT ROOM |
| T-001 - TECHNOLOGY GENERAL NOTES, SYMBOL LEGEND, AND ABBREVIATIONS |
| T-101 - SYSTEMS FLOOR PLANS GROUND AND FIRST FLOOR |
| T-102 - SYSTEMS FLOOR PLANS SECOND AND THIRD FLOOR |
| T-103 - SYSTEMS FLOOR PLANS FOURTH AND FIFTH FLOOR |
| T-104 - SYSTEMS FLOOR PLANS SIXTH AND SEVENTH FLOOR |
| T-105 - SYSTEMS FLOOR PLANS NINTH FLOOR |
| T-401 - SYSTEMS ENLARGEMENTS |
| T-402 - SYSTEMS ENLARGEMENTS |
| T-501 - TECHNOLOGY DETAILS |
| E-18-401-Q23-VA Chicago-JB-Elev Modernization IL_jwbeezley@acg-pa - Sheet - E-101 - ELECTRICAL FLOOR PLANS GROUND AND NINTH FLOOR |
| Sheets |
| E-001 - ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS |
| E-101 - ELECTRICAL FLOOR PLANS GROUND AND NINTH FLOOR |
| E-102 - ELECTIRCAL FLOOR PLANS FIRST FLOOR |
| E-201 - HOISTWAY SECTIONS |
| E-401 - ELECTRICAL ENLARGEMENTS |
| E-402 - ELECTRICAL ENLARGEMENTS |
| E-501 - ELECTRICAL DETAILS |
| E-602 - ELECTRICAL SCHEDULES |
| ED401 - ELECTRICAL DEMOLITION ENLARGEMENTS |
| ED402 - ELECTRICAL DEMOLITION ENLARGEMENTS |
| EM401 - MECHANICAL POWER ENLARGEMENTS |
| FA001 - FIRE ALARM GENERAL NOTES, SYMBOLE LEGEND, AND RISER |
| FA101 - FIRE ALARM PLAN - ELEVATOR LOBBIES |
| FA102 - FIRE ALARM PLAN - ELEVATOR EQUIPMENT ROOM |
| T-001 - TECHNOLOGY GENERAL NOTES, SYMBOL LEGEND, AND ABBREVIATIONS |
| T-101 - SYSTEMS FLOOR PLANS GROUND AND FIRST FLOOR |
| T-102 - SYSTEMS FLOOR PLANS SECOND AND THIRD FLOOR |
| T-103 - SYSTEMS FLOOR PLANS FOURTH AND FIFTH FLOOR |
| T-104 - SYSTEMS FLOOR PLANS SIXTH AND SEVENTH FLOOR |
| T-105 - SYSTEMS FLOOR PLANS NINTH FLOOR |
| T-401 - SYSTEMS ENLARGEMENTS |
| T-402 - SYSTEMS ENLARGEMENTS |
| T-501 - TECHNOLOGY DETAILS |
| E-18-401-Q23-VA Chicago-JB-Elev Modernization IL_jwbeezley@acg-pa - Sheet - E-102 - ELECTIRCAL FLOOR PLANS FIRST FLOOR |
| Sheets |
| E-001 - ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS |
| E-101 - ELECTRICAL FLOOR PLANS GROUND AND NINTH FLOOR |
| E-102 - ELECTIRCAL FLOOR PLANS FIRST FLOOR |
| E-201 - HOISTWAY SECTIONS |
| E-401 - ELECTRICAL ENLARGEMENTS |
| E-402 - ELECTRICAL ENLARGEMENTS |
| E-501 - ELECTRICAL DETAILS |
| E-602 - ELECTRICAL SCHEDULES |
| ED401 - ELECTRICAL DEMOLITION ENLARGEMENTS |
| ED402 - ELECTRICAL DEMOLITION ENLARGEMENTS |
| EM401 - MECHANICAL POWER ENLARGEMENTS |
| FA001 - FIRE ALARM GENERAL NOTES, SYMBOLE LEGEND, AND RISER |
| FA101 - FIRE ALARM PLAN - ELEVATOR LOBBIES |
| FA102 - FIRE ALARM PLAN - ELEVATOR EQUIPMENT ROOM |
| T-001 - TECHNOLOGY GENERAL NOTES, SYMBOL LEGEND, AND ABBREVIATIONS |
| T-101 - SYSTEMS FLOOR PLANS GROUND AND FIRST FLOOR |
| T-102 - SYSTEMS FLOOR PLANS SECOND AND THIRD FLOOR |
| T-103 - SYSTEMS FLOOR PLANS FOURTH AND FIFTH FLOOR |
| T-104 - SYSTEMS FLOOR PLANS SIXTH AND SEVENTH FLOOR |
| T-105 - SYSTEMS FLOOR PLANS NINTH FLOOR |
| T-401 - SYSTEMS ENLARGEMENTS |
| T-402 - SYSTEMS ENLARGEMENTS |
| T-501 - TECHNOLOGY DETAILS |
| E-18-401-Q23-VA Chicago-JB-Elev Modernization IL_jwbeezley@acg-pa - Sheet - E-201 - HOISTWAY SECTIONS |
| Sheets |
| E-001 - ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS |
| E-101 - ELECTRICAL FLOOR PLANS GROUND AND NINTH FLOOR |
| E-102 - ELECTIRCAL FLOOR PLANS FIRST FLOOR |
| E-201 - HOISTWAY SECTIONS |
| E-401 - ELECTRICAL ENLARGEMENTS |
| E-402 - ELECTRICAL ENLARGEMENTS |
| E-501 - ELECTRICAL DETAILS |
| E-602 - ELECTRICAL SCHEDULES |
| ED401 - ELECTRICAL DEMOLITION ENLARGEMENTS |
| ED402 - ELECTRICAL DEMOLITION ENLARGEMENTS |
| EM401 - MECHANICAL POWER ENLARGEMENTS |
| FA001 - FIRE ALARM GENERAL NOTES, SYMBOLE LEGEND, AND RISER |
| FA101 - FIRE ALARM PLAN - ELEVATOR LOBBIES |
| FA102 - FIRE ALARM PLAN - ELEVATOR EQUIPMENT ROOM |
| T-001 - TECHNOLOGY GENERAL NOTES, SYMBOL LEGEND, AND ABBREVIATIONS |
| T-101 - SYSTEMS FLOOR PLANS GROUND AND FIRST FLOOR |
| T-102 - SYSTEMS FLOOR PLANS SECOND AND THIRD FLOOR |
| T-103 - SYSTEMS FLOOR PLANS FOURTH AND FIFTH FLOOR |
| T-104 - SYSTEMS FLOOR PLANS SIXTH AND SEVENTH FLOOR |
| T-105 - SYSTEMS FLOOR PLANS NINTH FLOOR |
| T-401 - SYSTEMS ENLARGEMENTS |
| T-402 - SYSTEMS ENLARGEMENTS |
| T-501 - TECHNOLOGY DETAILS |
| E-18-401-Q23-VA Chicago-JB-Elev Modernization IL_jwbeezley@acg-pa - Sheet - ED401 - ELECTRICAL DEMOLITION ENLARGEMENTS |
| Sheets |
| E-001 - ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS |
| E-101 - ELECTRICAL FLOOR PLANS GROUND AND NINTH FLOOR |
| E-102 - ELECTIRCAL FLOOR PLANS FIRST FLOOR |
| E-201 - HOISTWAY SECTIONS |
| E-401 - ELECTRICAL ENLARGEMENTS |
| E-402 - ELECTRICAL ENLARGEMENTS |
| E-501 - ELECTRICAL DETAILS |
| E-602 - ELECTRICAL SCHEDULES |
| ED401 - ELECTRICAL DEMOLITION ENLARGEMENTS |
| ED402 - ELECTRICAL DEMOLITION ENLARGEMENTS |
| EM401 - MECHANICAL POWER ENLARGEMENTS |
| FA001 - FIRE ALARM GENERAL NOTES, SYMBOLE LEGEND, AND RISER |
| FA101 - FIRE ALARM PLAN - ELEVATOR LOBBIES |
| FA102 - FIRE ALARM PLAN - ELEVATOR EQUIPMENT ROOM |
| T-001 - TECHNOLOGY GENERAL NOTES, SYMBOL LEGEND, AND ABBREVIATIONS |
| T-101 - SYSTEMS FLOOR PLANS GROUND AND FIRST FLOOR |
| T-102 - SYSTEMS FLOOR PLANS SECOND AND THIRD FLOOR |
| T-103 - SYSTEMS FLOOR PLANS FOURTH AND FIFTH FLOOR |
| T-104 - SYSTEMS FLOOR PLANS SIXTH AND SEVENTH FLOOR |
| T-105 - SYSTEMS FLOOR PLANS NINTH FLOOR |
| T-401 - SYSTEMS ENLARGEMENTS |
| T-402 - SYSTEMS ENLARGEMENTS |
| T-501 - TECHNOLOGY DETAILS |
| E-18-401-Q23-VA Chicago-JB-Elev Modernization IL_jwbeezley@acg-pa - Sheet - ED402 - ELECTRICAL DEMOLITION ENLARGEMENTS |
| Sheets |
| E-001 - ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS |
| E-101 - ELECTRICAL FLOOR PLANS GROUND AND NINTH FLOOR |
| E-102 - ELECTIRCAL FLOOR PLANS FIRST FLOOR |
| E-201 - HOISTWAY SECTIONS |
| E-401 - ELECTRICAL ENLARGEMENTS |
| E-402 - ELECTRICAL ENLARGEMENTS |
| E-501 - ELECTRICAL DETAILS |
| E-602 - ELECTRICAL SCHEDULES |
| ED401 - ELECTRICAL DEMOLITION ENLARGEMENTS |
| ED402 - ELECTRICAL DEMOLITION ENLARGEMENTS |
| EM401 - MECHANICAL POWER ENLARGEMENTS |
| FA001 - FIRE ALARM GENERAL NOTES, SYMBOLE LEGEND, AND RISER |
| FA101 - FIRE ALARM PLAN - ELEVATOR LOBBIES |
| FA102 - FIRE ALARM PLAN - ELEVATOR EQUIPMENT ROOM |
| T-001 - TECHNOLOGY GENERAL NOTES, SYMBOL LEGEND, AND ABBREVIATIONS |
| T-101 - SYSTEMS FLOOR PLANS GROUND AND FIRST FLOOR |
| T-102 - SYSTEMS FLOOR PLANS SECOND AND THIRD FLOOR |
| T-103 - SYSTEMS FLOOR PLANS FOURTH AND FIFTH FLOOR |
| T-104 - SYSTEMS FLOOR PLANS SIXTH AND SEVENTH FLOOR |
| T-105 - SYSTEMS FLOOR PLANS NINTH FLOOR |
| T-401 - SYSTEMS ENLARGEMENTS |
| T-402 - SYSTEMS ENLARGEMENTS |
| T-501 - TECHNOLOGY DETAILS |
| E-18-401-Q23-VA Chicago-JB-Elev Modernization IL_jwbeezley@acg-pa - Sheet - E-401 - ELECTRICAL ENLARGEMENTS |
| Sheets |
| E-001 - ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS |
| E-101 - ELECTRICAL FLOOR PLANS GROUND AND NINTH FLOOR |
| E-102 - ELECTIRCAL FLOOR PLANS FIRST FLOOR |
| E-201 - HOISTWAY SECTIONS |
| E-401 - ELECTRICAL ENLARGEMENTS |
| E-402 - ELECTRICAL ENLARGEMENTS |
| E-501 - ELECTRICAL DETAILS |
| E-602 - ELECTRICAL SCHEDULES |
| ED401 - ELECTRICAL DEMOLITION ENLARGEMENTS |
| ED402 - ELECTRICAL DEMOLITION ENLARGEMENTS |
| EM401 - MECHANICAL POWER ENLARGEMENTS |
| FA001 - FIRE ALARM GENERAL NOTES, SYMBOLE LEGEND, AND RISER |
| FA101 - FIRE ALARM PLAN - ELEVATOR LOBBIES |
| FA102 - FIRE ALARM PLAN - ELEVATOR EQUIPMENT ROOM |
| T-001 - TECHNOLOGY GENERAL NOTES, SYMBOL LEGEND, AND ABBREVIATIONS |
| T-101 - SYSTEMS FLOOR PLANS GROUND AND FIRST FLOOR |
| T-102 - SYSTEMS FLOOR PLANS SECOND AND THIRD FLOOR |
| T-103 - SYSTEMS FLOOR PLANS FOURTH AND FIFTH FLOOR |
| T-104 - SYSTEMS FLOOR PLANS SIXTH AND SEVENTH FLOOR |
| T-105 - SYSTEMS FLOOR PLANS NINTH FLOOR |
| T-401 - SYSTEMS ENLARGEMENTS |
| T-402 - SYSTEMS ENLARGEMENTS |
| T-501 - TECHNOLOGY DETAILS |
| E-18-401-Q23-VA Chicago-JB-Elev Modernization IL_jwbeezley@acg-pa - Sheet - E-402 - ELECTRICAL ENLARGEMENTS |
| Sheets |
| E-001 - ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS |
| E-101 - ELECTRICAL FLOOR PLANS GROUND AND NINTH FLOOR |
| E-102 - ELECTIRCAL FLOOR PLANS FIRST FLOOR |
| E-201 - HOISTWAY SECTIONS |
| E-401 - ELECTRICAL ENLARGEMENTS |
| E-402 - ELECTRICAL ENLARGEMENTS |
| E-501 - ELECTRICAL DETAILS |
| E-602 - ELECTRICAL SCHEDULES |
| ED401 - ELECTRICAL DEMOLITION ENLARGEMENTS |
| ED402 - ELECTRICAL DEMOLITION ENLARGEMENTS |
| EM401 - MECHANICAL POWER ENLARGEMENTS |
| FA001 - FIRE ALARM GENERAL NOTES, SYMBOLE LEGEND, AND RISER |
| FA101 - FIRE ALARM PLAN - ELEVATOR LOBBIES |
| FA102 - FIRE ALARM PLAN - ELEVATOR EQUIPMENT ROOM |
| T-001 - TECHNOLOGY GENERAL NOTES, SYMBOL LEGEND, AND ABBREVIATIONS |
| T-101 - SYSTEMS FLOOR PLANS GROUND AND FIRST FLOOR |
| T-102 - SYSTEMS FLOOR PLANS SECOND AND THIRD FLOOR |
| T-103 - SYSTEMS FLOOR PLANS FOURTH AND FIFTH FLOOR |
| T-104 - SYSTEMS FLOOR PLANS SIXTH AND SEVENTH FLOOR |
| T-105 - SYSTEMS FLOOR PLANS NINTH FLOOR |
| T-401 - SYSTEMS ENLARGEMENTS |
| T-402 - SYSTEMS ENLARGEMENTS |
| T-501 - TECHNOLOGY DETAILS |
| E-18-401-Q23-VA Chicago-JB-Elev Modernization IL_jwbeezley@acg-pa - Sheet - EM401 - MECHANICAL POWER ENLARGEMENTS |
| Sheets |
| E-001 - ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS |
| E-101 - ELECTRICAL FLOOR PLANS GROUND AND NINTH FLOOR |
| E-102 - ELECTIRCAL FLOOR PLANS FIRST FLOOR |
| E-201 - HOISTWAY SECTIONS |
| E-401 - ELECTRICAL ENLARGEMENTS |
| E-402 - ELECTRICAL ENLARGEMENTS |
| E-501 - ELECTRICAL DETAILS |
| E-602 - ELECTRICAL SCHEDULES |
| ED401 - ELECTRICAL DEMOLITION ENLARGEMENTS |
| ED402 - ELECTRICAL DEMOLITION ENLARGEMENTS |
| EM401 - MECHANICAL POWER ENLARGEMENTS |
| FA001 - FIRE ALARM GENERAL NOTES, SYMBOLE LEGEND, AND RISER |
| FA101 - FIRE ALARM PLAN - ELEVATOR LOBBIES |
| FA102 - FIRE ALARM PLAN - ELEVATOR EQUIPMENT ROOM |
| T-001 - TECHNOLOGY GENERAL NOTES, SYMBOL LEGEND, AND ABBREVIATIONS |
| T-101 - SYSTEMS FLOOR PLANS GROUND AND FIRST FLOOR |
| T-102 - SYSTEMS FLOOR PLANS SECOND AND THIRD FLOOR |
| T-103 - SYSTEMS FLOOR PLANS FOURTH AND FIFTH FLOOR |
| T-104 - SYSTEMS FLOOR PLANS SIXTH AND SEVENTH FLOOR |
| T-105 - SYSTEMS FLOOR PLANS NINTH FLOOR |
| T-401 - SYSTEMS ENLARGEMENTS |
| T-402 - SYSTEMS ENLARGEMENTS |
| T-501 - TECHNOLOGY DETAILS |
| E-18-401-Q23-VA Chicago-JB-Elev Modernization IL_jwbeezley@acg-pa - Sheet - E-501 - ELECTRICAL DETAILS |
| Sheets |
| E-001 - ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS |
| E-101 - ELECTRICAL FLOOR PLANS GROUND AND NINTH FLOOR |
| E-102 - ELECTIRCAL FLOOR PLANS FIRST FLOOR |
| E-201 - HOISTWAY SECTIONS |
| E-401 - ELECTRICAL ENLARGEMENTS |
| E-402 - ELECTRICAL ENLARGEMENTS |
| E-501 - ELECTRICAL DETAILS |
| E-602 - ELECTRICAL SCHEDULES |
| ED401 - ELECTRICAL DEMOLITION ENLARGEMENTS |
| ED402 - ELECTRICAL DEMOLITION ENLARGEMENTS |
| EM401 - MECHANICAL POWER ENLARGEMENTS |
| FA001 - FIRE ALARM GENERAL NOTES, SYMBOLE LEGEND, AND RISER |
| FA101 - FIRE ALARM PLAN - ELEVATOR LOBBIES |
| FA102 - FIRE ALARM PLAN - ELEVATOR EQUIPMENT ROOM |
| T-001 - TECHNOLOGY GENERAL NOTES, SYMBOL LEGEND, AND ABBREVIATIONS |
| T-101 - SYSTEMS FLOOR PLANS GROUND AND FIRST FLOOR |
| T-102 - SYSTEMS FLOOR PLANS SECOND AND THIRD FLOOR |
| T-103 - SYSTEMS FLOOR PLANS FOURTH AND FIFTH FLOOR |
| T-104 - SYSTEMS FLOOR PLANS SIXTH AND SEVENTH FLOOR |
| T-105 - SYSTEMS FLOOR PLANS NINTH FLOOR |
| T-401 - SYSTEMS ENLARGEMENTS |
| T-402 - SYSTEMS ENLARGEMENTS |
| T-501 - TECHNOLOGY DETAILS |
| E-18-401-Q23-VA Chicago-JB-Elev Modernization IL_jwbeezley@acg-pa - Sheet - E-602 - ELECTRICAL SCHEDULES |
| Sheets |
| E-001 - ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS |
| E-101 - ELECTRICAL FLOOR PLANS GROUND AND NINTH FLOOR |
| E-102 - ELECTIRCAL FLOOR PLANS FIRST FLOOR |
| E-201 - HOISTWAY SECTIONS |
| E-401 - ELECTRICAL ENLARGEMENTS |
| E-402 - ELECTRICAL ENLARGEMENTS |
| E-501 - ELECTRICAL DETAILS |
| E-602 - ELECTRICAL SCHEDULES |
| ED401 - ELECTRICAL DEMOLITION ENLARGEMENTS |
| ED402 - ELECTRICAL DEMOLITION ENLARGEMENTS |
| EM401 - MECHANICAL POWER ENLARGEMENTS |
| FA001 - FIRE ALARM GENERAL NOTES, SYMBOLE LEGEND, AND RISER |
| FA101 - FIRE ALARM PLAN - ELEVATOR LOBBIES |
| FA102 - FIRE ALARM PLAN - ELEVATOR EQUIPMENT ROOM |
| T-001 - TECHNOLOGY GENERAL NOTES, SYMBOL LEGEND, AND ABBREVIATIONS |
| T-101 - SYSTEMS FLOOR PLANS GROUND AND FIRST FLOOR |
| T-102 - SYSTEMS FLOOR PLANS SECOND AND THIRD FLOOR |
| T-103 - SYSTEMS FLOOR PLANS FOURTH AND FIFTH FLOOR |
| T-104 - SYSTEMS FLOOR PLANS SIXTH AND SEVENTH FLOOR |
| T-105 - SYSTEMS FLOOR PLANS NINTH FLOOR |
| T-401 - SYSTEMS ENLARGEMENTS |
| T-402 - SYSTEMS ENLARGEMENTS |
| T-501 - TECHNOLOGY DETAILS |
| E-18-401-Q23-VA Chicago-JB-Elev Modernization IL_jwbeezley@acg-pa - Sheet - T-001 - TECHNOLOGY GENERAL NOTES, SYMBOL LEGEND, AND ABBREVIATIONS |
| Sheets |
| E-001 - ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS |
| E-101 - ELECTRICAL FLOOR PLANS GROUND AND NINTH FLOOR |
| E-102 - ELECTIRCAL FLOOR PLANS FIRST FLOOR |
| E-201 - HOISTWAY SECTIONS |
| E-401 - ELECTRICAL ENLARGEMENTS |
| E-402 - ELECTRICAL ENLARGEMENTS |
| E-501 - ELECTRICAL DETAILS |
| E-602 - ELECTRICAL SCHEDULES |
| ED401 - ELECTRICAL DEMOLITION ENLARGEMENTS |
| ED402 - ELECTRICAL DEMOLITION ENLARGEMENTS |
| EM401 - MECHANICAL POWER ENLARGEMENTS |
| FA001 - FIRE ALARM GENERAL NOTES, SYMBOLE LEGEND, AND RISER |
| FA101 - FIRE ALARM PLAN - ELEVATOR LOBBIES |
| FA102 - FIRE ALARM PLAN - ELEVATOR EQUIPMENT ROOM |
| T-001 - TECHNOLOGY GENERAL NOTES, SYMBOL LEGEND, AND ABBREVIATIONS |
| T-101 - SYSTEMS FLOOR PLANS GROUND AND FIRST FLOOR |
| T-102 - SYSTEMS FLOOR PLANS SECOND AND THIRD FLOOR |
| T-103 - SYSTEMS FLOOR PLANS FOURTH AND FIFTH FLOOR |
| T-104 - SYSTEMS FLOOR PLANS SIXTH AND SEVENTH FLOOR |
| T-105 - SYSTEMS FLOOR PLANS NINTH FLOOR |
| T-401 - SYSTEMS ENLARGEMENTS |
| T-402 - SYSTEMS ENLARGEMENTS |
| T-501 - TECHNOLOGY DETAILS |
| E-18-401-Q23-VA Chicago-JB-Elev Modernization IL_jwbeezley@acg-pa - Sheet - T-101 - SYSTEMS FLOOR PLANS GROUND AND FIRST FLOOR |
| Sheets |
| E-001 - ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS |
| E-101 - ELECTRICAL FLOOR PLANS GROUND AND NINTH FLOOR |
| E-102 - ELECTIRCAL FLOOR PLANS FIRST FLOOR |
| E-201 - HOISTWAY SECTIONS |
| E-401 - ELECTRICAL ENLARGEMENTS |
| E-402 - ELECTRICAL ENLARGEMENTS |
| E-501 - ELECTRICAL DETAILS |
| E-602 - ELECTRICAL SCHEDULES |
| ED401 - ELECTRICAL DEMOLITION ENLARGEMENTS |
| ED402 - ELECTRICAL DEMOLITION ENLARGEMENTS |
| EM401 - MECHANICAL POWER ENLARGEMENTS |
| FA001 - FIRE ALARM GENERAL NOTES, SYMBOLE LEGEND, AND RISER |
| FA101 - FIRE ALARM PLAN - ELEVATOR LOBBIES |
| FA102 - FIRE ALARM PLAN - ELEVATOR EQUIPMENT ROOM |
| T-001 - TECHNOLOGY GENERAL NOTES, SYMBOL LEGEND, AND ABBREVIATIONS |
| T-101 - SYSTEMS FLOOR PLANS GROUND AND FIRST FLOOR |
| T-102 - SYSTEMS FLOOR PLANS SECOND AND THIRD FLOOR |
| T-103 - SYSTEMS FLOOR PLANS FOURTH AND FIFTH FLOOR |
| T-104 - SYSTEMS FLOOR PLANS SIXTH AND SEVENTH FLOOR |
| T-105 - SYSTEMS FLOOR PLANS NINTH FLOOR |
| T-401 - SYSTEMS ENLARGEMENTS |
| T-402 - SYSTEMS ENLARGEMENTS |
| T-501 - TECHNOLOGY DETAILS |
| E-18-401-Q23-VA Chicago-JB-Elev Modernization IL_jwbeezley@acg-pa - Sheet - T-102 - SYSTEMS FLOOR PLANS SECOND AND THIRD FLOOR |
| Sheets |
| E-001 - ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS |
| E-101 - ELECTRICAL FLOOR PLANS GROUND AND NINTH FLOOR |
| E-102 - ELECTIRCAL FLOOR PLANS FIRST FLOOR |
| E-201 - HOISTWAY SECTIONS |
| E-401 - ELECTRICAL ENLARGEMENTS |
| E-402 - ELECTRICAL ENLARGEMENTS |
| E-501 - ELECTRICAL DETAILS |
| E-602 - ELECTRICAL SCHEDULES |
| ED401 - ELECTRICAL DEMOLITION ENLARGEMENTS |
| ED402 - ELECTRICAL DEMOLITION ENLARGEMENTS |
| EM401 - MECHANICAL POWER ENLARGEMENTS |
| FA001 - FIRE ALARM GENERAL NOTES, SYMBOLE LEGEND, AND RISER |
| FA101 - FIRE ALARM PLAN - ELEVATOR LOBBIES |
| FA102 - FIRE ALARM PLAN - ELEVATOR EQUIPMENT ROOM |
| T-001 - TECHNOLOGY GENERAL NOTES, SYMBOL LEGEND, AND ABBREVIATIONS |
| T-101 - SYSTEMS FLOOR PLANS GROUND AND FIRST FLOOR |
| T-102 - SYSTEMS FLOOR PLANS SECOND AND THIRD FLOOR |
| T-103 - SYSTEMS FLOOR PLANS FOURTH AND FIFTH FLOOR |
| T-104 - SYSTEMS FLOOR PLANS SIXTH AND SEVENTH FLOOR |
| T-105 - SYSTEMS FLOOR PLANS NINTH FLOOR |
| T-401 - SYSTEMS ENLARGEMENTS |
| T-402 - SYSTEMS ENLARGEMENTS |
| T-501 - TECHNOLOGY DETAILS |
| E-18-401-Q23-VA Chicago-JB-Elev Modernization IL_jwbeezley@acg-pa - Sheet - T-103 - SYSTEMS FLOOR PLANS FOURTH AND FIFTH FLOOR |
| Sheets |
| E-001 - ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS |
| E-101 - ELECTRICAL FLOOR PLANS GROUND AND NINTH FLOOR |
| E-102 - ELECTIRCAL FLOOR PLANS FIRST FLOOR |
| E-201 - HOISTWAY SECTIONS |
| E-401 - ELECTRICAL ENLARGEMENTS |
| E-402 - ELECTRICAL ENLARGEMENTS |
| E-501 - ELECTRICAL DETAILS |
| E-602 - ELECTRICAL SCHEDULES |
| ED401 - ELECTRICAL DEMOLITION ENLARGEMENTS |
| ED402 - ELECTRICAL DEMOLITION ENLARGEMENTS |
| EM401 - MECHANICAL POWER ENLARGEMENTS |
| FA001 - FIRE ALARM GENERAL NOTES, SYMBOLE LEGEND, AND RISER |
| FA101 - FIRE ALARM PLAN - ELEVATOR LOBBIES |
| FA102 - FIRE ALARM PLAN - ELEVATOR EQUIPMENT ROOM |
| T-001 - TECHNOLOGY GENERAL NOTES, SYMBOL LEGEND, AND ABBREVIATIONS |
| T-101 - SYSTEMS FLOOR PLANS GROUND AND FIRST FLOOR |
| T-102 - SYSTEMS FLOOR PLANS SECOND AND THIRD FLOOR |
| T-103 - SYSTEMS FLOOR PLANS FOURTH AND FIFTH FLOOR |
| T-104 - SYSTEMS FLOOR PLANS SIXTH AND SEVENTH FLOOR |
| T-105 - SYSTEMS FLOOR PLANS NINTH FLOOR |
| T-401 - SYSTEMS ENLARGEMENTS |
| T-402 - SYSTEMS ENLARGEMENTS |
| T-501 - TECHNOLOGY DETAILS |
| E-18-401-Q23-VA Chicago-JB-Elev Modernization IL_jwbeezley@acg-pa - Sheet - T-104 - SYSTEMS FLOOR PLANS SIXTH AND SEVENTH FLOOR |
| Sheets |
| E-001 - ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS |
| E-101 - ELECTRICAL FLOOR PLANS GROUND AND NINTH FLOOR |
| E-102 - ELECTIRCAL FLOOR PLANS FIRST FLOOR |
| E-201 - HOISTWAY SECTIONS |
| E-401 - ELECTRICAL ENLARGEMENTS |
| E-402 - ELECTRICAL ENLARGEMENTS |
| E-501 - ELECTRICAL DETAILS |
| E-602 - ELECTRICAL SCHEDULES |
| ED401 - ELECTRICAL DEMOLITION ENLARGEMENTS |
| ED402 - ELECTRICAL DEMOLITION ENLARGEMENTS |
| EM401 - MECHANICAL POWER ENLARGEMENTS |
| FA001 - FIRE ALARM GENERAL NOTES, SYMBOLE LEGEND, AND RISER |
| FA101 - FIRE ALARM PLAN - ELEVATOR LOBBIES |
| FA102 - FIRE ALARM PLAN - ELEVATOR EQUIPMENT ROOM |
| T-001 - TECHNOLOGY GENERAL NOTES, SYMBOL LEGEND, AND ABBREVIATIONS |
| T-101 - SYSTEMS FLOOR PLANS GROUND AND FIRST FLOOR |
| T-102 - SYSTEMS FLOOR PLANS SECOND AND THIRD FLOOR |
| T-103 - SYSTEMS FLOOR PLANS FOURTH AND FIFTH FLOOR |
| T-104 - SYSTEMS FLOOR PLANS SIXTH AND SEVENTH FLOOR |
| T-105 - SYSTEMS FLOOR PLANS NINTH FLOOR |
| T-401 - SYSTEMS ENLARGEMENTS |
| T-402 - SYSTEMS ENLARGEMENTS |
| T-501 - TECHNOLOGY DETAILS |
| E-18-401-Q23-VA Chicago-JB-Elev Modernization IL_jwbeezley@acg-pa - Sheet - T-105 - SYSTEMS FLOOR PLANS NINTH FLOOR |
| Sheets |
| E-001 - ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS |
| E-101 - ELECTRICAL FLOOR PLANS GROUND AND NINTH FLOOR |
| E-102 - ELECTIRCAL FLOOR PLANS FIRST FLOOR |
| E-201 - HOISTWAY SECTIONS |
| E-401 - ELECTRICAL ENLARGEMENTS |
| E-402 - ELECTRICAL ENLARGEMENTS |
| E-501 - ELECTRICAL DETAILS |
| E-602 - ELECTRICAL SCHEDULES |
| ED401 - ELECTRICAL DEMOLITION ENLARGEMENTS |
| ED402 - ELECTRICAL DEMOLITION ENLARGEMENTS |
| EM401 - MECHANICAL POWER ENLARGEMENTS |
| FA001 - FIRE ALARM GENERAL NOTES, SYMBOLE LEGEND, AND RISER |
| FA101 - FIRE ALARM PLAN - ELEVATOR LOBBIES |
| FA102 - FIRE ALARM PLAN - ELEVATOR EQUIPMENT ROOM |
| T-001 - TECHNOLOGY GENERAL NOTES, SYMBOL LEGEND, AND ABBREVIATIONS |
| T-101 - SYSTEMS FLOOR PLANS GROUND AND FIRST FLOOR |
| T-102 - SYSTEMS FLOOR PLANS SECOND AND THIRD FLOOR |
| T-103 - SYSTEMS FLOOR PLANS FOURTH AND FIFTH FLOOR |
| T-104 - SYSTEMS FLOOR PLANS SIXTH AND SEVENTH FLOOR |
| T-105 - SYSTEMS FLOOR PLANS NINTH FLOOR |
| T-401 - SYSTEMS ENLARGEMENTS |
| T-402 - SYSTEMS ENLARGEMENTS |
| T-501 - TECHNOLOGY DETAILS |
| E-18-401-Q23-VA Chicago-JB-Elev Modernization IL_jwbeezley@acg-pa - Sheet - T-401 - SYSTEMS ENLARGEMENTS |
| Sheets |
| E-001 - ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS |
| E-101 - ELECTRICAL FLOOR PLANS GROUND AND NINTH FLOOR |
| E-102 - ELECTIRCAL FLOOR PLANS FIRST FLOOR |
| E-201 - HOISTWAY SECTIONS |
| E-401 - ELECTRICAL ENLARGEMENTS |
| E-402 - ELECTRICAL ENLARGEMENTS |
| E-501 - ELECTRICAL DETAILS |
| E-602 - ELECTRICAL SCHEDULES |
| ED401 - ELECTRICAL DEMOLITION ENLARGEMENTS |
| ED402 - ELECTRICAL DEMOLITION ENLARGEMENTS |
| EM401 - MECHANICAL POWER ENLARGEMENTS |
| FA001 - FIRE ALARM GENERAL NOTES, SYMBOLE LEGEND, AND RISER |
| FA101 - FIRE ALARM PLAN - ELEVATOR LOBBIES |
| FA102 - FIRE ALARM PLAN - ELEVATOR EQUIPMENT ROOM |
This is the start of the file's text. The full file is on GovTribe.