S06 - A-402_Addendum 1.pdf

PDF 682 KB Posted

Attached to
Z1DA--537-19-101 Taylor Elevator Modernization Federal contract opportunity
Solicitation number
36C25220R0063
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 12

About this file

This document package includes plans and specifications for an elevator modernization project at the Jesse Brown VA Medical Center in Chicago, Illinois. The project involves replacing controls, motors, cabling, and exit doors for four passenger elevators and one service elevator serving nine floors. Elevator cabs will be renovated with new finishes, ceilings, lighting, flooring, and wall panels. Exterior doors and controls in the lobbies will be replaced in the existing locations. The sixth and seventh floor lobbies can be used for temporary storage and staging during construction. The machine room floor will be painted once old equipment is removed in phases corresponding to elevator refurbishment. An opening from a demolished mechanical exhaust vent must be closed on the roof along with roof repairs and replacement of the entire elevator machine room roof section to match the existing roof system. The solicitation was issued by the Department of Veterans Affairs Veterans Health Administration VISN 12 for proposal number 537-19-101 Taylor Elevator Modernization.

View the file

Other files for this federal contract opportunity

Other files attached to Z1DA--537-19-101 Taylor Elevator Modernization, newest first.
File Type Posted
36C25220R0063_8.docx DOCX document
36C25220R0063 0003.docx DOCX document
S06 - A-601_Addendum 1.pdf PDF
S06 - Specs 000115 List of Drawings.pdf PDF
36C25220R0063_7.docx DOCX document
S06 - Addendum1.pdf PDF
S06 - Specs 024119 SelectiveDemolition.pdf PDF
S06 - Consolidated RFI Response 537-19-101.pdf PDF
S06 - Specs 000110 TOC 18-401.pdf PDF
S06 - FA-001 Addendum 1.pdf PDF
S06 - Specs 014500 QualityControl.pdf PDF
36C25220R0063_6.docx DOCX document
36C25220R0063-067.docx DOCX document
36C25220R0063-068.pdf PDF
36C25220R0063-064.pdf PDF
36C25220R0063-062.pdf PDF
36C25220R0063-066.pdf PDF
36C25220R0063-061.pdf PDF
36C25220R0063-063.pdf PDF
36C25220R0063-065.pdf PDF
36C25220R0063-060.pdf PDF
36C25220R0063-059.docx DOCX document
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ELECTRICAL

62E2

ELEVATOR LOBBY

C6204

ELEVATOR

PT2

ELEVATOR

ELEVATOR

ST1

ELEVATOR

PT3

ELEVATOR

PT4

STAIR

NO-11

PT1

TEL

62T1

ELEVATOR

72T1

ELEVATOR

PT2

ELEVATOR

PT1

ELEVATOR

ST1

CORRIDOR

C7201

ELEVATOR

PT3

PT4

STAIR

NO 11

ELECTRICAL

72E2

TELECOM CLOSET

ELEVATOR

PT2

ELEVATOR

PT1

ELEVATOR

ST1

ELEVATOR

PT4

ELEVATOR

PT3

STAIR

NO-11

STAIR

NO 11

FIN. 1ST FLOOR

FIN. 2ND FLOOR

FIN. 3RD FLOOR

1 _ 4

1 _ 2

1 _ 2

FIN. 4TH FLOOR

FIN. 5TH FLOOR

FIN. 6TH FLOOR

FIN. 7TH FLOOR

1 _ 2

1 _ 2

1 _ 2

PASSENGER ELEV. (4)

9 FLOORS - 7 STOPS

PT1, PT2, PT3, PT4

SERVICE ELEV. (1)

9 FLOORS - 7 STOPS

ST1

FIN. 8TH FLOOR

FIN. MACHINE ROOM FLOOR

1 _ 2

1 _ 4

L.P. OF ROOF SLAB

FIN. GROUND FLOOR

TEMPORARY STORAGE

AND LAY DOWN AREA

TEMPORARY STORAGE

AND LAY DOWN AREA

ROOF ACCESS DOOR

ST1

PT1PT4

PT3 PT2

A

LA

R

E GI H,NC

S

G O 52644

P E

N

CO

LU IT

E

NG

RG

U O

A

P ,P

R E

G I

S T

E R

E D

A R

C H I T E C T U R

A L

C O

R P

O T

I O

N

N O

R T H C A R O L

I N A

A R

JE

FFREY A BROOKS

11296R

EG

IS

TERED ARCHITECT

N O

R

T H

C A R O L

I N

ARA

LE

IGH , NORT H CAROL

I N

A

Engineers Architects

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

MICHAEL BLADES & ASSOCIATES, CTO-ELEVATOR CONSULTANTS

/1

/2

:4

:5

P

M

A-402

ENLARGED EXISTING FLOOR PLANS &

ELEVATOR RISER DIAGRAM

10 12ANP

ELEVATOR MODERNIZATION

JESSE BROWN VA MEDICAL CENTER

820 S. DAMEN AVENUE

CHICAGO, ILLINOIS 60612 02/12/2020

ISSUED FOR BID AND CONSTRUCTION

537-19-101A18-401

11A

JAB

0 2 4 8

N O

R T

H

PLAN

0 2 4 8

N O

R T

H

PLAN

0 2 4 8

N O

R T

H

PLAN

0 2 4 8

N O

R T

H

PLAN

Scale: 1/4" = 1'-0"

ENLARGED EXISTING SIXTH FLOOR PLAN

Scale: 1/4" = 1'-0"

ENLARGED EXISTING SEVENTH FLOOR PLAN

Scale: 1/4" = 1'-0"

ENLARGED EXISTING EIGHTH FLOOR PLAN

Scale: 1/4" = 1'-0"

ENLARGED EXISTING MACHINE ROOM FLOOR PLAN

N

AREA OF WORK

SCOPE OUTLINE

KEY PLAN

SCALE: NO SCALE

W T

A Y

L O

R S

T R

E E

T

01 NOT USED.

02 SEE ELECTRICAL DWGS. FOR NEW SHAFT

LIGHTING.

03 THE EXISTING ELEVATORS CONTROLS,

MOTORS, CABLEING AND EXIT DOORS WILL BE

REPLACED FOR EACH CAR. EACH ELEVATOR

CAB WILL BE RENOVATED WITH NEW FINISHES,

NEW CEILING AND LIGHTING, NEW FLOORING,

AND NEW WALL PANELS AND RAILS AS

DETAILED ON SHT. A-601

04 INSTALL NEW EXTERIOR DOORS AND CONTROLS

IN THE LOBBIES AS SPECIFIED IN THE SAME

LOCATION AS EXISTING DOORS AND CONTROLS.

05 CLOSE UP EXISTING ELEVATOR DOOR

WITH NEW 2 HOUR WALL ASSEMBLY. 2X6

18 GA METAL WALL STUDS @ 16 O.C., (2)

LAYERS OF 5/8" TYPE "X" GYPSUM BOARD ON

BOTH SIDES OF WALL. FIRE CAULK ALL JOINTS

AND PENETRATIONS FOR A 2 HOUR RATED

ASSEMBLY. TURN ELEVATOR DOORS OVER TO

THE COR FOR PROPER DISPOSAL.

06 PAINT EXISTING MACHINE ROOM FLOORS ONCE

OLD EQUIPMENT HAS BEEN REMOVED. PAINTING

SHALL TAKE PLACE IN DIFFERENT PHASES AS

EACH ELEVATOR IS BEING REFURBISHED.

07 A PORTION OF THE 6TH AND 7TH FLOOR LOBBY

SPACE CAN BE UTILIZED FOR STORAGE AND A

STAGING AREA. THE GC SHALL ENCLOSE THE

AREA WITH TEMPORARY RIGID WALLS MEETING

THE INFECTION CONTROL REQUIREMENTS.

PLEASE SEE FLOOR PLAN FOR LIMITS OF

ENCLOSED AREAS

08 CONTRACTOR SHALL CLOSE UP OPENING FROM

DEMOLISHED MECHANICAL EXHAUST VENT.

CONTRACTOR SHALL INCLUDE REROOFING THE

ENTIRE ELEVATOR MACHINE ROOM SPACE.

COORDINATE LOCATION WITH MECHANICAL

DRAWINGS AND FINAL ROOFING INFORMATION

WITH COR.

DOOR SCHEDULE

DOOR DOOR FRAME FIRE

RATING

HDWR

SET REMARKSNO. WIDTH HEIGHT THICK MAT'L FINISH MAT'L FINISH

MACHINE ROOM FLOOR PLAN

901 3' - 6" 6' - 8" 1 3/4" 90MIN. REPLACE EXISTING DOOR WITH 900MIN FIRE RATED DOOR

AND 2HR RATED FRAME. VERIFY SIZE IN FIELD.

HM PT HM PT

Scale: No Scale

ELEVATOR RISER DIAGRAM

DocuSign Envelope ID: DB6390C2-326C-4F6F-95FC-61D9C19491B1

2/12/2020

CONTRACTOR SHALL CLOSE UP ROOF OPENING

FROM DEMOLISHED MECHANICAL EXHAUST

VENT. ROOF REPAIR WILL INCLUDE NEW

CONCRETE ROOF STRUCTURE, AND THE NEW

ROOF SYSTEM WILL BE PATCHED TO MATCH THE

EXISTING ROOF SYSTEM THAT IS CURRENTLY IN

PLACE.

1 ADDENDUM 01 05/18/2020

5/18/2020

File details come from the government source that posted it. Updated .