About this file

This document announces a pre-solicitation notice for a federal contract opportunity to replace failed roofs at multiple buildings on the Jesse Brown VA Medical Center campus in Chicago, Illinois. The VA requires a contractor to provide all labor, materials, equipment and supervision to demolish existing roofing systems across ten phases and install new roofing assemblies including membrane, insulation, copings and accessories. The project value is estimated between $1-2 million. Drawings and specifications will be released with the solicitation, which is scheduled for posting on November 12, 2019. Bids are due December 12, 2019, with a pre-bid site visit. The period of performance for the base contract is 240 calendar days from notice to proceed. There are also four alternate bid deduct options with various periods of performance.

36C25220B0008 Attch 2-Drawings 2 of 3 07.31.2019 537-15-128B.pdf

View the file

Other files

File Type Posted
36C25220B0008-0005001.pdf PDF
36C25220B0008-0005000.docx DOCX document
36C25220B0008-0004000.docx DOCX document
36C25220B0008-0004001.pdf PDF
36C25220B0008-0003001.pdf PDF
36C25220B0008-0003002.pdf PDF
36C25220B0008-0003000.docx DOCX document
36C25220B0008-0003003.pdf PDF
36C25220B0008-0002004.docx DOCX document
36C25220B0008-0002005.pdf PDF
36C25220B0008-0001000.docx DOCX document
36C25220B0008-0001001.pdf PDF
36C25220B0008-0001002.pdf PDF
36C25220B0008-010.pdf PDF
36C25220B0008-005.docx DOCX document
36C25220B0008-011.pdf PDF
36C25220B0008-007.pdf PDF
36C25220B0008-006.pdf PDF
36C25220B0008-009.pdf PDF
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PHOTO NOTES - PHASE 8 THIS SHEET ONLY

SEE ROOF PLANS FOR PHOTO LOCATION

P 1

P 2

P 3

P 4

P 5

P 6

REMOVE EXISTING BALLASTED ROOF ASSEMBLY. EXISTING EXHAUST

HOOD TO REMAIN. REMOVE AND INSPECT ALL COPING STONES. DISPOSE

OF AND REPLACE DAMAGED COPING STONES. REMOVE EXISTING CANTS

AND INSTALL NEW CANTS, SHEATHING, AND FLASHING AT VERTICAL

WALLS AND/OR PARAPETS.

REMOVE EXISTING EPDM ROOF ASSEMBLY. REMOVE EXISTING CANTS

AND INSTALL NEW CANTS, SHEATHING, AND FLASHING AT VERTICAL

WALLS AND/OR PARAPETS. REPLACE ALL ROOF DRAIN BODIES AND

HEADS.

REMOVE EXISTING BALLASTED ROOF ASSEMBLY. EXISTING EXHAUST

HOOD TO REMAIN. REMOVE AND INSPECT ALL COPING STONES. DISPOSE

OF AND REPLACE DAMAGED COPING STONES.

REMOVE EXISTING BALLASTED ROOF ASSEMBLY. REMOVE AND INSPECT

ALL COPING STONES. DISPOSE OF AND REPLACE DAMAGED COPING

STONES. EXISTING MECHANICAL EQUIPMENT TO REMAIN. COORDINATE

WITH MECHANICAL DRAWINGS.

REMOVE EXISTING BALLASTED ROOF ASSEMBLY.EXISTING MECHANICAL

EQUIPMENT TO REMAIN. COORDINATE WITH MECHANICAL DRAWINGS.

PROVIDE AND INSTALL NEW PERMANENT WALKWAY PADS PER THE

SPECIFICATIONS.

REMOVE EXISTING BALLASTED ROOF ASSEMBLY. REMOVE AND INSPECT

ALL COPING STONES. DISPOSE OF AND REPLACE DAMAGED COPING

STONES. EXISTING MECHANICAL EQUIPMENT TO REMAIN. COORDINATE

WITH MECHANICAL DRAWINGS. REMOVE EXISTING CANTS AND INSTALL

NEW CANTS, SHEATHING, AND FLASHING AT VERTICAL WALLS AND/OR

PARAPETS.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

Issued for Bid and Construction 7/31/19

C U s e rs \e b ro w n

\D o c u m e n ts

\1 .5

.0

J

B V

A M

C e b ro w n .r v t

/3

/2

:5

:2

P

M

AD108

PHASE 8 PHOTOS REPLACE MULTI-ROOFS

820 S. Damen Ave,Chicago, IL 60612

537-15-128B

1A, 11, 15, 21, 30

JULY 31, 2019 JLG ELB

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

P1 P2 P3 P4

P5

P5

Revisions: Date:

GARAGE

30' - 9"

/8

44' - 9"

5/ 8"

54' - 6"

22' - 2 7/8"

11A 11B

1A

DEMOLITION ROOF PLAN NOTES - THIS SHEET ONLY

A

B

C

D

E

F

G

H

I

J

K

L

M

ALL DIMENSIONS SHOWN ARE TO FACE OF WALL FRAMING/ MASONRY

UNLESS NOTED OTHERWISE. DIMENSIONS DESIGNATES AS "CLR" OR

"CLEAR" INDICATE A CLEAR DIMENSION FROM FACE OF FINISH TO FACE OF

FINISH.

REFERENCE MECHANICAL, PLUMBING AND ELECTRICAL FOR COORDINATION

ITEMS. COORDINATE AS REQUIRED INCLUDING NECESSARY FRAMING,

BLOCKING, ETC.

ROOFING SUPPLIERS, MANUFACTURERS, & INSTALLERS SHALL REVIEW ALL

ROOFING DETAILS & ADVISE THE ARCHITECT ON ANY RECOMMENDED

CHANGES.

UNLESS NOTIFIED OTHERWISE, ROOFING SUPPLIERS, MANUFACTURERS

AND INSTALLERS WILL BE ASSUMED TO HAVE REVIEWED AND APPROVED

THE DETAILS SHOWN.

PROVIDE FLASHING AT ALL CONDUIT & HVAC LINES PENETRATING THE

ROOF.

CONTRACTOR & ALL SUBTRADES SHALL BE AWARE AND EXERCISE THE

NECESSARY CARE TO PREVENT DAMAGE TO OR PUNCTURE OF THE ROOF.

THIS SHALL INCLUDE ALL DELETERIOUS MATERIALS AND TOOLS.

PHOTOS SHOWN DEPICT THE EXISTING CONDITIONS. REFER TO DEMOLITION

ROOF PLAN FOR LOCATION OF PHOTOS

ESTABLISH A DUST/DEBRIS CONTROL PLAN TO PREVENT THE SEPERATION

OF FLYING PARTICLES. AT ROOF AND AT ROOF ACCESS INSIDE HOSPITAL.

DISPOSE DEMOLITION WASTE LAWFULLY AND OFF-SITE DAILY

PROVIDE TEMPORARY ROOF/VAPOR RETARDER. SUBMIT A TEMPORARY

PROTECTION PLAN.

PROVIDE TEMPORARY WATER PROTECTION FROM RAIN AT THE END OF

EACH WORK PERIOD.

CONTRACTOR SHALL KEEP AWARE OF CHANGING WEATHER AND STOP

WORK AND PROVIDE WATER PROTECTION MEASURES BEFORE WEATHER

EVENT.

NO HELICOPTER OR ROOF CHUTES TO BE UTILIZED DURING DEMOLITION OR

CONSTRUCTION.

DEMOLITION ROOF PLAN NOTES - THIS SHEET ONLY

1.

2.

3.

4.

5.

6.

7.

8.

REMOVE EXISTING BALLASTED ROOF ASSEMBLY AND INSULATION COMPLETELY

DOWN TO ROOF DECK. DO NOT DAMAGE ROOF DECK.

REMOVE EXISTING ROLLED ASPHALT ROOF ASSEMBLY AND INSULATION

COMPLETELY DOWN TO ROOF DECK.

REPLACE ROOF DRAIN BODIES AND HEADS. ACCESS FROM FLOOR BELOW IN

FINISHED SPACES. COORDINATE WITH COR. PROVIDE INFECTION CONTROL

MEASURES WHEN WORKING IN FINISHED AREAS. COMPLETE ON WEEKEND/

NIGHTS - COORDINATE WITH MEP.

EXISTING ROOF HATCH TO REMAIN - TAKE CARE TO NOT DAMAGE.

REMOVE EXISTING TAPERED INSULATION DOWN TO ROOF DECK.

REMOVE AND REPLACE EXISTING ROOF PAVERS.

ALL EXISTING CURBS THAT ARE IN USE ARE TO REMAIN.

REMOVE AND REINSTALL SAFETY HANDRAILS AND COPING.

ROOF LEGEND

ROOF SLOPE

EXHAUST FAN

ROOF VENT

DIRECTION OF PHOTO VIEW

EF

RV

P1

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

Issued for Bid and Construction 7/31/19

C U s e rs \e b ro w n

\D o c u m e n ts

\1 .5

.0

J

B V

A M

C e b ro w n .r v t

/3

/2

:5

:2

P

M

AD109

PHASES 9 & 10 DEMOLITION ROOF

PLAN

REPLACE MULTI-ROOFS

820 S. Damen Ave,Chicago, IL 60612

537-15-128B

1A, 11, 15, 21, 30

JULY 31, 2019 JLG JDJ

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/4" = 1'-0"AD109

1 BUILDING 15 ROOF PLAN - PHASE 10

SCALE: 1/4" = 1'-0"AD109

2 BUILDING 21 ROOF PLAN - PHASE 9

N

N

N

KEYPLAN

NO SCALE

RV

RV

AS500

AS500

AS500

AS500

AS500

AS500

AS500

AS500

AS500

AS500

AS500

AS500

AS500

AS500

AS500

AS500

VP

AS500

VP

VP

VPVP

VPVP

VP

VP

VP

VP

VP

VP

VP

RD

RD

RD RD

RD RD

VP

VP

AS500

AS500

AS500

ROOF PLAN GENERAL NOTES

A

B

C

D

E

F

G

ROOF PLAN NOTES - THIS SHEET ONLY #

ROOFING SUPPLIERS, MANUFACTURERS, & INSTALLERS SHALL REVIEW ALL

ROOFING DETAILS & ADVISE THE ARCHITECT/COR ON ANY RECOMMENDED

CHANGES.

UNLESS NOTIFIED OTHERWISE, ROOFING SUPPLIERS, MANUFACTURERS

AND INSTALLERS WILL BE ASSUMED TO HAVE REVIEWED AND APPROVED

THE DETAILS SHOWN.

PROVIDE FLASHING AND SEALANT PER ROOFING MANUFACTURER

RECOMMENDATION AT ALL CONDUIT & HVAC LINES PENETRATING THE

ROOF.

CONTRACTOR & ALL SUBTRADES SHALL BE AWARE & EXERCISE THE

NECESSARY CARE TO PREVENT DAMAGE TO OR PUNCTURE OF THE ROOF.

THIS SHALL INCLUDE ALL MATERIALS, TOOLS, DELETERIOUS MATERIALS.

REFERENCE STRUCTURAL, MECHANICAL, PLUMBING, FIRE PROTECTION AND

ELECTRICAL FOR ITEMS. COORDINATE AS REQUIRED INCLUDING

NECESSARY FRAMING, BLOCKING, ETC.

VERIFY EXISTING FIELD CONDITIONS PRIOR TO BEGINNING WORK, AND

REPORT DISCREPANCIES IMMEDIATELY

FOR TYPICAL FLASHING DETAIL AT EXHAUST FAN. SEE MECHANICAL

DRAWINGS FOR MORE INFORMATION.

REMOVE AND REPLACE SCUPPERS.

REPLACE ALL ROOF DRAIN HEADS AND BODIES - SEE PLUMBING SHEETS

SCRAPE, PRIME, AND PAINT ALL EXISTING EXPOSED STEEL EQUIPMENT

SUPPORTS, FRAMING WITHIN WORK AREA.

REMOVE AND REPLACE EXISTING CANTS, SHEATHING, AND FLASHING AT

PARAPETS.

REINSTALL SAFETY HANDRAILS AND COPINGS.

EXISTING ROOF HATCH TO REMAIN

NEW WALKWAY PADS.

ROOF LEGEND

ROOF SLOPE - TO MATCH EXISTING

EXHAUST FAN

ROOF VENT

VENT PIPE

ROOF DRAIN

EF

RV

VP

RD

AS500

AS500

AS500

AS500

AS500

12TH FLOOR

AS500

AS500

AS500

AS500

VP

AS500

AS500

11TH FLOOR

T

H F

LO

O

R

AS500

AS500

AS500

AS500

VP

VP

AS500

AS500

AS501

RD

AS500

AS500

AS500

AS500

VP

AS500

AS500

AS500

11A 11B

1A

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

Issued for Bid and Construction 7/31/19

C U s e rs \e b ro w n

\D o c u m e n ts

\1 .5

.0

J

B V

A M

C e b ro w n .r v t

/3

/2

:5

:2

P

M

AS100

PHASES 1-4 RENOVATION ROOF

PLANS

REPLACE MULTI-ROOFS

820 S. Damen Ave,Chicago, IL 60612

537-15-128B

1A, 11, 15, 21, 30

JULY 31, 2019 JLG JDJ

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/8" = 1'-0"AS100

3 BUILDING 1A 10TH FLOOR MECHANICAL PENTHOUSE ROOF PLAN - PHASE 4

SCALE: 1/8" = 1'-0"AS100

2 BUILDING 1A 11TH FLOOR PENTHOUSE ROOF - PHASE 2 & 3

SCALE: 1/8" = 1'-0"AS100

1 BUILDING 1A 12TH FLOOR PENTHOUSE ROOF - PHASE 1

NN N

N

2 2

5 5

KEYPLAN

NO SCALE

ROOF PLAN GENERAL NOTES

A

B

C

D

E

F

G

ROOF PLAN NOTES - THIS SHEET ONLY #

ROOFING SUPPLIERS, MANUFACTURERS, & INSTALLERS SHALL REVIEW ALL

ROOFING DETAILS & ADVISE THE ARCHITECT/COR ON ANY RECOMMENDED

CHANGES.

UNLESS NOTIFIED OTHERWISE, ROOFING SUPPLIERS, MANUFACTURERS

AND INSTALLERS WILL BE ASSUMED TO HAVE REVIEWED AND APPROVED

THE DETAILS SHOWN.

PROVIDE FLASHING AND SEALANT PER ROOFING MANUFACTURER

RECOMMENDATION AT ALL CONDUIT & HVAC LINES PENETRATING THE

ROOF.

CONTRACTOR & ALL SUBTRADES SHALL BE AWARE & EXERCISE THE

NECESSARY CARE TO PREVENT DAMAGE TO OR PUNCTURE OF THE ROOF.

THIS SHALL INCLUDE ALL MATERIALS, TOOLS, DELETERIOUS MATERIALS.

REFERENCE STRUCTURAL, MECHANICAL, PLUMBING, FIRE PROTECTION AND

ELECTRICAL FOR ITEMS. COORDINATE AS REQUIRED INCLUDING

NECESSARY FRAMING, BLOCKING, ETC.

VERIFY EXISTING FIELD CONDITIONS PRIOR TO BEGINNING WORK, AND

REPORT DISCREPANCIES IMMEDIATELY

FOR TYPICAL FLASHING DETAIL AT EXHAUST FAN. SEE MECHANICAL

DRAWINGS FOR MORE INFORMATION.

REMOVE AND REPLACE SCUPPERS.

REPLACE ALL ROOF DRAIN HEADS AND BODIES - SEE PLUMBING SHEETS

SCRAPE, PRIME, AND PAINT ALL EXISTING EXPOSED STEEL EQUIPMENT

SUPPORTS, FRAMING WITHIN WORK AREA.

REMOVE AND REPLACE EXISTING CANTS, SHEATHING, AND FLASHING AT

PARAPETS.

REINSTALL SAFETY HANDRAILS AND COPINGS.

EXISTING ROOF HATCH TO REMAIN

NEW WALKWAY PADS.

ROOF LEGEND

ROOF SLOPE - TO MATCH EXISTING

EXHAUST FAN

ROOF VENT

VENT PIPE

ROOF DRAIN

EF

RV

VP

RD

AS500

AS500

AS500

AS500

AS500

AS500

AS500

AS500

AS500

AS500

AS500

AS500

AS500

AS500

AS500

AS500

AS500

AS500

AS500

RDRD

RD

VPVP

VP

AS500

AS500

AS500

AS500

11A 11B

1A

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

Issued for Bid and Construction 7/31/19

C U s e rs \e b ro w n

\D o c u m e n ts

\1 .5

.0

J

B V

A M

C e b ro w n .r v t

/3

/2

:5

:3

P

M

AS102

PHASE 5 RENOVATION ROOF

PLANS

REPLACE MULTI-ROOFS

820 S. Damen Ave,Chicago, IL 60612

537-15-128B

1A, 11, 15, 21, 30

JULY 31, 2019 JLG ELB

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/4" = 1'-0"AS102

1 BUILDING 1A 3RD FLOOR AUDITORIUM ROOF PLAN - PHASE 5

N

N

KEYPLAN

NO SCALE

SIM.

AS500

VP

VP

RD

RD

AS500

AS501

AS500

AS500

AS502

AS502

AS502

VP

VP

VP

RD RD

AS500

AS502

AS500

AS500

AS501

AS500

VP

AS502

AS502

ROOF PLAN GENERAL NOTES

A

B

C

D

E

F

G

ROOF PLAN NOTES - THIS SHEET ONLY #

ROOFING SUPPLIERS, MANUFACTURERS, & INSTALLERS SHALL REVIEW ALL

ROOFING DETAILS & ADVISE THE ARCHITECT/COR ON ANY RECOMMENDED

CHANGES.

UNLESS NOTIFIED OTHERWISE, ROOFING SUPPLIERS, MANUFACTURERS

AND INSTALLERS WILL BE ASSUMED TO HAVE REVIEWED AND APPROVED

THE DETAILS SHOWN.

PROVIDE FLASHING AND SEALANT PER ROOFING MANUFACTURER

RECOMMENDATION AT ALL CONDUIT & HVAC LINES PENETRATING THE

ROOF.

CONTRACTOR & ALL SUBTRADES SHALL BE AWARE & EXERCISE THE

NECESSARY CARE TO PREVENT DAMAGE TO OR PUNCTURE OF THE ROOF.

THIS SHALL INCLUDE ALL MATERIALS, TOOLS, DELETERIOUS MATERIALS.

REFERENCE STRUCTURAL, MECHANICAL, PLUMBING, FIRE PROTECTION AND

ELECTRICAL FOR ITEMS. COORDINATE AS REQUIRED INCLUDING

NECESSARY FRAMING, BLOCKING, ETC.

VERIFY EXISTING FIELD CONDITIONS PRIOR TO BEGINNING WORK, AND

REPORT DISCREPANCIES IMMEDIATELY

FOR TYPICAL FLASHING DETAIL AT EXHAUST FAN. SEE MECHANICAL

DRAWINGS FOR MORE INFORMATION.

REMOVE AND REPLACE SCUPPERS.

REPLACE ALL ROOF DRAIN HEADS AND BODIES - SEE PLUMBING SHEETS

SCRAPE, PRIME, AND PAINT ALL EXISTING EXPOSED STEEL EQUIPMENT

SUPPORTS, FRAMING WITHIN WORK AREA.

REMOVE AND REPLACE EXISTING CANTS, SHEATHING, AND FLASHING AT

PARAPETS.

REINSTALL SAFETY HANDRAILS AND COPINGS.

EXISTING ROOF HATCH TO REMAIN

NEW WALKWAY PADS.

ROOF LEGEND

ROOF SLOPE - TO MATCH EXISTING

EXHAUST FAN

ROOF VENT

VENT PIPE

ROOF DRAIN

EF

RV

VP

RD

11A 11B

1A

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

Issued for Bid and Construction 7/31/19

C U s e rs \e b ro w n

\D o c u m e n ts

\1 .5

.0

J

B V

A M

C e b ro w n .r v t

/3

/2

:5

:3

P

M

AS103

PHASE 6 & 7 RENOVATION ROOF

PLANS

REPLACE MULTI-ROOFS

820 S. Damen Ave,Chicago, IL 60612

537-15-128B

1A, 11, 15, 21, 30

JULY 31, 2019 JLG ELB

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

SCALE: 3/16" = 1'-0"AS103

1 BUILDING 30 2ND FLOOR MECHANICAL ROOF PLAN - PHASE 7

SCALE: 1/4" = 1'-0"AS103

2 BUILDING 30 2ND FLOOR MECHANICAL ROOF PLAN - PHASE 6

N

N

N

SIM

SIM

SIM

SIM

SIM

KEYPLAN

NO SCALE

A

B

C

D

E

F

G

ROOF PLAN NOTES - THIS SHEET ONLY #

ROOFING SUPPLIERS, MANUFACTURERS, & INSTALLERS SHALL REVIEW ALL

ROOFING DETAILS & ADVISE THE ARCHITECT/COR ON ANY RECOMMENDED

CHANGES.

UNLESS NOTIFIED OTHERWISE, ROOFING SUPPLIERS, MANUFACTURERS

AND INSTALLERS WILL BE ASSUMED TO HAVE REVIEWED AND APPROVED

THE DETAILS SHOWN.

PROVIDE FLASHING AND SEALANT PER ROOFING MANUFACTURER

RECOMMENDATION AT ALL CONDUIT & HVAC LINES PENETRATING THE

ROOF.

CONTRACTOR & ALL SUBTRADES SHALL BE AWARE & EXERCISE THE

NECESSARY CARE TO PREVENT DAMAGE TO OR PUNCTURE OF THE ROOF.

THIS SHALL INCLUDE ALL MATERIALS, TOOLS, DELETERIOUS MATERIALS.

REFERENCE STRUCTURAL, MECHANICAL, PLUMBING, FIRE PROTECTION AND

ELECTRICAL FOR ITEMS. COORDINATE AS REQUIRED INCLUDING

NECESSARY FRAMING, BLOCKING, ETC.

VERIFY EXISTING FIELD CONDITIONS PRIOR TO BEGINNING WORK, AND

REPORT DISCREPANCIES IMMEDIATELY

FOR TYPICAL FLASHING DETAIL AT EXHAUST FAN. SEE MECHANICAL

DRAWINGS FOR MORE INFORMATION.

REMOVE AND REPLACE SCUPPERS.

REPLACE ALL ROOF DRAIN HEADS AND BODIES - SEE PLUMBING SHEETS

SCRAPE, PRIME, AND PAINT ALL EXISTING EXPOSED STEEL EQUIPMENT

SUPPORTS, FRAMING WITHIN WORK AREA.

REMOVE AND REPLACE EXISTING CANTS, SHEATHING, AND FLASHING AT

PARAPETS.

REINSTALL SAFETY HANDRAILS AND COPINGS.

EXISTING ROOF HATCH TO REMAIN

NEW WALKWAY PADS.

ROOF LEGEND

ROOF SLOPE - TO MATCH EXISTING

EXHAUST FAN

ROOF VENT

VENT PIPE

ROOF DRAIN

EF

RV

VP

RD

AS500

AS500

AS500

AS502

AS500

AS500

RD

RDRD

RD

AS500

RD

RD

AS500

AS500

AS502

AS500

AS500

AS502

AS500

SIM

AS502

RV

RD

RD

RD

SIM

AS500

AS500

AS500

11A 11B

1A

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

Issued for Bid and Construction 7/31/19

C U s e rs \e b ro w n

\D o c u m e n ts

\1 .5

.0

J

B V

A M

C e b ro w n .r v t

/3

/2

:5

:3

P

M

AS104

PHASE 8 RENOVATION ROOF

PLANS

REPLACE MULTI-ROOFS

820 S. Damen Ave,Chicago, IL 60612

537-15-128B

1A, 11, 15, 21, 30

JULY 31, 2019 JLG JDJ

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/4" = 1'-0"AS104

1 BUILDING 11A CANTEEN KITCHEN ROOF PLAN - PHASE 8

SCALE: 3/16" = 1'-0"AS104

2 TAYLOR ST. LOADING DOCK ROOF PLAN (1ST FLOOR ROOF) - PHASE 8

NN

N

7 7

KEYPLAN

A

B

C

D

E

F

G

ROOF PLAN NOTES - THIS SHEET ONLY #

ROOFING SUPPLIERS, MANUFACTURERS, & INSTALLERS SHALL REVIEW ALL

ROOFING DETAILS & ADVISE THE ARCHITECT/COR ON ANY RECOMMENDED

CHANGES.

UNLESS NOTIFIED OTHERWISE, ROOFING SUPPLIERS, MANUFACTURERS

AND INSTALLERS WILL BE ASSUMED TO HAVE REVIEWED AND APPROVED

THE DETAILS SHOWN.

PROVIDE FLASHING AND SEALANT PER ROOFING MANUFACTURER

RECOMMENDATION AT ALL CONDUIT & HVAC LINES PENETRATING THE

ROOF.

CONTRACTOR & ALL SUBTRADES SHALL BE AWARE & EXERCISE THE

NECESSARY CARE TO PREVENT DAMAGE TO OR PUNCTURE OF THE ROOF.

THIS SHALL INCLUDE ALL MATERIALS, TOOLS, DELETERIOUS MATERIALS.

REFERENCE STRUCTURAL, MECHANICAL, PLUMBING, FIRE PROTECTION AND

ELECTRICAL FOR ITEMS. COORDINATE AS REQUIRED INCLUDING

NECESSARY FRAMING, BLOCKING, ETC.

VERIFY EXISTING FIELD CONDITIONS PRIOR TO BEGINNING WORK, AND

REPORT DISCREPANCIES IMMEDIATELY

FOR TYPICAL FLASHING DETAIL AT EXHAUST FAN. SEE MECHANICAL

DRAWINGS FOR MORE INFORMATION.

REMOVE AND REPLACE SCUPPERS.

REPLACE ALL ROOF DRAIN HEADS AND BODIES - SEE PLUMBING SHEETS

SCRAPE, PRIME, AND PAINT ALL EXISTING EXPOSED STEEL EQUIPMENT

SUPPORTS, FRAMING WITHIN WORK AREA.

REMOVE AND REPLACE EXISTING CANTS, SHEATHING, AND FLASHING AT

PARAPETS.

REINSTALL SAFETY HANDRAILS AND COPINGS.

EXISTING ROOF HATCH TO REMAIN

NEW WALKWAY PADS.

ROOF LEGEND

ROOF SLOPE - TO MATCH EXISTING

EXHAUST FAN

ROOF VENT

VENT PIPE

ROOF DRAIN

EF

RV

VP

RD

AS501

AS501

AS501

AS500

AS501

AS501

AS501

RD

AS500

AS501

AS500

AS501

AS501

AS501

AS501

AS501

AS501

AS501

AS500

RD

11A 11B

1A

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

Issued for Bid and Construction 7/31/19

C U s e rs \e b ro w n

\D o c u m e n ts

\1 .5

.0

J

B V

A M

C e b ro w n .r v t

/3

/2

:5

:3

P

M

AS105

PHASES 9 & 10 RENOVATION

ROOF PLANS

REPLACE MULTI-ROOFS

820 S. Damen Ave,Chicago, IL 60612

537-15-128B

1A, 11, 15, 21, 30

JULY 31, 2019 JLG JDJ

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/4" = 1'-0"AS105

2 BUILDING 21 ROOF PLAN - PHASE 9

SCALE: 1/4" = 1'-0"AS105

1 BUILDING 15 ROOF PLAN - PHASE 10

N

N

N

KEYPLAN

5"

V.I.F.

6 3/4"

V.I.F.

5 1/4"

1/

2"

6" M

IN

1/2" THICK FIBERGLASS

COVER BOARD

TAPERED HIGH DENSITY POLY-ISO

INSULATION - MATCH EXISTING

THICKNESS

FULLY ADHERED WHITE TPO

SINGLE-PLY MEMBRANE

VAPOR BARRIER

1/2" THICK EXTERIOR GRADE

PLYWOOD SHEATHING

NEW .063" ALUMINUM COPING

WITH KYNAR FINISH

EXISTING STONE

COPING TO BE

REPLACED IF DAMAGED

EXISTING DECK

M

IN

CONTINUOUS SEALANT AT

PERIMETER OF POST

SAFETY HAND RALINGS

AND COPINGS TO BE REINSTALLED,

IN SAME LOCATION, IN EXISTING

SLEEVES

TREATED WOOD CANT

1' - 1 1/2"

1/2" THICK FIBERGLASS COVER BOARD

TAPERED HIGH DENSITY POLY-ISO

INSULATION - TO MATCH EXISTING THICKNESS

FULLY ADHERED WHITE TPO

SINGLE-PLY MEMBRANE

VAPOR BARRIER

EXISTING ROOF DECK

NEW .024 METAL FLASHING

COPING STONE

1/2" THICK FIBERGLASS COVER BOARD

TAPERED HIGH DENSITY POLY-ISO

INSULATION - MATCH EXISTING THICKNESS

FULLY ADHERED WHITE TPO

SINGLE-PLY MEMBRANE

REPLACE ROOF DRAIN, COORDINATE WITH COR

COMPRESSION RING

AND STRAINER BASKET

CONTINUOUS BEAD OF

WATERBLOCK AROUND

ROOF DRAIN

DEPRESSED NOTCHED CLAMPING RING

1/2" THICK FIBERGLASS COVER BOARD

HIGH DENSITY POLY-ISO INSULATION

FULLY ADHERED WHITE TPO

SINGLE-PLY MEMBRANE

VAPOR BARRIER

EXISTING ROOF DECK

1/2" THICK EXTERIOR GRADE

PLYWOOD SHEATHING

TERMINATION BAR

.024 METAL FLASHING - EXTEND

UNDER EXISTING FLASHING AND

EXTEND DOWN PAST TERMINATION

BAR - SUPPLY HEMNED EDGE

METAL FASTENERS

EXISTING MECHANICAL UNIT TO

REMAIN - TAKE CARE TO NOT DAMAGE

TREATED WOOD CANT

SEALANT

1/2" THICK FIBERGLASS COVER BOARD

TAPERED HIGH DENSITY POLY-ISO

INSULATION - TO MATCH EXISTING

THICKNESS

FULLY ADHERED WHITE TPO

SINGLE-PLY MEMBRANE

VAPOR BARRIER

EXISTING ROOF DECK

TERMINATION BAR

METAL COUNTERFLASHING, SEE 4/AS501

TREATED WOOD CANT

EXISTING ROOF DECK

1/2" THICK FIBERGLASS COVER BOARD

TAPERED HIGH DENSITY POLY-ISO

INSULATION - MATCH EXISTING THICKNESS

FULLY ADHERED WHITE TPO

SINGLE-PLY MEMBRANE

VAPOR BARRIER

EXISTING ROOF DECK

1/2" THICK FIBERGLASS COVER BOARD

TAPERED HIGH DENSITY POLY-ISO

INSULATION - MATCH EXISTING

THICKNESS

NEW .063" ALUMINUM COPING

WITH KYNAR FINISH

FULLY ADHERED WHITE TPO

SINGLE-PLY MEMBRANE

VAPOR BARRIER

1' - 1 1/2"

5"

1 1/2"

1/

2"

1/2" THICK EXTERIOR GRADE

PLYWOOD SHEATHING

EXISTING STONE COPING

TO BE REPLACED IF DAMAGED

TREATED WOOD CANT

ALUMINUM COPING

DRIVE CLEATED CORNER

PREDRILLED PILOT HOLE

SCREW FASTENER LOCATIONS - TYP.

EXISTING ROOF DECK

1/2" THICK FIBERGLASS COVER BOARD

TAPERED HIGH DENSITY POLY-ISO

INSULATION - MATCH EXISTING THICKNESS

FULLY ADHERED WHITE TPO

SINGLE-PLY MEMBRANE

VAPOR BARRIER

NEW .063" ALUMINUM COPING WITH KYNAR FINISH

TREATED WOOD BLOCKING

TREATED WOOD CANT

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

Issued for Bid and Construction 7/31/19

C U s e rs \e b ro w n

\D o c u m e n ts

\1 .5

.0

J

B V

A M

C e b ro w n .r v t

/3

/2

:5

:3

P

M

AS500

ROOF DETAILS REPLACE MULTI-ROOFS

820 S. Damen Ave,Chicago, IL 60612

537-15-128B

1A, 11, 15, 21, 30

JULY 31, 2019 JLG ELB

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

SCALE: 3" = 1'-0"AS500

1 ROOF PARAPET

SCALE: 3" = 1'-0"AS500

2 SCUPPER DETAIL

SCALE: 1 1/2" = 1'-0"AS500

3 ROOF DRAIN DETAIL

SCALE: 3" = 1'-0"AS500

4 ROOFTOP UNIT CURB DETAIL

SCALE: 1 1/2" = 1'-0"AS500

8 ROOF TERMINATION DETAIL

SCALE: 1 1/2" = 1'-0"AS500

5 VENT PIPE DETAIL

SCALE: 3" = 1'-0"AS500

6 ROOF PARAPET

SCALE: 1 1/2" = 1'-0"AS500

7 OUTSIDE COPING CORNER

SCALE: 3" = 1'-0"AS500

9 DUCT PENETRATION CURB

1/2" THICK FIBERGLASS COVER BOARD

TAPERED HIGH DENSITY POLY-ISO

INSULATION - TO MATCH EXISTING THICKNESS

FULLY ADHERED WHITE TPO

SINGLE-PLY MEMBRANE

VAPOR BARRIER

1/2" THICK PLYWOOD SHEATHING

NEW .063" ALUMINUM COPING

WITH KYNAR FINISH

2X TREATED WOOD BLOCKING

EXISTING ROOF DECK

10"

1/

8"

TREATED WOOD CANT

EXISTING CONSTRUCTION

NEW .063" ALUMINUM

COPING W/KYNAR FINISH

1/2" THICK FIBERGLASS COVER BOARD

TAPERED HIGH DENSITY POLY-ISO

INSULATION - TO MATCH EXISTING THICKNESS

FULLY ADHERED WHITE TPO

SINGLE-PLY MEMBRANE

VAPOR BARRIER

TREATED WOOD BLOCKING

CONTINUOUS SEALANT AT

PERIMETER OF POST

M

IN

SAFETY HAND RAILINGS AND COPINGS

TO BE REINSTALLED, IN SAME LOCATION,

IN EXISTING SLEEVES

1/2" THICK FIBERGLASS COVER

BOARD

TAPERED HIGH DENSITY

POLY-ISO INSULATION - TO

MATCH EXISTING THICKNESS

FULLY ADHERED WHITE TPO

SINGLE-PLY MEMBRANE

VAPOR BARRIER

NEW .024 METAL FLASHING

EXISTING ROOF DECK

PLAN

ELEVATION

TREATED WOOD BLOCKING

1/2" THICK FIBERGLASS COVER BOARD

TAPERED HIGH DENSITY POLY-ISO

INSULATION - TO MATCH EXISTING THICKNESS

FULLY ADHERED WHITE TPO

SINGLE-PLY MEMBRANE

VAPOR BARRIER

NEW .063" ALUMINUM COPING

WITH KYNAR FINISH

EXISTING ROOF DECK

SURFACED CAP SHEET

1/2" THICK FIBERGLASS

COVER BOARD

TAPERED HIGH DENSITY

POLY-ISO INSULATION - TO MATCH

EXISTING THICKNESS

FULLY ADHERED WHITE TPO

SINGLE-PLY MEMBRANE

VAPOR BARRIER

EXISTING ROOF DECK

EXISTING ROOF HATCH TO REMAIN - TAKE

CARE TO NOT DAMAGE

TREATED WOOD CANT

SEALANT

TERMINATION BAR

.024 METAL FLASHING

WITH HEMNED EDGE

SEALANT

COUNTER FLASHING

FULLY ADHERED WHITE TPO

SINGLE-PLY MEMBRANE

TERMINATION BAR

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

Issued for Bid and Construction 7/31/19

C U s e rs \e b ro w n

\D o c u m e n ts

\1 .5

.0

J

B V

A M

C e b ro w n .r v t

/3

/2

:5

:3

P

M

AS501

ROOF DETAILS REPLACE MULTI-ROOFS

820 S. Damen Ave,Chicago, IL 60612

537-15-128B

1A, 11, 15, 21, 30

JULY 31, 2019 JLG ELB

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

SCALE: 3" = 1'-0"AS501

1 ROOF EDGE DETAIL 4

SCALE: 3" = 1'-0"AS501

2 ROOF EDGE DETAIL 1

SCALE: 1 1/2" = 1'-0"AS501

6 HOT VENT PIPE ROOF CURB

SCALE: 3" = 1'-0"AS501

5 ROOF CURB RAIL FLASHING

SCALE: 3" = 1'-0"AS501

3 ROOF HATCH DETAIL

SCALE: 3" = 1'-0"AS501

4 ROOF COUNTERFLASHING DETAIL

NEW .063" ALUMINUM COPING

WITH KYNAR FINISH

1/2" THICK FIBERGLASS COVER BOARD

TAPERED HIGH DENSITY POLY-ISO

INSULATION - TO MATCH EXISTING

THICKNESS

FULLY ADHERED WHITE TPO

SINGLE-PLY MEMBRANE

VAPOR BARRIER

V.I.F.

1' - 1 1/2"

5"

1/

2"

1/2" THICK EXTERIOR GRADE

PLYWOOD SHEATHING

EXISTING ROOF DECK

EXISTING STONE COPING

TO BE REPLACED IF DAMAGED

TREATED WOOD CANT

1/2" THICK FIBERGLASS COVER BOARD

TAPERED HIGH DENSITY POLY-ISO

INSULATION - TO MATCH EXISTING THICKNESS

FULLY ADHERED WHITE TPO

SINGLE-PLY MEMBRANE

VAPOR BARRIER

1/2" THICK EXTERIOR GRADE

PLYWOOD SHEATHING

NEW .063" ALUMINUM COPING

WITH KYNAR FINISH

EXISTING STONE COPING TO

BE REPLACED IF DAMAGED

EXISTING ROOF DECK

TREATED WOOD CANT

EXISTING ROOF DECK

NEW .063" ALUMINUM COPING

WITH KYNAR FINISH

1/2" FIBERGLASS COVER BOARD

TAPERED HIGH DENSITY POLY-ISO

INSULATION - TO MATCH EXISTING THICKNESS

FULLY ADHERED WHITE TPO

SINGLE-PLY MEMBRANE

VAPOR BARRIER

TREATED WOOD

BLOCKING

CONTINUOUS SEALANT AT

PERIMETER OF POST

M

IN

9 3/8"

SAFETY HAND RAILINGS AND COPINGS TO

BE REINSTALLED IN SAME LOCATION

1' - 2"

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

Issued for Bid and Construction 7/31/19

C U s e rs \e b ro w n

\D o c u m e n ts

\1 .5

.0

J

B V

A M

C e b ro w n .r v t

/3

/2

:5

:3

P

M

AS502

ROOF DETAILS REPLACE MULTI-ROOFS

820 S. Damen Ave,Chicago, IL 60612

537-15-128B

1A, 11, 15, 21, 30

JULY 31, 2019 JLG ELB

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

SCALE: 3" = 1'-0"AS502

1 ROOF SEPARATION CURB

SCALE: 3" = 1'-0"AS502

2 ROOF CURB EDGE DETAIL

SCALE: 3" = 1'-0"AS502

3 ROOF EDGE HANDRAIL DETAIL

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

V P r o j e c t s V

I R

R

A r c h

U p d a t e s

A r c h i t e c t u r a l

R e v i t

J B

V

A M

C r v t

P

M

820 S. Damen Ave., Chicago, IL 60612

1A, 11, 15, 21, 30

JULY 31, 2019 AJM LAM

FULLY SPRINKLERED

Revisions: Date:

10411 Meeting Street, Prospect, Kentucky 40059

502 326.3085 f 502 326.2691 www.cmtaegrs.com

CMTA Project: VIRR19

CONSTRUCTION

DOCUMENTS

REPLACE MULTI-ROOFS 537-15-128BIssued for Bid and Construction 7/31/19

A/E:Consultant:

ML100

MECHANICAL LEGEND AND

GENERAL NOTES

AutoCAD SHX Text R

AutoCAD SHX Text

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text J

AutoCAD SHX Text I

AutoCAD SHX Text L

AutoCAD SHX Text L

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text B

AutoCAD SHX Text E

AutoCAD SHX Text

LICENSED

AutoCAD SHX Text

PROFESSIONAL

AutoCAD SHX Text

OF

AutoCAD SHX Text

ENGINEER

AutoCAD SHX Text 062.069980

AutoCAD SHX Text

DIRECTION OF FLOW (PIPING)

AutoCAD SHX Text

PIPE SIZE TRANSITION

AutoCAD SHX Text

BALANCING VALVE

AutoCAD SHX Text

BALL VALVE

AutoCAD SHX Text

TAGGED NOTE

AutoCAD SHX Text

NOT IN CONTRACT

AutoCAD SHX Text

NIC

AutoCAD SHX Text

BELOW FLOOR

AutoCAD SHX Text

ABOVE FINISHED FLOOR

AutoCAD SHX Text

EXPOSED AT CEILING

AutoCAD SHX Text

TYPICAL

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text

BF

AutoCAD SHX Text

NTS

AutoCAD SHX Text

TYP

AutoCAD SHX Text

EAC

AutoCAD SHX Text

AFF

AutoCAD SHX Text

PIPING TEE (TURNED UP/DOWN)

AutoCAD SHX Text

PIPING ELBOW (TURNED UP/DOWN)

AutoCAD SHX Text

MECHANICAL LEGEND

AutoCAD SHX Text E( )

AutoCAD SHX Text

EXISTING PIPE/DUCT

AutoCAD SHX Text

MECHANICAL EQUIPMENT DESIGNATOR

AutoCAD SHX Text

DCW

AutoCAD SHX Text

DOMESTIC COLD WATER

AutoCAD SHX Text

PHOTO INDICATOR

AutoCAD SHX Text P

AutoCAD SHX Text

AutoCAD SHX Text

%%UGENERAL NOTES (APPLICABLE TO ALL DRAWINGS):

AutoCAD SHX Text

1. EACH CONTRACTOR, SUPPLIER AND, OR MANUFACTURER SHALL REFER TO ALL DOCUMENTS PERTAINING TO THIS PROJECT AND COORDINATE

AutoCAD SHX Text ACCORDINGLY SO AS TO ENSURE ADEQUACY OF FIT, COMPLIANCE WITH SPECIFICATIONS, PROPER VOLTAGE AND CURRENT CHARACTERISTICS AND

AutoCAD SHX Text

AVOID CONFLICT WITH ANY OTHER BUILDINGS SYSTEMS. VERIFY SAME WITH SHOP DRAWINGS.

AutoCAD SHX Text

2. ALL OFFSETS, TURNS, FITTINGS, TRIM, DETAIL, ETC., MAY NOT BE INDICATED, BUT SHALL BE PROVIDED AS REQUIRED. ADDITIONAL ALLOWANCES

AutoCAD SHX Text

SHALL BE INCLUDED FOR SAME AT EACH PROPOSERS' DISCRETION.

AutoCAD SHX Text

3. INSTALL NO PIPING, CONDUIT, DUCTWORK, ETC., IN A LOCATION OR IN A MANNER WHICH WILL ALLOW FREEZING AND/OR THE COLLECTION OF

AutoCAD SHX Text

CONDENSATION THEREON.

AutoCAD SHX Text

4. OBSERVE ALL APPLICABLE CODES, RULES AND REGULATIONS (CITY, COUNTY, LOCAL, STATE, FEDERAL, MUNICIPALITY, UTILITY COMPANY, OSHA, AutoCAD SHX Text

ETC.). THIS INCLUDES EXISTING FACILITY STANDARDS FOR CONSTRUCTION.

AutoCAD SHX Text

5. ALL SYSTEMS, EQUIPMENT AND MATERIALS ARE TO BE INSTALLED IN A NEAT AND WORKMANLIKE MANNER. WORK NOT DONE SO SHALL BE

AutoCAD SHX Text

REMOVED AND REINSTALLED SATISFACTORILY.

AutoCAD SHX Text

6. WHERE MOUNTING HEIGHTS ARE NOT INDICATED OR ARE IN CONFLICT WITH ANY OTHER BUILDING SYSTEM, CONTACT THE ENGINEERS BEFORE

AutoCAD SHX Text INSTALLATION. REFER ALSO TO ARCHITECTURAL WALL INTERIOR AND EXTERIOR WALL ELEVATIONS, CEILING HEIGHTS AND OTHER DETAILS OF THESE

AutoCAD SHX Text

DOCUMENTS.

AutoCAD SHX Text

7. DO NOT SCALE FROM DRAWINGS, PRINTING DISTORTS SCALE. WORK SHALL BE LAID OUT FROM DIMENSIONED DRAWINGS, OR DIMENSIONS

AutoCAD SHX Text

SUPPLIED TO THE CONTRACTOR.

AutoCAD SHX Text

8. THIS CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING AND PATCHING REQUIRED FOR HIS WORK. ALL CUTTING AND PATCHING SHALL

AutoCAD SHX Text MATCH EXISTING ADJACENT SURFACES AND BE IN ACCORD WITH HOSPITAL STANDARDS FOR SUCH WORK.

AutoCAD SHX Text

9. THESE DRAWINGS ARE ACCURATE TO THE BEST OF OUR KNOWLEDGE, HOWEVER LOCATIONS, DEPTHS, ELEVATIONS AND SIZES WERE TAKEN FROM

AutoCAD SHX Text DIFFERENT SOURCES AND ARE SUBJECT TO DEVIATION. THE CONTRACTOR SHALL ASSUME SOME DEVIATIONS AND INCLUDE OFFSETS, ADDITIONAL

AutoCAD SHX Text

PIPING, ETC AT THE TIME OF BID.

AutoCAD SHX Text

10. ADVISE THE ENGINEERS/COR OF ANY CONFLICTS, ERRORS, OMISSIONS, ETC.

AutoCAD SHX Text

%%UAT LEAST TEN DAYS PRIOR TO BID DATE

AutoCAD SHX Text

, TO ALLOW

AutoCAD SHX Text

CLARIFICATION BY WRITTEN ADDENDUM.

AutoCAD SHX Text

11. DEVIATION FROM SPECIFICATIONS OR PLANS REQUIRES PRIOR WRITTEN APPROVAL FROM THE ENGINEERS AND

AutoCAD SHX Text

%%UMUST BE SUBMITTED IN WRITING

AutoCAD SHX Text

%%UNO LATER THAN TEN DAYS PRIOR TO THE BID DATE

AutoCAD SHX Text

AutoCAD SHX Text

12. THE PURPOSE AND INTENT OF ALL THE DOCUMENTS PERTAINING TO THIS PROJECT IS TO PROVIDE A COMPLETE, FUNCTIONAL, SAFE, LIKE-NEW

AutoCAD SHX Text

FACILITY. ANYTHING LESS SHALL BE UNACCEPTABLE.

AutoCAD SHX Text

13. INSTALL EQUIPMENT, MATERIALS, ETC. IN STRICT ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS AND DIRECTION. IF IN CONFLICT

AutoCAD SHX Text

WITH THE DESIGN INDICATED IN CONTRACT DOCUMENTS,

AutoCAD SHX Text

%%UADVISE THE ENGINEERS/COR PRIOR TO INSTALLATION

AutoCAD SHX Text

FOR CLARIFICATION.

AutoCAD SHX Text

14. ALL SUPPORTS FOR EQUIPMENT, DEVICES OR FIXTURES SHALL BE UNIQUE AND FROM THE BUILDING STRUCTURE. DO NOT SUPPORT WORK

AutoCAD SHX Text FROM OTHER TRADES, EQUIPMENT OR SUPPORTS WITHOUT WRITTEN PERMISSION FROM THE ENGINEER AND CONSENT OF THE OTHER TRADE, IN

AutoCAD SHX Text

WRITING. DO NOT SUPPORT EQUIPMENT FROM WALLS OR PARTITIONS.

AutoCAD SHX Text

%%USUPPORT FROM STRUCTURAL BRIDGING IS UNACCEPTABLE.

AutoCAD SHX Text

15. DEVIATIONS IN SIZE, CAPACITIES, FIT, FINISH, ETC. FOR EQUIPMENT FROM THAT PRIME SPECIFIED SHALL BE THE RESPONSIBILITY OF THE

AutoCAD SHX Text PURCHASER OF THAT EQUIPMENT. ANY PROVISIONS REQUIRED TO ACCOMMODATE A DEVIATION, WHETHER APPROVED BY THE ENGINEERS OR NOT, AutoCAD SHX Text

SHALL BE THE RESPONSIBILITY OF THE PURCHASER.

AutoCAD SHX Text

16. THE GENERAL CONTRACTOR FOR THIS CONSTRUCTION IS RESPONSIBLE FOR THE COORDINATION, APPEARANCE, SCHEDULING AND TIMELINESS OF

AutoCAD SHX Text THE WORK OF ALL TRADES, CONTRACTORS, SUPPLIERS, INSTALLERS, ETC. EACH TRADE SHALL COORDINATE THEIR WORK WITH OTHER TRADES

AutoCAD SHX Text

AND THE GENERAL CONTRACTOR.

AutoCAD SHX Text %%UTHIS INCLUDES ANY REQUIRED SHUTDOWNS THAT WILL NEED TO BE COORDINATED WITH THE HOSPITAL.

AutoCAD SHX Text

17. ENSURE PROPER COORDINATION BETWEEN ALL TRADES SUCH THAT CONDUITS, PIPING, ETC. DO NOT BLOCK ACCESS TO VALVES, EQUIPMENT, AutoCAD SHX Text DUCT ACCESS DOORS, ETC. ITEMS THAT HAVE BEEN INSTALLED WHERE ACCESS IS COMPROMISED SHALL BE RELOCATED AT THE CONTRACTOR'S

AutoCAD SHX Text

EXPENSE.

AutoCAD SHX Text

%%UREFER TO SPECIFICATIONS FOR COORDINATION DRAWING REQUIREMENTS.

AutoCAD SHX Text

18. INCLUDE IN BID ALL COST ASSOCIATED WITH DRAINING AND FILLING ALL PIPING SYSTEMS AS REQUIRED TO INSTALL WORK. THIS INCLUDES:

AutoCAD SHX Text

* HOT WATER HEATING PIPING SYSTEM

AutoCAD SHX Text

19. REFER TO ARCHITECTURAL DRAWINGS FOR ALTERNATE BIDS.

AutoCAD SHX Text

* CHILLED WATER PIPING SYSTEM

SPRINT

CLEARWIRE

SPRINT

SPRINT

SPRINT

CLEARWIRE

ERD

ERD

SC

SC

CLEARWIRE

T-MOBILE

T-MOBILE

T

M

O

B

I

L

E 11A 11B

1A

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

V P r o j e c t s V

I R

R

A r c h

U p d a t e s

A r c h i t e c t u r a l

R e v i t

M

C r v t

P

M

820 S. Damen Ave., Chicago, IL 60612

1A, 11, 15, 21, 30

JULY 31, 2019 AJM LAM

FULLY SPRINKLERED

Revisions: Date:

10411 Meeting Street, Prospect, Kentucky 40059

502 326.3085 f 502 326.2691 www.cmtaegrs.com

CMTA Project: VIRR19

CONSTRUCTION

DOCUMENTS

REPLACE MULTI-ROOFS 537-15-128BIssued for Bid and Construction 7/31/19

A/E:Consultant:

SCALE: 1/8" = 1'-0"PME100

3 BUILDING 1A 10TH FLOOR MECHANICAL PENTHOUSE ROOF PLAN - PLUMBING, MECHANICAL AND ELECTRICAL DEMOLITION

SCALE: 1/8" = 1'-0"

2 BUILDING 1A 11TH FLOOR PENTHOUSE ROOF - PLUMBING, MECHANICAL AND ELECTRICAL DEMOLITION

SCALE: 1/8" = 1'-0"

1 BUILDING 1A 12TH FLOOR PENTHOUSE ROOF - PLUMBING, MECHANICAL AND ELECTRICAL DEMOLITION

PME100

PLUMBING, MECHANICAL, & ELEC.

DEMOLITION ROOF PLANS

NO SCALE

KEYPLAN

N

N

NNPME100 PME100

AutoCAD SHX Text

EF

AutoCAD SHX Text E

AutoCAD SHX Text

EF

AutoCAD SHX Text E

AutoCAD SHX Text

CU

AutoCAD SHX Text E

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

(TYP)

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

TYP.

AutoCAD SHX Text

AutoCAD SHX Text

TYP.

AutoCAD SHX Text

AutoCAD SHX Text

TYP.

AutoCAD SHX Text

AutoCAD SHX Text

TYP.

AutoCAD SHX Text

AutoCAD SHX Text

TYP.

AutoCAD SHX Text

AutoCAD SHX Text

TYP.

AutoCAD SHX Text

AutoCAD SHX Text

TYP.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

TYP.

AutoCAD SHX Text

AutoCAD SHX Text

TYP.

AutoCAD SHX Text

AutoCAD SHX Text

TYP.

AutoCAD SHX Text

AutoCAD SHX Text

TYP.

AutoCAD SHX Text

AutoCAD SHX Text

TYP.

AutoCAD SHX Text

AutoCAD SHX Text

TYP.

AutoCAD SHX Text

AutoCAD SHX Text

TYP.

AutoCAD SHX Text

AutoCAD SHX Text

TYP.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text P

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text P

AutoCAD SHX Text

AutoCAD SHX Text P

AutoCAD SHX Text

AutoCAD SHX Text P

AutoCAD SHX Text

AutoCAD SHX Text P

AutoCAD SHX Text

AutoCAD SHX Text P

AutoCAD SHX Text

AutoCAD SHX Text P

AutoCAD SHX Text

AutoCAD SHX Text P

AutoCAD SHX Text

AutoCAD SHX Text P

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AC

AutoCAD SHX Text E

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

CHIMNEY

AutoCAD SHX Text

AutoCAD SHX Text P

AutoCAD SHX Text

AutoCAD SHX Text P

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AC

AutoCAD SHX Text E

AutoCAD SHX Text

EF

AutoCAD SHX Text E

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

TYP.

AutoCAD SHX Text

AutoCAD SHX Text

TYP.

AutoCAD SHX Text

AutoCAD SHX Text

TYP.

AutoCAD SHX Text

AutoCAD SHX Text

TYP.

AutoCAD SHX Text

AutoCAD SHX Text

TYP.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text P

AutoCAD SHX Text

AutoCAD SHX Text P

AutoCAD SHX Text

AutoCAD SHX Text P

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

GARAGE

AutoCAD SHX Text ELECTRICAL TAG NOTES: 1. CONTRACTOR SHALL PROVIDE TEMPORARY SUPPORTS FOR CONTRACTOR SHALL PROVIDE TEMPORARY SUPPORTS FOR ALL ELECTRICAL CONNECTIONS TO EXISTING ROOFTOP MECHANICAL EQUIPMENT INDICATED TO ALLOW FOR ROOF REPLACEMENT AROUND EXISTING EQUIPMENT. REWORK SUPPORTS AND RACEWAYS AS REQUIRED. COORDINATE WITH ROOFING CONTRACTOR. 2. EXISTING PRIVATELY OWNED COMMUNICATIONS COMPANY EXISTING PRIVATELY OWNED COMMUNICATIONS COMPANY ANTENNAS AND MOUNTING SLEDS SHALL BE TEMPORARILY SUPPORTED AS REQUIRED FOR RE-ROOFING. CONTRACTOR SHALL COORDINATE ALL SCHEDULING AND REQUIREMENTS FOR DOWNTIME WITH COMMUNICATIONS COMPANY. PROVIDE TEMPORARY SUPPORTS FOR RACEWAYS AND CABLES AS REQUIRED. 3. EXISTING GOVERNMENT OWNED ANTENNA MOUNTED TO ROOF EXISTING GOVERNMENT OWNED ANTENNA MOUNTED TO ROOF SHALL BE REMOVED AS REQUIRED FOR ROOF REPLACEMENT. REWORK SUPPORTS AND RACEWAYS AS REQUIRED. 4. EXISTING LIGHTING PROTECTION SYSTEM SHALL BE REMOVED EXISTING LIGHTING PROTECTION SYSTEM SHALL BE REMOVED AS REQUIRED FOR RE-ROOFING. AIR TERMINALS, CONDUITS, AND ALL OTHER COMPONENTS SHALL BE REMOVED AS NECESSARY. 5. EXISTING CONDUITS, CONDUCTORS AND CABLING EXISTING CONDUITS, CONDUCTORS AND CABLING ACCESSORIES WITH COMMUNICATIONS ANTENNA'S SHALL BE TEMPORARILY SUPPORTED IN COORDINATION WITH ROOF REPLACEMENT AS REQUIRED. COORDINATE ALL PHASING WITH ROOFING CONTRACTOR. 6. EXISTING LIGHTING PROTECTION DOWN LEADER ROUTED UP EXISTING LIGHTING PROTECTION DOWN LEADER ROUTED UP BUILDING AT LOCATION INDICATED. PROTECT AND REWORK CONDUCTOR AS REQUIRED DURING ROOF REPLACEMENT. REATTACH TO ROOF AND BUILDING AS REQUIRED. 7. LIGHTING PROTECTION CONDUCTOR ROUTED ALONG PARAPET. LIGHTING PROTECTION CONDUCTOR ROUTED ALONG PARAPET. CONTRACTOR SHALL PROTECT DURING ROOF REPLACEMENT AND PROVIDE NEW CONNECTIONS TO PARAPET WHERE CONDUCTOR HAS COME LOOSE. CONTRACTOR SHALL FIELD VERIFY CONDITION OF SYSTEM PRIOR TO BID. 8. LIGHTING PROTECTION CONDUCTOR ROUTED ACROSS ROOF LIGHTING PROTECTION CONDUCTOR ROUTED ACROSS ROOF AS INDICATED. CONDUCTOR SHALL BE REMOVED AND RE-ATTACHED AS REQUIRED FOR ROOF REPLACEMENT. COORDINATE EXACT CONNECTION METHOD AND OTHER REQUIREMENTS WITH ROOFING CONTRACTOR. 9. EXISTING CONDUITS AND COMMUNICATION CABLE DUCT EXISTING CONDUITS AND COMMUNICATION CABLE DUCT ROUTED ALONG ROOF SHALL BE TEMPORARILY SUPPORTED AS REQUIRED FOR ROOF REPLACEMENT. EXISTING BONDING JUMPERS SHALL BE REMOVED AND RE-INSTALLED WITH EQUIPMENT. THE CONTRACTOR SHALL PROVIDE NEW CONNECTIONS AS REQUIRED WHERE JUMPERS ARE IN POOR CONDITION. 10. EXISTING LADDER AND SAFETY CAGE SHALL BE BONDED TO EXISTING LADDER AND SAFETY CAGE SHALL BE BONDED TO THE LIGHTING PROTECTION SYSTEM AS REQUIRED. 11. EXISTING ANTENNA MOUNTED ON ROOF SHALL BE REMOVED EXISTING ANTENNA MOUNTED ON ROOF SHALL BE REMOVED AND RE-INSTALLED AS REQUIRED FOR ROOF REPLACEMENT. 12. EXISTING LOW VOLTAGE TRANSFORMER, RACEWAYS AND EXISTING LOW VOLTAGE TRANSFORMER, RACEWAYS AND FEEDERS SHALL BE TEMPORARILY SUPPORTED AS REQUIRED FOR ROOF REPLACEMENT. COORDINATE EXACT PHASING WITH ROOFING CONTRACTOR. 13. EXISTING LIGHTING PROTECTION DOWN LEADER ROUTED EXISTING LIGHTING PROTECTION DOWN LEADER ROUTED DOWN BUILDING AT LOCATION INDICATED. PROTECT AND REWORK CONDUCTOR AS REQUIRED DURING ROOF REPLACEMENT. REATTACH TO ROOF AND BUILDING AS REQUIRED. 14. LIGHTNING PROTECTION CONDUCTOR BONDED TO ROOF VENT LIGHTNING PROTECTION CONDUCTOR BONDED TO ROOF VENT AT LOCATION INDICATED. REWORK CONNECTION AS REQUIRED FOR ROOF REPLACEMENT.

AutoCAD SHX Text X

AutoCAD SHX Text R

AutoCAD SHX Text

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text J

AutoCAD SHX Text I

AutoCAD SHX Text L

AutoCAD SHX Text L

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text B

AutoCAD SHX Text E

AutoCAD SHX Text

LICENSED

AutoCAD SHX Text

PROFESSIONAL

AutoCAD SHX Text

OF

AutoCAD SHX Text

ENGINEER

AutoCAD SHX Text 062.069980

AutoCAD SHX Text RF RADIATION EXPOSURE NOTE: THE CONTRACTOR SHALL OBEY ALL OSHEA RADIO FREQUENCY AND MICROWAVE RADIATION SAFETY STANDARDS. CONTRACTOR SHALL OBEY ALL POSTED RF HAZARD WARNING SIGNS. THESE DOCUMENTS IN NO WAY INDICATE ALL RF HAZARDS. THE CONTRACTOR IS RESPONSIBLE FOR IDENTIFYING HAZARDOUS LOCATIONS.

AutoCAD SHX Text PLUMBING TAG NOTES: DEMOLITION 1. REMOVE EXISTING ROOF DRAIN AND DISPOSE.REMOVE EXISTING ROOF DRAIN AND DISPOSE.

AutoCAD SHX Text GENERAL NOTES: A. REFER TO ARCHITECTURAL PLANS FOR PHASING AND REFER TO ARCHITECTURAL PLANS FOR PHASING AND ALTERNATE BIDS. B. ALL WORK FOR ROOF DRAINS WITH SPACE BELOW TO BE ALL WORK FOR ROOF DRAINS WITH SPACE BELOW TO BE COORDINATED WITH VA STAFF TWO WEEKS PRIOR TO WORK COMMENCING.

AutoCAD SHX Text LEASED COMMUNICATION ANTENNA COORDINATION NOTES: A. THE CONTRACTOR SHALL CONTACT ALL ENTITIES LEASING THE CONTRACTOR SHALL CONTACT ALL ENTITIES LEASING SPACE ON ROOFS FOR COMMUNICATIONS ANTENNAS AND COORDINATE DOWNTIME AND SCHEDULING. B. THE CONTRACTOR SHALL INCLUDE ALL REQUIRED COSTS THE CONTRACTOR SHALL INCLUDE ALL REQUIRED COSTS ASSOCIATED WITH RELOCATION AND SUPPORTING EXISTING COMMUNICATIONS ANTENNAS AS REQUIRED FOR ROOF REPLACEMENT. C. COMMUNICATION COMPANY CONTACT INFO: COMMUNICATION COMPANY CONTACT INFO: T-MOBILE PROPERTY MANAGEMENT DEPARTMENT: 877-373-0093 PROPERTYMANAGEMENT@T-MOBILE.COM SPRINT/CLEARWIRE PROPERTY SERVICES SEAN MCGORMAN 630-664-1219 D. ANY EQUIPMENT DEEMED NOT LONGER IN USE BY THE ANY EQUIPMENT DEEMED NOT LONGER IN USE BY THE COMMUNICATIONS COMPANIES SHALL BE REMOVED AND DISPOSED OF OR TURNED OVER TO THE RESPECTIVE COMMUNICATION COMPANY.

AutoCAD SHX Text X

AutoCAD SHX Text LIGHTNING PROTECTION NOTE: 1. THE LIGHTNING PROTECTION SYSTEM SHALL BE REMOVED THE LIGHTNING PROTECTION SYSTEM SHALL BE REMOVED AND REINSTALLED AT ALL AFFECTED ROOFS AS REQUIRED FOR ROOF REPLACEMENT. A CERTIFIED LIGHTNING PROTECTION CONTRACTOR SHALL PROVIDE A UL MASTER LABEL FOR ALL AFFECTED ROOF AREAS FOR RE-INSTALLED SYSTEM. THE CONTRACTOR SHALL REPLACE ALL DAMAGED COMPONENTS AND UPGRADE THE EXISTING INSTALLATION AS REQUIRED TO PROVIDE THE MASTER LABEL. REFER TO SPECIFICATION SECTION "264100 - FACILITY LIGHTNING PROTECTION" FOR ADDITIONAL REQUIREMENTS.

X

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

V P r o j e c t s V

I R

R

A r c h

U p d a t e s

A r c h i t e c t u r a l

R e v i t

M

C r v t

P

M

820 S. Damen Ave., Chicago, IL 60612

1A, 11, 15, 21, 30

JULY 31, 2019 AJM LAM

FULLY SPRINKLERED

Revisions: Date:

10411 Meeting Street, Prospect, Kentucky 40059

502 326.3085 f 502 326.2691 www.cmtaegrs.com

CMTA Project: VIRR19

CONSTRUCTION

DOCUMENTS

REPLACE MULTI-ROOFS 537-15-128BIssued for Bid and Construction 7/31/19

A/E:Consultant:

PHOTO

1 PHOTO 1

PME101

PHOTOS

PHOTO

2 PHOTO 2

PHOTO

3 PHOTO 3

PHOTO

4 PHOTO 4

PHOTO

5 PHOTO 5

PHOTO

6 PHOTO 6

PHOTO

7 PHOTO 7

PHOTO

8 PHOTO 8

BLDG 1A - 10TH FLOOR BLDG 1A - 10TH FLOOR BLDG 1A - 10TH FLOOR BLDG 1A - 10TH FLOOR

BLDG 1A - 10TH FLOOR

BLDG 1A - 10TH FLOOR

BLDG 1A - 10TH FLOOR

BLDG 1A - 10TH FLOOR

PHOTO

9 PHOTO 9

BLDG 1A - 11TH FLOOR PHOTO

10 PHOTO 10

BLDG 1A - 11TH FLOOR

PHOTO

11 PHOTO 11

BLDG 1A - 11TH FLOOR PHOTO

12 PHOTO 12

BLDG 1A - 12TH FLOOR PENTHOUSE ROOF PHOTO

13 PHOTO 13

BLDG 1A - 12TH FLOOR PENTHOUSE ROOF PHOTO

14 PHOTO 14

BLDG 1A - 12TH FLOOR PENTHOUSE ROOF

AutoCAD SHX Text R

AutoCAD SHX Text

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text J

AutoCAD SHX Text I

AutoCAD SHX Text L

AutoCAD SHX Text L

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text B

AutoCAD SHX Text E

AutoCAD SHX Text

LICENSED

AutoCAD SHX Text

PROFESSIONAL

AutoCAD SHX Text

OF

AutoCAD SHX Text

ENGINEER

AutoCAD SHX Text 062.069980

PHOTO NOTES - PHASES 1-4 (SEE ROOF PLANS FOR PHOTO LOCATIONS) P1 EXISTING CONDENSING UNITS AND UTILITY CONNECTIONS TO EXISTING CONDENSING UNITS AND UTILITY CONNECTIONS TO REMAIN IN PLACE AND IN OPERATION DURING NEW ROOF INSTALLATION. P2 EXISTING REFRIGERANT PIPING AND CONDUITS AND EXISTING REFRIGERANT PIPING AND CONDUITS AND SUPPORTS TO REMAIN. MAINTAIN ROOFING PENETRATIONS AND REWORK AS REQUIRED FOR NEW ROOF. PROVIDE TEMPORARY PIPING SUPPORTS TO ALLOW FOR PIPING TO BE IN OPERATION DURING NEW ROOF INSTALLATION. P3 EXISTING UTILITY SET EXHAUST FAN AND ASSOCIATED EXISTING UTILITY SET EXHAUST FAN AND ASSOCIATED DUCTWORK TO REMAIN IN PLACE AND IN OPERATION PENETRATION TO REMAIN AND SHALL BE REWORKED AS REQUIRED FOR ROOF REPLACEMENT. P4 EXISTING CELL PHONE TOWER EQUIPMENT PLATFORM AND EXISTING CELL PHONE TOWER EQUIPMENT PLATFORM AND ENCLOSURE SHALL REMAIN. MAINTAIN UTILITY AND COMMUNICATIONS CONNECTIONS TO BUILDING AS REQUIRED. COORDINATE ALL REQUIREMENTS WITH COMMUNICATIONS COMPANIES. P5 EXISTING EXHAUST FAN TO REMAIN IN PLACE AND IN EXISTING EXHAUST FAN TO REMAIN IN PLACE AND IN OPERATION DURING NEW ROOF INSTALLATION. P6 EXISTING CELL PHONE TOWER EQUIPMENT PLATFORM AND EXISTING CELL PHONE TOWER EQUIPMENT PLATFORM AND ENCLOSURE SHALL REMAIN. MAINTAIN UTILITY AND COMMUNICATIONS CONNECTIONS TO BUILDING AS REQUIRED. COORDINATE. ALL COSTS TO BE INCLUDED IN BID. P7 EXISTING ROOF MOUNTED TELECOMMUNICATION COMPANY EXISTING ROOF MOUNTED TELECOMMUNICATION COMPANY ANTENNAS SHALL BE REWORKED AS REQUIRED FOR ROOF REPLACEMENT. COORDINATE ALL SCHEDULING AND ADDITIONAL REQUIREMENTS WITH COMMUNICATION COMPANIES. ALL COSTS TO BE INCLUDED IN BID. P8 EXISTING ROOF MOUNTED TELECOMMUNICATION COMPANY EXISTING ROOF MOUNTED TELECOMMUNICATION COMPANY ANTENNAS SHALL BE REWORKED AS REQUIRED FOR ROOF REPLACEMENT. COORDINATE ALL SCHEDULING AND ADDITIONAL REQUIREMENTS WITH COMMUNICATION COMPANIES. ALL COSTS TO BE INCLUDED IN BID. P9 EXISTING AIR CONDITIONING UNIT AND ASSOCIATED EXISTING AIR CONDITIONING UNIT AND ASSOCIATED DUCTWORK TO REMAIN IN PLACE AND IN OPERATION DURING NEW ROOF INSTALLATION. P10 EXISTING LOUVERED PENTHOUSE TO REMAIN IN PLACE AND EXISTING LOUVERED PENTHOUSE TO REMAIN IN PLACE AND IN OPERATION DURING NEW ROOF INSTALLATION. P11 EXISTING ROOF MOUNTED TELECOMMUNICATION COMPANY EXISTING ROOF MOUNTED TELECOMMUNICATION COMPANY ANTENNAS SHALL BE REWORKED AS REQUIRED FOR ROOF REPLACEMENT. COORDINATE ALL SCHEDULING AND ADDITIONAL REQUIREMENTS WITH COMMUNICATION COMPANIES. ALL COSTS TO BE INCLUDED IN BID. P12 EXISTING ROOF MOUNTED TELECOMMUNICATION COMPANY EXISTING ROOF MOUNTED TELECOMMUNICATION COMPANY ANTENNAS SHALL BE REWORKED AS REQUIRED FOR ROOF REPLACEMENT. COORDINATE ALL SCHEDULING AND ADDITIONAL REQUIREMENTS WITH COMMUNICATION COMPANIES. ALL COSTS TO BE INCLUDED IN BID. P13 EXISTING ROOF MOUNTED TELECOMMUNICATION COMPANY EXISTING ROOF MOUNTED TELECOMMUNICATION COMPANY ANTENNAS SHALL BE REWORKED AS REQUIRED FOR ROOF REPLACEMENT. COORDINATE ALL SCHEDULING AND ADDITIONAL REQUIREMENTS WITH COMMUNICATION COMPANIES. ALL COSTS TO BE INCLUDED IN BID. P14 EXISTING ROOF MOUNTED TELECOMMUNICATION COMPANY EXISTING ROOF MOUNTED TELECOMMUNICATION COMPANY ANTENNAS SHALL BE REWORKED AS REQUIRED FOR ROOF REPLACEMENT. COORDINATE ALL SCHEDULING AND ADDITIONAL REQUIREMENTS WITH COMMUNICATION COMPANIES. ALL COSTS TO BE INCLUDED IN BID.

11A 11B

1A

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

V P r o j e c t s V

I R

R

A r c h

U p d a t e s

A r c h i t e c t u r a l

R e v i t

M

C r v t

P

M

820 S. Damen Ave., Chicago, IL 60612

1A, 11, 15, 21, 30

JULY 31, 2019 AJM LAM

FULLY SPRINKLERED

Revisions: Date:

10411 Meeting Street, Prospect, Kentucky 40059

502 326.3085 f 502 326.2691 www.cmtaegrs.com

CMTA Project: VIRR19

CONSTRUCTION

DOCUMENTS

REPLACE MULTI-ROOFS 537-15-128BIssued for Bid and Construction 7/31/19

A/E:Consultant:

PME102

PLUMBING, MECHANICAL, & ELEC.

DEMOLITION ROOF PLAN

NO SCALE

KEYPLAN

N

SCALE: 1/4" = 1'-0"PME102

1 BUILDING 1A 3RD FLOOR AUDITORIUM ROOF PLAN - PLUMBING, MECHANICAL AND ELECTRICAL DEMOLITION

N

AutoCAD SHX Text

GARAGE

AutoCAD SHX Text

AC

AutoCAD SHX Text E

AutoCAD SHX Text

EF

AutoCAD SHX Text E

AutoCAD SHX Text

EF

AutoCAD SHX Text E

AutoCAD SHX Text

AutoCAD SHX Text

(TYP)

AutoCAD SHX Text

EF

AutoCAD SHX Text E

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

EF

AutoCAD SHX Text E

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

LIGHTNING PROTECTION CONDUCTOR ROUTED UP AND ALONG SCREEN WALL.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text P

AutoCAD SHX Text

AutoCAD SHX Text P

AutoCAD SHX Text

AutoCAD SHX Text P

AutoCAD SHX Text

AutoCAD SHX Text P

AutoCAD SHX Text

AutoCAD SHX Text P

AutoCAD SHX Text

AutoCAD SHX Text P

AutoCAD SHX Text

AutoCAD SHX Text P

AutoCAD SHX Text

AutoCAD SHX Text P

AutoCAD SHX Text

AutoCAD SHX Text

AC

AutoCAD SHX Text E

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

EF

AutoCAD SHX Text E

AutoCAD SHX Text

AutoCAD SHX Text

(TYP)

AutoCAD SHX Text

(TYP)

AutoCAD SHX Text

AutoCAD SHX Text

(TYP)

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text ELECTRICAL TAG NOTES: 1. CONTRACTOR SHALL PROVIDE TEMPORARY SUPPORTS FOR CONTRACTOR SHALL PROVIDE TEMPORARY SUPPORTS FOR ALL ELECTRICAL CONNECTIONS TO EXISTING ROOFTOP MECHANICAL EQUIPMENT INDICATED TO ALLOW FOR ROOF REPLACEMENT AROUND EXISTING EQUIPMENT. REWORK SUPPORTS AND RACEWAYS AS REQUIRED. COORDINATE WITH ROOFING CONTRACTOR. 2. EXISTING LIGHTING PROTECTION SYSTEM SHALL BE REMOVED EXISTING LIGHTING PROTECTION SYSTEM SHALL BE REMOVED AS REQUIRED FOR RE-ROOFING. AIR TERMINALS, CONDUITS, AND ALL OTHER COMPONENTS SHALL BE REMOVED AS NECESSARY. 3. LIGHTING PROTECTION CONDUCTOR ROUTED ALONG PARAPET. LIGHTING PROTECTION CONDUCTOR ROUTED ALONG PARAPET. CONTRACTOR SHALL PROTECT DURING ROOF REPLACEMENT AND PROVIDE NEW CONNECTIONS TO PARAPET WHERE CONDUCTOR HAS COME LOOSE. CONTRACTOR SHALL FIELD VERIFY CONDITION OF SYSTEM PRIOR TO BID. 4. LIGHTING PROTECTION CONDUCTOR ROUTED ACROSS ROOF LIGHTING PROTECTION CONDUCTOR ROUTED ACROSS ROOF AS INDICATED. CONDUCTOR SHALL BE REMOVED AND RE-ATTACHED AS REQUIRED FOR ROOF REPLACEMENT. COORDINATE EXACT CONNECTION METHOD AND OTHER REQUIREMENTS WITH ROOFING CONTRACTOR. 5. EXISTING LIGHTING PROTECTION DOWN LEADER ROUTED EXISTING LIGHTING PROTECTION DOWN LEADER ROUTED DOWN BUILDING AT LOCATION INDICATED. PROTECT AND REWORK CONDUCTOR AS REQUIRED DURING ROOF REPLACEMENT.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .