36C25220B0008-007.pdf
PDF Posted
- Solicitation number
- 36C25220B0008
About this file
This document provides details on a federal contract opportunity to replace failed roofs at multiple buildings on the campus of the Jesse Brown VA Medical Center in Chicago, Illinois. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 12 is seeking a contractor to demolish existing roofing materials and accessories and install new roofing systems including membrane, insulation, copings and accessories across ten phases of work. The project value is estimated between $1,000,000 to $2,000,000 with a period of performance of 240 calendar days for the base bid. There are also four alternate bid deduct options that would reduce the scope of work with various periods of performance. Interested parties can find the solicitation including drawings and specifications on FedBizOpps on or about November 12, 2019, with bids due by December 12, 2019. A pre-bid conference will be held to review the project.
36C25220B0008 Attch 2-Drawings 1 of 3 07.31.2019 537-15-128B.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25220B0008-0005001.pdf | ||
| 36C25220B0008-0005000.docx | DOCX document | |
| 36C25220B0008-0004000.docx | DOCX document | |
| 36C25220B0008-0004001.pdf | ||
| 36C25220B0008-0003001.pdf | ||
| 36C25220B0008-0003002.pdf | ||
| 36C25220B0008-0003000.docx | DOCX document | |
| 36C25220B0008-0003003.pdf | ||
| 36C25220B0008-0002004.docx | DOCX document | |
| 36C25220B0008-0002005.pdf | ||
| 36C25220B0008-0001000.docx | DOCX document | |
| 36C25220B0008-0001001.pdf | ||
| 36C25220B0008-0001002.pdf | ||
| 36C25220B0008-010.pdf | ||
| 36C25220B0008-005.docx | DOCX document | |
| 36C25220B0008-011.pdf | ||
| 36C25220B0008-008.pdf | ||
| 36C25220B0008-006.pdf | ||
| 36C25220B0008-009.pdf |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
Issued for Bid and Construction 7/31/19
C U s e rs \e b ro w n
\D o c u m e n ts
\1 .5
.0
J
B V
A M
C e b ro w n .r v t
/3
/2
:5
:4
P
M
GI000
COVER SHEET REPLACE MULTI-ROOFS
820 S. Damen Ave,Chicago, IL 60612
537-15-128B
1A, 11, 15, 21, 30
JULY 31, 2019 JLG JDJ
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
DEPARTMENT OF VETERAN AFFAIRS
820 S. Damen Ave,Chicago, IL 60612
CONSTRUCTION DOCUMENTS
REPLACE MULTI-ROOFS
537-15-128B
SHEET LIST
SHEET
NUMBER SHEET NAME
GENERAL
GI000 COVER SHEET
GI100 PHASING PLAN
HA101 PHASE 6 & 7 HAZARDOUS MATERIAL REMOVAL PLAN
ARCHITECTURAL
AS001 ARCHITECTURAL SYMBOLS AND ABBREVIATIONS
AD100 PHASE 1-4 DEMOLITION ROOF PLAN
AD101 PHASES 1-4 PHOTOS
AD102 PHASES 1-4 PHOTOS
AD103 PHASE 5 DEMOLITION ROOF PLAN
AD104 PHASE 5 PHOTOS
AD105 PHASES 6 & 7 DEMOLITION ROOF PLAN
AD106 PHASES 6-7 PHOTOS
AD107 PHASE 8 DEMOLITION ROOF PLAN
AD108 PHASE 8 PHOTOS
AD109 PHASES 9 & 10 DEMOLITION ROOF PLAN
AS100 PHASES 1-4 RENOVATION ROOF PLANS
AS102 PHASE 5 RENOVATION ROOF PLANS
AS103 PHASE 6 & 7 RENOVATION ROOF PLANS
AS104 PHASE 8 RENOVATION ROOF PLANS
AS105 PHASES 9 & 10 RENOVATION ROOF PLANS
AS500 ROOF DETAILS
AS501 ROOF DETAILS
AS502 ROOF DETAILS
PLUMBING, MECHANCAL, ELECTRICAL
ML100 MECHANICAL LEGEND & GENERAL NOTES
PME100 PLUMBING, MECHANICAL & ELECTRICAL DEMOLITION ROOF PLANS
PME101 PHOTOS
PME102 PLUMBING, MECHANICAL & ELECTRICAL DEMOLITION ROOF PLANS
PME103 PHOTOS
PME104 PLUMBING, MECHANICAL & ELECTRICAL DEMOLITION ROOF PLANS
PME105 PLUMBING, MECHANICAL & ELECTRICAL DEMOLITION ROOF PLANS
PME106 PHOTOS
PME107 PLUMBING, MECHANICAL & ELECTRICAL DEMOLITION ROOF PLANS
PME108 PHOTOS
PME109 PLUMBING, MECHANICAL & ELECTRICAL ROOF PLANS
PME110 PLUMBING, MECHANICAL & ELECTRICAL ROOF PLAN
PME111 PLUMBING, MECHANICAL & ELECTRICAL ROOF PLANS
PME112 PLUMBING, MECHANICAL & ELECTRICAL ROOF PLANS
PME113 PLUMBING, MECHANICAL & ELECTRICAL ROOF PLANS
Contact:Contact: Contact:
CMTA
Andy Myers
Project Engineer
MECHANICAL,
ELECTRICAL &
PLUMBING
JESSE BROWN VA MEDICAL CENTER
Jesse Brown VAMC 820 S. Damen Avenue Chicago, IL 60064-3048
OWNER
GUIDON DESIGN
James Gooden
Sr. Project Manager
1221 N. Pennsylvania St.
Suite 200 Indianapolis, IN 46202
ARCHITECT
10411 Meeting St.
Prospect, KY 40059
AREA MAP
VICINITY MAP
SITE
N
N
N
Revisions: Date:
V.B .
VP VP
VP
VP
VP
VP
VP
VP
VP
VP
T
T
L
S
THESE DIMENSIONS,
INCLUDING
MECHANICAL
EQUIPMENT NEED TO
BE VERIFIED IN FIELD -
THE FIELD NOTES WE
HAVE DO NOT COME
CLOSE TO WORKING
OUT.
GARAGE
PHASE FOUR
PHASE FIVE
PHASE SEVEN PHASE SIX
PHASE EIGHT
PHASE NINE
PHASE TWO
PHASE ONE
PHASE THREE
PHASE TEN
11A 11B
1A
PHASING GENERAL NOTES
A
B
C
D
E
F
G
H
I
CONSTRUCTION WORK SHALL BE COMPLETED IN TEN PHASES.
ONLY ONE PHASE SHALL BE COMPLETED AT A TIME UNLESS CONTRACTOR
RECEIVES WRITTEN APPROVAL FROM C.O.R.
DURING CONSTRUCTION, THE HOSPITAL WILL REMAIN IN OPERATION. PROTECT
ALL EXISTING BUILDING SYSTEMS TO REMAIN DURING THE WORK.
CONTRACTOR SHALL PROVIDE AND INSTALL ON THE PATH OF TRAVEL FROM THE
STAGING AREA TO THE PROJECT SITE.
CONSTRUCTION SHUTDOWN WORK SHALL BE DURING LOW PATIENT TIME AND
PERFORMED THROUGH MIDNIGHT.
CONTRACTOR SHALL BE RESPONSIBLE FOR ANY REQUIRED TEMPORARY
SHUTDOWN; AND RELOCATIONS OF ANTENNAS AND SATELLITES TO FACILITATE
WORKER SAFETY AND CONSTRUCTION. CONTRACTOR SHALL COORDINATE ALL
SHUTDOWN OF CELL PHONE ANTENNAS W/ THE CELL PHONE TOWER
OPERATORS, ALL OTHER SHUTDOWNS ARE TO BE COORDINATED WITH C.O.R.
SURVEY LIGHTNING PROTECTION SYSTEM IN THE CONSTRUCTION AREA,
DOCUMENT EXISTING CONDITIONS AND TURN RECORDS TO C.O.R. BEFORE
START OF WORK. TEMPORARILY REMOVE LIGHTNING PROTECTION DURING
CONSTRUCTION.
SURVEY HAND RAILINGS IN THE CONSTRUCTION AREA, DOCUMENT EXISTING
CONDITIONS AND TURN RECORDS TO C.O.R. BEFORE START OF WORK.
TEMPORARILY REMOVE SAFETY HAND RAILINGS.
SURVEY ROOF CURBS AND ROOF MOUNTED EQUIPMENT IN THE CONSTRUCTION
AREA, DOCUMENT EXISTING CONDITIONS AND TURN RECORDS TO C.O.R. BEFORE
START OF WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
Issued for Bid and Construction 7/31/19
C U s e rs \e b ro w n
\D o c u m e n ts
\1 .5
.0
J
B V
A M
C e b ro w n .r v t
/3
/2
:5
:4
P
M
GI100
PHASING PLAN REPLACE MULTI-ROOFS
820 S. Damen Ave,Chicago, IL 60612
537-15-128B
1A, 11, 15, 21, 30
JULY 31, 2019 JLG ELB
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
N
SCALE: 1" = 30'-0"GI100
1 PHASING PLAN
N
KEYPLAN
NO SCALE
ALTERNATE BID NOTES
ALTERNATE BID #1: DEDUCT ALL WORK INCLUDING, BUT NOT LIMITED TO
DEMOLITION OF EXISTING ROOFING MATERIALS AND ACCESSORIES,
INSTALLATION OF NEW ROOFING SYSTEM INCLUDING MEMBRANE,
INSULATION, COPINGS, AND ACCESSORIES ON PHASE NINE AND TEN.
ALTERNATE BID #2: DEDUCT ALL WORK INCLUDING, BUT NOT LIMITED TO
DEMOLITION OF EXISTING ROOFING MATERIALS AND ACCESSORIES,
INSTALLATION OF NEW ROOFING SYSTEM INCLUDING MEMBRANE,
INSULATION, COPINGS, AND ACCESSORIES ON PHASE SIX AND SEVEN.
ALTERNATE BID #3: DEDUCT ALL WORK INCLUDING, BUT NOT LIMITED TO
DEMOLITION OF EXISTING ROOFING MATERIALS AND ACCESSORIES,
INSTALLATION OF NEW ROOFING SYSTEM INCLUDING MEMBRANE,
INSULATION, COPINGS, AND ACCESSORIES ON PHASE EIGHT.
GARAGE
HAZARDOUS MATERIAL REMOVAL LEGEND
PROJECT BOUNDARY
AREA FOR REMOVAL OF ASBESTOS-CONTAINING MATERIAL
AND ASSOCIATED MASTIC
HAZARDOUS MATERIAL REMOVAL GENERAL NOTES
HAZMAT REMOVAL NOTES APPLY TO ENTIRE ROOFS. CONTRACTOR SHALL
IDENTIFY ALL MATERIALS DESCRIBED BY NOTE ON EACH ROOF AND REMOVE
ACCORDING TO SAFETY STANDARDS. REFERENCE SPECIFICATION SECTIONS
02 82 13.21 AND 07 01 50.19
ALL HAZARDOUS MATERIALS SHALL BE REMOVED IN COMPLIANCE WITH
APPLICABLE CODES AND LAWS.
THE CONTRACTOR IS RESPONSIBLE TO VERIFY THE HAZARD(S) AND LEVEL OF
PROTECTION REQUIRED FOR ALL EMPLOYEES OR SUBCONTRACTORS TO
COMPLETE THE CONSTRUCTION WORK.
BIDS SHALL INCLUDE REMOVAL, CLEAN-UP AND DISPOSAL OF ACM ROOFING IN
AN APPROPRIATE REGULATED AREA.
CONTRACTOR TO SUBMIT ASBESTOS ABATEMENT PLAN AND PROCEDURES
PRIOR TO COMMENCING WORK. SUBMITTAL SHALL BE IN ACCORDANCE WITH
SPECIFICATIONS.
A.
B.
C.
D.
E.
HAZARDOUS MATERIAL REMOVAL PLAN NOTES #
1 ASBESTOS CONTAINING MATERIAL INCLUDES FLASHING TAR UNDER RUBBER
ROOF (CATEGORY 1 NON-FRIABLE). LOCATED ON FLASHINGS AT THE EDGE OF
ROOF, VENT AND ROOF ACCESS HATCH
VP
VP
RD
RD
VP
VP
VP
RD RD
VP
1 1
11A 11B
1A
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
Issued for Bid and Construction 7/31/19
C U s e rs \e b ro w n
\D o c u m e n ts
\1 .5
.0
J
B V
A M
C e b ro w n .r v t
/3
/2
:5
:4
P
M
HA101
PHASE 6 & 7 HAZARDOUS
MATERIAL REMOVAL PLAN
REPLACE MULTI-ROOFS
820 S. Damen Ave,Chicago, IL 60612
537-15-128B
1A, 11, 15, 21, 30
JULY 31, 2019 JLG JDJ
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/4" = 1'-0"HA101
1 BUILDING 30 ROOF HAZMAT REMOVAL PLAN - PHASE 7
SCALE: 1/4" = 1'-0"HA101
2 BUILDING 30 ROOF HAZMAT REMOVAL PLAN - PHASE 6
N
N
SCALE: 1" = 20'-0"
KEYPLAN
N
ARCHITECTURAL ABBREVIATIONS
SECTION REFERENCE
DRAWING NUMBER
SHEET
LOCATION
DRAWING NUMBER
SHEET
LOCATION
DETAIL REFERENCE
OBJECT
REFERENCED
OBJECT
REFERENCED
X
XXXX
X
XXXX
SCALE: ??
VIEW TITLE
N
NORTH ARROW
EXTENT OF REVISION
REVISION SET
PROJECT BOUNDARY
BEYOND PROJECT BOUNDARY, NIC
DETAIL/DRAWING SCALE
TITLE OF DETAIL/DRAWING
DETAIL/DRAWING NUMBER
SHEET NUMBER
AHU AIR HANDLING UNIT
ALUM ALUMINUM
ANT ANTENNA
APPD APPROVED
APPROX APPROXIMATE
ASB ASBESTOS
ASPH ASPHALT
COORD COORDINATE
DEMO DEMOLITION
DIM DIMENSION
DWG DRAWING
EL ELEVATION
EQUIP EQUIPMENT
HVAC HEATING, VENTILATING, AND AIR CONDITIONING
MEMB MEMBRANE
QA QUALITY ASSURANCE
QC QUALITY CONTROL
RD ROAD OR ROOF DRAIN
RV ROOF VENT
SIM SIMILAR
TYP TYPICAL
GENERAL CONSTRUCTION NOTES
ANY INDICATION OF PROJECT LIMITS OR BOUNDARY OF DEMARCATION ARE SHOWN
FOR THE CONVENIENCE OF THE CONTRACTOR, THE FULL SCOPE OF THE PROJECT
LIMIT OF BOUNDARY REQUIRES COORDINATION WITH THE DESIGN SCOPE OF WORK
AND ACCESS TO EXISTING UTILITIES FOR TIE IN.
DO NOT SCALE THE DRAWINGS. DRAWING SCALES AS INDICATED ARE FOR GENERAL
ORIENTATION AND CONTEXT ONLY.
CONTRACTOR TO PROVIDE WORK WHERE DETAILS AND NOTES ARE IDENTIFIED AS
“TYPICAL” OR “SIMILAR” EACH INSTANCE THAT IS THE SAME IN NATURE TO THE
DETAIL, AREA, OR ITEM REFERENCED.
PROVIDED WORK SHALL BE FURNISHED AND INSTALLED BY THE CONTRACTOR.
CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF DELIVERY, MOUNTING,
INSTALLATION, NECESSARY BLOCKING AND ROUGH-IN.
INSTALLED WORK IS THE CONTRACTOR INSTALLING OWNER FURNISHED MATERIALS
AND EQUIPMENT. CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF MATERIAL
DELIVERY, MOUNTING, INSTALLATION AND ROUGH IN.
ALL PROVIDED WORK SHALL BE WITH NEW MATERIALS UNLESS SPECIFICALLY CALLED
OUT AS SALVAGED OR RELOCATED WITHIN THE CONTRACT DOCUMENTS.
CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING ADJACENT CONSTRUCTION,
FINISHES, EQUIPMENT, AND TRAVEL ROUTE TO AND FROM THE CONSTRUCTION SITE.
ANY DAMAGE OR UNACCEPTABLE WEAR BY THE CONSTRUCTION TEAM SHALL BE
REPAIRED/REPLACED BY THE CONTRACTOR AT NO COST TO THE OWNER.
1.
2.
3.
4.
5.
6.
7.
ARCHITECTURAL SYMBOLS
BUILDING SECTION REFERENCE
DRAWING NUMBER
SHEET LOCATION
BUILDING X
XXXX
X
XXXX
ROOM
ROOM TAG
1 PLAN NOTE
ALTERNATE/BID DEDUCT ITEM
PT-1 FINISH INDICATION
A FRAME / WINDOW
T GLAZING
101 EQUIPMENT/FURNITURE TAG
REVISION TO PLAN CALLOUT
KEY NOTE TAGS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
Issued for Bid and Construction 7/31/19
C U s e rs \e b ro w n
\D o c u m e n ts
\1 .5
.0
J
B V
A M
C e b ro w n .r v t
/3
/2
:5
:2
P
M
AS001
ARCHITECTURAL SYMBOLS AND
ABBREVIATIONS
REPLACE MULTI-ROOFS
820 S. Damen Ave,Chicago, IL 60612
537-15-128B
1A, 11, 15, 21, 30
JULY 31, 2019 JLG ELB
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
/8
39' - 2 1/8" 53' - 3 3/8"
92' - 5 1/2"
53' - 3 3/8" 39' - 2 1/8"
92' - 5 1/2"62' - 0"
1/ 8"
19' - 6 1/2" 11' - 6 1/2"
16' - 9" 17' - 1"
/2
16' - 7 1/2" 8' - 3"
20' - 7 1/2"
/2
62' - 0"
/8
13' - 11"
59' - 10"
6'
0"
5'
/8
26' - 11 3/4"
59' - 10"
44' - 9"
0"
11A 11B
1A
DEMOLITION ROOF PLAN NOTES - THIS SHEET ONLY
A
B
C
D
E
F
G
H
I
J
K
L
M
ALL DIMENSIONS SHOWN ARE TO FACE OF WALL FRAMING/ MASONRY
UNLESS NOTED OTHERWISE. DIMENSIONS DESIGNATES AS "CLR" OR
"CLEAR" INDICATE A CLEAR DIMENSION FROM FACE OF FINISH TO FACE OF
FINISH.
REFERENCE MECHANICAL, PLUMBING AND ELECTRICAL FOR COORDINATION
ITEMS. COORDINATE AS REQUIRED INCLUDING NECESSARY FRAMING,
BLOCKING, ETC.
ROOFING SUPPLIERS, MANUFACTURERS, & INSTALLERS SHALL REVIEW ALL
ROOFING DETAILS & ADVISE THE ARCHITECT ON ANY RECOMMENDED
CHANGES.
UNLESS NOTIFIED OTHERWISE, ROOFING SUPPLIERS, MANUFACTURERS
AND INSTALLERS WILL BE ASSUMED TO HAVE REVIEWED AND APPROVED
THE DETAILS SHOWN.
PROVIDE FLASHING AT ALL CONDUIT & HVAC LINES PENETRATING THE
ROOF.
CONTRACTOR & ALL SUBTRADES SHALL BE AWARE AND EXERCISE THE
NECESSARY CARE TO PREVENT DAMAGE TO OR PUNCTURE OF THE ROOF.
THIS SHALL INCLUDE ALL DELETERIOUS MATERIALS AND TOOLS.
PHOTOS SHOWN DEPICT THE EXISTING CONDITIONS. REFER TO DEMOLITION
ROOF PLAN FOR LOCATION OF PHOTOS
ESTABLISH A DUST/DEBRIS CONTROL PLAN TO PREVENT THE SEPERATION
OF FLYING PARTICLES. AT ROOF AND AT ROOF ACCESS INSIDE HOSPITAL.
DISPOSE DEMOLITION WASTE LAWFULLY AND OFF-SITE DAILY
PROVIDE TEMPORARY ROOF/VAPOR RETARDER. SUBMIT A TEMPORARY
PROTECTION PLAN.
PROVIDE TEMPORARY WATER PROTECTION FROM RAIN AT THE END OF
EACH WORK PERIOD.
CONTRACTOR SHALL KEEP AWARE OF CHANGING WEATHER AND STOP
WORK AND PROVIDE WATER PROTECTION MEASURES BEFORE WEATHER
EVENT.
NO HELICOPTER OR ROOF CHUTES TO BE UTILIZED DURING DEMOLITION OR
CONSTRUCTION.
DEMOLITION ROOF PLAN NOTES - THIS SHEET ONLY
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
REMOVE EXISTING EPDM ROOF ASSEMBLY AND INSULATION COMPLETELY
DOWN TO ROOF DECK. DO NOT DAMAGE ROOF DECK.
REMOVE EXISTING ROLLED ASPHALT ROOF ASSEMBLY AND INSULATION
COMPLETELY DOWN TO ROOF DECK.
REMOVE AND INSPECT ALL COPING STONES. DISPOSE AND REPLACE DAMAGED
COPING STONES TO MATCH EXISTING.
REPLACE ROOF DRAIN BODIES AND HEADS. ACCESS FROM FLOOR BELOW IN
FINISHED SPACES. COORDINATE WITH COR. PROVIDE INFECTION CONTROL
MEASURES WHEN WORKING IN FINISHED AREAS. COMPLETE ON WEEKEND/
NIGHTS - COORDINATE WITH MEP.
EXISTING LADDER TO REMAIN - REMOVE AND SALVAGE FOR REINSTALLATION.
REMOVE EXISTING TAPERED INSULATION DOWN TO ROOF DECK.
REMOVE AND REPLACE EXISTING METAL COPING.
REMOVE AND REPLACE EXISTING ROOF PAVERS.
ALL EXISTING CURBS THAT ARE IN USE ARE TO REMAIN.
REMOVE AND REPLACE SAFETY HANDRAILS AND COPING.
SCUPPER TO REMAIN.
ROOF LADDER AND CAGE TO REMAIN, TAKE CARE NOT TO DAMAGE. REFER TO
ELECTRICAL DRAWINGS FOR RELATED WORK.
ROOF LEGEND
ROOF SLOPE - TO MATCH EXISTING
EXHAUST FAN
ROOF VENT
DIRECTION OF PHOTO VIEW
HIGH FREQUENCY FCC TOWER
EF
RV
P1
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
Issued for Bid and Construction 7/31/19
C U s e rs \e b ro w n
\D o c u m e n ts
\1 .5
.0
J
B V
A M
C e b ro w n .r v t
/3
/2
:5
:0
P
M
AD100
PHASE 1-4 DEMOLITION ROOF
PLAN
REPLACE MULTI-ROOFS
820 S. Damen Ave,Chicago, IL 60612
537-15-128B
1A, 11, 15, 21, 30
JULY 31, 2019 JLG ELB
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/8" = 1'-0"AD100
3 BUILDING 1A 10TH FLOOR MECHANICAL PENTHOUSE ROOF PLAN (+/- 9,600 SF) - PHASE 4
SCALE: 1/8" = 1'-0"AD100
2 BUILDING 1A 11TH FLOOR PENTHOUSE ROOF (+/- 1,752 SF) - PHASE 2 & 3
SCALE: 1/8" = 1'-0"AD100
1 BUILDING 1A 12TH FLOOR PENTHOUSE ROOF (+/- 3,000 SF) - PHASE 1
N
N N
N
4 45
11TH FLOOR
12TH FLOOR
6 6 6
11TH
FLOOR
6 P1
P2 P3
P4
P5
P6
P14
P15
P9
P8 P7
P10
P11 P12
P13
P18
P19
P20
P24
P17
P16
RV
RV
P21
P23
P
11 1111
KEYPLAN
NO SCALE
PHOTO NOTES - PHASES 1-4 SEE ROOF PLANS FOR
PHOTO LOCATION
P 1
P 2
P 3
P 4
P 5
P 6
P 7
P 8
P 9
P 10
P 11
P 12
P 13
P 14
P 15
P 16
P 17
P 18
P 19
P 20
P 21
P 22
P 23
P 24
REMOVE EXISTING ROLLED ASPHALT ROOF ASSEMBLY. EXISTING VENT
STACK TO REMAIN. REMOVE AND INSPECT ALL COPING STONES. DISPOSE
OF AND REPLACE DAMAGED COPING STONES.
REMOVE EXISTING ROLLED ASPHALT ROOF ASSEMBLY. EXISTING ROOF
HATCH TO REMAIN
REMOVE EXISTING ROLLED ASPHALT ROOF ASSEMBLY.EXISTING
MECHANICAL EQUIPMENT TO REMAIN. COORDINATE WITH MECHANICAL
DRAWINGS.
REMOVE EXISTING ROLLED ASPHALT ROOF ASSEMBLY. REMOVE AND
INSPECT ALL COPING STONES. DISPOSE OF AND REPLACE DAMAGED
COPING STONES.
EXISTING MECHANICAL EQUIPMENT TO REMAIN. COORDINATE WITH
MECHANICAL DRAWINGS.
REMOVE EXISTING ROLLED ASPHALT ROOF ASSEMBLY. EXISTING
EXHAUST HOOD TO REMAIN.
REMOVE AND SALVAGE EXISTING LADDER FOR REINSTALLATION.
REINSTALL ALL SAFETY HAND RAILINGS. REMOVE EXISTING ROLLED
ASPHALT ROOF ASSEMBLY. REMOVE AND REPLACE ROOF PAVERS.
EXISTING MECHANICAL EQUIPMENT TO REMAIN. COORDINATE WITH
MECHANICAL DRAWINGS. EXISTING MECHANICAL EQUIPMENT TO REMAIN.
EXISTING MECHANICAL EQUIPMENT TO REMAIN. COORDINATE WITH
MECHANICAL DRAWINGS. INSPECT EXISTING COPING. REMOVE AND
REPLACE DAMAGED COPING.
EXISTING MECHANICAL EQUIPMENT TO REMAIN. COORDINATE WITH
MECHANICAL DRAWINGS.
REMOVE EXISTING ROLLED ASPHALT ROOF ASSEMBLY. REPLACE ALL
ROOF DRAIN BODIES AND HEADS. EXISTING VENT STACK TO REMAIN.
EXISTING MECHANICAL EQUIPMENT TO REMAIN. COORDINATE WITH
MECHANICAL DRAWINGS.
REMOVE EXISTING CANTS AND INSTALL NEW CANTS, SHEATHING, AND
FLASHING AT VERTICAL WALLS AND/OR PARAPETS. REMOVE EXISTING
ROOF MEMBRANE.
REMOVE EXISTING EPDM ROOF ASSEMBLY. REMOVE AND INSPECT ALL
COPING STONES. DISPOSE OF AND REPLACE DAMAGED COPING STONES.
REMOVE EXISTING EPDM ROOF ASSEMBLY. REPLACE ALL ROOF DRAIN
BODIES AND HEADS.
EXISTING MECHANICAL EQUIPMENT TO REMAIN. COORDINATE WITH
MECHANICAL DRAWINGS. REMOVE EXISTING EPDM ROOF ASSEMBLY.
REMOVE AND REPLACE ROOF PAVERS.
REMOVE EXISTING EPDM ROOF ASSEMBLY. PROVIDE AND INSTALL NEW
PERMANENT WALKWAY PADS PER THE SPECIFICATIONS.
REMOVE EXISTING EPDM ROOF ASSEMBLY. REPLACE ALL ROOF DRAIN
BODIES AND HEADS. REMOVE EXISTING CANTS AND INSTALL NEW CANTS,
SHEATHING, AND FLASHING AT VERTICAL WALLS AND/OR PARAPETS.
REMOVE EXISTING EPDM ROOF ASSEMBLY.
REMOVE EXISTING ROLLED ASPHALT ROOF ASSEMBLY. INSPECT ALL
COPING STONES. REMOVE AND REPLACE DAMAGED COPING.
FCC TOWER - COORDINATE WITH MEP.
FCC TOWER - COORDINATE WITH MEP.
FCC TOWER - COORDINATE WITH MEP.
EXISTING MECHANICAL EQUIPMENT TO REMAIN. COORDINATE WITH
MECHANICAL DRAWINGS. PROVIDE AND INSTALL NEW PERMANENT
WALKWAY PADS PER THE SPECIFICATIONS.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
Issued for Bid and Construction 7/31/19
C U s e rs \e b ro w n
\D o c u m e n ts
\1 .5
.0
J
B V
A M
C e b ro w n .r v t
/3
/2
:5
:1
P
M
AD101
PHASES 1-4 PHOTOS REPLACE MULTI-ROOFS
820 S. Damen Ave,Chicago, IL 60612
537-15-128B
1A, 11, 15, 21, 30
JULY 31, 2019 JLG ELB
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
P1 P2 P3 P4 P5 P6
P7 P8 P9 P10 P11
P12 P13
PHOTO NOTES - PHASES 1-4 SEE ROOF PLANS FOR
PHOTO LOCATION
P 1
P 2
P 3
P 4
P 5
P 6
P 7
P 8
P 9
P 10
P 11
P 12
P 13
P 14
P 15
P 16
P 17
P 18
P 19
P 20
P 21
P 22
P 23
P 24
REMOVE EXISTING ROLLED ASPHALT ROOF ASSEMBLY. EXISTING VENT
STACK TO REMAIN. REMOVE AND INSPECT ALL COPING STONES. DISPOSE
OF AND REPLACE DAMAGED COPING STONES.
REMOVE EXISTING ROLLED ASPHALT ROOF ASSEMBLY. EXISTING ROOF
HATCH TO REMAIN
REMOVE EXISTING ROLLED ASPHALT ROOF ASSEMBLY.EXISTING
MECHANICAL EQUIPMENT TO REMAIN. COORDINATE WITH MECHANICAL
DRAWINGS.
REMOVE EXISTING ROLLED ASPHALT ROOF ASSEMBLY. REMOVE AND
INSPECT ALL COPING STONES. DISPOSE OF AND REPLACE DAMAGED
COPING STONES.
EXISTING MECHANICAL EQUIPMENT TO REMAIN. COORDINATE WITH
MECHANICAL DRAWINGS.
REMOVE EXISTING ROLLED ASPHALT ROOF ASSEMBLY. EXISTING
EXHAUST HOOD TO REMAIN.
REMOVE AND SALVAGE EXISTING LADDER FOR REINSTALLATION.
REINSTALL ALL SAFETY HAND RAILINGS. REMOVE EXISTING ROLLED
ASPHALT ROOF ASSEMBLY. REMOVE AND REPLACE ROOF PAVERS.
EXISTING MECHANICAL EQUIPMENT TO REMAIN. COORDINATE WITH
MECHANICAL DRAWINGS. EXISTING MECHANICAL EQUIPMENT TO REMAIN.
EXISTING MECHANICAL EQUIPMENT TO REMAIN. COORDINATE WITH
MECHANICAL DRAWINGS. INSPECT EXISTING COPING. REMOVE AND
REPLACE DAMAGED COPING.
EXISTING MECHANICAL EQUIPMENT TO REMAIN. COORDINATE WITH
MECHANICAL DRAWINGS.
REMOVE EXISTING ROLLED ASPHALT ROOF ASSEMBLY. REPLACE ALL
ROOF DRAIN BODIES AND HEADS. EXISTING VENT STACK TO REMAIN.
EXISTING MECHANICAL EQUIPMENT TO REMAIN. COORDINATE WITH
MECHANICAL DRAWINGS.
REMOVE EXISTING CANTS AND INSTALL NEW CANTS, SHEATHING, AND
FLASHING AT VERTICAL WALLS AND/OR PARAPETS. REMOVE EXISTING
ROOF MEMBRANE.
REMOVE EXISTING EPDM ROOF ASSEMBLY. REMOVE AND INSPECT ALL
COPING STONES. DISPOSE OF AND REPLACE DAMAGED COPING STONES.
REMOVE EXISTING EPDM ROOF ASSEMBLY. REPLACE ALL ROOF DRAIN
BODIES AND HEADS.
EXISTING MECHANICAL EQUIPMENT TO REMAIN. COORDINATE WITH
MECHANICAL DRAWINGS. REMOVE EXISTING EPDM ROOF ASSEMBLY.
REMOVE AND REPLACE ROOF PAVERS.
REMOVE EXISTING EPDM ROOF ASSEMBLY. PROVIDE AND INSTALL NEW
PERMANENT WALKWAY PADS PER THE SPECIFICATIONS.
REMOVE EXISTING EPDM ROOF ASSEMBLY. REPLACE ALL ROOF DRAIN
BODIES AND HEADS. REMOVE EXISTING CANTS AND INSTALL NEW CANTS,
SHEATHING, AND FLASHING AT VERTICAL WALLS AND/OR PARAPETS.
REMOVE EXISTING EPDM ROOF ASSEMBLY.
REMOVE EXISTING ROLLED ASPHALT ROOF ASSEMBLY. INSPECT ALL
COPING STONES. REMOVE AND REPLACE DAMAGED COPING.
FCC TOWER - COORDINATE WITH MEP.
FCC TOWER - COORDINATE WITH MEP.
FCC TOWER - COORDINATE WITH MEP.
EXISTING MECHANICAL EQUIPMENT TO REMAIN. COORDINATE WITH
MECHANICAL DRAWINGS. PROVIDE AND INSTALL NEW PERMANENT
WALKWAY PADS PER THE SPECIFICATIONS.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
Issued for Bid and Construction 7/31/19
C U s e rs \e b ro w n
\D o c u m e n ts
\1 .5
.0
J
B V
A M
C e b ro w n .r v t
/3
/2
:5
:1
P
M
AD102
PHASES 1-4 PHOTOS REPLACE MULTI-ROOFS
820 S. Damen Ave,Chicago, IL 60612
537-15-128B
1A, 11, 15, 21, 30
JULY 31, 2019 JLG ELB
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
P14 P15 P16 P17 P18 P19
P20
P24
P21 P22 P23
95' - 0"
11' - 7" 71' - 10" 11' - 7"
3/
4"
/4
11A 11B
1A
DEMOLITION ROOF PLAN NOTES - THIS SHEET ONLY
A
B
C
D
E
F
G
H
I
J
K
L
M
ALL DIMENSIONS SHOWN ARE TO FACE OF WALL FRAMING/ MASONRY
UNLESS NOTED OTHERWISE. DIMENSIONS DESIGNATES AS "CLR" OR
"CLEAR" INDICATE A CLEAR DIMENSION FROM FACE OF FINISH TO FACE OF
FINISH.
REFERENCE MECHANICAL, PLUMBING AND ELECTRICAL FOR COORDINATION
ITEMS. COORDINATE AS REQUIRED INCLUDING NECESSARY FRAMING,
BLOCKING, ETC.
ROOFING SUPPLIERS, MANUFACTURERS, & INSTALLERS SHALL REVIEW ALL
ROOFING DETAILS & ADVISE THE ARCHITECT ON ANY RECOMMENDED
CHANGES.
UNLESS NOTIFIED OTHERWISE, ROOFING SUPPLIERS, MANUFACTURERS
AND INSTALLERS WILL BE ASSUMED TO HAVE REVIEWED AND APPROVED
THE DETAILS SHOWN.
PROVIDE FLASHING AT ALL CONDUIT & HVAC LINES PENETRATING THE
ROOF.
CONTRACTOR & ALL SUBTRADES SHALL BE AWARE AND EXERCISE THE
NECESSARY CARE TO PREVENT DAMAGE TO OR PUNCTURE OF THE ROOF.
THIS SHALL INCLUDE ALL DELETERIOUS MATERIALS AND TOOLS.
PHOTOS SHOWN DEPICT THE EXISTING CONDITIONS. REFER TO DEMOLITION
ROOF PLAN FOR LOCATION OF PHOTOS
ESTABLISH A DUST/DEBRIS CONTROL PLAN TO PREVENT THE SEPERATION
OF FLYING PARTICLES. AT ROOF AND AT ROOF ACCESS INSIDE HOSPITAL.
DISPOSE DEMOLITION WASTE LAWFULLY AND OFF-SITE DAILY
PROVIDE TEMPORARY ROOF/VAPOR RETARDER. SUBMIT A TEMPORARY
PROTECTION PLAN.
PROVIDE TEMPORARY WATER PROTECTION FROM RAIN AT THE END OF
EACH WORK PERIOD.
CONTRACTOR SHALL KEEP AWARE OF CHANGING WEATHER AND STOP
WORK AND PROVIDE WATER PROTECTION MEASURES BEFORE WEATHER
EVENT.
NO HELICOPTER OR ROOF CHUTES TO BE UTILIZED DURING DEMOLITION OR
CONSTRUCTION.
DEMOLITION ROOF PLAN NOTES - THIS SHEET ONLY
1.
2.
3.
4.
5.
6.
7.
8.
9.
REMOVE EXISTING EPDM ROOF ASSEMBLY AND INSULATION COMPLETELY
DOWN TO ROOF DECK. DO NOT DAMAGE ROOF DECK.
REMOVE AND INSPECT ALL COPING STONES. DISPOSE AND REPLACE DAMAGED
COPING STONES TO MATCH EXISTING.
REPLACE ROOF DRAIN BODIES AND HEADS. ACCESS FROM FLOOR BELOW IN
FINISHED SPACES. COORDINATE WITH COR. PROVIDE INFECTION CONTROL
MEASURES WHEN WORKING IN FINISHED AREAS. COMPLETE ON WEEKEND/
NIGHTS - COORDINATE WITH MEP.
REMOVE EXISTING TAPERED INSULATION DOWN TO ROOF DECK.
REMOVE AND REPLACE EXISTING METAL COPING COUNTERFLASHING.
EXISTING METAL STAIRS TO BE TEMPORARY REMOVED AND SALVAGED FOR
REINSTALLATION.
REMOVE AND REPLACE EXISTING ROOF PAVERS.
ALL EXISTING CURBS THAT ARE IN USE ARE TO REMAIN.
EXISTING SCREEN WALL TO BE REMOVED AND SALVAGED FOR
REINSTALLATION.
ROOF LEGEND
ROOF SLOPE TO MATCH EXISTING
EXHAUST FAN
ROOF VENT
DIRECTION OF PHOTO VIEW
EF
RV
P1
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
Issued for Bid and Construction 7/31/19
C U s e rs \e b ro w n
\D o c u m e n ts
\1 .5
.0
J
B V
A M
C e b ro w n .r v t
/3
/2
:5
:1
P
M
AD103
PHASE 5 DEMOLITION ROOF PLAN REPLACE MULTI-ROOFS
820 S. Damen Ave,Chicago, IL 60612
537-15-128B
1A, 11, 15, 21, 30
JULY 31, 2019 JLG JDJ
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/4" = 1'-0"AD103
1 BUILDING 1A 3RD FLOOR AUDITORIUM ROOF PLAN (+/- 5,600 SF) - PHASE 5
NN
3 3
P1
P2
P3
P4
P5
RV
KEYPLAN
NO SCALE
PHOTO NOTES - PHASE 5 THIS SHEET ONLY
SEE ROOF PLANS FOR PHOTO LOCATION
P 1
P 2
P 3
P 4
P 5
REMOVE EXISTING EPDM ROOF ASSEMBLY. REMOVE EXISTING CANTS
AND INSTALL NEW CANTS, SHEATHING, AND FLASHING AT VERTICAL
WALLS AND/OR PARAPETS. REMOVE AND REPLACE COUNTERFLASHING
EXISTING MECHANICAL EQUIPMENT TO REMAIN. COORDINATE WITH
MECHANICAL DRAWINGS. PROVIDE AND INSTALL NEW PERMANENT
WALKWAY PADS PER THE SPECIFICATIONS.
REMOVE EXISTING EPDM ROOF ASSEMBLY.EXISTING MECHANICAL
EQUIPMENT TO REMAIN. COORDINATE WITH MECHANICAL DRAWINGS.
REPLACE ALL ROOF DRAIN BODIES AND HEADS.
REMOVE EXISTING EPDM ROOF ASSEMBLY. REMOVE AND INSPECT ALL
COPING STONES. DISPOSE OF AND REPLACE DAMAGED COPING STONES.
EXISTING MECHANICAL EQUIPMENT TO REMAIN. COORDINATE WITH
MECHANICAL DRAWINGS.
EXISTING MECHANICAL EQUIPMENT TO REMAIN. COORDINATE WITH
MECHANICAL DRAWINGS. REMOVE EXISTING EPDM ROOF ASSEMBLY.
METAL STAIRS ARE TO BE REMOVED AND SALVAGED FOR
REINSTALLATION.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
Issued for Bid and Construction 7/31/19
C U s e rs \e b ro w n
\D o c u m e n ts
\1 .5
.0
J
B V
A M
C e b ro w n .r v t
/3
/2
:5
:1
P
M
AD104
PHASE 5 PHOTOS REPLACE MULTI-ROOFS
820 S. Damen Ave,Chicago, IL 60612
537-15-128B
1A, 11, 15, 21, 30
JULY 31, 2019 JLG JDJ
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
P1 P2 P3 P4
P5
62' - 10"
5' - 0 3/4" 57' - 9 1/4"
1'
48' - 8"
11A 11B
1A
DEMOLITION ROOF PLAN NOTES- THIS SHEET ONLY
A
B
C
D
E
F
G
H
I
J
K
L
M
ALL DIMENSIONS SHOWN ARE TO FACE OF WALL FRAMING/ MASONRY
UNLESS NOTED OTHERWISE. DIMENSIONS DESIGNATES AS "CLR" OR
"CLEAR" INDICATE A CLEAR DIMENSION FROM FACE OF FINISH TO FACE OF
FINISH.
REFERENCE MECHANICAL, PLUMBING AND ELECTRICAL FOR COORDINATION
ITEMS. COORDINATE AS REQUIRED INCLUDING NECESSARY FRAMING,
BLOCKING, ETC.
ROOFING SUPPLIERS, MANUFACTURERS, & INSTALLERS SHALL REVIEW ALL
ROOFING DETAILS & ADVISE THE ARCHITECT ON ANY RECOMMENDED
CHANGES.
UNLESS NOTIFIED OTHERWISE, ROOFING SUPPLIERS, MANUFACTURERS
AND INSTALLERS WILL BE ASSUMED TO HAVE REVIEWED AND APPROVED
THE DETAILS SHOWN.
PROVIDE FLASHING AT ALL CONDUIT & HVAC LINES PENETRATING THE
ROOF.
CONTRACTOR & ALL SUBTRADES SHALL BE AWARE AND EXERCISE THE
NECESSARY CARE TO PREVENT DAMAGE TO OR PUNCTURE OF THE ROOF.
THIS SHALL INCLUDE ALL DELETERIOUS MATERIALS AND TOOLS.
PHOTOS SHOWN DEPICT THE EXISTING CONDITIONS. REFER TO DEMOLITION
ROOF PLAN FOR LOCATION OF PHOTOS
ESTABLISH A DUST/DEBRIS CONTROL PLAN TO PREVENT THE SEPERATION
OF FLYING PARTICLES. AT ROOF AND AT ROOF ACCESS INSIDE HOSPITAL.
DISPOSE DEMOLITION WASTE LAWFULLY AND OFF-SITE DAILY
PROVIDE TEMPORARY ROOF/VAPOR RETARDER. SUBMIT A TEMPORARY
PROTECTION PLAN.
PROVIDE TEMPORARY WATER PROTECTION FROM RAIN AT THE END OF
EACH WORK PERIOD.
CONTRACTOR SHALL KEEP AWARE OF CHANGING WEATHER AND STOP
WORK AND PROVIDE WATER PROTECTION MEASURES BEFORE WEATHER
EVENT.
NO HELICOPTER OR ROOF CHUTES TO BE UTILIZED DURING DEMOLITION OR
CONSTRUCTION.
DEMOLITION ROOF PLAN NOTES - THIS SHEET ONLY
1.
2.
3.
4.
5.
6.
7.
REMOVE EXISTING ROLLED ASPHALT BALLASTED ROOF ASSEMBLY AND
INSULATION COMPLETELY DOWN TO ROOF DECK.
REPLACE ROOF DRAIN BODIES AND HEADS. ACCESS FROM FLOOR BELOW IN
FINISHED SPACES. COORDINATE WITH COR. PROVIDE INFECTION CONTROL
MEASURES WHEN WORKING IN FINISHED AREAS. COMPLETE ON WEEKEND/
NIGHTS - COORDINATE WITH MEP.
EXISTING ROOF HATCH TO REMAIN - TAKE CARE TO NOT DAMAGE.
REMOVE EXISTING TAPERED INSULATION DOWN TO ROOF DECK.
REMOVE AND REPLACE EXISTING METAL COPING.
REMOVE AND REPLACE EXISTING ROOF PAVERS.
ALL EXISTING CURBS THAT ARE IN USE ARE TO REMAIN.
ROOF LEGEND
ROOF SLOPE - TO MATCH EXISTING
EXHAUST FAN
ROOF VENT
DIRECTION OF PHOTO VIEW
EF
RV
P1
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
Issued for Bid and Construction 7/31/19
C U s e rs \e b ro w n
\D o c u m e n ts
\1 .5
.0
J
B V
A M
C e b ro w n .r v t
/3
/2
:5
:1
P
M
AD105
PHASES 6 & 7 DEMOLITION ROOF
PLAN
REPLACE MULTI-ROOFS
820 S. Damen Ave,Chicago, IL 60612
537-15-128B
1A, 11, 15, 21, 30
JULY 31, 2019 JLG JDJ
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/4" = 1'-0"AD105
1 BUILDING 30 2ND FLOOR MECHANICAL ROOF PLAN (+/- 1950 SF) - PHASE 7
SCALE: 1/4" = 1'-0"AD105
2 BUILDING 30 2ND FLOOR MECHANICAL ROOF PLAN (+/- 1900 SF) - PHASE 6
N
2 2
2 2
N
N
4 4 4
P2
P1
P5
P3
P4
RV
RV
RV
RV
RV
RV
KEYPLAN
PHOTO NOTES - PHASES 6 & 7 - THIS SHEET ONLY
SEE ROOF PLANS FOR PHOTO LOCATION
P 1
P 2
P 3
P 4
P 5
REMOVE EXISTING BALLASTED ROOF ASSEMBLY. REMOVE EXISTING
CANTS AND INSTALL NEW CANTS, SHEATHING, AND FLASHING AT
VERTICAL WALLS AND/OR PARAPETS.
EXISTING MECHANICAL EQUIPMENT TO REMAIN. COORDINATE WITH
MECHANICAL DRAWINGS. REMOVE EXISTING BALLASTED ROOF
ASSEMBLY, REMOVE EXISTING CANTS, INSTALL NEW CANTS, FLASHING AT
CURBS.
REMOVE EXISTING BALLASTED ROOF ASSEMBLY. EXISTING ROOF HATCH
TO REMAIN
REMOVE EXISTING BALLASTED ROOF ASSEMBLY. REMOVE EXISTING
CANTS AND INSTALL NEW CANTS, SHEATHING, AND FLASHING AT
VERTICAL WALLS AND/OR PARAPETS.
REMOVE EXISTING BALLASTED ROOF ASSEMBLY.EXISTING MECHANICAL
EQUIPMENT TO REMAIN. COORDINATE WITH MECHANICAL DRAWINGS.
REPLACE ALL ROOF DRAIN BODIES AND HEADS.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
Issued for Bid and Construction 7/31/19
C U s e rs \e b ro w n
\D o c u m e n ts
\1 .5
.0
J
B V
A M
C e b ro w n .r v t
/3
/2
:5
:2
P
M
AD106
PHASES 6-7 PHOTOS REPLACE MULTI-ROOFS
820 S. Damen Ave,Chicago, IL 60612
537-15-128B
1A, 11, 15, 21, 30
JULY 31, 2019 JLG JDJ
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
P1 P2 P3
P5
P4
96' - 1 1/2" 18' - 11"
124' - 2 1/2"
/8
/8
M A
T C
H
LI
N
E
30' - 2 1/2" 4' - 0"
34' - 2 1/2"
M A
T C
H
LI
N
E
11A 11B
1A
DEMOLITION ROOF PLAN NOTES- THIS SHEET ONLY
A
B
C
D
E
F
G
H
I
J
K
L
M
ALL DIMENSIONS SHOWN ARE TO FACE OF WALL FRAMING/ MASONRY
UNLESS NOTED OTHERWISE. DIMENSIONS DESIGNATES AS "CLR" OR
"CLEAR" INDICATE A CLEAR DIMENSION FROM FACE OF FINISH TO FACE OF
FINISH.
REFERENCE MECHANICAL, PLUMBING AND ELECTRICAL FOR COORDINATION
ITEMS. COORDINATE AS REQUIRED INCLUDING NECESSARY FRAMING,
BLOCKING, ETC.
ROOFING SUPPLIERS, MANUFACTURERS, & INSTALLERS SHALL REVIEW ALL
ROOFING DETAILS & ADVISE THE ARCHITECT ON ANY RECOMMENDED
CHANGES.
UNLESS NOTIFIED OTHERWISE, ROOFING SUPPLIERS, MANUFACTURERS
AND INSTALLERS WILL BE ASSUMED TO HAVE REVIEWED AND APPROVED
THE DETAILS SHOWN.
PROVIDE FLASHING AT ALL CONDUIT & HVAC LINES PENETRATING THE
ROOF.
CONTRACTOR AND ALL SUBTRADES SHALL BE AWARE AND EXERCISE THE
NECESSARY CARE TO PREVENT DAMAGE TO OR PUNCTURE OF THE ROOF.
THIS SHALL INCLUDE ALL DELETERIOUS MATERIALS AND TOOLS.
PHOTOS SHOWN DEPICT THE EXISTING CONDITIONS. REFER TO DEMOLITION
ROOF PLAN FOR LOCATION OF PHOTOS
ESTABLISH A DUST/DEBRIS CONTROL PLAN TO PREVENT THE SEPERATION
OF FLYING PARTICLES. AT ROOF AND AT ROOF ACCESS INSIDE HOSPITAL.
DISPOSE DEMOLITION WASTE LAWFULLY AND OFF-SITE DAILY
PROVIDE TEMPORARY ROOF/VAPOR RETARDER. SUBMIT A TEMPORARY
PROTECTION PLAN.
PROVIDE TEMPORARY WATER PROTECTION FROM RAIN AT THE END OF
EACH WORK PERIOD.
CONTRACTOR SHALL KEEP AWARE OF CHANGING WEATHER AND STOP
WORK AND PROVIDE WATER PROTECTION MEASURES BEFORE WEATHER
EVENT.
NO HELICOPTER OR ROOF CHUTES TO BE UTILIZED DURING DEMOLITION OR
CONSTRUCTION.
DEMOLITION ROOF PLAN NOTES - THIS SHEET ONLY
1.
2.
3.
4.
5.
6.
7.
8.
REMOVE EXISTING BALLASTED ROOF ASSEMBLY AND INSULATION COMPLETELY
DOWN TO ROOF DECK.
REMOVE AND INSPECT ALL COPING STONES. DISPOSE AND REPLACE DAMAGED
COPING STONES TO MATCH EXISTING.
REPLACE ROOF DRAIN BODIES AND HEADS. ACCESS FROM FLOOR BELOW IN
FINISHED SPACES. COORDINATE WITH COR. PROVIDE INFECTION CONTROL
MEASURES WHEN WORKING IN FINISHED AREAS. COMPLETE ON WEEKEND/
NIGHTS - COORDINATE WITH MEP.
REMOVE EXISTING TAPERED INSULATION DOWN TO ROOF DECK.
REMOVE AND INSPECT ALL COPING STONES. DISPOSE AND REPLACE DAMAGED
COPING STONES TO MATCH EXISTING.
REMOVE AND REPLACE EXISTING ROOF PAVERS.
ALL EXISTING CURBS THAT ARE IN USE ARE TO REMAIN.
REMOVE EXISTING ROLLED ASPHALT ROOF ASSEMBLY AND INSULATION
COMPLETELY DOWN TO ROOF DECK.
ROOF LEGEND
ROOF SLOPE - TO MATCH EXISTING
EXHAUST FAN
ROOF VENT
DIRECTION OF PHOTO VIEW
EF
RV
P1
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
Issued for Bid and Construction 7/31/19
C U s e rs \e b ro w n
\D o c u m e n ts
\1 .5
.0
J
B V
A M
C e b ro w n .r v t
/3
/2
:5
:2
P
M
AD107
PHASE 8 DEMOLITION ROOF PLAN REPLACE MULTI-ROOFS
820 S. Damen Ave,Chicago, IL 60612
537-15-128B
1A, 11, 15, 21, 30
JULY 31, 2019 JLG ELB
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/4" = 1'-0"AD107
2 BUILDING 11A CANTEEN KITCHEN ROOF PLAN - PHASE 8
SCALE: 3/16" = 1'-0"AD107
1 TAYLOR ST. LOADING DOCK ROOF PLAN (1ST FLOOR ROOF) - PHASE 8
N
N
N
RV
RV
P3
P5
P4
P1
P2
RV
RV
P5
KEYPLAN
| Sheets |
| GI000 - COVER SHEET |
| GI100 - PHASING PLAN |
| HA101 - PHASE 6 & 7 HAZARDOUS MATERIAL REMOVAL PLAN |
| AS001 - ARCHITECTURAL SYMBOLS AND ABBREVIATIONS |
| AD100 - PHASE 1-4 DEMOLITION ROOF PLAN |
| AD101 - PHASES 1-4 PHOTOS |
| AD102 - PHASES 1-4 PHOTOS |
| AD103 - PHASE 5 DEMOLITION ROOF PLAN |
| AD104 - PHASE 5 PHOTOS |
File details come from the government source that posted it. Updated .