About this file

This document provides details on a federal contract opportunity to replace failed roofs at multiple buildings on the campus of the Jesse Brown VA Medical Center in Chicago, Illinois. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 12 is seeking a contractor to demolish existing roofing materials and accessories and install new roofing systems including membrane, insulation, copings and accessories across ten phases of work. The project value is estimated between $1,000,000 to $2,000,000 with a period of performance of 240 calendar days for the base bid. There are also four alternate bid deduct options that would reduce the scope of work with various periods of performance. Interested parties can find the solicitation including drawings and specifications on FedBizOpps on or about November 12, 2019, with bids due by December 12, 2019. A pre-bid conference will be held to review the project.

36C25220B0008 Attch 2-Drawings 1 of 3 07.31.2019 537-15-128B.pdf

View the file

Other files

File Type Posted
36C25220B0008-0005001.pdf PDF
36C25220B0008-0005000.docx DOCX document
36C25220B0008-0004000.docx DOCX document
36C25220B0008-0004001.pdf PDF
36C25220B0008-0003001.pdf PDF
36C25220B0008-0003002.pdf PDF
36C25220B0008-0003000.docx DOCX document
36C25220B0008-0003003.pdf PDF
36C25220B0008-0002004.docx DOCX document
36C25220B0008-0002005.pdf PDF
36C25220B0008-0001000.docx DOCX document
36C25220B0008-0001001.pdf PDF
36C25220B0008-0001002.pdf PDF
36C25220B0008-010.pdf PDF
36C25220B0008-005.docx DOCX document
36C25220B0008-011.pdf PDF
36C25220B0008-008.pdf PDF
36C25220B0008-006.pdf PDF
36C25220B0008-009.pdf PDF
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

Issued for Bid and Construction 7/31/19

C U s e rs \e b ro w n

\D o c u m e n ts

\1 .5

.0

J

B V

A M

C e b ro w n .r v t

/3

/2

:5

:4

P

M

GI000

COVER SHEET REPLACE MULTI-ROOFS

820 S. Damen Ave,Chicago, IL 60612

537-15-128B

1A, 11, 15, 21, 30

JULY 31, 2019 JLG JDJ

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

DEPARTMENT OF VETERAN AFFAIRS

820 S. Damen Ave,Chicago, IL 60612

CONSTRUCTION DOCUMENTS

REPLACE MULTI-ROOFS

537-15-128B

SHEET LIST

SHEET

NUMBER SHEET NAME

GENERAL

GI000 COVER SHEET

GI100 PHASING PLAN

HA101 PHASE 6 & 7 HAZARDOUS MATERIAL REMOVAL PLAN

ARCHITECTURAL

AS001 ARCHITECTURAL SYMBOLS AND ABBREVIATIONS

AD100 PHASE 1-4 DEMOLITION ROOF PLAN

AD101 PHASES 1-4 PHOTOS

AD102 PHASES 1-4 PHOTOS

AD103 PHASE 5 DEMOLITION ROOF PLAN

AD104 PHASE 5 PHOTOS

AD105 PHASES 6 & 7 DEMOLITION ROOF PLAN

AD106 PHASES 6-7 PHOTOS

AD107 PHASE 8 DEMOLITION ROOF PLAN

AD108 PHASE 8 PHOTOS

AD109 PHASES 9 & 10 DEMOLITION ROOF PLAN

AS100 PHASES 1-4 RENOVATION ROOF PLANS

AS102 PHASE 5 RENOVATION ROOF PLANS

AS103 PHASE 6 & 7 RENOVATION ROOF PLANS

AS104 PHASE 8 RENOVATION ROOF PLANS

AS105 PHASES 9 & 10 RENOVATION ROOF PLANS

AS500 ROOF DETAILS

AS501 ROOF DETAILS

AS502 ROOF DETAILS

PLUMBING, MECHANCAL, ELECTRICAL

ML100 MECHANICAL LEGEND & GENERAL NOTES

PME100 PLUMBING, MECHANICAL & ELECTRICAL DEMOLITION ROOF PLANS

PME101 PHOTOS

PME102 PLUMBING, MECHANICAL & ELECTRICAL DEMOLITION ROOF PLANS

PME103 PHOTOS

PME104 PLUMBING, MECHANICAL & ELECTRICAL DEMOLITION ROOF PLANS

PME105 PLUMBING, MECHANICAL & ELECTRICAL DEMOLITION ROOF PLANS

PME106 PHOTOS

PME107 PLUMBING, MECHANICAL & ELECTRICAL DEMOLITION ROOF PLANS

PME108 PHOTOS

PME109 PLUMBING, MECHANICAL & ELECTRICAL ROOF PLANS

PME110 PLUMBING, MECHANICAL & ELECTRICAL ROOF PLAN

PME111 PLUMBING, MECHANICAL & ELECTRICAL ROOF PLANS

PME112 PLUMBING, MECHANICAL & ELECTRICAL ROOF PLANS

PME113 PLUMBING, MECHANICAL & ELECTRICAL ROOF PLANS

Contact:Contact: Contact:

CMTA

Andy Myers

Project Engineer

MECHANICAL,

ELECTRICAL &

PLUMBING

JESSE BROWN VA MEDICAL CENTER

Jesse Brown VAMC 820 S. Damen Avenue Chicago, IL 60064-3048

OWNER

GUIDON DESIGN

James Gooden

Sr. Project Manager

1221 N. Pennsylvania St.

Suite 200 Indianapolis, IN 46202

ARCHITECT

10411 Meeting St.

Prospect, KY 40059

AREA MAP

VICINITY MAP

SITE

N

N

N

Revisions: Date:

V.B .

VP VP

VP

VP

VP

VP

VP

VP

VP

VP

T

T

L

S

THESE DIMENSIONS,

INCLUDING

MECHANICAL

EQUIPMENT NEED TO

BE VERIFIED IN FIELD -

THE FIELD NOTES WE

HAVE DO NOT COME

CLOSE TO WORKING

OUT.

GARAGE

PHASE FOUR

PHASE FIVE

PHASE SEVEN PHASE SIX

PHASE EIGHT

PHASE NINE

PHASE TWO

PHASE ONE

PHASE THREE

PHASE TEN

11A 11B

1A

PHASING GENERAL NOTES

A

B

C

D

E

F

G

H

I

CONSTRUCTION WORK SHALL BE COMPLETED IN TEN PHASES.

ONLY ONE PHASE SHALL BE COMPLETED AT A TIME UNLESS CONTRACTOR

RECEIVES WRITTEN APPROVAL FROM C.O.R.

DURING CONSTRUCTION, THE HOSPITAL WILL REMAIN IN OPERATION. PROTECT

ALL EXISTING BUILDING SYSTEMS TO REMAIN DURING THE WORK.

CONTRACTOR SHALL PROVIDE AND INSTALL ON THE PATH OF TRAVEL FROM THE

STAGING AREA TO THE PROJECT SITE.

CONSTRUCTION SHUTDOWN WORK SHALL BE DURING LOW PATIENT TIME AND

PERFORMED THROUGH MIDNIGHT.

CONTRACTOR SHALL BE RESPONSIBLE FOR ANY REQUIRED TEMPORARY

SHUTDOWN; AND RELOCATIONS OF ANTENNAS AND SATELLITES TO FACILITATE

WORKER SAFETY AND CONSTRUCTION. CONTRACTOR SHALL COORDINATE ALL

SHUTDOWN OF CELL PHONE ANTENNAS W/ THE CELL PHONE TOWER

OPERATORS, ALL OTHER SHUTDOWNS ARE TO BE COORDINATED WITH C.O.R.

SURVEY LIGHTNING PROTECTION SYSTEM IN THE CONSTRUCTION AREA,

DOCUMENT EXISTING CONDITIONS AND TURN RECORDS TO C.O.R. BEFORE

START OF WORK. TEMPORARILY REMOVE LIGHTNING PROTECTION DURING

CONSTRUCTION.

SURVEY HAND RAILINGS IN THE CONSTRUCTION AREA, DOCUMENT EXISTING

CONDITIONS AND TURN RECORDS TO C.O.R. BEFORE START OF WORK.

TEMPORARILY REMOVE SAFETY HAND RAILINGS.

SURVEY ROOF CURBS AND ROOF MOUNTED EQUIPMENT IN THE CONSTRUCTION

AREA, DOCUMENT EXISTING CONDITIONS AND TURN RECORDS TO C.O.R. BEFORE

START OF WORK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

Issued for Bid and Construction 7/31/19

C U s e rs \e b ro w n

\D o c u m e n ts

\1 .5

.0

J

B V

A M

C e b ro w n .r v t

/3

/2

:5

:4

P

M

GI100

PHASING PLAN REPLACE MULTI-ROOFS

820 S. Damen Ave,Chicago, IL 60612

537-15-128B

1A, 11, 15, 21, 30

JULY 31, 2019 JLG ELB

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

N

SCALE: 1" = 30'-0"GI100

1 PHASING PLAN

N

KEYPLAN

NO SCALE

ALTERNATE BID NOTES

ALTERNATE BID #1: DEDUCT ALL WORK INCLUDING, BUT NOT LIMITED TO

DEMOLITION OF EXISTING ROOFING MATERIALS AND ACCESSORIES,

INSTALLATION OF NEW ROOFING SYSTEM INCLUDING MEMBRANE,

INSULATION, COPINGS, AND ACCESSORIES ON PHASE NINE AND TEN.

ALTERNATE BID #2: DEDUCT ALL WORK INCLUDING, BUT NOT LIMITED TO

DEMOLITION OF EXISTING ROOFING MATERIALS AND ACCESSORIES,

INSTALLATION OF NEW ROOFING SYSTEM INCLUDING MEMBRANE,

INSULATION, COPINGS, AND ACCESSORIES ON PHASE SIX AND SEVEN.

ALTERNATE BID #3: DEDUCT ALL WORK INCLUDING, BUT NOT LIMITED TO

DEMOLITION OF EXISTING ROOFING MATERIALS AND ACCESSORIES,

INSTALLATION OF NEW ROOFING SYSTEM INCLUDING MEMBRANE,

INSULATION, COPINGS, AND ACCESSORIES ON PHASE EIGHT.

GARAGE

HAZARDOUS MATERIAL REMOVAL LEGEND

PROJECT BOUNDARY

AREA FOR REMOVAL OF ASBESTOS-CONTAINING MATERIAL

AND ASSOCIATED MASTIC

HAZARDOUS MATERIAL REMOVAL GENERAL NOTES

HAZMAT REMOVAL NOTES APPLY TO ENTIRE ROOFS. CONTRACTOR SHALL

IDENTIFY ALL MATERIALS DESCRIBED BY NOTE ON EACH ROOF AND REMOVE

ACCORDING TO SAFETY STANDARDS. REFERENCE SPECIFICATION SECTIONS

02 82 13.21 AND 07 01 50.19

ALL HAZARDOUS MATERIALS SHALL BE REMOVED IN COMPLIANCE WITH

APPLICABLE CODES AND LAWS.

THE CONTRACTOR IS RESPONSIBLE TO VERIFY THE HAZARD(S) AND LEVEL OF

PROTECTION REQUIRED FOR ALL EMPLOYEES OR SUBCONTRACTORS TO

COMPLETE THE CONSTRUCTION WORK.

BIDS SHALL INCLUDE REMOVAL, CLEAN-UP AND DISPOSAL OF ACM ROOFING IN

AN APPROPRIATE REGULATED AREA.

CONTRACTOR TO SUBMIT ASBESTOS ABATEMENT PLAN AND PROCEDURES

PRIOR TO COMMENCING WORK. SUBMITTAL SHALL BE IN ACCORDANCE WITH

SPECIFICATIONS.

A.

B.

C.

D.

E.

HAZARDOUS MATERIAL REMOVAL PLAN NOTES #

1 ASBESTOS CONTAINING MATERIAL INCLUDES FLASHING TAR UNDER RUBBER

ROOF (CATEGORY 1 NON-FRIABLE). LOCATED ON FLASHINGS AT THE EDGE OF

ROOF, VENT AND ROOF ACCESS HATCH

VP

VP

RD

RD

VP

VP

VP

RD RD

VP

1 1

11A 11B

1A

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

Issued for Bid and Construction 7/31/19

C U s e rs \e b ro w n

\D o c u m e n ts

\1 .5

.0

J

B V

A M

C e b ro w n .r v t

/3

/2

:5

:4

P

M

HA101

PHASE 6 & 7 HAZARDOUS

MATERIAL REMOVAL PLAN

REPLACE MULTI-ROOFS

820 S. Damen Ave,Chicago, IL 60612

537-15-128B

1A, 11, 15, 21, 30

JULY 31, 2019 JLG JDJ

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/4" = 1'-0"HA101

1 BUILDING 30 ROOF HAZMAT REMOVAL PLAN - PHASE 7

SCALE: 1/4" = 1'-0"HA101

2 BUILDING 30 ROOF HAZMAT REMOVAL PLAN - PHASE 6

N

N

SCALE: 1" = 20'-0"

KEYPLAN

N

ARCHITECTURAL ABBREVIATIONS

SECTION REFERENCE

DRAWING NUMBER

SHEET

LOCATION

DRAWING NUMBER

SHEET

LOCATION

DETAIL REFERENCE

OBJECT

REFERENCED

OBJECT

REFERENCED

X

XXXX

X

XXXX

SCALE: ??

VIEW TITLE

N

NORTH ARROW

EXTENT OF REVISION

REVISION SET

PROJECT BOUNDARY

BEYOND PROJECT BOUNDARY, NIC

DETAIL/DRAWING SCALE

TITLE OF DETAIL/DRAWING

DETAIL/DRAWING NUMBER

SHEET NUMBER

AHU AIR HANDLING UNIT

ALUM ALUMINUM

ANT ANTENNA

APPD APPROVED

APPROX APPROXIMATE

ASB ASBESTOS

ASPH ASPHALT

COORD COORDINATE

DEMO DEMOLITION

DIM DIMENSION

DWG DRAWING

EL ELEVATION

EQUIP EQUIPMENT

HVAC HEATING, VENTILATING, AND AIR CONDITIONING

MEMB MEMBRANE

QA QUALITY ASSURANCE

QC QUALITY CONTROL

RD ROAD OR ROOF DRAIN

RV ROOF VENT

SIM SIMILAR

TYP TYPICAL

GENERAL CONSTRUCTION NOTES

ANY INDICATION OF PROJECT LIMITS OR BOUNDARY OF DEMARCATION ARE SHOWN

FOR THE CONVENIENCE OF THE CONTRACTOR, THE FULL SCOPE OF THE PROJECT

LIMIT OF BOUNDARY REQUIRES COORDINATION WITH THE DESIGN SCOPE OF WORK

AND ACCESS TO EXISTING UTILITIES FOR TIE IN.

DO NOT SCALE THE DRAWINGS. DRAWING SCALES AS INDICATED ARE FOR GENERAL

ORIENTATION AND CONTEXT ONLY.

CONTRACTOR TO PROVIDE WORK WHERE DETAILS AND NOTES ARE IDENTIFIED AS

“TYPICAL” OR “SIMILAR” EACH INSTANCE THAT IS THE SAME IN NATURE TO THE

DETAIL, AREA, OR ITEM REFERENCED.

PROVIDED WORK SHALL BE FURNISHED AND INSTALLED BY THE CONTRACTOR.

CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF DELIVERY, MOUNTING,

INSTALLATION, NECESSARY BLOCKING AND ROUGH-IN.

INSTALLED WORK IS THE CONTRACTOR INSTALLING OWNER FURNISHED MATERIALS

AND EQUIPMENT. CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF MATERIAL

DELIVERY, MOUNTING, INSTALLATION AND ROUGH IN.

ALL PROVIDED WORK SHALL BE WITH NEW MATERIALS UNLESS SPECIFICALLY CALLED

OUT AS SALVAGED OR RELOCATED WITHIN THE CONTRACT DOCUMENTS.

CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING ADJACENT CONSTRUCTION,

FINISHES, EQUIPMENT, AND TRAVEL ROUTE TO AND FROM THE CONSTRUCTION SITE.

ANY DAMAGE OR UNACCEPTABLE WEAR BY THE CONSTRUCTION TEAM SHALL BE

REPAIRED/REPLACED BY THE CONTRACTOR AT NO COST TO THE OWNER.

1.

2.

3.

4.

5.

6.

7.

ARCHITECTURAL SYMBOLS

BUILDING SECTION REFERENCE

DRAWING NUMBER

SHEET LOCATION

BUILDING X

XXXX

X

XXXX

ROOM

ROOM TAG

1 PLAN NOTE

ALTERNATE/BID DEDUCT ITEM

PT-1 FINISH INDICATION

A FRAME / WINDOW

T GLAZING

101 EQUIPMENT/FURNITURE TAG

REVISION TO PLAN CALLOUT

KEY NOTE TAGS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

Issued for Bid and Construction 7/31/19

C U s e rs \e b ro w n

\D o c u m e n ts

\1 .5

.0

J

B V

A M

C e b ro w n .r v t

/3

/2

:5

:2

P

M

AS001

ARCHITECTURAL SYMBOLS AND

ABBREVIATIONS

REPLACE MULTI-ROOFS

820 S. Damen Ave,Chicago, IL 60612

537-15-128B

1A, 11, 15, 21, 30

JULY 31, 2019 JLG ELB

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

/8

39' - 2 1/8" 53' - 3 3/8"

92' - 5 1/2"

53' - 3 3/8" 39' - 2 1/8"

92' - 5 1/2"62' - 0"

1/ 8"

19' - 6 1/2" 11' - 6 1/2"

16' - 9" 17' - 1"

/2

16' - 7 1/2" 8' - 3"

20' - 7 1/2"

/2

62' - 0"

/8

13' - 11"

59' - 10"

6'

0"

5'

/8

26' - 11 3/4"

59' - 10"

44' - 9"

0"

11A 11B

1A

DEMOLITION ROOF PLAN NOTES - THIS SHEET ONLY

A

B

C

D

E

F

G

H

I

J

K

L

M

ALL DIMENSIONS SHOWN ARE TO FACE OF WALL FRAMING/ MASONRY

UNLESS NOTED OTHERWISE. DIMENSIONS DESIGNATES AS "CLR" OR

"CLEAR" INDICATE A CLEAR DIMENSION FROM FACE OF FINISH TO FACE OF

FINISH.

REFERENCE MECHANICAL, PLUMBING AND ELECTRICAL FOR COORDINATION

ITEMS. COORDINATE AS REQUIRED INCLUDING NECESSARY FRAMING,

BLOCKING, ETC.

ROOFING SUPPLIERS, MANUFACTURERS, & INSTALLERS SHALL REVIEW ALL

ROOFING DETAILS & ADVISE THE ARCHITECT ON ANY RECOMMENDED

CHANGES.

UNLESS NOTIFIED OTHERWISE, ROOFING SUPPLIERS, MANUFACTURERS

AND INSTALLERS WILL BE ASSUMED TO HAVE REVIEWED AND APPROVED

THE DETAILS SHOWN.

PROVIDE FLASHING AT ALL CONDUIT & HVAC LINES PENETRATING THE

ROOF.

CONTRACTOR & ALL SUBTRADES SHALL BE AWARE AND EXERCISE THE

NECESSARY CARE TO PREVENT DAMAGE TO OR PUNCTURE OF THE ROOF.

THIS SHALL INCLUDE ALL DELETERIOUS MATERIALS AND TOOLS.

PHOTOS SHOWN DEPICT THE EXISTING CONDITIONS. REFER TO DEMOLITION

ROOF PLAN FOR LOCATION OF PHOTOS

ESTABLISH A DUST/DEBRIS CONTROL PLAN TO PREVENT THE SEPERATION

OF FLYING PARTICLES. AT ROOF AND AT ROOF ACCESS INSIDE HOSPITAL.

DISPOSE DEMOLITION WASTE LAWFULLY AND OFF-SITE DAILY

PROVIDE TEMPORARY ROOF/VAPOR RETARDER. SUBMIT A TEMPORARY

PROTECTION PLAN.

PROVIDE TEMPORARY WATER PROTECTION FROM RAIN AT THE END OF

EACH WORK PERIOD.

CONTRACTOR SHALL KEEP AWARE OF CHANGING WEATHER AND STOP

WORK AND PROVIDE WATER PROTECTION MEASURES BEFORE WEATHER

EVENT.

NO HELICOPTER OR ROOF CHUTES TO BE UTILIZED DURING DEMOLITION OR

CONSTRUCTION.

DEMOLITION ROOF PLAN NOTES - THIS SHEET ONLY

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

REMOVE EXISTING EPDM ROOF ASSEMBLY AND INSULATION COMPLETELY

DOWN TO ROOF DECK. DO NOT DAMAGE ROOF DECK.

REMOVE EXISTING ROLLED ASPHALT ROOF ASSEMBLY AND INSULATION

COMPLETELY DOWN TO ROOF DECK.

REMOVE AND INSPECT ALL COPING STONES. DISPOSE AND REPLACE DAMAGED

COPING STONES TO MATCH EXISTING.

REPLACE ROOF DRAIN BODIES AND HEADS. ACCESS FROM FLOOR BELOW IN

FINISHED SPACES. COORDINATE WITH COR. PROVIDE INFECTION CONTROL

MEASURES WHEN WORKING IN FINISHED AREAS. COMPLETE ON WEEKEND/

NIGHTS - COORDINATE WITH MEP.

EXISTING LADDER TO REMAIN - REMOVE AND SALVAGE FOR REINSTALLATION.

REMOVE EXISTING TAPERED INSULATION DOWN TO ROOF DECK.

REMOVE AND REPLACE EXISTING METAL COPING.

REMOVE AND REPLACE EXISTING ROOF PAVERS.

ALL EXISTING CURBS THAT ARE IN USE ARE TO REMAIN.

REMOVE AND REPLACE SAFETY HANDRAILS AND COPING.

SCUPPER TO REMAIN.

ROOF LADDER AND CAGE TO REMAIN, TAKE CARE NOT TO DAMAGE. REFER TO

ELECTRICAL DRAWINGS FOR RELATED WORK.

ROOF LEGEND

ROOF SLOPE - TO MATCH EXISTING

EXHAUST FAN

ROOF VENT

DIRECTION OF PHOTO VIEW

HIGH FREQUENCY FCC TOWER

EF

RV

P1

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

Issued for Bid and Construction 7/31/19

C U s e rs \e b ro w n

\D o c u m e n ts

\1 .5

.0

J

B V

A M

C e b ro w n .r v t

/3

/2

:5

:0

P

M

AD100

PHASE 1-4 DEMOLITION ROOF

PLAN

REPLACE MULTI-ROOFS

820 S. Damen Ave,Chicago, IL 60612

537-15-128B

1A, 11, 15, 21, 30

JULY 31, 2019 JLG ELB

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/8" = 1'-0"AD100

3 BUILDING 1A 10TH FLOOR MECHANICAL PENTHOUSE ROOF PLAN (+/- 9,600 SF) - PHASE 4

SCALE: 1/8" = 1'-0"AD100

2 BUILDING 1A 11TH FLOOR PENTHOUSE ROOF (+/- 1,752 SF) - PHASE 2 & 3

SCALE: 1/8" = 1'-0"AD100

1 BUILDING 1A 12TH FLOOR PENTHOUSE ROOF (+/- 3,000 SF) - PHASE 1

N

N N

N

4 45

11TH FLOOR

12TH FLOOR

6 6 6

11TH

FLOOR

6 P1

P2 P3

P4

P5

P6

P14

P15

P9

P8 P7

P10

P11 P12

P13

P18

P19

P20

P24

P17

P16

RV

RV

P21

P23

P

11 1111

KEYPLAN

NO SCALE

PHOTO NOTES - PHASES 1-4 SEE ROOF PLANS FOR

PHOTO LOCATION

P 1

P 2

P 3

P 4

P 5

P 6

P 7

P 8

P 9

P 10

P 11

P 12

P 13

P 14

P 15

P 16

P 17

P 18

P 19

P 20

P 21

P 22

P 23

P 24

REMOVE EXISTING ROLLED ASPHALT ROOF ASSEMBLY. EXISTING VENT

STACK TO REMAIN. REMOVE AND INSPECT ALL COPING STONES. DISPOSE

OF AND REPLACE DAMAGED COPING STONES.

REMOVE EXISTING ROLLED ASPHALT ROOF ASSEMBLY. EXISTING ROOF

HATCH TO REMAIN

REMOVE EXISTING ROLLED ASPHALT ROOF ASSEMBLY.EXISTING

MECHANICAL EQUIPMENT TO REMAIN. COORDINATE WITH MECHANICAL

DRAWINGS.

REMOVE EXISTING ROLLED ASPHALT ROOF ASSEMBLY. REMOVE AND

INSPECT ALL COPING STONES. DISPOSE OF AND REPLACE DAMAGED

COPING STONES.

EXISTING MECHANICAL EQUIPMENT TO REMAIN. COORDINATE WITH

MECHANICAL DRAWINGS.

REMOVE EXISTING ROLLED ASPHALT ROOF ASSEMBLY. EXISTING

EXHAUST HOOD TO REMAIN.

REMOVE AND SALVAGE EXISTING LADDER FOR REINSTALLATION.

REINSTALL ALL SAFETY HAND RAILINGS. REMOVE EXISTING ROLLED

ASPHALT ROOF ASSEMBLY. REMOVE AND REPLACE ROOF PAVERS.

EXISTING MECHANICAL EQUIPMENT TO REMAIN. COORDINATE WITH

MECHANICAL DRAWINGS. EXISTING MECHANICAL EQUIPMENT TO REMAIN.

EXISTING MECHANICAL EQUIPMENT TO REMAIN. COORDINATE WITH

MECHANICAL DRAWINGS. INSPECT EXISTING COPING. REMOVE AND

REPLACE DAMAGED COPING.

EXISTING MECHANICAL EQUIPMENT TO REMAIN. COORDINATE WITH

MECHANICAL DRAWINGS.

REMOVE EXISTING ROLLED ASPHALT ROOF ASSEMBLY. REPLACE ALL

ROOF DRAIN BODIES AND HEADS. EXISTING VENT STACK TO REMAIN.

EXISTING MECHANICAL EQUIPMENT TO REMAIN. COORDINATE WITH

MECHANICAL DRAWINGS.

REMOVE EXISTING CANTS AND INSTALL NEW CANTS, SHEATHING, AND

FLASHING AT VERTICAL WALLS AND/OR PARAPETS. REMOVE EXISTING

ROOF MEMBRANE.

REMOVE EXISTING EPDM ROOF ASSEMBLY. REMOVE AND INSPECT ALL

COPING STONES. DISPOSE OF AND REPLACE DAMAGED COPING STONES.

REMOVE EXISTING EPDM ROOF ASSEMBLY. REPLACE ALL ROOF DRAIN

BODIES AND HEADS.

EXISTING MECHANICAL EQUIPMENT TO REMAIN. COORDINATE WITH

MECHANICAL DRAWINGS. REMOVE EXISTING EPDM ROOF ASSEMBLY.

REMOVE AND REPLACE ROOF PAVERS.

REMOVE EXISTING EPDM ROOF ASSEMBLY. PROVIDE AND INSTALL NEW

PERMANENT WALKWAY PADS PER THE SPECIFICATIONS.

REMOVE EXISTING EPDM ROOF ASSEMBLY. REPLACE ALL ROOF DRAIN

BODIES AND HEADS. REMOVE EXISTING CANTS AND INSTALL NEW CANTS,

SHEATHING, AND FLASHING AT VERTICAL WALLS AND/OR PARAPETS.

REMOVE EXISTING EPDM ROOF ASSEMBLY.

REMOVE EXISTING ROLLED ASPHALT ROOF ASSEMBLY. INSPECT ALL

COPING STONES. REMOVE AND REPLACE DAMAGED COPING.

FCC TOWER - COORDINATE WITH MEP.

FCC TOWER - COORDINATE WITH MEP.

FCC TOWER - COORDINATE WITH MEP.

EXISTING MECHANICAL EQUIPMENT TO REMAIN. COORDINATE WITH

MECHANICAL DRAWINGS. PROVIDE AND INSTALL NEW PERMANENT

WALKWAY PADS PER THE SPECIFICATIONS.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

Issued for Bid and Construction 7/31/19

C U s e rs \e b ro w n

\D o c u m e n ts

\1 .5

.0

J

B V

A M

C e b ro w n .r v t

/3

/2

:5

:1

P

M

AD101

PHASES 1-4 PHOTOS REPLACE MULTI-ROOFS

820 S. Damen Ave,Chicago, IL 60612

537-15-128B

1A, 11, 15, 21, 30

JULY 31, 2019 JLG ELB

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

P1 P2 P3 P4 P5 P6

P7 P8 P9 P10 P11

P12 P13

PHOTO NOTES - PHASES 1-4 SEE ROOF PLANS FOR

PHOTO LOCATION

P 1

P 2

P 3

P 4

P 5

P 6

P 7

P 8

P 9

P 10

P 11

P 12

P 13

P 14

P 15

P 16

P 17

P 18

P 19

P 20

P 21

P 22

P 23

P 24

REMOVE EXISTING ROLLED ASPHALT ROOF ASSEMBLY. EXISTING VENT

STACK TO REMAIN. REMOVE AND INSPECT ALL COPING STONES. DISPOSE

OF AND REPLACE DAMAGED COPING STONES.

REMOVE EXISTING ROLLED ASPHALT ROOF ASSEMBLY. EXISTING ROOF

HATCH TO REMAIN

REMOVE EXISTING ROLLED ASPHALT ROOF ASSEMBLY.EXISTING

MECHANICAL EQUIPMENT TO REMAIN. COORDINATE WITH MECHANICAL

DRAWINGS.

REMOVE EXISTING ROLLED ASPHALT ROOF ASSEMBLY. REMOVE AND

INSPECT ALL COPING STONES. DISPOSE OF AND REPLACE DAMAGED

COPING STONES.

EXISTING MECHANICAL EQUIPMENT TO REMAIN. COORDINATE WITH

MECHANICAL DRAWINGS.

REMOVE EXISTING ROLLED ASPHALT ROOF ASSEMBLY. EXISTING

EXHAUST HOOD TO REMAIN.

REMOVE AND SALVAGE EXISTING LADDER FOR REINSTALLATION.

REINSTALL ALL SAFETY HAND RAILINGS. REMOVE EXISTING ROLLED

ASPHALT ROOF ASSEMBLY. REMOVE AND REPLACE ROOF PAVERS.

EXISTING MECHANICAL EQUIPMENT TO REMAIN. COORDINATE WITH

MECHANICAL DRAWINGS. EXISTING MECHANICAL EQUIPMENT TO REMAIN.

EXISTING MECHANICAL EQUIPMENT TO REMAIN. COORDINATE WITH

MECHANICAL DRAWINGS. INSPECT EXISTING COPING. REMOVE AND

REPLACE DAMAGED COPING.

EXISTING MECHANICAL EQUIPMENT TO REMAIN. COORDINATE WITH

MECHANICAL DRAWINGS.

REMOVE EXISTING ROLLED ASPHALT ROOF ASSEMBLY. REPLACE ALL

ROOF DRAIN BODIES AND HEADS. EXISTING VENT STACK TO REMAIN.

EXISTING MECHANICAL EQUIPMENT TO REMAIN. COORDINATE WITH

MECHANICAL DRAWINGS.

REMOVE EXISTING CANTS AND INSTALL NEW CANTS, SHEATHING, AND

FLASHING AT VERTICAL WALLS AND/OR PARAPETS. REMOVE EXISTING

ROOF MEMBRANE.

REMOVE EXISTING EPDM ROOF ASSEMBLY. REMOVE AND INSPECT ALL

COPING STONES. DISPOSE OF AND REPLACE DAMAGED COPING STONES.

REMOVE EXISTING EPDM ROOF ASSEMBLY. REPLACE ALL ROOF DRAIN

BODIES AND HEADS.

EXISTING MECHANICAL EQUIPMENT TO REMAIN. COORDINATE WITH

MECHANICAL DRAWINGS. REMOVE EXISTING EPDM ROOF ASSEMBLY.

REMOVE AND REPLACE ROOF PAVERS.

REMOVE EXISTING EPDM ROOF ASSEMBLY. PROVIDE AND INSTALL NEW

PERMANENT WALKWAY PADS PER THE SPECIFICATIONS.

REMOVE EXISTING EPDM ROOF ASSEMBLY. REPLACE ALL ROOF DRAIN

BODIES AND HEADS. REMOVE EXISTING CANTS AND INSTALL NEW CANTS,

SHEATHING, AND FLASHING AT VERTICAL WALLS AND/OR PARAPETS.

REMOVE EXISTING EPDM ROOF ASSEMBLY.

REMOVE EXISTING ROLLED ASPHALT ROOF ASSEMBLY. INSPECT ALL

COPING STONES. REMOVE AND REPLACE DAMAGED COPING.

FCC TOWER - COORDINATE WITH MEP.

FCC TOWER - COORDINATE WITH MEP.

FCC TOWER - COORDINATE WITH MEP.

EXISTING MECHANICAL EQUIPMENT TO REMAIN. COORDINATE WITH

MECHANICAL DRAWINGS. PROVIDE AND INSTALL NEW PERMANENT

WALKWAY PADS PER THE SPECIFICATIONS.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

Issued for Bid and Construction 7/31/19

C U s e rs \e b ro w n

\D o c u m e n ts

\1 .5

.0

J

B V

A M

C e b ro w n .r v t

/3

/2

:5

:1

P

M

AD102

PHASES 1-4 PHOTOS REPLACE MULTI-ROOFS

820 S. Damen Ave,Chicago, IL 60612

537-15-128B

1A, 11, 15, 21, 30

JULY 31, 2019 JLG ELB

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

P14 P15 P16 P17 P18 P19

P20

P24

P21 P22 P23

95' - 0"

11' - 7" 71' - 10" 11' - 7"

3/

4"

/4

11A 11B

1A

DEMOLITION ROOF PLAN NOTES - THIS SHEET ONLY

A

B

C

D

E

F

G

H

I

J

K

L

M

ALL DIMENSIONS SHOWN ARE TO FACE OF WALL FRAMING/ MASONRY

UNLESS NOTED OTHERWISE. DIMENSIONS DESIGNATES AS "CLR" OR

"CLEAR" INDICATE A CLEAR DIMENSION FROM FACE OF FINISH TO FACE OF

FINISH.

REFERENCE MECHANICAL, PLUMBING AND ELECTRICAL FOR COORDINATION

ITEMS. COORDINATE AS REQUIRED INCLUDING NECESSARY FRAMING,

BLOCKING, ETC.

ROOFING SUPPLIERS, MANUFACTURERS, & INSTALLERS SHALL REVIEW ALL

ROOFING DETAILS & ADVISE THE ARCHITECT ON ANY RECOMMENDED

CHANGES.

UNLESS NOTIFIED OTHERWISE, ROOFING SUPPLIERS, MANUFACTURERS

AND INSTALLERS WILL BE ASSUMED TO HAVE REVIEWED AND APPROVED

THE DETAILS SHOWN.

PROVIDE FLASHING AT ALL CONDUIT & HVAC LINES PENETRATING THE

ROOF.

CONTRACTOR & ALL SUBTRADES SHALL BE AWARE AND EXERCISE THE

NECESSARY CARE TO PREVENT DAMAGE TO OR PUNCTURE OF THE ROOF.

THIS SHALL INCLUDE ALL DELETERIOUS MATERIALS AND TOOLS.

PHOTOS SHOWN DEPICT THE EXISTING CONDITIONS. REFER TO DEMOLITION

ROOF PLAN FOR LOCATION OF PHOTOS

ESTABLISH A DUST/DEBRIS CONTROL PLAN TO PREVENT THE SEPERATION

OF FLYING PARTICLES. AT ROOF AND AT ROOF ACCESS INSIDE HOSPITAL.

DISPOSE DEMOLITION WASTE LAWFULLY AND OFF-SITE DAILY

PROVIDE TEMPORARY ROOF/VAPOR RETARDER. SUBMIT A TEMPORARY

PROTECTION PLAN.

PROVIDE TEMPORARY WATER PROTECTION FROM RAIN AT THE END OF

EACH WORK PERIOD.

CONTRACTOR SHALL KEEP AWARE OF CHANGING WEATHER AND STOP

WORK AND PROVIDE WATER PROTECTION MEASURES BEFORE WEATHER

EVENT.

NO HELICOPTER OR ROOF CHUTES TO BE UTILIZED DURING DEMOLITION OR

CONSTRUCTION.

DEMOLITION ROOF PLAN NOTES - THIS SHEET ONLY

1.

2.

3.

4.

5.

6.

7.

8.

9.

REMOVE EXISTING EPDM ROOF ASSEMBLY AND INSULATION COMPLETELY

DOWN TO ROOF DECK. DO NOT DAMAGE ROOF DECK.

REMOVE AND INSPECT ALL COPING STONES. DISPOSE AND REPLACE DAMAGED

COPING STONES TO MATCH EXISTING.

REPLACE ROOF DRAIN BODIES AND HEADS. ACCESS FROM FLOOR BELOW IN

FINISHED SPACES. COORDINATE WITH COR. PROVIDE INFECTION CONTROL

MEASURES WHEN WORKING IN FINISHED AREAS. COMPLETE ON WEEKEND/

NIGHTS - COORDINATE WITH MEP.

REMOVE EXISTING TAPERED INSULATION DOWN TO ROOF DECK.

REMOVE AND REPLACE EXISTING METAL COPING COUNTERFLASHING.

EXISTING METAL STAIRS TO BE TEMPORARY REMOVED AND SALVAGED FOR

REINSTALLATION.

REMOVE AND REPLACE EXISTING ROOF PAVERS.

ALL EXISTING CURBS THAT ARE IN USE ARE TO REMAIN.

EXISTING SCREEN WALL TO BE REMOVED AND SALVAGED FOR

REINSTALLATION.

ROOF LEGEND

ROOF SLOPE TO MATCH EXISTING

EXHAUST FAN

ROOF VENT

DIRECTION OF PHOTO VIEW

EF

RV

P1

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

Issued for Bid and Construction 7/31/19

C U s e rs \e b ro w n

\D o c u m e n ts

\1 .5

.0

J

B V

A M

C e b ro w n .r v t

/3

/2

:5

:1

P

M

AD103

PHASE 5 DEMOLITION ROOF PLAN REPLACE MULTI-ROOFS

820 S. Damen Ave,Chicago, IL 60612

537-15-128B

1A, 11, 15, 21, 30

JULY 31, 2019 JLG JDJ

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/4" = 1'-0"AD103

1 BUILDING 1A 3RD FLOOR AUDITORIUM ROOF PLAN (+/- 5,600 SF) - PHASE 5

NN

3 3

P1

P2

P3

P4

P5

RV

KEYPLAN

NO SCALE

PHOTO NOTES - PHASE 5 THIS SHEET ONLY

SEE ROOF PLANS FOR PHOTO LOCATION

P 1

P 2

P 3

P 4

P 5

REMOVE EXISTING EPDM ROOF ASSEMBLY. REMOVE EXISTING CANTS

AND INSTALL NEW CANTS, SHEATHING, AND FLASHING AT VERTICAL

WALLS AND/OR PARAPETS. REMOVE AND REPLACE COUNTERFLASHING

EXISTING MECHANICAL EQUIPMENT TO REMAIN. COORDINATE WITH

MECHANICAL DRAWINGS. PROVIDE AND INSTALL NEW PERMANENT

WALKWAY PADS PER THE SPECIFICATIONS.

REMOVE EXISTING EPDM ROOF ASSEMBLY.EXISTING MECHANICAL

EQUIPMENT TO REMAIN. COORDINATE WITH MECHANICAL DRAWINGS.

REPLACE ALL ROOF DRAIN BODIES AND HEADS.

REMOVE EXISTING EPDM ROOF ASSEMBLY. REMOVE AND INSPECT ALL

COPING STONES. DISPOSE OF AND REPLACE DAMAGED COPING STONES.

EXISTING MECHANICAL EQUIPMENT TO REMAIN. COORDINATE WITH

MECHANICAL DRAWINGS.

EXISTING MECHANICAL EQUIPMENT TO REMAIN. COORDINATE WITH

MECHANICAL DRAWINGS. REMOVE EXISTING EPDM ROOF ASSEMBLY.

METAL STAIRS ARE TO BE REMOVED AND SALVAGED FOR

REINSTALLATION.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

Issued for Bid and Construction 7/31/19

C U s e rs \e b ro w n

\D o c u m e n ts

\1 .5

.0

J

B V

A M

C e b ro w n .r v t

/3

/2

:5

:1

P

M

AD104

PHASE 5 PHOTOS REPLACE MULTI-ROOFS

820 S. Damen Ave,Chicago, IL 60612

537-15-128B

1A, 11, 15, 21, 30

JULY 31, 2019 JLG JDJ

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

P1 P2 P3 P4

P5

62' - 10"

5' - 0 3/4" 57' - 9 1/4"

1'

48' - 8"

11A 11B

1A

DEMOLITION ROOF PLAN NOTES- THIS SHEET ONLY

A

B

C

D

E

F

G

H

I

J

K

L

M

ALL DIMENSIONS SHOWN ARE TO FACE OF WALL FRAMING/ MASONRY

UNLESS NOTED OTHERWISE. DIMENSIONS DESIGNATES AS "CLR" OR

"CLEAR" INDICATE A CLEAR DIMENSION FROM FACE OF FINISH TO FACE OF

FINISH.

REFERENCE MECHANICAL, PLUMBING AND ELECTRICAL FOR COORDINATION

ITEMS. COORDINATE AS REQUIRED INCLUDING NECESSARY FRAMING,

BLOCKING, ETC.

ROOFING SUPPLIERS, MANUFACTURERS, & INSTALLERS SHALL REVIEW ALL

ROOFING DETAILS & ADVISE THE ARCHITECT ON ANY RECOMMENDED

CHANGES.

UNLESS NOTIFIED OTHERWISE, ROOFING SUPPLIERS, MANUFACTURERS

AND INSTALLERS WILL BE ASSUMED TO HAVE REVIEWED AND APPROVED

THE DETAILS SHOWN.

PROVIDE FLASHING AT ALL CONDUIT & HVAC LINES PENETRATING THE

ROOF.

CONTRACTOR & ALL SUBTRADES SHALL BE AWARE AND EXERCISE THE

NECESSARY CARE TO PREVENT DAMAGE TO OR PUNCTURE OF THE ROOF.

THIS SHALL INCLUDE ALL DELETERIOUS MATERIALS AND TOOLS.

PHOTOS SHOWN DEPICT THE EXISTING CONDITIONS. REFER TO DEMOLITION

ROOF PLAN FOR LOCATION OF PHOTOS

ESTABLISH A DUST/DEBRIS CONTROL PLAN TO PREVENT THE SEPERATION

OF FLYING PARTICLES. AT ROOF AND AT ROOF ACCESS INSIDE HOSPITAL.

DISPOSE DEMOLITION WASTE LAWFULLY AND OFF-SITE DAILY

PROVIDE TEMPORARY ROOF/VAPOR RETARDER. SUBMIT A TEMPORARY

PROTECTION PLAN.

PROVIDE TEMPORARY WATER PROTECTION FROM RAIN AT THE END OF

EACH WORK PERIOD.

CONTRACTOR SHALL KEEP AWARE OF CHANGING WEATHER AND STOP

WORK AND PROVIDE WATER PROTECTION MEASURES BEFORE WEATHER

EVENT.

NO HELICOPTER OR ROOF CHUTES TO BE UTILIZED DURING DEMOLITION OR

CONSTRUCTION.

DEMOLITION ROOF PLAN NOTES - THIS SHEET ONLY

1.

2.

3.

4.

5.

6.

7.

REMOVE EXISTING ROLLED ASPHALT BALLASTED ROOF ASSEMBLY AND

INSULATION COMPLETELY DOWN TO ROOF DECK.

REPLACE ROOF DRAIN BODIES AND HEADS. ACCESS FROM FLOOR BELOW IN

FINISHED SPACES. COORDINATE WITH COR. PROVIDE INFECTION CONTROL

MEASURES WHEN WORKING IN FINISHED AREAS. COMPLETE ON WEEKEND/

NIGHTS - COORDINATE WITH MEP.

EXISTING ROOF HATCH TO REMAIN - TAKE CARE TO NOT DAMAGE.

REMOVE EXISTING TAPERED INSULATION DOWN TO ROOF DECK.

REMOVE AND REPLACE EXISTING METAL COPING.

REMOVE AND REPLACE EXISTING ROOF PAVERS.

ALL EXISTING CURBS THAT ARE IN USE ARE TO REMAIN.

ROOF LEGEND

ROOF SLOPE - TO MATCH EXISTING

EXHAUST FAN

ROOF VENT

DIRECTION OF PHOTO VIEW

EF

RV

P1

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

Issued for Bid and Construction 7/31/19

C U s e rs \e b ro w n

\D o c u m e n ts

\1 .5

.0

J

B V

A M

C e b ro w n .r v t

/3

/2

:5

:1

P

M

AD105

PHASES 6 & 7 DEMOLITION ROOF

PLAN

REPLACE MULTI-ROOFS

820 S. Damen Ave,Chicago, IL 60612

537-15-128B

1A, 11, 15, 21, 30

JULY 31, 2019 JLG JDJ

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/4" = 1'-0"AD105

1 BUILDING 30 2ND FLOOR MECHANICAL ROOF PLAN (+/- 1950 SF) - PHASE 7

SCALE: 1/4" = 1'-0"AD105

2 BUILDING 30 2ND FLOOR MECHANICAL ROOF PLAN (+/- 1900 SF) - PHASE 6

N

2 2

2 2

N

N

4 4 4

P2

P1

P5

P3

P4

RV

RV

RV

RV

RV

RV

KEYPLAN

PHOTO NOTES - PHASES 6 & 7 - THIS SHEET ONLY

SEE ROOF PLANS FOR PHOTO LOCATION

P 1

P 2

P 3

P 4

P 5

REMOVE EXISTING BALLASTED ROOF ASSEMBLY. REMOVE EXISTING

CANTS AND INSTALL NEW CANTS, SHEATHING, AND FLASHING AT

VERTICAL WALLS AND/OR PARAPETS.

EXISTING MECHANICAL EQUIPMENT TO REMAIN. COORDINATE WITH

MECHANICAL DRAWINGS. REMOVE EXISTING BALLASTED ROOF

ASSEMBLY, REMOVE EXISTING CANTS, INSTALL NEW CANTS, FLASHING AT

CURBS.

REMOVE EXISTING BALLASTED ROOF ASSEMBLY. EXISTING ROOF HATCH

TO REMAIN

REMOVE EXISTING BALLASTED ROOF ASSEMBLY. REMOVE EXISTING

CANTS AND INSTALL NEW CANTS, SHEATHING, AND FLASHING AT

VERTICAL WALLS AND/OR PARAPETS.

REMOVE EXISTING BALLASTED ROOF ASSEMBLY.EXISTING MECHANICAL

EQUIPMENT TO REMAIN. COORDINATE WITH MECHANICAL DRAWINGS.

REPLACE ALL ROOF DRAIN BODIES AND HEADS.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

Issued for Bid and Construction 7/31/19

C U s e rs \e b ro w n

\D o c u m e n ts

\1 .5

.0

J

B V

A M

C e b ro w n .r v t

/3

/2

:5

:2

P

M

AD106

PHASES 6-7 PHOTOS REPLACE MULTI-ROOFS

820 S. Damen Ave,Chicago, IL 60612

537-15-128B

1A, 11, 15, 21, 30

JULY 31, 2019 JLG JDJ

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

P1 P2 P3

P5

P4

96' - 1 1/2" 18' - 11"

124' - 2 1/2"

/8

/8

M A

T C

H

LI

N

E

30' - 2 1/2" 4' - 0"

34' - 2 1/2"

M A

T C

H

LI

N

E

11A 11B

1A

DEMOLITION ROOF PLAN NOTES- THIS SHEET ONLY

A

B

C

D

E

F

G

H

I

J

K

L

M

ALL DIMENSIONS SHOWN ARE TO FACE OF WALL FRAMING/ MASONRY

UNLESS NOTED OTHERWISE. DIMENSIONS DESIGNATES AS "CLR" OR

"CLEAR" INDICATE A CLEAR DIMENSION FROM FACE OF FINISH TO FACE OF

FINISH.

REFERENCE MECHANICAL, PLUMBING AND ELECTRICAL FOR COORDINATION

ITEMS. COORDINATE AS REQUIRED INCLUDING NECESSARY FRAMING,

BLOCKING, ETC.

ROOFING SUPPLIERS, MANUFACTURERS, & INSTALLERS SHALL REVIEW ALL

ROOFING DETAILS & ADVISE THE ARCHITECT ON ANY RECOMMENDED

CHANGES.

UNLESS NOTIFIED OTHERWISE, ROOFING SUPPLIERS, MANUFACTURERS

AND INSTALLERS WILL BE ASSUMED TO HAVE REVIEWED AND APPROVED

THE DETAILS SHOWN.

PROVIDE FLASHING AT ALL CONDUIT & HVAC LINES PENETRATING THE

ROOF.

CONTRACTOR AND ALL SUBTRADES SHALL BE AWARE AND EXERCISE THE

NECESSARY CARE TO PREVENT DAMAGE TO OR PUNCTURE OF THE ROOF.

THIS SHALL INCLUDE ALL DELETERIOUS MATERIALS AND TOOLS.

PHOTOS SHOWN DEPICT THE EXISTING CONDITIONS. REFER TO DEMOLITION

ROOF PLAN FOR LOCATION OF PHOTOS

ESTABLISH A DUST/DEBRIS CONTROL PLAN TO PREVENT THE SEPERATION

OF FLYING PARTICLES. AT ROOF AND AT ROOF ACCESS INSIDE HOSPITAL.

DISPOSE DEMOLITION WASTE LAWFULLY AND OFF-SITE DAILY

PROVIDE TEMPORARY ROOF/VAPOR RETARDER. SUBMIT A TEMPORARY

PROTECTION PLAN.

PROVIDE TEMPORARY WATER PROTECTION FROM RAIN AT THE END OF

EACH WORK PERIOD.

CONTRACTOR SHALL KEEP AWARE OF CHANGING WEATHER AND STOP

WORK AND PROVIDE WATER PROTECTION MEASURES BEFORE WEATHER

EVENT.

NO HELICOPTER OR ROOF CHUTES TO BE UTILIZED DURING DEMOLITION OR

CONSTRUCTION.

DEMOLITION ROOF PLAN NOTES - THIS SHEET ONLY

1.

2.

3.

4.

5.

6.

7.

8.

REMOVE EXISTING BALLASTED ROOF ASSEMBLY AND INSULATION COMPLETELY

DOWN TO ROOF DECK.

REMOVE AND INSPECT ALL COPING STONES. DISPOSE AND REPLACE DAMAGED

COPING STONES TO MATCH EXISTING.

REPLACE ROOF DRAIN BODIES AND HEADS. ACCESS FROM FLOOR BELOW IN

FINISHED SPACES. COORDINATE WITH COR. PROVIDE INFECTION CONTROL

MEASURES WHEN WORKING IN FINISHED AREAS. COMPLETE ON WEEKEND/

NIGHTS - COORDINATE WITH MEP.

REMOVE EXISTING TAPERED INSULATION DOWN TO ROOF DECK.

REMOVE AND INSPECT ALL COPING STONES. DISPOSE AND REPLACE DAMAGED

COPING STONES TO MATCH EXISTING.

REMOVE AND REPLACE EXISTING ROOF PAVERS.

ALL EXISTING CURBS THAT ARE IN USE ARE TO REMAIN.

REMOVE EXISTING ROLLED ASPHALT ROOF ASSEMBLY AND INSULATION

COMPLETELY DOWN TO ROOF DECK.

ROOF LEGEND

ROOF SLOPE - TO MATCH EXISTING

EXHAUST FAN

ROOF VENT

DIRECTION OF PHOTO VIEW

EF

RV

P1

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

Issued for Bid and Construction 7/31/19

C U s e rs \e b ro w n

\D o c u m e n ts

\1 .5

.0

J

B V

A M

C e b ro w n .r v t

/3

/2

:5

:2

P

M

AD107

PHASE 8 DEMOLITION ROOF PLAN REPLACE MULTI-ROOFS

820 S. Damen Ave,Chicago, IL 60612

537-15-128B

1A, 11, 15, 21, 30

JULY 31, 2019 JLG ELB

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/4" = 1'-0"AD107

2 BUILDING 11A CANTEEN KITCHEN ROOF PLAN - PHASE 8

SCALE: 3/16" = 1'-0"AD107

1 TAYLOR ST. LOADING DOCK ROOF PLAN (1ST FLOOR ROOF) - PHASE 8

N

N

N

RV

RV

P3

P5

P4

P1

P2

RV

RV

P5

KEYPLAN

Sheets
GI000 - COVER SHEET
GI100 - PHASING PLAN
HA101 - PHASE 6 & 7 HAZARDOUS MATERIAL REMOVAL PLAN
AS001 - ARCHITECTURAL SYMBOLS AND ABBREVIATIONS
AD100 - PHASE 1-4 DEMOLITION ROOF PLAN
AD101 - PHASES 1-4 PHOTOS
AD102 - PHASES 1-4 PHOTOS
AD103 - PHASE 5 DEMOLITION ROOF PLAN
AD104 - PHASE 5 PHOTOS

File details come from the government source that posted it. Updated .