36C25218B0106-00005004.pdf
PDF 2 MB Posted
- Solicitation number
- 36C25218B0106
About this file
36C25218B0106 00005 SB101.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25218B0106-00005007.pdf | ||
| 36C25218B0106-00005001.pdf | ||
| 36C25218B0106-00005009.pdf | ||
| 36C25218B0106-00005002.pdf | ||
| 36C25218B0106-00005005.pdf | ||
| 36C25218B0106-00005006.pdf | ||
| 36C25218B0106-00005008.pdf | ||
| 36C25218B0106-00005000.docx | DOCX document | |
| 36C25218B0106-00005003.pdf | ||
| 36C25218B0106-00004000.docx | DOCX document | |
| 36C25218B0106-00003000.docx | DOCX document | |
| 36C25218B0106-00002000.docx | DOCX document | |
| 36C25218B0106-00001001.pdf | ||
| 36C25218B0106-00001000.docx | DOCX document | |
| 36C25218B0106-00001002.pdf | ||
| 36C25218B0106-005.pdf | ||
| 36C25218B0106-002.pdf | ||
| 36C25218B0106-004.pdf | ||
| 36C25218B0106-003.pdf | ||
| 36C25218B0106-006.pdf | ||
| 36C25218B0106-001.docx | DOCX document | |
| 36C25218B0106-000.docx | DOCX document |
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TRANSFORMERS
CONC WALL
TRANSFORMER
SPRINKLER
CONTROL
BOX
FAN
STEPS
RIM 638.86'
8" PVC E 634.86'
RIM 634.53'
12" E 629.37' 12" W 629.37'
12" RCP N 629.47'
RIM 634.65'
12" E 631.15'
RIM 628.69'
6" NW 625.66'
8" E 625.66'
(TO BOTTOM OF BELL)
RIM 628.29'
8" W 625.44'
8" SW 625.38'
6" E 625.64'
RIM 628.48'
6" W 624.58' +/-
(FILLED WITH DEBRIS)
RIM 629.49'
8" N 624.79' +/- 6" W 624.89' +/- 8" S 624.79'+/-
(FULL OF DEBRIS,
UNKNOWN CONNECTIONS)
RIM 637.20'
8" PVC W 632.94'
12" RCP S 631.99'
RIM 640.17'
12" RCP S 634.16'
12" RCP W 635.09'
RIM 642.82'
6" E 637.66' 6" N 637.74' 6" W 637.82'
N 642.79' +/-
METAL FENCE
C H A
IN
LI
N K
F E N C E
S
IG
N
LANDSCAPING
S
IG
N
LANDSCAPING
BR
IC
K
WA
LL
S
IG
N
TUNNEL
ACCESS
HATCH
METAL CAP
S
IG
N
GAS PUMPS
AND VENT
ON CONC
PAD
SIGN
LA
ND
SC
AP
IN
G
SET BENCHMARK, CHISELED " "
ON WEST SIDE, TOP OF
CONCRETE LIGHT POLE BASE
ELEV = 640.24'
ABANDONED TUNNEL ACCESS
F L O W E R
D R
POWER PLANT DR.
B R
IC
K
ASPHAL
T
ASPHALT
GRAVEL
ASPHALT
ASPH
C O N C R E T E
ASPHALT
ASPHALT
A S P H A L T
C O N C R E T E
CONC
C O N C
CONC
C O N C
CONC
C O N C
C O N C
CONC
C O N C
FOUND
IRON ROD
1 STORY
METAL
BUILDING
BLDG 112
SB101
SB101
TYP
TYP
ABANDONED STEAM PIPE (TO
BE REMOVED) (~01+10)
STEP DOWN (~01+31)
APPROX. LOCATION
FRAME 20 ANCHOR
(~01+40)
ABANDONED WATER LINE
(TO BE REMOVED) (~1+90)
MID-HEIGHT PIPE CROSSING (~ 02+08)
START (~00+00)
BAD SPALL AREA
(APPROX 02+50 -02+60)
APPROX. LOCATION FRAME 43
ANCHOR (~03+20)
APPROX LOCATION OF
JOINT LEAK (~04+35)
APPROX. LOCATION FRAME
70 ANCHOR (~05+30)
APPROX. LOCATION FRAME
81 ANCHOR (~ 06+15)
APPROX. LOCATION FRAME
88 ANCHOR (~ 06+80)
PIPE CROSSING MID-
HEIGHT (~ 07+50)
END OF SCOPE OF
PROJECT ( ~ 07+79 )
TOP SLAB NEEDS
REPLACEMENT IN THIS AREA.
OVERHEAD LIGHT FIXTURES
TO BE REMOVED AND
REPLACED
SB101
SB101
NOTES:
1. PROVIDE TEMPORARY FALL PROTECTION COVER OVER OPENING DURING CONSTRUCTION
2. PROVIDE TEMPORARY HORIZONTAL BRACING ACROSS TUNNEL WHILE TOP SLAB IS REMOVED CAPABLE
OF WITHSTANDING 5K TENSION OR COMPRESSION FORCE.
3. PROVIDE TEMPORARY WEATHER PROTECTION OVER TUNNEL OPENING DURING CONSTRUCTION AND
REPAIR WORK.
4. STEAM PIPES TO REMAIN OPERATIONAL DURING DURATION OF CONSTRUCTION. CONTRACTOR TO PLACE PROPER SAFEGUARDS IN PLACE TO PROTECT PIPES DURING CONSTRUCTION AND TO PROMOTE SAFETY
OF WORKERS.
BOILER PLANT
MAUSOLEUM
OVERHEAD LIGHT
FIXTURE, TYP.
REMOVE EXISTING
TOP PLATE
REMOVE EXISTING
BASE PLATE
EXISTING
CONCRETE
TUNNEL
REMOVE EXISTING
PIPE SUPPORT FRAME
REMOVE EXISTING PIPE
SUPPORT FRAME
REMOVE UPPER GUIDE STEEL
PLATE SUPPORT (SEE REPAIR
TABLE FOR LOCATIONS)
REMOVE LOWER GUIDE STEEL
PLATE SUPPORT (SEE REPAIR
TABLE FOR LOCATIONS)
NOTES:
1. CONTRACTOR TO PROVIDE TEMPORARY PIPE SUPPORT UPON DEMOLITION
2. REPLACE ALL FRAMES LABELED 1-101 (SEE REPAIR TABLE) BETWEEN BOILER
PLANT AND ABOVE-GROUND STEAM VAULT "MAUSOLEUM"
3. DO NOT REMOVE FRAMES BEFORE INSTALLING REPLACEMENT.
CUT BOTTOM STEEL TUBE ANCHOR TO
MOST VIABLE STEEL. REMOVE WALL
PLATE ASSEMBLIES. LOCATIONS
INDICATED IN REPAIR TABLE
PROTECT EXISTING LIGHT
FIXTURE AND CONDUIT
L3x3x1/4 GALVANIZED ANGLE
CONNECTION W/ 3/8" DIA. S.S.
EXPANSION ANCHORS
NEW HSS 3x3x1/4
GALVANIZED STEEL TUBE
COLUMN
NEW HDPE
BEARING PAD
NEW HSS 3x3x1/4 GALVANIZED
STEEL TUBE SUPPORT
NEW LOW FRICTION PIPE
SUPPORT ASSEMBLY TO
REPLACE GUIDE STEEL PLATES
L3x3x1/4 GALVANIZED ANGLE
CONNECTION W/ 3/8" DIA. S.S. EXPANSION
ANCHORS
NEW HSS 3x3x1/4
GALVANIZED STEEL
TUBE SUPPORT
EXISTING
CONCRETE
TUNNEL
PROVIDE 1/2" GAP BENEATH TUBE
COLUMN FOR POTENTIAL DRAINAGE
1/4" 2" MIN
1/4"
NEW 3/8" x 9" x 9" GALV. STEEL
PLATE W/ (4) 1/2" DIA. S.S.
EXPANSION ANCHORS
1/4
SB101
NOTE:
1. REPLACE FRAMES 1-101 (SEE REPAIR TABLE) BETWEEN BOILER PLANT AND ABOVE-
GROUND STEAM VAULT "MAUSOLEUM"
2. INSTALL FRAMES 6"-12" HORIZONTALLY FROM ORIGINAL FRAMES. DO NOT REMOVE
ORIGINAL FRAMES UNTIL NEW ASSEMBLIES ARE COMPLETELY INSTALLED.
1/4 3"
PROTECT EXISTING LIGHT
FIXTURE AND CONDUIT
CUT, REMOVE, AND REPLACE TOP SLAB
1'
DRILL AND EPOXY #5 "L" BARS @ 12"
O.C. W/ 12" EMBEDMENT
12"
24"
CONT. #5 BARS @ 12" O.C. TOP & BOTT.
6' - 7 1/2"
#5 BARS @ 12" OC
TOP & BOTT
NOTE:
1. CONTRACTOR TO FIELD-VERIFY ALL DIMENSIONS
2. PIPES AND SUPPORTS NOT SHOWN FOR CLARITY
ROUGHEN SURFACE TO 1/4"
AMPLITUDE AND APPLY
BONDING AGENT, TYP
2" PROTECTION BOARD
WATERPROOFING
EXISTING CONCRETE
TUNNEL
CONTINUOUS HYDROPHILIC
WATER STOP
SLOPE PROTECTION BOARD FOR DRAINAGE
REMOVE EXISTING LIGHT FIXTURE AND CONDUIT
IN AREA OF TUNNEL WITH ROOF REMOVAL.
REINSTALL LIGHT FIXTURE AFTER
CONSTRUCTION OF NEW CONCRETE ROOF
INSTALL TEMPORARY JUNCTION BOX ON WALL
OF TUNNEL TO MAINTAIN LIGHT SYSTEM
OUTSIDE AREA OF TUNNEL ROOF REWORK
PROVIDE PVC COATED RIGID METAL CONDUIT
AND REPLACE CONDUCTORS WITH SAME WIRE
GAUGE AND XHHW 2-WIRE INSULATION. FIELD
VERIFY CONDUIT AND CONDUCTOR SIZE.
BOXES SHALL BE CAST ALUMINUM FS TYPE
BOXES.
ETCH FRAME NUMBER INTO FACE
OF STEEL COLUMN AT 2 SIDES. (SEE
REPAIR TABLE FOR DESIGNATED
FRAME NUMBERS)
EXISTING TUNNEL TOP SLAB
NEW TUNNEL TOP SLAB
CONTINUOUS HYDROPHILIC
WATERSTOP
ROUGHEN EXISTING SURFACE TO 1/4"
AMPLITUDE AND APPLY BONDING AGENT
#5 BARS @ 12"
EPOXY-DOWEL REBAR INTO EXISTING
W/ 6" MIN EMBEDMENT.
1/2" x 9" x 10" GALV. PLATE W/ (4) 3/8"
DIA. EXPANSION ANCHORS, GALV.
COAT ASSEMBLY W/ MIN. 1/8" LAYER
OF EPOXY AFTER INSTALLATION.
NOTES:
1. SEE REPAIR TABLE FOR ANCHOR LOCATIONS.
2. ADDITIONAL STEEL AND SUPPORTS NOT SHOWN FOR CLARITY
1/4 3@121/2" x 1'-0" x 1'-5" GALV. STEEL PLATE
WELDED TO ANCHOR TUBES.
GALV. SHIM PLATES AS REQUIRED
1/2" x 4" x 8" GALV. PLATE 1/4 3"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
GUIDON DESIGN INC.
905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204
317.800.6388 | WWW.GUIDONDESIGN.COM
SUSTAINABLE ARCHITECTURE + ENGINEERING
PROJECT LEAD
Architect, Structural Engineer, Civil Engineer
NON-SPRINKLERED
C U s e rs
\b th o m a s \D o c u m e n ts
\1 .1
.0
T u n n e l M o d e l_ b ill th o m s .r v t
/2
/2
:2
:0
A
M
SB101
STEAM TUNNEL PLANS AND
SECTIONSRING & DuCHATEAU LLP
17400 W. CAPITOL DRIVE
BROOKFIELD, WI 53045
REPAIR CAMPUS STEAM TUNNEL
AND STRUCTURAL SUPPORTS
MILWAUKEE VAMC
695-17-119
1 SEPTEMBER 2017 MV LL
100% BID SET
MILWAUKEE VAMC
BLDG 112
SCALE: 1" = 20'-0"SB101
1 TUNNEL PLAN
N
SCALE: 3/4" = 1'-0"SB101
2 TYPICAL EXIST TUNNEL SECTION
SCALE: 3/4" = 1'-0"SB101
3 TYPICAL REPAIR SECTION
SCALE: 3/4" = 1'-0"SB101
6 TOP SLAB REPLACEMENT/WATERPROOFING DETAIL
SCALE: 3" = 1'-0"SB101
4 FRAME LABEL DETAIL
SCALE: 3/4" = 1'-0"SB101
5 CONNECTION TO EXISTING TOP SLAB
SCALE: 3/4" = 1'-0"SB101
7 ANCHOR
Revisions: Date:
29 JAN 2018
ACCOMPANYING AMENDMENT 36C25218B0106 00005
VHAMIWAvenaP Line
VHAMIWAvenaP Line
VHAMIWAvenaP Line
VHAMIWAvenaP Line
VHAMIWAvenaP Typewritten Text
VHAMIWAvenaP Text Box Ammendment 5
| Sheets |
| SB101 - STEAM TUNNEL PLANS AND SECTIONS |
File details come from the government source that posted it.