About this file

36C25218B0106 00002 36C25218B0106 00002.docx

View the file

Other files

File Type Posted
36C25218B0106-00005007.pdf PDF
36C25218B0106-00005001.pdf PDF
36C25218B0106-00005009.pdf PDF
36C25218B0106-00005002.pdf PDF
36C25218B0106-00005005.pdf PDF
36C25218B0106-00005006.pdf PDF
36C25218B0106-00005008.pdf PDF
36C25218B0106-00005000.docx DOCX document
36C25218B0106-00005004.pdf PDF
36C25218B0106-00005003.pdf PDF
36C25218B0106-00004000.docx DOCX document
36C25218B0106-00003000.docx DOCX document
36C25218B0106-00001001.pdf PDF
36C25218B0106-00001000.docx DOCX document
36C25218B0106-00001002.pdf PDF
36C25218B0106-005.pdf PDF
36C25218B0106-002.pdf PDF
36C25218B0106-004.pdf PDF
36C25218B0106-003.pdf PDF
36C25218B0106-006.pdf PDF
36C25218B0106-001.docx DOCX document
36C25218B0106-000.docx DOCX document
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2.

AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE

OF PAGES

10A. MODIFICATION OF

CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV.

11/2016) is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITE M 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR

43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes r eference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

BY

Contractor

16C. DATE SIGNED

14.

DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME

AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS

OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 00002 01-16-2018 695-18-1-6985-0007 695-17-119 36C252 Department of Veterans Affairs Great Lakes Acquisition Center (GLAC) 115 S 84th Street, Suite 101 Milwaukee WI 53214-1476 36C252 Department of Veterans Affairs Wm. S. Middleton VA Hospital Attn: Stacy Hoover 90C Overlook Terrace Madison WI 53705-2254 To all Offerors/Bidders

36C25218B0106 12-20-2017

X X X X

SEE ATTACHED SUMMARY OF CHANGES

REMINDER: THE BID OEPNING WILL BE HELD AT THE MADISON VA HOSPITAL.

William S. Middleton VA Hospital

ATTN: Stacy Hoover (90C) 2500 Overlook Terrace Madison, WI 53705-2254

Ensure all correspondence is mailed to or hand-carried to the address listed in block 7 of this SF30.

Jerrod J.

Schleis Contracting Officer

ACCOMPANYING AMENDMENT– 36C25218B0106 - 00002

REPAIR CAMPUS STEAM TUNNEL AND STRUCTURAL SUPPORTS

CLEMENT J. ZABLOCKI VA MEDICAL CENTER, MILWAUKEE, WI

I. THE FOLLOWING CHANGES ARE TO BE MADE ON PROJECT SPECIFICATIONS:

NONE

II. THE FOLLOWING CHANGES ARE TO BE MADE ON PROJECT DRAWINGS:

NONE

III. THE FOLLOWING QUESTIONS AND ANSWERS / CLARIFICATIONS ARE THE RESULT OF BIDDERS REQUEST(S) FOR INFORMATION:

1. Based on the walk thru it was observed that there are areas that may require patching tight behind existing piping. There is concern of being able to access these areas with tools, equipment and personnel to properly fix these locations. Has this been considered?

Response:

· The means and methods to patch and repair behind existing piping is determined by the Contractor.

1. Please confirm as to whether or not there is any suspected asbestos issues.

Response:

· No survey was completed. Any suspected asbestos must be brought to the attention of the COR immediately for remediation by VA.

3. The statement of work lists cracked concrete as a work scope item. There is no specification or detail for the repair of cracked concrete. It is assumed standard epoxy injection would be required. Is there any approximation of lineal footage of cracked concrete to be repaired?

Response:

· Epoxy injection is the preferred method of repair; however, wet and leaking cracks will likely require polyurethane injections for a more watertight condition. Contractor to assume ~200 lineal feet of crack repair.

4. Wage Determination lists two categories for Concrete Finishers noted on Page 6-CEMENT MASON/CONCRETE FINISHER...$ 33.95 21.93 Fringes $21.93 and Page 7- Laborers: Concrete Worker $ 16.34 3.59 Fringe $3.59. Please clarify which labor rate is to be used?

· The labor rate will be determined by the job function being performed. For further clarification, please contact:

Milwaukee Area Office US Dept. of Labor Wage & Hour Division 310 W. Wisconsin Ave., Suite 1170 Milwaukee, WI 53203

Phone:

(414) 297-1590

1-866-4-USWAGE

(1-866-487-9243)

5. What is the existing waterproofing material on the tunnel?

Response:

· Existing Waterproofing Material, if any, is unknown.

6. The Specification call for repair of undefined concrete spalled areas. Can you define the quantity or allow for a Unit Cost price to be included in the Sonication?

Response:

· Areas for repair are provided in the table on SI001.

7. Please provide soil borings for the areas to be excavated.

· No soil borings performed during design for this project.

8. Please provide elevation of the bottom of the tunnel to include sections where there are changes.

· Elevations could not be verified through original drawings. Based on 3D scans, the estimates for the interior top of floor elevations for the following stations are:

3+00 -> 631’ 3+21.5 -> 629’ 4+61 -> 626.5’ 5+39 -> 624’ 5+80 -> 624’

Based on the profile, we have assumed constant slope between indicated stations. Actual field elevations may vary. Contractor to verify.

9. Please provide tunnel dimensions to include wall thickness.

Response:

· Typical interior dimensions are 6’-0” (V) x 4’-6” (H). Wall thickness could not be verified, but is estimated to be between 8-10”.

10. Please provide dimensions of the steel frames used as pipe supports

Response:

· Vertical members will occupy 6’-0” floor-to-ceiling height, with HDPE pad thickness and erection gaps taken into account. Horizontal distance from face of wall to outside of vertical member is ~3’-0”

11. Detail 3, on SB101 shows the pipes passing through the stand. The supplier for the new friction pipe support assembly needs to know the pipe sizes and thickness of insulation. Is it possible for the VA to post a piping diagram? Walking through the tunnel I don’t recall if the pipe increase or decreases along the way or if additional pipes enter or exit before the Mausoleum. The piping plan would be useful.

· Piping Diagram is not available.

12. Detail 6, on SB101 is labeled - “cont. #5 bars 12” O.C. Top & Bott.” With arrows pointing at the left and far right. It appears there is another mat of rebar below that just above the #5 “L” bars @ 12” O.C. W/ 12” embedment. Is there 2 mats of rebar with #5 bar @ 12” O.C. each direction?

· Yes, there are two mats of #5s @ 12”. This is what the “TOP & BOTT” is referencing.

13. 6” white ash are difficult to find- Generally not available due to ash borer issues and nursery’s not growing them. Potential substitutes would be Shag bark hickory, Sugar maple and Hackberry.

Response:

· Sugar Maple is acceptable substitute.

14. Black Oak is not available in 4” from most nursery’s due to size and not transporting well at this size. Could go a little smaller or substitute burr oak, red oak or Chinkapin.

Response:

· Smaller size is acceptable.

15. 6” white oak is generally not available. Could substitute Swamp oak. Oak trees do not survive transplanting once they reach a certain size. We feel this would be a costly item with limited survivability. If the VA or Architect has a place in mind that they were able to find these trees in these sizes we would like to get that info to meet what is shown on the documents. Otherwise we would like to consider smaller sizes or the above mentioned substitutes.

Response:

· Swamp oak is acceptable substitute.

16. Specification, Section 05 12 00 Structural Steel Framing – 1.5 Quality Assurance –B. Installer Qualifications: AICS Quality Certification Program participant designated as AISC-Certified Erector. Cat. ACSE

1. Regularly installs specified products

2. Installed specified products with satisfactory service on similar installations for a minimum of 5 years.

Requiring this Certification is a rising cost impact to bidders. We are not aware of any Structural Steel Fab/Install contractors that are bidding as a prime contractor on this project. None of the Steel Fabricators I am getting quotes from will be quote the installation of the pipe stands. (stating the project is too small for their scope) We feel the fabricated stands are not a structural element of the tunnel, rather a structural device designed to carry piping. Installing these stands is more similar to installing pipe columns, pallet racks, H.D. shop machinery etc. which are all fabricated at a AISC Certified Shop. L-ECS is requesting a variance to delete the requirement of AISC Cert. Erector to install the bolt-in installation of the pipe stands.

Response:

· Welders and suppliers must be certified per the Specifications. Work must be inspected by AISC Erector to verify compliance.

17. There is nothing called out on the plan or specifications for attaching the 3 smaller pipes (electrical conduit?) only the 2 large steam pipes offer a detail & specification for attachment to the new pipe stands. Please provide more information on attachment to the new stands.

Response:

· The smaller pipes do not require lateral force stabilization, and currently are connected to the stands using standard pipe hangers or simply resting on the frame. These elements are to be re-used and only replaced if necessary.

18. Det. #7 SB101 shows a pipe close to the floor. The notes call for a ½” x 1’-0” x 1’-5” Galv. Steel Plate welded to anchor tubes. This detail is not clear on the attachment to the pipe or locations on Tunnel Repair Locations chart (S1001) Only happens at 2 locations? We are requesting more clarity on this detail. (D7/SB101) I also would mention welding galvanized stock is not S.O.P. with any AICS procedure. The assembly would be manufactured (welded) then dipped in the galvanizing process.

Response:

· Detail 2/SB101 shows that the existing anchors should be cut to a viable length. The tube shown in 7/SB101 is already connected to the existing pipe and will remain, while new plate steel will be placed underneath. The table on SI001 lists the specific sections where 7/SB101 applies (6 shown). Dipping the plate assembly is acceptable. Contractor may submit high-performance protective paint coating for approval if field welding of galvanized steel is a concern.. ½” x 1’-0” x 1’-5” plate is not a part of the assembly and may be ignored.

19. Will it be acceptable to backfill tunnel with excavated spoils?

Response:

· It depends on the quality of the soils excavated. If the soil is in poor condition than it will need to be replaced with acceptable fill. Refer to Specifications.

20. Does the traffic control signage required for the project need to be turned over to the VA at the completion of the project?

Response:

· No, it should be provided and retained by the contractor.

21. Is the steam tunnel considered a permit required confined Space? –

Response:

· No, it is a controlled entry and must be coordinated with the COR, Steam Plant Staff and Police.

22. Detail 5/SB101 shows the top slab replacement. If galvanized metal decking that spans across from the top of the walls as part of the engineered shoring system is used, is it acceptable to leave the metal decking in place after the concrete is poured?

Response:

We will consider allowing deck to remain provided the following conditions are met: the deck should not unreasonably encroach (~2”) on head space within the tunnel, nor interfere with embedded connections and waterproofing between joints. Contractor is responsible for providing a deck designed to support appropriate loading conditions.

IV. GENERAL INFORMATION:

1. NOTE: The bid opening remains on 1/23/2018 at 1:00pm Local Time at the following location:

Department of Veteran Affairs Wm. S. Middleton VA Hospital Attn: Stacy Hoover 90C 2500 Overlook Terrace Madison WI 53705-2254

THERE ARE NO FURTHER CHANGES

ACCOMPANYING AMENDMENT 36C25218B0106 00002