About this file

36C25218B0106 00005 CD101.pdf

View the file

Other files

File Type Posted
36C25218B0106-00005007.pdf PDF
36C25218B0106-00005001.pdf PDF
36C25218B0106-00005009.pdf PDF
36C25218B0106-00005005.pdf PDF
36C25218B0106-00005006.pdf PDF
36C25218B0106-00005008.pdf PDF
36C25218B0106-00005000.docx DOCX document
36C25218B0106-00005004.pdf PDF
36C25218B0106-00005003.pdf PDF
36C25218B0106-00004000.docx DOCX document
36C25218B0106-00003000.docx DOCX document
36C25218B0106-00002000.docx DOCX document
36C25218B0106-00001001.pdf PDF
36C25218B0106-00001000.docx DOCX document
36C25218B0106-00001002.pdf PDF
36C25218B0106-005.pdf PDF
36C25218B0106-002.pdf PDF
36C25218B0106-004.pdf PDF
36C25218B0106-003.pdf PDF
36C25218B0106-006.pdf PDF
36C25218B0106-001.docx DOCX document
36C25218B0106-000.docx DOCX document
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

GUIDON DESIGN INC.

905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204

317.800.6388 | WWW.GUIDONDESIGN.COM

SUSTAINABLE ARCHITECTURE + ENGINEERING

PROJECT LEAD

Architect, Structural Engineer, Civil Engineer

Consultant:

NON-SPRINKLERED

BLDG 112RING & DuCHATEAU LLP

17400 W. CAPITOL DRIVE

BROOKFIELD, WI 53045

(414) 778-1700

REPAIR CAMPUS STEAM TUNNEL

AND STRUCTURAL SUPPORTS

MILWAUKEE VAMC

695-17-119

JIM BEIER, COR, VAMC

Revisions: Date: 01 SEPTEMBER 2017

100% BID SET

KC HF

0 2010

N

CD101

SITE DEMOLITION PLAN

1/29/2018

ACCOMPANYING AMENDMENT 36C25218B0106 00005

AutoCAD SHX Text

TRANSFORMER

AutoCAD SHX Text

CONC

AutoCAD SHX Text

CONC

AutoCAD SHX Text

CONC

AutoCAD SHX Text

CONC

AutoCAD SHX Text

FAN

AutoCAD SHX Text

CONC

AutoCAD SHX Text

1 STORY METAL BUILDING

AutoCAD SHX Text

CONC

AutoCAD SHX Text

STEPS

AutoCAD SHX Text

BLDG 112

AutoCAD SHX Text

RIM 642.82' 6" E 637.66' 6" N 637.74' 6" W 637.82'

AutoCAD SHX Text

PER PLAN

AutoCAD SHX Text

PER PLAN

AutoCAD SHX Text

PER PLAN

AutoCAD SHX Text

TUNNEL ACCESS VAULT

AutoCAD SHX Text

ABANDONED STEAM (PER PLAN)

AutoCAD SHX Text

ABANDONED STEAM (PER PLAN)

AutoCAD SHX Text

TRANSFORMER

AutoCAD SHX Text

SPRINKLER CONTROL BOX

AutoCAD SHX Text

CONC

AutoCAD SHX Text

PIPE CROSSING IN UNDERGROUND STEAM TUNNEL

AutoCAD SHX Text

LIMITS OF EXCAVATION

AutoCAD SHX Text

CONTRACTOR TO PROTECT EXISTING UTILITIES (TYP)

AutoCAD SHX Text

AutoCAD SHX Text

GRAVEL

AutoCAD SHX Text

ASPHALT

AutoCAD SHX Text

CONCRETE

AutoCAD SHX Text

ASPHALT

AutoCAD SHX Text

CONC WALL

AutoCAD SHX Text

LIMITS OF EXCAVATION

AutoCAD SHX Text

1 STORY CONC BUILDING

AutoCAD SHX Text

CONCRETE

AutoCAD SHX Text

CONC

AutoCAD SHX Text

CONCRETE

AutoCAD SHX Text

PER PLAN

AutoCAD SHX Text

PER PLAN

AutoCAD SHX Text

PER PLAN

AutoCAD SHX Text

PIPE CROSSING IN UNDERGROUND STEAM TUNNEL

AutoCAD SHX Text

LUKE J LEISING 43897-6 INDIANAPOLIS, IN

AutoCAD SHX Text

PANEL 1

AutoCAD SHX Text

PANEL 2

AutoCAD SHX Text

PANEL 3

AutoCAD SHX Text

PANEL 4

AutoCAD SHX Text

DEMOLITION PLAN KEYNOTES

AutoCAD SHX Text

1. SAWCUT AND REMOVE ASPHALT PAVEMENT AND SAWCUT AND REMOVE ASPHALT PAVEMENT AND GRAVEL BASE. GRAVEL BASE. 2. SAWCUT AND REMOVE CURB AND GUTTER. SAWCUT AND REMOVE CURB AND GUTTER. 3. REMOVE TREE AND ROOTBALL. REPLACE IN KIND. SEE REMOVE TREE AND ROOTBALL. REPLACE IN KIND. SEE SHEET CS101 FOR TREE REPLACEMENT. 4. REMOVE CONCRETE SIDEWALK. REMOVE CONCRETE SIDEWALK. 5. CUT AND CAP ABANDONED STEAM LINE IN TUNNEL. CUT AND CAP ABANDONED STEAM LINE IN TUNNEL. 6. CUT AND CAP ABANDONED WATER LINE IN TUNNEL. CUT AND CAP ABANDONED WATER LINE IN TUNNEL. 7. TEMPORARY SUPPORT POLE BASE DURING CONSTRUCTION, TEMPORARY SUPPORT POLE BASE DURING CONSTRUCTION, EXISTING BASE AND POLE TO REMAIN. TREE REMOVAL SCHEDULE:

AutoCAD SHX Text B

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text

MATCHLINE

AutoCAD SHX Text

MATCHLINE

AutoCAD SHX Text

MATCHLINE

AutoCAD SHX Text

MATCHLINE

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text B

AutoCAD SHX Text

MATCHLINE

AutoCAD SHX Text A

AutoCAD SHX Text A

AutoCAD SHX Text

MATCHLINE

AutoCAD SHX Text

VHAMIWAvenaP Line

VHAMIWAvenaP Line

VHAMIWAvenaP Line

VHAMIWAvenaP Line

VHAMIWAvenaP Typewritten Text

VHAMIWAvenaP Text Box Ammendment 5

Sheets and Views
DEMOLITION

File details come from the government source that posted it.