This document is Amendment A00002 to a Request for Proposal (RFP) for installing an analog phone line to Building 6 at VA Northern Indiana Health Care, Fort Wayne Campus (Project Number 610A4-26-510). The solicitation is issued by the Department of Veterans Affairs, Network Contracting Office 10, Indianapolis, Indiana.
The amendment extends the offer receipt deadline to September 10, 2026, at 1:30 PM EDT and provides answers to nine clarification questions submitted by potential offerors. Key technical requirements include installation of Category 3 (Cat 3) 25-pair copper twisted-pair wiring from the 100-pair Building Entrance Protector to the 66-block, with higher categories acceptable if copper twisted-pair is used. Cable installation must be field-certified to meet TIA 568-C.2 performance category requirements. The scope covers work in maintenance holes MH #6, MH #7, and MH #8, which contain existing fiber optic cables; MH #7 and MH #8 are configured as double vaults with one side dedicated to 480V power and the other to communications. Termination may be made directly onto the existing 66-block without requiring new building entrance protector or surge-protection modules. The contractor must comply with all Generic Division 27 requirements, including three comparable installations, OEM authorization, material-conformance certifications, cable samples, and test-report formats. For confined-space rescue operations, the contractor may designate FWFD Special Ops at 260-427-1478 rather than providing a dedicated onsite team. Firestop inspection will be conducted by the Contracting Officer's Representative using 3M Fire Barrier Moldable Putty to replace any putty removed during installation. The solicitation is structured as an all-or-nothing proposal; partial proposals will not be considered, and all offerors must perform all aspects of the required work.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODECODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 3
0002 08-28-2026 610-26-3-6902-0015 610A4-26-510
36C250
Department of Veterans Affairs Network Contracting Office 10 8888 Keystone Crossing Suite 325 Indianapolis IN 46240-4628
36C250
Department of Veterans Affairs Network Contracting Office 10 8888 Keystone Crossing Suite 325 Indianapolis IN 46240-4628
To all Offerors/Bidders
36C25026Q0789
X
X X
** HOUR & DATE for Receipt of Offers is EXTENDED to: 09-10-2026 13:30 EDT
610-3650162-6901-854200-3220-23NRNR001
X 1
Install Analog Phone Line - 610A4-26-510 The purpose of this amendment is to do the following:
1) provide answers to question and clarification
2) extend the request for proposal time line
Please include the full amendment document in final offer with associated documentation
Other than these changes, the terms and conditions of this solicitation remain unchanged and in effect.
Shelton Beasley Contracting Officer
CONTINUATION PAGE
INSTALL ANALOG PHONE LINE TO BUILDING 6
VA NORTHERN INDIANA HEALTH CARE
FORT WAYNE CAMPUS
PROJECT NUMBER - 610A4-26-510
QUESTION AND ANSWER (RFI)
CORRECTION AND CLARIFICATION
Disclaimer: Questions that have not received a response were either unclear or lacked sufficient specificity for an answer. All questions must be submitted by 11:30 am on August 28, 2026, to be recorded.
Question 10: What systems are currently installed in the maintenance holes? Is high voltage present?
Answer 10: Fiber optic cables are present.
Question 11: Please provide available information regarding MH #8, MH #6 and MH #7, including dimensions, depth, access conditions, water infiltration, existing cable racks, existing cable quantities, conduit occupancy and known hazards
Answer 11: MH#6 measures 6 feet by 6 feet by 7 feet 6 inches. The exact dimensions of MH#7 and MH#8 are unknown; however, visual inspection indicates they have a smaller footprint.
MH#7 and MH#8 are configured as double vaults, with one side dedicated to 480V power and the other two communications. All work will occur on the communications side. All maintenance holes are accessible from the grounds. Recent work in MH#7 and MH#8 required water removal from the vaults. Each vault is expected to contain four fiber runs.
Question 12: Please confirm whether a new building entrance protector and surge-protection modules are required at Building 6 or whether termination directly onto the existing 66-block is acceptable.
Answer 12: Termination may be made directly onto the existing 66-block.
Question 13: Please confirm whether the contractor must provide a dedicated onsite confined-space rescue team or whether an evaluated third-party emergency rescue service may be designated. Please also identify any.
VANIHCS-specific confined-space orientation, permit approval, rescue coordination, or equipment requirements beyond 29 CFR 1926 Subpart AA and the provided VA CSEP form?
Answer 13: Utilization of FWFD SPECIAL OPS at 260-427-1478 for rescue operations is acceptable.
No additional requirements are specified beyond 29 CFR 1926 Subpart AA and the VA CSEP.
Question 14: Please confirm the required copper-pair acceptance tests and reporting format for all 25 pairs. Please also confirm whether the final functional test consists of restoring and verifying the blue call-pole analog communication circuit and identify who will witness and approve the test.
Answer 14: Following installation, each cable shall be field-certified to meet the performance category requirements in accordance with TIA 568-C.2.
Restoration and verification of the blue call-poles is not required. The scope of work extends from the 100-pair Building Entrance Protector to the 66-block.
Question 15: Please confirm whether the generic Division 27 requirements for three comparable installations, OEM authorization, OEM material-conformance certifications, cable samples and proposed test-report formats apply in full to this small cable-replacement project?
Answer 15: Yes, the Generic Division 27 requirements apply in full to this project.
Question 16: Please identify the fire-resistance rating and construction of the existing Building 3 OIT telecommunications-room penetration. Please provide the existing listed firestop-system number, if available, or confirm that the contractor may select a compatible listed system after verifying field conditions.
Answer 16: A 3M Fire Barrier Putty Sleeve Kit is currently installed and will remain in place. Any putty removed during cable installation must be replaced with 3M Fire Barrier Moldable Putty.
Installation must be repacked with 3M Fire Barrier Moldable Putty.
Question 17: Please confirm whether an independent third-party firestop inspector is required for the single telecommunications-room penetration. If required, please identify the required inspector qualifications, inspection report format, and required advance.
notice.
Answer 17: Inspection will be conducted by the Contracting Officer’s Representative (COR). An independent third-party firestop inspector is not required.
Question 9: Can Cat5 25-pair wire be used instead of Cat3 25-pair wire?
Answer 9: Category 3 (Cat 3) is the minimum acceptable standard. Higher categories are also acceptable, provided the wiring is copper twisted-pair rather than fiber optic or other types.
NOTE: This solicitation is an all-or-nothing request for proposal. Partial proposals will not be considered. All offerors must perform all aspects of the required work.
END OF AMENDMENT A00002