Site Visit Sign In Sheet 1.pdf
PDF 941 KB Posted
- Solicitation number
- 36C25026B0050
About this file
This is an internal planning document for an overhead page system project, specifically an "Overhead Page Walk-Thru" meeting notes sheet containing preliminary requirements and action items.
The document outlines key project specifications and considerations: contractors are required to submit quotes for 800 speakers, with specific cable color requirements designated as "PINK." The current system uses Valcom speakers. Project parameters under discussion include a proposed Period of Performance of 180 days. The document indicates coordination with the Office of Information Technology (OI&T) is ongoing to clarify project scope and requirements. Contact information is provided for two potential contractors: Nathan Gerke from Gerke Electric (Nathan.gerke@gerkelectric.com) and Joe Baker from Echo 24 (jbaker@echo24.com). The document notes that no additional building will be added to the Overhead Page System, and there is discussion about the overall project size scope with contractors.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
No additional building to be added to the Overhead Page System.
Working with OI&T to get a better idea of this.
Question contractor brought up. Valcom is what we have now.
Have everyone quote for 800 speakers to.
Run specific cable color for speakers "PINK"
Talking to the contractors, about size of project. Might want to make Period of Performance it to 180 days.
VHADAYRobinT Cross-Out