This document is an Asbestos Inspection Report for the Battle Creek Veterans Affairs Medical Center in Battle Creek, Michigan. The report summarizes the findings of a pre-renovation asbestos inspection conducted by Alliance Environmental Group on November 14-17, 2016. 280 samples of window caulking and glazing were collected from various buildings. Several materials were found to contain asbestos, including exterior and interior caulking, glazing, and other components. The report provides details on the specific asbestos-containing materials and their locations. It also outlines the procedures and requirements for handling materials containing less than 1% asbestos, such as the use of wet methods, prompt cleanup, and employee exposure monitoring. The report is intended to provide information for the upcoming renovation project at the medical center.
The related federal contract opportunity is for a project to Renovate Restrooms at the VA Medical Center in Battle Creek, Michigan. The Department of Veterans Affairs plans to issue an Invitation for Bid (IFB) on or about August 15, 2024 for this project, which has an estimated value between $2,000,000 and $5,000,000. This acquisition is a 100% set-aside for qualified Service-Disabled Veteran Owned Small Businesses (SDVOSB).
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
THE ENVIRONMENTAL SOLUTION
ALLIANCE
Environmental Group, Inc.
5153 COMMERCE SQUARE DRIVE, SUITE E, INDIANAPOLIS, INDIANA 46237
TEL (317) 865-3400 ▪ FAX (317) 865-3401 ▪ 800-783-7523
www.aegindy.com
December 16, 2016
Mr. Terry Thornsbury, AIA Viridian Architectural Design, Inc.
2020 East Washington Street Boulevard Suite 200 Fort Wayne, Indiana 46803
RE: ASBESTOS INSPECTION
BATTLE CREEK VETERANS AFFAIRS MEDICAL CENTER
ALLIANCE ENVIRONMENTAL GROUP PROJECT NUMBER 16-0151-A
Dear Mr. Thornsbury:
Pursuant to your request, on November 14 through November 17, 2016, Alliance Environmental Group (Alliance) conducted a pre-renovation asbestos inspection at Battle Creek Veterans Affairs Medical Center in Battle Creek, Michigan. Asbestos bulk samples were collected from interior and exterior caulking and glazing from buildings 1, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 24, 25, 26, 27, 28, 30, 85, 101, 109, 134, 136 and 138. Samples were analyzed by EMSL Analytical, Inc. utilizing polarized light microscopy (PLM) by EPA 600/R-93/116 Method and friable samples containing less than 1% asbestos were verified by EPA 600/R-93/116 with 400 Point Count. The following serves to summarize results of the inspection performed and a copy of the bulk sampling data sheet (16-0151-A) from the inspection is attached for your review.
In accordance with federal and state regulations, Alliance conducted an asbestos inspection of the aforementioned locations. Specifically, 280 samples of window caulking and glazing were collected.
Federal, state, and local regulations define asbestos-containing material (ACM) as any material containing greater than 1% asbestos.
The following materials are determined by the inspector to be friable and reported by the laboratory to be asbestos containing:
Dark Gray Exterior Caulking on Building 27/28 Metal Frame Gray Exterior Caulking on Building 30 Glass Block Wall White Interior Caulking on Building 134 Galvanized Frame with Flat Mullions Dark Gray Exterior Glazing on Building 136 Aluminum Frame with 3’ x 2’ Panes Gray Exterior Caulking on Building 136 Aluminum Frame with 3’ x 2’ Panes
The following materials are determined by the inspector to be non-friable and reported by the laboratory to be asbestos containing:
Gray Exterior Caulking on Building 1 Aluminum Frame Gray Exterior Caulking on Building 5 Aluminum Frame Gray Interior Caulking on Building 5 Aluminum Frame Gray Exterior Caulking on Building 6 Aluminum Frame Gray Interior Caulking on Building 6 Aluminum Frame Gray Exterior Caulking on Building 8 Aluminum Frame Gray Interior Caulking on Building 8 Aluminum Frame Gray Exterior Caulking on Building 11 Aluminum Frame lfedorczyk Text Box Z:\Viridian\Projects\20160019\JobDocs\02-SD\29-VA SD Submission\Battle Creek VA Bulk Sampling Report with attachments
Asbestos Inspection Battle Creek VA December 16, 2016 Page 2
Gray Interior Caulking on Building 11 Aluminum Frame Gray Exterior Caulking on Building 13 Aluminum Frame Gray Exterior Caulking on Building 14 Aluminum Frame Gray Exterior Caulking on Building 14 Off White Vent in Opening White Exterior Caulking on Building 14 Off White Vent in Opening Gray Exterior Caulking on Building 24 Aluminum Frame Gray Interior Caulking on Building 24 Aluminum Frame Gray Interior Caulking on Building 136 Aluminum Frame with 1’ x 3’ Light Gray Interior Caulking on Building 136 Aluminum Frame with 2’ x 3’ Gray Interior Caulking on Building 136 Aluminum Frame with 4’ x 5’
The following materials are determined by the inspector to be friable by the inspector and reported by the laboratory to contain less than 1% asbestos:
White Exterior Glazing on Building 6 Wood Frame Gray Exterior Glazing on Building 8 Wood Frame Gray Exterior Caulking on Building 9 Wood Frame White Exterior Caulking on Building 10 Aluminum Frame Cream Interior Caulking on Building 13 Wood Frame White Exterior Glazing on Building 14 Attic Wood Frame Translucent Interior Caulking on Building 26 Metal Frame Gray Exterior Caulk on Building 26 3’ x 5’ Window Opening Cover White Exterior Caulking on Building 26 Metal Frame Light Gray Interior Glazing on Building 27/28 Metal Frame Light Gray Interior Caulking on Building 27/28 Metal Frame Light Gray Exterior Glazing on Building 27/28 Metal Frame White Exterior Caulking on Building 134 Galvanized Frame with Rounded Mullions White Exterior Glazing on Building 134 Galvanized Frame with Rounded Mullions White Interior Glazing on Building 134 Galvanized Frame with Rounded Mullions White Exterior Glazing on Building 136 Aluminum Frame 2’ x 3’ Panes Gray Interior Glazing on Building 138 Thin Aluminum Frame Gray Interior Glazing on Building 138 Thick Aluminum Frame
The following materials are determined by the inspector to be non-friable and reported by the laboratory to contain less than 1% asbestos:
White Exterior Glazing on Building 4 Aluminum Frame Gray Exterior Caulking on Building 4 Aluminum Frame White Exterior Caulking on Building 6 Wood Frame Off White Exterior Caulking on Building 8 Aluminum Frame White Interior Caulking on Building 14 Aluminum Frame Off White Exterior Caulking on Building 26 Aluminum Frame Light Gray Interior Caulking on Building 27/28 Metal Frame
All other materials sampled did not contain asbestos.
The state of Michigan licensed inspector for this project was Mike Ardis; license number A49064, expiration date 06/07/2017.
Contact with materials containing less than one percent asbestos, according to OSHA, still require some limited safe work practices, prohibitions, and provisions including:
Asbestos Inspection Battle Creek VA December 16, 2016 Page 3
Wet methods, or wetting agents, to control employee exposures during asbestos handling, mixing, removal, cutting, application, and cleanup except where employers demonstrate that the use of wet methods is infeasible due to, for example the creation of electrical hazards.
Prompt clean-up and disposal of wastes and debris contaminated with asbestos in leak-tight containers.
High-speed abrasive disc saws that are not equipped with point-of-cut ventilator or enclosures with HEPA filtered exhaust air are prohibited.
Compressed air used to remove asbestos, or materials containing asbestos, unless the compressed air is used in conjunction with an enclosed ventilation system designed to capture the dust cloud created by the compressed air is prohibited.
Employee rotation as a means of reducing employee exposure to asbestos is prohibited.
A “competent person” should conduct an exposure assessment immediately before or at the initiation of the operation to ascertain expected exposures during the operation. The assessment must be completed in time to comply with requirements which are triggered by exposure data or the lack of a “negative exposure assessment”, and to provide information necessary to assure that all control systems planned are appropriate for that operation and will work properly. The permissible exposure limit is an eight-hour time-weighted average of 0.1 fiber per cubic centimeter of air and an excursion limit of 1.0 fiber per cubic centimeter of air as averaged over a sampling period of 30 minutes.
The employer should provide the affected employees and their designated representatives an opportunity to observe any monitoring of employee exposure to asbestos.
The employer shall notify affected employees of the monitoring results that represent that employee’s exposure as soon as possible following receipt of monitoring results in writing individually or by posting in a central location which is accessible to all affected employees.
The employer shall notify affected employees of the results of monitoring representing the employee’s exposure in writing either individually or by posting at a centrally located place that is accessible to affected employees
Mr. Thornsbury, Alliance appreciates the opportunity to have been of service to you and Viridian Architectural Design, Inc. and Battle Creek Veterans Affairs Medical Center. Please contact the undersigned if you require any additional information.
Sincerely, Alliance Environmental Group
Mike Ardis Environmental Project Specialist
Attachments
Asbestos Homogeneous Area (HA) and Sampling Summary
Samples Collected By:
Location: Battle Creek VA Hospital, Battle Creek, Michigan Mike Ardis
HA
No.
HA
Description
Type of
ACBM ¹
Approx.
Quantity
(Entire HA) ² Friable?
(Yes/No)
Damage (N,L,M,H) ³
Sample No. Sample Location Asbestos Content
Window Caulking/Glazing Inpection Alliance Project Number: 16-0151-A
Date Collected
(via Method EPA 600/R-93/116)
Project:
Date Collected: 11/14/2016 11/17/2016-
001 Metal Frame Light Gray Exterior Caulking
MISC N/A No M 001 Building 30 North None Detected11/14/2016
002 Metal Frame Light Gray Exterior Glazing
MISC N/A No M 002 Building 30 North None Detected11/14/2016
003 Plastic Frame Light Gray Exterior Caulking
MISC N/A No L 003 Building 30 West None Detected11/14/2016
003 Plastic Frame Light Gray Exterior Caulking
MISC N/A No L 004 Building 30 South None Detected11/14/2016
003 Plastic Frame Light Gray Exterior Caulking
MISC N/A No L 005 Building 30 West None Detected11/14/2016
004 Plastic Plastic Frame Dark Gray Exterior Caulking
MISC N/A No L 006 Building 30 West None Detected11/14/2016
005 Glass Block Wall Light Gray Exterior Caulking
MISC 1 Unit Yes L 007 Building 30 North % Chrysotile1.111/14/2016
006 Plastic Frame Light Gray Interior Caulking
MISC N/A No L 008 Building 30 North None Detected11/14/2016
006 Plastic Frame Light Gray Interior Caulking
MISC N/A No L 009 Building 30 West None Detected11/14/2016
SM = Surfacing Material; TSI = Thermal System Insulation; Misc. = Miscellaneous Material N = None; L = Low; M = Medium; H = HighSF = Square Feet; LF = Linear Feet; FTG = Fitting1 2 3
Location: Battle Creek VA Hospital, Battle Creek, Michigan Mike Ardis
HA
No.
HA
Description
Type of
ACBM ¹
Approx.
Quantity
(Entire HA) ² Friable?
(Yes/No)
Damage (N,L,M,H) ³
Sample No. Sample Location Asbestos Content
Window Caulking/Glazing Inpection Alliance Project Number: 16-0151-A
Date Collected
(via Method EPA 600/R-93/116)
Project:
Date Collected: 11/14/2016 11/17/2016-
007 Plastic Frame Light Gray Exterior Caulking
MISC N/A No L 010 Building 27/28 North None Detected11/14/2016
007 Plastic Frame Light Gray Exterior Caulking
MISC N/A Yes H 016 Building 27/28 South None Detected11/14/2016
007 Plastic Frame Light Gray Exterior Caulking
MISC N/A No H 017 Building 27/28 South None Detected11/14/2016
008 Metal Frame Light Gray Interior Glazing
MISC 22 Units Yes M 011 Building 27/28 South % Chrysotile0.2511/14/2016
008 Metal Frame Light Gray Interior Glazing
MISC N/A No L 026 Building 27/28 South None Detected11/14/2016
008 Metal Frame Light Gray Interior Glazing
MISC N/A Yes M 028 Building 27/28 South None Detected11/14/2016
008 Metal Frame Light Gray Interior Glazing
MISC N/A No L 031 Building 27/28 South None Detected11/14/2016
009 Metal Frame Light Gray Interior Caulking
MISC 22 Units Yes M 012 Building 27/28 South % Chrysotile<0.2511/14/2016
009 Metal Frame Light Gray Interior Caulking
MISC N/A No L 025 Building 27/28 South None Detected11/14/2016
009 Metal Frame Light Gray Interior Caulking
MISC N/A No M 027 Building 27/28 South None Detected11/14/2016
009 Metal Frame Light Gray Interior Caulking
MISC 22 Units Yes H 030 Building 27/28 South % Chrysotile0.5011/14/2016
SM = Surfacing Material; TSI = Thermal System Insulation; Misc. = Miscellaneous Material N = None; L = Low; M = Medium; H = HighSF = Square Feet; LF = Linear Feet; FTG = Fitting1 2 3
Location: Battle Creek VA Hospital, Battle Creek, Michigan Mike Ardis
HA
No.
HA
Description
Type of
ACBM ¹
Approx.
Quantity
(Entire HA) ² Friable?
(Yes/No)
Damage (N,L,M,H) ³
Sample No. Sample Location Asbestos Content
Window Caulking/Glazing Inpection Alliance Project Number: 16-0151-A
Date Collected
(via Method EPA 600/R-93/116)
Project:
Date Collected: 11/14/2016 11/17/2016-
010 Metal Frame Light Gray Exterior Caulking
MISC N/A No L 013 Building 27/28 South None Detected11/14/2016
010 Metal Frame Light Gray Exterior Caulking
MISC N/A No L 018 Building 27/28 West None Detected11/14/2016
010 Metal Frame Light Gray Exterior Caulking
MISC 22 Units No L 023 Building 27/28 West % Chrysotile<111/14/2016
011 Metal Frame Light Gray Exterior Glazing
MISC 22 Units Yes M 014 Building 27/28 South % Chrysotile0.2511/14/2016
012 Metal Frame Dark Gray Exterior Caulking
MISC 22 Units Yes M 015 Building 27/28 South % Chrysotile1.811/14/2016
013 Metal Frame White Exterior Caulking
MISC N/A No L 019 Building 27/28 South None Detected11/14/2016
014 Metal Frame Black Exterior Caulking
MISC N/A No L 020 Building 27/28 South None Detected11/14/2016
015 Metal Frame Black Exterior Glazing
MISC N/A No L 021 Building 27/28 South None Detected11/14/2016
016 Basement Window Covering Lightn Gray
Exterior Caulking
MISC N/A No L 022 Building 27/28 South None Detected11/14/2016
017 White Plastic Frame Translucent Exterior
Caulking
MISC N/A No L 024 Building 27/28 Entrance None Detected11/14/2016
SM = Surfacing Material; TSI = Thermal System Insulation; Misc. = Miscellaneous Material N = None; L = Low; M = Medium; H = HighSF = Square Feet; LF = Linear Feet; FTG = Fitting1 2 3
Location: Battle Creek VA Hospital, Battle Creek, Michigan Mike Ardis
HA
No.
HA
Description
Type of
ACBM ¹
Approx.
Quantity
(Entire HA) ² Friable?
(Yes/No)
Damage (N,L,M,H) ³
Sample No. Sample Location Asbestos Content
Window Caulking/Glazing Inpection Alliance Project Number: 16-0151-A
Date Collected
(via Method EPA 600/R-93/116)
Project:
Date Collected: 11/14/2016 11/17/2016-
018 Metal Frame Light Gray Interior Caulking
MISC N/A No H 029 Building 27/28 South None Detected11/14/2016
020 Plastic Frame Light Gray Exterior Caulking
MISC N/A No L 032 Building 26 South None Detected11/14/2016
021 Plastic Frame Light Gray Exterior Glazing
MISC N/A No L 033 Building 26 South None Detected11/14/2016
022 Metal Frame Light Gray Exterior Glazing
MISC N/A Yes L 034 Building 26 South None Detected11/14/2016
023 Metal Frame Light Gray Interior Glazing
MISC N/A Yes L 035 Building 26 South None Detected11/14/2016
024 Metal Frame Over Door Gray Exterior Caulking
MISC N/A No L 036 Building 26 South None Detected11/14/2016
025 Metal Frame Over Door Translucent Exterior
Caulking
MISC N/A No L 037 Building 26 South None Detected11/14/2016
026 Metal Frame Over Door Black Exterior Glazing
MISC N/A No L 038 Building 26 South None Detected11/14/2016
027 Plastic Frame Light Gray Exterior Caulking
MISC N/A No L 039 Building 26 South None Detected11/14/2016
028 Plastic Frame Light Gray Exterior Glazing
MISC N/A No L 040 Building 26 South None Detected11/14/2016
SM = Surfacing Material; TSI = Thermal System Insulation; Misc. = Miscellaneous Material N = None; L = Low; M = Medium; H = HighSF = Square Feet; LF = Linear Feet; FTG = Fitting1 2 3
Location: Battle Creek VA Hospital, Battle Creek, Michigan Mike Ardis
HA
No.
HA
Description
Type of
ACBM ¹
Approx.
Quantity
(Entire HA) ² Friable?
(Yes/No)
Damage (N,L,M,H) ³
Sample No. Sample Location Asbestos Content
Window Caulking/Glazing Inpection Alliance Project Number: 16-0151-A
Date Collected
(via Method EPA 600/R-93/116)
Project:
Date Collected: 11/14/2016 11/17/2016-
029 Metal Frame Translucent Exterior Caulking
MISC 20 Units Yes H 041 Building 26 East % Chrysotile<0.2511/14/2016
030 Metal Frame Translucent Exterior Glazing
MISC N/A Yes H 042 Building 26 East None Detected11/14/2016
031 Window Opening Cover Gray Exterior Caulking
MISC 7 Units Yes M 043 Building 26 North % Chrysotile0.7511/14/2016
032 Window Opening Cover Translucent Exterior
Caulking
MISC N/A No M 044 Building 26 North None Detected11/14/2016
033 Metal Frame White Interior Caulking
MISC 20 Units Yes M 045 Building 26 West % Chrysotile<0.2511/14/2016
033 Metal Frame White Interior Caulking
MISC N/A Yes M 046 Building 26 West None Detected11/14/2016
034 Plastic Frame Light Gray Interior Caulking
MISC N/A No L 047 Building 26 South None Detected11/14/2016
035 Aluminum Frame Gray Exterior Caulking
MISC N/A No L 048 Building 26 South None Detected11/14/2016
035 Aluminum Frame Gray Exterior Caulking
MISC 95 Units No L 054 Building 24 East % Chrysotile211/14/2016
036 Aluminum Frame Off White Exterior Caulking
MISC 12 Units No L 049 Building 26 South % Chrysotile<111/14/2016
SM = Surfacing Material; TSI = Thermal System Insulation; Misc. = Miscellaneous Material N = None; L = Low; M = Medium; H = HighSF = Square Feet; LF = Linear Feet; FTG = Fitting1 2 3
Location: Battle Creek VA Hospital, Battle Creek, Michigan Mike Ardis
HA
No.
HA
Description
Type of
ACBM ¹
Approx.
Quantity
(Entire HA) ² Friable?
(Yes/No)
Damage (N,L,M,H) ³
Sample No. Sample Location Asbestos Content
Window Caulking/Glazing Inpection Alliance Project Number: 16-0151-A
Date Collected
(via Method EPA 600/R-93/116)
Project:
Date Collected: 11/14/2016 11/17/2016-
037 Aluminum Frame Cream Exterior Caulking
MISC N/A No L 050 Building 26 South None Detected11/14/2016
038 Aluminum Frame Gray Exterior Glazing
MISC N/A No L 051 Building 26 South None Detected11/14/2016
038 Aluminum Frame Gray Exterior Glazing
MISC N/A No L 055 Building 24 East None Detected11/14/2016
039 Aluminum Frame Dark Gray Interior Caulking
MISC N/A No L 052 Building 25 South None Detected11/14/2016
040 Aluminum Frame Light Gray Interior Caulking
MISC N/A No L 053 Building 25 South None Detected11/14/2016
041 Aluminum Frame Gray Exterior Caulking
MISC N/A Yes M 056 Building 24 East None Detected11/14/2016
041 Aluminum Frame Gray Exterior Caulking
MISC 90 Units No L 058 Building 24 East % Chrysotile211/14/2016
042 Aluminum Frame Gray Exterior Glazing
MISC N/A Yes M 057 Building 24 East None Detected11/14/2016
042 Aluminum Frame Gray Exterior Glazing
MISC N/A No L 060 Building 24 East None Detected11/14/2016
043 Aluminum Frame Clear Exterior Caulking
MISC N/A No L 059 Building 24 East None Detected11/14/2016
044 Aluminum Frame Gray Interior Caulking
MISC 90 Units No L 061 Building 24 North % Chrysotile211/14/2016
SM = Surfacing Material; TSI = Thermal System Insulation; Misc. = Miscellaneous Material N = None; L = Low; M = Medium; H = HighSF = Square Feet; LF = Linear Feet; FTG = Fitting1 2 3
Location: Battle Creek VA Hospital, Battle Creek, Michigan Mike Ardis
HA
No.
HA
Description
Type of
ACBM ¹
Approx.
Quantity
(Entire HA) ² Friable?
(Yes/No)
Damage (N,L,M,H) ³
Sample No. Sample Location Asbestos Content
Window Caulking/Glazing Inpection Alliance Project Number: 16-0151-A
Date Collected
(via Method EPA 600/R-93/116)
Project:
Date Collected: 11/14/2016 11/17/2016-
044 Aluminum Frame Gray Interior Caulking
MISC 90 Units No L 064 Building 24 North % Chrysotile211/14/2016
045 Aluminum Frame Gray Interior Glazing
MISC N/A No L 062 Building 24 North None Detected11/14/2016
045 Aluminum Frame Gray Interior Glazing
MISC N/A No L 063 Building 24 South None Detected11/14/2016
045 Aluminum Frame Gray Interior Glazing
MISC N/A No L 065 Building 24 North None Detected11/14/2016
046 Aluminum Frame White Exterior Caulking
MISC N/A No L 066 Building 10 South None Detected11/14/2016
046 Aluminum Frame White Exterior Caulking
MISC N/A No L 071 Building 10 East None Detected11/14/2016
046 Aluminum Frame White Exterior Caulking
MISC N/A No L 074 Building 10 East None Detected11/14/2016
046 Aluminum Frame White Exterior Caulking
MISC N/A No L 077 Building 10 West None Detected11/14/2016
047 Aluminum Frame Gray Exterior Caulking
MISC N/A No L 067 Building 10 South None Detected11/14/2016
047 Aluminum Frame Gray Exterior Caulking
MISC N/A No L 069 Building 10 East None Detected11/14/2016
047 Aluminum Frame Gray Exterior Caulking
MISC N/A No L 075 Building 10 East None Detected11/14/2016
SM = Surfacing Material; TSI = Thermal System Insulation; Misc. = Miscellaneous Material N = None; L = Low; M = Medium; H = HighSF = Square Feet; LF = Linear Feet; FTG = Fitting1 2 3
Location: Battle Creek VA Hospital, Battle Creek, Michigan Mike Ardis
HA
No.
HA
Description
Type of
ACBM ¹
Approx.
Quantity
(Entire HA) ² Friable?
(Yes/No)
Damage (N,L,M,H) ³
Sample No. Sample Location Asbestos Content
Window Caulking/Glazing Inpection Alliance Project Number: 16-0151-A
Date Collected
(via Method EPA 600/R-93/116)
Project:
Date Collected: 11/14/2016 11/17/2016-
047 Aluminum Frame Gray Exterior Caulking
MISC N/A No L 078 Building 10 West None Detected11/14/2016
048 Aluminum Frame Gray Exterior Glazing
MISC N/A No L 068 Building 10 South None Detected11/14/2016
048 Aluminum Frame Gray Exterior Glazing
MISC N/A No L 076 Building 10 East None Detected11/14/2016
048 Aluminum Frame Gray Exterior Glazing
MISC N/A No L 079 Building 10 West None Detected11/14/2016
049 Aluminum Frame Light Gray Exterior Glazing
MISC N/A No L 070 Building 10 East None Detected11/14/2016
051 Aluminum Frame Gray Interior Caulking
MISC N/A No L 080 Building 10 West None Detected11/14/2016
051 Aluminum Frame Gray Interior Caulking
MISC N/A No L 081 Building 10 South None Detected11/14/2016
051 Aluminum Frame Gray Interior Caulking
MISC N/A No L 082 Building 10 North None Detected11/14/2016
051 Aluminum Frame Gray Interior Caulking
MISC N/A No L 083 Building 10 South None Detected11/14/2016
052 Metal Frame White Interior Glazing
MISC N/A Yes H 084 Building 30 South None Detected11/14/2016
053 Metal Frame Gray Exterior Caulking
MISC N/A No L 085 Building 9 West None Detected11/14/2016
SM = Surfacing Material; TSI = Thermal System Insulation; Misc. = Miscellaneous Material N = None; L = Low; M = Medium; H = HighSF = Square Feet; LF = Linear Feet; FTG = Fitting1 2 3
Location: Battle Creek VA Hospital, Battle Creek, Michigan Mike Ardis
HA
No.
HA
Description
Type of
ACBM ¹
Approx.
Quantity
(Entire HA) ² Friable?
(Yes/No)
Damage (N,L,M,H) ³
Sample No. Sample Location Asbestos Content
Window Caulking/Glazing Inpection Alliance Project Number: 16-0151-A
Date Collected
(via Method EPA 600/R-93/116)
Project:
Date Collected: 11/14/2016 11/17/2016-
053 Metal Frame Gray Exterior Caulking
MISC N/A No L 087 Building 9 West None Detected11/14/2016
054 Metal Frame LG White Exterior Caulking
MISC N/A No L 086 Building 9 West None Detected11/14/2016
054 Metal Frame LG White Exterior Caulking
MISC N/A No L 088 Building 9 West None Detected11/14/2016
055 Wood Frame Gray Exterior Caulking
MISC 11 Units Yes H 089 Building 9 North (B) % Chrysotile0.2511/14/2016
056 Aluminum Frame Gray Interior Caulking
MISC N/A No L 090 Building 9 South None Detected11/14/2016
056 Aluminum Frame Gray Interior Caulking
MISC N/A No L 092 Building 9 East None Detected11/14/2016
057 Aluminum Frame Light Gray Interior Caulking
MISC N/A No L 091 Building 9 South None Detected11/14/2016
058 Aluminum Frame Gray Exterior Caulking
MISC 91 Units No L 093 Building 8 South % Chrysotile211/14/2016
058 Aluminum Frame Gray Exterior Caulking
MISC 91 Units No L 098 Building 8 North % Chrysotile211/14/2016
059 Aluminum Frame Gray Exterior Glazing
MISC N/A No L 094 Building 8 South None Detected11/14/2016
059 Aluminum Frame Gray Exterior Glazing
MISC N/A No L 096 Building 8 West None Detected11/14/2016
SM = Surfacing Material; TSI = Thermal System Insulation; Misc. = Miscellaneous Material N = None; L = Low; M = Medium; H = HighSF = Square Feet; LF = Linear Feet; FTG = Fitting1 2 3
Location: Battle Creek VA Hospital, Battle Creek, Michigan Mike Ardis
HA
No.
HA
Description
Type of
ACBM ¹
Approx.
Quantity
(Entire HA) ² Friable?
(Yes/No)
Damage (N,L,M,H) ³
Sample No. Sample Location Asbestos Content
Window Caulking/Glazing Inpection Alliance Project Number: 16-0151-A
Date Collected
(via Method EPA 600/R-93/116)
Project:
Date Collected: 11/14/2016 11/17/2016-
059 Aluminum Frame Gray Exterior Glazing
MISC N/A No L 099 Building 8 North None Detected11/14/2016
060 Aluminum Frame Off White Exterior Caulking
MISC 91 Units No L 095 Building 8 West % Chrysotile<111/14/2016
061 Wood Frame Gray Exterior Glazing
MISC 20 Units Yes M 097 Building 8 North (B) % Chrysotile<0.2511/14/2016
062 Aluminum Frame Gray Interior Caulking
MISC 84 Units No L 100 Building 8 East % Chrysotile211/14/2016
062 Aluminum Frame Gray Interior Caulking
MISC 84 Units No L 102 Building 8 North % Chrysotile211/14/2016
062 Aluminum Frame Gray Interior Caulking
MISC 84 Units No L 104 Building 8 East % Chrysotile211/14/2016
063 Aluminum Frame Gray Interior Glazing
MISC N/A No L 101 Building 8 East None Detected11/14/2016
063 Aluminum Frame Gray Interior Glazing
MISC N/A No L 103 Building 8 North None Detected11/14/2016
063 Aluminum Frame Gray Interior Glazing
MISC N/A No L 105 Building 8 East None Detected11/14/2016
064 Aluminum Frame Gray Exterior Caulking
MISC 51 Units No L 106 Building 13 West (B) % Chrysotile211/14/2016
064 Aluminum Frame Gray Exterior Caulking
MISC N/A No L 108 Building 13 South None Detected11/14/2016
SM = Surfacing Material; TSI = Thermal System Insulation; Misc. = Miscellaneous Material N = None; L = Low; M = Medium; H = HighSF = Square Feet; LF = Linear Feet; FTG = Fitting1 2 3
Location: Battle Creek VA Hospital, Battle Creek, Michigan Mike Ardis
HA
No.
HA
Description
Type of
ACBM ¹
Approx.
Quantity
(Entire HA) ² Friable?
(Yes/No)
Damage (N,L,M,H) ³
Sample No. Sample Location Asbestos Content
Window Caulking/Glazing Inpection Alliance Project Number: 16-0151-A
Date Collected
(via Method EPA 600/R-93/116)
Project:
Date Collected: 11/14/2016 11/17/2016-
064 Aluminum Frame Gray Exterior Caulking
MISC N/A No L 110 Building 13 South None Detected11/14/2016
064 Aluminum Frame Gray Exterior Caulking
MISC N/A No L 112 Building 13 West None Detected11/14/2016
064 Aluminum Frame Gray Exterior Caulking
MISC N/A No L 114 Building 13 South None Detected11/14/2016
064 Aluminum Frame Gray Exterior Caulking
MISC N/A No L 118 Building 13 West None Detected11/14/2016
064 Aluminum Frame Gray Exterior Caulking
MISC N/A No L 129 Building 13 South None Detected11/14/2016
065 Aluminum Frame Gray Exterior Glazing
MISC N/A No L 107 Building 13 West None Detected11/14/2016
065 Aluminum Frame Gray Exterior Glazing
MISC N/A No L 109 Building 13 South None Detected11/14/2016
065 Aluminum Frame Gray Exterior Glazing
MISC N/A No L 111 Building 13 South None Detected11/14/2016
065 Aluminum Frame Gray Exterior Glazing
MISC N/A No L 113 Building 13 West None Detected11/14/2016
066 Aluminum Frame Black Exterior Glazing
MISC N/A No L 115 Building 13 South None Detected11/14/2016
066 Aluminum Frame Black Exterior Glazing
MISC N/A No L 119 Building 13 West None Detected11/14/2016
SM = Surfacing Material; TSI = Thermal System Insulation; Misc. = Miscellaneous Material N = None; L = Low; M = Medium; H = HighSF = Square Feet; LF = Linear Feet; FTG = Fitting1 2 3
Location: Battle Creek VA Hospital, Battle Creek, Michigan Mike Ardis
HA
No.
HA
Description
Type of
ACBM ¹
Approx.
Quantity
(Entire HA) ² Friable?
(Yes/No)
Damage (N,L,M,H) ³
Sample No. Sample Location Asbestos Content
Window Caulking/Glazing Inpection Alliance Project Number: 16-0151-A
Date Collected
(via Method EPA 600/R-93/116)
Project:
Date Collected: 11/14/2016 11/17/2016-
066 Aluminum Frame Black Exterior Glazing
MISC N/A No L 130 Building 13 South None Detected11/14/2016
067 Aluminum Frame with AC Unit Translucent Exterior
Caulking
MISC N/A No L 116 Building 13 South None Detected11/14/2016
068 Aluminum Frame with AC Unit Gray Exterior
Caulking
MISC 20 Units No L 117 Building 13 South % Chrysotile211/14/2016
069 Plastic Frame White Interior Caulking
MISC N/A No L 120 Building 13 North None Detected11/14/2016
069 Plastic Frame White Interior Caulking
MISC N/A No L 131 Building 13 East None Detected11/14/2016
070 Plastic Frame Black Interior Glazing
MISC N/A No L 121 Building 13 North None Detected11/14/2016
070 Plastic Frame Black Interior Glazing
MISC N/A No L 132 Building 13 East None Detected11/14/2016
071 Plastic Frame Black Exterior Glazing
MISC N/A No L 122 Building 13 North None Detected11/14/2016
072 Round Window Outer Frame Cream Exterior
Caulk
MISC N/A No L 123 Building 13 South None Detected11/14/2016
072 Round Window Inner Frame Cream Exterior
Caulk
MISC N/A No L 124 Building 13 South None Detected11/14/2016
SM = Surfacing Material; TSI = Thermal System Insulation; Misc. = Miscellaneous Material N = None; L = Low; M = Medium; H = HighSF = Square Feet; LF = Linear Feet; FTG = Fitting1 2 3
Location: Battle Creek VA Hospital, Battle Creek, Michigan Mike Ardis
HA
No.
HA
Description
Type of
ACBM ¹
Approx.
Quantity
(Entire HA) ² Friable?
(Yes/No)
Damage (N,L,M,H) ³
Sample No. Sample Location Asbestos Content
Window Caulking/Glazing Inpection Alliance Project Number: 16-0151-A
Date Collected
(via Method EPA 600/R-93/116)
Project:
Date Collected: 11/14/2016 11/17/2016-
073 Round Window Inner Frame Exterior Glazing
MISC 8 Units Yes H 125 Building 13 South % Chrysotile0.2511/14/2016
074 Aluminum Frame Gray Interior Caulking
MISC N/A No L 126 Building 13 South None Detected11/14/2016
074 Aluminum Frame Gray Interior Caulking
MISC N/A No L 128 Building 13 South None Detected11/14/2016
074 Aluminum Frame Gray Interior Caulking
MISC N/A No L 135 Building 13 Room 133 None Detected11/14/2016
075 Aluminum Frame Dark Gray Interior Glazing
MISC N/A Yes M 127 Building 13 South None Detected11/14/2016
076 Aluminum Frame Gray Interior Glazing
MISC N/A No L 133 Building 13 Room 025 None Detected11/14/2016
077 Aluminum Frame White Interior Caulking
MISC N/A No H 134 Building 13 Room 133 None Detected11/14/2016
078 Wood Frame White Exterior Glazing
MISC N/A Yes M 136 Building 5 NW Corner None Detected11/14/2016
079 Wood Frame White Exterior Glazing
MISC N/A Yes M 137 Building 5 NW Corner None Detected11/14/2016
080 Wood Frame Gray Exterior Caulking
MISC N/A No M 138 Building 5 NW Corner None Detected11/14/2016
081 Aluminum Frame Gray Exterior Caulking
MISC N/A No L 139 Building 5 NW Basement None Detected11/14/2016
SM = Surfacing Material; TSI = Thermal System Insulation; Misc. = Miscellaneous Material N = None; L = Low; M = Medium; H = HighSF = Square Feet; LF = Linear Feet; FTG = Fitting1 2 3
Location: Battle Creek VA Hospital, Battle Creek, Michigan Mike Ardis
HA
No.
HA
Description
Type of
ACBM ¹
Approx.
Quantity
(Entire HA) ² Friable?
(Yes/No)
Damage (N,L,M,H) ³
Sample No. Sample Location Asbestos Content
Window Caulking/Glazing Inpection Alliance Project Number: 16-0151-A
Date Collected
(via Method EPA 600/R-93/116)
Project:
Date Collected: 11/14/2016 11/17/2016-
081 Aluminum Frame Gray Exterior Caulking
MISC 48 Units No L 141 Building 5 Load Dock % Chrysotile211/14/2016
082 Aluminum Frame White Exterior Glazing
MISC N/A Yes M 140 Building 5 NW Basement None Detected11/14/2016
083 Aluminum Frame Gray Exterior Glazing
MISC N/A No L 142 Building 5 Load Dock None Detected11/14/2016
084 Aluminum Frame Gray Interior Caulking
MISC 58 Units No L 143 Building 5 History Museum % Chrysotile211/14/2016
085 Aluminum Frame Gray Interior Glazing
MISC N/A No L 144 Building 5 Covered Walkway None Detected11/14/2016
086 Plastic Frame White Exterior Caulking
MISC N/A No L 145 Building 5 Northest Dormer None Detected11/14/2016
087 Plastic Frame White Exterior Glazing
MISC N/A No L 146 Building 5 Northwest Dormer None Detected11/14/2016
088 Wood Frame White Exterior Caulking
MISC N/A No L 147 Building 85 Northwest None Detected11/14/2016
089 Wood Frame Gray Exterior Glazing
MISC N/A Yes M 148 Building 85 Northwest None Detected11/14/2016
090 Metal Frame Gray Exterior Caulking
MISC N/A No L 149 Building 85 Northwest None Detected11/14/2016
091 Metal Frame White Exterior Glazing
MISC N/A Yes L 150 Building 85 Northwest None Detected11/14/2016
SM = Surfacing Material; TSI = Thermal System Insulation; Misc. = Miscellaneous Material N = None; L = Low; M = Medium; H = HighSF = Square Feet; LF = Linear Feet; FTG = Fitting1 2 3
Location: Battle Creek VA Hospital, Battle Creek, Michigan Mike Ardis
HA
No.
HA
Description
Type of
ACBM ¹
Approx.
Quantity
(Entire HA) ² Friable?
(Yes/No)
Damage (N,L,M,H) ³
Sample No. Sample Location Asbestos Content
Window Caulking/Glazing Inpection Alliance Project Number: 16-0151-A
Date Collected
(via Method EPA 600/R-93/116)
Project:
Date Collected: 11/14/2016 11/17/2016-
092 Plastic Frame White Exterior Caulking
MISC N/A No L 151 Building 85 Southwest None Detected11/14/2016
093 Vent Metal Frame Gray Exterior Caulking
MISC N/A No L 152 Building 85 Southeast None Detected11/14/2016
094 Metal Frame White Interior Glazing
MISC N/A Yes L 153 Building 85 North None Detected11/14/2016
095 Metal Frame White Interior Glazing
MISC N/A No L 154 Building 85 North None Detected11/14/2016
096 Plastic Frame White Interior Caulking
MISC N/A No L 155 Building 85 Southwest None Detected11/14/2016
097 Plastic Frame White Interior Glazing
MISC N/A No L 156 Building 85 Southwest None Detected11/14/2016
098 Plastic Frame Gray Exterior Caulking
MISC N/A No L 157 Building 109 South None Detected11/14/2016
099 Plastic Frame White Exterior Caulking
MISC N/A No L 158 Building 109 South None Detected11/14/2016
100 Plastic Frame White Exterior Glazing
MISC N/A No L 159 Building 109 South None Detected11/14/2016
101 Aluminium Frame 1' x 3' Panes Gray Exterior
Glazing
MISC 15 Units No L 160 Building 136 North % Chrysotile211/14/2016
SM = Surfacing Material; TSI = Thermal System Insulation; Misc. = Miscellaneous Material N = None; L = Low; M = Medium; H = HighSF = Square Feet; LF = Linear Feet; FTG = Fitting1 2 3
Location: Battle Creek VA Hospital, Battle Creek, Michigan Mike Ardis
HA
No.
HA
Description
Type of
ACBM ¹
Approx.
Quantity
(Entire HA) ² Friable?
(Yes/No)
Damage (N,L,M,H) ³
Sample No. Sample Location Asbestos Content
Window Caulking/Glazing Inpection Alliance Project Number: 16-0151-A
Date Collected
(via Method EPA 600/R-93/116)
Project:
Date Collected: 11/14/2016 11/17/2016-
102 Aluminium Frame 1' x 3' Panes Gray Exterior
Glazing
MISC N/A No L 161 Building 136 North None Detected11/14/2016
103 Aluminium Frame 2' x 3' Panes Light Gray Exterior
Caulking
MISC 15 Units No L 162 Building 136 North % Chrysotile211/14/2016
104 Aluminium Frame 2' x 3' Panes Dark Gray Exterior
Glazing
MISC 15 Units Yes L 163 Building 136 North % Chrysotile211/14/2016
105 Aluminium Frame 2' x 3' Black Exterior Glazing
MISC N/A Yes L 164 Building 136 North None Detected11/14/2016
106 Aluminium Frame 2' x 3' Thick Gray Exterior
Caulking
MISC 15 Units Yes L 165 Building 136 North % Chrysotile211/14/2016
107 Aluminium Frame 2' x 3' White Exterior Glazing
MISC 5 Units Yes L 166 Building 136 North % Chrysotile0.5011/14/2016
108 Aluminium Frame 4' x 5' Gray Exterior Caulking
MISC 5 Units No L 167 Building 136 North % Chrysotile211/14/2016
109 Aluminium Frame 4' x 5' Black Exterior Glazing
MISC N/A No L 168 Building 136 North None Detected11/14/2016
110 Aluminium Frame 1.5' x 3' Gray Exterior Caulking
MISC N/A No L 169 Building 136 East None Detected11/14/2016
111 Aluminium Frame 1.5' x 3' Gray Exterior Caulking
MISC N/A No L 170 Building 136 East None Detected11/14/2016
SM = Surfacing Material; TSI = Thermal System Insulation; Misc. = Miscellaneous Material N = None; L = Low; M = Medium; H = HighSF = Square Feet; LF = Linear Feet; FTG = Fitting1 2 3
Location: Battle Creek VA Hospital, Battle Creek, Michigan Mike Ardis
HA
No.
HA
Description
Type of
ACBM ¹
Approx.
Quantity
(Entire HA) ² Friable?
(Yes/No)
Damage (N,L,M,H) ³
Sample No. Sample Location Asbestos Content
Window Caulking/Glazing Inpection Alliance Project Number: 16-0151-A
Date Collected
(via Method EPA 600/R-93/116)
Project:
Date Collected: 11/14/2016 11/17/2016-
112 Aluminium Frame 1.5' x 3' Black Exterior Glazing
MISC N/A No L 171 Building 136 East None Detected11/14/2016
113 Aluminium Frame 2' x 3' Black Interior Glazing
MISC N/A No L 172 Building 136 Library NW None Detected11/14/2016
114 Aluminium Frame 4' x 5' Black Interior Glazing
MISC N/A No L 173 Building 136 Med Supply None Detected11/14/2016
114 Aluminium Frame 4' x 5' Black Interior Glazing
MISC N/A No L 174 Building 136 Library None Detected11/14/2016
115 Aluminum Frame BG Gray Exterior Caulking
MISC N/A No L 175 Building 138 North None Detected11/14/2016
116 Aluminum Frame BG Gray Exterior Glazing
MISC N/A Yes L 176 Building 138 North None Detected11/14/2016
117 Aluminium Thick Frame Gray Interior Glazing
MISC N/A Yes M 177 Building 138 South None Detected11/14/2016
118 Aluminium Thick Frame Gray Exterior Caulking
MISC N/A Yes L 178 Building 138 South None Detected11/14/2016
119 Aluminium Thick Frame Gray Exterior Glazing
MISC N/A Yes L 179 Building 138 South None Detected11/14/2016
120 Aluminium Thin Frame Gray Interior Glazing
MISC 11 Units Yes H 180 Building 138 South % Chrysotile0.5011/14/2016
121 Aluminium Thick Frame Gray Interior Glazing
MISC 9 Units Yes H 181 Building 138 South % Chrysotile<0.2511/14/2016
SM = Surfacing Material; TSI = Thermal System Insulation; Misc. = Miscellaneous Material N = None; L = Low; M = Medium; H = HighSF = Square Feet; LF = Linear Feet; FTG = Fitting1 2 3
Location: Battle Creek VA Hospital, Battle Creek, Michigan Mike Ardis
HA
No.
HA
Description
Type of
ACBM ¹
Approx.
Quantity
(Entire HA) ² Friable?
(Yes/No)
Damage (N,L,M,H) ³
Sample No. Sample Location Asbestos Content
Window Caulking/Glazing Inpection Alliance Project Number: 16-0151-A
Date Collected
(via Method EPA 600/R-93/116)
Project:
Date Collected: 11/14/2016 11/17/2016-
122 Aluminum Frame BG Gray Interior Caulking
MISC N/A No L 182 Building 138 North None Detected11/14/2016
123 Aluminum Frame BG Black Interior Glazing
MISC N/A No L 183 Building 138 North None Detected11/14/2016
124 Galvanized Rounded Mulliuns White Exterior
Caulking
MISC 47 Units Yes M 184 Building 134 East % Chrysotile<0.2511/14/2016
125 Galvanized Rounded Mulliuns White Exterior
Glazing
MISC 47 Units Yes M 185 Building 134 East % Chrysotile0.2511/14/2016
126 Galvanized Rounded Mulliuns White Interior
Glazing
MISC 15 Units Yes L 186 Building 134 West % Chrysotile<0.2511/14/2016
127 Galvanized Flat Mulliuns White Interior Caulking
MISC N/A No L 187 Building 134 West None Detected11/14/2016
128 Galvanized Flat Mulliuns White Exterior Caulking
MISC 15 Units Yes L 188 Building 134 West % Chrysotile211/14/2016
129 Galvanized Flat Mulliuns Gray Exterior Glazing
MISC N/A Yes L 189 Building 134 West None Detected11/14/2016
130 Aluminum Frame Outer Gray Exterior Caulking
MISC N/A No L 190 Building 101 North None Detected11/14/2016
131 Aluminum Frame Inner Gray Exterior Caulking
MISC N/A No L 191 Building 101 North None Detected11/14/2016
SM = Surfacing Material; TSI = Thermal System Insulation; Misc. = Miscellaneous Material N = None; L = Low; M = Medium; H = HighSF = Square Feet; LF = Linear Feet; FTG = Fitting1 2 3
Location: Battle Creek VA Hospital, Battle Creek, Michigan Mike Ardis
HA
No.
HA
Description
Type of
ACBM ¹
Approx.
Quantity
(Entire HA) ² Friable?
(Yes/No)
Damage (N,L,M,H) ³
Sample No. Sample Location Asbestos Content
Window Caulking/Glazing Inpection Alliance Project Number: 16-0151-A
Date Collected
(via Method EPA 600/R-93/116)
Project:
Date Collected: 11/14/2016 11/17/2016-
132 Aluminum Frame Black Exterior Glazing
MISC N/A No L 192 Building 101 North None Detected11/14/2016
133 Aluminum Frame Black Interior Glazing
MISC N/A No L 193 Building 101 South None Detected11/14/2016
134 Aluminum Frame Gray Exterior Caulking
MISC 58 Units No L 194 Building 6 W NW Entrance % Chrysotile211/14/2016
134 Aluminum Frame Gray Exterior Caulking
MISC N/A No L 195 Building 6 W NW Entrance None Detected11/14/2016
134 Aluminum Frame Gray Exterior Caulking
MISC 58 Units No L 197 Building 6 North % Chrysotile211/14/2016
134 Aluminum Frame Gray Exterior Caulking
MISC N/A No L 200 Building 6 South None Detected11/14/2016
135 Aluminum Frame Black Exterior Glazing
MISC N/A No L 196 Building 6 W NW Entrance None Detected11/14/2016
136 Aluminum Frame Gray Exterior Glazing
MISC N/A No L 198 Building 6 South None Detected11/14/2016
137 Aluminum Frame with Vent Black Exterior
Glazing
MISC 1 Unit Yes M 199 Building 6 South % Chrysotile211/14/2016
138 Wood Frame Inner White Exterior Caulking
MISC N/A Yes M 201 Building 6 South None Detected11/14/2016
SM = Surfacing Material; TSI = Thermal System Insulation; Misc. = Miscellaneous Material N = None; L = Low; M = Medium; H = HighSF = Square Feet; LF = Linear Feet; FTG = Fitting1 2 3
Location: Battle Creek VA Hospital, Battle Creek, Michigan Mike Ardis
HA
No.
HA
Description
Type of
ACBM ¹
Approx.
Quantity
(Entire HA) ² Friable?
(Yes/No)
Damage (N,L,M,H) ³
Sample No. Sample Location Asbestos Content
Window Caulking/Glazing Inpection Alliance Project Number: 16-0151-A
Date Collected
(via Method EPA 600/R-93/116)
Project:
Date Collected: 11/14/2016 11/17/2016-
139 Wood Frame Inner White Exterior Caulking
MISC 2 Units No H 202 Building 6 South % Chrysotile<111/14/2016
140 Wood Frame White Exterior Glazing
MISC 2 Units Yes M 203 Building 6 South % Chrysotile0.2511/14/2016
141 Aluminum Frame Gray Interior Glazing
MISC N/A No L 204 Building 6 North None Detected11/14/2016
142 Aluminum Frame Gray Interior Caulking
MISC 58 Units No L 205 Building 6 East % Chrysotile211/14/2016
142 Aluminum Frame Gray Interior Caulking
MISC N/A No L 206 Building 6 East None Detected11/14/2016
143 Aluminum Frame Black Interior Glazing
MISC N/A No L 207 Building 6 East None Detected11/14/2016
144 Aluminum Frame with Vent Black Exterior
Caulking
MISC N/A No L 208 Building 14 North None Detected11/14/2016
145 Aluminum Frame with Vent Black Exterior
Caulking
MISC N/A No L 209 Building 14 North None Detected11/14/2016
146 Aluminum Frame Gray Exterior Caulking
MISC 240 Units No L 210 Building 14 North % Chrysotile211/14/2016
146 Aluminum Frame Gray Exterior Caulking
MISC N/A No L 212 Building 14 South None Detected11/14/2016
SM = Surfacing Material; TSI = Thermal System Insulation; Misc. = Miscellaneous Material N = None; L = Low; M = Medium; H = HighSF = Square Feet; LF = Linear Feet; FTG = Fitting1 2 3
Location: Battle Creek VA Hospital, Battle Creek, Michigan Mike Ardis
HA
No.
HA
Description
Type of
ACBM ¹
Approx.
Quantity
(Entire HA) ² Friable?
(Yes/No)
Damage (N,L,M,H) ³
Sample No. Sample Location Asbestos Content
Window Caulking/Glazing Inpection Alliance Project Number: 16-0151-A
Date Collected
(via Method EPA 600/R-93/116)
Project:
Date Collected: 11/14/2016 11/17/2016-
146 Aluminum Frame Gray Exterior Caulking
MISC N/A No L 213 Building 14 South None Detected11/14/2016
147 Aluminum Frame Black Exterior Glazing
MISC N/A No L 211 Building 14 North None Detected11/14/2016
147 Aluminum Frame Black Exterior Glazing
MISC N/A No L 214 Building 14 South None Detected11/14/2016
148 Off White Vent Light Gray Exterior Caulking
MISC 12 Units Yes L 215 Building 14 South % Chrysotile211/14/2016
149 Off White Vent White Exterior Caulking
MISC 12 Units Yes L 216 Building 14 South % Chrysotile211/14/2016
150 Aluminum Frame White Exterior Caulking
MISC N/A No L 217 Building 14 East None Detected11/14/2016
151 Aluminum Frame Gray Interior Caulking
MISC N/A No L 218 Building 14 South None Detected11/14/2016
151 Aluminum Frame Gray Interior Caulking
MISC N/A No L 222 Building 14 Laundry None Detected11/14/2016
152 Aluminum Frame White Interior Caulking
MISC 240 Units No L 219 Building 14 NW % Chrysotile<111/14/2016
152 Aluminum Frame White Interior Caulking
MISC N/A No L 224 Building 14 Room 247 None Detected11/14/2016
153 Wood Frame Red Interior Caulking
MISC N/A No L 220 Building 14 Attic None Detected11/14/2016
SM = Surfacing Material; TSI = Thermal System Insulation; Misc. = Miscellaneous Material N = None; L = Low; M = Medium; H = HighSF = Square Feet; LF = Linear Feet; FTG = Fitting1 2 3
Location: Battle Creek VA Hospital, Battle Creek, Michigan Mike Ardis
HA
No.
HA
Description
Type of
ACBM ¹
Approx.
Quantity
(Entire HA) ² Friable?
(Yes/No)
Damage (N,L,M,H) ³
Sample No. Sample Location Asbestos Content
Window Caulking/Glazing Inpection Alliance Project Number: 16-0151-A
Date Collected
(via Method EPA 600/R-93/116)
Project:
Date Collected: 11/14/2016 11/17/2016-
154 Wood Frame White Exterior Glazing
MISC N/A Yes L 221 Building 14 Attic % Chrysotile<0.2511/14/2016
155 Aluminum Frame Blue Green Interior Caulking
MISC N/A No L 223 Building 14 Men's Restroom None Detected11/14/2016
156 Aluminum Frame Gray Exterior Caulking
MISC N/A No L 225 Building 3 South None Detected11/14/2016
156 Aluminum Frame Gray Exterior Caulking
MISC N/A No L 228 Building 3 South None Detected11/14/2016
156 Aluminum Frame Gray Exterior Caulking
MISC N/A No L 229 Building 3 South None Detected11/14/2016
157 Aluminum Frame Black Exterior Glazing
MISC N/A No L 226 Building 3 South None Detected11/14/2016
157 Aluminum Frame Black Exterior Glazing
MISC N/A No L 227 Building 3 South None Detected11/14/2016
158 Aluminum Frame Gray Exterior Glazing
MISC N/A No L 230 Building 3 North None Detected11/14/2016
159 Aluminum Frame Gray Interior Caulking
MISC N/A No L 231 Building 3 North None Detected11/14/2016
159 Aluminum Frame Gray Interior Caulking
MISC N/A No L 233 Building 3 South None Detected11/14/2016
160 Aluminum Frame Gray Interior Glazing
MISC N/A No L 232 Building 3 North None Detected11/14/2016
SM = Surfacing Material; TSI = Thermal System Insulation; Misc. = Miscellaneous Material N = None; L = Low; M = Medium; H = HighSF = Square Feet; LF = Linear Feet; FTG = Fitting1 2 3
Location: Battle Creek VA Hospital, Battle Creek, Michigan Mike Ardis
HA
No.
HA
Description
Type of
ACBM ¹
Approx.
Quantity
(Entire HA) ² Friable?
(Yes/No)
Damage (N,L,M,H) ³
Sample No. Sample Location Asbestos Content
Window Caulking/Glazing Inpection Alliance Project Number: 16-0151-A
Date Collected
(via Method EPA 600/R-93/116)
Project:
Date Collected: 11/14/2016 11/17/2016-
161 Aluminum Frame Gray Exterior Caulking
MISC N/A No L 234 Building 12 West None Detected11/14/2016
161 3' x 5' Pane Aluminum Inner Exterior Gray Caulk
MISC N/A No L 235 Building 12 West None Detected11/14/2016
161 Aluminum Frame Gray Exterior Caulking
MISC N/A No L 237 Building 12 East None Detected11/14/2016
161 Aluminum Frame Gray Exterior Caulking
MISC N/A No L 238 Building 12 East None Detected11/14/2016
162 Wood Frame White Exterior Glazing
MISC N/A Yes H 236 Building 12 West None Detected11/14/2016
163 Aluminum Frame Gray Exterior Caulking
MISC 102 Units No L 239 Building 11 East % Chrysotile211/14/2016
163 Aluminum Frame Gray Exterior Caulking
MISC 102 Units No L 242 Building 11 North % Chrysotile211/14/2016
164 Aluminum Frame Gray Exterior Glazing
MISC N/A No L 240 Building 11 East None Detected11/14/2016
164 Aluminum Frame Gray Exterior Glazing
MISC N/A No L 244 Building 11 North None Detected11/14/2016
165 Wood Frame White Exterior Glazing
MISC N/A Yes M 241 Building 11 North None Detected11/14/2016
166 Aluminum Frame Cream Exterior Caulking
MISC N/A No L 243 Building 11 North None Detected11/14/2016
SM = Surfacing Material; TSI = Thermal System Insulation; Misc. = Miscellaneous Material N = None; L = Low; M = Medium; H = HighSF = Square Feet; LF = Linear Feet; FTG = Fitting1 2 3
Location: Battle Creek VA Hospital, Battle Creek, Michigan Mike Ardis
HA
No.
HA
Description
Type of
ACBM ¹
Approx.
Quantity
(Entire HA) ² Friable?
(Yes/No)
Damage (N,L,M,H) ³
Sample No. Sample Location Asbestos Content
Window Caulking/Glazing Inpection Alliance Project Number: 16-0151-A
Date Collected
(via Method EPA 600/R-93/116)
Project:
Date Collected: 11/14/2016 11/17/2016-
167 Aluminum Frame Weathered Black Exterior
Caulking
MISC N/A No L 245 Building 11 Porch None Detected11/14/2016
168 Aluminum Frame Dark Black Exterior Caulking
MISC N/A No L 246 Building 11 Porch None Detected11/14/2016
169 Aluminum Frame Dark Gray Interior Caulking
MISC N/A No L 247 Building 12 West None Detected11/14/2016
169 Aluminum Frame Dark Gray Interior Caulking
MISC N/A No L 250 Building 12 South None Detected11/14/2016
170 Aluminum Frame Light Gray Interior Caulking
MISC N/A No L 248 Building 12 West None Detected11/14/2016
170 Aluminum Frame Light Gray Interior Caulking
MISC N/A No L 251 Building 12 South None Detected11/14/2016
171 Aluminum Frame Gray Interior Glazing
MISC N/A No L 249 Building 12 West None Detected11/14/2016
171 Aluminum Frame Gray Interior Glazing
MISC N/A No L 252 Building 12 South None Detected11/14/2016
171 Aluminum Frame Gray Interior Glazing
MISC N/A No L 254 Building 11 South None Detected11/14/2016
171 Aluminum Frame Gray Interior Glazing
MISC N/A No L 257 Building 11 West None Detected11/14/2016
SM = Surfacing Material; TSI = Thermal System Insulation; Misc. = Miscellaneous Material N = None; L = Low; M = Medium; H = HighSF = Square Feet; LF = Linear Feet; FTG = Fitting1 2 3
Location: Battle Creek VA Hospital, Battle Creek, Michigan Mike Ardis
HA
No.
HA
Description
Type of
ACBM ¹
Approx.
Quantity
(Entire HA) ² Friable?
(Yes/No)
Damage (N,L,M,H) ³
Sample No. Sample Location Asbestos Content
Window Caulking/Glazing Inpection Alliance Project Number: 16-0151-A
Date Collected
(via Method EPA 600/R-93/116)
Project:
Date Collected: 11/14/2016 11/17/2016-
172 Aluminum Frame Gray Interior Caulking
MISC 102 Units No L 253 Building 11 South % Chrysotile211/14/2016
172 Aluminum Frame Gray Interior Caulking
MISC 102 Units No L 256 Building 11 West % Chrysotile211/14/2016
173 Aluminum Frame Cream Interior Caulking
MISC 102 Units No L 255 Building 11 South % Chrysotile211/14/2016
174 Aluminum Frame Cream Exterior Caulking
MISC N/A No L 258 Building 4 North None Detected11/14/2016
174 Aluminum Frame Cream Exterior Caulking
MISC N/A No L 261 Building 4 North None Detected11/14/2016
175 Aluminum Frame Gray Exterior Caulking
MISC N/A No L 259 Building 4 North None Detected11/14/2016
175 Aluminum Frame Gray Exterior Caulking
MISC 2 Units No L 262 Building 4 North % Chrysotile<111/14/2016
175 Aluminum Frame Gray Exterior Caulking
MISC N/A No L 265 Building 4 South None Detected11/14/2016
175 3' x 4' Double Pane Gray Exterior Glazing
MISC N/A Yes M 266 Building 4 East None Detected11/14/2016
176 Aluminum Frame Gray Exterior Glazing
MISC N/A No L 260 Building 4 North None Detected11/14/2016
177 Aluminum Frame White Exterior Glazing
MISC 2 Units No L 263 Building 4 North % Chrysotile<111/14/2016
SM = Surfacing Material; TSI = Thermal System Insulation; Misc. = Miscellaneous Material N = None; L = Low; M = Medium; H = HighSF = Square Feet; LF = Linear Feet; FTG = Fitting1 2 3
Location: Battle Creek VA Hospital, Battle Creek, Michigan Mike Ardis
HA
No.
HA
Description
Type of
ACBM ¹
Approx.
Quantity
(Entire HA) ² Friable?
(Yes/No)
Damage (N,L,M,H) ³
Sample No. Sample Location Asbestos Content
Window Caulking/Glazing Inpection Alliance Project Number: 16-0151-A
Date Collected
(via Method EPA 600/R-93/116)
Project:
Date Collected: 11/14/2016 11/17/2016-
178 Wood Frame White Exterior Glazing
MISC N/A Yes H 264 Building 4 West None Detected11/14/2016
179 Aluminum Frame Gray Interior Glazing
MISC N/A No L 267 Building 4 East None Detected11/14/2016
179 Aluminum Frame Gray Interior Glazing
MISC N/A No L 269 Building 4 West None Detected11/14/2016
180 Aluminum Frame White Interior Caulking
MISC N/A No L 268 Building 4 Room 118 None…