This document is an Asbestos Inspection Report for the Battle Creek Veterans Affairs Medical Center in Battle Creek, Michigan. The report summarizes the findings of a pre-renovation asbestos inspection conducted by Alliance Environmental Group on November 14-17, 2016. 280 samples of window caulking and glazing were collected from various buildings. Several materials were found to contain asbestos, including exterior and interior caulking, glazing, and other components. The report provides details on the specific asbestos-containing materials and their locations. It also outlines the procedures and requirements for handling materials containing less than 1% asbestos, such as the use of wet methods, prompt cleanup, and employee exposure monitoring. The report is intended to provide information for the upcoming renovation project at the medical center.

The related federal contract opportunity is for a project to Renovate Restrooms at the VA Medical Center in Battle Creek, Michigan. The Department of Veterans Affairs plans to issue an Invitation for Bid (IFB) on or about August 15, 2024 for this project, which has an estimated value between $2,000,000 and $5,000,000. This acquisition is a 100% set-aside for qualified Service-Disabled Veteran Owned Small Businesses (SDVOSB).

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

THE ENVIRONMENTAL SOLUTION

ALLIANCE

Environmental Group, Inc.

5153 COMMERCE SQUARE DRIVE, SUITE E, INDIANAPOLIS, INDIANA 46237

TEL (317) 865-3400 ▪ FAX (317) 865-3401 ▪ 800-783-7523

www.aegindy.com

December 16, 2016

Mr. Terry Thornsbury, AIA Viridian Architectural Design, Inc.

2020 East Washington Street Boulevard Suite 200 Fort Wayne, Indiana 46803

RE: ASBESTOS INSPECTION

BATTLE CREEK VETERANS AFFAIRS MEDICAL CENTER

ALLIANCE ENVIRONMENTAL GROUP PROJECT NUMBER 16-0151-A

Dear Mr. Thornsbury:

Pursuant to your request, on November 14 through November 17, 2016, Alliance Environmental Group (Alliance) conducted a pre-renovation asbestos inspection at Battle Creek Veterans Affairs Medical Center in Battle Creek, Michigan. Asbestos bulk samples were collected from interior and exterior caulking and glazing from buildings 1, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 24, 25, 26, 27, 28, 30, 85, 101, 109, 134, 136 and 138. Samples were analyzed by EMSL Analytical, Inc. utilizing polarized light microscopy (PLM) by EPA 600/R-93/116 Method and friable samples containing less than 1% asbestos were verified by EPA 600/R-93/116 with 400 Point Count. The following serves to summarize results of the inspection performed and a copy of the bulk sampling data sheet (16-0151-A) from the inspection is attached for your review.

In accordance with federal and state regulations, Alliance conducted an asbestos inspection of the aforementioned locations. Specifically, 280 samples of window caulking and glazing were collected.

Federal, state, and local regulations define asbestos-containing material (ACM) as any material containing greater than 1% asbestos.

The following materials are determined by the inspector to be friable and reported by the laboratory to be asbestos containing:

Dark Gray Exterior Caulking on Building 27/28 Metal Frame Gray Exterior Caulking on Building 30 Glass Block Wall White Interior Caulking on Building 134 Galvanized Frame with Flat Mullions Dark Gray Exterior Glazing on Building 136 Aluminum Frame with 3’ x 2’ Panes Gray Exterior Caulking on Building 136 Aluminum Frame with 3’ x 2’ Panes

The following materials are determined by the inspector to be non-friable and reported by the laboratory to be asbestos containing:

Gray Exterior Caulking on Building 1 Aluminum Frame Gray Exterior Caulking on Building 5 Aluminum Frame Gray Interior Caulking on Building 5 Aluminum Frame Gray Exterior Caulking on Building 6 Aluminum Frame Gray Interior Caulking on Building 6 Aluminum Frame Gray Exterior Caulking on Building 8 Aluminum Frame Gray Interior Caulking on Building 8 Aluminum Frame Gray Exterior Caulking on Building 11 Aluminum Frame lfedorczyk Text Box Z:\Viridian\Projects\20160019\JobDocs\02-SD\29-VA SD Submission\Battle Creek VA Bulk Sampling Report with attachments

Asbestos Inspection Battle Creek VA December 16, 2016 Page 2

Gray Interior Caulking on Building 11 Aluminum Frame Gray Exterior Caulking on Building 13 Aluminum Frame Gray Exterior Caulking on Building 14 Aluminum Frame Gray Exterior Caulking on Building 14 Off White Vent in Opening White Exterior Caulking on Building 14 Off White Vent in Opening Gray Exterior Caulking on Building 24 Aluminum Frame Gray Interior Caulking on Building 24 Aluminum Frame Gray Interior Caulking on Building 136 Aluminum Frame with 1’ x 3’ Light Gray Interior Caulking on Building 136 Aluminum Frame with 2’ x 3’ Gray Interior Caulking on Building 136 Aluminum Frame with 4’ x 5’

The following materials are determined by the inspector to be friable by the inspector and reported by the laboratory to contain less than 1% asbestos:

White Exterior Glazing on Building 6 Wood Frame Gray Exterior Glazing on Building 8 Wood Frame Gray Exterior Caulking on Building 9 Wood Frame White Exterior Caulking on Building 10 Aluminum Frame Cream Interior Caulking on Building 13 Wood Frame White Exterior Glazing on Building 14 Attic Wood Frame Translucent Interior Caulking on Building 26 Metal Frame Gray Exterior Caulk on Building 26 3’ x 5’ Window Opening Cover White Exterior Caulking on Building 26 Metal Frame Light Gray Interior Glazing on Building 27/28 Metal Frame Light Gray Interior Caulking on Building 27/28 Metal Frame Light Gray Exterior Glazing on Building 27/28 Metal Frame White Exterior Caulking on Building 134 Galvanized Frame with Rounded Mullions White Exterior Glazing on Building 134 Galvanized Frame with Rounded Mullions White Interior Glazing on Building 134 Galvanized Frame with Rounded Mullions White Exterior Glazing on Building 136 Aluminum Frame 2’ x 3’ Panes Gray Interior Glazing on Building 138 Thin Aluminum Frame Gray Interior Glazing on Building 138 Thick Aluminum Frame

The following materials are determined by the inspector to be non-friable and reported by the laboratory to contain less than 1% asbestos:

White Exterior Glazing on Building 4 Aluminum Frame Gray Exterior Caulking on Building 4 Aluminum Frame White Exterior Caulking on Building 6 Wood Frame Off White Exterior Caulking on Building 8 Aluminum Frame White Interior Caulking on Building 14 Aluminum Frame Off White Exterior Caulking on Building 26 Aluminum Frame Light Gray Interior Caulking on Building 27/28 Metal Frame

All other materials sampled did not contain asbestos.

The state of Michigan licensed inspector for this project was Mike Ardis; license number A49064, expiration date 06/07/2017.

Contact with materials containing less than one percent asbestos, according to OSHA, still require some limited safe work practices, prohibitions, and provisions including:

Asbestos Inspection Battle Creek VA December 16, 2016 Page 3

Wet methods, or wetting agents, to control employee exposures during asbestos handling, mixing, removal, cutting, application, and cleanup except where employers demonstrate that the use of wet methods is infeasible due to, for example the creation of electrical hazards.

Prompt clean-up and disposal of wastes and debris contaminated with asbestos in leak-tight containers.

High-speed abrasive disc saws that are not equipped with point-of-cut ventilator or enclosures with HEPA filtered exhaust air are prohibited.

Compressed air used to remove asbestos, or materials containing asbestos, unless the compressed air is used in conjunction with an enclosed ventilation system designed to capture the dust cloud created by the compressed air is prohibited.

Employee rotation as a means of reducing employee exposure to asbestos is prohibited.

A “competent person” should conduct an exposure assessment immediately before or at the initiation of the operation to ascertain expected exposures during the operation. The assessment must be completed in time to comply with requirements which are triggered by exposure data or the lack of a “negative exposure assessment”, and to provide information necessary to assure that all control systems planned are appropriate for that operation and will work properly. The permissible exposure limit is an eight-hour time-weighted average of 0.1 fiber per cubic centimeter of air and an excursion limit of 1.0 fiber per cubic centimeter of air as averaged over a sampling period of 30 minutes.

The employer should provide the affected employees and their designated representatives an opportunity to observe any monitoring of employee exposure to asbestos.

The employer shall notify affected employees of the monitoring results that represent that employee’s exposure as soon as possible following receipt of monitoring results in writing individually or by posting in a central location which is accessible to all affected employees.

The employer shall notify affected employees of the results of monitoring representing the employee’s exposure in writing either individually or by posting at a centrally located place that is accessible to affected employees

Mr. Thornsbury, Alliance appreciates the opportunity to have been of service to you and Viridian Architectural Design, Inc. and Battle Creek Veterans Affairs Medical Center. Please contact the undersigned if you require any additional information.

Sincerely, Alliance Environmental Group

Mike Ardis Environmental Project Specialist

Attachments

Asbestos Homogeneous Area (HA) and Sampling Summary

Samples Collected By:

Location: Battle Creek VA Hospital, Battle Creek, Michigan Mike Ardis

HA

No.

HA

Description

Type of

ACBM ¹

Approx.

Quantity

(Entire HA) ² Friable?

(Yes/No)

Damage (N,L,M,H) ³

Sample No. Sample Location Asbestos Content

Window Caulking/Glazing Inpection Alliance Project Number: 16-0151-A

Date Collected

(via Method EPA 600/R-93/116)

Project:

Date Collected: 11/14/2016 11/17/2016-

001 Metal Frame Light Gray Exterior Caulking

MISC N/A No M 001 Building 30 North None Detected11/14/2016

002 Metal Frame Light Gray Exterior Glazing

MISC N/A No M 002 Building 30 North None Detected11/14/2016

003 Plastic Frame Light Gray Exterior Caulking

MISC N/A No L 003 Building 30 West None Detected11/14/2016

003 Plastic Frame Light Gray Exterior Caulking

MISC N/A No L 004 Building 30 South None Detected11/14/2016

003 Plastic Frame Light Gray Exterior Caulking

MISC N/A No L 005 Building 30 West None Detected11/14/2016

004 Plastic Plastic Frame Dark Gray Exterior Caulking

MISC N/A No L 006 Building 30 West None Detected11/14/2016

005 Glass Block Wall Light Gray Exterior Caulking

MISC 1 Unit Yes L 007 Building 30 North % Chrysotile1.111/14/2016

006 Plastic Frame Light Gray Interior Caulking

MISC N/A No L 008 Building 30 North None Detected11/14/2016

006 Plastic Frame Light Gray Interior Caulking

MISC N/A No L 009 Building 30 West None Detected11/14/2016

SM = Surfacing Material; TSI = Thermal System Insulation; Misc. = Miscellaneous Material N = None; L = Low; M = Medium; H = HighSF = Square Feet; LF = Linear Feet; FTG = Fitting1 2 3

Location: Battle Creek VA Hospital, Battle Creek, Michigan Mike Ardis

HA

No.

HA

Description

Type of

ACBM ¹

Approx.

Quantity

(Entire HA) ² Friable?

(Yes/No)

Damage (N,L,M,H) ³

Sample No. Sample Location Asbestos Content

Window Caulking/Glazing Inpection Alliance Project Number: 16-0151-A

Date Collected

(via Method EPA 600/R-93/116)

Project:

Date Collected: 11/14/2016 11/17/2016-

007 Plastic Frame Light Gray Exterior Caulking

MISC N/A No L 010 Building 27/28 North None Detected11/14/2016

007 Plastic Frame Light Gray Exterior Caulking

MISC N/A Yes H 016 Building 27/28 South None Detected11/14/2016

007 Plastic Frame Light Gray Exterior Caulking

MISC N/A No H 017 Building 27/28 South None Detected11/14/2016

008 Metal Frame Light Gray Interior Glazing

MISC 22 Units Yes M 011 Building 27/28 South % Chrysotile0.2511/14/2016

008 Metal Frame Light Gray Interior Glazing

MISC N/A No L 026 Building 27/28 South None Detected11/14/2016

008 Metal Frame Light Gray Interior Glazing

MISC N/A Yes M 028 Building 27/28 South None Detected11/14/2016

008 Metal Frame Light Gray Interior Glazing

MISC N/A No L 031 Building 27/28 South None Detected11/14/2016

009 Metal Frame Light Gray Interior Caulking

MISC 22 Units Yes M 012 Building 27/28 South % Chrysotile<0.2511/14/2016

009 Metal Frame Light Gray Interior Caulking

MISC N/A No L 025 Building 27/28 South None Detected11/14/2016

009 Metal Frame Light Gray Interior Caulking

MISC N/A No M 027 Building 27/28 South None Detected11/14/2016

009 Metal Frame Light Gray Interior Caulking

MISC 22 Units Yes H 030 Building 27/28 South % Chrysotile0.5011/14/2016

SM = Surfacing Material; TSI = Thermal System Insulation; Misc. = Miscellaneous Material N = None; L = Low; M = Medium; H = HighSF = Square Feet; LF = Linear Feet; FTG = Fitting1 2 3

Location: Battle Creek VA Hospital, Battle Creek, Michigan Mike Ardis

HA

No.

HA

Description

Type of

ACBM ¹

Approx.

Quantity

(Entire HA) ² Friable?

(Yes/No)

Damage (N,L,M,H) ³

Sample No. Sample Location Asbestos Content

Window Caulking/Glazing Inpection Alliance Project Number: 16-0151-A

Date Collected

(via Method EPA 600/R-93/116)

Project:

Date Collected: 11/14/2016 11/17/2016-

010 Metal Frame Light Gray Exterior Caulking

MISC N/A No L 013 Building 27/28 South None Detected11/14/2016

010 Metal Frame Light Gray Exterior Caulking

MISC N/A No L 018 Building 27/28 West None Detected11/14/2016

010 Metal Frame Light Gray Exterior Caulking

MISC 22 Units No L 023 Building 27/28 West % Chrysotile<111/14/2016

011 Metal Frame Light Gray Exterior Glazing

MISC 22 Units Yes M 014 Building 27/28 South % Chrysotile0.2511/14/2016

012 Metal Frame Dark Gray Exterior Caulking

MISC 22 Units Yes M 015 Building 27/28 South % Chrysotile1.811/14/2016

013 Metal Frame White Exterior Caulking

MISC N/A No L 019 Building 27/28 South None Detected11/14/2016

014 Metal Frame Black Exterior Caulking

MISC N/A No L 020 Building 27/28 South None Detected11/14/2016

015 Metal Frame Black Exterior Glazing

MISC N/A No L 021 Building 27/28 South None Detected11/14/2016

016 Basement Window Covering Lightn Gray

Exterior Caulking

MISC N/A No L 022 Building 27/28 South None Detected11/14/2016

017 White Plastic Frame Translucent Exterior

Caulking

MISC N/A No L 024 Building 27/28 Entrance None Detected11/14/2016

SM = Surfacing Material; TSI = Thermal System Insulation; Misc. = Miscellaneous Material N = None; L = Low; M = Medium; H = HighSF = Square Feet; LF = Linear Feet; FTG = Fitting1 2 3

Location: Battle Creek VA Hospital, Battle Creek, Michigan Mike Ardis

HA

No.

HA

Description

Type of

ACBM ¹

Approx.

Quantity

(Entire HA) ² Friable?

(Yes/No)

Damage (N,L,M,H) ³

Sample No. Sample Location Asbestos Content

Window Caulking/Glazing Inpection Alliance Project Number: 16-0151-A

Date Collected

(via Method EPA 600/R-93/116)

Project:

Date Collected: 11/14/2016 11/17/2016-

018 Metal Frame Light Gray Interior Caulking

MISC N/A No H 029 Building 27/28 South None Detected11/14/2016

020 Plastic Frame Light Gray Exterior Caulking

MISC N/A No L 032 Building 26 South None Detected11/14/2016

021 Plastic Frame Light Gray Exterior Glazing

MISC N/A No L 033 Building 26 South None Detected11/14/2016

022 Metal Frame Light Gray Exterior Glazing

MISC N/A Yes L 034 Building 26 South None Detected11/14/2016

023 Metal Frame Light Gray Interior Glazing

MISC N/A Yes L 035 Building 26 South None Detected11/14/2016

024 Metal Frame Over Door Gray Exterior Caulking

MISC N/A No L 036 Building 26 South None Detected11/14/2016

025 Metal Frame Over Door Translucent Exterior

Caulking

MISC N/A No L 037 Building 26 South None Detected11/14/2016

026 Metal Frame Over Door Black Exterior Glazing

MISC N/A No L 038 Building 26 South None Detected11/14/2016

027 Plastic Frame Light Gray Exterior Caulking

MISC N/A No L 039 Building 26 South None Detected11/14/2016

028 Plastic Frame Light Gray Exterior Glazing

MISC N/A No L 040 Building 26 South None Detected11/14/2016

SM = Surfacing Material; TSI = Thermal System Insulation; Misc. = Miscellaneous Material N = None; L = Low; M = Medium; H = HighSF = Square Feet; LF = Linear Feet; FTG = Fitting1 2 3

Location: Battle Creek VA Hospital, Battle Creek, Michigan Mike Ardis

HA

No.

HA

Description

Type of

ACBM ¹

Approx.

Quantity

(Entire HA) ² Friable?

(Yes/No)

Damage (N,L,M,H) ³

Sample No. Sample Location Asbestos Content

Window Caulking/Glazing Inpection Alliance Project Number: 16-0151-A

Date Collected

(via Method EPA 600/R-93/116)

Project:

Date Collected: 11/14/2016 11/17/2016-

029 Metal Frame Translucent Exterior Caulking

MISC 20 Units Yes H 041 Building 26 East % Chrysotile<0.2511/14/2016

030 Metal Frame Translucent Exterior Glazing

MISC N/A Yes H 042 Building 26 East None Detected11/14/2016

031 Window Opening Cover Gray Exterior Caulking

MISC 7 Units Yes M 043 Building 26 North % Chrysotile0.7511/14/2016

032 Window Opening Cover Translucent Exterior

Caulking

MISC N/A No M 044 Building 26 North None Detected11/14/2016

033 Metal Frame White Interior Caulking

MISC 20 Units Yes M 045 Building 26 West % Chrysotile<0.2511/14/2016

033 Metal Frame White Interior Caulking

MISC N/A Yes M 046 Building 26 West None Detected11/14/2016

034 Plastic Frame Light Gray Interior Caulking

MISC N/A No L 047 Building 26 South None Detected11/14/2016

035 Aluminum Frame Gray Exterior Caulking

MISC N/A No L 048 Building 26 South None Detected11/14/2016

035 Aluminum Frame Gray Exterior Caulking

MISC 95 Units No L 054 Building 24 East % Chrysotile211/14/2016

036 Aluminum Frame Off White Exterior Caulking

MISC 12 Units No L 049 Building 26 South % Chrysotile<111/14/2016

SM = Surfacing Material; TSI = Thermal System Insulation; Misc. = Miscellaneous Material N = None; L = Low; M = Medium; H = HighSF = Square Feet; LF = Linear Feet; FTG = Fitting1 2 3

Location: Battle Creek VA Hospital, Battle Creek, Michigan Mike Ardis

HA

No.

HA

Description

Type of

ACBM ¹

Approx.

Quantity

(Entire HA) ² Friable?

(Yes/No)

Damage (N,L,M,H) ³

Sample No. Sample Location Asbestos Content

Window Caulking/Glazing Inpection Alliance Project Number: 16-0151-A

Date Collected

(via Method EPA 600/R-93/116)

Project:

Date Collected: 11/14/2016 11/17/2016-

037 Aluminum Frame Cream Exterior Caulking

MISC N/A No L 050 Building 26 South None Detected11/14/2016

038 Aluminum Frame Gray Exterior Glazing

MISC N/A No L 051 Building 26 South None Detected11/14/2016

038 Aluminum Frame Gray Exterior Glazing

MISC N/A No L 055 Building 24 East None Detected11/14/2016

039 Aluminum Frame Dark Gray Interior Caulking

MISC N/A No L 052 Building 25 South None Detected11/14/2016

040 Aluminum Frame Light Gray Interior Caulking

MISC N/A No L 053 Building 25 South None Detected11/14/2016

041 Aluminum Frame Gray Exterior Caulking

MISC N/A Yes M 056 Building 24 East None Detected11/14/2016

041 Aluminum Frame Gray Exterior Caulking

MISC 90 Units No L 058 Building 24 East % Chrysotile211/14/2016

042 Aluminum Frame Gray Exterior Glazing

MISC N/A Yes M 057 Building 24 East None Detected11/14/2016

042 Aluminum Frame Gray Exterior Glazing

MISC N/A No L 060 Building 24 East None Detected11/14/2016

043 Aluminum Frame Clear Exterior Caulking

MISC N/A No L 059 Building 24 East None Detected11/14/2016

044 Aluminum Frame Gray Interior Caulking

MISC 90 Units No L 061 Building 24 North % Chrysotile211/14/2016

SM = Surfacing Material; TSI = Thermal System Insulation; Misc. = Miscellaneous Material N = None; L = Low; M = Medium; H = HighSF = Square Feet; LF = Linear Feet; FTG = Fitting1 2 3

Location: Battle Creek VA Hospital, Battle Creek, Michigan Mike Ardis

HA

No.

HA

Description

Type of

ACBM ¹

Approx.

Quantity

(Entire HA) ² Friable?

(Yes/No)

Damage (N,L,M,H) ³

Sample No. Sample Location Asbestos Content

Window Caulking/Glazing Inpection Alliance Project Number: 16-0151-A

Date Collected

(via Method EPA 600/R-93/116)

Project:

Date Collected: 11/14/2016 11/17/2016-

044 Aluminum Frame Gray Interior Caulking

MISC 90 Units No L 064 Building 24 North % Chrysotile211/14/2016

045 Aluminum Frame Gray Interior Glazing

MISC N/A No L 062 Building 24 North None Detected11/14/2016

045 Aluminum Frame Gray Interior Glazing

MISC N/A No L 063 Building 24 South None Detected11/14/2016

045 Aluminum Frame Gray Interior Glazing

MISC N/A No L 065 Building 24 North None Detected11/14/2016

046 Aluminum Frame White Exterior Caulking

MISC N/A No L 066 Building 10 South None Detected11/14/2016

046 Aluminum Frame White Exterior Caulking

MISC N/A No L 071 Building 10 East None Detected11/14/2016

046 Aluminum Frame White Exterior Caulking

MISC N/A No L 074 Building 10 East None Detected11/14/2016

046 Aluminum Frame White Exterior Caulking

MISC N/A No L 077 Building 10 West None Detected11/14/2016

047 Aluminum Frame Gray Exterior Caulking

MISC N/A No L 067 Building 10 South None Detected11/14/2016

047 Aluminum Frame Gray Exterior Caulking

MISC N/A No L 069 Building 10 East None Detected11/14/2016

047 Aluminum Frame Gray Exterior Caulking

MISC N/A No L 075 Building 10 East None Detected11/14/2016

SM = Surfacing Material; TSI = Thermal System Insulation; Misc. = Miscellaneous Material N = None; L = Low; M = Medium; H = HighSF = Square Feet; LF = Linear Feet; FTG = Fitting1 2 3

Location: Battle Creek VA Hospital, Battle Creek, Michigan Mike Ardis

HA

No.

HA

Description

Type of

ACBM ¹

Approx.

Quantity

(Entire HA) ² Friable?

(Yes/No)

Damage (N,L,M,H) ³

Sample No. Sample Location Asbestos Content

Window Caulking/Glazing Inpection Alliance Project Number: 16-0151-A

Date Collected

(via Method EPA 600/R-93/116)

Project:

Date Collected: 11/14/2016 11/17/2016-

047 Aluminum Frame Gray Exterior Caulking

MISC N/A No L 078 Building 10 West None Detected11/14/2016

048 Aluminum Frame Gray Exterior Glazing

MISC N/A No L 068 Building 10 South None Detected11/14/2016

048 Aluminum Frame Gray Exterior Glazing

MISC N/A No L 076 Building 10 East None Detected11/14/2016

048 Aluminum Frame Gray Exterior Glazing

MISC N/A No L 079 Building 10 West None Detected11/14/2016

049 Aluminum Frame Light Gray Exterior Glazing

MISC N/A No L 070 Building 10 East None Detected11/14/2016

051 Aluminum Frame Gray Interior Caulking

MISC N/A No L 080 Building 10 West None Detected11/14/2016

051 Aluminum Frame Gray Interior Caulking

MISC N/A No L 081 Building 10 South None Detected11/14/2016

051 Aluminum Frame Gray Interior Caulking

MISC N/A No L 082 Building 10 North None Detected11/14/2016

051 Aluminum Frame Gray Interior Caulking

MISC N/A No L 083 Building 10 South None Detected11/14/2016

052 Metal Frame White Interior Glazing

MISC N/A Yes H 084 Building 30 South None Detected11/14/2016

053 Metal Frame Gray Exterior Caulking

MISC N/A No L 085 Building 9 West None Detected11/14/2016

SM = Surfacing Material; TSI = Thermal System Insulation; Misc. = Miscellaneous Material N = None; L = Low; M = Medium; H = HighSF = Square Feet; LF = Linear Feet; FTG = Fitting1 2 3

Location: Battle Creek VA Hospital, Battle Creek, Michigan Mike Ardis

HA

No.

HA

Description

Type of

ACBM ¹

Approx.

Quantity

(Entire HA) ² Friable?

(Yes/No)

Damage (N,L,M,H) ³

Sample No. Sample Location Asbestos Content

Window Caulking/Glazing Inpection Alliance Project Number: 16-0151-A

Date Collected

(via Method EPA 600/R-93/116)

Project:

Date Collected: 11/14/2016 11/17/2016-

053 Metal Frame Gray Exterior Caulking

MISC N/A No L 087 Building 9 West None Detected11/14/2016

054 Metal Frame LG White Exterior Caulking

MISC N/A No L 086 Building 9 West None Detected11/14/2016

054 Metal Frame LG White Exterior Caulking

MISC N/A No L 088 Building 9 West None Detected11/14/2016

055 Wood Frame Gray Exterior Caulking

MISC 11 Units Yes H 089 Building 9 North (B) % Chrysotile0.2511/14/2016

056 Aluminum Frame Gray Interior Caulking

MISC N/A No L 090 Building 9 South None Detected11/14/2016

056 Aluminum Frame Gray Interior Caulking

MISC N/A No L 092 Building 9 East None Detected11/14/2016

057 Aluminum Frame Light Gray Interior Caulking

MISC N/A No L 091 Building 9 South None Detected11/14/2016

058 Aluminum Frame Gray Exterior Caulking

MISC 91 Units No L 093 Building 8 South % Chrysotile211/14/2016

058 Aluminum Frame Gray Exterior Caulking

MISC 91 Units No L 098 Building 8 North % Chrysotile211/14/2016

059 Aluminum Frame Gray Exterior Glazing

MISC N/A No L 094 Building 8 South None Detected11/14/2016

059 Aluminum Frame Gray Exterior Glazing

MISC N/A No L 096 Building 8 West None Detected11/14/2016

SM = Surfacing Material; TSI = Thermal System Insulation; Misc. = Miscellaneous Material N = None; L = Low; M = Medium; H = HighSF = Square Feet; LF = Linear Feet; FTG = Fitting1 2 3

Location: Battle Creek VA Hospital, Battle Creek, Michigan Mike Ardis

HA

No.

HA

Description

Type of

ACBM ¹

Approx.

Quantity

(Entire HA) ² Friable?

(Yes/No)

Damage (N,L,M,H) ³

Sample No. Sample Location Asbestos Content

Window Caulking/Glazing Inpection Alliance Project Number: 16-0151-A

Date Collected

(via Method EPA 600/R-93/116)

Project:

Date Collected: 11/14/2016 11/17/2016-

059 Aluminum Frame Gray Exterior Glazing

MISC N/A No L 099 Building 8 North None Detected11/14/2016

060 Aluminum Frame Off White Exterior Caulking

MISC 91 Units No L 095 Building 8 West % Chrysotile<111/14/2016

061 Wood Frame Gray Exterior Glazing

MISC 20 Units Yes M 097 Building 8 North (B) % Chrysotile<0.2511/14/2016

062 Aluminum Frame Gray Interior Caulking

MISC 84 Units No L 100 Building 8 East % Chrysotile211/14/2016

062 Aluminum Frame Gray Interior Caulking

MISC 84 Units No L 102 Building 8 North % Chrysotile211/14/2016

062 Aluminum Frame Gray Interior Caulking

MISC 84 Units No L 104 Building 8 East % Chrysotile211/14/2016

063 Aluminum Frame Gray Interior Glazing

MISC N/A No L 101 Building 8 East None Detected11/14/2016

063 Aluminum Frame Gray Interior Glazing

MISC N/A No L 103 Building 8 North None Detected11/14/2016

063 Aluminum Frame Gray Interior Glazing

MISC N/A No L 105 Building 8 East None Detected11/14/2016

064 Aluminum Frame Gray Exterior Caulking

MISC 51 Units No L 106 Building 13 West (B) % Chrysotile211/14/2016

064 Aluminum Frame Gray Exterior Caulking

MISC N/A No L 108 Building 13 South None Detected11/14/2016

SM = Surfacing Material; TSI = Thermal System Insulation; Misc. = Miscellaneous Material N = None; L = Low; M = Medium; H = HighSF = Square Feet; LF = Linear Feet; FTG = Fitting1 2 3

Location: Battle Creek VA Hospital, Battle Creek, Michigan Mike Ardis

HA

No.

HA

Description

Type of

ACBM ¹

Approx.

Quantity

(Entire HA) ² Friable?

(Yes/No)

Damage (N,L,M,H) ³

Sample No. Sample Location Asbestos Content

Window Caulking/Glazing Inpection Alliance Project Number: 16-0151-A

Date Collected

(via Method EPA 600/R-93/116)

Project:

Date Collected: 11/14/2016 11/17/2016-

064 Aluminum Frame Gray Exterior Caulking

MISC N/A No L 110 Building 13 South None Detected11/14/2016

064 Aluminum Frame Gray Exterior Caulking

MISC N/A No L 112 Building 13 West None Detected11/14/2016

064 Aluminum Frame Gray Exterior Caulking

MISC N/A No L 114 Building 13 South None Detected11/14/2016

064 Aluminum Frame Gray Exterior Caulking

MISC N/A No L 118 Building 13 West None Detected11/14/2016

064 Aluminum Frame Gray Exterior Caulking

MISC N/A No L 129 Building 13 South None Detected11/14/2016

065 Aluminum Frame Gray Exterior Glazing

MISC N/A No L 107 Building 13 West None Detected11/14/2016

065 Aluminum Frame Gray Exterior Glazing

MISC N/A No L 109 Building 13 South None Detected11/14/2016

065 Aluminum Frame Gray Exterior Glazing

MISC N/A No L 111 Building 13 South None Detected11/14/2016

065 Aluminum Frame Gray Exterior Glazing

MISC N/A No L 113 Building 13 West None Detected11/14/2016

066 Aluminum Frame Black Exterior Glazing

MISC N/A No L 115 Building 13 South None Detected11/14/2016

066 Aluminum Frame Black Exterior Glazing

MISC N/A No L 119 Building 13 West None Detected11/14/2016

SM = Surfacing Material; TSI = Thermal System Insulation; Misc. = Miscellaneous Material N = None; L = Low; M = Medium; H = HighSF = Square Feet; LF = Linear Feet; FTG = Fitting1 2 3

Location: Battle Creek VA Hospital, Battle Creek, Michigan Mike Ardis

HA

No.

HA

Description

Type of

ACBM ¹

Approx.

Quantity

(Entire HA) ² Friable?

(Yes/No)

Damage (N,L,M,H) ³

Sample No. Sample Location Asbestos Content

Window Caulking/Glazing Inpection Alliance Project Number: 16-0151-A

Date Collected

(via Method EPA 600/R-93/116)

Project:

Date Collected: 11/14/2016 11/17/2016-

066 Aluminum Frame Black Exterior Glazing

MISC N/A No L 130 Building 13 South None Detected11/14/2016

067 Aluminum Frame with AC Unit Translucent Exterior

Caulking

MISC N/A No L 116 Building 13 South None Detected11/14/2016

068 Aluminum Frame with AC Unit Gray Exterior

Caulking

MISC 20 Units No L 117 Building 13 South % Chrysotile211/14/2016

069 Plastic Frame White Interior Caulking

MISC N/A No L 120 Building 13 North None Detected11/14/2016

069 Plastic Frame White Interior Caulking

MISC N/A No L 131 Building 13 East None Detected11/14/2016

070 Plastic Frame Black Interior Glazing

MISC N/A No L 121 Building 13 North None Detected11/14/2016

070 Plastic Frame Black Interior Glazing

MISC N/A No L 132 Building 13 East None Detected11/14/2016

071 Plastic Frame Black Exterior Glazing

MISC N/A No L 122 Building 13 North None Detected11/14/2016

072 Round Window Outer Frame Cream Exterior

Caulk

MISC N/A No L 123 Building 13 South None Detected11/14/2016

072 Round Window Inner Frame Cream Exterior

Caulk

MISC N/A No L 124 Building 13 South None Detected11/14/2016

SM = Surfacing Material; TSI = Thermal System Insulation; Misc. = Miscellaneous Material N = None; L = Low; M = Medium; H = HighSF = Square Feet; LF = Linear Feet; FTG = Fitting1 2 3

Location: Battle Creek VA Hospital, Battle Creek, Michigan Mike Ardis

HA

No.

HA

Description

Type of

ACBM ¹

Approx.

Quantity

(Entire HA) ² Friable?

(Yes/No)

Damage (N,L,M,H) ³

Sample No. Sample Location Asbestos Content

Window Caulking/Glazing Inpection Alliance Project Number: 16-0151-A

Date Collected

(via Method EPA 600/R-93/116)

Project:

Date Collected: 11/14/2016 11/17/2016-

073 Round Window Inner Frame Exterior Glazing

MISC 8 Units Yes H 125 Building 13 South % Chrysotile0.2511/14/2016

074 Aluminum Frame Gray Interior Caulking

MISC N/A No L 126 Building 13 South None Detected11/14/2016

074 Aluminum Frame Gray Interior Caulking

MISC N/A No L 128 Building 13 South None Detected11/14/2016

074 Aluminum Frame Gray Interior Caulking

MISC N/A No L 135 Building 13 Room 133 None Detected11/14/2016

075 Aluminum Frame Dark Gray Interior Glazing

MISC N/A Yes M 127 Building 13 South None Detected11/14/2016

076 Aluminum Frame Gray Interior Glazing

MISC N/A No L 133 Building 13 Room 025 None Detected11/14/2016

077 Aluminum Frame White Interior Caulking

MISC N/A No H 134 Building 13 Room 133 None Detected11/14/2016

078 Wood Frame White Exterior Glazing

MISC N/A Yes M 136 Building 5 NW Corner None Detected11/14/2016

079 Wood Frame White Exterior Glazing

MISC N/A Yes M 137 Building 5 NW Corner None Detected11/14/2016

080 Wood Frame Gray Exterior Caulking

MISC N/A No M 138 Building 5 NW Corner None Detected11/14/2016

081 Aluminum Frame Gray Exterior Caulking

MISC N/A No L 139 Building 5 NW Basement None Detected11/14/2016

SM = Surfacing Material; TSI = Thermal System Insulation; Misc. = Miscellaneous Material N = None; L = Low; M = Medium; H = HighSF = Square Feet; LF = Linear Feet; FTG = Fitting1 2 3

Location: Battle Creek VA Hospital, Battle Creek, Michigan Mike Ardis

HA

No.

HA

Description

Type of

ACBM ¹

Approx.

Quantity

(Entire HA) ² Friable?

(Yes/No)

Damage (N,L,M,H) ³

Sample No. Sample Location Asbestos Content

Window Caulking/Glazing Inpection Alliance Project Number: 16-0151-A

Date Collected

(via Method EPA 600/R-93/116)

Project:

Date Collected: 11/14/2016 11/17/2016-

081 Aluminum Frame Gray Exterior Caulking

MISC 48 Units No L 141 Building 5 Load Dock % Chrysotile211/14/2016

082 Aluminum Frame White Exterior Glazing

MISC N/A Yes M 140 Building 5 NW Basement None Detected11/14/2016

083 Aluminum Frame Gray Exterior Glazing

MISC N/A No L 142 Building 5 Load Dock None Detected11/14/2016

084 Aluminum Frame Gray Interior Caulking

MISC 58 Units No L 143 Building 5 History Museum % Chrysotile211/14/2016

085 Aluminum Frame Gray Interior Glazing

MISC N/A No L 144 Building 5 Covered Walkway None Detected11/14/2016

086 Plastic Frame White Exterior Caulking

MISC N/A No L 145 Building 5 Northest Dormer None Detected11/14/2016

087 Plastic Frame White Exterior Glazing

MISC N/A No L 146 Building 5 Northwest Dormer None Detected11/14/2016

088 Wood Frame White Exterior Caulking

MISC N/A No L 147 Building 85 Northwest None Detected11/14/2016

089 Wood Frame Gray Exterior Glazing

MISC N/A Yes M 148 Building 85 Northwest None Detected11/14/2016

090 Metal Frame Gray Exterior Caulking

MISC N/A No L 149 Building 85 Northwest None Detected11/14/2016

091 Metal Frame White Exterior Glazing

MISC N/A Yes L 150 Building 85 Northwest None Detected11/14/2016

SM = Surfacing Material; TSI = Thermal System Insulation; Misc. = Miscellaneous Material N = None; L = Low; M = Medium; H = HighSF = Square Feet; LF = Linear Feet; FTG = Fitting1 2 3

Location: Battle Creek VA Hospital, Battle Creek, Michigan Mike Ardis

HA

No.

HA

Description

Type of

ACBM ¹

Approx.

Quantity

(Entire HA) ² Friable?

(Yes/No)

Damage (N,L,M,H) ³

Sample No. Sample Location Asbestos Content

Window Caulking/Glazing Inpection Alliance Project Number: 16-0151-A

Date Collected

(via Method EPA 600/R-93/116)

Project:

Date Collected: 11/14/2016 11/17/2016-

092 Plastic Frame White Exterior Caulking

MISC N/A No L 151 Building 85 Southwest None Detected11/14/2016

093 Vent Metal Frame Gray Exterior Caulking

MISC N/A No L 152 Building 85 Southeast None Detected11/14/2016

094 Metal Frame White Interior Glazing

MISC N/A Yes L 153 Building 85 North None Detected11/14/2016

095 Metal Frame White Interior Glazing

MISC N/A No L 154 Building 85 North None Detected11/14/2016

096 Plastic Frame White Interior Caulking

MISC N/A No L 155 Building 85 Southwest None Detected11/14/2016

097 Plastic Frame White Interior Glazing

MISC N/A No L 156 Building 85 Southwest None Detected11/14/2016

098 Plastic Frame Gray Exterior Caulking

MISC N/A No L 157 Building 109 South None Detected11/14/2016

099 Plastic Frame White Exterior Caulking

MISC N/A No L 158 Building 109 South None Detected11/14/2016

100 Plastic Frame White Exterior Glazing

MISC N/A No L 159 Building 109 South None Detected11/14/2016

101 Aluminium Frame 1' x 3' Panes Gray Exterior

Glazing

MISC 15 Units No L 160 Building 136 North % Chrysotile211/14/2016

SM = Surfacing Material; TSI = Thermal System Insulation; Misc. = Miscellaneous Material N = None; L = Low; M = Medium; H = HighSF = Square Feet; LF = Linear Feet; FTG = Fitting1 2 3

Location: Battle Creek VA Hospital, Battle Creek, Michigan Mike Ardis

HA

No.

HA

Description

Type of

ACBM ¹

Approx.

Quantity

(Entire HA) ² Friable?

(Yes/No)

Damage (N,L,M,H) ³

Sample No. Sample Location Asbestos Content

Window Caulking/Glazing Inpection Alliance Project Number: 16-0151-A

Date Collected

(via Method EPA 600/R-93/116)

Project:

Date Collected: 11/14/2016 11/17/2016-

102 Aluminium Frame 1' x 3' Panes Gray Exterior

Glazing

MISC N/A No L 161 Building 136 North None Detected11/14/2016

103 Aluminium Frame 2' x 3' Panes Light Gray Exterior

Caulking

MISC 15 Units No L 162 Building 136 North % Chrysotile211/14/2016

104 Aluminium Frame 2' x 3' Panes Dark Gray Exterior

Glazing

MISC 15 Units Yes L 163 Building 136 North % Chrysotile211/14/2016

105 Aluminium Frame 2' x 3' Black Exterior Glazing

MISC N/A Yes L 164 Building 136 North None Detected11/14/2016

106 Aluminium Frame 2' x 3' Thick Gray Exterior

Caulking

MISC 15 Units Yes L 165 Building 136 North % Chrysotile211/14/2016

107 Aluminium Frame 2' x 3' White Exterior Glazing

MISC 5 Units Yes L 166 Building 136 North % Chrysotile0.5011/14/2016

108 Aluminium Frame 4' x 5' Gray Exterior Caulking

MISC 5 Units No L 167 Building 136 North % Chrysotile211/14/2016

109 Aluminium Frame 4' x 5' Black Exterior Glazing

MISC N/A No L 168 Building 136 North None Detected11/14/2016

110 Aluminium Frame 1.5' x 3' Gray Exterior Caulking

MISC N/A No L 169 Building 136 East None Detected11/14/2016

111 Aluminium Frame 1.5' x 3' Gray Exterior Caulking

MISC N/A No L 170 Building 136 East None Detected11/14/2016

SM = Surfacing Material; TSI = Thermal System Insulation; Misc. = Miscellaneous Material N = None; L = Low; M = Medium; H = HighSF = Square Feet; LF = Linear Feet; FTG = Fitting1 2 3

Location: Battle Creek VA Hospital, Battle Creek, Michigan Mike Ardis

HA

No.

HA

Description

Type of

ACBM ¹

Approx.

Quantity

(Entire HA) ² Friable?

(Yes/No)

Damage (N,L,M,H) ³

Sample No. Sample Location Asbestos Content

Window Caulking/Glazing Inpection Alliance Project Number: 16-0151-A

Date Collected

(via Method EPA 600/R-93/116)

Project:

Date Collected: 11/14/2016 11/17/2016-

112 Aluminium Frame 1.5' x 3' Black Exterior Glazing

MISC N/A No L 171 Building 136 East None Detected11/14/2016

113 Aluminium Frame 2' x 3' Black Interior Glazing

MISC N/A No L 172 Building 136 Library NW None Detected11/14/2016

114 Aluminium Frame 4' x 5' Black Interior Glazing

MISC N/A No L 173 Building 136 Med Supply None Detected11/14/2016

114 Aluminium Frame 4' x 5' Black Interior Glazing

MISC N/A No L 174 Building 136 Library None Detected11/14/2016

115 Aluminum Frame BG Gray Exterior Caulking

MISC N/A No L 175 Building 138 North None Detected11/14/2016

116 Aluminum Frame BG Gray Exterior Glazing

MISC N/A Yes L 176 Building 138 North None Detected11/14/2016

117 Aluminium Thick Frame Gray Interior Glazing

MISC N/A Yes M 177 Building 138 South None Detected11/14/2016

118 Aluminium Thick Frame Gray Exterior Caulking

MISC N/A Yes L 178 Building 138 South None Detected11/14/2016

119 Aluminium Thick Frame Gray Exterior Glazing

MISC N/A Yes L 179 Building 138 South None Detected11/14/2016

120 Aluminium Thin Frame Gray Interior Glazing

MISC 11 Units Yes H 180 Building 138 South % Chrysotile0.5011/14/2016

121 Aluminium Thick Frame Gray Interior Glazing

MISC 9 Units Yes H 181 Building 138 South % Chrysotile<0.2511/14/2016

SM = Surfacing Material; TSI = Thermal System Insulation; Misc. = Miscellaneous Material N = None; L = Low; M = Medium; H = HighSF = Square Feet; LF = Linear Feet; FTG = Fitting1 2 3

Location: Battle Creek VA Hospital, Battle Creek, Michigan Mike Ardis

HA

No.

HA

Description

Type of

ACBM ¹

Approx.

Quantity

(Entire HA) ² Friable?

(Yes/No)

Damage (N,L,M,H) ³

Sample No. Sample Location Asbestos Content

Window Caulking/Glazing Inpection Alliance Project Number: 16-0151-A

Date Collected

(via Method EPA 600/R-93/116)

Project:

Date Collected: 11/14/2016 11/17/2016-

122 Aluminum Frame BG Gray Interior Caulking

MISC N/A No L 182 Building 138 North None Detected11/14/2016

123 Aluminum Frame BG Black Interior Glazing

MISC N/A No L 183 Building 138 North None Detected11/14/2016

124 Galvanized Rounded Mulliuns White Exterior

Caulking

MISC 47 Units Yes M 184 Building 134 East % Chrysotile<0.2511/14/2016

125 Galvanized Rounded Mulliuns White Exterior

Glazing

MISC 47 Units Yes M 185 Building 134 East % Chrysotile0.2511/14/2016

126 Galvanized Rounded Mulliuns White Interior

Glazing

MISC 15 Units Yes L 186 Building 134 West % Chrysotile<0.2511/14/2016

127 Galvanized Flat Mulliuns White Interior Caulking

MISC N/A No L 187 Building 134 West None Detected11/14/2016

128 Galvanized Flat Mulliuns White Exterior Caulking

MISC 15 Units Yes L 188 Building 134 West % Chrysotile211/14/2016

129 Galvanized Flat Mulliuns Gray Exterior Glazing

MISC N/A Yes L 189 Building 134 West None Detected11/14/2016

130 Aluminum Frame Outer Gray Exterior Caulking

MISC N/A No L 190 Building 101 North None Detected11/14/2016

131 Aluminum Frame Inner Gray Exterior Caulking

MISC N/A No L 191 Building 101 North None Detected11/14/2016

SM = Surfacing Material; TSI = Thermal System Insulation; Misc. = Miscellaneous Material N = None; L = Low; M = Medium; H = HighSF = Square Feet; LF = Linear Feet; FTG = Fitting1 2 3

Location: Battle Creek VA Hospital, Battle Creek, Michigan Mike Ardis

HA

No.

HA

Description

Type of

ACBM ¹

Approx.

Quantity

(Entire HA) ² Friable?

(Yes/No)

Damage (N,L,M,H) ³

Sample No. Sample Location Asbestos Content

Window Caulking/Glazing Inpection Alliance Project Number: 16-0151-A

Date Collected

(via Method EPA 600/R-93/116)

Project:

Date Collected: 11/14/2016 11/17/2016-

132 Aluminum Frame Black Exterior Glazing

MISC N/A No L 192 Building 101 North None Detected11/14/2016

133 Aluminum Frame Black Interior Glazing

MISC N/A No L 193 Building 101 South None Detected11/14/2016

134 Aluminum Frame Gray Exterior Caulking

MISC 58 Units No L 194 Building 6 W NW Entrance % Chrysotile211/14/2016

134 Aluminum Frame Gray Exterior Caulking

MISC N/A No L 195 Building 6 W NW Entrance None Detected11/14/2016

134 Aluminum Frame Gray Exterior Caulking

MISC 58 Units No L 197 Building 6 North % Chrysotile211/14/2016

134 Aluminum Frame Gray Exterior Caulking

MISC N/A No L 200 Building 6 South None Detected11/14/2016

135 Aluminum Frame Black Exterior Glazing

MISC N/A No L 196 Building 6 W NW Entrance None Detected11/14/2016

136 Aluminum Frame Gray Exterior Glazing

MISC N/A No L 198 Building 6 South None Detected11/14/2016

137 Aluminum Frame with Vent Black Exterior

Glazing

MISC 1 Unit Yes M 199 Building 6 South % Chrysotile211/14/2016

138 Wood Frame Inner White Exterior Caulking

MISC N/A Yes M 201 Building 6 South None Detected11/14/2016

SM = Surfacing Material; TSI = Thermal System Insulation; Misc. = Miscellaneous Material N = None; L = Low; M = Medium; H = HighSF = Square Feet; LF = Linear Feet; FTG = Fitting1 2 3

Location: Battle Creek VA Hospital, Battle Creek, Michigan Mike Ardis

HA

No.

HA

Description

Type of

ACBM ¹

Approx.

Quantity

(Entire HA) ² Friable?

(Yes/No)

Damage (N,L,M,H) ³

Sample No. Sample Location Asbestos Content

Window Caulking/Glazing Inpection Alliance Project Number: 16-0151-A

Date Collected

(via Method EPA 600/R-93/116)

Project:

Date Collected: 11/14/2016 11/17/2016-

139 Wood Frame Inner White Exterior Caulking

MISC 2 Units No H 202 Building 6 South % Chrysotile<111/14/2016

140 Wood Frame White Exterior Glazing

MISC 2 Units Yes M 203 Building 6 South % Chrysotile0.2511/14/2016

141 Aluminum Frame Gray Interior Glazing

MISC N/A No L 204 Building 6 North None Detected11/14/2016

142 Aluminum Frame Gray Interior Caulking

MISC 58 Units No L 205 Building 6 East % Chrysotile211/14/2016

142 Aluminum Frame Gray Interior Caulking

MISC N/A No L 206 Building 6 East None Detected11/14/2016

143 Aluminum Frame Black Interior Glazing

MISC N/A No L 207 Building 6 East None Detected11/14/2016

144 Aluminum Frame with Vent Black Exterior

Caulking

MISC N/A No L 208 Building 14 North None Detected11/14/2016

145 Aluminum Frame with Vent Black Exterior

Caulking

MISC N/A No L 209 Building 14 North None Detected11/14/2016

146 Aluminum Frame Gray Exterior Caulking

MISC 240 Units No L 210 Building 14 North % Chrysotile211/14/2016

146 Aluminum Frame Gray Exterior Caulking

MISC N/A No L 212 Building 14 South None Detected11/14/2016

SM = Surfacing Material; TSI = Thermal System Insulation; Misc. = Miscellaneous Material N = None; L = Low; M = Medium; H = HighSF = Square Feet; LF = Linear Feet; FTG = Fitting1 2 3

Location: Battle Creek VA Hospital, Battle Creek, Michigan Mike Ardis

HA

No.

HA

Description

Type of

ACBM ¹

Approx.

Quantity

(Entire HA) ² Friable?

(Yes/No)

Damage (N,L,M,H) ³

Sample No. Sample Location Asbestos Content

Window Caulking/Glazing Inpection Alliance Project Number: 16-0151-A

Date Collected

(via Method EPA 600/R-93/116)

Project:

Date Collected: 11/14/2016 11/17/2016-

146 Aluminum Frame Gray Exterior Caulking

MISC N/A No L 213 Building 14 South None Detected11/14/2016

147 Aluminum Frame Black Exterior Glazing

MISC N/A No L 211 Building 14 North None Detected11/14/2016

147 Aluminum Frame Black Exterior Glazing

MISC N/A No L 214 Building 14 South None Detected11/14/2016

148 Off White Vent Light Gray Exterior Caulking

MISC 12 Units Yes L 215 Building 14 South % Chrysotile211/14/2016

149 Off White Vent White Exterior Caulking

MISC 12 Units Yes L 216 Building 14 South % Chrysotile211/14/2016

150 Aluminum Frame White Exterior Caulking

MISC N/A No L 217 Building 14 East None Detected11/14/2016

151 Aluminum Frame Gray Interior Caulking

MISC N/A No L 218 Building 14 South None Detected11/14/2016

151 Aluminum Frame Gray Interior Caulking

MISC N/A No L 222 Building 14 Laundry None Detected11/14/2016

152 Aluminum Frame White Interior Caulking

MISC 240 Units No L 219 Building 14 NW % Chrysotile<111/14/2016

152 Aluminum Frame White Interior Caulking

MISC N/A No L 224 Building 14 Room 247 None Detected11/14/2016

153 Wood Frame Red Interior Caulking

MISC N/A No L 220 Building 14 Attic None Detected11/14/2016

SM = Surfacing Material; TSI = Thermal System Insulation; Misc. = Miscellaneous Material N = None; L = Low; M = Medium; H = HighSF = Square Feet; LF = Linear Feet; FTG = Fitting1 2 3

Location: Battle Creek VA Hospital, Battle Creek, Michigan Mike Ardis

HA

No.

HA

Description

Type of

ACBM ¹

Approx.

Quantity

(Entire HA) ² Friable?

(Yes/No)

Damage (N,L,M,H) ³

Sample No. Sample Location Asbestos Content

Window Caulking/Glazing Inpection Alliance Project Number: 16-0151-A

Date Collected

(via Method EPA 600/R-93/116)

Project:

Date Collected: 11/14/2016 11/17/2016-

154 Wood Frame White Exterior Glazing

MISC N/A Yes L 221 Building 14 Attic % Chrysotile<0.2511/14/2016

155 Aluminum Frame Blue Green Interior Caulking

MISC N/A No L 223 Building 14 Men's Restroom None Detected11/14/2016

156 Aluminum Frame Gray Exterior Caulking

MISC N/A No L 225 Building 3 South None Detected11/14/2016

156 Aluminum Frame Gray Exterior Caulking

MISC N/A No L 228 Building 3 South None Detected11/14/2016

156 Aluminum Frame Gray Exterior Caulking

MISC N/A No L 229 Building 3 South None Detected11/14/2016

157 Aluminum Frame Black Exterior Glazing

MISC N/A No L 226 Building 3 South None Detected11/14/2016

157 Aluminum Frame Black Exterior Glazing

MISC N/A No L 227 Building 3 South None Detected11/14/2016

158 Aluminum Frame Gray Exterior Glazing

MISC N/A No L 230 Building 3 North None Detected11/14/2016

159 Aluminum Frame Gray Interior Caulking

MISC N/A No L 231 Building 3 North None Detected11/14/2016

159 Aluminum Frame Gray Interior Caulking

MISC N/A No L 233 Building 3 South None Detected11/14/2016

160 Aluminum Frame Gray Interior Glazing

MISC N/A No L 232 Building 3 North None Detected11/14/2016

SM = Surfacing Material; TSI = Thermal System Insulation; Misc. = Miscellaneous Material N = None; L = Low; M = Medium; H = HighSF = Square Feet; LF = Linear Feet; FTG = Fitting1 2 3

Location: Battle Creek VA Hospital, Battle Creek, Michigan Mike Ardis

HA

No.

HA

Description

Type of

ACBM ¹

Approx.

Quantity

(Entire HA) ² Friable?

(Yes/No)

Damage (N,L,M,H) ³

Sample No. Sample Location Asbestos Content

Window Caulking/Glazing Inpection Alliance Project Number: 16-0151-A

Date Collected

(via Method EPA 600/R-93/116)

Project:

Date Collected: 11/14/2016 11/17/2016-

161 Aluminum Frame Gray Exterior Caulking

MISC N/A No L 234 Building 12 West None Detected11/14/2016

161 3' x 5' Pane Aluminum Inner Exterior Gray Caulk

MISC N/A No L 235 Building 12 West None Detected11/14/2016

161 Aluminum Frame Gray Exterior Caulking

MISC N/A No L 237 Building 12 East None Detected11/14/2016

161 Aluminum Frame Gray Exterior Caulking

MISC N/A No L 238 Building 12 East None Detected11/14/2016

162 Wood Frame White Exterior Glazing

MISC N/A Yes H 236 Building 12 West None Detected11/14/2016

163 Aluminum Frame Gray Exterior Caulking

MISC 102 Units No L 239 Building 11 East % Chrysotile211/14/2016

163 Aluminum Frame Gray Exterior Caulking

MISC 102 Units No L 242 Building 11 North % Chrysotile211/14/2016

164 Aluminum Frame Gray Exterior Glazing

MISC N/A No L 240 Building 11 East None Detected11/14/2016

164 Aluminum Frame Gray Exterior Glazing

MISC N/A No L 244 Building 11 North None Detected11/14/2016

165 Wood Frame White Exterior Glazing

MISC N/A Yes M 241 Building 11 North None Detected11/14/2016

166 Aluminum Frame Cream Exterior Caulking

MISC N/A No L 243 Building 11 North None Detected11/14/2016

SM = Surfacing Material; TSI = Thermal System Insulation; Misc. = Miscellaneous Material N = None; L = Low; M = Medium; H = HighSF = Square Feet; LF = Linear Feet; FTG = Fitting1 2 3

Location: Battle Creek VA Hospital, Battle Creek, Michigan Mike Ardis

HA

No.

HA

Description

Type of

ACBM ¹

Approx.

Quantity

(Entire HA) ² Friable?

(Yes/No)

Damage (N,L,M,H) ³

Sample No. Sample Location Asbestos Content

Window Caulking/Glazing Inpection Alliance Project Number: 16-0151-A

Date Collected

(via Method EPA 600/R-93/116)

Project:

Date Collected: 11/14/2016 11/17/2016-

167 Aluminum Frame Weathered Black Exterior

Caulking

MISC N/A No L 245 Building 11 Porch None Detected11/14/2016

168 Aluminum Frame Dark Black Exterior Caulking

MISC N/A No L 246 Building 11 Porch None Detected11/14/2016

169 Aluminum Frame Dark Gray Interior Caulking

MISC N/A No L 247 Building 12 West None Detected11/14/2016

169 Aluminum Frame Dark Gray Interior Caulking

MISC N/A No L 250 Building 12 South None Detected11/14/2016

170 Aluminum Frame Light Gray Interior Caulking

MISC N/A No L 248 Building 12 West None Detected11/14/2016

170 Aluminum Frame Light Gray Interior Caulking

MISC N/A No L 251 Building 12 South None Detected11/14/2016

171 Aluminum Frame Gray Interior Glazing

MISC N/A No L 249 Building 12 West None Detected11/14/2016

171 Aluminum Frame Gray Interior Glazing

MISC N/A No L 252 Building 12 South None Detected11/14/2016

171 Aluminum Frame Gray Interior Glazing

MISC N/A No L 254 Building 11 South None Detected11/14/2016

171 Aluminum Frame Gray Interior Glazing

MISC N/A No L 257 Building 11 West None Detected11/14/2016

SM = Surfacing Material; TSI = Thermal System Insulation; Misc. = Miscellaneous Material N = None; L = Low; M = Medium; H = HighSF = Square Feet; LF = Linear Feet; FTG = Fitting1 2 3

Location: Battle Creek VA Hospital, Battle Creek, Michigan Mike Ardis

HA

No.

HA

Description

Type of

ACBM ¹

Approx.

Quantity

(Entire HA) ² Friable?

(Yes/No)

Damage (N,L,M,H) ³

Sample No. Sample Location Asbestos Content

Window Caulking/Glazing Inpection Alliance Project Number: 16-0151-A

Date Collected

(via Method EPA 600/R-93/116)

Project:

Date Collected: 11/14/2016 11/17/2016-

172 Aluminum Frame Gray Interior Caulking

MISC 102 Units No L 253 Building 11 South % Chrysotile211/14/2016

172 Aluminum Frame Gray Interior Caulking

MISC 102 Units No L 256 Building 11 West % Chrysotile211/14/2016

173 Aluminum Frame Cream Interior Caulking

MISC 102 Units No L 255 Building 11 South % Chrysotile211/14/2016

174 Aluminum Frame Cream Exterior Caulking

MISC N/A No L 258 Building 4 North None Detected11/14/2016

174 Aluminum Frame Cream Exterior Caulking

MISC N/A No L 261 Building 4 North None Detected11/14/2016

175 Aluminum Frame Gray Exterior Caulking

MISC N/A No L 259 Building 4 North None Detected11/14/2016

175 Aluminum Frame Gray Exterior Caulking

MISC 2 Units No L 262 Building 4 North % Chrysotile<111/14/2016

175 Aluminum Frame Gray Exterior Caulking

MISC N/A No L 265 Building 4 South None Detected11/14/2016

175 3' x 4' Double Pane Gray Exterior Glazing

MISC N/A Yes M 266 Building 4 East None Detected11/14/2016

176 Aluminum Frame Gray Exterior Glazing

MISC N/A No L 260 Building 4 North None Detected11/14/2016

177 Aluminum Frame White Exterior Glazing

MISC 2 Units No L 263 Building 4 North % Chrysotile<111/14/2016

SM = Surfacing Material; TSI = Thermal System Insulation; Misc. = Miscellaneous Material N = None; L = Low; M = Medium; H = HighSF = Square Feet; LF = Linear Feet; FTG = Fitting1 2 3

Location: Battle Creek VA Hospital, Battle Creek, Michigan Mike Ardis

HA

No.

HA

Description

Type of

ACBM ¹

Approx.

Quantity

(Entire HA) ² Friable?

(Yes/No)

Damage (N,L,M,H) ³

Sample No. Sample Location Asbestos Content

Window Caulking/Glazing Inpection Alliance Project Number: 16-0151-A

Date Collected

(via Method EPA 600/R-93/116)

Project:

Date Collected: 11/14/2016 11/17/2016-

178 Wood Frame White Exterior Glazing

MISC N/A Yes H 264 Building 4 West None Detected11/14/2016

179 Aluminum Frame Gray Interior Glazing

MISC N/A No L 267 Building 4 East None Detected11/14/2016

179 Aluminum Frame Gray Interior Glazing

MISC N/A No L 269 Building 4 West None Detected11/14/2016

180 Aluminum Frame White Interior Caulking

MISC N/A No L 268 Building 4 Room 118 None…