S02 Drawings - 515-22-101 Renovate Restrooms.pdf

PDF 21 MB Posted

Attached to
Z1DA--Renovate Restrooms 515-22-101
Solicitation number
36C25024B0066
Issued by

About this file

This document is a pre-solicitation notice for a federal contract opportunity to renovate restrooms at the VA Medical Center in Battle Creek, Michigan. The Department of Veterans Affairs intends to issue an Invitation for Bid (IFB) on or about August 15, 2024 for Project 515-22-101. The contractor shall furnish all necessary labor, tools, materials, equipment, and supervision to complete the project in compliance with the drawings, specifications, manufacturer's recommendations, and applicable codes and standards. The work is scheduled to be performed during normal daytime business hours, excluding federal holidays. The procurement is a 100% set-aside for Service-Disabled Veteran Owned Small Businesses, with a NAICS code of 236220 Commercial and Institutional Building Construction. The estimated project cost is between $2,000,000 and $5,000,000, and the Government intends to award a Firm Fixed Price Contract within 120 days from the bid opening date.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

All Concepts, ideas, design elements, plans, and details as shown on this document are the sole property of Viridian Architectural Design, Inc. and shall not be used for any purpose without prior expressed written consent.

The Owner shall be permitted to retain copies for information and reference.

2020 E. Washington Boulevard Suite 200 Fort Wayne, Indiana 46803

PH: 260.424.4830

www.viridian-design.net

NORTH

REFERENCE

PROJECT # SIGNATURE DATE

Director Associate Director Chief of Staff Associate Director for Patient Services Associcate C.O.S. for Mental Health Chief, FMS Chief, Engineering Section Chief, Environmental Management Section Infectious Control Officer Patient Safety Manager GEMS Coordinator Safety Specialist Chief, Police Service Chief, Fire Station Union Safety Representative Contracting Officer Contracting Officer Representative

VA PROJECT NO.:

FINAL BID

DOCUMENTS

01 66OF

LOCATION MAP VICINITY MAP

Z:

\V iri di an \P ro je ct s\

\0

D R

AW

IN

G S\

R

EV

IT

\L

O C

AL

F

IL

ES

\2

2_ C

EN

TR

AL

_R

_l fe do rc zy k.

rv t 4/

/2

:2

9:

P M

GI001

COVER SHEET RENOVATE RESTROOMS 515-22-101

BC VA CAMPUS

02/23/2023 TWT AKM

RENOVATE RESTROOMS

515-22-101

515-22-101

BATTLE CREEK, MICHIGAN

BATTLE CREEK VETERANS AFFAIRS MEDICAL CENTER

BATTLE CREEK VA MEDICAL CENTER

5500 Armstrong Road Battle Creek, Michigan

49037

INDEX OF WORKING DRAWINGS

SHEET NO DRAWING TITLE DRAWING N0

PLUMBING

MPG001 MECHANICAL / PLUMBING GENERAL INFORMATION 31

PD100 PLUMBING DEMOLITION BUILDINGS 2 & 7 PLANS 32

PD101 PLUMBING DEMOLITION BUILDINGS 9, 10 & 11 PLANS 33

PD102 PLUMBING DEMOLITION BUILDINGS 12, 14 & 24 PLANS 34

PD103 PLUMBING DEMOLITION BUILDINGS 82, 84 & 136 PLANS 35

PL100 PLUMBING BUILDINGS 2 & 7 PLANS 36

PL101 PLUMBING BUILDINGS 9, 10 & 11 PLANS 37

PL102 PLUMBING BUILDINGS 12, 14 & 24 PLANS 38

PL103 PLUMBING BUILDINGS 82, 84 & 136 PLANS 39

MECHANICAL

MD100 MECHANICAL DEMOLITION BUILDINGS 2 & 7 PLANS 40

MD101 MECHANICAL DEMOLITION BUILDINGS 9, 10, & 11 PLANS 41

MD102 MECHANICAL DEMOLITION BUILDINGS 12, 14 & 24 PLANS 42

MD103 MECHANICAL DEMOLITION BUILDINGS 82, 84 & 136 PLANS 43

MH100 MECHANICAL HVAC - BUILDINGS 2 & 7 PLANS 44

MH101 MECHANICAL HVAC - BUILDINGS 9, 10 & 11 PLANS 45

MH102 MECHANICAL HVAC - BUILDINGS 12, 14 & 24 PLANS 46

MH103 MECHANICAL HVAC - BUILDINGS 82, 84 & 136 PLANS 47

MG001 MECHANICAL DETAILS 48

ELECTRICAL

EGI000 ELECTRICAL GENERAL INFORMATION AND NOTES 49

EGI100 ELECTRICAL ABBREVIATIONS AND SYMBOLS 50

ED100 ELECTRICAL DEMOLITION - BUILDINGS 2 & 7 PLANS 51

ED101 ELECTRICAL DEMOLITION - BUILDINGS 9, 10, & 11 PLANS 52

ED102 ELECTRICAL DEMOLITION - BUILDINGS 12, 14 & 24 PLANS 53

ED103 ELECTRICAL DEMOLITION - BUILDINGS 82, 84, & 136 PLANS 54

EL100 ELECTRICAL LIGHTING - BUILDINGS 2 & 7 PLANS 55

EL101 ELECTRICAL LIGHTING - BUILDINGS 9, 10, & 11 PLANS 56

EL102 ELECTRICAL LIGHTING - BUILDINGS 12, 14, & 24 PLANS 57

EL103 ELECTRICAL LIGHTING - BUILDINGS 82, 84, & 136 PLANS 58

EP100 ELECTRICAL POWER - BUILDINGS 2 & 7 PLANS 59

EP101 ELECTRICAL POWER - BUILDINGS 9, 10, & 11 PLANS 60

EP102 ELECTRICAL POWER - BUILDINGS 12, 14, & 24 PLANS 61

EP103 ELECTRICAL POWER - BUILDINGS 82, 84 & 136 PLANS 62

EP104 ELECTRICAL OVERALL PLANS - BUILDINGS 7, 10, 11, 24, & 82 63

EJ401 ELECTRICAL DETAILS 64

EJ402 ELECTRICAL DETAILS 65

EJ501 ELECTRICAL SCHEDULES 66

INDEX OF WORKING DRAWINGS

SHEET NO DRAWING TITLE DRAWING N0

GENERAL

GI001 COVER SHEET 01

GI002 ICRA PHASE PLANS AND DETAILS 02

GI003 SITE CAMPUS MAP, PHASING NOTES AND HAZARDOUS MATERIALS 03

DEMOLITION

AD100 DEMOLITION - KEY PLANS - BUILDING 2, 7, & 9 04

AD101 DEMOLITION - KEY PLANS - BUILDING 10, 11, 12, 14, & 24 05

AD102 DEMOLITION - KEY PLANS - BUILDING 82, 84, & 136 06

AD103 ARCHITECTURAL - DEMOLITION - BUILDING 2 FLOOR PLANS AND RCP 07

AD104 ARCHITECTURAL - DEMOLITION - BUILDINGS 7, 9, & 10 FLR. PLANS & RCP 08

AD105 ARCHITECTURAL - DEMOLITION - BLDGS. 10, 11, & 12 FLR. PLANS & RCP 09

AD106 ARCHITECTURAL - DEMOLITION - BLDGS. 14 & 24 FLOOR PLANS AND RCP 10

AD107 ARCHITECTURAL - DEMOLITION - BUILDING 82 FLOOR PLANS AND RCP 11

AD108 ARCHITECTURAL - DEMOLITION - BLDGS. 84 & 136 FLOOR PLANS & RCP 12

ARCHITECTURAL

AGI001 ARCHITECTURAL - ABBREVATIONS AND SYMBOLS 13

AS100 ARCHITECTURAL - KEY PLANS - BUILDING 2, 7, & 9 14

AS101 ARCHITECTURAL - KEY PLANS - BUILDING 10, 11, 12, 14, & 24 15

AS102 ARCHITECTURAL - KEY PLANS - BUILDING 82, 84, & 136 16

AS103 ARCHITECTURAL - SCHEDULES AND DETAILS 17

AS104 ARCHITECTURAL - BUILDING 2 FLOOR PLANS, RCP AND ELEVATIONS 18

AS105 ARCHITECTURAL - BUILDING 2 FLOOR PLANS, RCP AND ELEVATIONS 19

AS106 ARCHITECTURAL - BUILDING 7 FLOOR PLANS, RCP AND ELEVATIONS 20

AS107 ARCHITECTURAL - BUILDING 9 FLOOR PLANS, RCP AND ELEVATIONS 21

AS108 ARCHITECTURAL - BUILDING 10 FLOOR PLANS, RCP AND ELEVATIONS 22

AS109 ARCHITECTURAL - BUILDING 11 FLOOR PLANS, RCP AND ELEVATIONS 23

AS110 ARCHITECTURAL - BUILDING 12 FLOOR PLANS, RCP AND ELEVATIONS 24

AS111 ARCHITECTURAL - BUILDING 14 FLOOR PLANS, RCP AND ELEVATIONS 25

AS112 ARCHITECTURAL - BUILDING 14 FLOOR PLANS, RCP AND ELEVATIONS 26

AS113 ARCHITECTURAL - BUILDING 24 FLOOR PLANS, RCP AND ELEVATIONS 27

AS114 ARCHITECTURAL - BUILDING 82 FLOOR PLANS, RCP AND ELEVATIONS 28

AS115 ARCHITECTURAL - BUILDING 82 FLOOR PLANS, RCP AND ELEVATIONS 29

AS116 ARCHITECTURAL - BUILDING 84 & 136 FLOOR PLANS, RCP AND ELEVATIONS 30

Revisions: Date:

NOTICE TO BIDDERS

BUILDING 24 IS 'NOT IN BID'

EITHER KEEP RUNNING

COVER ALL RETURNS

TAPE ALL SERVICES

FIRE EXTINGUISHER ON

A

O

V

SUPPLY DUCTS

OR COVER WHEN RUNNING

TO KEEP DUST OUT.

AT THE GRATE/DIFFUSERS

TO PROTECT AGAINST

PORTABLE FLOOR BRACKET

CONTAMINATION

E

OPTIONAL EXHAUST DUCTS

(COVER THE GRATES

AND THE DIFFUSERS)

OUTSIDE OF BUILDING

PROVIDE STICKY MATS

(CHANGED END OF SHIFT

(ILSM MAY REQUIRE MORE

THAN ONE).

OR MORE IF NECESSARY

TO MAINTAIN CLEANLINESS).

INDICATOR MUST BE AT -0.01 OR GREATER

(VERIFY DAILY), IF NOT VERIFY ALL OPENING

SUCH AS DOORS ARE CLOSED AND/OR CHANGE

OUT NEGATIVE AIR PRE-FILTER.

POST ICRA, ILSM, FIRE INSPECTION

SHEETS VISIBLE TO PUBLIC

SUSPENDED PLASTIC ZIPPER

WALL CURTAIN BARRIER

PROVIDE STICKY MATS

(CHANGED END OF SHIFT

OR MORE IF NECESSARY

TO MAINTAIN CLEANLINESS).

HEPA NEGATIVE AIR UNIT

FIRE RATED PLYWOOD

WEEKLY CHANGED

(OR MORE AS NEEDED)

MONTHLY CHANGED

HEPA FILTER

PRE-FILTER

(REFER TO ELEVATION)

FL

EX

D

UC

T

AA

EXISTING WINDOW FRAME

FIRE RATED PLYWOOD

(TEMP. REMOVE

HEPA NEGATIVE AIR UNIT

EXISTING FIRE

SPRINKLER SYSTEM

EXISTING CONCRETE SLAB FLOORING

GLASS PANEL)

FINISHED FLOORING TO BE KEPT CLEAN.

FLOORS NOT BEING REPLACED TO BE

PROTECTED OR COVERED WITH ROSEN

PAPER/FIRE RATED PLYWOOD.

HEATED DETECTOR CUT-OFF

C L A

SS

II

I

CLASS III WORK ITEMS NOTES:

1. REMOVE OR ISOLATE H.V.A.C. SYSTEM IN AREA WHERE WORK IS BEING DONE TO

PREVENT CONTAMINATION OF DUCT SYSTEM.

2. COMPLETE ALL CRITICAL BARRIERS IE. SHEETROCK, PLYWOOD, PLASTIC, TO SEAL

AREA FROM NON-WORK AREA OR IMPLEMENT CONTROL CUBE METHOD (CART WITH

PLASTIC COVERING AND SEALED CONNECTION TO WORK SITE WITH HEPA VACUUM FOR

VACUUMING PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS.

3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR

FILTRATION UNITS IF INDICATED.

4. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.

5. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.

6. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS

INSPECTED BY THE OWNER'S SAFETY DEPARTMENT AND INFECTION CONTROL

DEPARTMENT AND THOROUGHLY CLEANED BY THE OWNER'S ENVIRONMENTAL SERVICES

DEPARTMENT.

1. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS

ASSOCIATED WITH CONSTRUCTION.

2. VACUUM WORK AREA WITH HEPA FILTERED VACUUM.

3. WET MOP AREA WITH DISINFECTANT.

4. REMOVE ISOLATION OF H.V.A.C. SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.

PRIOR TO ANY CONSTRUCTION

POST CONSTRUCTION

SYMBOL LEGEND

TEMPORARY PARTITION (CONTAIN OR

MINIMIZE SPREAD OF DUST)

TEMPORARY PARTITION (CONTAIN OR

MINIMIZE SPREAD OF DUST)

CONSTRUCTION BOUNDARY

EXISTING AREAS (NOT IN PROJECT)

CONTRACTOR STAGING

COORDINATE WITH COR

EXIT

CLOSED FOR

CONSTRUCTION

PROVIDE AND DISPLAY ICRA

REQUIREMENT

DOCUMENTATION.

COORDINATE WITH COR.

5-PLY SOLID CORE FLUSH DOORS

SHALL BE SECURED, AND HAVE

LIMITED, ZIPPERED ACCESS, AND

MASKED OFF / SEALED AND

PROTECTED PER INFECTION CONTROL

REQUIREMENTS PRIOR TO DEMOLITION

AND FOR DURATION OF

CONSTRUCTION. COORDINATE EGRESS

REQUIREMENTS WITH COR. SEE

SPECIFICATIONS FOR ADDITIONAL

INFORMATION.

USE ALTERNATIVE

EXITS

CAUTION

THIS AREA CLOSED

OFF

ICRA

REQUIREMENTS

NO ENTRY

DUST BARRIER

PROVIDE AND DISPLAY ICRA

REQUIREMENT

DOCUMENTATION.

COORDINATE WITH COR.

5-PLY SOLID CORE FLUSH DOORS

SHALL BE SECURED, AND HAVE

LIMITED, ZIPPERED ACCESS, AND

MASKED OFF / SEALED AND

PROTECTED PER INFECTION

CONTROL REQUIREMENTS PRIOR TO

DEMOLITION AND FOR DURATION

OF CONSTRUCTION. COORDINATE

EGRESS REQUIREMENTS WITH COR.

SEE SPECIFICATIONS FOR

ADDITIONAL INFORMATION.

TYPE A

WA

LL

H

EIG

HT

V

AR

IES

TYPE B

FIE

LD

V

ER

IFY

CE

ILI

NG

H

EI

GH

T 8'

-0

W

AL

L

HE

IG

HT

V

AR

IE

S

FI

EL

D

VE

RI

FY

4 7/8"4 7/8"

ALL TEMPORARY CONSTRUCTION

BARRIER - INFECTION / DUST

CONTROL PARTITION(S) SHALL BE

SEALED TO EXISTING FLOOR,

CEILING, WALL, & DOOR/ WINDOW

FRAME CONSTRUCTION AS

APPLICABLE, PER INFECTION

CONTROL REQUIREMENTS PRIOR TO

DEMOLITION & FOR DURATION OF

CONSTRUCTION. SEE

SPECIFICATIONS FOR ADDITIONAL

INFORMATION.

TEMPORARY CONSTRUCTION

"SMOKE TIGHT" BARRIER - INFECTION

/ DUST CONTROL PARTITION: 4" , 20

GA. METAL STUDS @ 16" O.C.,

INFILLED w/ SOUND BARRIER BATT

INSULATION, STUDS SHALL BE

SECURED TO FLOOR, CEILING, WALL,

& DOOR / WINDOW FRAME

INTERSECTIONS FOR STRUCTURAL

STABILITY, w/ 1/2" GYP. BD. EA.

SIDE, w/ ALL JOINTS TAPED AND

SEALED FOR INFECTION / DUST

CONTROL (NOT MUDDED).

CEILING AS

SCHEDULED ON

FLOOR PLAN.

DECK ABOVE

ALL TEMPORARY CONSTRUCTION

BARRIER - INFECTION/ DUST CONTROL

PARTITION(S) SHALL BE SEALED TO

EXISTING FLOOR, CEILING, WALL, &

DOOR / WINDOW FRAME CONSTRUCTION

AS APPLICABLE, PER INFECTION

CONTROL REQUIREMENTS PRIOR TO

DEMOLITION & FOR DURATION OF

CONSTRUCTION. SEE SPECIFICATIONS

FOR ADDITIONAL INFORMATION.

GASKET ON TOP AND

BOTTOM OF PANEL;

PROVIDES AIR TIGHT

SEAL BETWEEN PANEL

AND FLOOR / CEILING

ANONDIZED

ALUMINUM

FRAME

GASKET ON TOP AND BOTTOM

OF PANEL; PROVIDES AIR

TIGHT SEAL BETWEEN PANEL

AND FLOOR / CEILING

FIBERGLASS

REINFORCED POLYMER

PANELS WITHIN

ANONDIZED ALUMINUM

FRAME.

ADJUSTABLE HEIGHT

PANEL, TELESCOPING

FROM 6'-10" TO 10'-3".

CONCEALED HEIGHT LOCKS,

TOOL LESS KNOBLESS LIFT

AND DROP CONNECTION.

CEILING GRID

ATTACHMENT OPTION

6'-

" T O

'-3

TYPE C

BASE SHALL MATCH EXISTING AREA

BASE AT BOTH SIDES.

CEILING AS SCHEDULED

ON FLOOR PLAN.

TEMPORARY CONSTRUCTION

"SMOKE TIGHT" BARRIER -

INFECTION / DUST CONTROL

PARTITION: 4" , 20 GA. METAL

STUDS @ 16" O.C., SECURED

TO FLOOR, CEILING, WALL, &

DOOR / WINDOW FRAME

INTERSECTIONS FOR

STRUCTURAL STABILITY, w/ 1/2" GYP. BD. EA. SIDE, w/ ALL

JOINTS TAPED AND SEALED FOR

INFECTION / DUST CONTROL

(NOT MUDDED).

ALL TEMPORARY CONSTRUCTION

BARRIER - INFECTION / DUST CONTROL

PARTITION(S) SHALL BE SEALED TO

EXISTING FLOOR, CEILING, WALL, &

DOOR/ WINDOW FRAME

CONSTRUCTION AS APPLICABLE, PER

INFECTION CONTROL REQUIREMENTS

PRIOR TO DEMOLITION & FOR

DURATION OF CONSTRUCTION. SEE

SPECIFICATIONS FOR ADDITIONAL

INFORMATION.

BASE SHALL MATCH EXISTING AREA

BASE AT BOTH SIDES.

DECK ABOVE

DECK ABOVE

FIRE / U.L. RATED PLASTIC

SEALED TO DECK ABOVE.

FIRE / U.L. RATED PLASTIC

SEALED TO DECK ABOVE.

FIRE / U.L. RATED PLASTIC

SEALED TO DECK ABOVE.

SECTION A-A

TYPE A

TYPE B

TYPE C

TYPE A

TYPE B

TYPE C

TYPE A

TYPE B

TYPE C

GI002

GI002

GI002

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

All Concepts, ideas, design elements, plans, and details as shown on this document are the sole property of Viridian Architectural

Design, Inc. and shall not be used for any purpose without prior expressed written consent. The Owner shall be permitted to retain copies for information and reference.

2020 E. Washington Boulevard Suite 200 Fort Wayne, Indiana 46803

PH: 260.424.4830

www.viridian-design.net

FINAL BID

DOCUMENTS

OF02 66

Z:

\V iri di an \P ro je ct s\

\0

D R

AW

IN

G S\

R

EV

IT

\L

O C

AL

F

IL

ES

\2

2_ C

EN

TR

AL

_R

_l fe do rc zy k.

rv t 2/

/2

:5

4:

A M

GI002

ICRA PHASE PLANS AND DETAILS RENOVATE RESTROOMS

BATTLE CREEK, MICHIGAN

515-22-101

BC VA CAMPUS

02/23/2023 TWT AKM

LOW RISK MEDIUM RISK HIGH RISK HIGHEST RISK

• OFFICE AREAS • CARDIOLOGY

• ECHOCARDIOGRAPHY

• ENDOSCROPY

• NUCLEAR MEDICINE

• PHYSICAL THERAPY

• RADIOLOGY / MRI

• RESPIRATORY THERAPY

• CCU

• EMERGENCY ROOM

• LABOR AND DELIVERY

• LABORATORY (SPECIMEN)

• NEWBORN NURSEY

• OUTPATIENT SURGERY

• PEDIATRICS

• PHARMACY

• POST ANESTHESIA CARE UNIT

• SURGICAL UNITS

• ANY AREA CARING FOR

IMMUNOCOMPROMISED PATIENTS

• BURN UNIT

• CARDIAC CATH LAB

• CENTRAL STERILE SUPPLY

• INTENSIVE CARE UNITS

• MEDICAL UNIT

• NEGATIVE PRESSURE ISOLATION ROOMS

• ONCOLOGY

• OPERATING ROOMS INCLUDING

C-SECTION ROOMS

PATIENT RISK GROUPS

INFECTION CONTROL PLAN GENERAL NOTES

COORDINATE WITH BATTLE CREEK VA MEDICAL CENTER VAMC CONTRACTING OFFICER'S REPRESENTATIVE (COR) TO COMPLETE AN INFECTION CONTROL RISK ASSESSMENT MATRIX AND OBTAIN AN INFECTION CONTROL CONSTRUCTION PERMIT FOR EACH PHASE OF WORK OUTLINED IN THESE DOCUMENTS PRIOR TO THE START OF DEMOLITION AND CONSTRUCTION. COMPLY WITH ALL INFECTION CONTROL REQUIREMENTS FOR THE DURATION OF THE CONSTRUCTION PROJECT. SEE ITEMS LISTED BELOW AND SPECIFICATIONS FOR ADDITIONAL INFORMATION.

1. REFER TO SPECIFICATIONS FOR MEDICAL CENTER "INFECTION CONTROL RISK ASSESSMENT MATRIX OF

PRECAUTIONS FOR CONSTRUCTION & RENOVATION" FOR INFECTION CONTROL INFORMATION AND

REQUIREMENTS.

2. USING THE "INFECTION CONTROL RISK ASSESSMENT MATRIX OF PRECAUTIONS FOR CONSTRUCTION &

RENOVATION" COORDINATE WITH COR TO DETERMINE THE FOLLOWING PROJECT CONDITIONS:

• PATIENT RISK GROUPS (LOW, MEDIUM, HIGH, HIGHEST)

• TYPE OF CONSTRUCTION PROJECT ACTIVITY (A, B, C, OR D)

• CLASS OF PRECAUTION / LEVEL OF INFECTION CONTROL ACTIVITIES REQUIRED (CLASS1I REQUIRED)

3. ONCE THE "CLASS OF PRECAUTION" HAS BEEN DETERMINED IN COORDINATION WITH THE COR, COMPLETE THE "INFECTION CONTROL CONSTRUCTION PERMIT." PROCEED WITH DEMOLITION AND CONSTRUCTION WORK ONLY AFTER THE PERMIT HAS BEEN AUTHORIZED BY THE COR. ONCE THE PERMIT IS AUTHORIZED, POST THE PERMIT

AS DIRECTED BY THE COR.

4. USING THE "DESCRIPTION OF REQUIRED INFECTION CONTROL PRECAUTIONS BY CLASS" AS OUTLINED BELOW, COORDINATE WITH THE COR TO DETERMINE THE SPECIFIC EXTENT AND APPLICATION METHODS OF THE REQUIRED INFECTION CONTROL PRECAUTIONS. PRECAUTIONS LISTED BELOW ARE TO BE CONFIRMED WITH THE

COR:

1.1. DURING CONSTRUCTION PROJECT PHASE:

1.1.1. ISOLATE THE HVAC SYSTEM AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION OF

DUCT SYSTEM.

1.1.2. COMPLETE ALL CRITICAL BARRIERS TO SEAL WORK AREA FROM NON-WORK AREA BEFORE

DEMOLITION OR CONSTRUCTION BEGINS.

1.1.3. MAINTAIN NEGATIVE AIR PRESSURE OF -0.1"W.C. WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR

FILTRATION UNITS. CONTRACTOR SHALL PROVIDE MAGNOMETER TO MEASURE AIR PRESSURE.

1.1.4. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES APPROPRIATELY.

1.1.5. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS THROUGH THIS ROOM SO THEY

CAN BE VACUUMED USING A HEPA VACUUM CLEANER BEFORE LEAVING THE WORK SITE OR THEY

CAN WEAR CLOTH OR PAPER COVERALLS THAT ARE REMOVED EACH TIME THEY LEAVE THE WORK

SITE.

1.1.6. ALL PERSONNEL ENTERING WOK SITE ARE REQUIRED TO WEAR SHOW COVERS. SHOW COVERS

MUST BE EXCHANGED EACH TIME WORKER EXITS THE WORK AREA.

1.1.7. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS INSPECTED BY THE

SAFETY OFFICE AND INFECTION CONTROL AND THOROUGHLY CLEANED BY ENVIRONMENTAL

MANAGEMENT SERVICE.

1.2. UPON COMPLETION OF PROJECT PHASE:

1.2.1. REMOVE BARRIER MATERIAL CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS

ASSOCIATED WITH CONSTRUCTION.

1.2.2. WIPE WORK SURFACES TO CONTROL DUST WHILE CUTTING.

1.2.3. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.

1.2.4. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.

1.2.5. WET MOP AND / OR VACUUM WITH HEPA FILTERED VACUUM BEFORE LEAVING WORK AREA.

1.2.6. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.

5. DURING THE CONSTRUCTION PROJECT PHASE, PROVIDE, INSTALL, & MAINTAIN THE SPECIFIC INFECTION

CONTROL PRECAUTIONS AS DETERMINED BY COORDINATION WITH COR.

6. UPON COMPLETION OF THE CONSTRUCTION PROJECT PHASE, REMOVE SPECIFIC INFECTION CONTROL

PRECAUTIONS AS DETERMINED BY COORDINATION WITH COR.

7. IAQ (INDOOR AIR QUALITY) CONTROL MEASURES DURING CONSTRUCTION.

INFECTION CONTROL PLAN NOTES

1 INFECTION / DUST CONTROL PARTITION. PARTITION SHALL BE ALUMINUM FRAME AND

FIBERGLASS REINFORCED POLYMER MODULAR WALL SYSTEM. THE MODULAR WALL SYSTEM

SHALL EXCEED ICRA CLASS IV REQUIREMENTS. BASIS OF DESIGN STARC SYSTEMS LITE

BARRIER WALL SYSTEM OR EQUAL. PARTITIONS SHALL BE SECURED, SEALED, AND PROTECTED

FOR DURATION OF CONSTRUCTION. COORDINATE INFECTION CONTROL RISK ASSESSMENT

(ICRA) AND EGRESS REQUIREMENTS WITH COR. COORDINATE ADDITIONAL REQUIREMENTS WITH

COR. SEE DETAIL 4/GI002 AND SPECIFICATIONS FOR ADDITIONAL INFORMATION.

2 INFECTION / DUST CONTROL PARTITION EGRESS DOOR SHALL BE SECURED, SEALED, AND

PROTECTED FOR DURATION OF CONSTRUCTION. COORDINATE INFECTION CONTROL RISK

ASSESSMENT (ICRA) AND EGRESS REQUIREMENTS WITH COR. COORDINATE ADDITIONAL

REQUIREMENTS WITH COR. SEE DETAILS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION.

3 CONTRACTOR TO PROVIDE AND INSTALL "STICKY" MAT FLOOR PADS IMMEDIATELY OUTSIDE ALL INFECTION / DUST CONTROL PARTITIONS TO ENSURE THAT FLOOR CLEANLINESS IS MANTAINED

THROUGHOUT THE DURATION OF CONSTRUCTION.

4 PATH OF DEMOLITION / TRASH REMOVAL TRAVEL FROM RENOVATED AREA. ALL CONSTRUCTION

DEBRIS REMOVED AS PART OF DEMOLITION SHALL BE REMOVED IN ENCLOSED / SEALED

CONTAINERS AND FOLLOW THE INFECTION CONTROL RISK ASSESSMENT (ICRA) REQUIREMENTS

AS COORDINATED WITH THE COR.

RISK RELATED GROUP

LOW RISK GROUP

MEDIUM RISK GROUP

HIGH RISK GROUP

HIGHEST RISK GROUP

TYPE A

I

I

I

II

TYPE B

II

II

II

III / IV

TYPE C

II

III

III / IV

III / IV

TYPE D

III / IV

IV

IV

IV

NOTE:

INFECTION CONTROL APPROVAL WILL BE REQUIRED WHEN THE CONSTRUCTION ACITIVITY AND RISK LEVEL INDICATE THAT CLASS IV CONTROL

PROCEDURES ARE NECESSARY.

IC MATRIX - CLASS OF PRECAUTIONS:

CONSTRUCTION PROJECT BY PATIENT RISK

CONSTRUCTION PROJECT TYPE

TYPE A

INCLUDES, BUT IS NOT LIMITED TO:

• REMOVABLE OF CEILING TILES FOR VISUAL INSPECTION LIMITED TO 1 TILE PER 50 SQUARE FEET.

• PAINTING (BUT NOT SANDING).

• WALL COVERING, ELECTRICAL TRIM, MINOR PLUMBING, AND ACTIVITIES WHICH DO NOT GENERATE DUST OR

REQUIRE CUTTING OF WALLS OR ACCESS TO CEILINGS OTHER THAN FOR VISUAL INSPECTION.

INFECTION CONTROL RISK ASSESSMENT (ICRA)

MATRIX OF PRECAUTIONS FOR

CONSTRUCTION AND RENOVATION

INSPECTION AND NON-INVASIVE ACTIVITIES

TYPE B

INCLUDES, BUT IS NOT LIMITED TO:

• INSTALLATION OF TELEPHONE AND COMPUTER CABLING.

• ACCESS TO CHASE SPACES.

• CUTTING OF WALLS OR CEILING WHERE DUST MIGRATION CAN BE CONTROLLED.

SMALL SCALE, SHORT DURATION ACTIVITIES

WHICH CREATES MINIMAL DUST

TYPE C INCLUDES, BUT IS NOT LIMITED TO:

• SANDING OF WALLS FOR PAINTING OR WALL COVERING.

• REMOVAL OF FLOOR COVERINGS, CEILING TILES OR CASEWORK.

• NEW WALL CONSTRUCTION.

• MINOR DUCT WORK OR ELECTRICAL WORK ABOVE CEILINGS.

• MAJOR CABLING ACTIVITIES.

• ANY ACTIVITY WHICH CANNOT BE COMPLETED WITHIN A SINGLE WORK SHIFT.

WORK THAT GENERATES A MODERATE TO HIGH LEVEL

OF DUST OR REQUIRES DEMOLITION OR REMOVAL OF

ANY FIXED BUILDING COMPONENTS OR ASSEMBLIES

TYPE D INCLUDES, BUT IS NOT LIMITED TO:

• ACTIVITIES WHICH REQUIRE CONSECUTIVE WORK SHIFTS.

• REQUIRE HEAVY DEMOLITION OR REMOVAL OF A COMPLETE CABLING SYSTEM.

• NEW CONSTRUCTION.

MAJOR DEMOLITION AND CONSTRUCTION PROJECTS

SCALE: 1/2" = 1'-0"

GI002

CLOSED FOR CONSTRUCTION DOOR

SCALE: 1/2" = 1'-0"

GI002

INFECTION / DUST CONTROL DOOR

SCALE: 1/2" = 1'-0"

GI002

INFECTION CONTROL PARTITION

SCALE: 1/2" = 1'-0"

GI002

CLASS III TYPICAL CONSTRUCTION LAYOUT

Revisions: Date:

WEST DICKMAN ROAD

URB

AN DRIVE

JO

HNSO

N DRIVE

SHAFTER CIRCLE EAST

WILLIAMS LANE

HA

MME

RB

ER

G

LA

NE

FO

X L

AN

E

FLORAL LANE

LAMBERS TRAIL

SHAFTER CIRCLE WEST

DEWEY LANE

FURLONG LANE

SHAFTER CIRCLE SOUTH

CONTRACTOR STAGING AREA

SHAFTER CIRCLE SOUTH

AR

M

ST

RO

NG

RO

AD

FURLONG LANE

SHAFTER CIRCLE NO

RTH

SHAFTER CIRCLE NORTH

SHAFTER CIRCLE NORTH

URBAN DRIVE

BLDG. #

/ ROOM #

7, 16

ASBESTOS CONTAINING MATERIAL ABATEMENT

MATERIAL: LOCATION: NOTES:

12"x12" BEIGE / BROWN STREAK FLOOR TILE &

ASSOCIATED MASTIC.

FLOOR. 96 SQ. FT.

7, 29 1" x 1" GREEN AND BLUE CERAMIC FLOOR TILE &

ASSOCIATED MASTIC

FLOOR, 80 SQ. FT.

9, 116 1" x 1" GREEN AND YELLOW CERAMIC FLOOR TILE

BEDDING COMPOUND AND GROUT

FLOOR, 140 SQ. FT.

9, 119 1" x 1" GREEN AND YELLOW CERAMIC FLOOR TILE

BEDDING COMPOUND AND GROUT

FLOOR, 140 SQ. FT.

9, 121 1" x 2" TAN MOSAIC CERAMIC FLOOR TILE BEDDING

COMPOUND AND GROUT

FLOOR, 50 SQ. FT.

9, 121 4" x 4" BLUE CERAMIC WALL TILE BEDDING COMPOUND

AND GROUT

FLOOR, 260 SQ. FT.

9, 208 1" x 1" BLUE AND WHITE CERAMIC WALL TILE BEDDING

COMPOUND AND GROUT

FLOOR, 150 SQ. FT.

9, 211 1" x 1" BLUE AND WHITE CERAMIC WALL TILE BEDDING

COMPOUND AND GROUT

FLOOR, 150 SQ. FT.

10, 112 FLOOR, 120 SQ. FT.1" SQUARE BROWN CERAMIC FLOOR TILE BEDDING

COMPOUND AND GROUT

10, 117 FLOOR, 224 SQ. FT.4" SQUARE CERAMIC WALL TILE BEDDING COMPOUND

AND GROUT

10, 117 FLOOR, 48 SQ. FT.1" x 2" RECTANGULAR CERAMIC FLOOR TILE BEDDING

COMPOUND AND GROUT

10, 211 FLOOR, 120 SQ. FT.1" SQUARE BROWN CERAMIC FLOOR TILE BEDDING

COMPOUND AND GROUT

10, 214 FLOOR, 120 SQ. FT.1" SQUARE BROWN CERAMIC FLOOR TILE BEDDING

COMPOUND AND GROUT

11, 111 WINDOW, 1 SQ. FT.INTERIOR GRAY WINDOW CAULK

11, 111 FLOOR, 130 SQ. FT.TAN AND CREAM SQUARE CERAMIC FLOOR TILE

BEDDING COMPOUND

11, 111 FLOOR, 160 SQ. FT.4" SQUARE CERAMIC WALL TILE BEDDING COMPOUND

11, 114 WINDOW, 1 SQ. FT.INTERIOR GRAY WINDOW CAULK

11, 114 FLOOR, 140 SQ. FT.TAN AND CREAM SQUARE CERAMIC FLOOR TILE

BEDDING COMPOUND

11, 114 FLOOR, 200 SQ. FT.4" SQUARE CERAMIC WALL TILE BEDDING COMPOUND

11, 209 WINDOW, 1 SQ. FT.INTERIOR GRAY WINDOW CAULK

11, 209 FLOOR, 140 SQ. FT.TAN AND CREAM SQUARE CERAMIC FLOOR TILE

BEDDING COMPOUND

11, 209 FLOOR, 160 SQ. FT.4" SQUARE CERAMIC WALL TILE BEDDING COMPOUND

11, 211 WINDOW, 1 SQ. FT.INTERIOR GRAY WINDOW CAULK

11, 211 FLOOR, 140 SQ. FT.TAN AND CREAM SQUARE CERAMIC FLOOR TILE

BEDDING COMPOUND

11, 211 FLOOR, 160 SQ. FT.4" SQUARE CERAMIC WALL TILE BEDDING COMPOUND

12, 115 FLOOR, 170 SQ. FT.4" CERAMIC WALL TILE GROUT COMPOUND

12, 115 FLOOR, 140 SQ. FT.4" CERAMIC WALL TILE BEDDING COMPOUND

12, 115 FLOOR, 170 SQ. FT.2" x 2" CERAMIC FLOOR TILE BEDDING COMPOUND 12, 115 FLOOR, 85 SQ. FT.2" x 2" CERAMIC FLOOR TILE GROUT COMPOUND

12, 117 FLOOR, 160 SQ. FT.4" CERAMIC WALL TILE GROUT COMPOUND

12, 117 FLOOR, 320 SQ. FT.4" CERAMIC WALL TILE BEDDING COMPOUND

12, 117 FLOOR, 48 SQ. FT.1" x 2" CERAMIC FLOOR TILE BEDDING COMPOUND 12, 117 FLOOR, 24 SQ. FT.1" x 2" CERAMIC FLOOR TILE GROUT COMPOUND

12, 118 FLOOR, 67 SQ. FT.1" x 2" CERAMIC FLOOR TILE BEDDING COMPOUND 12, 118 FLOOR, 34 SQ. FT.1" x 2" CERAMIC FLOOR TILE GROUT COMPOUND

12, 118 FLOOR, 184 SQ. FT.4" CERAMIC WALL TILE GROUT COMPOUND

12, 118 FLOOR, 368 SQ. FT.4" CERAMIC WALL TILE BEDDING COMPOUND

12, 208 FLOOR, 224 SQ. FT.1" x 1" BEIGE FLOOR TILE AND ASSOCIATED MASTIC 12, 211 FLOOR, 150 SQ. FT.2" x 2" CERAMIC FLOOR TILE BEDDING COMPOUND 12, 211 FLOOR, 75 SQ. FT.2" x 2" CERAMIC FLOOR TILE GROUT COMPOUND 12, 214 FLOOR, 150 SQ. FT.2" x 2" CERAMIC FLOOR TILE BEDDING COMPOUND 12, 214 FLOOR, 75 SQ. FT.2" x 2" CERAMIC FLOOR TILE GROUT COMPOUND 14, 234 FLOOR, 120 SQ. FT.1" x 2" BROWN AND CREAM CERAMIC FLOOR TILE

BEDDING COMPOUND AND GROUT

14, 234 FLOOR, 200 SQ. FT.4" SQUARE LIGHT BROWN CERAMIC WALL TILE

BEDDING COMPOUND AND GROUT

14, 244 FLOOR, 180 SQ. FT.1" x 2" GREEN SQUARE CERAMIC FLOOR TILE

BEDDING COMPOUND AND GROUT

24, 206 FLOOR, 100 SQ. FT.GREEN 1" SQUARE CERAMIC FLOOR TILE BEDDING COMPOUND

24, 207 WINDOW, 1 SQ. FT.INTERIOR GRAY WINDOW CAULK

24, 208 WINDOW, 2 SQ. FT.INTERIOR GRAY WINDOW CAULK

24, 208 FLOOR, 108 SQ. FT.GREEN 1" SQUARE CERAMIC FLOOR TILE BEDDING COMPOUND

24, 208 PIPE, 18 COUNTDOMESTIC PIPE JOINT INSULATION (LAYERED PAPER

PIPE INSULATION AND MUD JOINTS)

24, 209 PIPE, 50 COUNTDOMESTIC PIPE (LAYERED PAPER PIPE INSULATION

AND MUD JOINTS)

82, 246 1 COUNTWOOD FIRE DOOR

82, 007G WINDOW, 2 SQ. FT.INTERIOR GRAY WINDOW CAULK

82, 007J WINDOW, 2 SQ. FT.INTERIOR GRAY WINDOW CAULK

82, 007K FLOOR, 8 SQ. FT.CERAMIC FLOOR TILE BEDDING COMPOUND & GROUT

82, 007G 330 SQ. FT.1"x1" TAN & BEIGE FLOOR TILE & ASSOC. MASTIC

82, 016C WINDOW, 2 SQ. FT.INTERIOR GRAY WINDOW CAULK

82, 016D WINDOW, 2 SQ. FT.INTERIOR GRAY WINDOW CAULK

82, 016F WINDOW, 2 SQ. FT.INTERIOR GRAY WINDOW CAULK

82, 016G WINDOW, 2 SQ. FT.INTERIOR GRAY WINDOW CAULK

136, 125 WALL, 400 SQ. FT.4"x4" CERAMIC WALL TILE BEDDING COMPOUND & GROUT 136, 125 FLOOR, 117 SQ. FT.12"x12" BROWN CERAMIC FLOOR TILE BEDDING COMPOUND

& GROUT

136, 125 1 COUNTMETAL FIRE DOOR WITHOUT WINDOW

136, 125 1 COUNTJOINTS ON FIBERGLASS PIPE INSULATION

136, 126 WALL, 400 SQ. FT.4"x4" CERAMIC WALL TILE BEDDING COMPOUND & GROUT 136, 126 FLOOR, 117 SQ. FT.12"x12" BROWN CERAMIC FLOOR TILE BEDDING COMPOUND

& GROUT

136, 126 1 COUNTMETAL FIRE DOOR WITHOUT WINDOW

SCHEDULE NOTES:

1. PLEASE REFERENCE "ASBESTOS INSPECTION, BATTLE CREEK VETERANS AFFAIRS MEDICAL CENTER, _______

ENVIRONMENTALGROUP PROJECT NUMBER ... DATED 2019

2. ANY AND ALL CONFIRMATION TESTING FOR HAZARDOUS MATERIALS SHALL BE CONDUCTED BY THE CONTRACTOR.

3. MATERIAL DETERMINED TO BE ASBESTOS CONTAINING (1% OR ABOVE).

4. MATERIAL ASSUMED TO CONTAIN ASBESTOS.

5. SEE SPECIFICATIONS FOR ADDITIONAL INFORMATION.

NOTE:

• ONLY POSITIVE ACM SAMPLES IN RENOVATION AREAS ARE LISTED ABOVE FOR REFERENCE. SEE THE FULL ASBESTOS REPORT IN

THE SPECIFICATIONS FOR ADDITIONAL INFORMATION.

• LEAD CONTAINING PAINT SUSPECTED IN ALL BUILDINGS. CONTRACTOR IS RESPONSIBLE FOR ALL TESTING AND ABATEMENT OF

LEAD PAINT.

• FOR ACM UP TO 1%, GENERAL CONTRACTOR MAY REMEDIATE, REMOVE, AND DISPOSE OF MATERIALS, BUT MUST FIRST ATTEND A MINIMUM OF 16 HOUR AWARNESS / TRAINING CLASS AND BECOME CERTIFIED TO REMOVE THIS MATERIAL AND THE GENERAL

CONTRACTOR MUST CARRY INSURANCE WHICH ALLOWS THIS ACTIVITY.

• FOR ACM OVER 1%, AN ENVIRONMENTAL CONTRACTOR MUST BE HIRED TO REMOVE AND DISPOSE OF THIS MATERIAL.

• ALL ACM SHALL BE REMOVED, STORED, TRANSPORTED, AND DISPOSED OF BY AN APPROVED AND LICENSED SUB-CONTRACTOR IN ACCORDANCE WITH FEDERAL, STATE, AND VA REQUIREMENTS. ALL ACM SHALL BE STORED IN APPROVED CONTAINERS

PROVIDED BY CONTRACTOR.

• DRAWINGS DO NOT CLAIM TO IDENTIFY ALL THE ASBESTOS CONTAINING MATERIAL (ACM) PRESENT IN THE BUILDING AND SHOULD NOT BE THE SOLE BASIS FOR IDENTIFYING ACM FOR FUTURE RENOVATION OR DEMOLITION PROJECTS, ABATEMENT SPECIFICATIONS, ASBESTOS SURVEY WAS PERFORMED WITH LIMITATION INHERENT TO NON-DESTRUCTIVE VISUAL INSPECTIONS IN OCCUPIED SPACES, ANY SUSPECT MATERIAL ENCOUNTERED DURING RENOVATION / DEMOLITION THAT IS NOT IDENTIFIED AS

BEING NON-ACM SHOULD BE ASSUMED TO BE ACM UNLESS SAMPLE RESULTS PROVE OTHERWISE.

1, 2, 3, 5

1, 2, 4, 5

1, 2, 4, 5

1, 2, 4, 5

1, 2, 4, 5

1, 2, 4, 5

1, 2, 4, 5

1, 2, 4, 5

1, 2, 4, 5

1, 2, 4, 5

1, 2, 4, 5

1, 2, 4, 5

1, 2, 4, 5

1, 2, 3, 5 1, 2, 4, 5

1, 2, 4, 5

1, 2, 3, 5 1, 2, 4, 5

1, 2, 4, 5

1, 2, 4, 5 1, 2, 3, 5

1, 2, 4, 5

1, 2, 3, 5 1, 2, 4, 5

1, 2, 4, 5 1, 2, 4, 5 1, 2, 4, 5 1, 2, 4, 5 1, 2, 4, 5 1, 2, 4, 5 1, 2, 4, 5 1, 2, 4, 5 1, 2, 4, 5 1, 2, 4, 5 1, 2, 4, 5 1, 2, 4, 5 1, 2, 4, 5 1, 2, 3, 5 1, 2, 4, 5 1, 2, 4, 5 1, 2, 4, 5 1, 2, 4, 5 1, 2, 4, 5

1, 2, 4, 5

1, 2, 4, 5

1, 2, 4, 5 1, 2, 3, 5 1, 2, 3, 5 1, 2, 4, 5 1, 2, 3, 5

1, 2, 3, 5

1, 2, 4, 5 1, 2, 3, 5 1, 2, 3, 5 1, 2, 3, 5 1, 2, 3, 5 1, 2, 3, 5 1, 2, 3, 5 1, 2, 3, 5 1, 2, 3, 5

1, 2, 4, 5 1, 2, 4, 5

1, 2, 4, 5

1, 2, 4, 5 1, 2, 3, 5

1, 2, 4, 5

1, 2, 4, 5

2 NO ACMS REPORTED 1, 2

84 NO ACMS REPORTED 1, 2

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

All Concepts, ideas, design elements, plans, and details as shown on this document are the sole property of Viridian Architectural

Design, Inc. and shall not be used for any purpose without prior expressed written consent. The Owner shall be permitted to retain copies for information and reference.

2020 E. Washington Boulevard Suite 200 Fort Wayne, Indiana 46803

PH: 260.424.4830

www.viridian-design.net

FINAL BID

DOCUMENTS

OF03 66

Z:

\V iri di an \P ro je ct s\

\0

D R

AW

IN

G S\

R

EV

IT

\L

O C

AL

F

IL

ES

\2

2_ C

EN

TR

AL

_R

_l fe do rc zy k.

rv t 4/

/2

:4

1:

A M

GI003

SITE CAMPUS MAP, PHASING NOTES

AND HAZARDOUS MATERIALS

RENOVATE RESTROOMS

BATTLE CREEK, MICHIGAN

515-22-101

BC VA CAMPUS

02/23/2023 TWT AKM

SCALE: 1" = 160'-0"

GI003

SITE CAMPUS MAP

# ONLY SHADED BUILDINGS ARE

INCLUDED IN THIS PROJECT.

BUILDING

NORTH

GENERAL CONSTRUCTION & PHASING NOTES

APPLICABILITY OF GENERAL CONSTRUCTION NOTES:

THESE NOTES APPLY TO ALL WORK DESCRIBED IN THESE DRAWINGS AND SPECIFICATIONS AND TO ALL CONTRACTORS AND / OR SUBCONTRACTORS THAT WORK IN, ON, OR AROUND THIS BUILDING OR THE ADJACENT SITE. FOR ADDITIONAL SCOPE OF WORK DESCRIBED IN DETAIL, SEE THE RESPECTIVE DISCIPLINE DRAWINGS AND

SPECIFICATIONS. COORDINATE ORDER OF CONSTRUCTION PHASING WITH COR.

1. EXISTING BUILDING UTILITIES:

PRIOR TO THE COMMENCEMENT OF ANY / ALL WORK, VERIFY THE LOCATION AND ENSURE THE OBVIOUS MARKING OF ALL EXISTING UTILITIES AND RELATED EQUIPMENT ON, ABOVE, OR BENEATH THE ADJACENT WORK AREA, WHETHER INDICATED TO REMAIN, TO BE MODIFIED, OR TO BE REMOVED. COORDINATE ALL VERIFICATION

AND MARKING WORK WITH THE COR.

2. BUILDING DUST AND INFECTION CONTROL:

THE BUILDING WILL REMAIN FULLY OCCUPIED DURING ALL PHASES OF THIS WORK. THEREFORE, PROVIDE, INSTALL, AND MAINTAIN ALL CONSTRUCTION DUST, DEBRIS AND INFECTION CONTROL MEASURES OUTLINED.

GENERAL CONTRACTOR TO PROVIDE INTERIOR PROTECTIVE MEASURES BETWEEN CONTRACTOR CONTROLLED SPACE AND VA OCCUPIED SPACE. INTERIOR PROTECTIVE MEASURES SHALL INCLUDE AN ALUMINUM FRAME AND FIBERGLASS REINFORCED POLYMER MODULAR WALL SYSTEM. THE MODULAR WALL SYSTEM SHALL EXCEED ICRA CLASS IV REQUIREMENTS. BASIS OF DESIGN; STARC SYSTEMS LITE BARRIER WALL SYSTEM OR EQUAL.

SEE INFECTION CONTROL PLAN ON GI002 AND SPECIFICATIONS FOR ADDITIONAL INFORMATION. COORDINATE

SPECIFIC INFORMATION WITH THE COR.

3. BUILDING ACCESS AND SECURITY: THE BUILDING WILL REMAIN FULLY OCCUPIED DURING ALL PHASES OF THIS WORK. THEREFORE, PROVIDE, INSTALL, AND MAINTAIN ALL TEMPORARY MEASURES REQUIRED TO MAINTAIN ACCESS AND SECURITY OF THE EXISTING BUILDING AND THE WORK AREA FOR THE DURATION OF THE CONSTRUCTION PROJECT. COORDINATE SPECIFIC INFORMATION WITH THE COR. SEE SPECIFICATIONS FOR

ADDITIONAL INFORMATION.

4. EXISTING WORK AREA AND BUILDING CONDITION:

PROVIDE, INSTALL, AND MAINTAIN PROTECTIVE MEASURES TO KEEP THE EXISTING BUILDING ADJACENT TO THE WORK AREA AND PATH OF DEMOLITION TRAVEL FROM CONSTRUCTION DAMAGE DURING WORK. RESTORE ANY PORTION OF THE EXISTING BUILDING OR ADJACENT SITE INADVERTENTLY DAMAGED BY, OR AS A RESULT OF THIS WORK, AT NO ADDITIONAL COST TO THE VA. DAMAGE TO THE SITE / LANDSCAPING SHALL BE RESTORED SEASONALLY, PER BUILDING, REGARDLESS OF THE OVERALL PROJECT PROGRESS / COMPLETION. SEE

SPECIFICATIONS FOR ADDITIONAL INFORMATION.

5. EXITS TO BE MAINTAINED:

MAINTAIN ONE (1) EXITS FROM ALL AREAS AT ALL TIMES FOR THE DURATION OF CONSTRUCTION. IF AN EXIT MUST BE CLOSED THE GENERAL CONTRACTOR SHALL COORDINATE WITH VA COR FOR AN ILSM PRIOR TO

CLOSING THE EXIT.

6. GENERAL DEMOLITION NOTES AND INFORMATION:

SEE DISCIPLINE DRAWINGS AND SPECIFICATIONS FOR GENERAL DEMOLITION NOTES AND INFORMATION INCLUDING DISPOSAL AND / OR SALVAGE OF DEMOLISHED MATERIALS. THE CONTRACTOR SHALL NOT CONTINUE WITH DEMOLITION UNTIL THE SCOPE OF WORK AT THE TURNED OVER RESTROOM IN THE SAME BUILDING IS COMPLETE (FIXTURES, FINISHES, EXHAUST FAN, MECHANICAL, PLUMBING, ETC.) AND ACCEPTED BY THE VA.

COORDINATE NEW CONSTRUCTION VS. DEMOLITION PROGRESS PHASING WITH THE COR.

7. GENERAL CONSTRUCTION NOTES AND INFORMATION:

SEE DISCIPLINE DRAWINGS AND SPECIFICATIONS FOR GENERAL CONSTRUCTION NOTES AND INFORMATION INCLUDING STORAGE AND STAGING OF CONSTRUCTION MATERIALS. THE CONTRACTOR SHALL NOT CONTINUE WITH CONSTRUCTION UNTIL THE SCOPE OF WORK AT THE TURNED OVER RESTROOM IN THE SAME BUILDING IS COMPLETE (FIXTURES, FINISHES, EXHAUST FAN, MECHANICAL, PLUMBING, ETC.) AND ACCEPTED BY THE VA.

GENERAL CONTRACTOR TO PROVIDE INTERIOR PROTECTIVE MEASURES BETWEEN CONTRACTOR CONTROLLED SPACE AND VA OCCUPIED SPACE. INTERIOR PROTECTIVE MEASURES SHALL INCLUDE AN ALUMINUM FRAME AND FIBERGLASS REINFORCED POLYMER MODULAR WALL SYSTEM. THE MODULAR WALL SYSTEM SHALL EXCEED ICRA CLASS IV REQUIREMENTS. BASIS OF DESIGN; STARC SYSTEMS LITE BARRIER WALL SYSTEM OR EQUAL.

COORDINATE SPECIFIC INFORMATION WITH THE COR.

8. EXISTING PLUMBING SUPPLY AND DWV SYSTEMS AND EQUIPMENT: THE BUILDING WILL REMAIN FULLY OCCUPIED DURING CONSTRUCTION. THEREFORE, COORDINATE ALL TEMPORARY AND PERMANENT DISCONNECTING, MODIFICATIONS TO, REROUTING OF, AND RECONNECTING OF EXISTING PLUMBING SUPPLY AND DRAIN WASTE VENT SYSTEMS (DWV) AND EQUIPMENT WITH THE COR. SEE DEMOLITION, ARCHITECTURAL, MECHANICAL, ELECTRICAL, AND SPECIFICATIONS FOR ADDITIONAL INFORMATION.

9. EXISTING MECHANICAL SYSTEMS AND EQUIPMENT: THE BUILDING WILL REMAIN FULLY OCCUPIED DURING CONSTRUCTION. THEREFORE, COORDINATE ALL TEMPORARY AND PERMANENT DISCONNECTING AND RECONNECTING OF EXISTING MECHANICAL SYSTEMS, STEAM PIPING AND EQUIPMENT WITH THE COR. SEE DEMOLITION, ARCHITECTURAL, MECHANICAL, ELECTRICAL, AND SPECIFICATIONS FOR ADDITIONAL INFORMATION.

10. EXISTING ELECTRICAL POWER SUPPLIES AND EQUIPMENT: THE BUILDING WILL REMAIN FULLY OCCUPIED DURING CONSTRUCTION. THEREFORE, COORDINATE ALL TEMPORARY AND PERMANENT DISCONNECTING AND RECONNECTING OF EXISTING POWER SUPPLIES AND EQUIPMENT WITH THE COR. SEE DEMOLITION, ARCHITECTURAL, AND ELECTRICAL DRAWINGS, AND SPECIFICATIONS FOR ADDITIONAL INFORMATION.

11.FIRE-PROTECTION SYSTEMS AND EQUIPMENT: THE BUILDING WILL REMAIN FULLY OCCUPIED DURING CONSTRUCTION. THEREFORE, COORDINATE ALL NEW ROUTING OF FIRE-PROTECTION SYSTEMS AND EQUIPMENT WITH THE COR. SEE DEMOLITION, ARCHITECTURAL, MECHANICAL, AND ELECTRICAL DRAWINGS AND

SPECIFICATIONS FOR ADDITIONAL INFORMATION.

12. PROJECT PHASING: ALL WORK FOR THIS PROJECT SHALL BE PHASED TO MAINTAIN ONE (1) EGRESS EXIT AT ALL TIMES AND TO LIMIT DISRUPTIONS TO DAILY OPERATIONS. CONTRACTOR SHALL COORDINATE FINAL SCHEDULE WITH COR. IF ANY MEANS OF EGRESS MUST BE BLOCKED, THE GENERAL CONTRACTOR SHALL COORDINATE

WITH VA COR FOR AN ILSM PRIOR TO CLOSING THE EXIT.

13.THE BUILDING WILL REMAIN FULLY OCCUPIED DURING CONSTRUCTION. THEREFORE, EXISTING CORRIDOR ACCESS AND OPERATIONS SHALL REMAIN OPEN FOR SERVICE CONTINUALLY DURING CONSTRUCTION.

14.GENERAL CONTRACTOR TO PROVIDE INTERIOR PROTECTIVE MEASURES BETWEEN CONTRACTOR CONTROLLED SPACE AND VA OCCUPIED SPACE. PROTECTIVE DEVICE SHALL INCLUDE AN ALUMINUM FRAME AND FIBERGLASS REINFORCED POLYMER MODULAR WALL SYSTEM. THE MODULAR WALL SYSTEM SHALL EXCEED ICRA CLASS IV

REQUIREMENTS. BASIS OF DESIGN; STARC SYSTEMS LITE BARRIER WALL SYSTEM OR EQUAL.

15.AT THE COMPLETION OF EACH PHASE, NOTICE SHALL BE GIVEN TO THE CONTRACTOR BY THE COR TO PROCEED

TO THE NEXT PHASE.

16.CONTRACTOR TO STAGE ALL DRYWALL WITHIN EACH SPACE AND INFECTION CONTROLS IMPLEMENTED AND MAINTAINED BEFORE AND DURING CUTTING, HANGING, MUDDING, AND SANDING OPERATIONS. PROJECT MATERIAL PHASING WILL BE LOCATED IN ONE FENCED AREA. LOCATION TO BE PROVIDED BY THE VA, FENCING (MINIMUM 8'-0" w/ MESH FABRIC PRIVACY SCREENING) SHALL BE PROVIDED BY THE GENERAL CONTRACTOR.

MATERIALS SHALL BE BROUGHT TO EACH BUILDING DAILY FROM THE STAGING AREA AND SHALL ONLY BE IN THE AMOUNT NEEDED FOR THAT DAYS WORK. EXACT LOCATION OF STAGING AREA SHALL BE COORDINATED

WITH COR.

17. ALL AREAS TURNED OVER TO THE CONTRACTOR SHALL HAVE THE FLOOR 100% COVERED WHICH IS NOT INCLUDED IN THE SCOPE OF WORK. GC SHALL NOT LEAN TOOL OR EQUIPMENT AGAINST WALLS. ALL EQUIPMENT AND / OR ELECTRONICS WHICH ARE TO REMAIN SHALL BE 100% COVERED. THE 'COVER' SHALL BE SEALED AND SECURED TO PREVENT DUST AND DEBRIS FORM INFILTRATION COVERED ITEMS. CONTRACTOR SHALL BE

RESPONSIBLE FOR DAMAGE TO ITEMS NOT PROPERLY PROTECTED.

18.HAZARDOUS MATERIAL (ASBESTOS, LEAD) SEE ASBESTOS NOTES THIS SHEET. CONTRACTOR SHALL STOP WORK AND CONTACT THE COR IMMEDIATELY IF ASBESTOS AND OR LEAD CONTAMNATES ARE FOUND DURING

DEMO OR CONSTRUCTION.

Revisions: Date:

NOT IN BID

UP

UP

UP

UP

UP

UP

UP

UP

UP

UP

UP UP

UP

UP

UP

UP

UP

DN

UP

UP

UP

UP UP

UP

AD103

RECORDS

B2 048

OFFICE

B2 0114

OFFICE

B2 0113

CORRIDOR

B2 C013

TRIAGE

B2 0112

TRIAGE

B2 0111

OFFICE

B2 0110

RECEPTION

B2 0109

PATIENT

INFORMATION

B2 0108

ADMISSIONS

WAITING ROOM

B2 061

VEST

B2 061A

STAIR

B2 S5

PATIENT ADVOCATE

B2 064

PATIENT ADVOCATE

B2 065

STOR

B2 066

SERVICE OFFICER

B2 067

OFFICE

B2 008

OWCP

B2 009

STAIR

B2 S3

CORRIDOR

B2 C04

FILE / RECEPTION

B2 010

OFFICE

B2 011

ADP COORD

B2 012

LOCKER ROOM

B2 013

PHARMACY WAITING

B2 014

RECEPTION

B2 014A

ELIGIBILITY CLERK

B2 074

SERVICE OFFICER

B2 074A

SUB WAITING

B2 073

CORRIDOR

B2 084A

H.A.C.

B2 080

ELEC

B2 069E

DISBATCH

B2 078

ELIGIBILITY OFFICER

B2 077

BATH

B2 078A

DATA

B2 076

RELEASE OF

INFORMATION

B2 075

OFFICE

B2 007

OUTPATIENT OFFICE

B2 005

CHASE

B2 006E BENEFITS SECTION

SUPERVISOR

B2 002

CORRIDOR

B2 C02

STAIR

B2 S1

AGENT CASHIER

B2 016

PATIENT FUNDS

B2 017

HVAC CLOSET

B2 017A

ELEV

B2 E1

ELEVATOR EQUIP

B2 018E

ELEV

B2 E2

DATA

B2 019A

SOILED LINEN /

UTILITY / TELEPHONE

B2 019

PHARMACY

B2 015

CONTROLLED

SUBSTANCE VAULT

B2 015A

HVAC

B2 015E

STAIR

B2 S5

MECH

B2 0F-020

ELEC

B2 0F-020E

VEST

B2 0F-003

SHELL

B2 0F-001

EXIT PASSAGEWAY

B2 C0-1

MACH / TANK

B2 020E

VENDING

B2 024

HVAC

B2 021E

OFFICE

B2 086

CORRIDOR

B2 C05

OFFICE

B2 088

EXIT PASSAGEWAY

B2 C0-2

SHELL

B2 0G-001

ELEC

B2 0G-010E

MECHANICAL

B2 0G-020

B2 0043

EXAM SOUND BOOTH

B2 042

HEATING / AC UNIT

B2 042E

OFFICE

B2 043

AUIDO

BOOTH

IT ROOM

VEST

AUIDO

BOOTH

AUIDO

BOOTH

EXAM SOUND BOOTH

B2 041

EXAM SOUND BOOTH

B2 044

SECRETARY

B2 045

OFFICE

B2 040

TREATMENT

B2 039

PROSTHETICS

B2 038

AUDIOLOGY WAITING

B2 037

AMBULANCE BAY

CORRIDOR

B2 C09

CORRIDOR

B2 C08

STAIR

B2 S2

LINEN

B2 087

CORRIDOR

B2 C06

RECOVERY

B2 093

DRESSING ROOM

B2 092

BATH

B2 092A

SOILED UTILITY

B2 091 CORRIDOR

B2 C010

TREATMENT

B2 095

BATH

B2 096

STORAGE

B2 095A

CORRIDOR

B2 C01ELEV

B2 E3

EQUIPMENT

B2 0106

LOCKER ROOM

B2 097

NURSES STATION

B2 0103

CORRIDOR

B2 C012

EXAM

B2 0122

BATH

B2 0122A

EXAM

B2 0116

EXAM

B2 0117

EXAM

B2 0118

OFFICE

B2 0119

BATH

B2 0103A

DATA

B2 050E

SOILED LINEN

B2 050

MENS TOILET

B2 046

WOMENS TOILET

B2 047

STAIR

B2 S4

WOMENS TOILET

B2 082

MENS TOILET

B2 083

WOMENS TOILET

B2 003

MENS TOILET

B2 004

AD103

AD103

AD103

EXAM

B2 1109B

EXAM

B2 1109A

EXAM

B2 1109

EXAM

B2 1109C

EXAM

B2 1109D

EXAM

B2 1108

OFFICE

B2 1184

EXAM ROOM

B2 1185

CORRIDOR

B2 C19B

EXAM

B2 1171

EXAM

B2 1170

EXAM

B2 1169

OFFICE

B2 1168

EXAM

B2 1167

STORAGE

B2 1187

CORRIDOR

B2 C19

CORRIDOR

B2 C19A

ELEC

B2 1191E

ELEC

B2 1192E

STAIR

B2 S5-1

ELEV

B2 E3

H.A.C.

B2 1188EXAM

B2 1107

GROUP OFFICE

B2 1183

EXAM ROOM

B2 1186

EXAM

B2 1110

OFFICE

B2 1111

OFFICE

B2 1112

OFFICE

B2 1113

OFFICE

B2 1114

OFFICE

B2 1124

H.A.C.

B2 1125

STAIR

B2 S1

OFFICE

B2 1103

CHASE

B2 1107E

CHASE

B2 1106E

OFFICE

B2 1102

BREAKROOM

B2 1101

OFFICE

B2 1100C

OFFICE

B2 1100C

OFFICE

B2 1100A

OFFICE

B2 1100

CORRIDOR

B2 C12

OFFICE

B2 1117

POD BEDROOM

B2 1118

TOILET

B2 1127A

H.A.C.

B2 1119

ELEV

B2 E1

ELEV. MECH.

B2 1119E

OFFICE

B2 1120A

ELEV

B2 E2

CORRIDOR

B2 C11

EXAM

B2 1115

OFFICE

B2 1123

EXAM

B2 1116

EXAM

B2 1122

CLASSROOM

B2 1317

EXAM

B2 1117

EXAM

B2 1121

EXAM

B2 1118

EXAM

B2 1120

EXAM

B2 1119

TOILET

B2 1315A

EXAM

B2 1315

CORRIDOR

B2 C1-2

EXAM

B2 1318

TOILET

B2 1318A WORK ROOM

B2 1316

EXAM

B2 1320

CORRIDOR

B2 C1-1

LIQUID NITROGEN

B2 1319

CORRIDOR

B2 C1-4

CORRIDOR

B2 C1-5

CORRIDOR

B2 C1-6

ELEC

B2 1301

CLEAN SUPPLY

ROOM

B2 1300

MEDICATION ROOM

B2 1304

OFFICE

B2 1310

TOILET

B2 1314A

EXAM

B2 1314

STORAGE

B2 1313

SOILED UTILITY

B2 1312

PATIENT TOILET

B2 1311

CORRIDOR

B2 C1-3

SCI PROCEDURE

ROOM

B2 1302

SCI PROCEDURE

ROOM

B2 1303

STAIR

B2 S7

EXAM

B2 1305

EXAM

B2 1306

EXAM

B2 1307

EXAM

B2 1308

EXAM

B2 1309

CHECK IN

B2 1364A

CHECK IN

B2 1416A

WAITING

B2 1130

EXAM

B2 1420

CORRIDOR

B2 C1-21

LIQUID NITROGEN

B2 1319

WORK ROOM

B2 1416

EXAM

B2 1418

BATH

B2 1418A

CLASSROOM

B2 1417

EXAM

B2 1415

TOILET

B2 1415A

CORRIDOR

B2 C1-20

DATA

B2 1131

OFFICE

B2 1132

OFFICE

B2 1133

OFFICE

B2 1134

STAIR

B2 S2

CORRIDOR

B2 C17

BATH

B2 1158

DATA

B2 1156E

EXAM

B2 1157

OFFICE

B2 1155

OFFICE

B2 1154

OFFICE

B2 1153

CHASE

B2 1151E

WORK ROOM

B2 1194

RECEPTION

B2 1195

CORRIDOR

B2 C18

CORRIDOR

B2 C18B

CMS STORAGE

B2 1196

OFFICE

B2 1203

CORRIDOR

B2 C18A

OFFICE

B2 1197

OFFICE

B2 1198

GROUP TREATMENT

B2 1199

OFFICE

B2 1204

OFFICE

B2 1205

OFFICE

B2 1206

OFFICE

B2 1207

OFFICE

B2 1208

OFFICE

B2 1209

EXAM

B2 1149C

SOILED UTILITY

B2 1149B

BATH

B2 1149A

STAIR

B2 S4

EXAM

B2 1149D

CLEAN STORAGE

B2 1149G

WAITING

B2 1165

EXAM

B2 1149F

WAITING

B2 1149

CHASE

B2 1135E

CHASE

B2 1149E

OFFICE

B2 1148B

OFFICE

B2 1148A

OFFICE

OFFICEOFFICE

OFFICE

EXAM

EXAM

EXAM

EXAM EXAM

EXAM

EXAM

EXAM

EXAM

CLEAN SUPPLY

ROOM

B2 1400

ELECTRICAL ROOM

B2 1401E

MEDICATION ROOM

B2 1404

CORRIDOR

B2 C1-19

SCI PROCEDURE

ROOM

B2 1402

PATIENT TOILET

B2 1414A

EXAM

B2 1414

RN WORK ROOM

B2 1410

CORRIDOR

B2 C1-17

STORAGE

B2 1413

SOILED UTILITY

B2 1412

TOILET

B2 1411

CORRIDOR

B2 C1-18

EXAM

B2 1409

EXAM

B2 1408

EXAM

B2 1407

EXAM

B2 1406

EXAM

B2 1405

STAIR

B2 S8

EKG EXAM

B2 1403

CORRIDOR

B2 C1-16

MENS TOILET

B2 1150

MENS TOILET

B2 1190

WOMENS TOILET

B2 1189

WOMENS TOILET

B2 1105

AD103

AD103

STAIR

B2 S3

STORAGE

B2 2213

CONFERENCE /

BREAK ROOM

B2 2212

STORAGE

B2 2211

LOCKERS

B2 2214

OFFICE

B2 2215

OFFICE

B2 2210

H.A.C.

B2 2209OFFICE

B2 2216

CORRIDOR

B2 C22

TOILET

B2 2203A

CHASE

B2 2204E

CHASE

B2 2207E

DEV LAB

B2 2217

OFFICE

B2 2218

WAITING

B2 2203

LAB

B2 2205

STAIR

B2 S1

OFFICE

B2 2219

BIOSAFETY LAB

B2 2220A

OFFICE

B2 2220B

MEDICAL WASTE

B2 2221

MICROBIOLOGY

B2 2220

ULTRASOUND

B2 2222

TOILET

B2 2222A

H.A.C.

B2 2223

STORAGE

B2 2224A

CORRIDOR

B2 2224

STORAGE

B2 2225A

BREAKROOM

B2 2225

ELEV

B2 E2

STORAGE

B2 2202B WAITING

B2 2202

WAITING

B2 2200

ELEV

B2 E3

STORAGE

B2 2273

TOILET

B2 2272

STAIR

B2 S5

CORRIDOR

B2 C26

CT CONTROL ROOM

B2 2268

CT GANTRY

B2 2269

STRESS TESTING

ROOM

B2 2270

NUCLEAR MEDICINE

B2 2271

HOT TUB

B2 2271B

HOT TUB

B2 2271A

RECEPTION

B2 2265

CORRIDOR

B2 C21

WAITING ROOM

B2 2264

EXAM

B2 2264A

EXAM

B2 2263

OFFICE

B2 2263A

H.A.C.

B2 2262

CHASE

B2 2261E

CHASE

B2 2259E

DENTAL PROSTHETIC

LAB

B2 2254

LOUNGE ROOM

B2 2255

TREATMENT

B2 2256

CORRIDOR

B2 C25

OFFICE

B2 2253

STORAGE

B2 2252

TREATMENT

B2 2257

H.A.C.

B2 2251

OFFICE

B2 2249A

OFFICE

B2 2249

DENTIST OFFICES

B2 2248

STAFF OFFICES

B2 2250

STAIR

B2 S2

OFFICE

B2 2239

TREATMENT ROOM

B2 2247

TREATMENT ROOM

B2 2246

TREATMENT ROOM

B2 2245

SOILED UTILITY

B2 2244

360 X-RAY

B2 2240

TREATMENT

B2 2241

CORRIDOR

B2 C24

TREATMENT ROOM

B2 2242

TREATMENT ROOM

B2 2243

EXAM

B2 2238

BATH

B2 2237A

X-RAY 1

B2 2237

CONTROL

B2 2237

WAITING AREA

B2 2236

OFFICE

B2 2235

OFFICE

B2 2226

CORRIDOR

B2 C23

X-RAY

B2 2233

OFFICE

B2 2227

X-RAY

B2 2228

FILM PROCESSING

B2 2231

TOILET

B2 2231A

WOMENS TOILET

B2 2260

MENS TOILET

B2 2258

WOMENS TOILET

B2 2206

MENS TOILET

B2 2208

AD104

AD104

AD104

VACANT

B7 030

STAIR

B7 S4

VACANT

B7 031

STORAGE

B7 028B

VACANT

B7 032

MORGUE

B7 028

CORRIDOR

B7 C05

OFFICE

B7 028A

WHEEL CHAIR REPAIR

B7 028

TOILET

B7 028C

ELEC

B7 027E

CORRIDOR

B7 C04

STORAGE

B7 017

STAIR

B7 S2

CORRIDOR

B7 C02

STORAGE

B7 033

H.A.C.

B7 034

STORAGE

B7 001

ELEV

B7 S5

STORAGE

B7 002

STORAGE

B7 003

STORAGE

B7 003A

BEHAVIORAL HEALTH

MESSENGER POOL

B7 004

OFFICE

B7 005A

OFFICE

B7 005B

OFFICE

B7 005C

STAFF AREA

B7 005

STAIR

B7 S5-0B

ELEC

B7 006A

ELEC

B7 B38

MECH

B7 008

STORAGE

B7 009

H.A.C.

B7 008A

MECH

B7 009D

STORAGE

B7 009

STORAGE

B7 009A

STORAGE

B7 009B

STAIR

B7 S1-0B

TOILET

B7 010

H.A.C.

B7 011

MECH

B7 011E

OFFICE

B7 012

VACANT

B7 015

WOMENS LOCKER

B7 016

STORAGE

B7 014

CORRIDOR

B7 C03

VACANT

B7 013

TOILET

B7 010

TOILET

B7 016A

TOILET

B7 029

AD104

AD104

CLASSROOM

B9 124

STORAGE

B9 125

TOILET

B9 125A

H.A.C.

B9 126

CLOSET

B9 126A

STAIR

B9 S2 ELEVATOR

B9 127

MECHANICAL ROOM

B9 128E

OFFICE

B9 128

OFFICE

B9 129

VEST

B9 C11

OFFICE

B9 101

STORAGE

B9 102

OFFICE

B9 103

CLOSET

B9 103A

STAIR

B9 S1

OFFICE

B9 104

TOILET

B9 104A

OFFICE

B9 105

OFFICE

B9 107

CONFERENCE ROOM

B9 106

STORAGE

B9 108

CORRIDOR

B9 C13

OFFICE

B9 109

OFFICE

B9 110

OFFICE

B9 111

OFFICE

B9 112

OFFICE

B9 113

OFFICE

B9 114

CLASSROOM

B9 123A

VENDING

B9 123

STORAGE

B9 122

CLASSROOM

B9 118

LOUNGE

B9 117

TOILET

B9 121

WOMENS TOILET

B9 119

MENS TOILET

B9 116

AD104

AD104

SKILLS LAB

B9 216

OFFICE

B9 217

STORAGE

B9 217A

STAIR

B9 S2

H.A.C.

B9 218

KITCHEN

B9 200A

WORK ROOM

B9 200

STORAGE

B9 202

STORAGE

B9 203

CLOSET

B9 203

WORK ROOM

B9 215

CORRIDOR

B9 C23

WORK ROOM

B9 214

OFFICE

B9 213

CORRIDOR

B9 C24

OFFICE

B9 210

OFFICE

B9 209

PIPE CHASE

B9 208E

PIPE CHASE

B9 207E

CLASSROOM

B9 206

CLASSROOM

B9 205

OFFICE

B9 204

DATA

B9 204A

STAIR

B9 S1

CORRIDOR

B9 C21

WOMENS TOILET

B9 208

MENS TOILET

B9 211

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

All Concepts, ideas, design elements, plans, and details as shown on this document are the sole property of Viridian Architectural

Design, Inc. and shall not be used for any purpose without prior expressed written consent. The Owner shall be permitted to retain copies for information and reference.

2020 E. Washington Boulevard Suite 200 Fort Wayne, Indiana 46803

PH: 260.424.4830

www.viridian-design.net

FINAL BID

DOCUMENTS

OF04 66

Z:

\V iri di an \P ro je ct s\

\0

D R

AW

IN

G S\

R

EV

IT

\L

O C

AL

F

IL

ES

\2

2_ C

EN

TR

AL

_R

_l fe do rc zy k.

rv t 2/

/2

:4

2:

A M

AD100

DEMOLITION - KEY PLANS - BUILDING 2,

7, & 9

RENOVATE RESTROOMS

BATTLE CREEK, MICHIGAN

515-22-101

BC VA CAMPUS

02/23/2023 TWT AKM

SCALE: 1" = 20'-0"

AD100

DEMOLITION - KEY PLAN - B2 GROUND FLOOR

SCALE: 1" = 20'-0"

AD100

DEMOLITION - KEY PLAN - B2 FIRST FLOOR

SCALE: 1" = 20'-0"

AD100

DEMOLITION - KEY PLAN - B2 SECOND FLOOR

SCALE: 1" = 20'-0"

AD100

DEMOLITION - KEY PLAN - B7 GROUND FLOOR

SCALE: 1" = 20'-0"

AD100

DEMOLITION - KEY PLAN - B9 FIRST FLOOR

SCALE: 1" = 20'-0"

AD100

DEMOLITION - KEY PLAN - B9 SECOND FLOOR

NORTH

NORTH

NORTH

NORTH

NORTH

NORTH

TRUE

NORTH

TRUE

NORTH

TRUE

NORTH

TRUE

NORTH

TRUE

NORTH

TRUE

NORTH

DN

UPUP

UP

UP

UP

UP

UP

DNDN

DN

UP

UP

UP

UP

UP

UP

UP

UP

FD

AD104

AD104

WORK ROOM

B10 123

OFFICE

B10 124

OFFICE

B10 122

CONFERENCE

B10 121A

STORAGE

B10 118

OFFICE

B10 119

OFFICE

B10 120

OFFICE

B10 121

TOILET

B10 117

PIPE CHASE

B10 115E

STORAGE

B10 114

STORAGE

B10 113

STORAGE

B10 125

STORAGE

B10 125A

STAIR

B10 S2

STORAGE

B10 126

CLOSET

B10 126A

STORAGE

B10 127

OFFICE

B10 128

CORRIDOR

B10 C11

OFFICE

B10 101

OFFICE

B10 102

H.A.C.

B10 103

LOUNGE

B10 104

STAIR

B10 S1

TOILET

B10 104

OFFICE

B10 105

CONFERENCE ROOM

B10 106

WORK ROOM

B10 107

WAITING AREA

B10 C12

OFFICE

B10 110

OFFICE

B10 108

OFFICE

B10 109

WOMENS TOILET

B10 112

MENS TOILET

B10 115

AD105

AD105

OFFICE

B10 220B

OFFICE

B10 220

OFFICE

B10 220A

OFFICE

B10 219

OFFICE

B10 218

CORRIDOR

B10 C23

OFFICE

B10 217

OFFICE

B10 216

CORRIDOR

B10 C24

OFFICE

B10 213

OFFICE

B10 212

PIPE CHASE

B10 211E

PIPE CHASE

B10 210E

CORRIDOR

B10 C21

CORRIDOR

B10 C22

OFFICE

B10 209

OFFICE

B10 208

OFFICE

B10 207

OFFICE

B10 206

OFFICE

B10 205A

OFFICE

B10 205

OFFICE

B10 204

STAIR

B10 S1

STORAGE

B10 203

CLOSET

B10 203A

OFFICE

B10 202

OFFICE

B10 201

OFFICE

B10 224

OFFICE

B10 223

H.A.C.

B10 222

STAIR

B10 S2

COPY

B10 221

TOILET

B10 221A

MENS TOILET

B10 211

WOMENS TOILET

B10 214

AD105

AD105

OFFICE

B11 118C

OFFICE

B11 118A

OFFICE

B11 118

OFFICE

B11 119

STAIR

B11 S2

H.A.C.

B11 120 OFFICE

B11 121

OFFICE

B11 122

OFFICE

B11 123

VEST

B11 C14

OFFICE

B11 101

OFFICE

B11 102

OFFICE

B11 103

OFFICE

B11 104

CLOSET

B11 104A

STAIR

B11 S1

OFFICE

B11 105

VEST

B11 C15

OFFICE

B11 109A

RECEPTION

B11 109D

OFFICE

B11 108

OFFICE

B11 108A

OFFICE

B11 109

CORRIDOR

B11 C13

PIPE CHASE

B11 110E

OFFICE

B11 112

OFFICE

B11 113

CORRIDOR

B11 C12

PIPE CHASE

B11 114E

PIPE CHASE

B11 115E

CONFERENCE

B11 116

OFFICE

B11 117

WOMENS TOILET

B11 111

MENS TOILET

B11 114

AD105

AD105

OFFICE

B11 220B

OFFICE

B11 220A

IMS OFFICE

B11 220

OFFICE

B11 219

VEST

B11 C24

CORRIDOR

B11 C21

CORRIDOR

B11 C22

CORRIDOR

B11 C23

COPIER

B11 218

OFFICE

B11 217

OFFICE

B11 216

OFFICE

B11 215

OFFICE

B11 214

OFFICE

B11 213

PIPE CHASE

B11 212E

PIPE CHASE

B11 211E

CONFERENCE

B11 210

PIPE CHASE

B11 209E

PIPE CHASE

B11 208E

OFFICE

B11 207

OFFICE

B11 206B

OFFICE

B11 206A

SECRETARY

B11 206

IMS OFFICE

B11 205

TOILET

B11 205B

OFFICE

B11 204

STAIR

B11 S1

WORK ROOM

B11 203

OFFICE

B11 202

OFFICE

B11 201

OFFICE

B11 224

IMS STORAGE

B11 223

H.A.C.

B11 222

BREAKROOM

B11 221

STAIR

B11 S2

WOMENS TOILET

B11 209

MENS TOILET

B11 211

AD105

OFFICE

B12 122

OFFICE

B12 123

BREAKROOM

B12 124

TOILET

B12 124A

TCM

B12 125

COPY / MAIL

B12 126

OFFICE

B12 127

OFFICE

B12 128

VESTIBULE

B12 C11

TCM

B12 101

H.A.C.

B12 102

OFFICE

B12 103

TOILET

B12 103A

OFFICE

B12 104

CORRIDOR

B12 C12

CONFERENCE ROOM

B12 105

OFFICE

B12 106

CALL CENTER

B12 107

CALL CENTER

STORAGE

B12 108

OFFICE

B12 110

MECH

B12 109E

MECH

B12 110E

OFFICE

B12 111

INTERVIEW

B12 112

UTILITY ROOM

B12 113

SHOWER

B12 114

MECH

B12 115E

TOILET

B12 117

OFFICE

B12 119

CONFERENCE ROOM

B12 119B

WAITING ROOM

B12 119

OFFICE

B12 120

OFFICE

B12 121

CORRIDOR

B12 C12

EXTERIOR HVAC

CONCRETE PAD

B12 C13

WOMENS TOILET

B12 115

MENS TOILET

B12 118

AD105

AD105

OFFICE

B12 220

OFFICE

B12 219

OFFICE

B12 218

SEC ANCILLARY

SERVICE

B12 221 STAIR

B12 S2

OFFICE

B12 222

OFFICE

B12 223

OFFICE

B12 224

OFFICE

B12 225

OFFICE

B12 201

COMPLIANCE

OFFICER

B12 202

H.A.C.

B12 203 STAIR

B12 S1

CLOSET

B12 203A

WORK ROOM

B12 204

TOILET

B12 204A

OFFICE

B12 205

OFFICE

B12 206

OFFICE

B12 207

CORRIDOR

B12 C22

OFFICE

B12 208

OFFICE

B12 209

OFFICE

B12 212

MECH

B12 211E

MECH

B12 210E

STORAGE

B12 213

MECH

B12 215E

MECH

B12 214E

CORRIDOR

B12 C23

OFFICE

B12 217

CONFERENCE ROOM

B12 216

MENS TOILET

B12 211

WOMENS TOILET

B12 214

AD106

AD106

AD106

DAY ROOM

B14 142B

OFFICE

B14 142D

CORRIDOR

B14 142

OFFICE

B14 142A

KITCHEN

B14 143

OFFICE

B14 141

CORRIDOR

B14 C17

SHOWER

B14 147A

H.A.C.

B14 146

SHOWER

B14 147

EXAM

B14 149

OFFICE

B14 150

OFFICE

B14 151

OFFICE

B14 152

OFFICE

B14 153

OFFICE

B14 154

TOILET

B14 101A

TOILET

B14 100

WAITING

B14 101

CORRIDOR

B14 C11

OFFICE

B14 102

CLEAN LINEN

B14 103

SOILED LINEN

B14 104

CMS

B14 105

1 BED

B14 106

CORRIDOR

B14 107

1 BED

B14 108

1 BED

B14 109

BREAKROOM

B14 110

LAUNDRY

B14 115

DIRTY LINEN

B14 115A

1 BED

B14 114

2 BED

B14 111

3 BED

B14 112

4 BED

B14 113

SHOWERS

B14 115A

H.A.C.

B14 116

1 BED

B14 119

1 BED

B14 120

2 BED

B14 121A

CORRIDOR

B14 121

2 BED

B14 121C

BREAKROOM

B14 122

CONFERENCE

B14 123

STAIR

B14 S1

H.A.C.

B14 124

1 BED

B14 125

1 BED

B14 126

MED

B14 127

RECEPTION

B14 128

CORRIDOR

B14 C14

BEDROOM

B14 129

BEDROOM

B14 130A

CORRIDOR

B14 C15

TOILET

B14 130

BEDROOM

B14 131

BEDROOM

B14 133

STORAGE

B14 135

CORRIDOR

B14 B

CORRIDOR

B14 C12

CORRIDOR

B14 C13

OFFICE

B14 137

OFFICE

B14 138

OFFICE

B14 139

H.A.C.

B14 140

STAIR

B14 S2

CORRIDOR

B14 C16

QUIET ROOM

B14 148A

CORRIDOR

B14 D

BEDROOM

B14 148F

1 BED

B14 148D

CONFERENCE

B14 148B

RECREATION

B14 148C

MENS TOILET

B14 144

TOILET

B14 134

MENS TOILET

B14 118

AD106

AD106

AD106

STORAGE

B14 246

VENDING

B14 246A

LAUNDRY

B14 243

OFFICE

B14 241

DAYCARE

B14 242

PORCH

B14 242A

STAIR

B14 S2-02

H.A.C.

B14 240

OFFICE

B14 239

EXAM

B14 238

OFFICE

B14 237

STORAGE

B14 236

STORAGE

B14 235

STAFF BREAK

B14 233

CORRIDOR

B14 C26

STATION

B14 228

BEDROOM

B14 229

BEDROOM

B14 230

TOILET

B14 232

WOMEN LOUNGE

B14 231

MEDS

B14 227

MEDS

B14 226

1 BED

B14 225

H.A.C.

B14 224

STAIR

B14 S1

3 BEDS

B14 223

2 BEDS

B14 222

2 BEDS

B14 220

4 BEDROOMS

B14 221

3 BEDS

B14 219

CORRIDOR

B14 C25

CHASE

B14 219E

H.A.C.

B14 216

CORRIDOR

B14 C23

CORRIDOR

B14 C22

SHOWER

B14 215

1 BED

B14 214

2 BED

B14 211

CORRIDOR

B14 C24

QUIET ROOM

B14 210

3 BED

B14 213

3 BED

B14 212

CONFERENCE

B14 247

GROUP ROOM

B14 248A

GROUP ROOM

B14 248C

CORRIDOR

B14 248

GROUP ROOM

B14 248B

MENS TOILET

B14 244

TOILET

B14…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .