This document is a pre-solicitation notice for a federal contract opportunity to renovate restrooms at the VA Medical Center in Battle Creek, Michigan. The Department of Veterans Affairs intends to issue an Invitation for Bid (IFB) on or about August 15, 2024 for Project 515-22-101. The contractor shall furnish all necessary labor, tools, materials, equipment, and supervision to complete the project in compliance with the drawings, specifications, manufacturer's recommendations, and applicable codes and standards. The work is scheduled to be performed during normal daytime business hours, excluding federal holidays. The procurement is a 100% set-aside for Service-Disabled Veteran Owned Small Businesses, with a NAICS code of 236220 Commercial and Institutional Building Construction. The estimated project cost is between $2,000,000 and $5,000,000, and the Government intends to award a Firm Fixed Price Contract within 120 days from the bid opening date.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
All Concepts, ideas, design elements, plans, and details as shown on this document are the sole property of Viridian Architectural Design, Inc. and shall not be used for any purpose without prior expressed written consent.
The Owner shall be permitted to retain copies for information and reference.
2020 E. Washington Boulevard Suite 200 Fort Wayne, Indiana 46803
PH: 260.424.4830
www.viridian-design.net
NORTH
REFERENCE
PROJECT # SIGNATURE DATE
Director Associate Director Chief of Staff Associate Director for Patient Services Associcate C.O.S. for Mental Health Chief, FMS Chief, Engineering Section Chief, Environmental Management Section Infectious Control Officer Patient Safety Manager GEMS Coordinator Safety Specialist Chief, Police Service Chief, Fire Station Union Safety Representative Contracting Officer Contracting Officer Representative
VA PROJECT NO.:
FINAL BID
DOCUMENTS
01 66OF
LOCATION MAP VICINITY MAP
Z:
\V iri di an \P ro je ct s\
\0
D R
AW
IN
G S\
R
EV
IT
\L
O C
AL
F
IL
ES
\2
2_ C
EN
TR
AL
_R
_l fe do rc zy k.
rv t 4/
/2
:2
9:
P M
GI001
COVER SHEET RENOVATE RESTROOMS 515-22-101
BC VA CAMPUS
02/23/2023 TWT AKM
RENOVATE RESTROOMS
515-22-101
515-22-101
BATTLE CREEK, MICHIGAN
BATTLE CREEK VETERANS AFFAIRS MEDICAL CENTER
BATTLE CREEK VA MEDICAL CENTER
5500 Armstrong Road Battle Creek, Michigan
49037
INDEX OF WORKING DRAWINGS
SHEET NO DRAWING TITLE DRAWING N0
PLUMBING
MPG001 MECHANICAL / PLUMBING GENERAL INFORMATION 31
PD100 PLUMBING DEMOLITION BUILDINGS 2 & 7 PLANS 32
PD101 PLUMBING DEMOLITION BUILDINGS 9, 10 & 11 PLANS 33
PD102 PLUMBING DEMOLITION BUILDINGS 12, 14 & 24 PLANS 34
PD103 PLUMBING DEMOLITION BUILDINGS 82, 84 & 136 PLANS 35
PL100 PLUMBING BUILDINGS 2 & 7 PLANS 36
PL101 PLUMBING BUILDINGS 9, 10 & 11 PLANS 37
PL102 PLUMBING BUILDINGS 12, 14 & 24 PLANS 38
PL103 PLUMBING BUILDINGS 82, 84 & 136 PLANS 39
MECHANICAL
MD100 MECHANICAL DEMOLITION BUILDINGS 2 & 7 PLANS 40
MD101 MECHANICAL DEMOLITION BUILDINGS 9, 10, & 11 PLANS 41
MD102 MECHANICAL DEMOLITION BUILDINGS 12, 14 & 24 PLANS 42
MD103 MECHANICAL DEMOLITION BUILDINGS 82, 84 & 136 PLANS 43
MH100 MECHANICAL HVAC - BUILDINGS 2 & 7 PLANS 44
MH101 MECHANICAL HVAC - BUILDINGS 9, 10 & 11 PLANS 45
MH102 MECHANICAL HVAC - BUILDINGS 12, 14 & 24 PLANS 46
MH103 MECHANICAL HVAC - BUILDINGS 82, 84 & 136 PLANS 47
MG001 MECHANICAL DETAILS 48
ELECTRICAL
EGI000 ELECTRICAL GENERAL INFORMATION AND NOTES 49
EGI100 ELECTRICAL ABBREVIATIONS AND SYMBOLS 50
ED100 ELECTRICAL DEMOLITION - BUILDINGS 2 & 7 PLANS 51
ED101 ELECTRICAL DEMOLITION - BUILDINGS 9, 10, & 11 PLANS 52
ED102 ELECTRICAL DEMOLITION - BUILDINGS 12, 14 & 24 PLANS 53
ED103 ELECTRICAL DEMOLITION - BUILDINGS 82, 84, & 136 PLANS 54
EL100 ELECTRICAL LIGHTING - BUILDINGS 2 & 7 PLANS 55
EL101 ELECTRICAL LIGHTING - BUILDINGS 9, 10, & 11 PLANS 56
EL102 ELECTRICAL LIGHTING - BUILDINGS 12, 14, & 24 PLANS 57
EL103 ELECTRICAL LIGHTING - BUILDINGS 82, 84, & 136 PLANS 58
EP100 ELECTRICAL POWER - BUILDINGS 2 & 7 PLANS 59
EP101 ELECTRICAL POWER - BUILDINGS 9, 10, & 11 PLANS 60
EP102 ELECTRICAL POWER - BUILDINGS 12, 14, & 24 PLANS 61
EP103 ELECTRICAL POWER - BUILDINGS 82, 84 & 136 PLANS 62
EP104 ELECTRICAL OVERALL PLANS - BUILDINGS 7, 10, 11, 24, & 82 63
EJ401 ELECTRICAL DETAILS 64
EJ402 ELECTRICAL DETAILS 65
EJ501 ELECTRICAL SCHEDULES 66
INDEX OF WORKING DRAWINGS
SHEET NO DRAWING TITLE DRAWING N0
GENERAL
GI001 COVER SHEET 01
GI002 ICRA PHASE PLANS AND DETAILS 02
GI003 SITE CAMPUS MAP, PHASING NOTES AND HAZARDOUS MATERIALS 03
DEMOLITION
AD100 DEMOLITION - KEY PLANS - BUILDING 2, 7, & 9 04
AD101 DEMOLITION - KEY PLANS - BUILDING 10, 11, 12, 14, & 24 05
AD102 DEMOLITION - KEY PLANS - BUILDING 82, 84, & 136 06
AD103 ARCHITECTURAL - DEMOLITION - BUILDING 2 FLOOR PLANS AND RCP 07
AD104 ARCHITECTURAL - DEMOLITION - BUILDINGS 7, 9, & 10 FLR. PLANS & RCP 08
AD105 ARCHITECTURAL - DEMOLITION - BLDGS. 10, 11, & 12 FLR. PLANS & RCP 09
AD106 ARCHITECTURAL - DEMOLITION - BLDGS. 14 & 24 FLOOR PLANS AND RCP 10
AD107 ARCHITECTURAL - DEMOLITION - BUILDING 82 FLOOR PLANS AND RCP 11
AD108 ARCHITECTURAL - DEMOLITION - BLDGS. 84 & 136 FLOOR PLANS & RCP 12
ARCHITECTURAL
AGI001 ARCHITECTURAL - ABBREVATIONS AND SYMBOLS 13
AS100 ARCHITECTURAL - KEY PLANS - BUILDING 2, 7, & 9 14
AS101 ARCHITECTURAL - KEY PLANS - BUILDING 10, 11, 12, 14, & 24 15
AS102 ARCHITECTURAL - KEY PLANS - BUILDING 82, 84, & 136 16
AS103 ARCHITECTURAL - SCHEDULES AND DETAILS 17
AS104 ARCHITECTURAL - BUILDING 2 FLOOR PLANS, RCP AND ELEVATIONS 18
AS105 ARCHITECTURAL - BUILDING 2 FLOOR PLANS, RCP AND ELEVATIONS 19
AS106 ARCHITECTURAL - BUILDING 7 FLOOR PLANS, RCP AND ELEVATIONS 20
AS107 ARCHITECTURAL - BUILDING 9 FLOOR PLANS, RCP AND ELEVATIONS 21
AS108 ARCHITECTURAL - BUILDING 10 FLOOR PLANS, RCP AND ELEVATIONS 22
AS109 ARCHITECTURAL - BUILDING 11 FLOOR PLANS, RCP AND ELEVATIONS 23
AS110 ARCHITECTURAL - BUILDING 12 FLOOR PLANS, RCP AND ELEVATIONS 24
AS111 ARCHITECTURAL - BUILDING 14 FLOOR PLANS, RCP AND ELEVATIONS 25
AS112 ARCHITECTURAL - BUILDING 14 FLOOR PLANS, RCP AND ELEVATIONS 26
AS113 ARCHITECTURAL - BUILDING 24 FLOOR PLANS, RCP AND ELEVATIONS 27
AS114 ARCHITECTURAL - BUILDING 82 FLOOR PLANS, RCP AND ELEVATIONS 28
AS115 ARCHITECTURAL - BUILDING 82 FLOOR PLANS, RCP AND ELEVATIONS 29
AS116 ARCHITECTURAL - BUILDING 84 & 136 FLOOR PLANS, RCP AND ELEVATIONS 30
Revisions: Date:
NOTICE TO BIDDERS
BUILDING 24 IS 'NOT IN BID'
EITHER KEEP RUNNING
COVER ALL RETURNS
TAPE ALL SERVICES
FIRE EXTINGUISHER ON
A
O
V
SUPPLY DUCTS
OR COVER WHEN RUNNING
TO KEEP DUST OUT.
AT THE GRATE/DIFFUSERS
TO PROTECT AGAINST
PORTABLE FLOOR BRACKET
CONTAMINATION
E
OPTIONAL EXHAUST DUCTS
(COVER THE GRATES
AND THE DIFFUSERS)
OUTSIDE OF BUILDING
PROVIDE STICKY MATS
(CHANGED END OF SHIFT
(ILSM MAY REQUIRE MORE
THAN ONE).
OR MORE IF NECESSARY
TO MAINTAIN CLEANLINESS).
INDICATOR MUST BE AT -0.01 OR GREATER
(VERIFY DAILY), IF NOT VERIFY ALL OPENING
SUCH AS DOORS ARE CLOSED AND/OR CHANGE
OUT NEGATIVE AIR PRE-FILTER.
POST ICRA, ILSM, FIRE INSPECTION
SHEETS VISIBLE TO PUBLIC
SUSPENDED PLASTIC ZIPPER
WALL CURTAIN BARRIER
PROVIDE STICKY MATS
(CHANGED END OF SHIFT
OR MORE IF NECESSARY
TO MAINTAIN CLEANLINESS).
HEPA NEGATIVE AIR UNIT
FIRE RATED PLYWOOD
WEEKLY CHANGED
(OR MORE AS NEEDED)
MONTHLY CHANGED
HEPA FILTER
PRE-FILTER
(REFER TO ELEVATION)
FL
EX
D
UC
T
AA
EXISTING WINDOW FRAME
FIRE RATED PLYWOOD
(TEMP. REMOVE
HEPA NEGATIVE AIR UNIT
EXISTING FIRE
SPRINKLER SYSTEM
EXISTING CONCRETE SLAB FLOORING
GLASS PANEL)
FINISHED FLOORING TO BE KEPT CLEAN.
FLOORS NOT BEING REPLACED TO BE
PROTECTED OR COVERED WITH ROSEN
PAPER/FIRE RATED PLYWOOD.
HEATED DETECTOR CUT-OFF
C L A
SS
II
I
CLASS III WORK ITEMS NOTES:
1. REMOVE OR ISOLATE H.V.A.C. SYSTEM IN AREA WHERE WORK IS BEING DONE TO
PREVENT CONTAMINATION OF DUCT SYSTEM.
2. COMPLETE ALL CRITICAL BARRIERS IE. SHEETROCK, PLYWOOD, PLASTIC, TO SEAL
AREA FROM NON-WORK AREA OR IMPLEMENT CONTROL CUBE METHOD (CART WITH
PLASTIC COVERING AND SEALED CONNECTION TO WORK SITE WITH HEPA VACUUM FOR
VACUUMING PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS.
3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR
FILTRATION UNITS IF INDICATED.
4. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.
5. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.
6. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS
INSPECTED BY THE OWNER'S SAFETY DEPARTMENT AND INFECTION CONTROL
DEPARTMENT AND THOROUGHLY CLEANED BY THE OWNER'S ENVIRONMENTAL SERVICES
DEPARTMENT.
1. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS
ASSOCIATED WITH CONSTRUCTION.
2. VACUUM WORK AREA WITH HEPA FILTERED VACUUM.
3. WET MOP AREA WITH DISINFECTANT.
4. REMOVE ISOLATION OF H.V.A.C. SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.
PRIOR TO ANY CONSTRUCTION
POST CONSTRUCTION
SYMBOL LEGEND
TEMPORARY PARTITION (CONTAIN OR
MINIMIZE SPREAD OF DUST)
TEMPORARY PARTITION (CONTAIN OR
MINIMIZE SPREAD OF DUST)
CONSTRUCTION BOUNDARY
EXISTING AREAS (NOT IN PROJECT)
CONTRACTOR STAGING
COORDINATE WITH COR
EXIT
CLOSED FOR
CONSTRUCTION
PROVIDE AND DISPLAY ICRA
REQUIREMENT
DOCUMENTATION.
COORDINATE WITH COR.
5-PLY SOLID CORE FLUSH DOORS
SHALL BE SECURED, AND HAVE
LIMITED, ZIPPERED ACCESS, AND
MASKED OFF / SEALED AND
PROTECTED PER INFECTION CONTROL
REQUIREMENTS PRIOR TO DEMOLITION
AND FOR DURATION OF
CONSTRUCTION. COORDINATE EGRESS
REQUIREMENTS WITH COR. SEE
SPECIFICATIONS FOR ADDITIONAL
INFORMATION.
USE ALTERNATIVE
EXITS
CAUTION
THIS AREA CLOSED
OFF
ICRA
REQUIREMENTS
NO ENTRY
DUST BARRIER
PROVIDE AND DISPLAY ICRA
REQUIREMENT
DOCUMENTATION.
COORDINATE WITH COR.
5-PLY SOLID CORE FLUSH DOORS
SHALL BE SECURED, AND HAVE
LIMITED, ZIPPERED ACCESS, AND
MASKED OFF / SEALED AND
PROTECTED PER INFECTION
CONTROL REQUIREMENTS PRIOR TO
DEMOLITION AND FOR DURATION
OF CONSTRUCTION. COORDINATE
EGRESS REQUIREMENTS WITH COR.
SEE SPECIFICATIONS FOR
ADDITIONAL INFORMATION.
TYPE A
WA
LL
H
EIG
HT
V
AR
IES
TYPE B
FIE
LD
V
ER
IFY
CE
ILI
NG
H
EI
GH
T 8'
-0
W
AL
L
HE
IG
HT
V
AR
IE
S
FI
EL
D
VE
RI
FY
4 7/8"4 7/8"
ALL TEMPORARY CONSTRUCTION
BARRIER - INFECTION / DUST
CONTROL PARTITION(S) SHALL BE
SEALED TO EXISTING FLOOR,
CEILING, WALL, & DOOR/ WINDOW
FRAME CONSTRUCTION AS
APPLICABLE, PER INFECTION
CONTROL REQUIREMENTS PRIOR TO
DEMOLITION & FOR DURATION OF
CONSTRUCTION. SEE
SPECIFICATIONS FOR ADDITIONAL
INFORMATION.
TEMPORARY CONSTRUCTION
"SMOKE TIGHT" BARRIER - INFECTION
/ DUST CONTROL PARTITION: 4" , 20
GA. METAL STUDS @ 16" O.C.,
INFILLED w/ SOUND BARRIER BATT
INSULATION, STUDS SHALL BE
SECURED TO FLOOR, CEILING, WALL,
& DOOR / WINDOW FRAME
INTERSECTIONS FOR STRUCTURAL
STABILITY, w/ 1/2" GYP. BD. EA.
SIDE, w/ ALL JOINTS TAPED AND
SEALED FOR INFECTION / DUST
CONTROL (NOT MUDDED).
CEILING AS
SCHEDULED ON
FLOOR PLAN.
DECK ABOVE
ALL TEMPORARY CONSTRUCTION
BARRIER - INFECTION/ DUST CONTROL
PARTITION(S) SHALL BE SEALED TO
EXISTING FLOOR, CEILING, WALL, &
DOOR / WINDOW FRAME CONSTRUCTION
AS APPLICABLE, PER INFECTION
CONTROL REQUIREMENTS PRIOR TO
DEMOLITION & FOR DURATION OF
CONSTRUCTION. SEE SPECIFICATIONS
FOR ADDITIONAL INFORMATION.
GASKET ON TOP AND
BOTTOM OF PANEL;
PROVIDES AIR TIGHT
SEAL BETWEEN PANEL
AND FLOOR / CEILING
ANONDIZED
ALUMINUM
FRAME
GASKET ON TOP AND BOTTOM
OF PANEL; PROVIDES AIR
TIGHT SEAL BETWEEN PANEL
AND FLOOR / CEILING
FIBERGLASS
REINFORCED POLYMER
PANELS WITHIN
ANONDIZED ALUMINUM
FRAME.
ADJUSTABLE HEIGHT
PANEL, TELESCOPING
FROM 6'-10" TO 10'-3".
CONCEALED HEIGHT LOCKS,
TOOL LESS KNOBLESS LIFT
AND DROP CONNECTION.
CEILING GRID
ATTACHMENT OPTION
6'-
" T O
'-3
TYPE C
BASE SHALL MATCH EXISTING AREA
BASE AT BOTH SIDES.
CEILING AS SCHEDULED
ON FLOOR PLAN.
TEMPORARY CONSTRUCTION
"SMOKE TIGHT" BARRIER -
INFECTION / DUST CONTROL
PARTITION: 4" , 20 GA. METAL
STUDS @ 16" O.C., SECURED
TO FLOOR, CEILING, WALL, &
DOOR / WINDOW FRAME
INTERSECTIONS FOR
STRUCTURAL STABILITY, w/ 1/2" GYP. BD. EA. SIDE, w/ ALL
JOINTS TAPED AND SEALED FOR
INFECTION / DUST CONTROL
(NOT MUDDED).
ALL TEMPORARY CONSTRUCTION
BARRIER - INFECTION / DUST CONTROL
PARTITION(S) SHALL BE SEALED TO
EXISTING FLOOR, CEILING, WALL, &
DOOR/ WINDOW FRAME
CONSTRUCTION AS APPLICABLE, PER
INFECTION CONTROL REQUIREMENTS
PRIOR TO DEMOLITION & FOR
DURATION OF CONSTRUCTION. SEE
SPECIFICATIONS FOR ADDITIONAL
INFORMATION.
BASE SHALL MATCH EXISTING AREA
BASE AT BOTH SIDES.
DECK ABOVE
DECK ABOVE
FIRE / U.L. RATED PLASTIC
SEALED TO DECK ABOVE.
FIRE / U.L. RATED PLASTIC
SEALED TO DECK ABOVE.
FIRE / U.L. RATED PLASTIC
SEALED TO DECK ABOVE.
SECTION A-A
TYPE A
TYPE B
TYPE C
TYPE A
TYPE B
TYPE C
TYPE A
TYPE B
TYPE C
GI002
GI002
GI002
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
All Concepts, ideas, design elements, plans, and details as shown on this document are the sole property of Viridian Architectural
Design, Inc. and shall not be used for any purpose without prior expressed written consent. The Owner shall be permitted to retain copies for information and reference.
2020 E. Washington Boulevard Suite 200 Fort Wayne, Indiana 46803
PH: 260.424.4830
www.viridian-design.net
FINAL BID
DOCUMENTS
OF02 66
Z:
\V iri di an \P ro je ct s\
\0
D R
AW
IN
G S\
R
EV
IT
\L
O C
AL
F
IL
ES
\2
2_ C
EN
TR
AL
_R
_l fe do rc zy k.
rv t 2/
/2
:5
4:
A M
GI002
ICRA PHASE PLANS AND DETAILS RENOVATE RESTROOMS
BATTLE CREEK, MICHIGAN
515-22-101
BC VA CAMPUS
02/23/2023 TWT AKM
LOW RISK MEDIUM RISK HIGH RISK HIGHEST RISK
• OFFICE AREAS • CARDIOLOGY
• ECHOCARDIOGRAPHY
• ENDOSCROPY
• NUCLEAR MEDICINE
• PHYSICAL THERAPY
• RADIOLOGY / MRI
• RESPIRATORY THERAPY
• CCU
• EMERGENCY ROOM
• LABOR AND DELIVERY
• LABORATORY (SPECIMEN)
• NEWBORN NURSEY
• OUTPATIENT SURGERY
• PEDIATRICS
• PHARMACY
• POST ANESTHESIA CARE UNIT
• SURGICAL UNITS
• ANY AREA CARING FOR
IMMUNOCOMPROMISED PATIENTS
• BURN UNIT
• CARDIAC CATH LAB
• CENTRAL STERILE SUPPLY
• INTENSIVE CARE UNITS
• MEDICAL UNIT
• NEGATIVE PRESSURE ISOLATION ROOMS
• ONCOLOGY
• OPERATING ROOMS INCLUDING
C-SECTION ROOMS
PATIENT RISK GROUPS
INFECTION CONTROL PLAN GENERAL NOTES
COORDINATE WITH BATTLE CREEK VA MEDICAL CENTER VAMC CONTRACTING OFFICER'S REPRESENTATIVE (COR) TO COMPLETE AN INFECTION CONTROL RISK ASSESSMENT MATRIX AND OBTAIN AN INFECTION CONTROL CONSTRUCTION PERMIT FOR EACH PHASE OF WORK OUTLINED IN THESE DOCUMENTS PRIOR TO THE START OF DEMOLITION AND CONSTRUCTION. COMPLY WITH ALL INFECTION CONTROL REQUIREMENTS FOR THE DURATION OF THE CONSTRUCTION PROJECT. SEE ITEMS LISTED BELOW AND SPECIFICATIONS FOR ADDITIONAL INFORMATION.
1. REFER TO SPECIFICATIONS FOR MEDICAL CENTER "INFECTION CONTROL RISK ASSESSMENT MATRIX OF
PRECAUTIONS FOR CONSTRUCTION & RENOVATION" FOR INFECTION CONTROL INFORMATION AND
REQUIREMENTS.
2. USING THE "INFECTION CONTROL RISK ASSESSMENT MATRIX OF PRECAUTIONS FOR CONSTRUCTION &
RENOVATION" COORDINATE WITH COR TO DETERMINE THE FOLLOWING PROJECT CONDITIONS:
• PATIENT RISK GROUPS (LOW, MEDIUM, HIGH, HIGHEST)
• TYPE OF CONSTRUCTION PROJECT ACTIVITY (A, B, C, OR D)
• CLASS OF PRECAUTION / LEVEL OF INFECTION CONTROL ACTIVITIES REQUIRED (CLASS1I REQUIRED)
3. ONCE THE "CLASS OF PRECAUTION" HAS BEEN DETERMINED IN COORDINATION WITH THE COR, COMPLETE THE "INFECTION CONTROL CONSTRUCTION PERMIT." PROCEED WITH DEMOLITION AND CONSTRUCTION WORK ONLY AFTER THE PERMIT HAS BEEN AUTHORIZED BY THE COR. ONCE THE PERMIT IS AUTHORIZED, POST THE PERMIT
AS DIRECTED BY THE COR.
4. USING THE "DESCRIPTION OF REQUIRED INFECTION CONTROL PRECAUTIONS BY CLASS" AS OUTLINED BELOW, COORDINATE WITH THE COR TO DETERMINE THE SPECIFIC EXTENT AND APPLICATION METHODS OF THE REQUIRED INFECTION CONTROL PRECAUTIONS. PRECAUTIONS LISTED BELOW ARE TO BE CONFIRMED WITH THE
COR:
1.1. DURING CONSTRUCTION PROJECT PHASE:
1.1.1. ISOLATE THE HVAC SYSTEM AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION OF
DUCT SYSTEM.
1.1.2. COMPLETE ALL CRITICAL BARRIERS TO SEAL WORK AREA FROM NON-WORK AREA BEFORE
DEMOLITION OR CONSTRUCTION BEGINS.
1.1.3. MAINTAIN NEGATIVE AIR PRESSURE OF -0.1"W.C. WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR
FILTRATION UNITS. CONTRACTOR SHALL PROVIDE MAGNOMETER TO MEASURE AIR PRESSURE.
1.1.4. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES APPROPRIATELY.
1.1.5. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS THROUGH THIS ROOM SO THEY
CAN BE VACUUMED USING A HEPA VACUUM CLEANER BEFORE LEAVING THE WORK SITE OR THEY
CAN WEAR CLOTH OR PAPER COVERALLS THAT ARE REMOVED EACH TIME THEY LEAVE THE WORK
SITE.
1.1.6. ALL PERSONNEL ENTERING WOK SITE ARE REQUIRED TO WEAR SHOW COVERS. SHOW COVERS
MUST BE EXCHANGED EACH TIME WORKER EXITS THE WORK AREA.
1.1.7. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS INSPECTED BY THE
SAFETY OFFICE AND INFECTION CONTROL AND THOROUGHLY CLEANED BY ENVIRONMENTAL
MANAGEMENT SERVICE.
1.2. UPON COMPLETION OF PROJECT PHASE:
1.2.1. REMOVE BARRIER MATERIAL CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS
ASSOCIATED WITH CONSTRUCTION.
1.2.2. WIPE WORK SURFACES TO CONTROL DUST WHILE CUTTING.
1.2.3. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.
1.2.4. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.
1.2.5. WET MOP AND / OR VACUUM WITH HEPA FILTERED VACUUM BEFORE LEAVING WORK AREA.
1.2.6. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.
5. DURING THE CONSTRUCTION PROJECT PHASE, PROVIDE, INSTALL, & MAINTAIN THE SPECIFIC INFECTION
CONTROL PRECAUTIONS AS DETERMINED BY COORDINATION WITH COR.
6. UPON COMPLETION OF THE CONSTRUCTION PROJECT PHASE, REMOVE SPECIFIC INFECTION CONTROL
PRECAUTIONS AS DETERMINED BY COORDINATION WITH COR.
7. IAQ (INDOOR AIR QUALITY) CONTROL MEASURES DURING CONSTRUCTION.
INFECTION CONTROL PLAN NOTES
1 INFECTION / DUST CONTROL PARTITION. PARTITION SHALL BE ALUMINUM FRAME AND
FIBERGLASS REINFORCED POLYMER MODULAR WALL SYSTEM. THE MODULAR WALL SYSTEM
SHALL EXCEED ICRA CLASS IV REQUIREMENTS. BASIS OF DESIGN STARC SYSTEMS LITE
BARRIER WALL SYSTEM OR EQUAL. PARTITIONS SHALL BE SECURED, SEALED, AND PROTECTED
FOR DURATION OF CONSTRUCTION. COORDINATE INFECTION CONTROL RISK ASSESSMENT
(ICRA) AND EGRESS REQUIREMENTS WITH COR. COORDINATE ADDITIONAL REQUIREMENTS WITH
COR. SEE DETAIL 4/GI002 AND SPECIFICATIONS FOR ADDITIONAL INFORMATION.
2 INFECTION / DUST CONTROL PARTITION EGRESS DOOR SHALL BE SECURED, SEALED, AND
PROTECTED FOR DURATION OF CONSTRUCTION. COORDINATE INFECTION CONTROL RISK
ASSESSMENT (ICRA) AND EGRESS REQUIREMENTS WITH COR. COORDINATE ADDITIONAL
REQUIREMENTS WITH COR. SEE DETAILS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION.
3 CONTRACTOR TO PROVIDE AND INSTALL "STICKY" MAT FLOOR PADS IMMEDIATELY OUTSIDE ALL INFECTION / DUST CONTROL PARTITIONS TO ENSURE THAT FLOOR CLEANLINESS IS MANTAINED
THROUGHOUT THE DURATION OF CONSTRUCTION.
4 PATH OF DEMOLITION / TRASH REMOVAL TRAVEL FROM RENOVATED AREA. ALL CONSTRUCTION
DEBRIS REMOVED AS PART OF DEMOLITION SHALL BE REMOVED IN ENCLOSED / SEALED
CONTAINERS AND FOLLOW THE INFECTION CONTROL RISK ASSESSMENT (ICRA) REQUIREMENTS
AS COORDINATED WITH THE COR.
RISK RELATED GROUP
LOW RISK GROUP
MEDIUM RISK GROUP
HIGH RISK GROUP
HIGHEST RISK GROUP
TYPE A
I
I
I
II
TYPE B
II
II
II
III / IV
TYPE C
II
III
III / IV
III / IV
TYPE D
III / IV
IV
IV
IV
NOTE:
INFECTION CONTROL APPROVAL WILL BE REQUIRED WHEN THE CONSTRUCTION ACITIVITY AND RISK LEVEL INDICATE THAT CLASS IV CONTROL
PROCEDURES ARE NECESSARY.
IC MATRIX - CLASS OF PRECAUTIONS:
CONSTRUCTION PROJECT BY PATIENT RISK
CONSTRUCTION PROJECT TYPE
TYPE A
INCLUDES, BUT IS NOT LIMITED TO:
• REMOVABLE OF CEILING TILES FOR VISUAL INSPECTION LIMITED TO 1 TILE PER 50 SQUARE FEET.
• PAINTING (BUT NOT SANDING).
• WALL COVERING, ELECTRICAL TRIM, MINOR PLUMBING, AND ACTIVITIES WHICH DO NOT GENERATE DUST OR
REQUIRE CUTTING OF WALLS OR ACCESS TO CEILINGS OTHER THAN FOR VISUAL INSPECTION.
INFECTION CONTROL RISK ASSESSMENT (ICRA)
MATRIX OF PRECAUTIONS FOR
CONSTRUCTION AND RENOVATION
INSPECTION AND NON-INVASIVE ACTIVITIES
TYPE B
INCLUDES, BUT IS NOT LIMITED TO:
• INSTALLATION OF TELEPHONE AND COMPUTER CABLING.
• ACCESS TO CHASE SPACES.
• CUTTING OF WALLS OR CEILING WHERE DUST MIGRATION CAN BE CONTROLLED.
SMALL SCALE, SHORT DURATION ACTIVITIES
WHICH CREATES MINIMAL DUST
TYPE C INCLUDES, BUT IS NOT LIMITED TO:
• SANDING OF WALLS FOR PAINTING OR WALL COVERING.
• REMOVAL OF FLOOR COVERINGS, CEILING TILES OR CASEWORK.
• NEW WALL CONSTRUCTION.
• MINOR DUCT WORK OR ELECTRICAL WORK ABOVE CEILINGS.
• MAJOR CABLING ACTIVITIES.
• ANY ACTIVITY WHICH CANNOT BE COMPLETED WITHIN A SINGLE WORK SHIFT.
WORK THAT GENERATES A MODERATE TO HIGH LEVEL
OF DUST OR REQUIRES DEMOLITION OR REMOVAL OF
ANY FIXED BUILDING COMPONENTS OR ASSEMBLIES
TYPE D INCLUDES, BUT IS NOT LIMITED TO:
• ACTIVITIES WHICH REQUIRE CONSECUTIVE WORK SHIFTS.
• REQUIRE HEAVY DEMOLITION OR REMOVAL OF A COMPLETE CABLING SYSTEM.
• NEW CONSTRUCTION.
MAJOR DEMOLITION AND CONSTRUCTION PROJECTS
SCALE: 1/2" = 1'-0"
GI002
CLOSED FOR CONSTRUCTION DOOR
SCALE: 1/2" = 1'-0"
GI002
INFECTION / DUST CONTROL DOOR
SCALE: 1/2" = 1'-0"
GI002
INFECTION CONTROL PARTITION
SCALE: 1/2" = 1'-0"
GI002
CLASS III TYPICAL CONSTRUCTION LAYOUT
Revisions: Date:
WEST DICKMAN ROAD
URB
AN DRIVE
JO
HNSO
N DRIVE
SHAFTER CIRCLE EAST
WILLIAMS LANE
HA
MME
RB
ER
G
LA
NE
FO
X L
AN
E
FLORAL LANE
LAMBERS TRAIL
SHAFTER CIRCLE WEST
DEWEY LANE
FURLONG LANE
SHAFTER CIRCLE SOUTH
CONTRACTOR STAGING AREA
SHAFTER CIRCLE SOUTH
AR
M
ST
RO
NG
RO
AD
FURLONG LANE
SHAFTER CIRCLE NO
RTH
SHAFTER CIRCLE NORTH
SHAFTER CIRCLE NORTH
URBAN DRIVE
BLDG. #
/ ROOM #
7, 16
ASBESTOS CONTAINING MATERIAL ABATEMENT
MATERIAL: LOCATION: NOTES:
12"x12" BEIGE / BROWN STREAK FLOOR TILE &
ASSOCIATED MASTIC.
FLOOR. 96 SQ. FT.
7, 29 1" x 1" GREEN AND BLUE CERAMIC FLOOR TILE &
ASSOCIATED MASTIC
FLOOR, 80 SQ. FT.
9, 116 1" x 1" GREEN AND YELLOW CERAMIC FLOOR TILE
BEDDING COMPOUND AND GROUT
FLOOR, 140 SQ. FT.
9, 119 1" x 1" GREEN AND YELLOW CERAMIC FLOOR TILE
BEDDING COMPOUND AND GROUT
FLOOR, 140 SQ. FT.
9, 121 1" x 2" TAN MOSAIC CERAMIC FLOOR TILE BEDDING
COMPOUND AND GROUT
FLOOR, 50 SQ. FT.
9, 121 4" x 4" BLUE CERAMIC WALL TILE BEDDING COMPOUND
AND GROUT
FLOOR, 260 SQ. FT.
9, 208 1" x 1" BLUE AND WHITE CERAMIC WALL TILE BEDDING
COMPOUND AND GROUT
FLOOR, 150 SQ. FT.
9, 211 1" x 1" BLUE AND WHITE CERAMIC WALL TILE BEDDING
COMPOUND AND GROUT
FLOOR, 150 SQ. FT.
10, 112 FLOOR, 120 SQ. FT.1" SQUARE BROWN CERAMIC FLOOR TILE BEDDING
COMPOUND AND GROUT
10, 117 FLOOR, 224 SQ. FT.4" SQUARE CERAMIC WALL TILE BEDDING COMPOUND
AND GROUT
10, 117 FLOOR, 48 SQ. FT.1" x 2" RECTANGULAR CERAMIC FLOOR TILE BEDDING
COMPOUND AND GROUT
10, 211 FLOOR, 120 SQ. FT.1" SQUARE BROWN CERAMIC FLOOR TILE BEDDING
COMPOUND AND GROUT
10, 214 FLOOR, 120 SQ. FT.1" SQUARE BROWN CERAMIC FLOOR TILE BEDDING
COMPOUND AND GROUT
11, 111 WINDOW, 1 SQ. FT.INTERIOR GRAY WINDOW CAULK
11, 111 FLOOR, 130 SQ. FT.TAN AND CREAM SQUARE CERAMIC FLOOR TILE
BEDDING COMPOUND
11, 111 FLOOR, 160 SQ. FT.4" SQUARE CERAMIC WALL TILE BEDDING COMPOUND
11, 114 WINDOW, 1 SQ. FT.INTERIOR GRAY WINDOW CAULK
11, 114 FLOOR, 140 SQ. FT.TAN AND CREAM SQUARE CERAMIC FLOOR TILE
BEDDING COMPOUND
11, 114 FLOOR, 200 SQ. FT.4" SQUARE CERAMIC WALL TILE BEDDING COMPOUND
11, 209 WINDOW, 1 SQ. FT.INTERIOR GRAY WINDOW CAULK
11, 209 FLOOR, 140 SQ. FT.TAN AND CREAM SQUARE CERAMIC FLOOR TILE
BEDDING COMPOUND
11, 209 FLOOR, 160 SQ. FT.4" SQUARE CERAMIC WALL TILE BEDDING COMPOUND
11, 211 WINDOW, 1 SQ. FT.INTERIOR GRAY WINDOW CAULK
11, 211 FLOOR, 140 SQ. FT.TAN AND CREAM SQUARE CERAMIC FLOOR TILE
BEDDING COMPOUND
11, 211 FLOOR, 160 SQ. FT.4" SQUARE CERAMIC WALL TILE BEDDING COMPOUND
12, 115 FLOOR, 170 SQ. FT.4" CERAMIC WALL TILE GROUT COMPOUND
12, 115 FLOOR, 140 SQ. FT.4" CERAMIC WALL TILE BEDDING COMPOUND
12, 115 FLOOR, 170 SQ. FT.2" x 2" CERAMIC FLOOR TILE BEDDING COMPOUND 12, 115 FLOOR, 85 SQ. FT.2" x 2" CERAMIC FLOOR TILE GROUT COMPOUND
12, 117 FLOOR, 160 SQ. FT.4" CERAMIC WALL TILE GROUT COMPOUND
12, 117 FLOOR, 320 SQ. FT.4" CERAMIC WALL TILE BEDDING COMPOUND
12, 117 FLOOR, 48 SQ. FT.1" x 2" CERAMIC FLOOR TILE BEDDING COMPOUND 12, 117 FLOOR, 24 SQ. FT.1" x 2" CERAMIC FLOOR TILE GROUT COMPOUND
12, 118 FLOOR, 67 SQ. FT.1" x 2" CERAMIC FLOOR TILE BEDDING COMPOUND 12, 118 FLOOR, 34 SQ. FT.1" x 2" CERAMIC FLOOR TILE GROUT COMPOUND
12, 118 FLOOR, 184 SQ. FT.4" CERAMIC WALL TILE GROUT COMPOUND
12, 118 FLOOR, 368 SQ. FT.4" CERAMIC WALL TILE BEDDING COMPOUND
12, 208 FLOOR, 224 SQ. FT.1" x 1" BEIGE FLOOR TILE AND ASSOCIATED MASTIC 12, 211 FLOOR, 150 SQ. FT.2" x 2" CERAMIC FLOOR TILE BEDDING COMPOUND 12, 211 FLOOR, 75 SQ. FT.2" x 2" CERAMIC FLOOR TILE GROUT COMPOUND 12, 214 FLOOR, 150 SQ. FT.2" x 2" CERAMIC FLOOR TILE BEDDING COMPOUND 12, 214 FLOOR, 75 SQ. FT.2" x 2" CERAMIC FLOOR TILE GROUT COMPOUND 14, 234 FLOOR, 120 SQ. FT.1" x 2" BROWN AND CREAM CERAMIC FLOOR TILE
BEDDING COMPOUND AND GROUT
14, 234 FLOOR, 200 SQ. FT.4" SQUARE LIGHT BROWN CERAMIC WALL TILE
BEDDING COMPOUND AND GROUT
14, 244 FLOOR, 180 SQ. FT.1" x 2" GREEN SQUARE CERAMIC FLOOR TILE
BEDDING COMPOUND AND GROUT
24, 206 FLOOR, 100 SQ. FT.GREEN 1" SQUARE CERAMIC FLOOR TILE BEDDING COMPOUND
24, 207 WINDOW, 1 SQ. FT.INTERIOR GRAY WINDOW CAULK
24, 208 WINDOW, 2 SQ. FT.INTERIOR GRAY WINDOW CAULK
24, 208 FLOOR, 108 SQ. FT.GREEN 1" SQUARE CERAMIC FLOOR TILE BEDDING COMPOUND
24, 208 PIPE, 18 COUNTDOMESTIC PIPE JOINT INSULATION (LAYERED PAPER
PIPE INSULATION AND MUD JOINTS)
24, 209 PIPE, 50 COUNTDOMESTIC PIPE (LAYERED PAPER PIPE INSULATION
AND MUD JOINTS)
82, 246 1 COUNTWOOD FIRE DOOR
82, 007G WINDOW, 2 SQ. FT.INTERIOR GRAY WINDOW CAULK
82, 007J WINDOW, 2 SQ. FT.INTERIOR GRAY WINDOW CAULK
82, 007K FLOOR, 8 SQ. FT.CERAMIC FLOOR TILE BEDDING COMPOUND & GROUT
82, 007G 330 SQ. FT.1"x1" TAN & BEIGE FLOOR TILE & ASSOC. MASTIC
82, 016C WINDOW, 2 SQ. FT.INTERIOR GRAY WINDOW CAULK
82, 016D WINDOW, 2 SQ. FT.INTERIOR GRAY WINDOW CAULK
82, 016F WINDOW, 2 SQ. FT.INTERIOR GRAY WINDOW CAULK
82, 016G WINDOW, 2 SQ. FT.INTERIOR GRAY WINDOW CAULK
136, 125 WALL, 400 SQ. FT.4"x4" CERAMIC WALL TILE BEDDING COMPOUND & GROUT 136, 125 FLOOR, 117 SQ. FT.12"x12" BROWN CERAMIC FLOOR TILE BEDDING COMPOUND
& GROUT
136, 125 1 COUNTMETAL FIRE DOOR WITHOUT WINDOW
136, 125 1 COUNTJOINTS ON FIBERGLASS PIPE INSULATION
136, 126 WALL, 400 SQ. FT.4"x4" CERAMIC WALL TILE BEDDING COMPOUND & GROUT 136, 126 FLOOR, 117 SQ. FT.12"x12" BROWN CERAMIC FLOOR TILE BEDDING COMPOUND
& GROUT
136, 126 1 COUNTMETAL FIRE DOOR WITHOUT WINDOW
SCHEDULE NOTES:
1. PLEASE REFERENCE "ASBESTOS INSPECTION, BATTLE CREEK VETERANS AFFAIRS MEDICAL CENTER, _______
ENVIRONMENTALGROUP PROJECT NUMBER ... DATED 2019
2. ANY AND ALL CONFIRMATION TESTING FOR HAZARDOUS MATERIALS SHALL BE CONDUCTED BY THE CONTRACTOR.
3. MATERIAL DETERMINED TO BE ASBESTOS CONTAINING (1% OR ABOVE).
4. MATERIAL ASSUMED TO CONTAIN ASBESTOS.
5. SEE SPECIFICATIONS FOR ADDITIONAL INFORMATION.
NOTE:
• ONLY POSITIVE ACM SAMPLES IN RENOVATION AREAS ARE LISTED ABOVE FOR REFERENCE. SEE THE FULL ASBESTOS REPORT IN
THE SPECIFICATIONS FOR ADDITIONAL INFORMATION.
• LEAD CONTAINING PAINT SUSPECTED IN ALL BUILDINGS. CONTRACTOR IS RESPONSIBLE FOR ALL TESTING AND ABATEMENT OF
LEAD PAINT.
• FOR ACM UP TO 1%, GENERAL CONTRACTOR MAY REMEDIATE, REMOVE, AND DISPOSE OF MATERIALS, BUT MUST FIRST ATTEND A MINIMUM OF 16 HOUR AWARNESS / TRAINING CLASS AND BECOME CERTIFIED TO REMOVE THIS MATERIAL AND THE GENERAL
CONTRACTOR MUST CARRY INSURANCE WHICH ALLOWS THIS ACTIVITY.
• FOR ACM OVER 1%, AN ENVIRONMENTAL CONTRACTOR MUST BE HIRED TO REMOVE AND DISPOSE OF THIS MATERIAL.
• ALL ACM SHALL BE REMOVED, STORED, TRANSPORTED, AND DISPOSED OF BY AN APPROVED AND LICENSED SUB-CONTRACTOR IN ACCORDANCE WITH FEDERAL, STATE, AND VA REQUIREMENTS. ALL ACM SHALL BE STORED IN APPROVED CONTAINERS
PROVIDED BY CONTRACTOR.
• DRAWINGS DO NOT CLAIM TO IDENTIFY ALL THE ASBESTOS CONTAINING MATERIAL (ACM) PRESENT IN THE BUILDING AND SHOULD NOT BE THE SOLE BASIS FOR IDENTIFYING ACM FOR FUTURE RENOVATION OR DEMOLITION PROJECTS, ABATEMENT SPECIFICATIONS, ASBESTOS SURVEY WAS PERFORMED WITH LIMITATION INHERENT TO NON-DESTRUCTIVE VISUAL INSPECTIONS IN OCCUPIED SPACES, ANY SUSPECT MATERIAL ENCOUNTERED DURING RENOVATION / DEMOLITION THAT IS NOT IDENTIFIED AS
BEING NON-ACM SHOULD BE ASSUMED TO BE ACM UNLESS SAMPLE RESULTS PROVE OTHERWISE.
1, 2, 3, 5
1, 2, 4, 5
1, 2, 4, 5
1, 2, 4, 5
1, 2, 4, 5
1, 2, 4, 5
1, 2, 4, 5
1, 2, 4, 5
1, 2, 4, 5
1, 2, 4, 5
1, 2, 4, 5
1, 2, 4, 5
1, 2, 4, 5
1, 2, 3, 5 1, 2, 4, 5
1, 2, 4, 5
1, 2, 3, 5 1, 2, 4, 5
1, 2, 4, 5
1, 2, 4, 5 1, 2, 3, 5
1, 2, 4, 5
1, 2, 3, 5 1, 2, 4, 5
1, 2, 4, 5 1, 2, 4, 5 1, 2, 4, 5 1, 2, 4, 5 1, 2, 4, 5 1, 2, 4, 5 1, 2, 4, 5 1, 2, 4, 5 1, 2, 4, 5 1, 2, 4, 5 1, 2, 4, 5 1, 2, 4, 5 1, 2, 4, 5 1, 2, 3, 5 1, 2, 4, 5 1, 2, 4, 5 1, 2, 4, 5 1, 2, 4, 5 1, 2, 4, 5
1, 2, 4, 5
1, 2, 4, 5
1, 2, 4, 5 1, 2, 3, 5 1, 2, 3, 5 1, 2, 4, 5 1, 2, 3, 5
1, 2, 3, 5
1, 2, 4, 5 1, 2, 3, 5 1, 2, 3, 5 1, 2, 3, 5 1, 2, 3, 5 1, 2, 3, 5 1, 2, 3, 5 1, 2, 3, 5 1, 2, 3, 5
1, 2, 4, 5 1, 2, 4, 5
1, 2, 4, 5
1, 2, 4, 5 1, 2, 3, 5
1, 2, 4, 5
1, 2, 4, 5
2 NO ACMS REPORTED 1, 2
84 NO ACMS REPORTED 1, 2
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
All Concepts, ideas, design elements, plans, and details as shown on this document are the sole property of Viridian Architectural
Design, Inc. and shall not be used for any purpose without prior expressed written consent. The Owner shall be permitted to retain copies for information and reference.
2020 E. Washington Boulevard Suite 200 Fort Wayne, Indiana 46803
PH: 260.424.4830
www.viridian-design.net
FINAL BID
DOCUMENTS
OF03 66
Z:
\V iri di an \P ro je ct s\
\0
D R
AW
IN
G S\
R
EV
IT
\L
O C
AL
F
IL
ES
\2
2_ C
EN
TR
AL
_R
_l fe do rc zy k.
rv t 4/
/2
:4
1:
A M
GI003
SITE CAMPUS MAP, PHASING NOTES
AND HAZARDOUS MATERIALS
RENOVATE RESTROOMS
BATTLE CREEK, MICHIGAN
515-22-101
BC VA CAMPUS
02/23/2023 TWT AKM
SCALE: 1" = 160'-0"
GI003
SITE CAMPUS MAP
# ONLY SHADED BUILDINGS ARE
INCLUDED IN THIS PROJECT.
BUILDING
NORTH
GENERAL CONSTRUCTION & PHASING NOTES
APPLICABILITY OF GENERAL CONSTRUCTION NOTES:
THESE NOTES APPLY TO ALL WORK DESCRIBED IN THESE DRAWINGS AND SPECIFICATIONS AND TO ALL CONTRACTORS AND / OR SUBCONTRACTORS THAT WORK IN, ON, OR AROUND THIS BUILDING OR THE ADJACENT SITE. FOR ADDITIONAL SCOPE OF WORK DESCRIBED IN DETAIL, SEE THE RESPECTIVE DISCIPLINE DRAWINGS AND
SPECIFICATIONS. COORDINATE ORDER OF CONSTRUCTION PHASING WITH COR.
1. EXISTING BUILDING UTILITIES:
PRIOR TO THE COMMENCEMENT OF ANY / ALL WORK, VERIFY THE LOCATION AND ENSURE THE OBVIOUS MARKING OF ALL EXISTING UTILITIES AND RELATED EQUIPMENT ON, ABOVE, OR BENEATH THE ADJACENT WORK AREA, WHETHER INDICATED TO REMAIN, TO BE MODIFIED, OR TO BE REMOVED. COORDINATE ALL VERIFICATION
AND MARKING WORK WITH THE COR.
2. BUILDING DUST AND INFECTION CONTROL:
THE BUILDING WILL REMAIN FULLY OCCUPIED DURING ALL PHASES OF THIS WORK. THEREFORE, PROVIDE, INSTALL, AND MAINTAIN ALL CONSTRUCTION DUST, DEBRIS AND INFECTION CONTROL MEASURES OUTLINED.
GENERAL CONTRACTOR TO PROVIDE INTERIOR PROTECTIVE MEASURES BETWEEN CONTRACTOR CONTROLLED SPACE AND VA OCCUPIED SPACE. INTERIOR PROTECTIVE MEASURES SHALL INCLUDE AN ALUMINUM FRAME AND FIBERGLASS REINFORCED POLYMER MODULAR WALL SYSTEM. THE MODULAR WALL SYSTEM SHALL EXCEED ICRA CLASS IV REQUIREMENTS. BASIS OF DESIGN; STARC SYSTEMS LITE BARRIER WALL SYSTEM OR EQUAL.
SEE INFECTION CONTROL PLAN ON GI002 AND SPECIFICATIONS FOR ADDITIONAL INFORMATION. COORDINATE
SPECIFIC INFORMATION WITH THE COR.
3. BUILDING ACCESS AND SECURITY: THE BUILDING WILL REMAIN FULLY OCCUPIED DURING ALL PHASES OF THIS WORK. THEREFORE, PROVIDE, INSTALL, AND MAINTAIN ALL TEMPORARY MEASURES REQUIRED TO MAINTAIN ACCESS AND SECURITY OF THE EXISTING BUILDING AND THE WORK AREA FOR THE DURATION OF THE CONSTRUCTION PROJECT. COORDINATE SPECIFIC INFORMATION WITH THE COR. SEE SPECIFICATIONS FOR
ADDITIONAL INFORMATION.
4. EXISTING WORK AREA AND BUILDING CONDITION:
PROVIDE, INSTALL, AND MAINTAIN PROTECTIVE MEASURES TO KEEP THE EXISTING BUILDING ADJACENT TO THE WORK AREA AND PATH OF DEMOLITION TRAVEL FROM CONSTRUCTION DAMAGE DURING WORK. RESTORE ANY PORTION OF THE EXISTING BUILDING OR ADJACENT SITE INADVERTENTLY DAMAGED BY, OR AS A RESULT OF THIS WORK, AT NO ADDITIONAL COST TO THE VA. DAMAGE TO THE SITE / LANDSCAPING SHALL BE RESTORED SEASONALLY, PER BUILDING, REGARDLESS OF THE OVERALL PROJECT PROGRESS / COMPLETION. SEE
SPECIFICATIONS FOR ADDITIONAL INFORMATION.
5. EXITS TO BE MAINTAINED:
MAINTAIN ONE (1) EXITS FROM ALL AREAS AT ALL TIMES FOR THE DURATION OF CONSTRUCTION. IF AN EXIT MUST BE CLOSED THE GENERAL CONTRACTOR SHALL COORDINATE WITH VA COR FOR AN ILSM PRIOR TO
CLOSING THE EXIT.
6. GENERAL DEMOLITION NOTES AND INFORMATION:
SEE DISCIPLINE DRAWINGS AND SPECIFICATIONS FOR GENERAL DEMOLITION NOTES AND INFORMATION INCLUDING DISPOSAL AND / OR SALVAGE OF DEMOLISHED MATERIALS. THE CONTRACTOR SHALL NOT CONTINUE WITH DEMOLITION UNTIL THE SCOPE OF WORK AT THE TURNED OVER RESTROOM IN THE SAME BUILDING IS COMPLETE (FIXTURES, FINISHES, EXHAUST FAN, MECHANICAL, PLUMBING, ETC.) AND ACCEPTED BY THE VA.
COORDINATE NEW CONSTRUCTION VS. DEMOLITION PROGRESS PHASING WITH THE COR.
7. GENERAL CONSTRUCTION NOTES AND INFORMATION:
SEE DISCIPLINE DRAWINGS AND SPECIFICATIONS FOR GENERAL CONSTRUCTION NOTES AND INFORMATION INCLUDING STORAGE AND STAGING OF CONSTRUCTION MATERIALS. THE CONTRACTOR SHALL NOT CONTINUE WITH CONSTRUCTION UNTIL THE SCOPE OF WORK AT THE TURNED OVER RESTROOM IN THE SAME BUILDING IS COMPLETE (FIXTURES, FINISHES, EXHAUST FAN, MECHANICAL, PLUMBING, ETC.) AND ACCEPTED BY THE VA.
GENERAL CONTRACTOR TO PROVIDE INTERIOR PROTECTIVE MEASURES BETWEEN CONTRACTOR CONTROLLED SPACE AND VA OCCUPIED SPACE. INTERIOR PROTECTIVE MEASURES SHALL INCLUDE AN ALUMINUM FRAME AND FIBERGLASS REINFORCED POLYMER MODULAR WALL SYSTEM. THE MODULAR WALL SYSTEM SHALL EXCEED ICRA CLASS IV REQUIREMENTS. BASIS OF DESIGN; STARC SYSTEMS LITE BARRIER WALL SYSTEM OR EQUAL.
COORDINATE SPECIFIC INFORMATION WITH THE COR.
8. EXISTING PLUMBING SUPPLY AND DWV SYSTEMS AND EQUIPMENT: THE BUILDING WILL REMAIN FULLY OCCUPIED DURING CONSTRUCTION. THEREFORE, COORDINATE ALL TEMPORARY AND PERMANENT DISCONNECTING, MODIFICATIONS TO, REROUTING OF, AND RECONNECTING OF EXISTING PLUMBING SUPPLY AND DRAIN WASTE VENT SYSTEMS (DWV) AND EQUIPMENT WITH THE COR. SEE DEMOLITION, ARCHITECTURAL, MECHANICAL, ELECTRICAL, AND SPECIFICATIONS FOR ADDITIONAL INFORMATION.
9. EXISTING MECHANICAL SYSTEMS AND EQUIPMENT: THE BUILDING WILL REMAIN FULLY OCCUPIED DURING CONSTRUCTION. THEREFORE, COORDINATE ALL TEMPORARY AND PERMANENT DISCONNECTING AND RECONNECTING OF EXISTING MECHANICAL SYSTEMS, STEAM PIPING AND EQUIPMENT WITH THE COR. SEE DEMOLITION, ARCHITECTURAL, MECHANICAL, ELECTRICAL, AND SPECIFICATIONS FOR ADDITIONAL INFORMATION.
10. EXISTING ELECTRICAL POWER SUPPLIES AND EQUIPMENT: THE BUILDING WILL REMAIN FULLY OCCUPIED DURING CONSTRUCTION. THEREFORE, COORDINATE ALL TEMPORARY AND PERMANENT DISCONNECTING AND RECONNECTING OF EXISTING POWER SUPPLIES AND EQUIPMENT WITH THE COR. SEE DEMOLITION, ARCHITECTURAL, AND ELECTRICAL DRAWINGS, AND SPECIFICATIONS FOR ADDITIONAL INFORMATION.
11.FIRE-PROTECTION SYSTEMS AND EQUIPMENT: THE BUILDING WILL REMAIN FULLY OCCUPIED DURING CONSTRUCTION. THEREFORE, COORDINATE ALL NEW ROUTING OF FIRE-PROTECTION SYSTEMS AND EQUIPMENT WITH THE COR. SEE DEMOLITION, ARCHITECTURAL, MECHANICAL, AND ELECTRICAL DRAWINGS AND
SPECIFICATIONS FOR ADDITIONAL INFORMATION.
12. PROJECT PHASING: ALL WORK FOR THIS PROJECT SHALL BE PHASED TO MAINTAIN ONE (1) EGRESS EXIT AT ALL TIMES AND TO LIMIT DISRUPTIONS TO DAILY OPERATIONS. CONTRACTOR SHALL COORDINATE FINAL SCHEDULE WITH COR. IF ANY MEANS OF EGRESS MUST BE BLOCKED, THE GENERAL CONTRACTOR SHALL COORDINATE
WITH VA COR FOR AN ILSM PRIOR TO CLOSING THE EXIT.
13.THE BUILDING WILL REMAIN FULLY OCCUPIED DURING CONSTRUCTION. THEREFORE, EXISTING CORRIDOR ACCESS AND OPERATIONS SHALL REMAIN OPEN FOR SERVICE CONTINUALLY DURING CONSTRUCTION.
14.GENERAL CONTRACTOR TO PROVIDE INTERIOR PROTECTIVE MEASURES BETWEEN CONTRACTOR CONTROLLED SPACE AND VA OCCUPIED SPACE. PROTECTIVE DEVICE SHALL INCLUDE AN ALUMINUM FRAME AND FIBERGLASS REINFORCED POLYMER MODULAR WALL SYSTEM. THE MODULAR WALL SYSTEM SHALL EXCEED ICRA CLASS IV
REQUIREMENTS. BASIS OF DESIGN; STARC SYSTEMS LITE BARRIER WALL SYSTEM OR EQUAL.
15.AT THE COMPLETION OF EACH PHASE, NOTICE SHALL BE GIVEN TO THE CONTRACTOR BY THE COR TO PROCEED
TO THE NEXT PHASE.
16.CONTRACTOR TO STAGE ALL DRYWALL WITHIN EACH SPACE AND INFECTION CONTROLS IMPLEMENTED AND MAINTAINED BEFORE AND DURING CUTTING, HANGING, MUDDING, AND SANDING OPERATIONS. PROJECT MATERIAL PHASING WILL BE LOCATED IN ONE FENCED AREA. LOCATION TO BE PROVIDED BY THE VA, FENCING (MINIMUM 8'-0" w/ MESH FABRIC PRIVACY SCREENING) SHALL BE PROVIDED BY THE GENERAL CONTRACTOR.
MATERIALS SHALL BE BROUGHT TO EACH BUILDING DAILY FROM THE STAGING AREA AND SHALL ONLY BE IN THE AMOUNT NEEDED FOR THAT DAYS WORK. EXACT LOCATION OF STAGING AREA SHALL BE COORDINATED
WITH COR.
17. ALL AREAS TURNED OVER TO THE CONTRACTOR SHALL HAVE THE FLOOR 100% COVERED WHICH IS NOT INCLUDED IN THE SCOPE OF WORK. GC SHALL NOT LEAN TOOL OR EQUIPMENT AGAINST WALLS. ALL EQUIPMENT AND / OR ELECTRONICS WHICH ARE TO REMAIN SHALL BE 100% COVERED. THE 'COVER' SHALL BE SEALED AND SECURED TO PREVENT DUST AND DEBRIS FORM INFILTRATION COVERED ITEMS. CONTRACTOR SHALL BE
RESPONSIBLE FOR DAMAGE TO ITEMS NOT PROPERLY PROTECTED.
18.HAZARDOUS MATERIAL (ASBESTOS, LEAD) SEE ASBESTOS NOTES THIS SHEET. CONTRACTOR SHALL STOP WORK AND CONTACT THE COR IMMEDIATELY IF ASBESTOS AND OR LEAD CONTAMNATES ARE FOUND DURING
DEMO OR CONSTRUCTION.
Revisions: Date:
NOT IN BID
UP
UP
UP
UP
UP
UP
UP
UP
UP
UP
UP UP
UP
UP
UP
UP
UP
DN
UP
UP
UP
UP UP
UP
AD103
RECORDS
B2 048
OFFICE
B2 0114
OFFICE
B2 0113
CORRIDOR
B2 C013
TRIAGE
B2 0112
TRIAGE
B2 0111
OFFICE
B2 0110
RECEPTION
B2 0109
PATIENT
INFORMATION
B2 0108
ADMISSIONS
WAITING ROOM
B2 061
VEST
B2 061A
STAIR
B2 S5
PATIENT ADVOCATE
B2 064
PATIENT ADVOCATE
B2 065
STOR
B2 066
SERVICE OFFICER
B2 067
OFFICE
B2 008
OWCP
B2 009
STAIR
B2 S3
CORRIDOR
B2 C04
FILE / RECEPTION
B2 010
OFFICE
B2 011
ADP COORD
B2 012
LOCKER ROOM
B2 013
PHARMACY WAITING
B2 014
RECEPTION
B2 014A
ELIGIBILITY CLERK
B2 074
SERVICE OFFICER
B2 074A
SUB WAITING
B2 073
CORRIDOR
B2 084A
H.A.C.
B2 080
ELEC
B2 069E
DISBATCH
B2 078
ELIGIBILITY OFFICER
B2 077
BATH
B2 078A
DATA
B2 076
RELEASE OF
INFORMATION
B2 075
OFFICE
B2 007
OUTPATIENT OFFICE
B2 005
CHASE
B2 006E BENEFITS SECTION
SUPERVISOR
B2 002
CORRIDOR
B2 C02
STAIR
B2 S1
AGENT CASHIER
B2 016
PATIENT FUNDS
B2 017
HVAC CLOSET
B2 017A
ELEV
B2 E1
ELEVATOR EQUIP
B2 018E
ELEV
B2 E2
DATA
B2 019A
SOILED LINEN /
UTILITY / TELEPHONE
B2 019
PHARMACY
B2 015
CONTROLLED
SUBSTANCE VAULT
B2 015A
HVAC
B2 015E
STAIR
B2 S5
MECH
B2 0F-020
ELEC
B2 0F-020E
VEST
B2 0F-003
SHELL
B2 0F-001
EXIT PASSAGEWAY
B2 C0-1
MACH / TANK
B2 020E
VENDING
B2 024
HVAC
B2 021E
OFFICE
B2 086
CORRIDOR
B2 C05
OFFICE
B2 088
EXIT PASSAGEWAY
B2 C0-2
SHELL
B2 0G-001
ELEC
B2 0G-010E
MECHANICAL
B2 0G-020
B2 0043
EXAM SOUND BOOTH
B2 042
HEATING / AC UNIT
B2 042E
OFFICE
B2 043
AUIDO
BOOTH
IT ROOM
VEST
AUIDO
BOOTH
AUIDO
BOOTH
EXAM SOUND BOOTH
B2 041
EXAM SOUND BOOTH
B2 044
SECRETARY
B2 045
OFFICE
B2 040
TREATMENT
B2 039
PROSTHETICS
B2 038
AUDIOLOGY WAITING
B2 037
AMBULANCE BAY
CORRIDOR
B2 C09
CORRIDOR
B2 C08
STAIR
B2 S2
LINEN
B2 087
CORRIDOR
B2 C06
RECOVERY
B2 093
DRESSING ROOM
B2 092
BATH
B2 092A
SOILED UTILITY
B2 091 CORRIDOR
B2 C010
TREATMENT
B2 095
BATH
B2 096
STORAGE
B2 095A
CORRIDOR
B2 C01ELEV
B2 E3
EQUIPMENT
B2 0106
LOCKER ROOM
B2 097
NURSES STATION
B2 0103
CORRIDOR
B2 C012
EXAM
B2 0122
BATH
B2 0122A
EXAM
B2 0116
EXAM
B2 0117
EXAM
B2 0118
OFFICE
B2 0119
BATH
B2 0103A
DATA
B2 050E
SOILED LINEN
B2 050
MENS TOILET
B2 046
WOMENS TOILET
B2 047
STAIR
B2 S4
WOMENS TOILET
B2 082
MENS TOILET
B2 083
WOMENS TOILET
B2 003
MENS TOILET
B2 004
AD103
AD103
AD103
EXAM
B2 1109B
EXAM
B2 1109A
EXAM
B2 1109
EXAM
B2 1109C
EXAM
B2 1109D
EXAM
B2 1108
OFFICE
B2 1184
EXAM ROOM
B2 1185
CORRIDOR
B2 C19B
EXAM
B2 1171
EXAM
B2 1170
EXAM
B2 1169
OFFICE
B2 1168
EXAM
B2 1167
STORAGE
B2 1187
CORRIDOR
B2 C19
CORRIDOR
B2 C19A
ELEC
B2 1191E
ELEC
B2 1192E
STAIR
B2 S5-1
ELEV
B2 E3
H.A.C.
B2 1188EXAM
B2 1107
GROUP OFFICE
B2 1183
EXAM ROOM
B2 1186
EXAM
B2 1110
OFFICE
B2 1111
OFFICE
B2 1112
OFFICE
B2 1113
OFFICE
B2 1114
OFFICE
B2 1124
H.A.C.
B2 1125
STAIR
B2 S1
OFFICE
B2 1103
CHASE
B2 1107E
CHASE
B2 1106E
OFFICE
B2 1102
BREAKROOM
B2 1101
OFFICE
B2 1100C
OFFICE
B2 1100C
OFFICE
B2 1100A
OFFICE
B2 1100
CORRIDOR
B2 C12
OFFICE
B2 1117
POD BEDROOM
B2 1118
TOILET
B2 1127A
H.A.C.
B2 1119
ELEV
B2 E1
ELEV. MECH.
B2 1119E
OFFICE
B2 1120A
ELEV
B2 E2
CORRIDOR
B2 C11
EXAM
B2 1115
OFFICE
B2 1123
EXAM
B2 1116
EXAM
B2 1122
CLASSROOM
B2 1317
EXAM
B2 1117
EXAM
B2 1121
EXAM
B2 1118
EXAM
B2 1120
EXAM
B2 1119
TOILET
B2 1315A
EXAM
B2 1315
CORRIDOR
B2 C1-2
EXAM
B2 1318
TOILET
B2 1318A WORK ROOM
B2 1316
EXAM
B2 1320
CORRIDOR
B2 C1-1
LIQUID NITROGEN
B2 1319
CORRIDOR
B2 C1-4
CORRIDOR
B2 C1-5
CORRIDOR
B2 C1-6
ELEC
B2 1301
CLEAN SUPPLY
ROOM
B2 1300
MEDICATION ROOM
B2 1304
OFFICE
B2 1310
TOILET
B2 1314A
EXAM
B2 1314
STORAGE
B2 1313
SOILED UTILITY
B2 1312
PATIENT TOILET
B2 1311
CORRIDOR
B2 C1-3
SCI PROCEDURE
ROOM
B2 1302
SCI PROCEDURE
ROOM
B2 1303
STAIR
B2 S7
EXAM
B2 1305
EXAM
B2 1306
EXAM
B2 1307
EXAM
B2 1308
EXAM
B2 1309
CHECK IN
B2 1364A
CHECK IN
B2 1416A
WAITING
B2 1130
EXAM
B2 1420
CORRIDOR
B2 C1-21
LIQUID NITROGEN
B2 1319
WORK ROOM
B2 1416
EXAM
B2 1418
BATH
B2 1418A
CLASSROOM
B2 1417
EXAM
B2 1415
TOILET
B2 1415A
CORRIDOR
B2 C1-20
DATA
B2 1131
OFFICE
B2 1132
OFFICE
B2 1133
OFFICE
B2 1134
STAIR
B2 S2
CORRIDOR
B2 C17
BATH
B2 1158
DATA
B2 1156E
EXAM
B2 1157
OFFICE
B2 1155
OFFICE
B2 1154
OFFICE
B2 1153
CHASE
B2 1151E
WORK ROOM
B2 1194
RECEPTION
B2 1195
CORRIDOR
B2 C18
CORRIDOR
B2 C18B
CMS STORAGE
B2 1196
OFFICE
B2 1203
CORRIDOR
B2 C18A
OFFICE
B2 1197
OFFICE
B2 1198
GROUP TREATMENT
B2 1199
OFFICE
B2 1204
OFFICE
B2 1205
OFFICE
B2 1206
OFFICE
B2 1207
OFFICE
B2 1208
OFFICE
B2 1209
EXAM
B2 1149C
SOILED UTILITY
B2 1149B
BATH
B2 1149A
STAIR
B2 S4
EXAM
B2 1149D
CLEAN STORAGE
B2 1149G
WAITING
B2 1165
EXAM
B2 1149F
WAITING
B2 1149
CHASE
B2 1135E
CHASE
B2 1149E
OFFICE
B2 1148B
OFFICE
B2 1148A
OFFICE
OFFICEOFFICE
OFFICE
EXAM
EXAM
EXAM
EXAM EXAM
EXAM
EXAM
EXAM
EXAM
CLEAN SUPPLY
ROOM
B2 1400
ELECTRICAL ROOM
B2 1401E
MEDICATION ROOM
B2 1404
CORRIDOR
B2 C1-19
SCI PROCEDURE
ROOM
B2 1402
PATIENT TOILET
B2 1414A
EXAM
B2 1414
RN WORK ROOM
B2 1410
CORRIDOR
B2 C1-17
STORAGE
B2 1413
SOILED UTILITY
B2 1412
TOILET
B2 1411
CORRIDOR
B2 C1-18
EXAM
B2 1409
EXAM
B2 1408
EXAM
B2 1407
EXAM
B2 1406
EXAM
B2 1405
STAIR
B2 S8
EKG EXAM
B2 1403
CORRIDOR
B2 C1-16
MENS TOILET
B2 1150
MENS TOILET
B2 1190
WOMENS TOILET
B2 1189
WOMENS TOILET
B2 1105
AD103
AD103
STAIR
B2 S3
STORAGE
B2 2213
CONFERENCE /
BREAK ROOM
B2 2212
STORAGE
B2 2211
LOCKERS
B2 2214
OFFICE
B2 2215
OFFICE
B2 2210
H.A.C.
B2 2209OFFICE
B2 2216
CORRIDOR
B2 C22
TOILET
B2 2203A
CHASE
B2 2204E
CHASE
B2 2207E
DEV LAB
B2 2217
OFFICE
B2 2218
WAITING
B2 2203
LAB
B2 2205
STAIR
B2 S1
OFFICE
B2 2219
BIOSAFETY LAB
B2 2220A
OFFICE
B2 2220B
MEDICAL WASTE
B2 2221
MICROBIOLOGY
B2 2220
ULTRASOUND
B2 2222
TOILET
B2 2222A
H.A.C.
B2 2223
STORAGE
B2 2224A
CORRIDOR
B2 2224
STORAGE
B2 2225A
BREAKROOM
B2 2225
ELEV
B2 E2
STORAGE
B2 2202B WAITING
B2 2202
WAITING
B2 2200
ELEV
B2 E3
STORAGE
B2 2273
TOILET
B2 2272
STAIR
B2 S5
CORRIDOR
B2 C26
CT CONTROL ROOM
B2 2268
CT GANTRY
B2 2269
STRESS TESTING
ROOM
B2 2270
NUCLEAR MEDICINE
B2 2271
HOT TUB
B2 2271B
HOT TUB
B2 2271A
RECEPTION
B2 2265
CORRIDOR
B2 C21
WAITING ROOM
B2 2264
EXAM
B2 2264A
EXAM
B2 2263
OFFICE
B2 2263A
H.A.C.
B2 2262
CHASE
B2 2261E
CHASE
B2 2259E
DENTAL PROSTHETIC
LAB
B2 2254
LOUNGE ROOM
B2 2255
TREATMENT
B2 2256
CORRIDOR
B2 C25
OFFICE
B2 2253
STORAGE
B2 2252
TREATMENT
B2 2257
H.A.C.
B2 2251
OFFICE
B2 2249A
OFFICE
B2 2249
DENTIST OFFICES
B2 2248
STAFF OFFICES
B2 2250
STAIR
B2 S2
OFFICE
B2 2239
TREATMENT ROOM
B2 2247
TREATMENT ROOM
B2 2246
TREATMENT ROOM
B2 2245
SOILED UTILITY
B2 2244
360 X-RAY
B2 2240
TREATMENT
B2 2241
CORRIDOR
B2 C24
TREATMENT ROOM
B2 2242
TREATMENT ROOM
B2 2243
EXAM
B2 2238
BATH
B2 2237A
X-RAY 1
B2 2237
CONTROL
B2 2237
WAITING AREA
B2 2236
OFFICE
B2 2235
OFFICE
B2 2226
CORRIDOR
B2 C23
X-RAY
B2 2233
OFFICE
B2 2227
X-RAY
B2 2228
FILM PROCESSING
B2 2231
TOILET
B2 2231A
WOMENS TOILET
B2 2260
MENS TOILET
B2 2258
WOMENS TOILET
B2 2206
MENS TOILET
B2 2208
AD104
AD104
AD104
VACANT
B7 030
STAIR
B7 S4
VACANT
B7 031
STORAGE
B7 028B
VACANT
B7 032
MORGUE
B7 028
CORRIDOR
B7 C05
OFFICE
B7 028A
WHEEL CHAIR REPAIR
B7 028
TOILET
B7 028C
ELEC
B7 027E
CORRIDOR
B7 C04
STORAGE
B7 017
STAIR
B7 S2
CORRIDOR
B7 C02
STORAGE
B7 033
H.A.C.
B7 034
STORAGE
B7 001
ELEV
B7 S5
STORAGE
B7 002
STORAGE
B7 003
STORAGE
B7 003A
BEHAVIORAL HEALTH
MESSENGER POOL
B7 004
OFFICE
B7 005A
OFFICE
B7 005B
OFFICE
B7 005C
STAFF AREA
B7 005
STAIR
B7 S5-0B
ELEC
B7 006A
ELEC
B7 B38
MECH
B7 008
STORAGE
B7 009
H.A.C.
B7 008A
MECH
B7 009D
STORAGE
B7 009
STORAGE
B7 009A
STORAGE
B7 009B
STAIR
B7 S1-0B
TOILET
B7 010
H.A.C.
B7 011
MECH
B7 011E
OFFICE
B7 012
VACANT
B7 015
WOMENS LOCKER
B7 016
STORAGE
B7 014
CORRIDOR
B7 C03
VACANT
B7 013
TOILET
B7 010
TOILET
B7 016A
TOILET
B7 029
AD104
AD104
CLASSROOM
B9 124
STORAGE
B9 125
TOILET
B9 125A
H.A.C.
B9 126
CLOSET
B9 126A
STAIR
B9 S2 ELEVATOR
B9 127
MECHANICAL ROOM
B9 128E
OFFICE
B9 128
OFFICE
B9 129
VEST
B9 C11
OFFICE
B9 101
STORAGE
B9 102
OFFICE
B9 103
CLOSET
B9 103A
STAIR
B9 S1
OFFICE
B9 104
TOILET
B9 104A
OFFICE
B9 105
OFFICE
B9 107
CONFERENCE ROOM
B9 106
STORAGE
B9 108
CORRIDOR
B9 C13
OFFICE
B9 109
OFFICE
B9 110
OFFICE
B9 111
OFFICE
B9 112
OFFICE
B9 113
OFFICE
B9 114
CLASSROOM
B9 123A
VENDING
B9 123
STORAGE
B9 122
CLASSROOM
B9 118
LOUNGE
B9 117
TOILET
B9 121
WOMENS TOILET
B9 119
MENS TOILET
B9 116
AD104
AD104
SKILLS LAB
B9 216
OFFICE
B9 217
STORAGE
B9 217A
STAIR
B9 S2
H.A.C.
B9 218
KITCHEN
B9 200A
WORK ROOM
B9 200
STORAGE
B9 202
STORAGE
B9 203
CLOSET
B9 203
WORK ROOM
B9 215
CORRIDOR
B9 C23
WORK ROOM
B9 214
OFFICE
B9 213
CORRIDOR
B9 C24
OFFICE
B9 210
OFFICE
B9 209
PIPE CHASE
B9 208E
PIPE CHASE
B9 207E
CLASSROOM
B9 206
CLASSROOM
B9 205
OFFICE
B9 204
DATA
B9 204A
STAIR
B9 S1
CORRIDOR
B9 C21
WOMENS TOILET
B9 208
MENS TOILET
B9 211
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
All Concepts, ideas, design elements, plans, and details as shown on this document are the sole property of Viridian Architectural
Design, Inc. and shall not be used for any purpose without prior expressed written consent. The Owner shall be permitted to retain copies for information and reference.
2020 E. Washington Boulevard Suite 200 Fort Wayne, Indiana 46803
PH: 260.424.4830
www.viridian-design.net
FINAL BID
DOCUMENTS
OF04 66
Z:
\V iri di an \P ro je ct s\
\0
D R
AW
IN
G S\
R
EV
IT
\L
O C
AL
F
IL
ES
\2
2_ C
EN
TR
AL
_R
_l fe do rc zy k.
rv t 2/
/2
:4
2:
A M
AD100
DEMOLITION - KEY PLANS - BUILDING 2,
7, & 9
RENOVATE RESTROOMS
BATTLE CREEK, MICHIGAN
515-22-101
BC VA CAMPUS
02/23/2023 TWT AKM
SCALE: 1" = 20'-0"
AD100
DEMOLITION - KEY PLAN - B2 GROUND FLOOR
SCALE: 1" = 20'-0"
AD100
DEMOLITION - KEY PLAN - B2 FIRST FLOOR
SCALE: 1" = 20'-0"
AD100
DEMOLITION - KEY PLAN - B2 SECOND FLOOR
SCALE: 1" = 20'-0"
AD100
DEMOLITION - KEY PLAN - B7 GROUND FLOOR
SCALE: 1" = 20'-0"
AD100
DEMOLITION - KEY PLAN - B9 FIRST FLOOR
SCALE: 1" = 20'-0"
AD100
DEMOLITION - KEY PLAN - B9 SECOND FLOOR
NORTH
NORTH
NORTH
NORTH
NORTH
NORTH
TRUE
NORTH
TRUE
NORTH
TRUE
NORTH
TRUE
NORTH
TRUE
NORTH
TRUE
NORTH
DN
UPUP
UP
UP
UP
UP
UP
DNDN
DN
UP
UP
UP
UP
UP
UP
UP
UP
FD
AD104
AD104
WORK ROOM
B10 123
OFFICE
B10 124
OFFICE
B10 122
CONFERENCE
B10 121A
STORAGE
B10 118
OFFICE
B10 119
OFFICE
B10 120
OFFICE
B10 121
TOILET
B10 117
PIPE CHASE
B10 115E
STORAGE
B10 114
STORAGE
B10 113
STORAGE
B10 125
STORAGE
B10 125A
STAIR
B10 S2
STORAGE
B10 126
CLOSET
B10 126A
STORAGE
B10 127
OFFICE
B10 128
CORRIDOR
B10 C11
OFFICE
B10 101
OFFICE
B10 102
H.A.C.
B10 103
LOUNGE
B10 104
STAIR
B10 S1
TOILET
B10 104
OFFICE
B10 105
CONFERENCE ROOM
B10 106
WORK ROOM
B10 107
WAITING AREA
B10 C12
OFFICE
B10 110
OFFICE
B10 108
OFFICE
B10 109
WOMENS TOILET
B10 112
MENS TOILET
B10 115
AD105
AD105
OFFICE
B10 220B
OFFICE
B10 220
OFFICE
B10 220A
OFFICE
B10 219
OFFICE
B10 218
CORRIDOR
B10 C23
OFFICE
B10 217
OFFICE
B10 216
CORRIDOR
B10 C24
OFFICE
B10 213
OFFICE
B10 212
PIPE CHASE
B10 211E
PIPE CHASE
B10 210E
CORRIDOR
B10 C21
CORRIDOR
B10 C22
OFFICE
B10 209
OFFICE
B10 208
OFFICE
B10 207
OFFICE
B10 206
OFFICE
B10 205A
OFFICE
B10 205
OFFICE
B10 204
STAIR
B10 S1
STORAGE
B10 203
CLOSET
B10 203A
OFFICE
B10 202
OFFICE
B10 201
OFFICE
B10 224
OFFICE
B10 223
H.A.C.
B10 222
STAIR
B10 S2
COPY
B10 221
TOILET
B10 221A
MENS TOILET
B10 211
WOMENS TOILET
B10 214
AD105
AD105
OFFICE
B11 118C
OFFICE
B11 118A
OFFICE
B11 118
OFFICE
B11 119
STAIR
B11 S2
H.A.C.
B11 120 OFFICE
B11 121
OFFICE
B11 122
OFFICE
B11 123
VEST
B11 C14
OFFICE
B11 101
OFFICE
B11 102
OFFICE
B11 103
OFFICE
B11 104
CLOSET
B11 104A
STAIR
B11 S1
OFFICE
B11 105
VEST
B11 C15
OFFICE
B11 109A
RECEPTION
B11 109D
OFFICE
B11 108
OFFICE
B11 108A
OFFICE
B11 109
CORRIDOR
B11 C13
PIPE CHASE
B11 110E
OFFICE
B11 112
OFFICE
B11 113
CORRIDOR
B11 C12
PIPE CHASE
B11 114E
PIPE CHASE
B11 115E
CONFERENCE
B11 116
OFFICE
B11 117
WOMENS TOILET
B11 111
MENS TOILET
B11 114
AD105
AD105
OFFICE
B11 220B
OFFICE
B11 220A
IMS OFFICE
B11 220
OFFICE
B11 219
VEST
B11 C24
CORRIDOR
B11 C21
CORRIDOR
B11 C22
CORRIDOR
B11 C23
COPIER
B11 218
OFFICE
B11 217
OFFICE
B11 216
OFFICE
B11 215
OFFICE
B11 214
OFFICE
B11 213
PIPE CHASE
B11 212E
PIPE CHASE
B11 211E
CONFERENCE
B11 210
PIPE CHASE
B11 209E
PIPE CHASE
B11 208E
OFFICE
B11 207
OFFICE
B11 206B
OFFICE
B11 206A
SECRETARY
B11 206
IMS OFFICE
B11 205
TOILET
B11 205B
OFFICE
B11 204
STAIR
B11 S1
WORK ROOM
B11 203
OFFICE
B11 202
OFFICE
B11 201
OFFICE
B11 224
IMS STORAGE
B11 223
H.A.C.
B11 222
BREAKROOM
B11 221
STAIR
B11 S2
WOMENS TOILET
B11 209
MENS TOILET
B11 211
AD105
OFFICE
B12 122
OFFICE
B12 123
BREAKROOM
B12 124
TOILET
B12 124A
TCM
B12 125
COPY / MAIL
B12 126
OFFICE
B12 127
OFFICE
B12 128
VESTIBULE
B12 C11
TCM
B12 101
H.A.C.
B12 102
OFFICE
B12 103
TOILET
B12 103A
OFFICE
B12 104
CORRIDOR
B12 C12
CONFERENCE ROOM
B12 105
OFFICE
B12 106
CALL CENTER
B12 107
CALL CENTER
STORAGE
B12 108
OFFICE
B12 110
MECH
B12 109E
MECH
B12 110E
OFFICE
B12 111
INTERVIEW
B12 112
UTILITY ROOM
B12 113
SHOWER
B12 114
MECH
B12 115E
TOILET
B12 117
OFFICE
B12 119
CONFERENCE ROOM
B12 119B
WAITING ROOM
B12 119
OFFICE
B12 120
OFFICE
B12 121
CORRIDOR
B12 C12
EXTERIOR HVAC
CONCRETE PAD
B12 C13
WOMENS TOILET
B12 115
MENS TOILET
B12 118
AD105
AD105
OFFICE
B12 220
OFFICE
B12 219
OFFICE
B12 218
SEC ANCILLARY
SERVICE
B12 221 STAIR
B12 S2
OFFICE
B12 222
OFFICE
B12 223
OFFICE
B12 224
OFFICE
B12 225
OFFICE
B12 201
COMPLIANCE
OFFICER
B12 202
H.A.C.
B12 203 STAIR
B12 S1
CLOSET
B12 203A
WORK ROOM
B12 204
TOILET
B12 204A
OFFICE
B12 205
OFFICE
B12 206
OFFICE
B12 207
CORRIDOR
B12 C22
OFFICE
B12 208
OFFICE
B12 209
OFFICE
B12 212
MECH
B12 211E
MECH
B12 210E
STORAGE
B12 213
MECH
B12 215E
MECH
B12 214E
CORRIDOR
B12 C23
OFFICE
B12 217
CONFERENCE ROOM
B12 216
MENS TOILET
B12 211
WOMENS TOILET
B12 214
AD106
AD106
AD106
DAY ROOM
B14 142B
OFFICE
B14 142D
CORRIDOR
B14 142
OFFICE
B14 142A
KITCHEN
B14 143
OFFICE
B14 141
CORRIDOR
B14 C17
SHOWER
B14 147A
H.A.C.
B14 146
SHOWER
B14 147
EXAM
B14 149
OFFICE
B14 150
OFFICE
B14 151
OFFICE
B14 152
OFFICE
B14 153
OFFICE
B14 154
TOILET
B14 101A
TOILET
B14 100
WAITING
B14 101
CORRIDOR
B14 C11
OFFICE
B14 102
CLEAN LINEN
B14 103
SOILED LINEN
B14 104
CMS
B14 105
1 BED
B14 106
CORRIDOR
B14 107
1 BED
B14 108
1 BED
B14 109
BREAKROOM
B14 110
LAUNDRY
B14 115
DIRTY LINEN
B14 115A
1 BED
B14 114
2 BED
B14 111
3 BED
B14 112
4 BED
B14 113
SHOWERS
B14 115A
H.A.C.
B14 116
1 BED
B14 119
1 BED
B14 120
2 BED
B14 121A
CORRIDOR
B14 121
2 BED
B14 121C
BREAKROOM
B14 122
CONFERENCE
B14 123
STAIR
B14 S1
H.A.C.
B14 124
1 BED
B14 125
1 BED
B14 126
MED
B14 127
RECEPTION
B14 128
CORRIDOR
B14 C14
BEDROOM
B14 129
BEDROOM
B14 130A
CORRIDOR
B14 C15
TOILET
B14 130
BEDROOM
B14 131
BEDROOM
B14 133
STORAGE
B14 135
CORRIDOR
B14 B
CORRIDOR
B14 C12
CORRIDOR
B14 C13
OFFICE
B14 137
OFFICE
B14 138
OFFICE
B14 139
H.A.C.
B14 140
STAIR
B14 S2
CORRIDOR
B14 C16
QUIET ROOM
B14 148A
CORRIDOR
B14 D
BEDROOM
B14 148F
1 BED
B14 148D
CONFERENCE
B14 148B
RECREATION
B14 148C
MENS TOILET
B14 144
TOILET
B14 134
MENS TOILET
B14 118
AD106
AD106
AD106
STORAGE
B14 246
VENDING
B14 246A
LAUNDRY
B14 243
OFFICE
B14 241
DAYCARE
B14 242
PORCH
B14 242A
STAIR
B14 S2-02
H.A.C.
B14 240
OFFICE
B14 239
EXAM
B14 238
OFFICE
B14 237
STORAGE
B14 236
STORAGE
B14 235
STAFF BREAK
B14 233
CORRIDOR
B14 C26
STATION
B14 228
BEDROOM
B14 229
BEDROOM
B14 230
TOILET
B14 232
WOMEN LOUNGE
B14 231
MEDS
B14 227
MEDS
B14 226
1 BED
B14 225
H.A.C.
B14 224
STAIR
B14 S1
3 BEDS
B14 223
2 BEDS
B14 222
2 BEDS
B14 220
4 BEDROOMS
B14 221
3 BEDS
B14 219
CORRIDOR
B14 C25
CHASE
B14 219E
H.A.C.
B14 216
CORRIDOR
B14 C23
CORRIDOR
B14 C22
SHOWER
B14 215
1 BED
B14 214
2 BED
B14 211
CORRIDOR
B14 C24
QUIET ROOM
B14 210
3 BED
B14 213
3 BED
B14 212
CONFERENCE
B14 247
GROUP ROOM
B14 248A
GROUP ROOM
B14 248C
CORRIDOR
B14 248
GROUP ROOM
B14 248B
MENS TOILET
B14 244
TOILET
B14…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .