This document is a set of construction drawings for a project titled "541-23-201 Temp Hum Control for SPS - Construction Document Drawings". The project is related to a federal contract opportunity with Solicitation Number 36C25024B0051, titled "Y1DA--Provide Temperature and Humidity Control For SPS - (541-23-201)".
The project requires the contractor to provide all labor, materials, equipment, supervision, and other items necessary to complete the project of providing temperature and humidity controls for the Sterile Processing Services (SPS) storage areas at the Louis Stokes Veterans Affairs Medical Center in Cleveland, Ohio. The purpose is to bring the SPS storage areas into compliance with the latest requirements, including temperature and humidity requirements, as outlined in the Office of Construction & Facilities Management HVAC Design Manual and VHA Directives 1116 and 1761. The project will be solicited as a 100% Set-Aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSBs), with the SDVOSB contractor or subcontractor required to perform a minimum of 15% of the construction work.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT LOCATIONCAMPUS LOCATION
G E N E R A L N O T E S
A. THE CONTRACT DRAWINGS AND PROJECT MANUAL (INDICATED BY THE SAME PROJECT NUMBER) ARE COMPLEMENTARY. THE CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER'S REPRESENTATIVE (C.O.R.) OF ANY DISCREPANCIES FOUND DURING BIDDING AND THROUGH CONSTRUCTION.
B. DO NOT SCALE DRAWINGS; DIMENSIONS SHALL GOVERN.
C. THE GENERAL CONTRACTOR SHALL VERIFY ALL EXISTING DIMENSIONS AND FIELD CONDITIONS PRIOR TO DEMOLITION AND CONSTRUCTION. IF PROVIDED, THE GENERAL CONTRACTOR SHALL EXAMINE EXISTING BUILDING DOCUMENTS. THE CONTRACTOR SHALL BRING ANY DISCREPANCIES TO THE IMMEDIATE
ATTENTION OF THE CONTRACTING OFFICER REPRESENTATIVE.
D. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF EXISTING ITEMS TO REMAIN DURING DEMOLITION AND CONSTRUCTION.
E. CONTRACTORS WORKING AT VA FACILITIES ARE REQUIRED TO PROVIDE A DOCUMENT STATING THAT ALL WORKERS, PRIME AND SUBS, HAVE HAD THE FLU SHOT FOR THE CURRENT YEAR OF THE CONTRACT. THIS IS IN COMPLIANCE WITH VA DIRECTIVE 1013, PREVENTION AND CONTROL OF SEASONAL INFLUENZA WITH VACCINES. ACCORDINGLY, THE GC SHALL PROVIDE A CERTIFICATION THAT ALL WORKERS ON THIS CONTRACT HAVE BEEN IMMUNIZED IN ACCORDANCE
WITH THIS DIRECTIVE.
F. THE CONTRACTOR SHALL MAINTAIN ACCESSIBLE EGRESS FOR THE DURATION OF THE PROJECT. THE CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF ALL CONSTRUCTION ROUTES BEYOND THE AREAS OF WORK AND THE ROUTES MUST BE RETURNED TO THEIR ORIGINAL CONDITION AT THE END OF THE
PROJECT.
G. PENETRATIONS THROUGH EXISTING FIRE RATED CONSTRUCTION MUST BE PROPERLY CLOSED AND FIRE SAFE’D TO ACHIEVE THE REQUIRED FIRE RATING BY
THE END OF CONSTRUCTION OPERATIONS FOR EACH DAY.
H. ALL WORK SHALL BE DONE IN ACCORDANCE WITH APPLICABLE CODES AND FEDERAL AUTHORITIES, RULES AND REGULATIONS.
I. THESE DOCUMENTS SHOW DESIGN INTENT WITH MINIMUM CONSTRUCTION REQUIREMENTS AND MINIMUM QUALITY OF WORK EXPECTED. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR ALL MEANS, METHODS AND TECHNIQUES FOR CONSTRUCTION AND EXPECTED QUALITY.
J. ALL MATERIALS UTILIZED ON THIS PROJECT SHALL BE NEW UNLESS OTHERWISE NOTED TO BE SALVAGED AND REFURBISHED. MATERIAL QUALITY SHALL MEET
OR EXCEED APPLICABLE INDUSTRY STANDARDS.
K. COORDINATE ALL WORK WITH ALL OTHER DISCIPLINES. EXACT SIZE AND LOCATION OF ROOF, WALL, AND FLOOR OPENINGS SHALL BE VERIFIED WITH
CORRESPONDING CONTRACTING TRADES PRIOR TO CONSTRUCTION.
L. ALL CONCEALED WOOD SHALL BE FIRE RETARDANT TREATED.
M. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR COORDINATING ALL EQUIPMENT INSTALLATION AND VARYING ALL REQUIRED ROUGH OPENINGS AND ROUGH-IN DIMENSIONS WITH THE EQUIPMENT MANUFACTURER AND CONTRACTING OFFICER REPRESENTATIVE PRIOR TO CONSTRUCTION.
N. WHERE EXISTING SURFACES ARE TO BE RE-FINISHED OR ARE TO SERVE AS SUBSTRATE FOR THE ATTACHMENT OF NEW CONSTRUCTION, PREPARE EXISTING SURFACES AS NECESSARY TO RECEIVE THE NEW MATERIALS FOR A LEVEL AND SMOOTH FINISH.
O. FIELD VERIFY SIZES AND DIMENSIONS OF ALL EXISTING UTILITIES APPARATUSES IMPACTING NEW CONSTRUCTION. DETERMINE EXACT SIZE AND LOCATION OF
PENETRATION WITHIN NEW CONSTRUCTION, TIGHTLY SEAL AND CAULK.
P. GENERAL CONTRACTOR SHALL HOST THE ONLINE CONSTRUCTION MANAGEMENT SOFTWARE FOR THE DURATION OF THE PROJECT.
Q. PROJECTED PROJECT PHASING DURATIONS AND CONSTRUCTION TIMELINES ARE AS FOLLOWS.
SUBMITTAL PHASE: 90 DAYS DAY 001-090
PHASE 1: 183 DAYS DAY 091-273
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s /C le v e la n d
V A
T e m p a n d
H u m id it y C o n tr o ls
/F F
E
C le v e la n d
T e m p
H u m id it y C o n tr o ls
A
R C
H rv t
/9 /2
:3
:3
P M
GI000
COVER SHEET
02/09/2024 SS NM
TEMPERATURE AND HUMIDITY
CONTROLS TO SPS STORAGE
541-23-201
CLEVELAND, OHIO
100% CONSTRUCTION
DOCUMENTS
LOUIS STOKES
VA MEDICAL
CENTER Approved: Owner
PROVIDE TEMPERATURE AND HUMIDITY
CONTROLS FOR SPS STORAGE
PROJECT NUMBER: 541-23-201
VA CLEVELAND HEALTHCARE SYSTEM
LOUIS STOKES VA MEDICAL CENTER
DEPARTMENT OF VETERANS AFFAIRS
CLEVELAND, OHIO 44106-1702
10701 EAST BOULEVARD
L O C A T I O N M A P
NTS
V I C I N I T Y M A P
NTS
SHEET INDEX
SHEET NUMBER SHEET NAME
GENERAL
GI000 COVER SHEET
GI001 SCHEDULES, PARTITION TYPES AND ABBREVIATIONS
ARCHITECTURE
AE100 BASEMENT FLOOR OVERALL PLAN
AE101 FIRST FLOOR OVERALL PLAN NORTH
AE102 SECOND FLOOR OVERALL PLAN
AE103 THIRD FLOOR OVERALL PLAN
AE104 FOURTH FLOOR OVERALL PLAN
AE105 FIFTH FLOOR OVERALL PLAN
AE401 ENLARGED PLANS
AE402 ENLARGED PLANS
AE403 ENLARGED PLANS
AE404 ENLARGED PLANS
AE901 DEDUCT ALTERNATE
MECHANICAL
M001 MECHANICAL LEGEND AND ABBREVIATIONS
MD101 MECHANICAL DEMOLITION FIRST PLOOR PLAN
MD102 MECHANICAL DEMOLITION SECOND FLOOR PLAN
MH100-1 MECHANICAL NEW WORK BASEMENT PLAN
MH100-2 MECHANICAL NEW WORK BASEMENT PLAN
MH101 MECHANICAL NEW WORK FIRST FLOOR PLAN
MH102-1 MECHANICAL NEW WORK SECOND FLOOR PLAN
MH102-2 MECHANICAL NEW WORK SECOND FLOOR PLAN
MH103 MECHANICAL NEW WORK THIRD FLOOR PLAN
MH104 MECHANICAL NEW WORK FOURTH FLOOR PLAN
MH105 MECHANICAL NEW WORK FIFTH FLOOR PLAN
M500 MECHANICAL DETAILS
M600 MECHANICAL SCHEDULES
M700 MECHANICAL CONTROLS
No. Revisions: Date:
1 100% CONSTRUCTION DOCUMENTS - BID SET 02/09/2024
5/8" GYPSUM WALLBOARD
- PAINT P-1
3-5/8" 20 GA. COLD-FORMED
STEEL FRAMING
4 7/8"
TYPE 1 (U.N.O.)
ONE LAYER OF 5/8" GYPSUM WALLBOARD AT EACH SIDE
OF 3-5/8" 20 GA. NON STRUCTURAL METAL FRAMING AT 16"
O.C. HEIGHT VARIES, VERIFY IN FIELD.
DEFLECTION CHANNEL
WALL BASE, BOTH SIDES -
MATCH EXISTING 4" RUBBER
BASE
EXISTING STRUCTURAL
DECK
LOCATION
F I N I S H S C H E D U L E
MATERIAL BASIS OF DESIGN FINISH
SHERWIN WILLIAMS
SHERWIN WILLIAMS
MASONITE ASPIRO SERIES
MATCH EXISTING CORRIDOR
MATCH ADJACENT WALLS
MATCH ADJACENT FRAMES
SOLID CORE DOOR/WOOD VENEER. MATCH
EXISTING FINISH, COLOR, AND CUT.
MATCH EXISTING CORRIDOR
PAINT, P-1
PAINT, P-2
DOORS
LUXURY VINYL TILE
WALL PAINT - ALL NEW GYPSUM/CMU
ALL NEW DOOR FRAMES
DOOR SLAB
CORRIDOR OUTSIDE ROOM 2A156A
P1
A101
SIM
A101
SIM
A101
SIM
A101
SIM
LEVEL NAME W/ ELEVATION
NEW GRID HEAD
CALL OUT HEAD W/ SHEET NUMBER
ROOM NAME W/ ROOM NUMBER, AREA
& OCCUPANCY
BUILDING SECTION NUMBER W/ SHEET
NUMBER
WALL SECTION NUMBER W/
SHEET NUMBER
DOOR NUMBER
WALL TAG
KEYNOTE
REVISION TAG
FINISH TAG
DETAIL SECTION NUMBER W/
SHEET NUMBER
NORTH ARROW
LEVEL
ELEVATION
ROOM NAME
150 SF
S Y M B O L S
WINDOW TAGA
0 EXISTING GRID HEAD
10'-0" CEILING HEIGHT TAG
N
A B B R E V I A T I O N S
NEW THROUGH WALL POSITIVE PRESSURE
INDICATOR ABOVE DOOR AS SCHEDULED
PROVIDE NEW FULL FRAME PERIMETER
GASKETING AT EXISTING FRAME
EQ EQ
PROVIDE NEW DOOR SWEEP AT EXISTING
DOOR
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s /C le v e la n d
V A
T e m p a n d
H u m id it y C o n tr o ls
/F F
E
C le v e la n d
T e m p
H u m id it y C o n tr o ls
A
R C
H rv t
/9 /2
:3
:3
P M
GI001
SCHEDULES, PARTITION TYPES
AND ABBREVIATIONS
02/09/2024 SS NM
TEMPERATURE AND HUMIDITY
CONTROLS TO SPS STORAGE
541-23-201
CLEVELAND, OHIO
100% CONSTRUCTION
DOCUMENTS
LOUIS STOKES
VA MEDICAL
CENTER Approved: Owner
1. BUILD PARTITIONS IN ACCORDANCE WITH PARTITION SCHEDULE AND DESIGN REFERENCED.
REFERENCES ARE TO LATEST EDITION OF GYPSUM ASSOCIATION (GA) FIRE RESISTANCE DESIGN
MANUAL, OR TO UNDERWRITERS LABORATORY (UL) FIRE RESISTANCE DIRECTORY.
2. ALL WALLBOARD IS TO BE TYPE "X" UNLESS NOTED OTHERWISE.
3. PARTITION TYPES INDICATED ARE CONTINUOUS TO A CORNER OR AN INTERSECTING PARTITION, UNLESS INDICATED OTHERWISE. WHERE PARTITIONS OF DIFFERENT THICKNESSES MEET, MAINTAIN A FLUSH SURFACE ON THE SIDE WHERE FACES ARE STRAIGHT AND CONTINUOUS, UNLESS NOTED
OTHERWISE.
4. METAL STUD GAUGES SCHEDULED ARE THE MINIMUM REQUIRED, AND MAY BE INCREASED BY
SPECIFICATIONS TO ACCOMMODATE LOADS, FINISHES, OR UNBRACED CEILING HEIGHT LIMITS. DO
NOT CONSIDER CEILING SYSTEM(S) AS A PARTITION BRACING ELEMENT.
5. WOOD AND PLYWOOD BLOCKING TO BE FIRE RETARDANT TREATED (FRT).
6. EDGES OF GYPSUM WALL BOARD (GWB) LEFT EXPOSED TO VIEW, OR ABUTTING DISSIMILAR
MATERIAL, IS TO BE FINISHED WITH METAL "L" BEAD TRIM AND COMPOUND UNLESS NOTED
OTHERWISE.
7. PARTITION SCHEDULE IS BASED ON THE USE OF GYPSUM WALL BOARD (GWB), BUT FACING BOARD
MAY VARY, DEPENDENT ON FINAL FINISH SCHEDULED FOR THAT PARTITION.
8. ALL FIRE RATED WALL AND FLOOR PENETRATION MUST COMPLY WITH ASTM-E814
9. ALL DOOR OPENINGS SHALL BE 4" FROM A PERPENDICULAR PARTITION TO OUTSIDE FACE OF FRAME, UNLESS NOTED OR DETAILED OTHERWISE.
10. ALL PARTITIONS, INCL. STUDS, BOARD, ETC. TO EXTEND FROM TOP OF FLOOR SLAB TO UNDERSIDE
OF CONCRETE SLAB ABOVE UNLESS OTHERWISE NOTED.
11. CONTRACTOR IS TO CLOSE OFF ANY VOIDS LEFT AS A RESULT OF ANY REMOVALS AND NEW CONSTRUCTION, AS WELL AS INFILL ANY EXISTING VOIDS IN NEWLY DESIGNATED FIRE RATED PARTITIONS. ALL PATCHES SHALL MATCH AND ALIGN WITH SURROUNDING MATERIALS AND SHALL BE
IN ACCORDANCE WITH NFPA CODE.
12. REFER TO NEW ARCHITECTURAL FLOOR PLANS FOR PARTITION TYPE DESIGNATIONS.
13. CONTRACTOR SHALL SEAL PARTITION WALLS AROUND ALL M.E.P. PENETRATIONS OR OPENINGS, RESULTING FROM M.E.P. INSTALLATIONS INCLUDING BUT NOT LIMITED TO THE SLAB, ABOVE AND
BELOW CEILINGS.
14. NO EXISTING FIREPROOFING IS TO BE REMOVED FROM EXISTING BUILDING STRUCTURE FOR ANY
NEW INSTALLATION FOR ANY REASON.
15. ALL INTERIOR PARTITIONS ARE TO BE CONSTRUCTED FROM FLOOR TO DECK, AND ALL
PENETRATIONS SEALED. THIS INCLUDES SEALING ABOUT PIPE/DUCT/CONDUIT PENETRATIONS. THE METHOD OF SEALING THE PENETRATIONS SHALL BE CONSISTENT WITH THE RATING – IF ANY – OF
THE WALL.
16. LABEL ALL RATED PARTITIONS (FIRE & SMOKE) ABOVE THE CEILING, ON BOTH SIDES OF THE WALL.
G E N E R A L N O T E S
1" = 1'-0"
WALL TYPE
A.C.M. ASBESTOS CONTAINING MATERIALS
ACT ACOUSTICAL CEILING TILE
AFF ABOVE FINISH FLOOR
B.U.R. BUILT-UP ROOFING
BLDG. BUILDING
C.B. CATCH BASIN
C.B.B. CEMENTITIOUS BACKER BOARD
C.J. CONSTRUCTION JOINT
C.O. CONTRACTING OFFICER
C.O.R. CONTRACTING OFFICER'S REPRESENTATIVE
CC CONTRACTOR FURNISHED AND INSTALLED
CLR. CLEAR
CMU CONCRETE MASONRY UNIT
CPT CARPET
CT CERAMIC TILE
CTR. CENTER
CV CONTRACTOR FURNISHED/ V.A. INSTALLED
DET. DETAIL
DIA. DIAMETER
DIM. DIMENSION
E OR (E) EXISTING
E.J. EXPANSION JOINT
E.W. EACH WAY
EA. EACH
ETR EXISTING TO REMAIN
EXT. EXTERIOR
F.D. FLOOR DRAIN
F.E. FIRE EXTINGUISHER
F.E.C. FIRE EXTINGUISHER CABINET
F.O.B. FACE OF BUILDING
F.O.C. FACE OF CONCRETE
FIN. FINISH
FTG. FOOTING
G.B. GRAB BAR
GYP GYPSUM BOARD
H.M. HOLLOW METAL
H.S.S. HOLLOW STRUCTURAL STEEL
M.E.P. MECHANICAL, ELECTRICAL, PLUMBING
M.R. MOISTURE RESISTANT
MECH. MECHANICAL
MFG. MANUFACTURER
MIN. MINIMUM
MISC. MISCELLANEOUS
MOD. MODULAR
MTD. MOUNTED
N OR (N) NEW
N.I.C. NOT IN CONTRACT
N.T.S. NOT TO SCALE
O.C. ON CENTER
O.D. OUTSIDE DIAMETER
P. PAINT
P.S.F. POUNDS PER SQUARE FOOT
P.S.I. POUNDS PER SQUARE INCH
PL. PLATE
PT PORCELAIN TILE
Q.T. QUARRY TILE
R.C.P. REFLECTED CEILING PLAN
R.D. ROOF DRAIN
R.O. ROUGH OPENING
RAD. RADIUS
RB RUBBER BASE
REF. REFERENCE
RES RESINOUS FLOORING
S.D. STORM DRAIN
S.S. SANITARY SEWER
SF SQUARE FOOT (FEET)
SIM. SIMILAR
SPEC. SPECIFICATION
SS STAINLESS STEEL
T.J. TOOL JOINT
T.O.C. TOP OF CURB
T.O.P. TOP OF PAVEMENT
T.S. TUBE STEEL
TYP. TYPICAL
U.N.O. UNLESS NOTED OTHERWISE
V.C.T. VINYL COMPOSITION TILE
V.I.F. VERIFY IN FIELD
VC V.A. FURNISHED/ CONTRACTOR INSTALLED
VT VINYL TILE
VV V.A. FURNISHED AND INSTALLED
W.C. WATER CLOSET
WSF WELDED SEAM SHEET FLOORING
NOTES:
1. NEW DOOR
A. HARDWARE SET 1.0 (SEE SPECIFICATIONS)
B. SOLID CORE WOOD DOOR TO MATCH EXISTING COLOR AND FINISH
C. HOLLOW METAL FRAME PAINTED P-2
2. NEW PERIMETER GASKETING AT EXISTING DOOR FRAME AND NEW DOOR SWEEP AT EXISTING DOOR - SEE
HARDWARE SET 1.0 IN THE SPECIFICATIONS FOR GASKETING DOOR SWEEP.
3. NEW POSITIVE PRESSURE INDICATOR
4. ALL DOORS ARE EXISTING TO REMAIN UNLESS NOTED OTHERWISE.
D O O R S C H E D U L E
MARK
DIMENSIONS
TOTAL PANELS NOTES
NEW DOOR
CLOSERWIDTH HEIGHT THICKNESS
BB527 3' - 0" 7' - 0" 0' - 1 3/4" 1 2, 3
BC435 4' - 0" 7' - 0" 0' - 1 3/4" 1 2, 3
BC437 4' - 0" 7' - 0" 0' - 1 3/4" 1 2, 3
BC519 3' - 0" 7' - 0" 0' - 1 3/4" 2 2, 3
BC519A 3' - 0" 7' - 0" 0' - 1 3/4" 1 2, 3
1-L871 3' - 0" 7' - 0" 0' - 1 3/4" 1 2,3
2A142 3' - 0" 7' - 0" 0' - 1 3/4" 1 2, 3
2A156 3' - 0" 7' - 0" 0' - 1 3/4" 1 1
2B309 3' - 0" 7' - 0" 0' - 1 3/4" 1 2, 3
2B310 3' - 6" 7' - 0" 0' - 1 3/4" 1 2, 3
2C143 3' - 0" 7' - 0" 0' - 1 3/4" 1 2, 3
2C144A 4' - 2" & 1' - 0" 7' - 0" 0' - 1 3/4" 2 2, 3
2C145A 3' - 0" 7' - 0" 0' - 1 3/4" 1 2, 3
2C147A 4' - 0" & 1' - 0" 7' - 0" 0' - 1 3/4" 2 2, 3
2C148 3' - 0" 7' - 0" 0' - 1 3/4" 1 2, 3
2C431B 3' - 0" 7' - 0" 0' - 1 3/4" 1 2, 3 Yes
2C432B 3' - 0" 7' - 0" 0' - 1 3/4" 1 2, 3 Yes
2D253 3' - 0" 7' - 0" 0' - 1 3/4" 1 2, 3
3A107 4' - 0" 7' - 0" 0' - 1 3/4" 1 2, 3 Yes
3A147A 3' - 0" 7' - 0" 0' - 1 3/4" 1 2, 3
4AC323 4' - 0" 7' - 0" 0' - 1 3/4" 1 2, 3
4AC324 3' - 0" 7' - 0" 0' - 1 3/4" 1 2, 3
4AC325 3' - 0" 7' - 0" 0' - 1 3/4" 1 2, 3
4AC327 4' - 0" 7' - 0" 0' - 1 3/4" 1 2, 3
4AC344 4' - 0" 7' - 0" 0' - 1 3/4" 1 2, 3
5A113C 3' - 0" 7' - 0" 0' - 1 3/4" 1 2, 3
1/2" = 1'-0"
TYPICAL DOOR/ FRAME ELEVATION
DN
DN
DN
DN
Sub-Basement Access
BE361D
Elect
BE361B
Corridor
BE361C
Toilet-Staff
BE351
Toilet-Unisex
BE350
EMS
BE352
Main Street
BE300
Corridor
BE361A
Equip. Alcove
BE338
Lab-8B Apt Animal Procedure
BE336
Procedure-Animal
BE334C
Equip. Alcove
BE334A
Office
BE334B
Lab-Biomechanical
BE334
Elect
BD330A
Corridor
BD330
Equip. Alcove
BD326
Lab-Research
BD324
Lab-Research
BD322
Lab-Research
BD318
Lab-Research
BD316
Toilet-Female
BD312A
Toilet-Male
BD312
Lab-Procedure
BD310
Office
BD313
Lab-Procedure
B-D355
Cold Room
BD317
Equip. Alcove
B-D357A
Office
BD319
Equip. Alcove
BD314
Equip. Alcove
BD320
Office
BD321
Lab-Procedure
B-E363
Office
BD325
Corridor
BD331
Office
BE333A
Equip. Alcove
BE335
Office
BE337A
Office
BE339
Tissue Culture
BE363A
PI Offices
BE216
Office-Spinal Cord PI
BE217
Patient Interview
BE218
Toilet
BE219
Closet
BE220
Computer Room
BE215
Corridor
BE211
Stair 18
BS18
HAC
BE214
Prosthetics Lab
BE213A
Lab-Robotics
BE213B
Work Room
BE212
Waiting/ Reception
BE210
Corridor
BD300
Closet
BE252A
Lab-Skin
BE252
Spinal Cord Staff
BE251
Electronics Lab
BE242
Corridor
BE250
Spinal Cord Staff
BE241
Lab-BCI
BE253
Surgery
BF333 Scrub and Gown
BF335
Surgery
BF334
Tech
BF313
Data
BF312
Surgical Work
BF332
Sterile
BF332A
Closet-EMS
BF311
Linen
BF302
Surgery Prep.
BF331 Corridor
BF330
Corridor
BF314
Clean Cage Prep
BF343
Corridor
BF340
Corridor
BF340A
Supplies
BF341
Post Operative Ward
BF325
Office
BF321
Corridor
BF310
Corridor
BF320
Storage
BF324
Toilet-Female
BF323
Toilet-Male
BF322
Animal Room
BF342
Cage Washer
BF344
Elect
D06A
Lab
BE360B
Lab
BE360A
Corridor
BD327
Corridor
BD311
Corridor
B-D311
Corridor
BE361
Office
B-D359
Lab
Breakroom
B-E381
Storage
B-E392B Office-M&O Supv.
B-E383
Office-Micro
B-E392
Lab
B-E341
Office-Pipe Plumb. Supervisor
B-E392A
HAC
D06B Stair 19
BS19
Lab
B-E337
Prog. Clerk
B-E380
Elect
CD02A
Lab
B-E333
Corridor
B-D332
Closet
B-E363G
Closet
B-E363F
Office
B-D365 Office
B-D361
Corridor
B-D350
Lab
B-D360
Lab
B-D358
Lab
B-D356
Cold Room
B-D357
Office
B-D353
Lab
B-D354
Stair 15
BS15
Conference
B-D352
Corridor
CE02
Toilet-Male
BB435
Storage
BB434
Lockers
BB437
Corridor
BC400C
Storage
BB456
Uniform Pick-up/Drop-Off
B-D410
Office-M&O Supv.
B-E382
Corridor
BC460
Storage
BB427A
Clean Linen
B-D412
Soiled Linen
B-D414
Toilets
B-E423
Lockers-Female
B-E425
HVAC Shop
B-E430
Lockers-Male
B-E424
Office-Electrical Shop Supervisor
B-E440A
Electrical Shop
B-E440
Corridor
CD02
Corridor
D23
Office-HVAC Shop Supervisor
B-E430A
Locksmith
B-E480B
Carpentry Shop
B-E480
Paint Shop
B-E490
Corridor
D25
Fire Alarm System
B-E440C
Electronics Shop
B-E460
Storage
B-E480C
Machine Shop
B-E470
Office-Paint Shop Supervisor
B-E490A
Office-Machine Shop Supervisor
B-E470A
Office-Contr/End Shift Supv.
B-E499
Transformer Room
D21
Storage
D20A
Mechanical
D20
Mechanical & Electrical Room
BD482
Corridor
BB502
Corridor
BB450
Corridor
BD420
Mechanical
BD424
Primary Switch Room
BD423
Primary Switch Room
BD422
Elect
BD421
Storage
BD480
Storage
BD481
Elect
BD470
Paint Shop
BD460
Stair 14
BS14
Corridor
CG01
Repair Station
BC490M
Repair Station
BC490N
Repair Station
BC490L
Ref. & Files
BC490OOffice-Supv
BC491
Repair Station
BC490B
Repair Station
BC490C
Repair Station
BC490E
Receiving & Cleaning
BC490A
Repair Station
BC490I
Showers-Female
BC482A
Repair Station
BC490F
Repair Station
BC490G Repair Station
BC490H
Bio Med
BC490
Repair Station
BC490J
Repair Station
BC490K
Nuc Med CT
BC468
Inject
BC461
Reading
BC467
Marconi Equipment Room
BC475
Soiled
BC466
Patient Holding
BC464
Holter
BC449
Thyroid Uptake
BC448
Toilet
BC462
Nuc Med CT
BC453
Elect
BC479
Nuc Med
BC452
Patient Holding
BC463
Echo Stress
BC447
Office
BB428
Office
BB426
Single-Plane Angiography
BB601
Closet-Eng.
BB545
Corridor
BB540
Radiography
BB541
Control
BB542
Corridor
BB539
Lab-Gait
BB322
Office
C15D
Office
C15C
Office
C15B
Stair 10
C15A
Closet
C15E
Elect
BB323
Stair
BB329
HAC
BB308
Corridor
BB300B
Corridor
BB300D
Office
BB332
Office
BB334
Office
BB335
Office
BB336
Office
BB337
Reception
BB310
Data
BB309
Corridor
BB300A
Office/ Exam Rm.
BB311
Office/ Exam Rm.
BB312
Alcove
BB200D
Soiled Linen Room
BB333
Exam
BB338
Exam
BB339
Exam
BB340
Storage
BB316
Corridor
BB400
Corridor
BB400A
Office-Rad.
BB401
Office-Rad.
BB402
Office-Rad.
BB403
Exam
BB411
Work Room
BB413
Pt/ Rt Work
BB412 Shower-Staff
BB413A
Toilet
BB413B
Vestibule
BB410
Lockers-Male
BB416
Lockers-Female
BB417
Corridor
BB415
Storage
BB418
Stair 10
BS10
Service Room
BB419
Theraputic Pool
BB421
Data
BB472Closet
BB471
Elect
BB473
Office
BB468
Lounge
BB438
Stair 11
BS11
Police Training
BAC323
Office
BAC323B
Control
BB582B
Radiographic Fluoroscopic
BB533
Control
BB531A
Radiographic Fluoroscopic
BB531
Clean Utility
BB565
Storage-System
BB563
Soiled Utility
BB567
Toilet
BB463
Office
BB452
Toilet
BB464
Office
BB466
Office
BB482
Office
BB467
Office
BB458
Office
BB483
Office
BB459
Office
BB462
Office
BB453
Corridor
BB470
Copy
BB455
Office
BB433
Corridor
BB440
Office
BB445
Office
BB444
Office
BB454
Office
BB443
Clean Linen
BB569
Office
BB442
Office
BB432
Corridor
BB430
Office
BB457
Corridor
BC502
Clean Storage
BC425
Staff
BC451
Office-Diabetes Coordinator
BC424
Echo Stress
BC445 Fes. Treatment
BC420
Corridor
BC400A
Diabetes Education
BC423
Dietitian
BC422
Dietitian
BC421
Conference
BC410
Corridor
BB460
Office-Engineering
BC444
Reading
BC443
Cardiology Tech
BC442 Corridor
BC400
Corridor
BC440
Corridor
BC430
Staff
BC441
Echo
BC437
Echo
BC435
Echo
BC433
EKG
BC436
Storage
BC432
EKG
BC434
Lab-Exercise
BC446
Rad. Waste
BC446A
Nuc Med
BC474
Soiled
BC431
Reception
BC471A
Work Room
BC471
Corridor
BC470A
Interview
BC473
Toilet
BC472
Waiting
BC470
Storage-Biohazard
E26
Toilet-Male
BC481B
Corridor
BC470B
Lockers-Female
BC482
Lockers-Male
BC481
Corridor
CE03
Service Lobby
BC404
Office-Tech Supv.
BC311
Office-IP Chief
BC312
Alcove
BC313
Alcove
BC314
Office-Engineering
BC315
Office-Assistant Chief
BC316
Secretary & Waiting
BC317
Office-Chief Pharm.
BC318
Office-Admin. Assist.
BC319
Office-Clinic Coord.
BC320
Data
BB379
Office Area
BC322
Corridor
BC402
Closet
BB375A
Laminating Room
BB375
Machine Room
BB374
Cad Room
BB373
Corridor
BC401
Tech Area
BB372
Paster Room
BB376
Office
BB377
Exam-Casting Room
BB378 Vestibule
BB370
Gait Room
BB371
Corridor
BB300E
Elect
BB362Vestibule
BB360
Inventory Storeroom
BB361
Conference
BB261
Corridor
BB260
Reception
BB262
Office
BB262A
Student Office
BB266
Student Office
BB267
Office
BB268
Office
BB270
Engineers
BB272
IR/ Video
BB283
Eye/ Head Room
BB284
Coil Room
BB286
Corridor
BB280
Coil Room
BB285
Shop
BB282
Moog Room
BB281
Stair 8
BS8
Storage
BB269
Office
BB265
Office
BB264
Exam Visual Test
BB263
HD Anteroom
BC328
Lockers
BC307A
Storage
BC307B
Vault
BC310
IV Workstation
BC309
Sterile
BC308
EMS
BC302
Storage
BC303
Breakdown
BC304
Storage
BC301
Main Street
BD300A
Lobby
BD300B
Stair 16
BS16
Mechanical
BC310A
Elevator Lobby
BC403
Corridor
Storage
BE440B
Office-Carpt. Shop Supv.
B-E480A
Office
BB427
Toilet
BB533B
Corridor
BB531C
Toilet
BB531B
Equipment-Angio
BB547
Storage
BB581A
CT
BB581
Control
BB581B
CT
BB582
Closet
BB582D
Storage-Sterile
BB561
Corridor
BB560
Staff Work
BB570
Toilet-Patient
BB602
Scrub
BB603
Control
BB605B
BI-Plane Angiography
BB605
Storage
BB604
Elect
C13A
Control
BC454
Closet
BB331
C13C
C13B
C15G
Corridor
BF402
Corridor
CG02
Prep/Recovery
BB600
Radiography
BB543
Radiographic Fluoroscopic
BB535
Control
BB534
Corridor
BB533C
Toilet
BB535B
Toilet
BB537
Office
BB451
CT/Ultrasound Sub-Waiting
BB507
HAC
BB495
Exam
BB491
Corridor
BB492
CR Copy/ Librarian
BB493
Office
BB494
Vestibule
B-D401A
Conference
BB497A
Storage
B-D408
Corridor
BB500
Office
BB431
Office
BB503
Office
BB441
Reading
BB505
Alcove
BB530B
Office
BB465
Control
BB601B
Office
BB429
Corridor
BB530
Closet
BB601C
Office
BB481
Toilet-Female
BB436
Waiting
BB410A
Corridor
BB300F
Repair Station
BC490D
Office
BB461
Office
BB497B
Room
BB600A
Corridor
BD401A
Shower
BE422
B-D414A
B-D409 B-D409A
B-D410A
HD Garbing
Anteroom-Non-HD
BC326
Garbing-Non-HD
BC325
Sterile Non-HD Buffer Area
BC324
Sterile HD Buffer Area
BC305
Open Work Area
BC327
Pharmacy-Inpatient
BC307
BC321
BC323
AE401
AE401
Switchgear
BE504
Pipe Tunnel
BE503
Stair
BE505
Exit Passage
BF501
Corridor
BF502
Elev Eq
BF503
Corridor
BF504
PALMS Neutralization Tanks
BF505
Mail Drop
BF509
Clerks-Warehouse
BF511
Storage-Warehouse
BF510
Corridor
BF520
Elect
BF521
Mail Sorting
BF522
Data
BF515
Engineering Closet
BF516
Corridor
BF526
EMS
BF527
Corridor
BF525
Breakroom/ Lockers
BF530
Toilet-Female
BF531
Toilet-Male
BF532
Clerks-TSS
BF535
Office-Storekeeper
BF536
Office-Storekeeper
BF537
Storage-Medical Gas
BF540
Elev Eq
BF541
Stair 23
BS23
Stair 22
BS22
Storage Bay
BF604
Storage Bay
BF605
Storage Bay
BF606
Hazardous Waste
BF469
Entry
BF473
Animal Ward
BF451
Animal Ward
BF453
Animal Ward
BF454
Animal Ward
BF455
Animal Ward
BF456
Machine Room
BF457
Electrical Vault
BF458
Bulk Food
BF459
Animal Ward
BF460
Animal Ward
BF461
Animal Ward
BF462
Necropsy
BF463
Vestibule
BF464Quarantine Ward
BF465
Reception-Animal
BF466
HVAC
BF467
Elect
BF468
Security
BF468A
Lab-Procedure
BF464A
Lab-Procedure
BF464B
Lab-Procedure
BF464C
Lab-Procedure
BF464D
Cooler
BF463A
Animal Ward
BF452
Bottle Washer
BF345
Bedding/ Food Staging
BF346Cage Assembly
BF347Sterilizer
BF347A
Sterile Cage Staging
BF349
Cage Assembly
BF346A
Corridor
BF350
Corridor
BF370
Corridor
BF371
Corridor
BF372
Stair 24
BS24
Mechanical
BF412
Water Filtration
BF411
Storage-Palms Bulk
BF410
Toilet-Female
BF401A
Toilet-Male
BF401B
Clean Supply
BF405
Office
BF406
Ancillary Testing
BF407
Office
BF408
Corridor
BF409
Storage-Palms Flammable
BF410A
EM Prep Room
BF440
Fluorescent Microscope
BF441
Microscope Room
BF442
Viewing Room
BF422
Corridor
BF403
Corridor
BF421
Hazardous Waste
BF424
Corridor
BF425
Office-Autopsy
BF426
Autopsy Room
BF427
Shower
BF428
EMS
BF429
Mortuary Refrigerator
BF430
Storage-Gross Specimen
BF431
Corridor
BF404
EM Chiller
BF420A
Lab Slide/ Block Storage
BF420B
Toilet
BF423
Corridor
BG401
Corridor
BG301
Stair 21
BS21
Stairway
BF-450
Room
BF442A
Office
BF410B
Elect
BA151
Stair 3
BS3
Office
BAC306
Work Room
BAC307
Data
BAC308
Elect
BAC309
Stair 1
BS1
Pharmacy-Outpatient
BAC311
Tech Sup. Mail Order
BAC312
Consult
BAC313
Supervisor
BAC316
Tech Supply
BAC317
Controlled Sub,/ Sec Disp
BAC318
Toilet-Staff
BAC319
Office
BAC320
Storage
BAC301
HAC
BAC302
Lockers/ Breakroom
BAC303
Consult
BAC321
Reception
BAC322
Waiting
BAC324
Elevator Lobby
BAC325
Waiting
BAC326
Corridor
BAC327
Corridor
BAC328
HVAC
BAC241
Data
BA149
Elect
BA148
Corridor
BAC299
Office-IT Work
BAC266
Office-4 Person
BAC265
Office-2 Person
BAC269Break Area/ Pantry
BAC270A
Collaboration Area
BAC270B
Office-Open
BAC270C
Reception/ Waiting
BAC260
Office-Regulatory/ Fiscal
BAC261
Office-2 Person
BAC262
Storage
BAC264
Office-Director
BAC271
Office
BAC272
Office
BAC273
Office-2 Person
BAC274 Office-2 Person
BAC275
Corridor
BAC260B
Copy/ Work Passage
BAC268
Corridor
BAC298
Corridor
BAC260C
Corridor
BAC260A
Office-Anti-Coagulation Clinic Open Office
BAC280
Corridor
BAC284 Office
BAC281
Storage-File Room
BAC285
Copy File/Work
BAC282
Breakroom
BAC283
Waiting
BAC250
Triage
BAC251
Exam
BAC252
Exam
BAC253
Exam
BAC254
Exam
BAC255
Records
BAC256
Office
BAC257
Soiled Holding
BAC258Clean Supply
BAC259
Conference
BAC286
Corridor
BAC250B
Toilet-Female
BAC329
Toilet-Male
BAC330
Storage
BA151A
Stair 4
BS4
Elect
BA150
Closet
BAC312A
Closet
BAC312B
Closet
BAC298A
Mechanical
BA109
Office
BA109C
Storage
BA150C
Bedroom
BF150
Bedroom
BF151
Bedroom
BF152
Clean Linen
BF153
Bedroom
BF154
Bedroom
BF155
Clean Utility
BF156
Bedroom
BF157
Bedroom
BF158
Bedroom
BF159
Nurse Practitioner
BF160
Soiled Utility
BF161
Storage-Non Food
BF162
Food Prep.
BF163
Dining
BF164
Nourishment
BF165
Soiled Food Carts
BF165A
Patient Lounge/ TV Room
BF216
Toilet
BF150A
Toilet
BF151A
Toilet
BF152A
Toilet
BF154A
Toilet
BF155A
Toilet
BF157A
Toilet
BF158A
Toilet
BF159A
Stair 27
BS27
Office-Multidisciplinary
BF123
Office-Nursing Home Administrator
BF122
Office-Multidisciplinary
BF124
Work Room
BF125
Admin. Workstations
BF126
Conference
BF127
Breakroom/ Lockers
BF134
Office-Physician
BF128
Storage-EMS
BF129
Office-Nurse Manager
BF130
Office-Adv. Pract.
BF131
Exam & Treatment Room
BF132
Toilet
BF133
Toilet-Staff
BF134A
Waiting-Family
BFC07D
Bedroom
BF106
Bedroom
BF107
Bedroom
BF108
Toilet
BF109
Toilet
BF110
Fire Command/ Police Station
BF111
Storage-Wheelchair
BFC05B
Toilet
BF108A
Vestibule
BFC05C
Elect
BFELC2
Office-Multidisciplinary
BF121
Toilet
BF106A
Toilet
BF107A
IRM Satellite Computer/ Equipment Room
BF101
Office
BF102
Bedroom
BF103
Bedroom
BF104
Bedroom
BF105
Toilet
BF105A
Toilet
BF104A
Toilet
BF102A
Toilet
BF103A
Office-EMS Supervisor
BF201
Trash Collection
BF202
EMS
BF203
Elect
BFELC1
Elevator Lobby-Service
BFC01B
Stair 25
BS25
Corridor
BFC01A
Corridor
BFC06
Corridor
BFC06A
Satellite Nurse Charting
BFC06B
Corridor
BFC06C
Corridor
BFC06D
Corridor
BFC06E
Corridor
BFC06F
Corridor
BFC06G
Corridor
BFC04
Public Elevator Lobby
BFC05
Vending
BFC07E
Alcove-Seating
BFC02B
Corridor
BFC02D
Vestibule
BFC02E
Satellite Nurse Charting
BFC02CMeds
BF218
Work Room
BFC07A
Nurse Station Ward Clerk
BFC07B
Crash Cart
BFC07C
Corridor
BFC07
Corridor
BFC08
Corridor
BFC08B
Corridor
BFC02F
Corridor
BFC01 Corridor
BFC01C
Corridor
BFC09
Soiled Utility
BF204
Storage-Equipment
BF205
Tub Room
BF206
Soiled Utility
BF207
Clean Utility
BF208
Clean Linen
BF209
Patient Laundry
BF210
Storage-Resident Clothing & Luggage
BF211
Clean Linen
BF212
Clean Utility
BF213
Toilet
BF214
Shared Workstations
BF215
Conference Patient/ Education
BF217
Office-Pharmacist
BF215A
Data
BFLVC1
Elect
BFLVC2
Bedroom
BF170
Bedroom
BF171
Bedroom
BF172
Bedroom
BF173
Bedroom
BF174
Bedroom
BF175
Lockers/ Toilets
BF176
Toilet
BF176A
Toilet
BF176B
Toilet
BF170A
Toilet
BF171A
Toilet
BF172A
Toilet
BF173A
Toilet
BF174A
Toilet
BF175A
EMS Satellite Supply Equipment Room
BF191
Mechanical
BF192
Corridor
BFC01D
Soiled Linen Collection
BF190
Corridor
BFC02
Corridor
BFC03
Corridor
BFC02A
Stair 26
BS26
Shower
BF176C
Alcove-Equipment
BFC08A
Storage
BFCO2CA
Elect
BF193
AE401
AE401
Exam
BB214
Exam
BB215 Exam
BB216
Mechanical
BB217
Office
BB218
Breakroom
BB219
Stretcher
BB220
CT Scan
BB223
Mechanical
BB224
Linear Accelerator
BB225
Computer
BB229
Breakroom
BB231
Control
BB230
Physicist
BB235
Mold Room
BB236
Physicist
BB238
Nurse
BB240
Elect
BB241
Staff
BB242
Reception
BB211
View/Cons
BB213
Waiting
BB226HAC
BB227
Doctor
BB237
Office-Chief
BB239
Waiting
BB212
Corridor
BB210
Corridor
BB210A
Corridor
BB210B
Corridor
BB221
Corridor
BB210D
Corridor
BB210E
Bio Med
BB233
Linear Accelerator
BB232
Office
BB226B
Office
BB226C
Toilet
BB226A
Toilet
BB228
Chiller
BB234
Dosimetry
BB222
Stair 6
BS6
Mechanical
BE260
Elect
BE261
Corridor
BE232
Workstations
BE231
Lab
BE236
Lab
BE237
Lab
BE238
Lab
BE239
Corridor
BE233
Storage
BE239A
Brain Scan
BE235C
Lab
BE240 Office
BE234
Lab
BE235B Lab
BE235A
Storage
BE260A
Cubicle
BE235A4
Cubicle
BE235A3
Cubicle
BE235A2
Cubicle
BE235A1
Corridor
BB621
Secretary-Chief
BC571
Office-Chief
BC572
Office-Phys
BC573
Office-Phys
BC574
Data
BC505
PET CT
BC527
Closet
BC527D
Closet
BC527C
Closet
BC527B
Equipment
BC523B
Control
BC523C
Control
BC523A
PET CT
BC519
Inject
BC512
Toilet-Patient
BC514
Inject
BC516
Corridor
BC510
Inject
BC520
Storage
BC518A
Lab-Hot
BC518
Sample Count
BC557
Interview
BC555
Storage-Collimator
BC540
EMS
BC541
Sub Waiting
BC552
Kitchen
BC554Office-BioMed
BC581
Office-Medicine Service
BC583
Storage-BioMed
BC597
Storage-EMS Equipment
BC598
Office-Asst Chief
BC593
Office-Chief
BC594
Storage
B-C595 Office-Open
BC592
Secretary
BC590
Conference
BC558
Techs Bio Safety
BC560
Reading
BC559
Inject
BC524
Toilet-Patient
BC522
Pat Hold (Hot)
BC526
Pat Hold (Hot)
BC528
Soiled-Utility
BC530
Storage
BC532
Toilet-Staff-Male
BC567
Toilet-Staff-Female
BC565
Elect
BC563
RHS Work Refrig
BC561
Office-Rad Safety
BC562
Office
BC564
Office-Coord
BC566
Corridor
BC570
Storage-EMS Equipment
BC599
Corridor
BC556
Conference
BC591
Corridor
BC550
Closet
BC519B
Closet
BC519C
Corridor
BC580
Closet
BC519D
Office
BB620
Office
BB618
Office
BB616
Corridor
BB610
Breakroom
BB553
EMS
BB554
Corridor
BB552
Elect
BB551 Corridor
BB586
Vestibule-CT
BB580
CT
BB583
Closet
BB583A
Toilet
BB526B
Toilet
BB524B
Ultrasound
BB528
Ultrasound
BB526
Toilet
BB528B
Storage
BB527
Ultrasound
BB524
Ultrasound
BB523
Corridor
BB520
Storage-Stretcher
BB525
Bone Density
BB511
Toilet
BB523B
Interview
BB521DED. Chest
BB514
Office
BB617
Office
BB615
Office
BB613
Micro Receiving
BB611
Sub Waiting
BB549
Control
BB583B
Toilet
BB587
Storage-CT
BB588
Toilet
BB614
Toilet
BB612
Storage
BB622
Stair 12
BS12
Room
BB510
MH100-2
MH100-1
MH100-2
G E N E R A L N O T E S
A. REFER TO COVER SHEET FOR ADDITIONAL GENERAL NOTES.
B. PROVIDE DUST SEPARATION FOR THE CONSTRUCTION AREA AT THE BEGINNING OF EACH SHIFT. AT THE END OF EACH SHIFT, REMOVE DUST SEPARATION AND CLEAN AREA AS REQUIRED. PROVIDE STICKY WALK-OFF MATS AT ENTRANCE TO CONSTRUCTION AREA AND PROVIDE CONSTRUCTION SIGNAGE STATING "DANGER -CONSTRUCTION AREA, AUTHORIZED
PERSONNEL ONLY".
C. MAINTAIN ALL EGRESS PATHS - NO EXITS TO BE BLOCKED.
D. ALL CONSTRUCTION ENTRY DOORS ARE TO USE VA STANDARD DOOR HARDWARE AND KEYED ALIKE WITH VA STANDARD
LOCKSETS.
E. ALL CONSTRUCTION ENTRANCE DOORS ARE TO REMAIN LOCKED AT ALL TIMES.
F. ALL CONSTRUCTION ENTRANCES ARE REQUIRED TO HAVE STICKY WALK-OFF MATS ON INSIDE AND OUTSIDE OF
WORKSPACE.
G. AFTER HOURS WORK TO TAKE PLACE BETWEEN 6:00 PM - 5:30 AM, MONDAY - FRIDAY, ALL DAY SATURDAY & SUNDAY.
H. TEMPORARY WALL REMOVAL TO TAKE PLACE AFTER STANDARD OPERATING HOURS.
I. ANY WORK TO BE COMPLETED ABOVE NOISE LEVELS INDICATED IN SPECIFICATIONS SHALL BE DONE AFTER HOURS AND COORDINATED WITH THE CONTRACTING OFFICER'S REPRESENTATIVE (COR) AT NO PREMIUM COST TO THE GOVERNMENT.
J. IF HAZARDOUS MATERIAL IS ENCOUNTERED INSIDE EXISTING WALLS AND/OR AREAS NOT VISIBLE PRIOR TO DEMOLITION, CONTRACTOR SHALL CONTACT OWNER FOR ABATEMENT.
K. IT IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO ENSURE ALL BUILDING AND CONSTRUCTION CODES ARE
MET FOR EACH PHASE PRIOR TO OCCUPANCY BEING GRANTED.
L. VERIFY EXISTING CONDITIONS BEFORE BID AND CONSTRUCTION.
M. EACH ZONE CAN BE COMPLETED CONCURRENTLY WITH OTHER ZONES.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s /C le v e la n d
V A
T e m p a n d
H u m id it y C o n tr o ls
/F F
E
C le v e la n d
T e m p
H u m id it y C o n tr o ls
A
R C
H rv t
/9 /2
:3
:5
P M
AE100
BASEMENT FLOOR OVERALL PLAN
02/09/2024 SS NM
TEMPERATURE AND HUMIDITY
CONTROLS TO SPS STORAGE
541-23-201
CLEVELAND, OHIO
100% CONSTRUCTION
DOCUMENTS
LOUIS STOKES
VA MEDICAL
CENTER Approved: Owner
N
1" = 30'-0"
BASEMENT FLOOR OVERALL PLAN
K E Y P L A N
CARES
TOWER
ENERGY
CENTER
WAREHOUSE
RESEARCH
CENTER
BUILDING ONE
SURGERY
EXPANSION
AMBULATORY
CARE
VA
ANNEX
MICU
ADDITION
MENTAL
HEALTH
RADIOLOGY
Elevated Walkway
1F601
Vestibule
1F620
Stair
1F621
G E N E R A L N O T E S
A. REFER TO COVER SHEET FOR ADDITIONAL GENERAL NOTES.
B. PROVIDE DUST SEPARATION FOR THE CONSTRUCTION AREA AT THE BEGINNING OF EACH SHIFT. AT THE END OF EACH SHIFT, REMOVE DUST SEPARATION AND CLEAN AREA AS REQUIRED. PROVIDE STICKY WALK-OFF MATS AT ENTRANCE TO CONSTRUCTION AREA AND PROVIDE CONSTRUCTION SIGNAGE STATING "DANGER -CONSTRUCTION AREA, AUTHORIZED
PERSONNEL ONLY".
C. MAINTAIN ALL EGRESS PATHS - NO EXITS TO BE BLOCKED.
D. ALL CONSTRUCTION ENTRY DOORS ARE TO USE VA STANDARD DOOR HARDWARE AND KEYED ALIKE WITH VA STANDARD
LOCKSETS.
E. ALL CONSTRUCTION ENTRANCE DOORS ARE TO REMAIN LOCKED AT ALL TIMES.
F. ALL CONSTRUCTION ENTRANCES ARE REQUIRED TO HAVE STICKY WALK-OFF MATS ON INSIDE AND OUTSIDE OF
WORKSPACE.
G. AFTER HOURS WORK TO TAKE PLACE BETWEEN 6:00 PM - 5:30 AM, MONDAY - FRIDAY, ALL DAY SATURDAY & SUNDAY.
H. TEMPORARY WALL REMOVAL TO TAKE PLACE AFTER STANDARD OPERATING HOURS.
I. ANY WORK TO BE COMPLETED ABOVE NOISE LEVELS INDICATED IN SPECIFICATIONS SHALL BE DONE AFTER HOURS AND COORDINATED WITH THE CONTRACTING OFFICER'S REPRESENTATIVE (COR) AT NO PREMIUM COST TO THE GOVERNMENT.
J. IF HAZARDOUS MATERIAL IS ENCOUNTERED INSIDE EXISTING WALLS AND/OR AREAS NOT VISIBLE PRIOR TO DEMOLITION, CONTRACTOR SHALL CONTACT OWNER FOR ABATEMENT.
K. IT IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO ENSURE ALL BUILDING AND CONSTRUCTION CODES ARE
MET FOR EACH PHASE PRIOR TO OCCUPANCY BEING GRANTED.
L. VERIFY EXISTING CONDITIONS BEFORE BID AND CONSTRUCTION.
M. EACH ZONE CAN BE COMPLETED CONCURRENTLY WITH OTHER ZONES.
Stair
1-L990
Elect
1-L936
Toilet-Female
1-L913
Data
1-L912
Lockers
1-L913A
Corridor
1-L910
Toilet-Male
1-L915
Lockers
1-L915A
HAC
1-L914
Lobby
1-L902
Office-3D Lab
1-L959
Computer Training Classroom
1-L955
Computer Training Classroom
1-L954
Storage
1-L953
Corridor
1-L950
EMS Storage
1-L911
Storage
1-L931
Office
1-L921
Debrief Room
1-L923
Lounge-Student
1-L924
Office
1-L952
Exam
1-L941 Exam
1-L942 Exam
1-L943 Exam
1-L944
Exam
1-L935
Exam
1-L934
Exam
1-L933
Exam
1-L932
Exam Review
1-L938
Lab-3D Printing
1-L957
Control
1-L956
Office-Director
1-L922
Corridor
1-L920
Corridor
1-L930
Corridor
1-L940
Corridor
1-L937
Toilet-Male
1-L951
Toilet-Female
1-L925
Mammography
1-L891
Procedure
1-L890
Toilet
1-L890A Toilet
1-L891A
Elect
1-L892
Exam
1-L882
Exam
1-L881
Soil
1-L881A
Exam
1-L843 Group
1-L842
Exam
1-L845
Exam
1-L880
Toilet
1-L845A
Toilet
1-L850A
Swing Space
1-L877
Breakroom
1-L874
Exam
1-L850
Exam
1-L851
Toilet
1-L851A
Office
1-L864
Exam
1-L852
Toilet-Male
1-L860
Toilet-Female
1-L861
Back Flow Room
1-L862
EMS
1-L863
REC
1-L822
Nurse / Intake
1-L823
Nurse / Intake
1-L824
Exam
1-L825
Waiting
1-L821
Lobby
1-L800
Stair
1-L899
Elevator Lobby
1-L800A
Lobby
1-L802
Stair
1-L802A
Exam
1-L826 Exam
1-L830 Exam
1-L832
Storage-ENG / SEC
1-L806 Office
1-L807
Storage
1-L808
Elect
1-L805 Toilet
1-L809
Elect
1-L836
Elect
1-L834
Conference
1-L837
Office
1-L838
Lounge
1-L810
Data
1-L804
Storage
1-L811
Corridor
1-L803 Vestibule
1-L801
Office
1-L841
Office
1-L839
PACT Team
1-L833
Equipment
1-L835
Toilet
1-L831
Toilet
1-L846
Soil
1-L829
Sterile Supply
1-L828
PACT
1-L827 Corridor
1-L800D
Corridor
1-L800H
Corridor
1-L800G
Corridor
1-L820 Corridor
1-L853
Corridor
1-L800C
Corridor
1-L854
Sterile Supply
1-L871
Office
1-L883
AE401
MH101
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s /C le v e la n d
V A
T e m p a n d
H u m id it y C o n tr o ls
/F F
E
C le v e la n d
T e m p
H u m id it y C o n tr o ls
A
R C
H rv t
/9 /2
:3
:0
P M
AE101
FIRST FLOOR OVERALL PLAN
NORTH
02/09/2024 SS NM
TEMPERATURE AND HUMIDITY
CONTROLS TO SPS STORAGE
541-23-201
CLEVELAND, OHIO
100% CONSTRUCTION
DOCUMENTS
LOUIS STOKES
VA MEDICAL
CENTER Approved: Owner
N
1" = 30'-0"
FIRST FLOOR OVERALL PLAN NORTH
K E Y P L A N
CARES
TOWER
ENERGY
CENTER
WAREHOUSE
RESEARCH
CENTER
BUILDING ONE
SURGERY
EXPANSION
AMBULATORY
CARE
VA
ANNEX
MICU
ADDITION
MENTAL
HEALTH
RADIOLOGY
UP
Corridor
2B459
Infusion
2B448
Infusion
2B445
Corridor
2B458
Exam
2B422
Exam
2B423
Exam
2B417
Exam
2B416
Corridor
2B410
Exam
2B414
Exam
2B415
Exam
2B420
Exam
2B421
Breakroom
2B411
Procedure
2B413
Elect
2B148
Data
2B149
Corridor
2B147
Storage-Hemodialysis
2B150
Procedure
2B307
Staff
2B306A
Toilet
2B306B
Elect
2B303
Corridor
2B301A
Procedure
2B308
Clean Utility
2B312
Office
2B325A
Office Space
2B325
Office
2B325H
Office
2B325G Office
2B325B
Office
2B325C
Office
2B325F
Office
2B325E
Office
2B325D
Reprocessing
2B310B
Decon
2B310A Equipment
2B309A
Corridor
2B309B
Data
2B322A
PFT
2B145
PFT
2B144
Toilet
2B143
PFT
2B142
Bedroom
2B301M
Bedroom
2B301N
Bedroom
2B301L
Procedure
2B314
Corridor
2B301
Storage
2B306
Soiled Utility
2B304
Bedroom
2B301K
Nurses
2B301BA
Corridor
2B100A
Corridor
2B100B
Waiting
2B434
Consult-Family
2B437
Storage
2B435
Nurse Intake
2B433
Toilet-Patient
2B438
Toilet-Staff
2B460
Office-Pharmacy
2B461
Office
2C137
UPS Room
2C135
Office
2B121D
Equip. Closet
2C144A
Lab-E.P.
2C144
Storage
2C143
Lockers
2C142
Toilet
2C141
Corridor
2C140
Control
2C145A
Control
2C145B
Scrub
2C145
Office
2C146 Intervention
2C148
Lab-Cath.
2C147
Equip. Closet
2C147A
Soiled Utility
2C149Clean Utility
2C150
Staff Work
2C151
Closet-EMS
2C154
Corridor
2C157
Holding
2C153
Viewing/Fellows
2C155
Lab-G.U. Clinic
2C431
Utility
2C431A Lab-G.U. Clinic
2C432
Office
2C433
Soiled Utility
2C429 Office
2C434
Exam
2C430
Exam
2C428
Exam
2C426
Dressing
2C427
Exam
2C424
Exam
2C425
Toilet
2C427A
Toilet
2C435 Office-Surgical
2C436
Holding
2C423
Corridor
2C400D
Corridor
2C400F
Office-G.I.
2C438 Storage
2C437
ICU Cleveland Clinic Resident
2C439
Secretary
2C422
Clinic-G.U. Urology
2C420
Stair 14
2S14
Cardiothoracic
2C440
F.A.C.
2C421
Office
2C415
Office
2C414
Office
2C413
Elect
2C411
Corridor
2C400A
Toilet-Male
2C131
Toilet-Female
2C130
Fan Room
2C129
Reception Alcove
2C133
Control
2C133A
Elevator Lobby
2C400B
Waiting-Endo/Cath
2C133B
Storage
2C134
Corridor
2C100C
Schedulers
2C136
Lockers-Male
2D192C
Breakroom
2D192 Toilet/ Shower-Staff
2D192D
Toilet/ Shower-Staff
2D192B
Lockers-Female
2D192A
Pharmacy
2D193
Lactation
2D194
Toilet-Public
2D195
Quiet Room
2D163
Stair 18
2S18
Lounge-Family
2D196
Corridor
2D100M
Communication (Monitor) Room
2D197
Office-Dietician
2D198
Physician/ Consultant
2D161
CICU/PCU
2D160
Closet-EMS
2D141
Doctor's Work Room
2D140
Corridor
2D100G
Nourishment
2D142
Soiled Utility
2D143
Resp. Supply
2D144
On-Call
2D139
Head Nurse
2D145
Conference
2D146
On-Call Toilet/Shower
2D139A Toilet/ Shower
2E352A
Bedroom
2E352
Corridor
2E353
On-Call
2E354
On-Call Toilet/Shower
2D129C
On-Call Toilet/Shower
2D129DOn-Call
2E344B
On-Call
2E344A
On-Call Lounge
2E344
On-Call
2E344E
On-Call
2E344F
Doctor's Conference
2E343
Conference/ Classroom
2E345
Office
2E342
Storage/ Equipment
2E346
Elect
2E347
Closet-EMS
K221
Office-Pharmacy
2E348
Stair 20
2S20 Corridor
2E300E
Nurse Station
2E340
Bedroom
2E339 Toilet/ Shower
2E339A
Toilet/ Shower
2E336A Bedroom
2E336
Bedroom
2E333 Toilet/ Shower
2E333A
Toilet/ Shower
2E330A
Corridor
2E300D
Bedroom
2E330
Storage
2E328
Corridor
2E300H
Linen
2E338
Soiled
2E363
Meds
2E337
Fellows/On-Call
2E365
Soiled Utility
2E335
Clean Supply
2E334
Patient Lounge
2E332
Nurses' Work
2E316B
Data
2E331
Meds
2E316A
Corridor
2E316C
Nourishment
2E369
Nurse Station
2E316
Corridor
2E300A
Exam/ Treatment
2E313
Office
2E312
Toilet-Staff
2E311
Office
2E310
Closet-EMS
2D159
Toilet/ Shower
2E370A
Bedroom
2E370
Corridor
2E300J
Bedroom
2E368
Toilet/ Shower
2E368A
Toilet/ Shower
2E367A
Bedroom
2E367
Bedroom-Isolation
2E366
Toilet/ Shower
2E366A
Anteroom
2E364
Toilet/ Shower
2E362A
Bedroom-Isolation
2E362
Elect
2E361
Clean Linen
2E360
Corridor
2E300G
Bedroom-Isolation
2E351
Toilet/ Shower
2E351A
Anteroom
2E350
Toilet/ Shower
2E349A
Bedroom-Isolation
2E349
Bedroom
2E314Toilet/ Shower
2E314A
Corridor
2E300B
Elect
2E315
Elect
2E320
Bedroom
2E321
Corridor
2E300C
Toilet/ Shower
2E327A
Bedroom
2E327
Stair 19
2S19
Toilet/ Shower
2E321A
Toilet/ Shower
2E322A
Bedroom
2E322
Bedroom
2E325
Bedroom
2E323
Toilet/ Shower
2E325A
Toilet/ Shower
2E323A
Breakroom
2E324
Lockers-Male
2E324A
Toilet/ Shower-Staff
2E324B
Toilet/ Shower-Staff
2E324D
Lockers-Female
2E324C
Procedure
2C231
Procedure
2C232
Corridor
2C230
Sub-Sterile
2C235 Procedure
2C233
Stair 8
2S8
EMS-PACU
2C234
Cubicle-PACU
2C237A
Cubicle-PACU
2C237B
Cubicle-PACU
2C237C
Cubicle-PACU
2C237D
Cubicle-PACU
2C237E
Cubicle-PACU
2C237F
Cubicle-PACU
2C326A
Cubicle-PACU
2C326B
Cubicle-PACU
2C326C
Cubicle-PACU
2C326D
PACU Administrative Center
2C323
Corridor
2C323A
Toilet-PACU
2C322
Cubicle-PACU
2C326E
Clean-PACU
2C330A
Elect
2C327
Storage-PACU
2C328
Cubicle-PACU
2C326F
Cubicle-PACU
2C326G
Cubicle-PACU
2C326H
Soiled Utility-PACU
2C321
Storage
2B121A
Meds-PACU
2C324
Nourish-PACU
2C325
Lead Therapist
2B119
Clean Utility
2B120
Report Room
2B122
O.P. Assess
2B123
Oxygen Assess
2B124
Elect
2B125
Elect
2B126 Reception
2B141
Nurses
2B301B
Bedroom
2B301H
Nourishment
2B301D
Toilet
2B301C
Clean Supply
2B311
Linen
2B338A
Chute
2B335
Bedroom
2B301I
Bedroom
2B301J
Toilet
2B325J
Stair 9
2S9
Corridor
2C100A
Corridor
2C100B
Corridor
2B134
Lab-Sleep
2B133
Toilet/ Shower
2B133A
Office
2B132
Office
2B131
Office
2B130
PFT
2B135
Toilet/ Shower
2B135A
Office
2B136
Conference
2B137
Stair 10
2S10
Office
2B139
Office
2B140
Office
2B127
Fellows
2B128
Office
2B129
2D196A
Corridor
2E300F
Linen
2E329
Corridor
2D100N
HAC
2C224
Closet
2B126A
Stair 15
2S15
Service Elevator Lobby
2C400C
EMS
2C416
Office
2C417
EMS
2C100
Office-Cardiology
2D100
Chute
2C134A
Office
2B134A
Alcove
2B143A
Elect
2B146A
Elect
2C140B
Corridor
2B480A
Office
2B121E
Exam
2B121C
Pulmonary Service
2B121
Clean Linen
2B412
Corridor
2B418
Corridor
2B419
ASMT.
2B432 Office
2B431
Corridor
2B430
Reception
2B462
EMS
2B436
Toilet-Patient
2B439
Private Infusion
2B440
Meds
2B456
Soiled
2B457 Infusion
2B441
Infusion
2B442
Infusion
2B443
Infusion
2B444
Infusion
2B446
Infusion
2B447 Infusion
2B449
Infusion
2B450
Infusion
2B451
Infusion
2B452
Nurse Station
2B455
2B146B
Corridor
2E400B
Stair
2E480A
2D100B
Mechanical
2C412
Corridor
2C400E
Office
2C138
Office
2C139
EMS
2B309C
Corridor
2B301G
Physician
2B313
Toilet
2B305
Main Platform
1D480B
Roof-Control Room
1D480A
Roof-Locker Room
1D480D
2D100A
Endo Admin Suite
2D301
2D309
Office-CRNA
2C170
Infusion
2B453
Infusion
2B454
Infusion
2B454A
Alcove
2B301P
2D301A
2D301B
2D301C
2D301D
2D301OO
2D301LL
2D301MM
2D301NN 2D301II
2D301JJ
2D301KK 2D301FF2D301EE
2D301DD2D301GG
2D301HH2D301CC
2D301Z 2D301Y
2D301X2D301AA
2D301BB2D301W
2D301U
2D301V
2D301H
2D301I 2D301J
2D301K 2D301L 2D301O
2D301P2D301M
2D301N 2D301Q
2D301R
2D301S
2D301T
2D301G
2D301F
2D301E
AE402
AE402
AE402
AE402
AE402
AE402
AE402
AE402
Corridor
2F500A
Elect
2F501A
Mechanical Penthouse
2F501B
Mechanical Penthouse
2F501C
Elect
2F501D
Tissue Culture
K202
Research-Vascular
K203
Cooler
K204
Research-Laboratory
K205
Lab-Endo
K206
Lab-Dermatology
K207
Temp Control
K208
Lab-Dermatology
K210
Lab-Dermatology
K211
Research-Cancer
K212
Toilet-Male
K213
Toilet-Female
K214
Elect
K214A
Stair 24
2S24
Stair 21
2S21
Office
K206A
Office
K211A
Lab-Motion Studies
K205A
Office
K207A
Office
K205B
Office
K203A
Service Lobby
K200
Lab-Endo
K201
Comp.
K201AStorage
K216A
Research-Surgery
K216Research-Optometry
K215
Research-Cancer
K217
Research-Laboratory
K218
Research-Laboratory
K219
Research-Laboratory
K220
Office
K218A
Elect
K222
Data
K223
Mechanical
K224
Office
K220A
Office
K219A
Office
K215A
Office
K217A
Corridor
K200A
Corridor
K200B
Corridor
K200C
Corridor
K200D
Storage
K205C
Closet
K206B
Closet
K215B
Corridor
K221
Cast Room
2A170
Linen Room
2A171
Conference
2A172
Toilet
2A173
Exam-Ortho
2A174
Work Room
2A175
Exam-Ortho
2A176
Exam-Ortho
2A177
Exam-Ortho
2A178
Exam-POD
2A179
Exam-POD
2A180
Exam-POD
2A181
Work Room-POD
2A182
Exam-POD
2A183
Exam-POD
2A184
Exam-POD
2A185
Data
2A186
Elect
2A187
Exam-POD
2A188
HAC
2A189
Stair 4
2S4
Waiting
2A191
Corridor
2A100N
Toilet-Female
2A192
Reception
2A193
Toilet-Male
2A194
Waiting
2A195
Waiting
2A196
Elevator Lobby
2A197
HAC
2A198
Stair 2
2S2
Corridor
2A199A
Concession
2A199C
Release of Information
2A199B
Stair 1
2S1
Elect
2A102 Data
2A103Intake/ Exit Interview
2A104 Office
2A105 Exam/ Treatment
2A106 Exam/ Treatment
2A107 Exam/ Treatment
2A108 Conference
2A109
Exam-Special Purpose
2A110
HAC
2A111
Soiled
2A112
Exam/ Treatment
2A113
Exam/ Treatment
2A114
Exam/ Treatment
2A115
Exam/ Treatment
2A116
Exam/ Treatment
2A117
Office
2A118
Exam/ Treatment
2A119 Exam/ Treatment
2A120 Exam/ Treatment
2A121 Exam/ Treatment
2A122 Toilet
2A123
Clean Linen
2A124
Exam/ Treatment
2A125
Meds
2A126Corridor
2A100E
Office
2A128
Waiting
2A129
Reception-Mas.
2A130
Office
2A131L
Exam/ Treatment
2A132 Exam/ Treatment
2A133
Intake/ Exit Interview
2A134
Exam/ Treatment
2A135
Exam/ Treatment
2A136
Exam/ Treatment
2A137
Exam/ Treatment
2A138
Multipurpose Conference
2A139
Breakroom
2A140
Exam/ Treatment
2A141Storage
2A142
Exam/ Treatment
2A143
Stair 3
2S3
HAC
2A146
Storage
2A147
Exam-ENT
2A148
Exam/ Treatment
2A149
Exam/ Treatment
2A150
Exam/ Treatment
2A151
Conference
2A152
Exam/ Treatment
2A153
Exam/ Treatment
2A154
Procedure-MOH's
2A155
Exam/ Treatment
2A156
Data
2A157
Elect
2A158
Clean Utility
2A159
Soiled Utility
2A160
Exam-Derm.
2A161
Exam-ENT
2A162
Exam-ENT
2A163
Reception
Exam-ENT
2A165 Exam-ENT
2A166
Exam-ENT
2A167 Copy/Storage
2A168
HAC
2A169
Storage-Ortho
2A170A
Corridor
2A100L
Corridor
2A100M
Corridor
2A100K
Storage
2A156A
Corridor
2A100H
Corridor
2A100J
Toilet
2A131A
Exam/ Treatment
2A131B
Exam/ Treatment
2A146B
Consult
2A131D
Treatment
2A131E
Treatment
2A131F
Exam/ Treatment
2A146A
Office
2A131H
Agent Prep
2A131I
Work Room
2A131J
Office
2A131K Corridor
2A100G
Medication Prep
2A131
Corridor
2A100A
Corridor
2A100B
Corridor
2A100C
Triage
2A127A
Corridor
2B200J
Corridor
2A100F
Office
2B200K Office
2B200L Office
2B200M
Office
2B200N
Exam
2A155A
Corridor
2A100D
Triage
2A127
Triage
2A134A
Exam-ENT
2A167A
Corridor
2A200B
Exam/ Treatment
2A146C
Office-Carpenter Shop
2A199D
Nurse Manager, Assistant Nurse Manager
2F130
Bedroom
2F131
Storage-Personal Care Items
2F132
Bedroom
2F133
Bedroom
2F134
Bedroom
2F135
Bedroom
2F136
Bedroom
2F137
Bedroom
2F138
Bedroom
2F139
Toilet-Specimen
2F140
Toilet
2F141
Office-Exam
2F142
Dining
2F150
Pat. Lounge Group Room
2F151
Storage
2F152
Soiled Tray Cart Storage
2F153
Food Prep/ Non-Food Storage
2F154
Large and Small Recreation Rooms
2F155
Breakroom/ Lockers
2F200
Soiled Utility
2F201
Storage-Oxygen
2F202
Storage-Equipment
2F203
Data
2FLVC1
Stair 25
2S25
Sterile/ Expendable Supplies
2F206
Resident Laundry
2F207
Clean Linen
2F208
Toilet-Staff
2F209
EMS
2F210
Toilet-Staff
2F200A
Alcove
2F206A
Bedroom
2F170
Bedroom
2F171
Bedroom
2F172
Bedroom
2F173
Bedroom
2F174
Bedroom
2F175
Bedroom
2F176
Bedroom
2F177
Bedroom
2F178
Bedroom
2F179
Bedroom
2F180
Soiled Linen Holding
2F190 Trash Collection
2F191
Storage-Patient Belonging
2F192
Elevator Lobby-Service
2FC01B
Corridor
2FC01C
Meds
2F204Conference Classroom
2F205
Corridor
2FC02
Public Elevator Lobby
2FC04
Nurse Station Ward Clerk
2FC04A
Corridor
2FC04B
Internet Station
2FC04C
Crash Cart
2FC05A
Meds Entry
2F204A
Elect
2FELC2
Toilet
2F131A
Toilet
2F133A
Stair 27
2S27
Toilet
2F134A Toilet
2F135A
Toilet
2F136A
Toilet
2F137A
Toilet
2F138A
Toilet
2F139A
EMS
2F143
Toilet
2F102A
Bedroom
2F102
Office
2F103
Bedroom
2F104
Bedroom
2F105
Bedroom
2F106
Bedroom
2F107
Bedroom
2F108
Bedroom
2F109
Bedroom
2F110
Bedroom
2F111
Bedroom
2F112
Bedroom
2F113
Bedroom
2F114
Toilet
2F114A
Toilet
2F113A
Toilet
2F112A
Toilet
2F111A
Toilet
2F110A
Toilet
2F109A
Toilet
2F108A
Toilet
2F107A
Toilet
2F106A
Toilet
2F105A
Toilet
2F104A
Stair 26
2S26
Nourishment
2FC07
Toilet
2F180A
Toilet
2F179A
Toilet
2F178A
Toilet
2F177A
Toilet
2F176A
Toilet
2F175A
Toilet
2F174A
Toilet
2F173A
Toilet
2F172A
Toilet
2F171A
Toilet
2F170A
Elect
2FELC1
Elect
2FLVC2
Corridor
2FC05
Corridor
2FC06
Corridor
2FC03
Corridor
2FC01
Satellite Nurse Charting
2FC01A
Corridor
2FC08
Vending
2FC02A
HAC
2F210A
Corridor
2FC09
Clean Utility/SPD
2D117
Meds
2D123
Bedroom-Isolation
2D127BAnteroom
2D127A
EMS
2D110
Gas Room Non Oxidizing
2514A
Laser Scales Video Equipment
Toilet
2D127C
Breakroom
2D135
Office-Nurse Manager
2D134 Office
2D132
Vestibule
2D258
Consult
2D264
On-Call
2D265
Toilet/ Shower
2D265A
On-Call
2D266
Toilet
2D263
Soiled Utility Room
2D124
Toilet-Staff
2D133 Clean Linen
2D120
Bedroom
2D116
Bedroom
2D115
Bedroom
2D114
Bedroom
2D113
Bedroom
2D112
Bedroom
2D111
Administrative Center
2D118
Bedroom
2D119
Bedroom
2D121 Bedroom
2D122 Nourishment
2D130A
Bedroom
2D125
Bedroom
2D126
Corridor
2D130B
Lockers
2D131
Lockers-Male
2D255A
Toilet-Male
2D255B
Toilet-Male
2D255C
Vestibule
2D256
Corridor
2D130
Corridor
2D275A
Storage-Surgical
2D251
Procedure
2D253
Alcove
2D250C
Corridor
2D250
Toilet-Female
2D257C Toilet-Female
2D257B
Lockers-Female
2D257AShower
2D257D
Shower
2D255D
Lounge-Staff
2D270
Office-Nurse Manager
2D262
Workroom
2D260A
Workroom
2D260B
Workroom
2D260C
Workroom
2D260D
Workroom
2D260E
Workroom
2D260F
Alcove
2D260H
Control
2D261
Holding
2D260
Corridor
2D260J
Holding
Corridor
2500B
Storage-Stretcher
Anesthesia
Medication Prep Room
Corridor
2500H
Workroom
OR-General
OR-General
Corridor
2500G
Elect
EMS
Storage-Anesthesia
EMS
2508A
Control
Sub Sterile
Sub Sterile
Corridor
2500F
Dictation
Storage-Sterile
OR-General
OR-General
Dark Room
Corridor
2500D
Storage
Plaster & Splint Closet
OR-Orthopedic
Light Room
Elect
2517A
Sub Sterile
Sub Sterile
Storage
OR-Cardiac
Corridor
2500A
Pump Room
Pharmacy
Toilet-Unisex
Gas Room Oxidizing
Equipment
Stair 7
2S7
Soiled Holding
Corridor
2500E
Corridor
2500C
Corridor
2500J
Stair 17
2S17
Office-SICU Nurse Manager
Special Equipment Records
OR-Neuro
Bed/ Treatment Room
Corridor
2C280
Control
2C124A
2D261A
2D252
Corridor
2D275
Alcove
2D275B
Alcove
2D275C
Foyer
2D255E
2D254
2D254A
Alcove
2D260G
Alcove
2D251A
Desk
2D118A
Desk
2D118B
Desk
2D118C
Desk
2D118D
Desk
2D118E
Desk
2D118F Desk
2D118G
Desk
2D118H
Desk
2D118I
Desk
2D118J
Desk
2D118K
Desk
2D118L
OR-Hybrid
2C125
Storage-Catheter
2C125A
Vestibule
2C124
Imaging Equip. Support
2C124B
OR-Hybrid
2C121
Equipment
2C121A
2C120
Control
2C120A
Imaging Equip. Support
2C120B
Alcove
2C100S
Scrub
2C100R
Alcove
2C100G
Scrub
2C100F
2D261B
2D252A
2519A
AE403
AE401
AE901
MH102-1 2
MH102-1
MH102-2
MH102-1
MH102-1
MD102
MD102
MH102-2
G E N E R A L N O T E S
A. REFER TO COVER SHEET FOR ADDITIONAL GENERAL NOTES.
B. PROVIDE DUST SEPARATION FOR THE CONSTRUCTION AREA AT THE BEGINNING OF EACH SHIFT. AT THE END OF EACH SHIFT, REMOVE DUST SEPARATION AND CLEAN AREA AS REQUIRED. PROVIDE STICKY WALK-OFF MATS AT ENTRANCE TO CONSTRUCTION AREA AND PROVIDE CONSTRUCTION SIGNAGE STATING "DANGER -CONSTRUCTION AREA, AUTHORIZED
PERSONNEL ONLY".
C. MAINTAIN ALL EGRESS PATHS - NO EXITS TO BE BLOCKED.
D. ALL CONSTRUCTION ENTRY DOORS ARE TO USE VA STANDARD DOOR HARDWARE AND KEYED ALIKE WITH VA STANDARD
LOCKSETS.
E. ALL CONSTRUCTION ENTRANCE DOORS ARE TO REMAIN LOCKED AT ALL TIMES.
F. ALL CONSTRUCTION ENTRANCES ARE REQUIRED TO HAVE STICKY WALK-OFF MATS ON INSIDE AND OUTSIDE OF
WORKSPACE.
G. AFTER HOURS WORK TO TAKE PLACE BETWEEN 6:00 PM - 5:30 AM, MONDAY - FRIDAY, ALL DAY SATURDAY & SUNDAY.
H. TEMPORARY WALL REMOVAL TO TAKE PLACE AFTER STANDARD OPERATING HOURS.
I. ANY WORK TO BE COMPLETED ABOVE NOISE LEVELS INDICATED IN SPECIFICATIONS SHALL BE DONE AFTER HOURS AND COORDINATED WITH THE CONTRACTING OFFICER'S REPRESENTATIVE (COR) AT NO PREMIUM COST TO THE GOVERNMENT.
J. IF HAZARDOUS MATERIAL IS ENCOUNTERED INSIDE EXISTING WALLS AND/OR AREAS NOT VISIBLE PRIOR TO DEMOLITION, CONTRACTOR SHALL CONTACT OWNER FOR ABATEMENT.
K. IT IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO ENSURE ALL BUILDING AND CONSTRUCTION CODES ARE
MET FOR EACH PHASE PRIOR TO OCCUPANCY BEING GRANTED.
L. VERIFY EXISTING CONDITIONS BEFORE BID AND CONSTRUCTION.
M. EACH ZONE CAN BE COMPLETED CONCURRENTLY WITH OTHER ZONES.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s /C le v e la n d
V A
T e m p a n d
H u m id it y C o n tr o ls
/F F
E
C le v e la n d
T e m p
H u m id it y C o n tr o ls
A
R C
H rv t
/9 /2
:3
:3
P M
AE102
SECOND FLOOR OVERALL PLAN
02/09/2024 SS NM
TEMPERATURE AND HUMIDITY
CONTROLS TO SPS STORAGE
541-23-201
CLEVELAND, OHIO
100% CONSTRUCTION
DOCUMENTS
LOUIS STOKES
VA MEDICAL
CENTER Approved: Owner
N
1" = 30'-0"
SECOND FLOOR OVERALL PLAN
K E Y P L A N
CARES
TOWER
ENERGY
CENTER
WAREHOUSE
RESEARCH
CENTER
BUILDING ONE
SURGERY
EXPANSION
AMBULATORY
CARE
VA
ANNEX
MICU
ADDITION
MENTAL
HEALTH
RADIOLOGY
Office
3C107B
Office
3C107A
Alcove
3B164
Corridor
3B100H
Corridor
3B100F
Toilet
3B138A
Quiet Room
3B136
Bedroom-Isolation
3B134
Spa
3B138
Toilet/ Shower
3B132A
Toilet/ Shower
3B134A Bedroom
3B132
Bedroom
3B130
Toilet/ Shower
3B130A
Toilet/ Shower
3B128A
Corridor
3B100C
Bedroom
3B128
Bedroom
3B126
Toilet/ Shower
3B126A
Toilet/ Shower
3B124A Bedroom
3B124
Equipment
3B139
Chute
3B137
EMS
3B145
EMS
3B135
Clean Utility
3B133
Soiled Utility
3B131
Elect
3B147
Data
3B129
Storage
3B111B
TCU Dictation Work Area
3B127
Nurse Sub-Station
3B100B
Nurse Station
3B110
Quiet Room
3B140
Bedroom-Isolation
3B142 Toilet/ Shower
3B142A
Bedroom
3B144
Toilet/ Shower
3B144A
Corridor
3B100D
Bedroom
3B146
Closet
3B148
Toilet/ Shower
3B146A
Anteroom
3B150
Toilet/ Shower
3B152A
Bedroom-Isolation
3B152
Bedroom
3B154
Toilet/ Shower
3B154A
Toilet/ Shower
3B156A Bedroom
3B156 Bedroom-Observation
3B158
Toilet/ Shower
3B158A
Corridor
3B100E
Elect
3B112
Elect
3B114
Open Alcove
3B115
Toilet/ Shower
3B116A
Bedroom
3B116
Toilet/ Shower
3B109A
Bedroom
3B109
Stair 19
3S19
Bedroom
3B118
Toilet/ Shower
3B118A
Toilet/ Shower
3B120A
Work Room
3B120
Office-Nurse Manager
3B121
Anteroom
3B165
Toilet/ Shower
3B166A
Bedroom-Isolation
3B166
Corridor
3B100G
Toilet/ Shower
3B160A
Bedroom
3B160
Bedroom
3B163
Toilet/ Shower
3B163A…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .