This document is a contract amendment for Solicitation Number 36C25024B0051, "Y1DA--Provide Temperature and Humidity Control For SPS - (541-23-201)". The purpose of the amendment is to provide the questions and responses received for this solicitation and to extend the bid due date to August 23, 2024 at 1:00 pm EST.
The solicitation is for a project to provide temperature and humidity controls for approximately 32 Sterile Processing Services (SPS) secondary storage areas at the Louis Stokes Veterans Affairs Medical Center in Cleveland, Ohio. The project will bring these SPS rooms into compliance with the latest VHA requirements. The solicitation is set aside for Service-Disabled Veteran-Owned Small Businesses, who must perform a minimum of 15% of the construction work. The contract duration is 183 calendar days, with an additional 90 days for the submittal phase.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 1
541-23-201
36C250
Contract Specialist Department of Veterans Affairs Network Contracting Office (NCO) 10 6100 Oak Tree Blvd., Suite 490 Independence OH 44131
36C250
Department of Veterans Affairs
ATTN: BID OFFER 36C25024B0051
Network Contracting Office (NCO) 10 6100 Oak Tree Blvd., Suite 490 Independence OH 44131
To all Offerors/Bidders
36C25024B0051
07-12-2024
X
X X
** HOUR & DATE for Receipt of Offers is EXTENDED to: August 23, 2024 @ 1:00pm est
X 1
The purpose of this amendment is listed below:
1. Provide a copy of the questions and responses received for this solicitation. (see attached)
2. The Bid Due date remains August 23, 2024 @ 1:00pm est.
36C25024B0051 - Provide Temperature and Humidity Controls to SPS Storage
Questions & Responses:
1) Drawing GI001, Door Schedule – Positive pressure indicator
a) New positive pressure indicators are shown to be provided but there is no other information shown for them. Can a specification or basis of design be provided for the positive pressure Indicators?
AE recommends the use of a ball in the wall Room Pressure Sensor. Additional information about devices can be found in Spec 230923, Direct Digital Control System for HVAC, Section 2.7.
2) 01 00 00 General Requirements - General Phasing
a) The General Phasing in the spec isn’t clear about which rooms are available to work in during standard working hours. It also states that Phase I and Phase II are TBD. Please clarify which rooms can be worked in during the day and which rooms/areas should be worked in during the off shift.
Many rooms are patient care areas and will need to be worked on during second and third shifts due to the high level of patient activity. Access to rooms during first shift will require more coordination with VA staff.
3) 02 82 11 Asbestos; 1.1 Summary of Work
a) The extent of work in the Asbestos spec mentions areas where asbestos is present, but it is unclear in the drawings where these areas are. Please confirm there is no known asbestos to be abated in the areas of work in the drawings.
This cannot be determined, refer to Part 1, item B, 1 for contractors site review. All hazardous abatement documentation was completed by the VA.
4) 07 84 00 Firestop; 1.5 Quality Assurance
a) The firestop spec calls for an approved FM global installer for firestop. Please confirm this requirement or can a manufactures certificate from Hilti, or other, suffice to fulfill the Installer Qualifications.
The spec states “A firm that has been approved by FM Global according to FM Global 4991 or been evaluated by UL and found to comply with UL’s “Qualified Firestop Contractor Program Requirements.”
Either of these qualifications will suffice.
5) Drawing AE401, Note 2
a) The referenced note calls for fill and seal of existing penetrations through walls and floors above ceiling that are currently not sealed. This is difficult to quantify not knowing the type/size of penetration and how many penetrations are passing through the floors versus walls. It’s also difficult to quantify how many of these penetrations pass through rated walls versus nonrated walls. Can additional information be provided on the size/type of each penetration, wall types being passed through for each penetration, quantity of penetrations passing through walls, and quantity of penetration through floors.
The AE is currently unsure how many existing penetrations there are above the ceiling in the scope area for this project. The preference stated by the VA was if there are any existing penetrations found above the ceiling during construction of the project, to seal them. The AE recommends adding an allowance to total cost estimate for if a penetration is found and needs to be sealed. Sealant should be on both sides of the wall for each penetration found. A suggestion of 4 penetrations of duct, pipe, and conduit for a total of 12 per room seems to be a reasonable number of penetrations to consider.
6) Solicitation - Contract Duration
a) The solicitation indicates a 183-calendar day duration. General Note Q on sheet GI000 indicated 90 days for the submittal phase and 183 days for Phase I, totaling 273 days. Please confirm the contract duration.
Submittal Phase: 90 Days Day 001-090
Phase 1: 183 Days Day 091-273
7) Solicitation - Bid Submission
The solicitation indicates that bids are to be hand delivered. Is there an option to allow for bids to be submitted by email?
No, sealed bids must be hand delivered.
8) Can a single individual serve more than one of the following roles simultaneously: CQC Manager, SSHO, and Superintendent? If so, can a single individual perform all three?
The specs states “The project superintendent and the SSHO can be the same person”. However, the spec does not appear to state anything about combining the CQC Manager role as well. It does state “The CQC system Manager is required to be a construction person with a minimum of 6 years in related work. The CQC System Manger is assigned as CQC System Manager but has duties as project superintendent in addition to quality control.”
9) The Solicitation lists completion date of 183 calendar days but drawing G100 lists completion date of 273 calendar days allowing for 90 days for submittals. Which is correct?
Submittal Phase: 90 Days Day 001-090
Phase 1: 183 Days Day 091-273