Attachment I - Drawings.pdf
PDF 40 MB Posted
- Solicitation number
- 36C25023B0075
About this file
This document provides details for a federal contract opportunity with the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10. The solicitation number is 36C25023B0075 for the Z2DZ--Remodel 1st Floor, Bldg. 138 610-19-103 project. The opportunity type is listed as a Pre-Solicitation. An Attachment I - Drawings.pdf file is provided that is 40MB in size and contains drawings and specifications for the remodel of the 1st floor of Building 138, including scope of work details. Interested parties can review the drawings and specifications to develop responses for the planned solicitation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment D-1.pdf | ||
| Attachment E.pdf | ||
| Attachment F.pdf | ||
| Attachment D.pdf | ||
| 36C25023B0075 0005.pdf | ||
| 36C25023B0075 0004.pdf | ||
| Attachment C.pdf | ||
| 36C25023B0075 0003.pdf | ||
| 36C25023B0075 0001 (Correction).pdf | ||
| Attachment B.pdf | ||
| Attachment A.pdf | ||
| 36C25023B0075 0002.pdf | ||
| Attachment - Attendance Sheet.pdf | ||
| 36C25023B0075 0001.pdf | ||
| 36C25023B0075-1.pdf | ||
| 36C25023B0075_2.docx | DOCX document | |
| Attachment IV - Contractor EMR Certification Form 610-19-103.pdf | ||
| 36C25023B0075.pdf | ||
| Attachment III - Wage Determination (DBA).pdf | ||
| Attachment VI - VHA_Directive_1192.pdf | ||
| Attachment V - RFI Form-36C25023B0075.pdf | ||
| Attachment II - Specs.pdf | ||
| 36C25023B0075_1.docx | DOCX document |
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R
I
V
E
R
38 Street
L in c o ln
B o u le v a rd
42 41
T504
T516
51 52
75 55
17 184
12 155
313029
105 35
(3001)
(1301)
(HA3)
(3003)
Main Entrance (3002)
(HA-2)
(4801)
(HA-4)
(HA-6)
(HA-5)
(3004)
(3G01)
(HA9)
(HA1)
(HA-7)
(HA8)
(DIESEL FUEL)
N
National
Cemetary
National
Cemetary
National
Cemetary
D
IX
R O
A D
P A R
K
D R
IV
E
McMahon
G ra y R o a d Steel Circle
Avenue
C o tt a g e
A v e n u e
B la ck
R o a d
B la ck R o a d
C o tt a g e
A v e n u e
G ra y R o a d
Water Street
Black R oad
Black Road
Water Street
Nelson
Avenue
Orchard
Avenue
M cM a h o n
A v e n u e
Doctors Road
V in e
Drive
Vine
Water Street
Railroad Avenue
M e c h a n ic s A v e n u e
Kuder Place
Indiana Avenue
Indiana Avenue
H y d e R o a d
Irw in
D riv e
Chapman Avenue
Chapman
H y d e R o a d
M a rio n R o a d
B la ck R o a d
O rc h a rd
A v e n u e
Indiana Avenue
F lo w e r
S tre e t
F lo w e r
S tre e t
Chapman Avenue
Ave.
N e ls o n A v e n u e
O rc h a rd
A v e n u e
Chapman Avenue
R o a d
Road
B la ck
R o ad
B la ck
R o a d
River Road
Material Compound
Vehicle
Compound
Cemetery
Dump
BLDG 138
EMPLOYEE
PARKING
CONTRACTOR DRIVING ROUTE
CONTRACTOR PARKING
AND STAGING
CONTRACTOR JOB
TRAILERS
EAST 38TH STREET
L
IN
C O
L N
B O
U L E
V A
R D
MAIN ENTRANCE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
VA NORTHERN
INDIANA
HEALTH CARE
SYSTEM
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
C H A M P L I N A R C H I T E C T U R E
720 East Pete Rose Way Suite 140 Cincinnati OH 45202 513-241-4474 www.thinkchamplin.com
#610-19-103
Marion, IN
REMODEL 1ST FLOOR, BUILDING 138
03/20/2023
FINAL BID DOCUMENTS
138NOT FOR CONSTRUCTION
Page Number
C U s e rs \b w e tz e l\ D o c u m e n ts \M a ri o n
V A
M C
A rc h
R b ri a n n a .w e tz e l.
rv t
/1
/2
:5
:5
A
M
G000
COVER SHEET, DRAWING INDEX, SITE
PLANS, PROJECT NOTES
MM MSW / BFW
FINAL BID DOCUMENTS MARCH 20, 2023
REMODEL FIRST FLOOR, BUILDING 138
VA PROJECT NO: 610-19-103
CAMPUS LOCATION
1. SEE GENERAL PROJECT NOTES FOR NEW WORK FOR ADDITIONAL REQUIREMENTS FOR WORK WITHIN THE EXISTING FACILITY.
2. THE GENERAL CONTRACTOR SHALL VERIFY ALL EXISTING DIMENSIONS AND FIELD CONDITIONS PRIOR TO DEMOLITION AND
CONSTRUCTION. IF PROVIDED, THE GENERAL CONTRACTOR SHALL CAREFULLY EXAMINE EXISTING BUILDING DOCUMENTS. THE CONTRACTOR SHALL BRING ANY DISCREPANCIES TO THE IMMEDIATE ATTENTION OF THE ARCHITECT.
3. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF EXISTING ITEMS TO REMAIN DURING DEMOLITION AND
CONSTRUCTION.
4. MAINTAIN EXIT EGRESS PATHS TO EXISTING EXIT DOORS DURING CONSTRUCTION.
5. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF ALL CONSTRUCTION ROUTES BEYOND THE AREAS OF WORK
AND THE ROUTES MUST BE RETURNED TO THEIR ORIGINAL CONDITION AT THE END OF THE PROJECT.
6. MAINTAIN THE BUILDING IN A WEATHER TIGHT CONDITION AT ALL TIMES.
7. ALL DEMOLITION AND CONSTRUCTION ACTIVITIES SHALL BE COORDINATED WITH THE OWNER TO MINIMIZE DISRUPTIONS OF NORMAL
FUNCTIONS OF THE OWNER'S OCCUPIED AREAS.
8. HIGH NOISE TO OCCUR AFTER HOURS. IF CONSTRUCTION NOISE IS ANTICIPATED, SUBMIT 21 DAYS IN ADVANCE A WRITTEN REQUEST
TO THE OWNER FOR THE SCHEDULED TIME OF THE CONSTRUCTION ACTIVITIES. NO WORK SHALL BE DONE WITHOUT THE WRITTEN APPROVAL OF THE OWNER. THE OWNER RESERVES THE RIGHT TO DISCONTINUE NOISY CONSTRUCTION AT ANY TIME. NO RADIOS SHALL BE PERMITTED AT ANY TIME IN WORK AREAS ADJACENT TO OCCUPIED SPACES. CONTRACTOR NEEDS TO UTILIZE NOISE MITIGATION TECHNIQUES. ALL WORK EXCEEDING OSHA THRESHOLD TO BE DONE AFTER HOURS, BETWEEN 5PM AND 6AM.
9. ALL EXISTING SERVICES AND UTILITIES SHALL BE MAINTAINED TO ADJACENT DEPARTMENTS OR AREAS THAT ARE IN OPERATION AND SERVED BY THEM. COORDINATE ALL DISRUPTIONS OR DISCONTINUATIONS OF UTILITIES AND SERVICES WITH OWNER. NO SHUT DOWN OF EXISTING SERVICES IS ALLOWED TO OCCUR UNTIL RECEIVING THE OWNER'S WRITTEN APPROVAL OF THE SHUT DOWN SCHEDULE. PROVIDE TEMPORARY SERVICES AND/OR UTILITIES DURING INTERRUPTIONS AS REQUIRED AND APPROVED BY THE OWNER. PLANNED POWER OUTAGES NEED TO BE COORDINATED WITH OWNER 21 DAYS IN ADVANCE.
10. THE GENERAL CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO PREVENT DAMAGE TO OWNER'S OCCUPIED AREAS ADJACENT TO NEW CONSTRUCTION OR OCCUPIED AREAS WHERE VARIOUS SYSTEM CONNECTIONS OR EXTENSIONS ARE REQUIRED.
IN THESE AREAS, THE GENERAL CONTRACTOR IS RESPONSIBLE FOR DAMAGE CAUSED BY LACK OF SUFFICIENT PROTECTION FROM THE WEATHER AND FROM THE RESULTS OF ALL CONSTRUCTION ACTIVITY INCLUDING BUT NOT LIMITED TO DUST AND WATER.
11. THE GENERAL CONTRACTOR SHALL RECEIVE WRITTEN APPROVAL FROM THE OWNER BEFORE USING OPEN FLAMES, WELDING RODS AND TORCHES. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR ALL MEANS AND METHODS TO PROHIBIT THE MIGRATION OF SMOKE AND OTHER PRODUCTS OF COMBUSTION INTO OCCUPIED AREAS OF THE EXISTING BUILDING AND FOR OBTAINING ALL REQUIRED PERMITS RELATED TO HOT WORK. CONTRACTOR TO FILL OUT AND SUBMIT HOT WORK PERMITS IN 21 DAYS IN ADVANCE.
12. PROVIDE FIRE PROTECTION IN ACCORDANCE WITH THE REQUIREMENTS OF THE GOVERNING AUTHORITY.
13. IT IS THE GENERAL CONTRACTORS RESPONSIBILITY TO PATCH ALL SPRAY-ON FIRE PROTECTION AT REMOVALS, AT ANY EXISTING
LOCATIONS WHICH ARE VOID OF PROTECTION WITHIN THE AREA OF WORK AND AT NEW CONSTRUCTION WHICH DISTURBS EXISTING
FIRE PROTECTION. FIREPROOFING MUST BE CONTINUOUS AND UNOBSTRUCTED.
14. DO NOT OVERLOAD THE EXISTING BUILDING STRUCTURE. MAINTAIN THE STRUCTURAL INTEGRITY OF ALL STRUCTURAL FRAMING
MEMBERS AND SYSTEMS AT ALL TIMES.
15. ALL DEMOLISHED MATERIAL, EXCEPT MATERIAL THAT IS LISTED OR MARKED BY THE ARCHITECT OR THE OWNER FOR RETENTION, SHALL BECOME THE PROPERTY OF THE CONTRACTOR AND IT SHALL BE LEGALLY DISPOSED OF. NO DEBRIS RESULTING FROM WORK
SHALL BE LEFT IN THE CONSTRUCTION ROUTES BEYOND THE AREAS OF WORK.
16. REMOVAL OF A PARTICULAR ITEM IS TO INCLUDE ALL RELATED ITEMS, SUCH AS REMOVAL OF WALLS WOULD INCLUDE ASSOCIATED DOORS, HARDWARE, ELECTRICAL, PLUMBING, MECHANICAL, ETC. REFER TO DEMOLITION DRAWINGS FOR MORE INFORMATION. FOR ALL REMOVALS, THE GENERAL CONTRACTOR SHALL COORDINATE WITH ALL OTHER DISCIPLINES INCLUDING BUT NOT LIMITED TO
MECHANICAL, ELECTRICAL AND PLUMBING.
17. WHERE CEILINGS ARE SHOWN TO BE REMOVED, ALL UNUSED SUSPENDED EQUIPMENT, WIRES, ANGLES, ETC. SHALL BE REMOVED.
SEE DEMOLITION DRAWINGS FOR ADDITIONAL INFORMATION. EXISTING LIGHTS MAY BE MAINTAINED AS TEMPORARY CONSTRUCTION
LIGHTING.
18. THE CONTRACTOR SHALL PROVIDE TEMPORARY SUPPORT FOR ITEMS NOT DEMOLISHED OR REMOVED AS REQUIRED UNTIL
PERMANENT SUPPORT IS PROVIDED IN THE FINAL CONSTRUCTION.
19. ALL OPENINGS IN EXISTING WALLS, CEILINGS AND FLOORS, WHICH ARE THE RESULT OF REMOVALS AND OTHER NEW CONSTRUCTION ACTIVITY, SHALL BE PATCHED WITH NEW MATERIALS THAT MATCH THE EXISTING MATERIALS. IF THE PATCH IS TO BE MADE IN FIRE RATED CONSTRUCTION, THE PATCH MUST ACHIEVE THE REQUIRED FIRE RATING. THE PATCH SHALL BE FINISHED TO A LIKE NEW
CONDITION TO MATCH THE EXISTING FINISH.
20. ALL EXISTING OPENINGS IN CEILINGS, FLOORS AND WALLS DISCOVERED IN THE EXISTING STRUCTURE SHALL BE PATCHED WITH NEW MATERIALS THAT MATCH THE EXISTING MATERIALS. IF THE PATCH IS TO BE MADE IN FIRE RATED CONSTRUCTION, THE PATCH MUST ACHIEVE THE REQUIRED FIRE RATING. THE PATCH SHALL BE FINISHED TO A LIKE NEW CONDITION TO MATCH THE EXISTING FINISH.
21. WHERE EXISTING SURFACES ARE TO BE REFINISHED OR ARE TO SERVE AS SUBSTRATE FOR THE ATTACHMENT OR APPLICATION OF NEW MATERIALS OR CONSTRUCTION, PREPARE OR ALTER THE EXISTING SURFACES AS NECESSARY TO PROPERLY ACCOMMODATE
THE NEW MATERIALS.
22. FIELD VERIFY SIZES AND DIMENSIONS OF ALL EXISTING UTILITIES THAT IMPACT THE NEW WORK. DETERMINE THE SIZE AND LOCATION THE PENETRATIONS FROM THE EXISTING UTILITIES WITHIN THE NEW WORK. SEAL TIGHT TO ALL PENETRATIONS AND CAULK.
23. PENETRATIONS THROUGH EXISTING FIRE RATED CONSTRUCTION MUST BE PROPERLY CLOSED AND FIRE SAFED TO ACHIEVE THE
PROPER FIRE RATING BY THE END OF CONSTRUCTION OPERATIONS FOR EACH DAY.
24. NEW HOLES IN EXISTING ELEVATED FLOOR AND ROOF STRUCTURES FOR NEW WORK MUST BE COORDINATED WITH THE EXISTING
STRUCTURE SO THAT CRITICAL STRUCTURAL MEMBERS ARE NOT DAMAGED.
25. UNLESS OTHERWISE NOTED, THE GENERAL CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL EXISTING SALVAGED STOCK BEFORE
ORDERING NEW MATERIAL.
GENERAL PROJECT NOTES FOR EXISTING FACILITIES
SHEET
NUMBER SHEET NAME
PAGE
NUMBER
G000 COVER SHEET, DRAWING INDEX, SITE PLANS, PROJECT NOTES 1
GI001 ABBREVIATIONS, SYMBOLS, PARTITION TYPES 2
GI002 LIFE SAFETY PLAN, CODE INFO 3
GI003 PHASING PLANS AND DEPARTMENT PLAN 4
GI004 ICRA PLANS 5
AE101 FLOOR PLAN - PHASE 1A & 1B 12
AE102 FLOOR PLAN - PHASE 1B 13
AE103 FLOOR PLAN - PHASE 2 14
AE110 LOBBY FLOOR PLAN AND REFLECTED CEILING PLAN - PHASE 2 15
AE121 REFLECTED CEILING PLAN - PHASE 1A & 1B 16
AE122 REFLECTED CEILING PLAN - PHASE 1B 17
AE123 REFLECTED CEILING PLAN - PHASE 2 18
AE201 INTERIOR ELEVATIONS 19
AE202 INTERIOR ELEVATIONS AND CASEWORK SECTIONS 20
AE401 EXTERIOR DETAILS 21
AE402 EXTERIOR WINDOW DETAILS 22
AE403 EXTERIOR WINDOW DETAILS 23
AE601 DOOR SCHEDULE, DOOR & FRAME TYPES 24
AE602 MISCELLANEOUS DETAILS 25
AF101 FINISH PLAN - PHASE 1A & 1B 26
AF102 FINISH PLAN - PHASE 1B 27
AF103 FINISH PLAN - PHASE 2 28
AF104 WALL PROTECTION PLAN - PHASE 3 29
AF601 ROOM FINISH SCHEDULE AND FINISH LEGEND 30
AQ101 FURNITURE, FIXTURE AND EQUIPMENT PLAN - PHASE 1B 31
AQ102 FURNITURE, FIXTURE AND EQUIPMENT PLAN - PHASES 1A, 1B, & 2 32
AQ103 FURNITURE, FIXTURE AND EQUIPMENT SCHEDULE 33
AQ104 EQUIPMENT SCHEDULE BY ROOM 34
AQ105 EQUIPMENT SCHEDULE BY ROOM 35
AQ106 EQUIPMENT SCHEDULE BY ROOM 36
AQ107 EQUIPMENT SCHEDULE BY ROOM 37
AQ108 EQUIPMENT SCHEDULE BY ROOM 38
AQ109 EQUIPMENT SCHEDULE BY ROOM 39
AW101 SIGNAGE FLOOR PLAN 40
AW102 SIGNAGE DETAILS 41
E100 ELECTRICAL GENERAL INFORMATION 86
E101 ELECTRICAL DETAILS 87
E102 ELECTRICAL DETAILS 88
E103 ELECTRICAL DETAILS 89
ED111 ELECTRICAL DEMOLITION PLAN, PHASE 1 90
ED112 ELECTRICAL DEMOLITION PLAN, PHASE 2 91
ED113 ELECTRICAL DEMOLITION PLAN, PHASE 3 92
EL111 ELECTRICAL LIGHTING PLAN, PHASE 1 93
EL112 ELECTRICAL LIGHTING PLAN, PHASE 2 94
EL113 ELECTRICAL LIGHTING PLAN, PHASE 3 95
EP111 ELECTRICAL POWER PLAN, PHASE 1 96
EP112 ELECTRICAL POWER PLAN, PHASE 2 97
EP113 ELECTRICAL POWER PLAN, PHASE 3 98
EP600 PANEL SCHEDULES 99
EP601 SINGLE-LINE DIAGRAM 100
EP602 SINGLE-LINE DIAGRAM 101
EY100 OVERALL FIRST FLOOR PLAN 102
EY101 TECHNOLOGY FLOOR PLAN - OUTSIDE PROJECT AREA 103
EY111 TECHNOLOGY & FIRE ALARM PANEL, PHASE 1 104
EY112 TECHNOLOGY & FIRE ALARM PANEL, PHASE 2 105
EY113 TECHNOLOGY & FIRE ALARM PANEL, PHASE 3 106
DRAWING LIST
SB101 STRUCTURAL SLAB PLAN AND DETAILS 42
SB501 STRUCTURAL DETAILS 43
P100 PLUMBING LEGENDS AND ABBREVIATIONS 47
PD101 PLUMBING DEMOLITION PLAN, BASEMENT, SANITARY & VENT, PHASE 1 48
PD102 PLUMBING DEMOLITION PLAN, BASEMENT, SANITARY & VENT, PHASE 2 49
PD103 PLUMBING DEMOLITION PLAN, LEVEL 1, SANITARY & VENT, PHASE 1 50
PD104 PLUMBING DEMOLITION PLAN, LEVEL 1, SANITARY & VENT, PHASE 2 51
PD111 PLUMBING DEMOLITION PLAN, LEVEL 1, DOMESTIC WATER, PHASE 1 52
PD112 PLUMBING DEMOLITION PLAN, LEVEL 1, DOMESTIC WATER, PHASE 2 53
PD121 PLUMBING FIRST FLOOR DEMOLITION PLAN - MEDICAL GAS 54
PL101 PLUMBING NEW WORK PLAN, BASEMENT, SANITARY & VENT, PHASE 1 55
PL102 PLUMBING NEW WORK PLAN, BASEMENT, SANITARY & VENT, PHASE 2 56
PL103 PLUMBING NEW WORK PLAN, LEVEL 1, SANITARY & VENT, PHASE 1 57
PL104 PLUMBING NEW WORK PLAN, LEVEL 1, SANITARY & VENT, PHASE 2 58
PL111 PLUMBING NEW WORK PLAN, LEVEL 1, DOMESTIC WATER, PHASE 1 59
PL112 PLUMBING NEW WORK PLAN, LEVEL 1, DOMESTIC WATER, PHASE 2 60
PL121 PLUMBING NEW WORK PLAN, LEVEL 1, MEDICAL GAS, PHASE 1 61
PL501 PLUMBING DETAILS & SCHEDULES 62
PL601 PLUMBING ISOMETRIC, SANITARY & VENT, PHASE 1 63
PL602 PLUMBING ISOMETRIC, SANITARY & VENT, PHASE 2 64
PL611 PLUMBING ISOMETRIC, DOMESTIC WATER, PHASE 1 65
PL612 PLUMBING ISOMETRIC, DOMESTIC WATER, PHASE 2 66
M001 MECHANICAL LEGEND AND ABBREVIATIONS 67
MD101 FIRST FLOOR - HVAC DEMOLITION PLAN - PHASE 1 68
MD102 FIRST FLOOR - HVAC DEMOLITION PLAN - PHASE 2 69
MD103 FIRST FLOOR - HVAC DEMOLITION PLAN - PHASE 3 70
MD111 FIRST FLOOR - MECHANICAL PIPING DEMOLITION - PHASE 1 71
MD112 FIRST FLOOR - MECHANICAL PIPING DEMOLITION - PHASE 2 72
MH101 FIRST FLOOR - HVAC NEW WORK - PHASE 1 73
MH102 FIRST FLOOR - HVAC NEW WORK - PHASE 2 74
MH103 FIRST FLOOR - HVAC NEW WORK - PHASE 3 75
MH104 ROOF PLAN - HVAC NEW WORK - PAHSE 1 76
MH301 MECHANICAL SECTION - PHASE 1 77
MH501 DETAILS 78
MH601 SCHEDULES 79
MH602 SCHEDULES 80
MH701 MECHANICAL CONTROLS 81
MP101 FIRST FLOOR - MECHANICAL PIPING - PHASE 1 82
MP102 FIRST FLOOR - MECHANICAL PIPING - PHASE 2 83
MP103 FIRST FLOOR - MECHANICAL PIPING - PHASE 3 84
MZ201 FIRST FLOOR - HVAC ZONES 85
FX101 FIRE SUPPRESSION PLAN, LEVEL 1, PHASE 1 44
FX102 FIRE SUPPRESSION PLAN, LEVEL 1, PHASE 2 45
FX103 FIRE SUPPRESSION PLAN, LEVEL 1, PHASE 3 46
VA Northern Indiana Health Care System: Marion, IN
LOCATION: 1700 East 38th Street Marion, IN 46953
MARION VA CAMPUS SITE PLAN
AD101 DEMOLITION PLAN - PHASE 1A & 1B 6
AD102 DEMOLITION PLAN - PHASE 1B 7
AD103 DEMOLITION PLAN - PHASE 2 8
AD121 REFLECTED CEILING DEMO PLAN - PHASE 1A & 1B 9
AD122 REFLECTED CEILING DEMO PLAN - PHASE 1B 10
AD123 REFLECTED CEILING DEMO PLAN - PHASE 2 11
Revisions: Date:
35% ISSUANCE 04/28/2021
65% ISSUANCE 03/23/2022
95% ISSUANCE 05/04/2022
100% BID DOCUMENTS - RESUBMISSION #2 02/10/2023
FINAL BID DOCUMENTS 03/20/2023
CEILING TAG
REVISION TAG
VIEW NAME w/ SCALE
WINDOW TAG
WALL TAG
DOOR TAG
DETAIL SECTION
WALL SECTION
BUILDING SECTION
ROOM TAG
CALL OUT HEAD
GRID HEAD
LEVEL NAME and ELEVATION
NORTH ARROW
1i
Room name
1 View Name 1/8" = 1'-0"A101
1t
C1
10'-0"
A101
SIM
A101
SIM
A101
SIM
A101
SIM
A101
SIM
Name Elevation
RENOVATION KEYNOTE TAG
DEMOLITION KEYNOTE TAG1
ACT
AD
AFF
ALUM
ANOD
BSMT
BYND
BOT
CFCI
CIP
CHNL
CJ
CLG
CLR
CMU
COMPR
CONC
CONT
CPT
CR
CT
DBL
DEMO
DIA
DIM
DN
DR
DWG
EA
EJ
EL
ELEC
ELEV
EPDM
EQ
EXST
EXT
FD
FDN
FEC
FIXT
FLR
FM
FO
FRT
GA
GALV
GWB
HC
POUND or NUMBER
AND
AT
ACOUSTICAL CEILING TILE
AREA DRAIN
ABOVE FINISHED FLOOR
ALUMINUM
ANODIZED
BASEMENT
BEYOND
BOTTOM
CONTRACTOR FURNISHED,
CONTRACTOR INSTALLED
CAST IN PLACE
CHANNEL
CONTROL JOINT
CEILING
CLEAR
CONCRETE MASONRY UNIT
COMPRESSIBLE
CONCRETE
CONTINUOUS
CARPET
CARD READER
CERAMIC TILE
DOUBLE
DEMOLITION
DIAMETER
DIMENSION
DOWN
DOOR
DRAWING
EACH
EXPANSION JOINT
ELEVATION
ELECTRICAL
ELEVATION
ETHYLENE PROPYLENE DIENE M-CLASS
EQUAL
EXISTING
EXTERIOR
FLOOR DRAIN
FOUNDATION
FIRE EXTINGUISHER CABINET
FIXTURE
FLOOR
FILLED MATERIAL
FACE OF
FIRE RETARDANT TREATED
GAUGE
GALVANIZED
GYPSUM WALL BOARD
HOLLOW CORE
HI
HM
HP
HR
HVAC
ILO
INSUL
INT
MAX
MO
MECH
MEMBR
MIN
MRGWB
MTL
NIC
NOM
OC
OFCI
OFOI
OPP
PCC
PLUM
PLYD
P
PVC
RBR
RCP
RD
REQD
RM
SCWD
SIM
SPEC
SPK
SS
SSTL
STST
STL
T&G
TELE
TLT
TO
TOC
TOS
TPD
T/D
TYP
UNO
U/S
VIF
VP
W/
WD
HIGH
HOLLOW METAL
HIGH POINT
HOUR
HEATING, VENTILATION, AIR CONDITIONING
IN LIEU OF
INSULATION
INTERIOR
MAXIMUM
MASONRY OPENING
MECHANICAL
MEMBRANE
MINIMUM
MOISTURE RESISTANT GYPSUM WALL BOARD
METAL
NOT IN CONTRACT
NOMINAL
ON CENTER
OWNER FURNISHED, CONTRACTOR INSTALLED
OWNER FURNISHED, OWNER INSTALLED
OPPOSITE HAND
PRE CAST CONCRETE
PLUMBING
PLYWOOD
PAINT
POLYVINYL CHLORIDE
RUBBER
REFLECTED CEILING PLAN
ROOF DRAIN
REQUIRED
ROOM
SOLID CORE WOOD DOOR
SIMILAR
SPECIFICATION
SPRINKLER
SOLID SURFACE
STAINLESS STEEL
STAINLESS STEEL
STEEL
TONGUE & GROOVE
TELEPHONE
TOILET
TOP OF
TOP OF CONCRETE
TOP OF STEEL
TOILET PAPER DISPENSER
TELEPHONE/DATA
TYPICAL
UNLESS NOTED OTHERWISE
UNDERSIDE
VERIFY IN FIELD
VISION PANEL
WITH
WOOD
TYPE A2
ONE LAYER OF 5/8" GYPSUM
WALLBOARD ON EACH SIDE
OF 3-5/8" 20 GA. METAL STUDS
@ 16" O.C. WITH 3" SOUND
ATTENUATION BLANKETS IN
STUD SPACE. EXTEND STUDS,
BOARD, AND BLANKETS TO 6"
ABOVE CEILING. BRACE TOP
OF WALL AS REQUIRED, BUT
NOT LESS THAN 8'-0" O.C.
TYPE A3 STC = 34
ONE LAYER OF 5/8" GYPSUM
WALLBOARD ON ROOM SIDE
OF 3-5/8" 20 GA. METAL STUDS
@ 16" O.C. WITH 3" SOUND
ATTENUATION BLANKET IN
STUD SPACE. EXTEND STUDS,
BOARD AND SOUND
BLANKETS FULL HEIGHT TO
DECK ABOVE. ATTACH TO
STRUCTURE ABOVE W/
VERTICAL SLIP
CONNECTIONS. SEE
PARTITION NOTES THIS DWG.
TYPE A4
ONE LAYER OF 5/8" GYPSUM
WALLBOARD ON ROOM SIDE
OF 3-5/8" 20 GA. METAL STUDS
@ 16" O.C. WITH 3" SOUND
ATTENUATION BLANKET IN
STUD SPACE. EXTEND STUDS,
BOARD, AND BLANKETS TO 6"
ABOVE CEILING. BRACE TOP
OF WALL AS REQUIRED, BUT
NOT LESS THAN 8'-0" O.C.
TYPE B1 STC = 44
ONE LAYER OF 5/8" GYPSUM
WALLBOARD ON EACH SIDE
OF 6" 20 GA. METAL STUDS @
16" O.C. WITH 6" SOUND
ATTENUATION BLANKETS IN
STUD SPACE. EXTEND STUDS,
BOARD, AND BLANKETS FULL
HEIGHT TO DECK ABOVE.
ATTACH TO STRUCTURE
ABOVE W/ VERTICAL SLIP
CONNECTIONS. SEE
PARTITION NOTES THIS DWG.
TYPE B2 STC = 37
ONE LAYER OF 5/8" GYPSUM
WALLBOARD ON ROOM SIDE
OF 6" 14 GA. METAL STUDS @
8" O.C. WITH 6" SOUND
ATTENUATION BLANKETS IN
STUD SPACE. EXTEND STUDS,
BOARD, AND BLANKETS FULL
HEIGHT TO DECK ABOVE.
ATTACH TO STRUCTURE
ABOVE W/ VERTICAL SLIP
CONNECTIONS. SEE
PARTITION NOTES THIS DWG.
TYPE F2 STC = 49
1 HOUR RATED WALL
UL# U419
PROVIDE TYPE "X" GYPSUM WALLBOARD
FOR 1 HR UL RATING ON EACH SIDE OF 6"
20 GA. METAL STUDS @ 16" O.C. WITH 6"
SOUND ATTENUATION BLANKETS IN
STUD SPACE. EXTEND STUDS, BOARD,
AND BLANKETS FULL HEIGHT TO DECK
ABOVE. ATTACH TO STRUCTURE ABOVE
W/ VERTICAL SLIP CONNECTIONS. SEE
PARTITION NOTES THIS DWG.
TYPE F1 STC = 49
1 HOUR RATED WALL
UL# U419
PROVIDE TYPE "X" GYPSUM
WALLBOARD FOR 1 HR UL RATING ON
EACH SIDE OF 3 5/8" 20 GA. METAL
STUDS @ 16" O.C. WITH 3" SOUND
ATTENUATION BLANKETS IN STUD
SPACE. EXTEND STUDS, BOARD, AND
BLANKETS FULL HEIGHT TO DECK
ABOVE. ATTACH TO STRUCTURE
ABOVE W/ VERTICAL SLIP
CONNECTIONS. SEE PARTITION
NOTES THIS DWG.
TYPE C1
ONE LAYER OF 5/8" GYPSUM
WALLBOARD ON ROOM SIDE
OF 2 1/2" 20 GA. METAL STUDS
@ 16" O.C. WITH 2" SOUND
ATTENUATION BLANKET IN
STUD SPACE. EXTEND STUDS,
BOARD AND SOUND
BLANKETS FULL HEIGHT TO
DECK ABOVE. ATTACH TO
STRUCTURE ABOVE. SEE
PARTITION NOTES THIS DWG.
TYPE D1
ONE LAYER OF 5/8" GYPSUM
WALLBOARD ON ROOM SIDE
OF 1 5/8" 20 GA. METAL STUDS
TO EXISTING WALL OR
COLUMNS @ 16" O.C. WITH 1
1/2" SOUND ATTENUATION
BLANKET IN STUD SPACE.
EXTEND STUDS, BOARD, AND
SOUND BLANKETS TO 6"
ABOVE FACE OF CEILING.
EXTEND TO DECK IF CEILING IS
EXPOSED.
TYPE E1
ONE LAYER OF 5/8" GYPSUM
WALLBOARD ON ROOM SIDE
OF 7/8" 20 GA. METAL STUDS
TO EXISTING WALL OR
COLUMNS @ 16" O.C. EXTEND
STUDS, BOARD, AND SOUND
BLANKETS TO 6" ABOVE FACE
OF CEILING.
TYPE A1 STC = 45
(TYPICAL U.N.O.)
ONE LAYER OF 5/8" GYPSUM
WALLBOARD ON EACH SIDE
OF 3-5/8" 20 GA. METAL STUDS
@ 16" O.C. WITH 3" SOUND
ATTENUATION BLANKETS IN
STUD SPACE. EXTEND STUDS,
BOARD, AND BLANKETS FULL
HEIGHT TO DECK ABOVE.
ATTACH TO STRUCTURE
ABOVE W/ VERTICAL SLIP
CONNECTIONS. SEE
PARTITION NOTES THIS DWG.
TYPE A6
ONE LAYER OF 5/8" GYPSUM
WALLBOARD ON ROOM SIDE
OF 3-5/8" 20 GA. METAL STUDS
@ 16" O.C. EXTEND STUDS
AND BOARD TO 6" ABOVE
CEILING. BRACE TOP OF WALL
AS REQUIRED, BUT NOT LESS
THAN 8'-0" O.C.
TYPE A5
ONE LAYER OF 5/8" GYPSUM
WALLBOARD ON ROOM SIDE
OF 3-5/8" 20 GA. METAL STUDS
@ 16" O.C. EXTEND STUDS
AND BOARD FULL HEIGHT TO
DECK ABOVE. ATTACH TO
STRUCTURE ABOVE W/
VERTICAL SLIP CONNECTIONS.
SEE PARTITION NOTES THIS
DWG.
TYPE B3 STC = 44
ONE LAYER OF 5/8" GYPSUM
WALLBOARD ON EACH SIDE
OF 6" 20 GA. METAL STUDS @
16" O.C. WITH 6" SOUND
ATTENUATION BLANKETS IN
STUD SPACE. EXTEND STUDS,
BOARD, AND BLANKETS TO 6"
ABOVE CEILING. BRACE TOP
OF WALL AS REQUIRED, BUT
NOT LESS THAN 8'-0" O.C.
TYPE B4
ONE LAYER OF 5/8" GYPSUM
WALLBOARD ON ROOM SIDE
OF 6" 20 GA. METAL STUDS @
16" O.C. WITH 6" SOUND
ATTENUATION BLANKETS IN
STUD SPACE. EXTEND STUDS,
BOARD, AND BLANKETS TO 6"
ABOVE CEILING. BRACE TOP
OF WALL AS REQUIRED, BUT
NOT LESS THAN 8'-0" O.C.
TYPE F8 STC = 51
2 HOUR SHAFT WALL
UL# U415 SYSTEM B
2 LAYER OF 5/8" TYPE "X" GYPSUM
WALLBOARD ON ONE SIDE OF 6"
2O GA. METAL CH STUD AT 16" O.C.
MAX., AND ONE LAYER OF 1" TYPE
"X" GYPSUM LINER PANEL
INSERTED WITHIN "H" PORTION OF
"CH" STUD, AND 5" SOUND
ATTENUATION BLANKETS IN STUD
SPACE. EXTEND STUDS, BOARD,
AND SOUND BLANKETS FULL
HEIGHT TO DECK ABOVE.ATTACH
TO STRUCTURE ABOVE W/
VERTICAL SLIP CONNECTIONS.
SEE PARTITION NOTES THIS DWG.
TYPE G2 STC = 44
1 HOUR WALL
UL # U905
INTERIOR H.C.B. WALL (NON
LOAD BEARING)
8" NOM. CONCRETE BLOCKS,
UL CLASSIFICATION D-2 (2 HR.)
TYPE G3 STC = 44
3 HOUR WALL
UL # U904
INTERIOR H.C.B. WALL (NON
LOAD BEARING)
8" NOM. CONCRETE BLOCKS,
UL CLASSIFICATION C-3 (3 HR.)
TYPE G1 STC = 44
INTERIOR H.C.B. WALL (NON
LOAD BEARING)
8" NOM. CONCRETE BLOCKS.
TYPE F4 STC = 49
2 HOUR RATED WALL
UL# U419
PROVIDE 2 LAYERS OF TYPE
"X" GYPSUM WALLBOARD FOR
2 HR UL RATING ON EACH SIDE
OF 6" 20 GA. METAL STUDS @
16" O.C. WITH 6" SOUND
ATTENUATION BLANKETS IN
STUD SPACE. EXTEND
STUDS, BOARD, AND
BLANKETS FULL HEIGHT TO
DECK ABOVE. ATTACH TO
STRUCTURE ABOVE W/
VERTICAL SLIP CONNECTIONS.
SEE PARTITION NOTES THIS
DWG.
TYPE F3 STC = 48
2 HOUR RATED WALL
UL# U419
PROVIDE 2 LAYERS OF TYPE
"X" GYPSUM WALLBOARD FOR
2 HR UL RATING ON EACH SIDE
OF 3 5/8" 20 GA. METAL STUDS
@ 16" O.C. WITH 3" SOUND
ATTENUATION BLANKETS IN
STUD SPACE. EXTEND
STUDS, BOARD, AND
BLANKETS FULL HEIGHT TO
DECK ABOVE. ATTACH TO
STRUCTURE ABOVE W/
VERTICAL SLIP CONNECTIONS.
SEE PARTITION NOTES THIS
DWG.
TYPE F7 STC = 51
2 HOUR SHAFT WALL
UL# U415 SYSTEM B
2 LAYER OF 5/8" TYPE "X" GYPSUM
WALLBOARD ON ONE SIDE OF 4" 2O
GA. METAL CH STUD AT 16" O.C.
MAX., AND ONE LAYER OF 1" TYPE
"X" GYPSUM LINER PANEL
INSERTED WITHIN "H" PORTION OF
"CH" STUD, AND 3" SOUND
ATTENUATION BLANKETS IN STUD
SPACE. EXTEND STUDS, BOARD,
AND SOUND BLANKETS FULL
HEIGHT TO DECK ABOVE.ATTACH
TO STRUCTURE ABOVE W/
VERTICAL SLIP CONNECTIONS. SEE
PARTITION NOTES THIS DWG.
TYPE F5 STC = 47
1 HOUR SHAFT WALL
UL# U415 SYSTEM A
1 LAYER OF 5/8" TYPE "X" GYPSUM
WALLBOARD ON ONE SIDE OF 4" 2O
GA. METAL CH STUD AT 16" O.C.
MAX., AND ONE LAYER OF 1" TYPE
"X" GYPSUM LINER PANEL
INSERTED WITHIN "H" PORTION OF
"CH" STUD, AND 3" SOUND
ATTENUATION BLANKETS IN STUD
SPACE. EXTEND STUDS, BOARD,
AND SOUND BLANKETS FULL
HEIGHT TO DECK ABOVE.ATTACH
TO STRUCTURE ABOVE W/
VERTICAL SLIP CONNECTIONS. SEE
PARTITION NOTES THIS DWG.
TYPE F6 STC = 53
1 HOUR SHAFT WALL
UL# U415 SYSTEM A
1 LAYER OF 5/8" TYPE "X" GYPSUM
WALLBOARD ON ONE SIDE OF 6" 2O
GA. METAL CH STUD AT 16" O.C.
MAX., AND ONE LAYER OF 1" TYPE
"X" GYPSUM LINER PANEL
INSERTED WITHIN "H" PORTION OF
"CH" STUD, AND 5" SOUND
ATTENUATION BLANKETS IN STUD
SPACE. EXTEND STUDS, BOARD,
AND SOUND BLANKETS FULL
HEIGHT TO DECK ABOVE.ATTACH
TO STRUCTURE ABOVE W/
VERTICAL SLIP CONNECTIONS. SEE
PARTITION NOTES THIS DWG.
1. PARTITION TYPES ARE INDICATED ON THE ARCHITECTURAL FLOOR PLAN OR PARTITION PLAN. THE TYPICAL PARTITION TYPE IS WALL TYPE "A1" UNLESS INDICATED OTHERWISE ON ARCHITECTURAL FLOOR PLAN OR PARTITION PLAN. TYPICAL WALL TYPES ARE NOT ALL SHOWN ON PLAN.
2. BUILD PARTITIONS IN ACCORDANCE WITH PARTITION SCHEDULE AND DESIGN REFERENCED. REFERENCES ARE TO LATEST EDITION OF GYPSUM ASSOCIATION (GA) FIRE RESISTANCE DESIGN MANUAL, OR TO UNDERWRITERS LABORATORY (UL) FIRE RESISTANCE DIRECTORY.
3. ALL WALLBOARD IS TO BE TYPE "X" UNLESS NOTED OTHERWISE. SEE NOTE 10 FOR ADDITIONAL INFORMATION.
4. PARTITION TYPES INDICATED ARE CONTINUOUS TO A CORNER OR AN INTERSECTING PARTITION UNLESS INDICATED OTHERWISE. WHERE PARTITIONS OF DIFFERENT
THICKNESSES MEET MAINTAIN A FLUSH SURFACE ON THE SIDE WHERE FACES ARE STRAIGHT AND CONTINUOUS UNLESS NOTED OTHERWISE.
5. METAL STUD GAUGES SCHEDULED ARE THE MINIMUM REQUIRED AND MAY BE INCREASED BY SPECIFICATIONS TO ACCOMMODATE LOADS, FINISHES, OR UNBRACED
CEILING HEIGHT LIMITS. DO NOT CONSIDER CEILING SYSTEM(S) AS A PARTITION BRACING ELEMENT.
6. SOUND ATTENUATION BATT (SAB) IS TO BE PLACED IN ALL PARTITIONS WHICH ENCLOSE A ROOM UNLESS NOTED OTHERWISE.
7. WOOD AND PLYWOOD BLOCKING TO BE FIRE RETARDANT TREATED (FRT).
8. EDGES OF GYPSUM WALL BOARD (GWB) LEFT EXPOSED TO VIEW OR ABUTTING DISSIMILAR MATERIAL SHALL BE FINISHED WITH METAL "L" BEAD TRIM AND COMPOUND
UNLESS NOTED OTHERWISE.
9. SCHEDULING OF A PARTITION DESIGN WHICH CARRIES A FIRE RATING DOES NOT IMPLY A FIRE SEPARATION FUNCTION FOR THAT PARTITION. LOCATIONS OF FIRE AND
SMOKE PARTITIONS ARE INDICATED ON THE RATED PARTITION PLAN (SHEET A002)
10. PARTITION SCHEDULE IS BASED ON USE OF GYPSUM WALL BOARD (GWB) BUT FACING BOARD MAY VARY. IN LIEU OF GWB:
A. USE CEMENTITIOUS BACKER BOARD (CBB) WHERE CERAMIC TILE IS SCHEDULED - WHERE CERAMIC TILE IS NOT FULL HEIGHT, INSTALL CEMENTITIOUS BACKER
BOARD TO TOP OF TILE WITH MOISTURE RESISTIANT BOARD ABOVE
B. USE GYPSUM LATH BOARD (BLUE BOARD) WHERE VENEER PLASTER IS SCHEDULED
C. USE MOISTURE RESISTANT BOARD (MR) AT ALL ALL LOCATIONS WITHING 4'-0" OF A PLUMBING FIXTURE INCLUDING ADJACENT SIDE WALLS.
D. SEE FINISH SCHEDULE AND SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS PARTICULARS.
11. ALL FIRE RATED WALL AND FLOOR PENETRATION MUST COMPLY WITH ASTM-E814
12. ALL DOOR OPENINGS SHALL BE 4" FROM A PERPENDICULAR PARTITION TO OUTSIDE FACE OF FRAME, UNLESS NOTED OR DETAILED OTHERWISE.
13. ALL PARTITIONS, INCL. STUDS, BOARD, SOUND ATTENUATION BLANKETS, ETC. TO EXTEND FROM TOP OF FLOOR SLAB TO UNDERSIDE OF CONCRETE SLAB ABOVE
UNLESS OTHERWISE NOTED.
14. CONTRACTOR SHALL CLOSE OFF ANY VOIDS LEFT AS A RESULT OF ANY REMOVALS AND NEW CONSTRUCTION AS WELL AS INFILL OF ANY EXISTING VOIDS IN NEWLY
DESIGNATED FIRE RATED PARTITIONS. ALL PATCHES SHALL MATCH AND ALIGN WITH SURROUNDING MATERIALS AND SHALL BE IN ACCORDANCE WITH OHIO BUILDING
CODE.
15. CONTRACTOR SHALL SEAL AROUND ALL MECHANICAL, ELECTRICAL, AND PLUMBING ELEMENTS WHERE THEY PENETRATE FLOORS, WALLS, AND HORIZONTAL OR VERTICAL ASSEMBLIES, INCLUDING PENETRATIONS OCCURING ABOVE CEILINGS OR IN OTHERWISE CONCEALED SPACES.
16. ALL NEW MASONRY WORK INCLUDING NEW PARTITIONS, INFILL AND PATCHING; MATCH EXISTING COURSING AND TOOTH IN WITH EXISTING ADJ. CONSTRUCTION.
17. NO EXISTING FIREPROOFING IS TO BE REMOVED FROM EXISTING BUILDING STRUCTURE FOR ANY NEW INSTALLATION FOR ANY REASON.
18. IN AREAS OF TOILET ROOMS AND OTHER PLUMBING FIXTURES SUCH AS MOP BASINS, SINKS, SHOWERS, TOILETS, ETC. A TYPE 'X' MOISTURE RESISTANT GYPSUM
WALLBOARD SHALL BE USED FOR THE WALL CONSTRUCTION. WHERE CERAMIC TILE IS SCHEDULED; CEMENTITIOUS BOARD SHALL BE USED FOR THE WALL
CONSTRUCTION.
19. UNLESS NOTED, THE CONNECTION AT THE TOP OF THE PARTITION TO THE STRUCTURE ABOVE MUST ALLOW FOR 1" MINIMUM VERTICAL MOVEMENT, EITHER UP OR DOWN. AT FIRE RATED METAL STUD PARTITIONS, THE TOP CONNECTION MUST BE A FIRE STOP CONNECTION THAT ALLOWS 1" MINIMUM VERTICAL MOVEMENT, EITHER UP OR DOWN. HOLD GYPSUM WALL BOARD AND METAL STUDS 1" FROM THE BOTTOM OF THE STRUCTURE ABOVE. DO NOT SCREW-ATTACH VERTICAL STUDS OR GYPSUM WALL BOARD TO THE TOP TRACK. INSTALL BRIDGING 12" MINIMUM FROM THE TOP OF THE STUDS.
PARTITION NOTES:
D E
C K
A B
O V
E
C E
IL
IN
G
5/8" 3 5/8" 5/8"
4 7/8"
6"
C E
IL
IN
G
5/8" 3 5/8" 5/8"
4 7/8"
5/8" 5/8" 5/8" 5/8"
C E
IL
IN
G
5/8" 6" 5/8"
7 1/4"
6" 5/8" 5/8" 6" 5/8"
7 1/4"
6 1/8" 5/8"
D E
C K
A B
O V
E
D E
C K
A B
O V
E
D E
C K
A B
O V
E
D E
C K
A B
O V
E
D E
C K
A B
O V
E
D E
C K
A B
O V
E
D E
C K
A B
O V
E
2 1/2" 5/8"
3 1/8"
1 5/8" 5/8"
2 1/4"
7/8" 5/8"
1 1/2"
5/8" 3 5/8" 5/8"
4 7/8"
5/8" 6" 5/8"
7 1/4"
5/8"
5/8"
3 5/8"
5/8"
5/8"
6 1/8"
5/8"
5/8"
6"
5/8"
5/8"
8 1/2"
1" 3" 5/8"
4 5/8"
1" 5" 5/8"
6 5/8"
1" 3"
5/8"
5/8"
5 1/4" 7 1/4"
1" 5"
5/8"
5/8" 7 5/8" 7 5/8" 7 5/8"
C E
IL
IN
G 6"
C E
IL
IN
G
C E
IL
IN
G
6"
C E
IL
IN
G
6"
D E
C K
A B
O V
E
D E
C K
A B
O V
E
D E
C K
A B
O V
E
D E
C K
A B
O V
E
D E
C K
A B
O V
E
D E
C K
A B
O V
E
D E
C K
A B
O V
E
D E
C K
A B
O V
E
D E
C K
A B
O V
E
6 5/8" 6 3/4"
TYPE A7
ONE LAYER OF 5/8" GYPSUM
WALLBOARD OUTSIDE OF ROOM
AND 1 LAYERS OF ABUSE
RESISTANT GYPSUM BOARD ON 3/4"
FRT PLYWOOD AT PSYCH ISOLATION
ROOM SIDE ON 3-5/8" 20 GA., METAL
STUDS @ 16" O.C. WITH 3" SOUND
ATTENUATION BLANKETS IN STUD
SPACE. EXTEND STUDS, BOARD,
AND BLANKETS FULL HEIGHT TO
DECK ABOVE. ATTACH TO
STRUCTURE ABOVE W/ VERTICAL
SLIP CONNECTIONS. SEE PARTITION
NOTES THIS DWG.
D E
C K
A B
O V
E
5/8" 4 1/2"
5 1/8"
TYPE C2
ONE LAYER OF 5/8" GYPSUM
WALLBOARD ON ROOM SIDE OF 2
1/2" 20 GA. METAL STUDS @ 16" O.C.
WITH 2" SOUND ATTENUATION
BLANKET IN STUD SPACE. FILL ANY
VOIDS AT WINDOW OPENINGS,
CROSS BRACING, ETC WITH FRT
PLAYWOOD PRIOR TO INSTALLING
SOUND BLANKETS. EXTEND STUDS,
BOARD AND SOUND BLANKETS FULL
HEIGHT TO DECK ABOVE. ATTACH
TO STRUCTURE ABOVE. SEE
PARTITION NOTES THIS DWG.
D E
C K
A B
O V
E
2 1/2" 5/8"
3 1/8"
TYPE C3
ONE LAYER OF 5/8" GYPSUM
WALLBOARD ON ROOM SIDE
OF 2 1/2" 20 GA. METAL STUDS
@ 16" O.C. WITH 2" SOUND
ATTENUATION BLANKET IN
STUD SPACE. EXTEND STUDS,
BOARD AND SOUND
BLANKETS FULL HEIGHT TO 6"
ABOVE FACE OF CEILING.
ATTACH TO STRUCTURE
ABOVE W/ CROSS BRACING.
SEE PARTITION NOTES THIS
DWG.
2 1/2" 5/8"
3 1/8"
C E
IL
IN
G
C E
IL
IN
G FRT PLYWOOD
ONLY WHERE
REQUIRED TO
INFILL VOIDS
6"
NOTE: ITEMS SHOWN HERE SHALL BE MOUNTED AT THE HEIGHT INDICATED HERE
UNLESS NOTED OTHERWISE FOR AN ITEM IN A SEPARATE DETAIL
MIN
1'-6"
TYPICAL ACCESSIBLE TOILET ROOM
COMB. TOWEL
DISPENSER/
WASTE
RECEPTACLE
PAPER TOWEL
DISPENSER (PTD)
LIQUID SOAP
DISPENSER (SD)
5' -0
BABY
CHANGING
STATION
2' -6
"3' -6
3' -8
6" 3'-0"
(O R
0"
M
IN
A
B O
V
C
O U
N T
E R
T O
P
RIM
RIM
RIM
RIM
URINAL WALL HUNG
LAVATORY
ACCESSIBLE
URINAL
FLUSHING RIM
SERVICE SINK W/
GRAB HANDLES
2' -1
0"
WATER
COOLER
ADA
2' -6
1' -5
2' -0
FLUSH CONTROLS SHALL BE
LOCATED ON THE OPEN SIDE
OF THE WATER CLOSET
T Y
P . A
LL
LO
C
A T
IO
N
S
2' -1
0"
TOP OF
SEAT
ACCESSIBLE
TOILET
to
9"
T P
D
1' -7
M
IN3'
-4
3' -0
3'-6" 1'-0"
7 TO 9"
LIGHT
SWITCH
ELECTRICAL
ABOVE 36" HIGH
COUNTER
ELECTRICAL
ABOVE 30" HIGH
COUNTER
THERMOSTATELECTRICAL
OUTLET
WALL
PHONE/
INTERCOM
CL
CLOCK COAT /
ROBE
HOOK
FIRE EXTINGUISHER
CABINET
7' -0
" CL
3' -8
COAT HOOK TYP. ON
OFFICES
ROBE HOOK TYP. ON
PATIENT/STAFF TOILET
ROOMS
SWITCH
LOCATION TYP
ALL DOORS
6"
SHARPS
CONTAINER
3' -2
HANDRAIL
WHERE
APPLICABLE
INTERNATIONAL
ACCESSIBILITY
SIGN WHERE
APPLICABLE
HANDRAIL
WHERE
APPLICABLE5'
-0
9"
2" 2"
NURSE CALL MEDICAL
GASES
CODE RED
CODE BLUE
NURSE CALL
(3 GANG BOX)
TV, AWARIX
MONITOR,
ETC. 6'
-6
4' -6
1' -6
" 3' -2
3' -8
4' -0
4' -0
4' -2
3' -0
3'-6"
4' -2
4' -0
A C
C E
S S
IB
LE
4' -0
4' -6
5' -0
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
VA NORTHERN
INDIANA
HEALTH CARE
SYSTEM
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
C H A M P L I N A R C H I T E C T U R E
720 East Pete Rose Way Suite 140 Cincinnati OH 45202 513-241-4474 www.thinkchamplin.com
#610-19-103
Marion, IN
REMODEL 1ST FLOOR, BUILDING 138
03/20/2023
FINAL BID DOCUMENTS
138NOT FOR CONSTRUCTION
Page Number
C U s e rs \b w e tz e l\ D o c u m e n ts \M a ri o n
V A
M C
A rc h
R b ri a n n a .w e tz e l.
rv t
/1
/2
:5
:0
A
M
GI001
ABBREVIATIONS, SYMBOLS, PARTITION
TYPES
MM BFW
SYMBOLS & ANNOTATIONSABBREVIATIONS
PARTITION TYPES
TYPICAL MOUNTING HEIGHTS
Revisions: Date:
35% ISSUANCE 04/28/2021
65% ISSUANCE 03/23/2022
95% ISSUANCE 05/04/2022
FEC
F E
C
F E
C
F E
C
9 69043
8 72457
391 9 96134
9 69061
8 72457
391 9 96126
8 72457
9 96134
8 72457
391 9 96126
F E
C
H
R F
B -A
H
R F
B -A
1HR FB-A 1HR FB-A
1HR FB-A
1HR FB-A
1HR FB-A
1HR
H
R
S
B
0SB
S
B
H
R H
R
2HR 2HR
2HR 2HR
H
R
2HR 2HR
2HR
H
R
2HR
H
R
H
R -A
H
R -A
H
R -A
H
R -A
H
R -A
H
R -A
H
R -A
H
R -A
H
R -A
2HR-A
H
R -A
2HR-A
H
R -A
H
R -A
2HR-A
2HR-A
2HR-A
2HR
H
R
H
R
2HR-A
2HR-A
H
R
2HR-A 2HR-A
2HR
H
R
2HR
H
R -A
H
R
H
R -A
1HR FB-A
2HR2HR 2HR2HR2HR
H
R H
R
H
R H
R H
R H
R
H
R H
R
2HR
2HR 2HR2HR 2HR
2HR
2HR2HR
H
R
H
R
H
R F
B -A
H
R F
B -A
H
R F
B -A
1HR FB-A1HR FB-A
H
R -A
H
R
H
R
H
R
H
R
2HR
2HR
2HR
1HR 1HR1HR 1HR 1HR
1HR
1HR
H
R
H
R
1HR 1HR
1HR
1HR
1HR 1HR1HR
H
R
1HR
H
R
1HR
H
R
1HR
H
R
1HR
H
R H
R
2HR-A
2SB
2HR
1HR FB-A
0SB
1HR
BUILDING 172
DOWN
UP
UNIT A
UNIT C
UNIT B
1HR FB-A
1HR FB-A
1HR FB-A
FEC
F E
C
F E
C
103'-0"
-4
152'-0"136'-6"149'-6"
F E
C
FEC
FEC FEC
F E
C
FEC
132'-4"
144'-0"
FE
FE
ACCESS POINT TO EXIT DISCHARGE OR PUBLIC WAY
ACCESS POINT TO EXIT ENCLOSURE OR HOIZONTAL EXIT
1 HOUR FIRE-RESISTANCE RATED FIRE BARRIER, SHAFT WALL
2 HOUR FIRE-RESISTANCE RATED FIRE BARRIER
2 HOUR FIRE-RESISTANCE RATED, SHAFT WALL
2 HOUR FIRE-RESISTANCE RATED SMOKE BARRIER
PARTITIONS TO BE FIRE RATED, SMOKE RESISTANT OR BOTH FIRE AND SMOKE
RESISTANT AS INDICATED GRAPHICALLY ON PLANS.
THIS PROJECT HAS BEEN DESIGNED UNDER THE CURRENT REQUIREMENTS OF
THE APPLICABLE CODES AND STANDARDS:
- INTERNATIONAL BUILDING CODE
- NFPA 101 LIFE SAFETY CODE
- ARCHITECTURAL BARRIERS ACT AND VA PG-13 BARRIER FREE DESIGN
- US DEPARTMENT OF VETERANS AFFAIRS DESIGN MANUALS & STANDARDS
SMOKE BARRIER (NON RATED)
FIRE EGRESS TRAVEL PATH WITH DISTANCES.
COMMON PATH OF TRAVEL DOES NOT EXCEED
100' AT ANY LOCATION WITHIN AREA OF WORK.
XX'-X"
FIRE EGRESS TRAVEL PATH WITH DISTANCES
FEC
GREY HATCH INDICATES REGIONS OF BUILDING
OUTSIDE OF AREA OF WORK FOR THIS PROJECT.
1 HOUR FIRE-RESISTANCE RATED FIRE BARRIER
Codes and Regulations:
Information in this code summary is in reference to the 2012 International Building Code (IBC), with the 2014 Indiana Building Code amendments.
Other applicable codes include:
• Architectural Barriers Act & VA PG18-13 Barrier Free Design
• US Department of Vertans Affairs Design Manuals & Standards
• Indiana Building Code, 2014 edition
• International Building Code, 2018 edition
• NFPA 101 Life Safety Code, National Fire Protection Association
• NFPA Fire Codes with the exception of NFPA 5000 and NFPA 900, National Fire Protection Association
• OSHA Standards
• Safety Code for Elevators and Escalators, A 17.1, American Society of Mechanical Engineers (ASME)
Building Use Group: B, Business
Construction Type: Type 1B
Construction Type: requires the following ratings:
• Structural frame: 2 hrs.
• Floor Construction: 2 hrs.
• Roof Construction: 2 hrs.
• Vertical Exit Enclosures 2 hrs. when connecting 4 or more stories
• Shaft Enclosures (Section 707) 2 hrs. when connecting 4 or more stories
Automatic Sprinkler System: Building is fully sprinklered.
Occupant Load: First Floor Footprint: 34,889 sf = 349 occupants/floor Phase 1: 4,648 sf = 47 occupants Phase 2: 2,460 sf = 25 occupants Phase 3: 3,260 sf = 33 occupants Total Area of project: 10,368 sf = 104 occupants
Number of Exits required per floor: 2
Means of Egress Door Width (Section 1010.1):
Institutional doors: 41.5" clear All other doors: 32" clear
Common path of Travel: 100ft. (max)
Exit Access Travel Distance : 300ft. (max.)
Dead End Corridor (Section 1020.4): 50ft.
Plumbing Fixture Requirements:
• Toilets, B occupancy - 1 per 25 for first 50, 1 per 50 for remainder
• Lavatories, B occupancy - 1 per 40 for first 80, 1 per 80 for remainder
• Drinking fountains - 1 per 100
• 1 service sink
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
VA NORTHERN
INDIANA
HEALTH CARE
SYSTEM
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
C H A M P L I N A R C H I T E C T U R E
720 East Pete Rose Way Suite 140 Cincinnati OH 45202 513-241-4474 www.thinkchamplin.com
#610-19-103
Marion, IN
REMODEL 1ST FLOOR, BUILDING 138
03/20/2023
FINAL BID DOCUMENTS
138NOT FOR CONSTRUCTION
Page Number
C U s e rs \b w e tz e l\ D o c u m e n ts \M a ri o n
V A
M C
A rc h
R b ri a n n a .w e tz e l.
rv t
/1
/2
:5
:0
A
M
GI002
LIFE SAFETY PLAN, CODE INFO
MM BFW
1/16" = 1'-0"GI002
1 LIFE SAFETY PLAN
LEGEND - RATED WALL PLAN
BUILDING CODE INFORMATION
Revisions: Date:
35% ISSUANCE 04/28/2021
65% ISSUANCE 03/23/2022
95% ISSUANCE 05/04/2022
E
C
F E
C
F E
C
F E
C
FEC
F E
C
F E
C
FEC
FEC
F E
C
F E
C
F E
C
DDD PR
F
D
F
T
T
D
F E
C
PHASE 1A - BUILD TEMPORARY ELECTRICAL AND DATA CLOSETS. COORDINATE AFTER HOURS SHUTDOWN
FOR SWITCH OVER TO NEW SERVICES FOR EXISTING AREAS OF FLOOR OUTSIDE OF GENERAL
CONSTRUCTION SCOPE FOR THIS PROJECT.
PHASE 1B - RENOVATE URGENT CARE AREA, PRIMARY CARE EAST PACT, WELCOME CENTER OFFICES, AND COMMONAREAS FOR SHARED BREAKROOM & HAC/ELEC/OIT ROOMS. AMBULANCE GARAGE WILL NOT HAVE ACCESS INTO BUILDING DURING THIS PHASE. MAINTAIN ACCESS THRU MAIN NORTH/SOUTH CORRIDOR AT ALL TIMES. MAINTAIN ACCESS TO STAIRWELL 3 FOR BUILDING EGRESS AT ALL TIMES, WITH MINIMUM 3' CLEAR.
COMPLETE NEW WALLS AND DOORS AT CORRIDOR ASAP SO THAT CONSTRUCTION BARRIERS MAY BE REDUCED
FOR DURATION OF PHASE.
PHASE 2 - RENOVATED FRONT WAITING AREA, LOBBY, AND CORRIDORS. NEW FINISHES IN CORRIDOR AREAS WITH ACCESS MAINTAINED DURING OPERATIONAL HOURS. WORK MAY OCCUR CONCURRENT WITH
PHASE 1 OR 2 BUT NEEDS TO BE COORDINATED WITH COR.
OUTSIDE OF SCOPE OF WORK
PHASING LEGEND
PHASE 1B
PHASE 1B
PHASE 1A
PHASE 2
VA Marion, Bldg 138, URGENT CARE
1. PRIOR TO START OF WORK ON EACH PHASE, THE VA WILL TEMPORARILY RELOCATE STAFF AND
DEPARTMENTS TO VACANT AREA WITHIN THE BUILDING COMPLEX.
2. REFERENCE VAMC STANDARD ICRA DRAWING SHEET(S) FOR ADDITIONAL INFECTION CONTROL INFORMATION, TEMPORARY PARTITION CONSTRUCTION AND MONITORING OF NEGATIVE AIR PRESSURE.
3. FOLLOW GUIDELINES ON INFECTION CONTROL RISK ACCESSMENT DRAWINGS, (IC SHEETS) AT ALL TIMES.
4. PHASE 1A WILL REQUIRE NEW POWER, PHONE AND DATA CONNECTIONS TO AREAS OUTSIDE OF THE
SCOPE OF THIS PROJECT. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING ALL
SHUTDOWNS WITH VA FACILITIES STAFF.
5. DASHED LINES ON PLAN INDICATE APPROXIMATE LOCATIONS OF TEMPORARY BARRIERS REQUIRED IN PUBLIC AREAS. THE GC TO LOCATE TEMP PARTITIONS AT THEIR DISCRETION WITH A MINIMUM 4'-0" CLEAR EGRESS PATH MAINTAINED AT FOR PUBLIC CIRCULATION AT CORRIDOR C106. SEE ICRA DRAWINGS. STICKY WALK-OFF MATT WILL BE REQUIRED AT ALL ACCESS POINTS IN EACH PHASE. PRESSURE MONITORING
WITH LOGS ARE REQUIRED AS INDICATED ON ICRA DRAWINGS.
6. PARTITIONS AND DOORS AT MAIN NORTH/SOUTH CORRIDOR TO BE COMPLETED TO INSURE BARRIERS ARE
REMOVED ASAP.
7. WHEN WORK IS REQUIRED ABOVE CEILING IN MAIN NORTH/SOUTH CORRIDOR DURING PHASE 1A, 1B AND 2, THE BARRIER MUST BE IN PLACE OR WORK MUST OCCUR AFTER HOURS.
8. AFTER MAIN BARRIER IS REMOVED, A MODIFIED BARRIER WILL BE REQUIRED AT CORRIDOR C105 AND WAITING 132 FOR DURATION OF PHASE AT PROVIDE SECURITY AND NEGATIVE AIR PRESSURE TO AREA OF
CONSTRUCTION.
9. PHASE 3 WORK OCCURS IN THE PUBLIC CORRIDORS AND WILL OCCUR OUTSIDE OF GENERAL HOURS OF OPERATION. COORDINATE ALLOWED ACCESS TIMES WITH VA FACILITIES. ALL AREAS MUST BE CLEANED
AND MAINTAINED DAILY TO INSURE SAFE AND SECURE PATH OF EGRESS DURING WORK HOURS.
10. MAINTAIN ACCESS TO EGRESS PATH THROUGH STAIR S103 AT ALL TIMES. PHASE 1B CONSTRUCTION BARRIER INDICATED ON PLAN MAY OCCUR AFTER HOURS OR BE PHASED BEFORE OR AFTER OTHER MAIN
CORRIDOR WORK AT CONTRACTOR'S DISCRETION TO INSURE CLEAR ACCESS WITHOUT BLOCKING
EGRESS PATH.
11. NEW PARTITIONS INSTALLED AT CORRIDOR DURING PHASE 1 AND 2 TO RECEIVE NEW WALL FINISHES DURING THOSE PHASES TO INSURE PUBLIC AREAS ARE MAINTAINED IN GOOD CONDITION AT ALL TIMES.
12. WORK REQUIRED ON BASEMENT LEVEL AND 2ND FLOOR SHALL BE SCHEDULED TO OCCUR AFTER HOURS.
PHASING NOTES
*PHASE 1B CONSTRUCTION BARRIERS
D U
M P S T E R
P H
A S
E
C O
N S
T R
U C
T
IO
N B
A R
R
IE
R
P O
T E N
T
IA
L
D U
M P S T E R
PHASE 1A CONSTRUCTION BARRIER
6'-0"
5' -1
6"
5' -1
" 7 1/
4"
*PHASE 1B CONSTRUCTION BARRIERS NOTE:
CONTRACTOR TO MAINTAIN ACCESS THROUGH THIS COORDIDOR THROUGHOUT CONSTRUCTION THUS
BARRIERS DURING THIS PHASE WILL NEED TO SHIFT TO ACCOMMODATE THIS AT TIMES.
BARRIER WHILE WORK WITHIN THE EAST AREA IS BEING WORKED ON
BARRIER WHILE WORK WITHIN THE WEST AREA IS BEING WORKED ON
CLOSE AND
LOCK THIS
DOOR LEAF
THROUGHOUT
PHASE 1B
CONSTRUCTION
REMOVE EXISTING
DOOR BEFORE THE
BARRIERS ARE
CONSTRUCTED, THEN
INSTALL BARRIER
DOOR ACCESS HERE
5' -7
PRIOR TO START OF WORK, TELEHEALTH TO BE RELOCATED OUT OF NW WING BY VA. URGENT CARE & WELCOME CENTER TO BE TEMPORARILY RELOCATED TO VACANT AREA WITHIN THE OVERALL PROJECT AREA.
PHASE 1A - BUILD TEMPORARY ELECTRICAL AND DATA CLOSETS.
PHASE 1B - RENOVATE URGENT CARE AREA, PRIMARY CARE EAST PACT, WELCOME CENTER OFFICES, AND
COMMONAREAS FOR SHARED BREAKROOM & HAC/ELEC/OIT ROOMS.
PHASE 2 - RENOVATED FRONT WAITING AREA, LOBBY, AND CORRIDORS. NEW FINISHES IN CORRIDOR AREAS WITH ACCESS MAINTAINED DURING OPERATIONAL HOURS. WORK MAY OCCUR CONCURRENT WITH PHASE 1
OR 2 BUT NEEDS TO BE COORDINATED WITH COR.
OUTSIDE OF SCOPE OF WORK
PHASING LEGEND
PHASE 1B
PHASE 2
PHASE 1B
PHASE 1A
CONSTRUCTION ACCESS/EGRESS ROUTE
CONSTRUCTION BARRIERS
D U
M P
S T
E R
CLOSE AND
LOCK THIS
DOOR LEAF
THROUGHOUT
PHASE 1B
CONSTRUCTION
REMOVE
EXISTING DOOR
BEFORE THE
BARRIERS ARE
CONSTRUCTED,
THEN INSTALL
BARRIER DOOR
ACCESS HERE
*PHASE 1B CONSTRUCTION BARRIERS
P H
A S
E
C O
N S
T R
U C
T
IO
N B
A R
R
IE
R
PHASE 1A CONSTRUCTION BARRIER
URGENT CARE = 2395 SF
PRIMARY CARE = 3084 SF
WELCOME CNTR = 443 SF
SHARED AREAS = 778 SF
BLDG CORIDOR = 3237 SF
OUTSIDE OF SCOPE
OF WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
VA NORTHERN
INDIANA
HEALTH CARE
SYSTEM
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
C H A M P L I N A R C H I T E C T U R E
720 East Pete Rose Way Suite 140 Cincinnati OH 45202 513-241-4474 www.thinkchamplin.com
#610-19-103
Marion, IN
REMODEL 1ST FLOOR, BUILDING 138
03/20/2023
FINAL BID DOCUMENTS
138NOT FOR CONSTRUCTION
Page Number
C U s e rs \b w e tz e l\ D o c u m e n ts \M a ri o n
V A
M C
A rc h
R b ri a n n a .w e tz e l.
rv t
/1
/2
:5
:1
A
M
GI003
PHASING PLANS AND DEPARTMENT
PLAN
MM BFW
1/8" = 1'-0"GI003
1 ICRA & PHASING PLAN - NEW WORK
1/16" = 1'-0"GI003
2 PHASING PLAN - DEMOLITION
1/16" = 1'-0"GI003
3 DEPARTMENT KEY PLAN
Revisions: Date:
35% ISSUANCE 04/28/2021
65% ISSUANCE 03/23/2022
95% ISSUANCE 05/04/2022
E
C
F E
C
F E
C
F E
C
THIS IS A
POST ICRA, ILSM, FIRE
INSPECTION SHEETS VISIBLE
TO PUBLIC
RESTRICTED AREA
AREA UNDER CONSTRUCTION
SUSPENDED PLASTIC ZIPPER WALL
CURTAIN BARRIER
PERSONNEL ENTERING MUST HAVE: HARD HAT, SAFETY GLASSES
AND PROPER I.D.
COMING SOON!!!
- DESCRIPTION OF NEWLY PROPOSED OCCUPANCY -
ICRA, ILSM, FIRE WATCH,
MISC. FORMS
FRAMED PICTURE OF
FRAMED COPY OF C.O.R.
CERTIFICATION
PAPER CADDY
INDICATOR MUST BE AT -0.01 OR GREATER (VERIFY
DAILY), IF NOT VERIFY ALL OPENINGS, SUCH AS DOORS,
ARE CLOSED AND/OR CHANGE OUT NEGATIVE AIR PRE-
FILTER.
C.O.R. WITH CONTACT
INFO
CONST. SUPERVISOR
NAME AND CELL
PHONE
CHILLER PLANT AFTER HOURS
CONTACT PHONE NUMBER FIRE
EMERGENCY DIAL 911
INDICATOR (REFER TO PLAN
& ELEVATION)
A P
P R
O X
. 4 " A
.F .F
1-HOUR FIRE BARRIER
THIS APPLIES TO 1.HOUR FIRE RATED OCCUPANCY SEPERATIONS, HAZARDOUS ROOM ENCLOSURES AND
STAIRWELLS 3 STORIES OR LESS.
WALL: WALL EXTENDS FROM FLOOR TO DECK ABOVE.
DUCTS: STEEL DUCT PENETRATIONS NOT REQUIRED TO BE PROTECTED BY FIRE DAMPERS.
PENETRATIONS: ALL NEW PENETRATIONS ARE SEALED WITH LISTED FIRESTOP MATERIALS FOR
PROTECTING 1.HOUR WALL ASSEMBLIES. WALL PENETRATIONS ARE REQUIRED TO BE
FILLED ON BOTH SIDES OF THE WALL. FLOOR PENETRATIONS ARE ONLY REQUIRED
TO BE FILLED ON THE TOP OF THE FLOOR.
DOORS: ALL DOORS REQUIRE THE FOLLOWING:
1. LABELED FRAMES (NFPA 80 4.2.1)
2. LABELED 3/4 OR 1.HOUR DOOR (NFPA 80 4.3.1)
3. MAXIMUM 100 SQ. IN. WINDOW (NFPA 80 TABLE 4.4.5)
4. POSITIVE LATCHING (NFPA 80 6.4.1.4)
5. SELF CLOSING OR AUTOMATIC CLOSING (NFPA 80 4.4.5)
6. COORDINATING DEVICES REQUIRED (NFPA 80 6.4.1.2.1)
7. MAXIMUM 1/8" GAP (NFPA 80 6.3.1.7.3)
8. MAXIMUM 3/4" UNDERCUT (NFPA 80 4.8.4.1)
9. MAXIMUM 16" PROTECTIVE PLATE (NFPA 80 6.4.5.1)
10. SWING IN PRIMARY DIRECTION OF TRAVEL (NFPA 101 18/19.2.2.2)
11. PERIODIC INSPECTION AND TESTING SHALL BE PERFORMED AT LEAST ANNUALLY
(NFPA 80 5.2.4.1)
CODE CRITERIA:
CODE REQUIREMENTS ARE PRIMARILY BASED ON NFPA 101 . LIFE SAFETY CODE . 2018 EDITION. DESIGN FEATURES NOT ADDRESSED BY NFPA 101 OR DOCUMENTS REFFERRENCED BY NFPA 101. SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF THE IBC OR AS OTHERWISE IDENTIFIED. FOR DESIGN FEATURES THAT ARE ADDRESSED BY BOTH NFPA 101 AS WELL AS TRHE IBC. NFPA 101 (OR DOCUMENTS REFERENCED OF NFPA 101) SHALL BE USED.
1. NFPA 101. LIFE SAFETY CODE . 2018 EDITION.
2. NFPA 10. STANDARD FOR PORTABLE FIRE EXTINGUISHERS . 2018 EDITION.
3. NFPA 13. STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS . 2019 EDITION.
4. NFPA 14. STANDARD FOR THE INSTALLATION OF STANDPIPE AND HOSE SYSTEMS . 2019 EDITION.
5. NFPA 20. STANDARD FOR THE INSTALLATION OF PUMPS FOR FIRE PROTECTION . 2019 EDITION.
6. NFPA 24. STANDARD FOR THE INSTALLATION OF PRIVATE SERVICE MAINS AND THEIR APPURENANCES . 2019 EDITION.
7. NFPA 70. NATIONAL ELECTRIC CODE . 2017 EDITION.
8. NFPA 80. STANDARD FOR FIRE DOORS . 2019 EDITION.
9. NFPA 90A. STANDARD FOR THE INSTALLATION OF ALL CONDITIONING AND VANTILATNG SYSTEMS . 2015 EDITION.
10. NFPA 241. STANDARD FOR SAFEGARDING CONSTRUCTION. ALTERATION AND DEMOLITION . 2019 EDITION.
11. NFPA 99. HEALTH CARE FACILITIES CODE . 2018 EDITION
12. NFPA 72. NATIONAL FIRE ALARM AND SIGNAGE CODE . 2019 EDITION.
13. NFPA 220. STANDARD FOR TYPES OF BUILDING CONSTRUCTION . 2018 EDITION.
14. VA FIRE PROTECTION DESIGN MANUAL . SEVENTH EDITION
15. VA PHYSICAL SECURITY DESIGN MANUAL FOR VA MISSION CRITICAL FACILITES . JANUARY 2015.
16. MASTER SPECIFICATION. TECHNICAL INFORMATION LIBRARY (TIL) . CURRENT VERSION
PHASE 1A - BUILD TEMPORARY ELECTRICAL AND DATA CLOSETS. COORDINATE AFTER HOURS SHUTDOWN
FOR SWITCH OVER TO NEW SERVICES FOR EXISTING AREAS OF FLOOR OUTSIDE OF GENERAL
CONSTRUCTION SCOPE FOR THIS PROJECT.
PHASE 1B - RENOVATE URGENT CARE AREA, PRIMARY CARE EAST PACT, WELCOME CENTER OFFICES, AND COMMONAREAS FOR SHARED BREAKROOM & HAC/ELEC/OIT ROOMS. AMBULANCE GARAGE WILL NOT HAVE ACCESS INTO BUILDING DURING THIS PHASE. MAINTAIN ACCESS THRU MAIN NORTH/SOUTH CORRIDOR AT ALL TIMES. MAINTAIN ACCESS TO STAIRWELL 3 FOR BUILDING EGRESS AT ALL TIMES, WITH MINIMUM 3' CLEAR.
COMPLETE NEW WALLS AND DOORS AT CORRIDOR ASAP SO THAT CONSTRUCTION BARRIERS MAY BE REDUCED
FOR DURATION OF PHASE.
PHASE 2 - RENOVATED FRONT WAITING AREA, LOBBY, AND CORRIDORS. NEW FINISHES IN CORRIDOR AREAS WITH ACCESS MAINTAINED DURING OPERATIONAL HOURS. WORK MAY OCCUR CONCURRENT WITH
PHASE 1 OR 2 BUT NEEDS TO BE COORDINATED WITH COR.
OUTSIDE OF SCOPE OF WORK
PHASING LEGEND
D U
M P S T E R
P O
T E N
T
IA
L
D U
M P S T E R
DUST MAT (2'-0" X 3'-0")
PROVIDE TEMPORARY INFECTION CONTROL/DUST
CONTROL BARRIERS AT THIS LOCATION. REMOVE AFTER
CONSTRUCTION IS COMPLETED PER PHASE INDICATED.
*PHASE 1B CONSTRUCTION BARRIERS
P H
A S
E
C O
N S
T R
U C
T
IO
N B
A R
R
IE
R
PHASE 1A CONSTRUCTION BARRIER
CLOSE AND
LOCK THIS
DOOR LEAF
THROUGHOUT
PHASE 1B
CONSTRUCTION
REMOVE EXISTING
DOOR BEFORE THE
BARRIERS ARE
CONSTRUCTED, THEN
INSTALL BARRIER
DOOR ACCESS HERE
*PHASE 1B CONSTRUCTION BARRIERS NOTE:
CONTRACTOR TO MAINTAIN ACCESS THROUGH THIS COORDIDOR THROUGHOUT CONSTRUCTION THUS
BARRIERS DURING THIS PHASE WILL NEED TO SHIFT TO ACCOMMODATE THIS AT TIMES.
BARRIER WHILE WORK WITHIN THE EAST AREA IS BEING WORKED ON
BARRIER WHILE WORK WITHIN THE WEST AREA IS BEING WORKED ON
5' -7
5' -1
6"
5' -1
" 7 1/
4"
RELOCATE DUST MAT
WITH ACCESS
DOORS AS BARRIERS
SHIFT THROUGHOUT
CONSTRUCTION TO
MAINTAIN ACCESS
PLAN CONSTRUCTION NOTES
1. EGRESS DOOR ON HOLD MAGNETS. MAY CLOSE AND SECURED WITH BADGE ACCESS.
2. CONTRACTOR TO LABEL ABOVE CEILING ALL FIRE AND/OR SMOKE BARRIER WALLS
WITH RED STENCIL.
3. EMERGENCY EGRESS DOOR.
4. SECURED BADGE ACCESS DOOR WITH PUSH BUTTON RELEASE ON ONE SIDE.
5. ENSURE 1.HOUR SMOKE BARRIER IS CONSRTUCTED FLOOR TO DECK AND ALL PENETRATION
ARE FIRE STOPPED.
6. CARD READER BADGE ACCESS.
7. 1.HOUR FIRE BARRIER CONSTRUCTED FLOOR TO DECK AND ALL PENETRATIONS ARE
FIRE STOPPED.
8. 2.HOURS FIRE BARRIER AROUND SHAFTS HAVE ALL PENETRATIONS FIRE STOPPED
9. CONTRACTOR SHALL PROVIDE AND INSTALL A TEMPORARY WALL "TYPE A"
(DETAIL 3/GIOO4). PROVIDE A CLASS II SECURE BARRIER WITH ZIPPERED ACCESS DOOR
PER DETAIL 4/GI004. CONTRACTOR MAY MAKE USE OF EXISTING WALL AND DOOR AND
SEAL AROUND ALL WALLS AND DOORS TO PROVIDE AN EQUIVALENCY WITH REQUIREMENTS
OF A CLASS A TEMPORARY WALL. COORDINATE WITH THE COR.
10. CONTRACTOR TO PROVIDE CLASS II ROOM MEASURES FOR INFECTION CONTROL
AND LIFE SAFETY, PER DETAIL 5/GI004, AS PERTAINING TO THE PHASE OF WORK REQUIRED.
COORDINATE WITH COR.
11. PATH OF DEMOLITION/ TRASH REMOVAL FROM CONSTRUCTION AREA. ALL CONSTRUCTION
DEBRIS REMOVED AS PART OF DEMOLITION AND SHALL BE REMOVED IN ENCLOSED/ SEALED
CONTAINERS AND DISPOSED OF LEGALLY. FOLLOW THE INFECTION CONTROL RISK
ASSESSMENT (ICRA) REQUIREMENTS.
12. CONTRACTOR TO RELOCATE EXISTING UNDERGROUND WATER PIPING FOR WATER MAIN
IN PHASE ONE AND PRIOR TO PHASE TWO. SEE CIVIL AND FIRE PROTECTION DRAWINGS
FOR ADDITIONAL INFORMATION
13. CONTRACTOR TO PROVIDE AND INSTALL SEALANT AROUND GAPS AT ALL WALL PENETRATIONS
OF PIPING AND DUCTWORK NOTED. PATCH WITH FRAMING OR GYP BOARD MATCHING
WALL OR BULKHEADS FINISH WHERE CUTTING REQUIRES LARGER ACCESS FOR WORK.
MAINTAIN A WATER TIGHT CONDITION AT EXTERIOR WALLS AND SMOKE RATING AT INTERIOR
WALLS. PROVIDE JOINT SEALANT TYPE REQUIRED PER SPECIFICATION. COORDINATE
WITH EXISTING COR ON WORK PERCIEVED IN AREAS THAT REMAIN IN OPERATION.
6.PLY SOLID CORE FLUSH DOORS SHALL BE
SECURED, AND HAVE LIMITED, ZIPPERED ACCESS,
AND MASKED OFF / SEALED AND PROTECTED PER
INFECTION CONTROL REQUIREMENTS PRIOR TO
DEMOLITION AND FOR DURATION OF CONSTRUCTION.
COORDINATE EGRESS REQUIREMENTS WITH COR.
SEE SPECIFICATIONS FOR ADDITIONAL INFORMATION
PROVIDE AND DISPLAY ICRA REQUIREMENT
DOCUMENTATION. COORDINATE WITH COR.
REQUIREMENT
ICRA
NO ENTRY
DUST BARRIER
F
IE
LD
V
E R
IF
Y
C E
IL
IN
G H
E
IG
H T
V A
R
IE
S
F
IE
LD
V
E R
IF
Y
W A
LL
H
E
IG
H T
V A
R
IE
S
DECK ABOVE
INFECTION DUST CONTROL BARRIER SEALED TO
EXISTING FLOOR, CEILING WALL, & DOOR/ WINDOW FRAME
2"x2" SUSPENDED ACOUSTICAL CEILING
TEMPORARY CONSTRUCTION 1.HOUR RATED "SMOKE TIGHT" BARRIER,
INFECTION DUST CONTROL PARTITION: 4', 20 GA, METAL STUDS a 16" O.C.
SECURED TO FLOOR, CEILING, WALL & DOOR/WINDOW FRAME INTERSECTIONS
FOR STRUCTURAL STABILITY. WITH 1/2" GYP. DD. EA SIDE, WITH ALL JOINTS TAPED
AND SEALED FOR INFECTION DUST CONTROL (NOT INCLUDED), INSULATION
FOR SOUND CONTROL.
ALL TEMPORARY CONSTRUCTION BARRIER, INFECTION/ DUST CONTROL PARTITION(S)
SHALL BE SEALED TO EXISTING FLOOR, CEILING, WALL, AND DOOR/ WINDOW FRAME
CONSTRUCTION AS APPLICABLE. SEE SPECIFICATIONS.
6.PLY SOLID CORE FLUSH DOORS SHALL BE
SECURED, AND HAVE LIMITED, ZIPPERED ACCESS,
AND MASKED OFF / SEALED AND PROTECTED PER
INFECTION CONTROL REQUIREMENTS PRIOR TO
DEMOLITION AND FOR DURATION OF CONSTRUCTION.
COORDINATE EGRESS REQUIREMENTS WITH COR.
SEE SPECIFICATIONS FOR ADDITIONAL INFORMATION
PROVIDE AND DISPLAY ICRA REQUIREMENT
DOCUMENTATION. COORDINATE WITH COR.
CLOSED FOR
CONSTRUCTION
CAUTION
THIS AREA CLOSED
OFF
EXIT
SEE ALTERNATIVE
EXITS
POST ICRA, LSM, FIRE
INSPECTION SHEETS
VISIBLE TO PUBLIC.
FIRE EXTINGUISHER
ON PORTABLE FLOOR
BRACKET (MAY REQUIRE
MORE THAN ONE)
INDICATOR MUST BE AT .O1 OR GREATER
(VERIFY DAILY). IF NOT VERIFY ALL OPENINGS
SUCH AS DOORS ARE CLOSED AND/OR CHANGE
OUT NEGATIVE AIR PRE-FILTER.
PROVIDE STICKY MATS (CHANGED END OF SHIFT
OR MORE NECESSARY TO MAINTAIN CLEANLINESS).
CLASS II WORK ITEMS NOTES:
PRIOR TO ANY CONSTRUCTION
1. PROVIDE ACTIVE MEANS TO PREVENT AIRBOURNE DUST FROM DISPERSING INTO ATMOSPHERE.
2. WATER MIST WORK SURFACES TO CONTROL DUST WHILE CUTTING.
3. SEAL UNUSED DOORS WITH DUCT TAPE.
4. BLOCK OFF AND SEAL AIR VENTS
5. PLACE DUST MAT AT ENTRANCE AND EXIT WORK AREAS.
6. REMOVE OR ISOLATE H.V.A.C. SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED
DURING CONSTRUCTION
1. ALL CONSTRUCTION PERSONNEL MUST BE SCREENED DAILY AND FOLLOW THE REQUIREMENTS
OF THE VA INFECTION CONTROL GUIDELINES. CONSTRUCTION PERSONNEL WILL TAKE CARE TO AVOID CONTACT WITH PATIENTS AND STAY OUT OF THE PATIENT AREAS THAT ARE NOT PART OF THE WORK SITE.
2. CONSTRUCTION PERSONNEL WILL ONLY USE DESIGNATED ENTRY AND EXIT POINTS.
3. WIPE WORK SURFACES TO CONTROL DUST WHILE CUTTING.
4. WASTE THAT IS TO BE TRANSPORTED THROUGH OCCUPIED AREAS MUST BE CONTAINED IN TIGHTLY
COVERED CONTAINERS AND…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .