This solicitation is for Project #541-18-101 to upgrade the fire alarm system at the Louis Stokes VA Medical Center in Cleveland, Ohio. The multi-phased project will install a new campus fiber loop and Notifier head end units in Phase 1. Phase 2 will rewire existing field devices like strobes, horns, pull stations and smoke detectors to the appropriate zone panel. All devices will be reprogrammed to report to the correct Notifier control panel. Upon completion, each zone will have a dedicated control panel and devices contained within the smoke compartment. Interested contractors must register at SAM.gov for automatic updates. The estimated value is between $2-5 million. The NAICS code is 238210 and bonds are required. The site visit will be scheduled through an amendment. Questions must be submitted in writing by the deadline. Bids are due approximately 30 days after the solicitation is posted to SAM.gov on November 24, 2020. The contract duration shall not exceed 425 days from notice to proceed. There is no set-aside and all business types may submit bids.

View the file

Other files

File Type Posted
36C25020B0065 0010.docx DOCX document
WD Cuyahoga 07.30.2021.pdf PDF
280500 - COMMON WORK RESULTS FOR ELECTRONIC SAFETY AND SECURITY. - Revised 7-26 -2021.pdf PDF
36C25020B0065 0009.docx DOCX document
36C25020B0065 0008.docx DOCX document
36C25020B0065 0007.docx DOCX document
541-18-101 - Upgrade Fire Alarm - Bid Documents Drawings_Part6.pdf PDF
36C25020B0065 0006.docx DOCX document
36C25020B0065 0005.docx DOCX document
541-18-101 - Upgrade Fire Alarm - Bid Documents Drawings_Part5.pdf PDF
541-18-101 - Upgrade Fire Alarm - Bid Documents Drawings_Part4.pdf PDF
36C25020B0065 0004.docx DOCX document
541-18-101 - Upgrade Fire Alarm - Bid Documents Drawings_Part3.pdf PDF
36C25020B0065 0003.docx DOCX document
36C25020B0065 0002.docx DOCX document
541-18-101 - Upgrade Fire Alarm - Bid Documents Drawings_Part2.pdf PDF
541-18-101 - Upgrade Fire Alarm - Bid Documents Drawings_Part1 (1).pdf PDF
36C25020B0065 0001.docx DOCX document
541-18-101 - Upgrade Fire Alarm - Bid Documents Specifications 02.pdf PDF
36C25020B0065_1.docx DOCX document
CUY WD 04.30.2021.pdf PDF
VAMC Health Requirements 05.26.2021.pdf PDF
Notifier JA Complete REDACTED.pdf PDF
VHA Directive 1192.01, Seasonal Influenza Prevention Program for VHA Health Care Personnel.pdf PDF
Corwin Russwin JA Complete REDACTED.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F

F

F

F

F

F

F

F

F

F

F

F F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

J

F

F

F

F

F

F

DNDN

DN

DN

DN

DN

UP

█V-N15 L1 M99-10█V-N15 L1 M99-10

█V-N15 L1 M99-10

█V-N15 L1 M99-10 █V-N15 L1 M99-10

█V-N15 L1 M99-4

█V-N15 L1 M99-4 █V-N15 L1 M99-9

█V-N15 L1 M99-9

█V-N15 L1 M99-9

█V-N15 L1 M99-9

█V-N15 L1 M99-9

█V-N15 L1 M99-9 █V-N15 L1 M99-9

█V-N15 L1 M99-9

█V-N15 L1 M99-9 EOL

█V-N15 L1 M99-11█V-N15 L1 M99-11

█V-N15 L1 M99-2

█V-N15 L1 M99-2

█V-N15 L1 M99-11 █V-N15 L1 M99-11 █V-N15 L1 M99-11

█V-N15 L1 M99-11█V-N15 L1 M99-11

█V-N15 L1 M99-11

█V-N15 L1 M99-11

█V-N15 L1 M99-9

█V-N15 L1 M99-9

█V-N15 L1 M99-9

█V-N15 L1 M99-11 EOL

█V-N15 L1 M99-11

█V-N15 L1 M99-11

█V-N15 L1 M99-11

█V-N15 L1 M99-10

█V-N15 L1 M99-9

Conference

1F582

Special Chemistry 3

1F571

Storage-1

BE606-1

Elec Room

1F549

Special Chemestry 1 1F570

Stair 1F621

Soiled Disposal & Staging

BF602

Microbiology Office

1F557

Microbiology Office 2 1F556

Bio-Hazard Trash Hold 1F551

Chemesitry Office #4

1F535

Specimen Toilet 1F560

Chief Office 1F523

Assist. Chief Office

1F524

Clerical

1F526

Fluorescent Microscope

1F530 ANTE Room

1F531

Mycobacterology (TB) Mycology Lab Biosafety Level

1F534

ANTE Room 1F533

Fluorescent Microscop.

1F579

Chem Office #3 1F577

IT EDU Office 1F569

IRM Telecomm Room

1F515

Blood Bank Office

1F566

Electrical Panel

1F511

ANTE Room 1F561

Specimen Accessioning

1F564

Phlembotomy Supplies 1F562

Gross & Frozen Section 1F541

Phlembotomy Office 1F563

Pathologist Office

1F548

Toxicology GM/MASS SPEC Testing

1F552Toxicology GM/MASS Spec Extraction

1F553

ICP MASS SPEC

1F554

Histology Supervisor Office

1F546

Histology

1F544

Microbiology Specimen Prep

1F555

Bicrobiology BSL - 2 Lab 1F558

Ontology 1F543

Chemistry Office #1 1F567

Chemistry Office #2

1F568

Core Lab Automated Chemistry

1F574

Corridor 1F583

Pathologist Office

1F528

Pathologist Office 1F527

Pathologist Office 1F525

Screening Office

1F542

EMS

1F578

Electric Closet

1F516

Microscope & Slide Room 1F545

Corridor

1F547

Supplies

1F575

Immunology

1F576

Lounge

1F581

Molecular Vrology Lab Biosafety Level 3

1F532

Corridor

1F502

Stair A 1F550

Male Toilets

1F522

Female Toilets 1F520

Corridor-1

1F501-1

Corridor-2 1F501-2

Office 1E482 Conference Room

1E446

Office 1E448

Office 1E450

Work Area

1E484

Investigator K108B

Clean Receiving & Staging

BF601

Elevated Walkway 1F601

Vestibule

1F620

Blood Bank 1F565

Intake

1F540 EMS

1F521

Corridor

1F503

Urinalysis 1F573

Corridor

1F529

Special Chemestry 2

1F572

█A-N16 A2 S1

█A-N16 A1 S2

█A-N16 A2 S3

█A-N16 A2 S3

█A-N16 A2 S3

█A-N16 A2 S3

█A-N16 A2 S3

█A-N16 A2 S1

█A-N16 A2 S1 EOL

█A-N16 A2 S1

█A-N16 A1 S2

█A-N16 A2 S1

█A-N16 A1 S4

█A-N16 A1 S4

█A-N16 A2 S1

█A-N16 A2 S1

█A-N16 A2 S1

█A-N16 A2 S1

█A-N16 A2 S1

█A-N16 A2 S1

█A-N16 A2 S3 EOL

█A-N16 A2 S3

█A-N16 A2 S3

█A-N16 A2 S3

█A-N16 A2 S2

█A-N16 A2 S2

█A-N16 A2 S2

█A-N16 A2 S2

█A-N16 A2 S2

█A-N16 A2 S2

█A-N16 A2 S1

Z5 Z6 Z7 Z8

1N

2M

1K

1H

1G

1E

1C

3B 4B 5B 6B 8B7B

3D 4D 5D 6D 8D7D

3F 4F 5F 6F 8B7F

3J 4J 5J 6J 8J7J

3L 4L 5L 6L 8L7L

H1 B1G1 F1 C1

FAZE

NEW

1 2

1 2

4 4

4 4

XR

NEW

N E

W

NEW

NEW

NEW

UP TO 2ND FL STAIR DEVICES,

REFEEDS CIRCUIT FROM THIS

ZONE.

N E

W

NEW

█V-N15 L1 M99█V-N15 L1 M99 EOL

█V-N15 L1 M99

█V-N15 L1 M99

█V-N15 L1 M99-10

█A-N16 A1 S4█A-N16 A1 S4 EOL

█A-N16 A1 S4

█A-N16 A1 S4

█A-N16 A2 S2

Z5 Z6 Z7 Z8

1N

2M

3B 4B 5B 6B 8B7B

3D 4D 5D 6D 8D7D

3F 4F 5F 6F 8B7F

3J 4J 5J 6J 8J7J

3L 4L 5L 6L 8L7L

H1 B1G1 F1 C1

FAZE

NEW

1 2

NEW

UP FROM 1ST FLOOR. CONNECTION

HERE PICKS UP REMAINIG DEVICES

ON CIRCUIT ON BELOW 2 FLOORS.

NEW

672 EAST ROYALTON ROAD

BROADVIEW HTS., OHIO 44147

TEL. (440) 546-9696

FAX: (440) 546-9699

S

59459

M.P. LONG

R

ES

O F

I R

GE

NOI

S

P

E

N E

DERT

L EA

E I N

G

R

TS

TEA HF OO

IO

CONSULTANTS: ARCHITECT:

Drawing Title Project NumberProject Title

Building Number

Approved: Location

LOUIS STOKES MEDICAL CENTER 10701 EAST BLVD.

Office of

Facilities

Management

FULLY SPRINKLERED

Date

05/14/21

Checked Drawn

Drawing Number

Dwg. of DateRevisions:

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

D

C

B

A

E

F

D

C

B

A

E

F

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

VA FORM 08-6231, OCT 1978

DOCUMENT SET MUST BE PRINTED IN COLOR

BID DOCUMENTS SUBMISSION 05/14/21 17069

NODE 6.1 - LAB WAREHOUSE

FIRST FLOOR AND PENTHOUSE

- NOTIFICATION

541-18-101UPGRADE FIRE ALARM

MPL CPC

FA-N-6.1b

8' 16' 32' 64'

1/16" = 1' 0"

FIRST FLOOR FIRE ALARM PLAN - NOTIFICATION - NODE 6.1 1

8' 16' 32' 64'

1/16" = 1' 0"

SECOND FLOOR FIRE ALARM PLAN - NOTIFICATION - NODE 6.1 2

NOT TO SCALE

NODE 6.1 - FIRST FLOOR

FIRE ALARM KEY PLAN

NOT TO SCALE

NODE 6.1 - SECOND FLOOR

FIRE ALARM KEY PLAN

FIRE ALARM NOTIFICATION DEVICE SCHEDULE - LAB WAREHOUSE - FIRST FLOOR - NODE 6.1

CIRCUIT IDENTIFIER NEW STROBE CIRCUIT NEW AUDIO CIRCUIT

3 N6.1A Z2 L1 N6.1B Z2 A1

4 N6.1A Z2 L2 N6.1B Z2 A2

5 N6.1A Z2 L3 N6.1B Z2 A3

6 N6.1A Z3 L1 N6.1B Z3 A1

CODED NOTES

1 LOCATION OF FIRST STROBE AND AUDIO CIRCUIT SERIES CONNECTION FROM

EXISTING EXTENDER PANEL AND AMPLIFIER. DISCONNECT EXISTING INCOMING

STROBE AND AUDIO CIRCUITS FROM DEVICE. REMOVE EXISTING CONDUIT AND

WIRING COMPLETE BACK TO SOURCE. MAINTAIN CONNECTION OUT TO NEXT

DEVICE IN SERIES.

PROVIDE 3/4"C WITH NEW AUDIO AND STROBE CIRCUIT CONDUCTORS FROM FIRE

ALARM ZONE EQUIPMENT IN THIS ZONE (FIRE ALARM EXTENDER PANEL AND

DIGITAL AUDIO AMPLIFIER) AND CONNECT COMPLETE TO FIRE ALARM

NOTIFICATION APPLIANCE TO MIGRATE EXISTING DEVICES TO NEW EQUIPMENT.

IF FIRST DEVICE IS A STROBE-ONLY OR SPEAKER-ONLY DEVICE, CONTINUE

ROUTING UNUSED CIRCUIT TO NEXT DEVICE FOR CONNECTION.

REMOVE EXISTING CONDUIT AND FIRE ALARM CIRCUIT CONDUCTORS INDICATED

AND PROVIDE 3/4"C WITH NEW AUDIO AND STROBE CIRCUIT CONDUCTORS TO

DEVICES INDICATED AND CONNECT COMPLETE TO MIGRATE EXISTING DEVICES

THE CIRCUIT.

EXISTING DEVICE REQUIRES REWORKING TO REMOVE FROM CURRENT FIRE

ALARM CIRCUITS AND TO MERGE WITH CIRCUIT INDICATED. DISCONNECT

INCOMING CIRCUITS TO ISOLATE DEVICES. MAINTAIN CIRCUITS BETWEEN

DEVICES TO FACILITATE RECONNECTION TO NEW CIRCUITS.

FIRE ALARM GENERAL NOTES

F1 ALL FIRE ALARM SYSTEM DEVICES SHALL BE CONNECTED COMPLETE TO THE FIRE

ALARM CONTROL SYSTEM IN ACCORDANCE WITH ENGINEER APPROVED

MANUFACTURER'S SHOP DRAWINGS, WIRING DIAGRAMS, AND DETAILS.

F2 ALL FIRE ALARM SYSTEM CONDUCTORS SHALL BE INSTALLED IN 3/4" MINIMUM SIZE

CONDUIT SYSTEM.

F3 SMOKE DETECTORS SHALL BE INSTALLED ON CEILINGS WITH SPACING NOT TO

EXCEED MANUFACTURER'S RECOMMENDATION AND IN ACCORDANCE WITH NFPA 72.

F4 SMOKE DETECTORS SHALL BE INSTALLED WITHIN 5'-0" OF CENTERLINE OF SMOKE

DOORS ON HOLD-OPEN DEVICES. DETECTORS SHALL BE INSTALLED ON EACH SIDE

OF THE DOOR PER VA FIRE PROTECTION DESIGN MANUAL.

F5 FIRE ALARM SYSTEM SHALL BE SUB-DIVIDED INTO ZONES THAT CORRESPOND TO

THE SMOKE COMPARTMENTS AND SPRINKLER ZONES PER VA FIRE PROTECTION

DESIGN MANUALS.

F6 ALL EXISTING FIRE ALARM DEVICES THAT WILL NOT BE REUSED IN THE REMODELED

INSTALLATION SHALL BE REMOVED UNLESS OTHERWISE NOTED. THIS DEMOLITION

SHALL INCLUDED ALL ITEMS SHOWN ON THIS PLAN THAT ARE DESIGNATED BY "XR"

AND ALL OTHER ADDITIONAL ITEMS THAT ARE NOT SHOWN BUT THAT MUST BE

REMOVED IN OREDER TO PRODUCE A NEAT, FINISHED, PROPERLY FUNCTIONING

ELECTRICAL INSTALLATION. MAINTAIN CIRCUIT CONTINUITY TO ALL EXISTING

REUSED DEVICES - PROVIDE ALL CONDUIT AND WIRING NECESSARY TO ACHIEVE

THE SAME. THE CONTRACTOR SHALL FIELD VERIFY THE NATURE AND THE EXTENT

OF ALL DEMOLITION WORK AND SHALL INCLUDE COST FOR THE SAME IN THE BID

SUBMITTAL.

F7 ALL EXISTING REMOVED ELECTRICAL EQUIPMENT, DEVICES, ETC. THAT ARE NOT

RETAINED BY THE OWNER SHALL BE DISPOSED OF BY THE ELECTRICAL

CONTRACTOR.

F8 REFER TO THE LEGEND FOR ALL SYMBOL DESIGNATIONS. NOTE SPECIAL ATTENTION

TO SELECTED EXISTING DEVICES, WIREWAYS, ETC. MARKED "XB", "XRR", OR "XN"

AND REMOVE/BLANK OFF, RELOCATE, OR REPLACE THESE COMPONENTS AS

REQUIRED.

F9 CLOSELY COORDINATE ALL DEMOLITION WORK WITH THE GENERAL CONTRACTOR

TO PROVIDE PATCHING AND PAINTING FOR EXISTING WALLS WHERE

DEVICES/PANELS ARE REMOVED.

F10 CONTACT THE ENGINEER IF A QUESTION SHOULD ARISE CONCERING THE STATUS

OF ANY OUTLET, DEVICE, FIXTURE, ETC.

672 EAST ROYALTON ROAD

BROADVIEW HTS., OHIO 44147

TEL. (440) 546-9696

FAX: (440) 546-9699

S

59459

M.P. LONG

R

ES

O F

I R

GE

NOI

S

P

E

N E

DERT

L EA

E I N

G

R

TS

TEA HF OO

IO

CONSULTANTS: ARCHITECT:

Drawing Title

Approved: Location

Project Title

Date Checked Drawn

Drawing Number

Building Number

Project Number

Office of

Facilities

Management

Dwg. of o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 7 8 9 10

A

1 2 3 4 5 6 7 8 9 10

B

C

D

E

F

A

B

C

D

E

F

LOUIS STOKES MEDICAL CENTER 10701 EAST BLVD.

Revisions: Date

DOCUMENT SET MUST BE PRINTED IN COLOR

FULLY SPRINKLERED

17069

BID DOCUMENTS SUBMISSION 05/14/21

UPGRADE FIRE ALARM 541-18-101

CPCMPL

DEMOLITION FIRE ALARM SYSTEM

BACKBONE DIAGRAM

FA-R-0.1

05/14/21

672 EAST ROYALTON ROAD

BROADVIEW HTS., OHIO 44147

TEL. (440) 546-9696

FAX: (440) 546-9699

S

59459

M.P. LONG

R

ES

O F

I R

GE

NOI

S

P

E

N E

DERT

L EA

E I N

G

R

TS

TEA HF OO

IO

CONSULTANTS: ARCHITECT:

Drawing Title

Approved: Location

Project Title

Date Checked Drawn

Drawing Number

Building Number

Project Number

Office of

Facilities

Management

Dwg. of o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 7 8 9 10

A

1 2 3 4 5 6 7 8 9 10

B

C

D

E

F

A

B

C

D

E

F

LOUIS STOKES MEDICAL CENTER 10701 EAST BLVD.

Revisions: Date

DOCUMENT SET MUST BE PRINTED IN COLOR

FULLY SPRINKLERED

17069

BID DOCUMENTS SUBMISSION 05/14/21

UPGRADE FIRE ALARM 541-18-101

CPCMPL

NEW FIRE ALARM SYSTEM

BACKBONE DIAGRAM

FA-R-0.2

05/14/21

FIRE ALARM SYSTEM BACKBONE LEGEND:

NOTIFIER 3030 FIRE ALARM CONTROL PANEL (FACP) WITH OPTIONAL DIGITAL VOICE COMMAND (DVC) MODULE

- # INDICATES BUILDING AND SEQUENTIAL NODE IDENTIFICATION

- A OR B INDICATES FACP OR DVC MODULE

FOR EXAMPLE: 3.5A DENOTES BUILDING #3, NODE #5, FIRE ALARM CONTROL PANEL, 4.2B DENOTES BUILDING #4, NODE #2, DIGITAL VOICE COMMAND MODULE

REFER TO FIRE ALARM ZONE FLOOR PLANS FOR AREAS OF COVERAGE.

- #,#,# INDICATES NODE IDENTIFICATION, AND SEQUENTIAL COMPARTMENT IDENTIFICATION.

FOR EXAMPLE: ZONE 1.2.3 REFERS TO NODE 1.2 AND COMPARTMENT #3.

UL-LISTED CONTROL AND MONITORING WORKSTATION WITH 22" TOUCH SCREEN

UL-LISTED INTERACTIVE GRAPHICAL TOUCH SCREEN DISPLAY. AUTOMATICALLY DISPLAYS EMERGENCY EVENT LOCATION AND INFORMATION FOR ACCESS BY FIRST RESPONDERS AND STAFF.

NOTIFIRE NET CABLING - SINGLE-MODE, CLASS X FIBER LOOP - INSTALLED IN COMPLETE RIGID CONDUIT SYSTEM

FIRE ALARM SYSTEM CABLING - (1) 6-STRAND 62.5/125 FIBER OPTIC CABLE - AUDIO, (2) RED/BLACK #14 THHN PAIRS FOR STROBE SYNC, (4) RED 16-2 SHIELDED CABLES - SLC LOOP

EQUIPMENT IN EACH ZONE CONSISTS OF:

(1) HPFF8 FIRE ALARM EXTENDER PANEL - (2) STROBE CIRCUITS, (1) DOOR HOLD CIRCUIT, (1) SPARE

(1) DAA2-7525 DIGITAL AUDIO AMPLIFIER - (4) AUDIO CIRCUITS, 75WATT TOTAL OUTPUT.

FA PULL BOX

ZONE EQUIPMENT (FAZE)

SBB-D4R WITH DR-D4R DOOR

SPACE AVAILABLE FOR FUTURE

AMPLIFIER OR POWER SUPPLY

FIRE ALARM

CONTROL

DIGITAL AUDIO NETWORK

(TYPICAL FOR DIGITAL AUDIO

BETWEEN DVC AND AMP)

SLC LOOPS OUT TO ADDITIONAL

ZONES ON THE SAME NODE (TYPICAL)

VISUAL CIRCUIT - STROBE #1

VISUAL CIRCUIT - STROBE #2

24V OUTPUT - DOOR HOLDS

FIRE ALARM SYSTEM CODED NOTES:

NOTIFIER SYSTEM NODE ENCLOSURE

PROVIDE COMPONENTS AS NECESSARY IN NOTIFIER SYSTEM CABINET TO PROVIDE CONNECTION BETWEEN FIRE ALARM CONTROL EQUIPMENT (ADDRESSABLE CIRCUIT CONTROL PANEL AND VOICE COMMUNICATION SYSTEM) AND ZONE EQUIPMENT (NOTIFICATION APPLIANCE PANEL AND DIGITAL AUDIO AMPLIFIER.

A. NOTIFIER SYSTEM CABINET: 24-1/8"W x 37-1/4"H BOX AND HINGED COVER (#SBB-C4R WITH #DR-C4R)

B. FIRE ALARM SYSTEM CONTROL UNIT (NFS2-3030 WITH DISPLAY ON CHS-M3 CHASSIS)

C. ADDRESSABLE LOOP CONTROL MODULE: GENERATES (1) SLC LOOP. (LCM-320)

D. ADDRESSABLE LOOP EXTENDER MODULE: EXTENDS LCM TO (2) SLC LOOPS (LEM-320)

E. VOICE COMMUNICATIONS SYSTEM: GENERATES AUDIO ALARM MESSAGES (DVC-EM ON CA-1 CHASSIS) F. HIGH SPEED COMMUNICATION MODULE: PROVIDES FIBER OPTIC NETWORK CONNECTION FIRE ALARM

EQUIPMENT (FACP, DVC, ONYXWORKS WORKSTATIONS, AND FIRST VISION GRAPHICAL ANNUNCIATORS).

MOUNT ON TOP OF LOOP MODULES WHERE INDICATED. (HS-NCM-F)

G. IP GATEWAY: CONNECTS ONYXWORKS WORKSTATIONS AND FIRSTVISION GRAPHICAL ANNUNCIATORS TO NOTIFIER NETWORK VIA CAT6 CABLING AND INTEFRACE WITH HIGH-SPEED COMMUNICATION MODULE.

H. 24V DC POWER SUPPLY: 120VAC INPUT, 5A CONTROL UNIT OUTPUT, 3A AUXILIARY OUTPUT (AMPS-24) I. BACK-UP BATTERIES. PROVIDE BATTERIES AS REQUIRED PER SPECIFICATION SECTION 28 31 00. IF

NECESSARY, PROVIDE SEPARATE BATTERY CABINET. (NFN-GW-EM-3)

J. MISCELLANEOUS DRESS PLATES: FILL EMPTY/FUTURE SPACES IN PANEL AND ACCOMMODATE INSTALLED

MODULES. PROVIDE DRESS PLATES AS REQUIRED FOR DEVICES BEING INSTALLED (DP-DISP, DPA-1, DP-1B, BP2-4, ETC).

K. PROVIDE ALL CABLING INTERCONNECTION BETWEEN NODE EQUIPMENT (NFS-3030 CONTROL BOARD, DVC-EM, NETWORK CARDS, POWER SUPPLY/BATTERY CHARGER, ETC). SOME CONNECTIONS MAY NOT BE SHOWN FOR CLARITY (E.G. CONNECTION BETWEEN POWER SUPPLY/BATTERY CHARGER AND FIRE

ALARM SYSTEM CONTROL UNIT AND VOICE COMMUNICATIONS SYSTEM.)

NOTIFIER SYSTEM ZONE ENCLOSURE

PROVIDE COMPONENTS AS NECESSARY IN A NOTIFIER SYSTEM CABINET TO PROVIDE CONNECTION FOR

LOCAL DEVICES IN THE AREAS OUTLINED ON THE ZONE PLANS.

A. 24 1/8"W x 37 1/4"H BOX AND HINGED COVER (#SBB-C4R WITH #DR-C4R)

B. DAA2-7525 AMPLIFIER

C. APC-610 POWER EXTENDER PANEL (2 STROBE CIRCUITS, 1 DOOR HOLD CIRCUIT AND 1 SPARE) D. 7.0 Ah BATTERIES E. PROVIDE CONNECTION BETWEEN POWER SUPPLY/BATTERY CHARGER AND AMPLIFIER. (NOT SHOWN)

PROVIDE 6"H x 4"D RACEWAY WITH NONSLIP FLUSH COVER. RACEWAY SHALL BE LENGTH OF NOTIFIER SYSTEM EQUIPMENT. ROUTE FIRE ALARM SYSTEM WIRING THROUGH RACEWAY AND PROVIDE AN ORGANIZED ROUTING

OF WIRING. PROVIDE ADDITIONAL CONDUITS AND RACEWAY AS NECESSARY.

SLC CARDS

CPU2-3030D

VOICE

COMMAND

SYSTEM

DVC-EM

(1) LCM-320

(1) LEM-320

DIGITAL AUDIO AMPLIFIER

DAA2-7525

ADDRESSABLE POWER SUPPLY

ACPS-610

AUDIO CIRCUIT TO

SPEAKERS IN ZONE

TO NEXT AMPLIFIER

FIRE ALARM EQUIPMENT DIAGRAM GENERAL NOTES:

ALL FIRE ALARM CABLING SHOWN SHALL BE ROUTED WITHIN CONDUIT, RACEWAYS, ENCLOSURES, ETC. WIRING IS SHOWN FROM POINT-TO-POINT OR OUTSIDE OF CONDUIT FOR CLARITY OF CONNECTIONS BEING INDICATED.

FIRE ALARM CABLING SHOWN IS FOR REFERENCE ONLY. CONTRACTOR SHALL VERIFY ALL CONNECTION REQUIREMENTS WITH NOTIFIER PRIOR TO INSTALLATION. PROVIDE TYPICAL WIRING DIAGRAMS WITH SHOP

DRAWINGS FOR REVIEW.

BATTERY BATTERY

SPACE AVAILABLE FOR FUTURE

AMPLIFIER OR POWER SUPPLY

(PROVIDE ADDITIONAL POWER SUPPLY IN ZONES

THAT REQUIRE MORE THAN 2 STROBE CIRCUITS)

MICROPHONE

CMIC-1

NODE EQUIPMENT (FANE)

SBB-D4R WITH DR-C4R DOOR

BATTERY

BATTERY

24V POWER

SUPPLY

AMPS-24

(24) STRAND

WALL-MOUNTED,

FIBER TERMINATION BOX

(LC-STYLE CONNECTORS)

6-STRAND,

TIGHT-BUFFERED,

PLENUM RATED, INDOOR,

SINGLE-MODE FIBER OPTIC

CABLE IN 3/4" EMT COMPLETE

CONDUIT SYSTEM

FROM PREVIOUS NODE

6-STRAND,

TIGHT-BUFFERED,

PLENUM RATED, INDOOR,

SINGLE-MODE FIBER OPTIC

CABLE IN 3/4" EMT COMPLETE

CONDUIT SYSTEM

FROM PREVIOUS NODE

PROVIDE (1) 3/4"C OUT TO EACH ZONE FED FROM THE

NODE EQUIPMENT WITH SLC LOOP TO NEW ZONE

EQUIPMENT AND FIBER CONNECTION TO AMPLIFIER.

SLC CARDS

(1) LCM-320

(1) LEM-320

FIRE ALARM CABLING LEGEND:

SIGNALING LINE CIRCUIT (SLC) LOOP - (1) #16 UNSHIELDED TWISTED PAIR WITH OVERALL JACKET

AMPLIFIER NETWORK LOOP - (2) 9/125 SINGLE-MODE FIBER OPTIC CABLES

NOTIFIER NETWORK LOOP - 6-STRAND, TIGHT-BUFFERED, INDOOR, PLENUM-RATED, SINGLE-MODE

FIBER OPTIC CABLE IN COMPLETE 3/4" EMT CONDUIT SYSTEM

VISUAL CIRCUIT - (1) #14 AWG PAIR

AUDIO CIRCUIT - (1) #14 SHIELDED, TWISTED PAIR

24V OUTPUT CIRCUIT - (1) #14 AWG PAIR (UNLESS OTHERWISE NOTED)

SLC LOOP OUT TO NOTIFICATION

APPLIANCE EXTENDER PANEL IN THE

SAME ZONE AS THE NODE EQUIPMENT

SLC LOOP OUT TO ADDITIONAL

DEVICES ON THIS ZONE (TYPICAL)

FIBER OPTIC AUDIO CONNECTION TO

AMPLIFIER IN THE SAME ZONE AS THE

NODE EQUIPMENT

FA PULL BOX 3

FUTURE

SM FIBER PAIR FROM

LAST ZONE AMPLIFIER

NOTIFIER NUP CABLE

ETHERNET CONNECTION - (1) CAT6 CABLE

NETWORK CONNECTION OUT TO NEXT NODE

(WHERE NECESSARY, CONNECT FIBER OUTPUT OF NETWORK

CARD FOR DVC TO NETWORK CARD(S) FOR FIRSTVISION OR

ONYXWORKS. THEN ROUTE OUTPUT TO TERMINATION BOX

FOR OUTPUT TO NEXT NODE. NOT SHOWN FOR CLARITY)

NETWORK CONNECTION IN

FROM PREVIOUS NODE

NETWORK CARD

HS-NCM-F (FACP)

NETWORK CARD

HS-NCM-F (DVC)

NOTIFIER NUP CABLE

SPACE FOR FUTURE

LOOP MODULES

[PROVIDE ADDITIONAL

LOOP MODULES FOR

NODES THAT REQUIRE

MORE THAN (4) LOOPS]

HS-NCM-F +

NFN-GW-EM-3

NETWORK

CARD

REQUIRED IN NODES

WITH FIRSTVISION PANEL

HS-NCM-F +

NFN-GW-EM-3

NETWORK

CARD

REQUIRED IN NODES WITH

ONYXWORKS STATION

ONYXWORKS

STATION

FIRSTVISION

1.

2.

SPACE AVAILABLE FOR FUTURE USE

672 EAST ROYALTON ROAD

BROADVIEW HTS., OHIO 44147

TEL. (440) 546-9696

FAX: (440) 546-9699

S

59459

M.P. LONG

R

ES

O F

I R

GE

NOI

S

P

E

N E

DERT

L EA

E I N

G

R

TS

TEA HF OO

IO

CONSULTANTS: ARCHITECT:

Drawing Title

Approved: Location

Project Title

Date Checked Drawn

Drawing Number

Building Number

Project Number

Office of

Facilities

Management

Dwg. of o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 7 8 9 10

A

1 2 3 4 5 6 7 8 9 10

B

C

D

E

F

A

B

C

D

E

F

LOUIS STOKES MEDICAL CENTER 10701 EAST BLVD.

Revisions: Date

DOCUMENT SET MUST BE PRINTED IN COLOR

FULLY SPRINKLERED

17069BID DOCUMENTS SUBMISSION 05/14/21

UPGRADE FIRE ALARM 541-18-101

CPCMPL

FIRE ALARM SYSTEM DETAILS

FA-D-0.1

05/14/21

NOT TO SCALE

TYPICAL FIRE ALARM EQUIPMENT PANEL DETAIL 1

X-0.1 - COVER SHEET
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
X-0.1 - COVER SHEET
FP-1-01 - PARTIAL SECOND AND FIFTH FLOOR FIRE PROTECTION PLAN
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FP-1-01 - PARTIAL SECOND AND FIFTH FLOOR FIRE PROTECTION PLAN
M-1-01 - PARTIAL SECOND AND FIFTH FLOOR MECHANICAL PLANS
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
M-1-01 - PARTIAL SECOND AND FIFTH FLOOR MECHANICAL PLANS
FA-L-0.1 - ELECTRICAL SYMBOL LEGEND AND GENERAL NOTES
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FA-L-0.1 - ELECTRICAL SYMBOL LEGEND AND GENERAL NOTES
FA-L-0.2 - FIRE ALARM INPUTOUTPUT AND ZONE TRIGGER MATRIX
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FA-L-0.2 - FIRE ALARM INPUT/OUTPUT AND ZONE TRIGGER MATRIX
FA-K-SB - SUB-BASEMENT FIRE ALARM ZONE KEY PLAN
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FA-K-SB - SUB-BASEMENT FIRE ALARM ZONE KEY PLAN
FA-K-B - BASEMENT FIRE ALARM ZONE KEY PLAN
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FA-K-B - BASEMENT FIRE ALARM ZONE KEY PLAN
FA-K-1 - FIRST FLOOR FIRE ALARM ZONE KEY PLAN
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FA-K-1 - FIRST FLOOR FIRE ALARM ZONE KEY PLAN
FA-K-2 - SECOND FLOOR FIRE ALARM ZONE KEY PLAN
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FA-K-2 - SECOND FLOOR FIRE ALARM ZONE KEY PLAN
FA-K-3 - THIRD FLOOR FIRE ALARM ZONE KEY PLAN
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FA-K-3 - THIRD FLOOR FIRE ALARM ZONE KEY PLAN
FA-K-4 - FOURTH FLOOR FIRE ALARM ZONE KEY PLAN
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FA-K-4 - FOURTH FLOOR FIRE ALARM ZONE KEY PLAN
FA-K-5 - FIFTH FLOOR FIRE ALARM ZONE KEY PLAN
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FA-K-5 - FIFTH FLOOR FIRE ALARM ZONE KEY PLAN
FA-K-6 - SIXTH FLOOR FIRE AND PENTHOUSE ALARM ZONE KEY PLANS
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FA-K-6 - SIXTH FLOOR FIRE AND PENTHOUSE ALARM ZONE KEY PLANS
FA-E-1.1 - BUILDING 1 - MAIN TOWER - ENLARGED FIRE ALARM EQUIPMENT PLANS (1 OF 5)
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FA-E-1.1 - BUILDING 1 - MAIN TOWER - ENLARGED FIRE ALARM EQUIPMENT PLANS (1 OF 5)
FA-E-1.2 - BUILDING 1 - MAIN TOWER - ENLARGED FIRE ALARM EQUIPMENT PLANS (2 OF 5)
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FA-E-1.2 - BUILDING 1 - MAIN TOWER - ENLARGED FIRE ALARM EQUIPMENT PLANS (2 OF 5)
FA-E-1.3 - BUILDING 1 - MAIN TOWER - ENLARGED FIRE ALARM EQUIPMENT PLANS (3 OF 5)
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FA-E-1.3 - BUILDING 1 - MAIN TOWER - ENLARGED FIRE ALARM EQUIPMENT PLANS (3 OF 5)
FA-E-1.4 - BUILDING 1 - MAIN TOWER - ENLARGED FIRE ALARM EQUIPMENT PLANS (4 OF 5)
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FA-E-1.4 - BUILDING 1 - MAIN TOWER - ENLARGED FIRE ALARM EQUIPMENT PLANS (4 OF 5)
FA-E-1.5 - BUILDING 1 - MAIN TOWER - ENLARGED FIRE ALARM EQUIPMENT PLANS (5 OF 5)
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FA-E-1.5 - BUILDING 1 - MAIN TOWER - ENLARGED FIRE ALARM EQUIPMENT PLANS (5 OF 5)
FA-E-2.1 - BUILDING 2 - ACC - ENLARGED FIRE ALARM EQUIPMENT LOCATION PLANS
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FA-E-2.1 - BUILDING 2 - ACC - ENLARGED FIRE ALARM EQUIPMENT LOCATION PLANS
FA-E-3.1 - BUILDING 3 - CARES TOWER - ENLARGED FIRE ALARM EQUIPMENT PLANS (1 OF 3)
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FA-E-3.1 - BUILDING 3 - CARES TOWER - ENLARGED FIRE ALARM EQUIPMENT PLANS (1 OF 3)
FA-E-3.2 - BUILDING 3 - CARES TOWER - ENLARGED FIRE ALARM EQUIPMENT PLANS (2 OF 3)
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FA-E-3.2 - BUILDING 3 - CARES TOWER - ENLARGED FIRE ALARM EQUIPMENT PLANS (2 OF 3)
FA-E-3.3 - BUILDING 3 - CARES TOWER - ENLARGED FIRE ALARM EQUIPMENT PLANS (3 OF 3)
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FA-E-3.3 - BUILDING 3 - CARES TOWER - ENLARGED FIRE ALARM EQUIPMENT PLANS (3 OF 3)
FA-E-4.1 - BUILDING 4 - RESEARCH WING - ENLARGED FIRE ALARM EQUIPMENT PLANS (1 OF 1)
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FA-E-4.1 - BUILDING 4 - RESEARCH WING - ENLARGED FIRE ALARM EQUIPMENT PLANS (1 OF 1)
FA-E-5.1 - BUILDING 5 - ENERGY CENTER - ENLARGED FIRE ALARM EQUIPMENT PLANS (1 OF 1)
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FA-E-5.1 - BUILDING 5 - ENERGY CENTER - ENLARGED FIRE ALARM EQUIPMENT PLANS (1 OF 1)
FA-E-6.1 - BUILDING 6 - PALMSLAB WAREHOUSE - ENLARGED FIRE ALARM EQUIPMENT PLANS (1 OF 1)
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FA-E-6.1 - BUILDING 6 - PALMS/LAB WAREHOUSE - ENLARGED FIRE ALARM EQUIPMENT PLANS (1 OF 1)
FA-A-1.1 - NODE 1.1 - MAIN BUILDING BASEMENT - ADDRESSABLE
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FA-A-1.1 - NODE 1.1 - MAIN BUILDING BASEMENT - ADDRESSABLE
FA-A-1.2 - NODE 1.2 - MAIN BUILDING BASEMENT - ADDRESSABLE
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FA-A-1.2 - NODE 1.2 - MAIN BUILDING BASEMENT - ADDRESSABLE
FA-A-1.3a - NODE 1.3 - MAIN BUILDING SUB-BASEMENT - ADDRESSABLE
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FA-A-1.3a - NODE 1.3 - MAIN BUILDING SUB-BASEMENT - ADDRESSABLE
FA-A-1.3b - NODE 1.3 - MAIN BUILDING BASEMENT - ADDRESSABLE
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FA-A-1.3b - NODE 1.3 - MAIN BUILDING BASEMENT - ADDRESSABLE
FA-A-1.3c - NODE 1.3 - PARKING STRUCTURE BASEMENT - ADDRESSABLE
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FA-A-1.3c - NODE 1.3 - PARKING STRUCTURE BASEMENT - ADDRESSABLE
FA-A-1.3d - NODE 1.3 - PARKING STRUCTURE FIRST FLOOR - ADDRESSABLE
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FA-A-1.3d - NODE 1.3 - PARKING STRUCTURE FIRST FLOOR - ADDRESSABLE
FA-A-1.3e - NODE 1.3 - PARKING STRUCTURE SECOND FLOOR - ADDRESSABLE
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FA-A-1.3e - NODE 1.3 - PARKING STRUCTURE SECOND FLOOR - ADDRESSABLE
FA-A-1.3f - NODE 1.3 - PARKING STRUCTURE THIRD FLOOR - ADDRESSABLE
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FA-A-1.3f - NODE 1.3 - PARKING STRUCTURE THIRD FLOOR - ADDRESSABLE
FA-A-1.4 - NODE 1.4 - MAIN BUILDING FIRST FLOOR - ADDRESSABLE
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FA-A-1.4 - NODE 1.4 - MAIN BUILDING FIRST FLOOR - ADDRESSABLE
FA-A-1.5 - NODE 1.5 - MAIN BUILDING BASEMENT AND FIRST FLOOR - ADDRESSABLE
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FA-A-1.5 - NODE 1.5 - MAIN BUILDING BASEMENT AND FIRST FLOOR - ADDRESSABLE
FA-A-1.6 - NODE 1.6 - MAIN BUILDING FIRST FLOOR - ADDRESSABLE
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FA-A-1.6 - NODE 1.6 - MAIN BUILDING FIRST FLOOR - ADDRESSABLE
FA-A-1.7 - NODE 1.7 - MAIN BUILDING FIRST FLOOR - ADDRESSABLE
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FA-A-1.7 - NODE 1.7 - MAIN BUILDING FIRST FLOOR - ADDRESSABLE
FA-A-1.8 - NODE 1.8 - MAIN BUILDING SECOND FLOOR - ADDRESSABLE
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FA-A-1.8 - NODE 1.8 - MAIN BUILDING SECOND FLOOR - ADDRESSABLE
FA-A-1.9 - NODE 1.9 - MAIN BUILDING SECOND FLOOR - ADDRESSABLE
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FA-A-1.9 - NODE 1.9 - MAIN BUILDING SECOND FLOOR - ADDRESSABLE
FA-A-1.10 - NODE 1.10 - MAIN BUILDING SECOND AND THIRD FLOOR - ADDRESSABLE
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FA-A-1.10 - NODE 1.10 - MAIN BUILDING SECOND AND THIRD FLOOR - ADDRESSABLE
FA-A-1.11 - NODE 1.11 - MAIN BUILDING THIRD FLOOR - ADDRESSABLE
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FA-A-1.11 - NODE 1.11 - MAIN BUILDING THIRD FLOOR - ADDRESSABLE
FA-A-1.12 - NODE 1.12 - MAIN BUILDING FOURTH FLOOR - ADDRESSABLE
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FA-A-1.12 - NODE 1.12 - MAIN BUILDING FOURTH FLOOR - ADDRESSABLE
FA-A-1.13 - NODE 1.13 - MAIN BUILDING FIFTH FLOOR - ADDRESSABLE
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FA-A-1.13 - NODE 1.13 - MAIN BUILDING FIFTH FLOOR - ADDRESSABLE
FA-A-1.14a - NODE 1.14 - MAIN BUILDING SIXTH FLOOR - ADDRESSABLE
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FA-A-1.14a - NODE 1.14 - MAIN BUILDING SIXTH FLOOR - ADDRESSABLE
FA-A-1.14b - NODE 1.14 - MAIN BUILDING PENTHOUSE - ADDRESSABLE
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FA-A-1.14b - NODE 1.14 - MAIN BUILDING PENTHOUSE - ADDRESSABLE
FA-A-2.1 - NODE 2.1 - ACC BUILDING BASEMENT - ADDRESSABLE
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FA-A-2.1 - NODE 2.1 - ACC BUILDING BASEMENT - ADDRESSABLE
FA-A-2.2 - NODE 2.2 - ACC BUILDING FIRST FLOOR - ADDRESSABLE
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FA-A-2.2 - NODE 2.2 - ACC BUILDING FIRST FLOOR - ADDRESSABLE
FA-A-2.3 - NODE 2.2 AND 2.3 - ACC BUILDING SECOND FLOOR - ADDRESSABLE
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FA-A-2.3 - NODE 2.2 AND 2.3 - ACC BUILDING SECOND FLOOR - ADDRESSABLE
FA-A-2.4 - NODE 2.4 - ACC BUILDING THIRD FLOOR - ADDRESSABLE
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FA-A-2.4 - NODE 2.4 - ACC BUILDING THIRD FLOOR - ADDRESSABLE
FA-A-2.5 - NODE 2.5 - ACC BUILDING FOURTH FLOOR AND PENTHOUSE - ADDRESSABLE
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FA-A-2.5 - NODE 2.5 - ACC BUILDING FOURTH FLOOR AND PENTHOUSE - ADDRESSABLE
FA-A-3.1 - NODE 3.1 - CARES TOWER LEVEL A - ADDRESSABLE
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FA-A-3.1 - NODE 3.1 - CARES TOWER LEVEL A - ADDRESSABLE
FA-A-3.2 - NODE 3.2 - CARES TOWER BASEMENT - ADDRESSABLE
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FA-A-3.2 - NODE 3.2 - CARES TOWER BASEMENT - ADDRESSABLE
FA-A-3.3 - NODE 3.3 - CARES TOWER FIRST FLOOR - ADDRESSABLE
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FA-A-3.3 - NODE 3.3 - CARES TOWER FIRST FLOOR - ADDRESSABLE
FA-A-3.4 - NODE 3.4 - CARES TOWER SECOND FLOOR - ADDRESSABLE
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FA-A-3.4 - NODE 3.4 - CARES TOWER SECOND FLOOR - ADDRESSABLE
FA-A-3.5 - NODE 3.5 - CARES TOWER THIRD FLOOR - ADDRESSABLE
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FA-A-3.5 - NODE 3.5 - CARES TOWER THIRD FLOOR - ADDRESSABLE
FA-A-3.6 - NODE 3.6 - CARES TOWER FOURTH FLOOR - ADDRESSABLE
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FA-A-3.6 - NODE 3.6 - CARES TOWER FOURTH FLOOR - ADDRESSABLE
FA-A-3.7 - NODE 3.7 - CARES TOWER FIFTH FLOOR - ADDRESSABLE
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FA-A-3.7 - NODE 3.7 - CARES TOWER FIFTH FLOOR - ADDRESSABLE
FA-A-3.8 - NODE 3.8 - CARES TOWER SIXTH FLOOR AND PENTHOUSE - ADDRESSABLE
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FA-A-3.8 - NODE 3.8 - CARES TOWER SIXTH FLOOR AND PENTHOUSE - ADDRESSABLE
FA-A-4.1a - NODE 4.1 - RESEARCH WING BASEMENT AND FIRST FLOOR - ADDRESSABLE
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FA-A-4.1a - NODE 4.1 - RESEARCH WING BASEMENT AND FIRST FLOOR - ADDRESSABLE
FA-A-4.1b - NODE 4.1 - RESEARCH WING SECOND AND THIRD FLOOR - ADDRESSABLE
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FA-A-4.1b - NODE 4.1 - RESEARCH WING SECOND AND THIRD FLOOR - ADDRESSABLE
FA-A-5.1 - NODE 5.1 - ENERGY CENTER BASEMENT AND FIRST FLOOR - ADDRESSABLE
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FA-A-5.1 - NODE 5.1 - ENERGY CENTER BASEMENT AND FIRST FLOOR - ADDRESSABLE
FA-A-6.1a - NODE 6.1 - LAB WAREHOUSE BASEMENT - ADDRESSABLE
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FA-A-6.1a - NODE 6.1 - LAB WAREHOUSE BASEMENT - ADDRESSABLE
FA-A-6.1b - NODE 6.1 - LAB WAREHOUSE FIRST FLOOR - ADDRESSABLE
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FA-A-6.1b - NODE 6.1 - LAB WAREHOUSE FIRST FLOOR - ADDRESSABLE
FA-A-6.1c - NODE 6.1 - LAB WAREHOUSE PENTHOUSE - ADDRESSABLE
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FA-A-6.1c - NODE 6.1 - LAB WAREHOUSE PENTHOUSE - ADDRESSABLE
FA-N-1.1 - NODE 1.1 - MAIN BUILDING BASEMENT - NOTIFICATION
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FA-N-1.1 - NODE 1.1 - MAIN BUILDING BASEMENT - NOTIFICATION
FA-N-1.2 - NODE 1.2 - MAIN BUILDING BASEMENT - NOTIFICATION
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FA-N-1.2 - NODE 1.2 - MAIN BUILDING BASEMENT - NOTIFICATION
FA-N-1.3a - NODE 1.3 - MAIN BUILDING SUB-BASEMENT - NOTIFICATION
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FA-N-1.3a - NODE 1.3 - MAIN BUILDING SUB-BASEMENT - NOTIFICATION
FA-N-1.3b - NODE 1.3 - MAIN BUILDING BASEMENT - NOTIFICATION
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FA-N-1.3b - NODE 1.3 - MAIN BUILDING BASEMENT - NOTIFICATION
FA-N-1.3c - NODE 1.3 - PARKING STRUCTURE BASEMENT - NOTIFICATION
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FA-N-1.3c - NODE 1.3 - PARKING STRUCTURE BASEMENT - NOTIFICATION
FA-N-1.3d - NODE 1.3 - PARKING STRUCTURE FIRST FLOOR - NOTIFICATION
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FA-N-1.3d - NODE 1.3 - PARKING STRUCTURE FIRST FLOOR - NOTIFICATION
FA-N-1.3e - NODE 1.3 - PARKING STRUCTURE SECOND FLOOR - NOTIFICATION
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FA-N-1.3e - NODE 1.3 - PARKING STRUCTURE SECOND FLOOR - NOTIFICATION
FA-N-1.3f - NODE 1.3 - PARKING STRUCTURE THIRD FLOOR - NOTIFICATION
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FA-N-1.3f - NODE 1.3 - PARKING STRUCTURE THIRD FLOOR - NOTIFICATION
FA-N-1.4 - NODE 1.4 - MAIN BUILDING FIRST FLOOR - NOTIFICATION
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FA-N-1.4 - NODE 1.4 - MAIN BUILDING FIRST FLOOR - NOTIFICATION
FA-N-1.5 - NODE 1.5 - MAIN BUILDING BASEMENT AND FIRST FLOOR - NOTIFICATION
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FA-N-1.5 - NODE 1.5 - MAIN BUILDING BASEMENT AND FIRST FLOOR - NOTIFICATION
FA-N-1.6 - NODE 1.6 - MAIN BUILDING FIRST FLOOR - NOTIFICATION
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FA-N-1.6 - NODE 1.6 - MAIN BUILDING FIRST FLOOR - NOTIFICATION
FA-N-1.7 - NODE 1.7 - MAIN BUILDING FIRST FLOOR - NOTIFICATION
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FA-N-1.7 - NODE 1.7 - MAIN BUILDING FIRST FLOOR - NOTIFICATION
FA-N-1.8 - NODE 1.8 - MAIN BUILDING SECOND FLOOR - NOTIFICATION
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FA-N-1.8 - NODE 1.8 - MAIN BUILDING SECOND FLOOR - NOTIFICATION
FA-N-1.9 - NODE 1.9 - MAIN BUILDING SECOND FLOOR - NOTIFICATION
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FA-N-1.9 - NODE 1.9 - MAIN BUILDING SECOND FLOOR - NOTIFICATION
FA-N-1.10 - NODE 1.10 - MAIN BUILDING SECOND AND THIRD FLOOR - NOTIFICATION
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FA-N-1.10 - NODE 1.10 - MAIN BUILDING SECOND AND THIRD FLOOR - NOTIFICATION
FA-N-1.11 - NODE 1.11 - MAIN BUILDING THIRD FLOOR - NOTIFICATION
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FA-N-1.11 - NODE 1.11 - MAIN BUILDING THIRD FLOOR - NOTIFICATION
FA-N-1.12 - NODE 1.12 - MAIN BUILDING FOURTH FLOOR - NOTIFICATION
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FA-N-1.12 - NODE 1.12 - MAIN BUILDING FOURTH FLOOR - NOTIFICATION
FA-N-1.13 - NODE 1.13 - MAIN BUILDING FIFTH FLOOR - NOTIFICATION
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FA-N-1.13 - NODE 1.13 - MAIN BUILDING FIFTH FLOOR - NOTIFICATION
FA-N-1.14a - NODE 1.14 - MAIN BUILDING SIXTH FLOOR - NOTIFICATION
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FA-N-1.14a - NODE 1.14 - MAIN BUILDING SIXTH FLOOR - NOTIFICATION
FA-N-1.14b - NODE 1.14 - MAIN BUILDING PENTHOUSE FLOOR - NOTIFICATION
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FA-N-1.14b - NODE 1.14 - MAIN BUILDING PENTHOUSE FLOOR - NOTIFICATION
FA-N-2.1 - NODE 2.1 - ACC BUILDING BASEMENT - NOTIFICATION
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FA-N-2.1 - NODE 2.1 - ACC BUILDING BASEMENT - NOTIFICATION
FA-N-2.2 - NODE 2.2 - ACC BUILDING FIRST FLOOR - NOTIFICATION
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FA-N-2.2 - NODE 2.2 - ACC BUILDING FIRST FLOOR - NOTIFICATION
FA-N-2.3 - NODE 2.2 AND 2.3 - ACC BUILDING SECOND FLOOR - NOTIFICATION
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FA-N-2.3 - NODE 2.2 AND 2.3 - ACC BUILDING SECOND FLOOR - NOTIFICATION
FA-N-2.4 - NODE 2.4 - ACC BUILDING THIRD FLOOR - NOTIFICATION
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FA-N-2.4 - NODE 2.4 - ACC BUILDING THIRD FLOOR - NOTIFICATION
FA-N-2.5 - NODE 2.5 - ACC BUILDING FOURTH FLOOR AND PENTHOUSE - NOTIFICATION
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FA-N-2.5 - NODE 2.5 - ACC BUILDING FOURTH FLOOR AND PENTHOUSE - NOTIFICATION
FA-N-3.1 - NODE 3.1 - CARES TOWER LEVEL A - NOTIFICATION
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FA-N-3.1 - NODE 3.1 - CARES TOWER LEVEL A - NOTIFICATION
FA-N-3.2 - NODE 3.2 - CARES TOWER BASEMENT - NOTIFICATION
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FA-N-3.2 - NODE 3.2 - CARES TOWER BASEMENT - NOTIFICATION
FA-N-3.3 - NODE 3.3 - CARES TOWER FIRST FLOOR - NOTIFICATION
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FA-N-3.3 - NODE 3.3 - CARES TOWER FIRST FLOOR - NOTIFICATION
FA-N-3.4 - NODE 3.4 - CARES TOWER SECOND FLOOR - NOTIFICATION
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FA-N-3.4 - NODE 3.4 - CARES TOWER SECOND FLOOR - NOTIFICATION
FA-N-3.5 - NODE 3.5 - CARES TOWER THIRD FLOOR - NOTIFICATION
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FA-N-3.5 - NODE 3.5 - CARES TOWER THIRD FLOOR - NOTIFICATION
FA-N-3.6 - NODE 3.6 - CARES TOWER FOURTH FLOOR - NOTIFICATION
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FA-N-3.6 - NODE 3.6 - CARES TOWER FOURTH FLOOR - NOTIFICATION
FA-N-3.7 - NODE 3.7 - CARES TOWER FIFTH FLOOR - NOTIFICATION
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FA-N-3.7 - NODE 3.7 - CARES TOWER FIFTH FLOOR - NOTIFICATION
FA-N-3.8 - NODE 3.8 - CARES TOWER SIXTH FLOOR AND PENTHOUSE - NOTIFICATION
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FA-N-3.8 - NODE 3.8 - CARES TOWER SIXTH FLOOR AND PENTHOUSE - NOTIFICATION
FA-N-4.1a - NODE 4.1 - RESEARCH WING BASEMENT AND FIRST FLOOR - NOTIFICATION
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FA-N-4.1a - NODE 4.1 - RESEARCH WING BASEMENT AND FIRST FLOOR - NOTIFICATION
FA-N-4.1b - NODE 4.1 - RESEARCH WING SECOND AND THIRD FLOOR - NOTIFICATION
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FA-N-4.1b - NODE 4.1 - RESEARCH WING SECOND AND THIRD FLOOR - NOTIFICATION
FA-N-5.1 - NODE 5.1 - ENERGY CENTER BASEMENT AND FIRST FLOOR - NOTIFICATION
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FA-N-5.1 - NODE 5.1 - ENERGY CENTER BASEMENT AND FIRST FLOOR - NOTIFICATION
FA-N-6.1a - NODE 6.1 - LAB WAREHOUSE BASEMENT - NOTIFICATION
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FA-N-6.1a - NODE 6.1 - LAB WAREHOUSE BASEMENT - NOTIFICATION
FA-N-6.1b - NODE 6.1 - LAB WAREHOUSE FIRST FLOOR AND PENTHOUSE - NOTIFICATION
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FA-N-6.1b - NODE 6.1 - LAB WAREHOUSE FIRST FLOOR AND PENTHOUSE - NOTIFICATION
FA-R-0.1 - DEMOLITION FIRE ALARM SYSTEM BACKBONE DIAGRAM
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FA-R-0.1 - DEMOLITION FIRE ALARM SYSTEM BACKBONE DIAGRAM
FA-R-0.2 - NEW FIRE ALARM SYSTEM BACKBONE DIAGRAM
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FA-R-0.2 - NEW FIRE ALARM SYSTEM BACKBONE DIAGRAM
FA-D-0.1 - FIRE ALARM SYSTEM DETAILS
17069 FFH CF - FIRE ALARM STUDY - R19_Ryan.P.Hewit
FA-D-0.1 - FIRE ALARM SYSTEM DETAILS

File details come from the government source that posted it. Updated .