About this file

36C25019B0046 541-19-201 - Project Drawings Combined Final-Part3.pdf

View the file

Other files

File Type Posted
36C25019C0255-000.docx DOCX document
36C25019B0046-0001002.pdf PDF
36C25019B0046-0001001.pdf PDF
36C25019B0046-0001000.docx DOCX document
36C25019B0046-0001000.docx DOCX document
36C25019B0046-0001001.pdf PDF
36C25019B0046-0001002.pdf PDF
36C25019B0046-004.pdf PDF
36C25019B0046-003.pdf PDF
36C25019B0046-007.pdf PDF
36C25019B0046-001.docx DOCX document
36C25019B0046-002.pdf PDF
36C25019B0046-006.pdf PDF
36C25019B0046-006.pdf PDF
36C25019B0046-005.pdf PDF
36C25019B0046-003.pdf PDF
36C25019B0046-007.pdf PDF
36C25019B0046-001.docx DOCX document
36C25019B0046-002.pdf PDF
36C25019B0046-004.pdf PDF
36C25019B0046-000.docx DOCX document
36C25019B0046-000.docx DOCX document
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

S2.15

XBSD.67

XBSD.44

XBSD.45

XBSD.46

XBSD.47 XBSD.48

XBSD.53

XBSD.54

XBSD.52

XBSD.50

XBSS.16

XBSD.51

(BELOW)

XBSD.49

FOTP

S4.15

S2.15

S2.15 S4.15

S4.15

S2.15

S2.15

S2.15

LME22-EQ

TO SPARE 20A-1P

IN LME22-EQ

RAD2USSHV1

RAD2USSHV2

MARK

AHU_EAST_1_2

NAME

10.20.100.27

IP ADDRESS

T1.8 TEMPERATURE CONTROLS NETWORK DEVICE LIST

ROOM

XBSD.44

XBSD.45

XBSD.46

XBSD.47

XBSD.48

EAST PENTHOUSE 2B480NETCONTROLLER

DESCRIPTION

10.20.100.28

10.20.100.29

10.20.100.30

10.20.100.31

XBSD.49 AHU_EAST_PENT 10.20.100.32NETCONTROLLER

XBSD.50

XBSD.51

XBSD.52

XBSD.53

XBSD.54

XBSD.67

AHU_EAST_0_1 NETCONTROLLER

AHU_EAST_0_3 NETCONTROLLER

AHU_EAST_0_2 NETCONTROLLER

AHU_EAST_1_1 NETCONTROLLER

EAST PENTHOUSE 2B480

EAST PENTHOUSE 2B480

EAST PENTHOUSE 2B480

EAST PENTHOUSE 2B480

EAST PENTHOUSE 2B480

- -WORKSTATION EAST PENTHOUSE 2B480

NUCMED_HX_BCX 10.20.100.111bCX1 CONTROLLER EAST PENTHOUSE 2B480

NUCMED_VAV_BCX 10.20.100.112bCX1 CONTROLLER EAST PENTHOUSE 2B480

3355 10.20.100.124bCX1 CONTROLLER EAST PENTHOUSE 2B480

BACNET GATEWAY - EAST PENTHOUSE 2B480-

AHU-6 10.20.100.34NETCONTROLLER MECHANICAL PENTHOUSE 2B501

XBSD.70

XBSD.71

NETCONTROLLER 10.20.100.18 ELEC 2B214INFINITY10_OMH

INFINITY11_DRIVE 10.20.100.19NETCONTROLLER ELEC 2B214

XBSD.108 CARES_LEVEL_2 10.20.100.70bCX1 CONTROLLER ELEC CLOSET 2FLVC2

GENERAL DEVICE NOTES:

A. CONNECT ALL LISTED DEVICES TO NEAREST SMART BUILDING SYSTEM DATA OUTLET. REFER TO TYPICAL BUILDING SYSTEM DEVICE CONNECTION

SCHEMATIC ON SHEET T3.3

XBSD.70

XBSD.71

XBSS.22

S4.06

S2.19

XBSD.108

XBSS.43 2

CODED NOTES:

1 AFTER ENTIRE ANDOVER DEVICE CUTOVER TO THE SMART BUILDING SYSTEM IS COMPLETE, REMOVE

EXISTING NETWORK SWITCH COMPLETE WITH ALL CABLING.

EXISTING ANDOVER NETWORK SWITCH TO REMAIN.

EXTEND COMMUNICATION CABLING FROM EXISTING ELECTRIC METERS FOR CONNECTION TO SMART

BUILDING SYSTEM AND TRIDIUM INTEGRATION. REFER TO SHEET T3.6.

REFER TO X1.3 - FIRST FLOOR KEY PLAN FOR LOCATION OF FOTP-6.

REFER TO X1.5 - THIRD FLOOR KEY PLAN FOR LOCATION OF FOTP-19.

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS:

VAMC - WADE PARK

ARCHITECT:

Office of Facilities

Management

Upgrade Smart Building

System (Tridium)

05/31/19

541-19-201

100% CONSTRUCTION DOCUMENTS SUBMISSION 05/31/19

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 07/19/19

NOT TO SCALE

SECOND FLOOR KEY PLAN

T1.8

SECOND FLOOR AREA PLANS -

T1.8

RPHMPL

FOTP-6, FOTP-15 AND FOTP-19

0'

SCALE: 1/8" = 1'0"

4' 8' 16' 32'

SECOND FLOOR AREA PLANS -

2B480 AND 2B501

T1.8

0'

SCALE: 1/8" = 1'0"

4' 8' 16' 32'

SECOND FLOOR AREA PLANS - 2B214

0'

SCALE: 1/8" = 1'0"

4' 8' 16' 32'

SECOND FLOOR AREA PLANS - 2FLVC2

T1.8

NEW

FOTP-15

XBSD.36 XBSD.35

XBSD.38

XBSD.43

XBSD.42

XBSD.39

XBSD.37

XBSD.41

XBSS.15

XBSD.40

XBSD.34

XBSS.18

XBSD.56

XBSD.57

XBSD.55

XBSS.17

XBSD.60 (ABOVE)

XBSD.61 (BELOW)

XBSD.59 (ABOVE)

XBSD.58 (BELOW)

FOTP

S2.16

S2.16

S2.16

S2.16

S2.16

S4.16

S2.16

S2.16

S4.16

S4.16

S4.16

S2.16

S2.16

LMW21-EQ

TO SPARE 20A-1P

IN LMW21-EQ

PALMS

SUB

LAB

SUB

XBSD.68

S2.16

XBSD.120 S2.15

XBSS.31 1

MARK

NAME

IP ADDRESS

T1.9 TEMPERATURE CONTROLS NETWORK DEVICE LIST

ROOM

XBSD.34

XBSD.35

XBSD.36

XBSD.37

XBSD.38

WEST PENTHOUSE 2D480WORKSTATION

DESCRIPTION

10.20.100.39

10.20.100.40

10.20.100.37

10.20.100.36

XBSD.39 AHU_WEST_1_1 10.20.100.38NETCONTROLLER

XBSD.40

XBSD.41

XBSD.42

XBSD.43

XBSD.55

XBSD.56

AHU_WEST_1_2 NETCONTROLLER

AHU_WEST_1_3 NETCONTROLLER

AHU_WEST_0_2 NETCONTROLLER

AHU_WEST_0_1 NETCONTROLLER

10.20.100.41

AHU-3B122B 10.20.100.102NETCONTROLLER

3356 10.20.100.125bCX1 CONTROLLER

- 10.20.100.124BACNET GATEWAY

NETCONTROLLER 10.20.100.49AHU_56

- -BACNET GATEWAY

XBSD.57

XBSD.58

XBSD.59

XBSD.60

XBSD.61

XBSD.68

AHU_WEST_PENT NETCONTROLLER

WEST PENTHOUSE 2D480

WEST PENTHOUSE 2D480

WEST PENTHOUSE 2D480

WEST PENTHOUSE 2D480

WEST PENTHOUSE 2D480

WEST PENTHOUSE 2D480

WEST PENTHOUSE 2D480

WEST PENTHOUSE 2D480

WEST PENTHOUSE 2D480

MECHANICAL RM 2F501B

MECHANICAL RM 2F501B

-WORKSTATION MECHANICAL RM 2F501B-

AHU_57 NETCONTROLLER 10.20.100.86 MECHANICAL RM 2F501C

PALMS_EF_PANEL NETCONTROLLER 10.20.100.89 MECHANICAL RM 2F501C

PALMS_ACV bCX1 CONTROLLER - MECHANICAL RM 2F501C

- PHOENIX CONTROLS MICROSERVER - MECHANICAL RM 2F501C

AHU_14 NETCONTROLLER 10.20.100.65 FAN RM 2C129

XBSD.120 - CYPRESS WIRELESS SYSTEM CONTROLLER 10.20.100.144 CHUTE 2C134A

GENERAL DEVICE NOTES:

A. CONNECT ALL LISTED DEVICES TO NEAREST SMART BUILDING SYSTEM DATA OUTLET. REFER TO TYPICAL BUILDING SYSTEM DEVICE CONNECTION

SCHEMATIC ON SHEET T3.3

CODED NOTES:

1 AFTER ENTIRE ANDOVER DEVICE CUTOVER TO THE SMART BUILDING SYSTEM IS COMPLETE, REMOVE

EXISTING NETWORK SWITCH COMPLETE WITH ALL CABLING.

REPLACE (5) EXISTING NIAGARA AX JACES (JACEEM1, JACEAHU, JACEBLR, JACECHLR, AND JACEEFS [OR

SPARE] WITH VYKON NIAGARA N4 JACES. REFER TO SPECIFICATIONS.

EXTEND COMMUNICATION CABLING FROM EXISTING ELECTRIC METERS FOR CONNECTION TO SMART

BUILDING SYSTEM AND TRIDIUM INTEGRATION. REFER TO SHEET T3.6.

REFER TO X1.4 - SECOND FLOOR KEY PLAN FOR LOCATION OF FOTP-15.

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS:

VAMC - WADE PARK

ARCHITECT:

Office of Facilities

Management

Upgrade Smart Building

System (Tridium)

05/31/19

541-19-201

100% CONSTRUCTION DOCUMENTS SUBMISSION 05/31/19

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 07/19/19

NOT TO SCALE

SECOND FLOOR KEY PLAN

T1.9

0'

SCALE: 1/8" = 1'0"

4' 8' 16' 32'

SECOND FLOOR AREA PLAN -

2C129, 2C134 AND 2C134A

SECOND FLOOR AREA PLANS -

T1.9

RPHMPL

FOTP-15 AND FOTP-16

T1.9

0'

SCALE: 1/8" = 1'0"

4' 8' 16' 32'

SECOND FLOOR AREA PLAN - 2E480,

2F501B AND 2F501C

NEW

FOTP-16

S4.17

XBSD.65

FOTP

XBSS.20

XBSD.62

XBSS.19

XBSD.63

XBSD.64

XBSD.66

S2.17

S2.17

S2.17

XBSD.95

XBSS.32

S2.17

LL31EQB

TO SPARE 20A-1P

IN LL31EQB

XBSD.80

XBSD.82

XBSD.81

S2.01

S4.01

PDU-B

UPS-B

FD

B1

B2

B3

E1

E2 X

X

X

X

X

X

X

X

FOTP-01

FOTP

MARK

AHU_S_2_2

NAME

10.20.100.91

IP ADDRESS

T1.9 TEMPERATURE CONTROLS NETWORK DEVICE LIST

ROOM

XBSD.62

XBSD.63

XBSD.64

XBSD.65

XBSD.66

SURGERY PENTHOUSE 3B162DNETCONTROLLER

DESCRIPTION

10.20.100.94

10.20.100.99

10.20.100.92

AHU_S_2_3

NETCONTROLLERAHU_S_NET_PE

bCX1 CONTROLLERSURGERY

NETCONTROLLER

- WORKSTATION

SURGERY PENTHOUSE 3B162D

SURGERY PENTHOUSE 3B162D

SURGERY PENTHOUSE 3B162D

SURGERY PENTHOUSE 3B162D

XBSD.80

XBSD.81

XBSD.82

INFINITY13_LAIID

INFINITY12_LAII

NETCONTROLLER

NETCONTROLLER

BACNET GATEWAY

LINACC PENTHOUSE

LINACC PENTHOUSE

LINACC PENTHOUSE

10.20.100.20

10.20.100.22

XBSD.94 INFINITY14_3RDFL NETCONTROLLER IRM 3A10110.20.100.23

XBSD.95 3352 bCX1 CONTROLLER TELECOM RM 3B162C10.20.100.121

XBSD.107 CARES_LEVEL_3 bCX1 CONTROLLER ELEC CLOSET 3FLVC210.20.100.69

GENERAL DEVICE NOTES:

A. CONNECT ALL LISTED DEVICES TO NEAREST SMART BUILDING SYSTEM DATA OUTLET. REFER TO TYPICAL BUILDING SYSTEM DEVICE CONNECTION

SCHEMATIC ON SHEET T3.3

S2.01 XBSD.94

XBSS.33 1

S2.19

XBSD.107

XBSS.44

FOTP

TO SPARE 20A-1P

IN F3LEL1

CODED NOTES:

1 AFTER ENTIRE ANDOVER DEVICE CUTOVER TO THE SMART BUILDING SYSTEM IS COMPLETE, REMOVE

EXISTING NETWORK SWITCH COMPLETE WITH ALL CABLING.

NEW FOTP IN EXISTING RACK.

EXISTING SICU JACE. REFER TO SPECIFICATIONS FOR ASSOCIATED WORK.

EXISTING ANDOVER NETWORK SWITCH TO REMAIN.

F3LEL1

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS:

VAMC - WADE PARK

ARCHITECT:

Office of Facilities

Management

Upgrade Smart Building

System (Tridium)

05/31/19

541-19-201

100% CONSTRUCTION DOCUMENTS SUBMISSION 05/31/19

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 07/19/19

NOT TO SCALE

THIRD FLOOR KEY PLAN

T1.10

THIRD FLOOR AREA PLANS -

T1.10

RPHMPL

FOTP-01, FOTP-17 AND FOTP-19

0'

SCALE: 1/8" = 1'0"

4' 8' 16' 32'

THIRD FLOOR AREA PLAN - 3B162D

0'

SCALE: 1/8" = 1'0"

4' 8' 16' 32'

THIRD FLOOR AREA PLAN -

LINACC PENTHOUSE AND 3A135

T1.10

T1.10

0'

SCALE: 1/8" = 1'0"

4' 8' 16' 32'

THIRD FLOOR AREA PLAN - 3A101

T1.10

0'

SCALE: 1/8" = 1'0"

4' 8' 16' 32'

THIRD FLOOR AREA PLAN - 3FLVC2

NEW

FOTP-19

NEW

FOTP-17

NEW

FOTP-01

T1.10

0'

SCALE: 1/8" = 1'0"

4' 8' 16' 32'

THIRD FLOOR AREA PLAN - 3FELC2

S2.19

XBSD.106

XBSS.45 2

XBSS.34 1

S2.03

XBSD.121

MARK

CARES_LEVEL_4

NAME

10.20.100.68

IP ADDRESS

T1.11 TEMPERATURE CONTROLS NETWORK DEVICE LIST

ROOM

XBSD.106 ELEC CLOSET 4FLVC2bCX1 CONTROLLER

DESCRIPTION

- 10.20.100.145XBSD.121 ELEC 4C103CYPRESS WIRELESS SYSTEM CONTROLLER

GENERAL DEVICE NOTES:

A. CONNECT ALL LISTED DEVICES TO NEAREST SMART BUILDING SYSTEM DATA OUTLET. REFER TO TYPICAL BUILDING SYSTEM DEVICE CONNECTION

SCHEMATIC ON SHEET T3.3

CODED NOTES:

1 AFTER ENTIRE ANDOVER DEVICE CUTOVER TO THE SMART BUILDING SYSTEM IS COMPLETE, REMOVE

EXISTING NETWORK SWITCH COMPLETE WITH ALL CABLING.

EXISTING ANDOVER NETWORK SWITCH TO REMAIN.

REFER TO X1.5 - THIRD FLOOR KEY PLAN FOR LOCATION OF FOTP-19.

REFER TO X1.9 - SEVENTH FLOOR KEY PLAN FOR LOCATION OF FOTP-3.

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS:

VAMC - WADE PARK

ARCHITECT:

Office of Facilities

Management

Upgrade Smart Building

System (Tridium)

05/31/19

541-19-201

100% CONSTRUCTION DOCUMENTS SUBMISSION 05/31/19

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 07/19/19

FOURTH FLOOR AREA PLANS -

T1.11

RPHMPL

0'

SCALE: 1/8" = 1'0"

4' 8' 16' 32'

FOURTH FLOOR AREA PLAN - 4FLVC2

FOTP-3 AND FOTP-19

0'

SCALE: 1/8" = 1'0"

4' 8' 16' 32'

FOURTH FLOOR AREA PLAN - 4A101 AND 4C103

NOT TO SCALE

FOURTH FLOOR KEY PLAN

T1.11

T1.11

FOTP20

XBSD.72

S2.20

S4.20

S4.20

XBSD.75

XBSD.76

XBSD.73

XBSD.74

XBSS.27 1

EQ-HMP3

EQ-LMP3

TO SPARE 20A-1P

IN LL31EQB

MARK

AHU_55

NAME

10.20.100.45

IP ADDRESS

T1.12 TEMPERATURE CONTROLS NETWORK DEVICE LIST

ROOM

XBSD.72

XBSD.73

XBSD.74

XBSD.75

XBSD.76

NORTH PENTHOUSE PAC302NETCONTROLLER

DESCRIPTION

AHU_54 10.20.100.44NETCONTROLLER

- -BACNET GATEWAY

3357 10.20.100.126bCX1 CONTROLLER

- -WORKSTATION

SOUTH PENTHOUSE PAC200

SOUTH PENTHOUSE PAC200

SOUTH PENTHOUSE PAC200

SOUTH PENTHOUSE PAC200

XBSD.105 CARES_LEVEL_5 10.20.100.67bCX1 CONTROLLER ELEC CLOSET 5FLVC2

XBSD.122 - 10.20.100.146CYPRESS WIRELESS SYSTEM CONTROLLER ELECT 5B115

GENERAL DEVICE NOTES:

A. CONNECT ALL LISTED DEVICES TO NEAREST SMART BUILDING SYSTEM DATA OUTLET. REFER TO TYPICAL BUILDING SYSTEM DEVICE CONNECTION

SCHEMATIC ON SHEET T3.3

XBSS.35 1

S2.19

XBSD.105

XBSS.46 34

CODED NOTES:

1 AFTER ENTIRE ANDOVER DEVICE CUTOVER TO THE SMART BUILDING SYSTEM IS COMPLETE, REMOVE

EXISTING NETWORK SWITCH COMPLETE WITH ALL CABLING.

EQ-LMP3: NEW 5KVA, 480:120/240 VAC POWER MINIZONE TRANSFORMER WITH PRIMARY MAIN BREAKER, SECONDARY MAIN BREAKER, AND (10) 20A-1P BRANCH CIRCUIT BREAKERS. CONNECT 2-POLES TO NEW

20A-3P IN EQ-HMP3 VIA 3/4"C-2 #12 & 1 #12EG.

EXISTING ANDOVER NETWORK SWITCH TO REMAIN.

REFER TO X1.5 - THIRD FLOOR KEY PLAN FOR LOCATION OF FOTP-19.

REFER TO X1.9 - SEVENTH FLOOR KEY PLAN FOR LOCATION OF FOTP-3.

S2.03

XBSD.122

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS:

VAMC - WADE PARK

ARCHITECT:

Office of Facilities

Management

Upgrade Smart Building

System (Tridium)

05/31/19

541-19-201

100% CONSTRUCTION DOCUMENTS SUBMISSION 05/31/19

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 07/19/19

NOT TO SCALE

FIFTH FLOOR KEY PLAN

T1.12

0'

SCALE: 1/8" = 1'0"

4' 8' 16' 32'

FIFTH FLOOR AREA PLAN -

PAC200 AND PAC302

0'

SCALE: 1/8" = 1'0"

4' 8' 16' 32'

FIFTH FLOOR AREA PLAN - 5A100

T1.12

FIFTH FLOOR AREA PLANS -

T1.12

RPHMPL

0'

SCALE: 1/8" = 1'0"

4' 8' 16' 32'

FIFTH FLOOR AREA PLAN - 5FLVC2

FOTP-3, FOTP-19, AND FOTP-20

T1.12

NEW

FOTP-20

T1.12

0'

SCALE: 1/8" = 1'0"

4' 8' 16' 32'

FIFTH FLOOR AREA PLAN - 5B115

XBSS.36 1

S2.12

XBSD.104

XBSS.47 2

MARK NAME IP ADDRESS

T1.13 TEMPERATURE CONTROLS NETWORK DEVICE LIST

ROOMDESCRIPTION

XBSD.104 CARES_LEVEL_6 10.20.100.66bCX1 CONTROLLER ELEC CLOSET 6FLVC2

GENERAL DEVICE NOTES:

A. CONNECT ALL LISTED DEVICES TO NEAREST SMART BUILDING SYSTEM DATA OUTLET. REFER TO TYPICAL BUILDING SYSTEM DEVICE CONNECTION

SCHEMATIC ON SHEET T3.3

CODED NOTES:

1 AFTER ENTIRE ANDOVER DEVICE CUTOVER TO THE SMART BUILDING SYSTEM IS COMPLETE, REMOVE

EXISTING NETWORK SWITCH COMPLETE WITH ALL CABLING.

EXISTING ANDOVER NETWORK SWITCH TO REMAIN.

REFER TO X1.9 - SEVENTH FLOOR KEY PLAN FOR LOCATION OF FOTP-12.

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS:

VAMC - WADE PARK

ARCHITECT:

Office of Facilities

Management

Upgrade Smart Building

System (Tridium)

05/31/19

541-19-201

100% CONSTRUCTION DOCUMENTS SUBMISSION 05/31/19

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 07/19/19

SIXTH FLOOR AREA PLANS -

T1.13

RPHMPL

FOTP-12

NOT TO SCALE

SIXTH FLOOR KEY PLAN

0'

SCALE: 1/8" = 1'0"

4' 8' 16' 32'

SIXTH FLOOR AREA PLAN - 6FLVC2

0'

SCALE: 1/8" = 1'0"

4' 8' 16' 32'

SIXTH FLOOR AREA PLAN - 6A100

T1.13

T1.13

S2.03

FOTP

XBSD.83

XBSS.25

XBSS.26

XBSD.84

XBSD.85 (BELOW)

XBSD.86 (ABOVE)

XBSD.87

XBSD.88

XBSD.89

XBSD.91

XBSD.92

S4.03

S4.03

S2.03

S2.03

XBSD.90

S2.03

S2.03

S2.03

1 2

MARK

INFINITY5_NE158

NAME

10.20.100.14

IP ADDRESS

T1.14 TEMPERATURE CONTROLS NETWORK DEVICE LIST

ROOM

XBSD.83

XBSD.84

XBSD.85

XBSD.86

XBSD.87

PENTHOUSE 7C105NETCONTROLLER

DESCRIPTION

- -BACNET GATEWAY

3351 10.20.100.120BACNET bCX1 CONTROLLER

AC_17 10.20.100.97NETCONTROLLER

AC_29 10.20.100.100NETCONTROLLER

XBSD.88 PERIMETERHT_WEST 10.20.100.95NETCONTROLLER

XBSD.89 MENTALHEALTH_BCX 10.20.100.132BACNET bCX1 CONTROLLER

XBSD.90 - -WORKSTATION TV & RADIO EQPT ROOM 7C104

XBSD.91 AC_18 10.20.100.98NETCONTROLLER

XBSD.92 PERIMETERHT_EAST 10.20.100.96NETCONTROLLER

PENTHOUSE 7C105

PENTHOUSE 7C105

PENTHOUSE 7C105

PENTHOUSE 7C105

PENTHOUSE 7C105

PENTHOUSE 7C105

PENTHOUSE 7C108

PENTHOUSE 7C108

GENERAL DEVICE NOTES:

A. CONNECT ALL LISTED DEVICES TO NEAREST SMART BUILDING SYSTEM DATA OUTLET. REFER TO TYPICAL BUILDING SYSTEM DEVICE CONNECTION

SCHEMATIC ON SHEET T3.3

CODED NOTES:

1 AFTER ENTIRE ANDOVER DEVICE CUTOVER TO THE SMART BUILDING SYSTEM IS COMPLETE, REMOVE

EXISTING NETWORK SWITCH COMPLETE WITH ALL CABLING.

EXISTING JACE AHU-29. REFER TO SPECIFICATIONS FOR ASSOCIATED WORK.2

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS:

VAMC - WADE PARK

ARCHITECT:

Office of Facilities

Management

Upgrade Smart Building

System (Tridium)

05/31/19

541-19-201

100% CONSTRUCTION DOCUMENTS SUBMISSION 05/31/19

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 07/19/19

0'

SCALE: 1/8" = 1'0"

4' 8' 16' 32'

SEVENTH FLOOR AREA PLAN -

7C104, 7C105, AND 7C108

NOT TO SCALE

SEVENTH FLOOR KEY PLAN

T1.14

SEVENTH FLOOR AREA PLAN -

T1.14

RPHMPL

FOTP-3

X-FOTP-3

F O

T P

XBSD.102

XBSD.101

XBSD.100

XBSS.50

XBSD.103

XBSS.49

XBSS.48

XBSD.99

S4.12

S2.12

S4.12

MARK NAME IP ADDRESS

T1.15 TEMPERATURE CONTROLS NETWORK DEVICE LIST

ROOM

XBSD.99

XBSD.100

DESCRIPTION

CARES_LEVEL_P 10.20.100.64bCX1 CONTROLLER

CARES_DRIVES6162 10.20.100.76

XBSD.101 3358 10.20.100.127

XBSD.102 - -WORKSTATION

XBSD.103 - -BACNET GATEWAY PENTHOUSE PF104

PENTHOUSE PF104

PENTHOUSE PF104

PENTHOUSE PF104

PENTHOUSE PF104

bCX1 CONTROLLER bCX1 CONTROLLER

GENERAL DEVICE NOTES:

A. CONNECT ALL LISTED DEVICES TO NEAREST SMART BUILDING SYSTEM DATA OUTLET. REFER TO TYPICAL BUILDING SYSTEM DEVICE CONNECTION

SCHEMATIC ON SHEET T3.3

CODED NOTES:

1 AFTER ENTIRE ANDOVER DEVICE CUTOVER TO THE SMART BUILDING SYSTEM IS COMPLETE, REMOVE

EXISTING NETWORK SWITCH COMPLETE WITH ALL CABLING.

EXISTING ANDOVER NETWORK SWITCH TO REMAIN.2

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS:

VAMC - WADE PARK

ARCHITECT:

Office of Facilities

Management

Upgrade Smart Building

System (Tridium)

05/31/19

541-19-201

100% CONSTRUCTION DOCUMENTS SUBMISSION 05/31/19

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 07/19/19

0'

SCALE: 1/8" = 1'0"

4' 8' 16' 32'

SEVENTH FLOOR AREA PLAN - PF104

NOT TO SCALE

SEVENTH FLOOR KEY PLAN

T1.15

SEVENTH FLOOR AREA PLAN -

T1.15

RPHMPL

FOTP-12

X-FOTP-12

XBSS.51FOTP

FOTP

MARK

LEARNINGEXCHANGE

NAME

10.20.100.103

IP ADDRESS

T1.16 TEMPERATURE CONTROLS NETWORK DEVICE LIST

ROOM

XBSD.115

XBSD.116

2L933ANETCONTROLLER

DESCRIPTION

LEARNINGEXRTU 10.20.100.106bCX1 CONTROLLER 2L933A

XBSD.117 - -WORKSTATION 2L933A

GENERAL DEVICE NOTES:

A. CONNECT ALL LISTED DEVICES TO NEAREST SMART BUILDING SYSTEM DATA OUTLET. REFER TO TYPICAL BUILDING SYSTEM DEVICE CONNECTION

SCHEMATIC ON SHEET T3.3

OVEN

W H

OVEN

S4.18

XBSD.115

XBSD.116

S2.18

XBSD.117

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS:

VAMC - WADE PARK

ARCHITECT:

Office of Facilities

Management

Upgrade Smart Building

System (Tridium)

05/31/19

541-19-201

100% CONSTRUCTION DOCUMENTS SUBMISSION 05/31/19

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 07/19/19

0'

SCALE: 1" = 20'-0"

10' 20' 40' 80'

LEARNING EXCHANGE FIRST

FLOOR KEY PLAN

LEARNING EXCHANGE

T1.16

RPHMPL

FLOOR PLANS - FOTP-18

T1.16

0'

SCALE: 1/8" = 1'0"

4' 8' 16' 32'

LEARNING EXCHANGE FIRST

FLOOR AREA PLAN - 1L936

0'

SCALE: 1" = 20'-0"

10' 20' 40' 80'

LEARNING EXCHANGE SECOND

FLOOR KEY PLAN

T1.16

0'

SCALE: 1/8" = 1'0"

4' 8' 16' 32'

LEARNING EXCHANGE SECOND

FLOOR AREA PLAN - 2L933A

X-FOTP-18

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS:

VAMC - WADE PARK

ARCHITECT:

Office of Facilities

Management

Upgrade Smart Building

System (Tridium)

03/30/19

541-19-201NEW NETWORK BACKBONE

T2.1

RPHMPL

SM SM SM SM FOTP.01

NEW

SMSM

Core

NS.01

SV.3

SV.2

SV.1

1F-516

LAB/WH

NEW F.04

6 X 1/10 Gbps SM Backbone

MM MM MM

FOTP.04

EXISTING TO

REMAIN

MAIN

MICU BSMT

Intermediate

NS.10

NEW F.10

6 X 1/10 Gbps SM Backbone

MM MM MM

FOTP.10

EXISTING TO

REMAIN

NEW F.15

6 X 1/10 Gbps SM Backbone

BA109

AM CARE

NEW F.09

6 X 1/10 Gbps SM Backbone

SM SM SM SM

MMMM

MM

FOTP.15

NEW

MM

AM CARE

PH

Edge - NS.20

NEW F.20

6 X 1/10 Gbps SM Backbone

SM

FOTP.19

EXISTING TO REMAIN

FOTP.20

NEW

Intermediate

NS.04

Intermediate

NS.15

Intermediate

NS.19

2B501

MAIN

EAST PH

SM

X X X X X X

PF104

CARES

7FL PH

Edge - NS.12 Edge - NS.03 Edge - NS.16Edge - NS.08

FOTP.12

EXISTING TO REMAIN

FOTP.03

EXISTING TO REMAIN

FOTP.08

EXISTING TO REMAIN

7C105

MAIN

7FL PH

BD603

ENERGY

CENTER

NEW F.16

6 X 1/10 Gbps

50/125 MM

Backbone

EXISTING

6 X 1/10 Gbps

50/125 MM

Backbone

EXISTING

6 X 1/10 Gbps

50/125 MM

Backbone

EXISTING

6 X 1/10 Gbps

50/125 MM

Backbone

MM MM MM

SW.15

1C-521

RADIOLOGY

NS.13

NEW F.14

6 X 1/10 Gbps SM Backbone

NS.14

MM MM

EXISTING

6 X 1/10 Gbps

50/125 MM

Backbone

2F501C

MAIN

WEST PH

FOTP.13

EXISTING TO REMAIN

FOTP.18

EXISTING TO REMAIN

PARK GARAGE

G. FLOOR

L. EXCHANGE

G. FLOOR

NS.XX

MM

FOTP.14

EXISTING TO

REMAIN

SM

J.04

J.05

J.09

FOTP.16

NEW

TIP.16

EXISTING

G.01 G.02

TIP.08

NEW

3B-162D

SURGERY

PH

1F-192B

CARES

1FL

SURGERY

1FL MECH

3FLVC2

CARES

3FL

FOTP.06

EXISTING TO REMAIN

FOTP.07

EXISTING TO REMAIN

FOTP.17

NEW

FOTP.19

NEW

NEW F.17

6 X 1/10 Gbps

50/125 MM

Backbone

NEW F.19

6 X 1/10 Gbps

50/125 MM

Backbone

EXISTING

6 X 1/10 Gbps

50/125 MM

Backbone

EXISTING

6 X 1/10 Gbps

50/125 MM

Backbone

EXISTING

6 X 1/10 Gbps

50/125 MM

Backbone

MM

BD404

MAIN

BSMT

FOTP.11

EXISTING TO REMAIN

MM

6M-606

ADMIN

6FL

FOTP.05

EXISTING TO REMAIN

Edge - NS.05

MM

EXISTING

6 X 1/10 Gbps

50/125 MM

Backbone

XN

XN

X X

X

X X X XX

XXXX

J.02

J.03

J.01 XNXN

XN

J.09

J.10

J.08 XX

X

Edge - NS.11 Edge - NS.17Edge - NS.07Edge - NS.06 Edge - NS.19

MMMM MM

TIP.03

EXISTING

TIP.17

EXISTING

TIP.11

EXISTING

TIP.10

NEW

TIP.15

NEW

TIP.19

NEW

J.07

J.12

J.06 XNXN J.13

J.14J.16

J.20

J.18 J.19

J.17

J.15

LEGEND - Integrated Automation Network Diagram

SYMBOL DESCRIPTION

New 12-port fiber optic housing with modular termination ports for 50/125 multimode fiber. Match existing facility SBS termination style. Refer to "X-Series" Drawings for suggested routing of new Fiber Optic Cables.

MM

MM

Existing 12-port fiber optic housing with modular termination ports for 50/125 multimode fiber.

New 12-port fiber optic housing with modular termination ports for single mode fiber.

Match existing facility SBS termination style. Refer to Specification Sections 25 05 11, 25 10 00, and Devision 27 for further requirements. Refer to "X-Series" Drawings for suggested routing of new Fiber Optic Cables.

SM

New Core Switch - Refer to Specification Sections 25 05 11 and 25 10 00 for requirements.

New Intermediate Switch - Refer to Specification Sections 25 05 11 and 25 10 00 for requirements.

New Edge Switch - Refer to Specification Sections 25 05 11 and 25 10 00 for requirements.

Core

NS.01

Intermediate NS.xx

Edge - NS.xx

SYMBOL DESCRIPTION

LEGEND - Integrated Automation Enterprise Platform

SV.x

J.xx

J.xx

New Server with Tridium Niagara N4 Supervisor (Typical for (3) thus). Refer to Specification Sections 25 05 11 and 25 15 00 for requirements.

Refer to X series drawings for suggested routing of new fiber optic cables (Typ)

New Tridium Vykon Niagara N4 J-8200 JACE. Refer to Specification Sections 25 05 11 and 25 15 00 for requirements.

J.xxXN Replace existing JACE 6 with New Tridium Vykon Niagara N4 J-8200 JACE . Refer to Specification Sections 25 05 11 and 25 15 00 for requirements.

J.xx X Existing JACE 8000. Refer to Specification Sections 25 05 11 and 25 15 00 for requirements.

Future JACE for reference only (N.I.C.).

100% CONSTRUCTION DOCUMENTS SUBMISSION 05/31/19

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 07/19/19

XBSD.26

INFINITY6_NE246

NETCONTROLLER

WS

XBSS.13

MECHANICAL ROOM

107 (SURGERY)

XBSD.27

XBSS.12

XBSD.29

INFINITY7_NE208

NETCONTROLLER

MECHANICAL ROOM

(131) 1D123

WS

XBSD.31

XBSD.28

BACNET

GATEWAY

WS

XBSD.01

INFINITY15_RES

NETCONTROLLER

XBSS.02

MICU MECHANICAL

ROOM BE-260

XBSD.05

AC_31

NETCONTROLLER

XBSD.02

BACNET

GATEWAY

FOTP-10

FIBER

12 STRAND 62.5

TO CARES TOWER

XBSD.04

bCX1

AC MECHANICAL

ROOM BA-109

XBSD.19

AC-51

NETCONTROLLER

XBSD.21

AC-53

NETCONTROLLER

XBSD.15

INFINITY9_AC

NETCONTROLLER

TAC

SERVER

XBSD.16

XBSD.17

WS TAC

SERVER

XBSD.18

XBSD.22

bCX1

XBSD.23

BACNET

GATEWAY

HVAC ROOM

BAC241

AC HVAC OFFICE

BA-109C

ANIMAL RESEARCH

HVAC BF467

XBSD.08

CORRIDOR

bCX1

XBSS.05

XBSD.06

LAB_WAREHOUSE

NETCONTROLLER

XBSS.04

MECHANICAL RM

(K-16) BF412

ROOM D20

(MECHANICAL ROOM)

XBSD.13

ENHANCE MED

NETCONTROLLER

XBSD.12

ENHANCEBCX_MAP

bCX1

XBSD.11

ENHANCEBCX_AHU

bCX1

PRIMARY SWITCH

GEAR BE-504

XBSS.09

XBSD.10

NETCONTROLLER

XBSS.08

ELEC ROOM (G08A)

BD-470

XBSD.09

INFINITY3_NB835

NETCONTROLLER

XBSS.07

POOL PAC SERVICE

ROOM BB-419

XBSS.03A

XBSS.10

XBSS.11

BASEMENT

1ST FLOOR

2ND FLOOR

3RD FLOOR

4TH FLOOR

5TH FLOOR

6TH FLOOR

PENTHOUSE

XBSD.03

ELEC RM.

BE-361B

MICU ELECTRICAL

ROOM SWITCH

XBSS.01

XBSD.32

INFINITY22_FMA

NETCONTROLLER

XBSS.06

CHILLER

BB234

XBSD.25

INFINITY1_NE102

NETCONTROLLER

XBSD.33

RESEARCH_RPM

bCX1

XBSS.14

XBSS.30 XBSS.29

COMM 1B100

COMM 1A181

(DENTAL/DATA ROOM)

XBSD.34

XBSS.18

XBSS.19

WS

XBSD.62

AHU_S_2_2

NETCONTROLLER

XBSD.63

AHU_S_NET_PE

NETCONTROLLER

XBSD.82

INFINITY12_LAII

NETCONTROLLER

XBSS.24

XBSD.81

BACNET

GATEWAY

XBSD.83

INFINITY5_NE158

NETCONTROLLER

XBSS.25

WS

XBSD.90

XBSD.44

AHU_EAST_1_2

NETCONTROLLER

XBSD.45

AHU_EAST_0_1

NETCONTROLLER

XBSD.46

AHU_EAST_0_3

NETCONTROLLER

XBSD.47

AHU_EAST_0_2

NETCONTROLLER

XBSD.48

AHU_EAST_1_1

NETCONTROLLER

XBSD.49

AHU_EAST_PENT

NETCONTROLLER

XBSS.16

WS

XBSD.50

XBSD.41

AHU-3B122B

NETCONTROLLER

XBSD.42

bCX1

XBSD.40

AHU_WEST_PENT

NETCONTROLLER

XBSS.15

XBSD.39

AHU_WEST_1_1

NETCONTROLLER

XBSD.38

AHU_WEST_0_1

NETCONTROLLER

XBSD.37

AHU_WEST_0_2

NETCONTROLLER

XBSD.36

AHU_WEST_1_3

NETCONTROLLER

XBSD.35

AHU_WEST_1_2

NETCONTROLLER

XBSD.43

BACNET

GATEWAY

XBSD.51

NUCMED_HX_BCX

bCX1

XBSD.52

NUCMED_VAV_BCX

bCX1

XBSD.53

bCX1

XBSD.54

BACNET

GATEWAY

MECH ROOM

2F-501B

WS

WS

XBSD.55

AHU_56

NETCONTROLLER

XBSD.56

BACNET

GATEWAY

XBSD.57

MECH ROOM

2F-501C

XBSD.58

AHU_57

NETCONTROLLER

XBSD.59

PALMS_EF_PANEL

NETCONTROLLER

XBSD.61

PHOENIX

CONTROLS

XBSS.17

XBSD.60

PALMS_ACV

bCX1

XBSD.64

SURGERY

bCX1

XBSS.20

SURGERY PENTHOUSE

3B-162D

XBSD.66

MECHANICAL PENTHOUSE

2B-501

XBSD.67

AHU_6

NETCONTROLLER

FAN RM

2C-129

XBSD.68

AHU_14

NETCONTROLLER

XBSD.14

INFINITY2_NE212

NETCONTROLLER

XBSS.21XBSD.69

LINACCHEX_BCX

bCX1

XBSS.28

OMH CLOSET

2B214

XBSD.71

INFINITY11_Drive

NETCONTROLLER

XBSD.70

INFINITY10_OMH

NETCONTROLLER

XBSD.72

AHU_55

NETCONTROLLER

NORTH PENTHOUSE

PAC302

PENTHOUSE (LINEAR ACCELERATOR)

PENTHOUSE

7C105

XBSD.73

AHU_54

NETCONTROLLER

XBSD.75

bCX1

XBSS.27

WS

XBSD.76

SOUTH PENTHOUSE

PAC200

XBSD.74

BACNET

GATEWAY

ENG CLOSET

BB545

XBSD.77

LIEBERT

bCX1

XBSS.22

XBSD.78

CYPRESS

CONTROLLER

COMM

1B499

FIBER SWITCH

XBSS.23

SPRINKLER

SHUT-OFF

129E

XBSD.79

CYPRESS

CONTROLLER

XBSD.80

INFINITY13_LAIID

NETCONTROLLER

XBSS.26

XBSD.86

AC_17

NETCONTROLLER

XBSD.84

BACNET

GATEWAY

XBSD.85

bCX1

XBSD.88

WEST PERIMETER

NETCONTROLLER

XBSD.89

MENTALHEALTH_BCX

bCX1

XBSD.87

AC_29

NETCONTROLLER

RADIO & TV EQPT RM

7C104

XBSD.91

AC_18

NETCONTROLLER

XBSD.92

EAST PERIMETER

NETCONTROLLER

XBSS.03B

XBSD.20

AC-52

NETCONTROLLER

XBSD.24

AC-50

NETCONTROLLER

XBSD.07

AHU_26

NETCONTROLLER

XBSD.30

SF-4

NETCONTROLLER

XBSD.58

AHU_S_2_3

NETCONTROLLER

WEST PENTHOUSE

2E-480

EAST PENTHOUSE 2B-480

PENTHOUSE

7C108

XBSD.93

INFINITY30_POLICE

NETCONTROLLER

HVAC SHOP

BE-430

HVAC SHOP

SUPERVISOR BE430A

XBSD.129

WS

XBSD.130

WS

XBSS.31

DATA ROOM

2C-134

IRM

3A101

XBSS.33

XBSD.##

INFINITY14_3RDFL

NETCONTROLLER

XBSS.34

DATA ROOM

4A-101

XBSS.35

DATA ROOM

5A-100

DATA ROOM

6A-100

TELECOM

3B162C

XBSS.32

XBSD.##

bCX1

XBSS.36

EXISTING NETWORK CABLING

TO BE REMOVED

EXISTING BUILDING SYSTEM

NETWORK DEVICE

EXISTING BUILDING SYSTEM

NETWORK SWITCH

WS

EXISTING BUILDING SYSTEM

WORKSTATION

LEGEND

ELECT

5B115

XBSD.121

CYPRESS

CONTROLLER

ELEC 4C103

XBSD.122

CYPRESS

CONTROLLER

XBSD.120

CYPRESS

CONTROLLER

CHUTE

2C-134A

ELEC 1B232

XBSD.119

CYPRESS

CONTROLLER

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS:

VAMC - WADE PARK

ARCHITECT:

Office of Facilities

Management

Upgrade Smart Building

System (Tridium)

05/31/19

541-19-201

100% CONSTRUCTION DOCUMENTS SUBMISSION 05/31/19

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 07/19/19

ANDOVER NETWORK

T2.2

RPHMPL

DEMOLITION SCHEMATIC

XBSD.26

INFINITY6_NE246

NETCONTROLLER

WS

XBSD.27

X

FOTP-6

XBSD.29

INFINITY7_NE208

NETCONTROLLER

WS

XBSD.31

XBSD.28

BACNET

GATEWAY

WS

XBSD.01

INFINITY15_RES

NETCONTROLLER

MICU MECHANICAL

ROOM BE-260

XBSD.05

AC_31

NETCONTROLLER

XBSD.02

BACNET

GATEWAY

X

FOTP-10

XBSD.04

bCX1

AC MECHANICAL

ROOM BA-109

XBSD.19

AC-51

NETCONTROLLER

XBSD.21

AC-53

NETCONTROLLER

XBSD.15

INFINITY9_AC

NETCONTROLLER

TAC

SERVER

XBSD.16

XBSD.17

WS TAC

SERVER

XBSD.18

XBSD.22

bCX1

XBSD.23

BACNET

GATEWAY

HVAC ROOM

BAC241

AC HVAC OFFICE

BA-109C

ANIMAL RESEARCH

HVAC BF467

XBSD.08

CORRIDOR

bCX1

XBSD.06

LAB_WAREHOUSE

NETCONTROLLER

MECHANICAL RM

(K-16) BF412

ROOM D20

(MECHANICAL ROOM)

XBSD.13

ENHANCE MED

NETCONTROLLER

XBSD.12

ENHANCEBCX_MAP

bCX1

XBSD.11

ENHANCEBCX_AHU

bCX1

PRIMARY SWITCH

GEAR BE-504

XBSD.10

NETCONTROLLER

ELEC ROOM (G08A)

BD-470

XBSD.09

INFINITY3_NB835

NETCONTROLLER

BASEMENT

1ST FLOOR

2ND FLOOR

3RD FLOOR

4TH FLOOR

5TH FLOOR

6TH FLOOR

PENTHOUSE

XBSD.03

ELEC RM.

BE-361B

XBSD.32

INFINITY22_FMA

NETCONTROLLER

CHILLER

BB234

XBSD.25

INFINITY1_NE102

NETCONTROLLER

XBSD.33

RESEARCH_RPM

bCX1

XBSD.34

WS

XBSD.62

AHU_S_2_2

NETCONTROLLER

XBSD.63

AHU_S_NET_PE

NETCONTROLLER

XBSD.82

INFINITY12_LAII

NETCONTROLLER

XBSD.81

BACNET

GATEWAY

XBSD.83

INFINITY5_NE158

NETCONTROLLER

WS

XBSD.90

XBSD.44

AHU_EAST_1_2

NETCONTROLLER

XBSD.45

AHU_EAST_0_1

NETCONTROLLER

XBSD.46

AHU_EAST_0_3

NETCONTROLLER

XBSD.47

AHU_EAST_0_2

NETCONTROLLER

XBSD.48

AHU_EAST_1_1

NETCONTROLLER

XBSD.49

AHU_EAST_PENT

NETCONTROLLER

WS

XBSD.50

XBSD.41

AHU-3B122B

NETCONTROLLER

XBSD.42

bCX1

XBSD.40

AHU_WEST_PENT

NETCONTROLLER

XBSD.39

AHU_WEST_1_1

NETCONTROLLER

XBSD.38

AHU_WEST_0_1

NETCONTROLLER

XBSD.37

AHU_WEST_0_2

NETCONTROLLER

XBSD.36

AHU_WEST_1_3

NETCONTROLLER

XBSD.35

AHU_WEST_1_2

NETCONTROLLER

XBSD.43

BACNET

GATEWAY

XBSD.51

NUCMED_HX_BCX

bCX1

XBSD.52

NUCMED_VAV_BCX

bCX1

XBSD.53

bCX1

XBSD.54

BACNET

GATEWAY

MECH ROOM

2F-501B

WS

WS

XBSD.55

AHU_56

NETCONTROLLER

XBSD.56

BACNET

GATEWAY

XBSD.57

MECH ROOM

2F-501C

XBSD.58

AHU_57

NETCONTROLLER

XBSD.59

PALMS_EF_PANEL

NETCONTROLLER

XBSD.61

PHOENIX

CONTROLS

XBSD.60

PALMS_ACV

bCX1

XBSD.64

SURGERY

bCX1

SURGERY PENTHOUSE

3B-162D

XBSD.66

MECHANICAL PENTHOUSE

2B-501

XBSD.67

AHU_6

NETCONTROLLER

FAN RM

2C-129

XBSD.68

AHU_14

NETCONTROLLER

XBSD.14

INFINITY2_NE212

NETCONTROLLER

XBSD.69

LINACCHEX_BCX

bCX1

OMH CLOSET

2B214

XBSD.71

INFINITY11_Drive

NETCONTROLLER

XBSD.72

AHU_55

NETCONTROLLER

NORTH PENTHOUSE

PAC302

PENTHOUSE (LINEAR ACCELERATOR)

PENTHOUSE

7C105

XBSD.73

AHU_54

NETCONTROLLER

XBSD.75

bCX1

WS

XBSD.76

SOUTH PENTHOUSE

PAC200

XBSD.74

BACNET

GATEWAY

ENG CLOSET

BB545

XBSD.77

LIEBERT

bCX1

XBSD.78

CYPRESS

CONTROLLER

COMM

1B499

SPRINKLER

SHUT-OFF

129E

XBSD.79

CYPRESS

CONTROLLER

XBSD.80

INFINITY13_LAIID

NETCONTROLLER

XBSD.86

AC_17

NETCONTROLLER

XBSD.84

BACNET

GATEWAY

XBSD.85

bCX1

XBSD.88

WEST PERIMETER

NETCONTROLLER

XBSD.89

MENTALHEALTH_BCX

bCX1

XBSD.87

AC_29

NETCONTROLLER

RADIO & TV EQPT RM

7C104

XBSD.91

AC_18

NETCONTROLLER

XBSD.92

EAST PERIMETER

NETCONTROLLER

XBSD.20

AC-52

NETCONTROLLER

XBSD.24

AC-50

NETCONTROLLER

XBSD.07

AHU_26

NETCONTROLLER

XBSD.30

SF-4

NETCONTROLLER

XBSD.58

AHU_S_2_3

NETCONTROLLER

XBSD.70

INFINITY10_OMH

NETCONTROLLER

X

FOTP-9

X

FOTP-11

SWITCH ROOM

BD404

X

FOTP-08

CHILLER

BD603

ELEC CLOSET

1F516

X

FOTP-4

MECHANICAL ROOM

107 (SURGERY)

MECHANICAL ROOM

(131) 1D123

FOTP-15FOTP-16

TELEPHONE EQUIPMENT 3A135

FOTP-18

FOTP-17

FOTP-20

X

FOTP-3

PENTHOUSE

7C108

XBSD.93

INFINITY30_POLICE

NETCONTROLLER

HVAC SHOP

BE-430

HVAC SHOP

SUPERVISOR BE430A

XBSD.129

WS

XBSD.130

WS

XBSD.94

INFINITY14_3RDFL

NETCONTROLLER

XBSD.95

bCX1

NEW NETWORK CONNECTION FROM BUILDING SYSTEM

NETWORK DEVICE OR WORKSTATION TO FIBER-OPTIC

TERMINATION PANEL. REFER TO "TYPICAL BUILDING SYSTEM

DEVICE CONNECTION SCHEMATIC," SHEET T3.3.

EXISTING BUILDING SYSTEM

NETWORK DEVICE

WS

EXISTING BUILDING SYSTEM

WORKSTATION

X

FOTP-#

EXISTING FIBER-OPTIC

TERMINATION PANEL

NEW FIBER-OPTIC TERMINATION

PANEL

FOTP-#

LEGEND

ELECT

5B115

XBSD.121

CYPRESS

CONTROLLER

ELEC 4C103

XBSD.122

CYPRESS

CONTROLLER

IRM

3A101

XBSD.120

CYPRESS

CONTROLLER

CHUTE

2C-134A

ELEC 1B232

XBSD.119

CYPRESS

CONTROLLER

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS:

VAMC - WADE PARK

ARCHITECT:

Office of Facilities

Management

Upgrade Smart Building

System (Tridium)

05/31/19

541-19-201

100% CONSTRUCTION DOCUMENTS SUBMISSION 05/31/19

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 07/19/19

ANDOVER NETWORK

T2.3

FOTP CONNECTION SCHEMATIC

1ST FLOOR

2ND FLOOR

3RD FLOOR

4TH FLOOR

5TH FLOOR

6TH FLOOR

PENTHOUSE

B LEVEL

A LEVEL

ELEC CLOSET

AFLVC2

XBSD.114

CARES_LEVEL_A

bCX1

XBSS.37

ELEC CLOSET

BFLVC2

XBSD.112

CARES_LEVEL_B

bCX1

ELEC CLOSET

1FLVC2

XBSD.109

CARES_LEVEL_1

bCX1

XBSS.41

ELEC CLOSET

2FLVC2

XBSD.108

CARES_LEVEL_2

bCX1

XBSS.43

ELEC CLOSET

3FLVC2

XBSD.107

CARES_LEVEL_3

bCX1

XBSS.44

ELEC CLOSET

4FLVC2

XBSD.106

CARES_LEVEL_4

bCX1

XBSS.45

ELEC CLOSET

5FLVC2

XBSD.105

CARES_LEVEL_5

bCX1

XBSS.46

ELEC CLOSET

6FLVC2

XBSD.104

CARES_LEVEL_6

bCX1

XBSS.47

BF111

XBSD.113

CARES_FSCS

bCX1

ENGINEERING

WORKSHOP 1F191

XBSD.110

CARES_AHU_63

NETCONTROLLER

XBSS.42

WS

XBSD.111

XBSS.40

PENTHOUSE

PF104

XBSD.97

AHU_62

NETCONTROLLER

XBSD.96

AHU_61

NETCONTROLLER

XBSD.98

AHU_64

NETCONTROLLER

XBSD.103

BACNET

GATEWAY

XBSD.99

CARES_LEVEL_P

NETCONTROLLER

XBSD.100

CARES_DRIVES6162

NETCONTROLLER

XBSD.101

bCX1

WS

XBSD.102

XBSS.49

XBSS.48 XBSS.50

XBSS.38

XBSS.39

EXISTING NETWORK CABLING

TO BE REMOVED

EXISTING BUILDING SYSTEM

NETWORK DEVICE

EXISTING BUILDING SYSTEM

NETWORK SWITCH TO BE

REMOVED

WS

EXISTING BUILDING SYSTEM

WORKSTATION

LEGEND

EXISTING ETHERNET OR FIBER OPTIC

NETWORK CABLING TO REMAIN

EXISTING BUILDING SYSTEM

NETWORK SWITCH TO REMAIN

1. EXISTING CARES TOWER NETWORK SWITCHES XBSS.37 THROUGH XBSS.49 SHALL BE MAINTAINED TO

PRESERVE INTEGRITY OF EXISTING SMOKE CONTROL SYSTEM.

GENERAL NOTES:

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS:

VAMC - WADE PARK

ARCHITECT:

Office of Facilities

Management

Upgrade Smart Building

System (Tridium)

05/31/19

541-19-201

100% CONSTRUCTION DOCUMENTS SUBMISSION 05/31/19

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 07/19/19

CARES TOWER ANDOVER

T2.4

NETWORK DEMOLITION SCHEMATIC

1ST FLOOR

2ND FLOOR

3RD FLOOR

4TH FLOOR

5TH FLOOR

6TH FLOOR

PENTHOUSE

B LEVEL

A LEVEL

ELEC CLOSET

AFLVC2

XBSD.114

CARES_LEVEL_A

bCX1

ELEC CLOSET

BFLVC2

XBSD.112

CARES_LEVEL_B

bCX1

ELEC CLOSET

1FLVC2

XBSD.109

CARES_LEVEL_1

bCX1

ELEC CLOSET

2FLVC2

ELEC CLOSET

3FLVC2

ELEC CLOSET

4FLVC2

ELEC CLOSET

5FLVC2

ELEC CLOSET

6FLVC2

BF111

XBSD.113

CARES_FSCS

bCX1

ENGINEERING

WORKSHOP 1F191

XBSD.110

CARES_AHU_63

NETCONTROLLER

WS

XBSD.111

PENTHOUSE

PF104

XBSD.97

AHU_62

NETCONTROLLER

XBSD.96

AHU_61

NETCONTROLLER

XBSD.98

AHU_64

NETCONTROLLER

XBSD.103

BACNET

GATEWAY

XBSD.99

CARES_LEVEL_P

NETCONTROLLER

XBSD.100

CARES_DRIVES6162

NETCONTROLLER

XBSD.101

bCX1

WS

XBSD.102

FOTP-19

X

FOTP-12

XBSD.108

CARES_LEVEL_2

bCX1

XBSD.107

CARES_LEVEL_3

bCX1

XBSD.106

CARES_LEVEL_4

bCX1

XBSD.105

CARES_LEVEL_5

bCX1

XBSD.104

CARES_LEVEL_6

bCX1

XBSS.37

XBSS.41

XBSS.43

XBSS.44

XBSS.45

XBSS.46

XBSS.47

XBSS.40

XBSS.49

XBSS.48

XBSS.38

XBSS.39

X

FOTP-7

ELECTRICAL

1F192B

EXISTING BUILDING SYSTEM

NETWORK DEVICE

WS

EXISTING BUILDING SYSTEM

WORKSTATION

X

FOTP-#

EXISTING FIBER-OPTIC

TERMINATION PANEL

NEW FIBER-OPTIC TERMINATION

PANEL

FOTP-#

LEGEND

XBSS.42

EXISTING BUILDING SYSTEM

NETWORK SWITCH

EXISTING NETWORK CABLING

NEW NETWORK CONNECTION FROM BUILDING SYSTEM

NETWORK DEVICE OR WORKSTATION TO FIBER-OPTIC

TERMINATION PANEL. REFER TO "TYPICAL BUILDING SYSTEM

DEVICE CONNECTION SCHEMATIC," SHEET T3.3.

1. EXISTING CARES TOWER NETWORK SWITCHES XBSS.37 THROUGH XBSS.49 SHALL BE MAINTAINED TO

PRESERVE INTEGRITY OF EXISTING SMOKE CONTROL SYSTEM.

GENERAL NOTES:

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS:

VAMC - WADE PARK

ARCHITECT:

Office of Facilities

Management

Upgrade Smart Building

System (Tridium)

05/31/19

541-19-201

100% CONSTRUCTION DOCUMENTS SUBMISSION 05/31/19

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 07/19/19

CARES TOWER ANDOVER

T2.5

RPHMPL

NETWORK FOTP CONNECTION

SCHEMATIC

X-APC UPS

X-24 PORT PATCH PANEL

X-CABLE MANAGEMENT

NEW MANAGED SWITCH

X-ROUTER

X-SSL VPN

X-FIBER TERMINATION

PORTS

X-FOTP-10

X-FOTP-3 Penthouse 7C105

Port Description

1 Existing Reliable MP-C Controller

2 Existing BACnet Gateway

3 Existing Trane Controller

4 Existing AHU-29 JACE

5 Existing Connection

6 Infinity5_NE158 Netcontroller

7 7C105 BACnet Gateway

8 3351 bCX1 Controller

9 AC-17 Netcontroller

10 AC-29 Netcontroller

11 Perimeter Ht West Netcontroller

12 Mental Health bCX1 Controller

13 7C104 Workstation

14 AC-18 Netcontroller

15 Perimeter Ht East Netcontroller

16 4th Flr Cypress Wireless System Controller

17 5th Flr Cypress Wireless System Controller

22 Existing Connection

23 Existing Connection

24 Existing Connection

X-FOTP-10 Mechanical Room BE260

Port Description

1 Existing RTA BACnet/IP Gateway

2 Infinity15_RES Netcontroller

3 BE260A BACnet Gateway

4 BE260A Workstation

5 3353 bCX1 Controller

6 AC_31 Netcontroller

7 Infinity1_NE102 Netcontroller

8 Research_RPM bCX1 Controller

9 1D123 BACnet Gateway

10 Infinity7_NE208 Netcontroller

11 SF-4 Netcontroller

12 1D123 Workstation

13 10-CLE-SIT-DW-2 Gateway

20 Existing Black Box Data Switch

21 Existing BACnet Router

X-FOTP-9

X-FOTP-9 Mechanical Room BA109

Port Description

1 Existing RTA BACnet/IP Gateway

2 Existing Controller Reliable MP-C

3 Existing Ambulatory Care Trane BCU-3

4 Infinity2_NE212 Netcontroller

5 Infinity9_AC Netcontroller

6 BA109C Workstation

7 BA109C TAC Server

8 BA109C TAC Backup Server

9 AC_51 Netcontroller

10 AC_52 Netcontroller

11 AC_53 Netcontroller

12 3354 Bcx1 Controller

13 BA109 BACnet Gateway

14 AHU_50 Netcontroller

15 10-CLE-001-E1K,E1L Gateway

16 10-CLE-01A-CH-1 Gateway

17 10-CLE-01A-ST-1 Gateway

X-FOTP-4

X-APC UPS

X-24 PORT PATCH PANEL

X-CABLE MANAGEMENT

NEW MANAGED SWITCH

X-FIBER TERMINATION

PORTS

X-CABLE MANAGEMENT

X-FOTP-4 Electric Closet 1F516

Port Description

1 Existing Tridium JACE EM-1

2 Existing Tridium JACE AHU

3 Existing Tridium JACE BLR

4 Existing Tridium JACE EFS

5 Existing Tridium JACE CHLR

6 Lab_Warehouse Netcontroller

7 Existing CONTROLLER RELIABLE MP-C

8 AHU_26 Netcontroller

9 Corridor Netcontroller

10 10-CLE-SIT-DW-1 Gateway

NETWORK SWITCH

PORT LIST

NETWORK SWITCH

PORT LIST

NETWORK SWITCH

PORT LIST

NETWORK SWITCH

PORT LIST

BLANK

BLANK

BLANK

X-APC UPS

X-CABLE MANAGEMENT

NEW MANAGED SWITCH

BLANK

X-24 PORT PATCH PANEL

X-CABLE MANAGEMENT

X-FIBER TERMINATION

PORTS

X-APC UPS

X-CABLE MANAGEMENT

NEW MANAGED SWITCH

BLANK

X-24 PORT PATCH PANEL

X-CABLE MANAGEMENT

X-FIBER TERMINATION

PORTS

NETWORK SWITCH

PORT LIST

X-FOTP-8 Chiller Plant BD603

Port Description

1 Existing RTA BACnet/IP Gateway

2 Existing Workstation

3 Existing Trane LON Bridge

4 Existing Trane BCU-5

5 Existing Trane BCU-15

6 Existing RTA BACnet/IP Gateway

7 Existing Workstation

8 Existing Trane BCU-1

9 Existing Workstation

10 Netcontroller

11 Energy Center Flowmeters Gateway

12 Steam Flowmeters Gateway

13 Natural Gas Flowmeters Gateway

X-FOTP-8

X-APC UPS

X-CABLE MANAGEMENT

NEW MANAGED SWITCH

BLANK

X-24 PORT PATCH PANEL

X-CABLE MANAGEMENT

X-FIBER TERMINATION

PORTS

X-FOTP-6

X-APC UPS

X-CABLE MANAGEMENT

NEW MANAGED SWITCH

BLANK

X-24 PORT PATCH PANEL

X-CABLE MANAGEMENT

X-FIBER TERMINATION

PORTS

X-FOTP-6 Mechanical Room 107

Port Description

1 Existing Controller Reliable MP-C

2 Existing RTA BACnet/IP Gateway

3 Infinity6_NE246 Netcontroller

4 Mech Rm 107 Workstation

5 Infinity_22 Netcontroller

6 LinAccHEX_BCX bCX1 Controller

7 Infinity10_OMH Netcontroller

8 Infinity11_Drive Netcontroller

9 Cypress Wireless System Network 4

10 1B232 Cypress Wireless System

NETWORK SWITCH

PORT LIST

NETWORK SWITCH

PORT LIST

X-FOTP-7 Electrical 1F192B

Port Description

1 Existing Controller Reliable MP-C

2 Existing Workstation

3 1F191 Workstation

X-FOTP-11 Switch Rm BD404

Port Description

1 Existing Tridium Jace

2 Existing Tridium Jace

3 Existing Electrical Shop Workstation

4 Existing Plumbing Shop Workstation

5 Existing Master BBMD

6 Existing Room D21 ION Meters

7 Existing Workstation Supervisor

8 Existing Boiler House Switch

9 Existing Boiler House BBMD

10 Existing Boiler House Gateway

11 Existing Steam HW Heater Flexim Gateway

12 Existing Boiler House Workstation

13 EnhanceBCX_AHU bCX1 Controller

14 EnhanceBCX_Map bCX1 Controller

15 AHU_WEST_0_3 Netcontroller

16 Infinity3_NB835 Netcontroller

17 Existing Pilot Metering BBMD

18 Existing SBS Port

19 Existing Andover Port

20 Existing Eaton Metering BBMD

21 Existing Schneider Network Router

22 Existing Eaton Metering Gateway

X-FOTP-12 Penthouse PF104

Port Description

1 Existing Lonworks Bridge

2 Existing Controller Reliable MP-S

3 Cares_Level_6 bCX1 Controller

4 Cares_Level_P bCX1 Controller

5 Cares_Drives6162 bCX1 Controller

6 3358 bCX1 Controller

7 PF104 Workstation

8 PF104 BACnet Gateway

X-FOTP-11 Switch Rm BD404

Port Description

25 EGX-1 Penthouse Elec Meters Gateway

26 EGX-2 Parking Elec Meter Gateway

27 EGX-3 Trans Vault/Research Elec Meters Gateway

28 EGX-4 MICU/Surgery Elec Meters Gateway

29 EGX-5 Energy Center/Utility Elec Meters Gateway

30 D20 Flowmeter Gateway

31 HVAC Shop WS

32 HVAC Shop Supervisor WS

33 Steam Trap Monitoring Gateway

X-FOTP-14 Eng Closet 1D516

Port Description

1 Existing Controller Reliable MP-C

2 Existing RTA BACnet/IP Gateway

3 MRIHEX_BCX bCX1 Controller

4 BTU-1 Economizer Meter

5 BTU-2 Economizer Meter

6 BTU-3 Economizer Meter

X-FOTP-18 Learning Exchange 1-L912

Port Description

1 LearningExchange Netcontroller

2 LearningExRTU bCX1 Controller

3 Learning Exchange Workstation

NETWORK SWITCH

PORT LIST

X-FOTP-7

X-APC UPS

X-CABLE MANAGEMENT

NEW MANAGED SWITCH

BLANK

X-24 PORT PATCH PANEL

X-CABLE MANAGEMENT

X-FIBER TERMINATION

PORTS

X-FOTP-11

X-24 PORT PATCH PANEL

X-CABLE MANAGEMENT

NEW MANAGED SWITCH

X-FIBER TERMINATION

PORTS

X-CABLE MANAGEMENT

X-APC UPS

X-FOTP-12

X-APC UPS

X-CABLE MANAGEMENT

NEW MANAGED SWITCH

BLANK

X-24 PORT PATCH PANEL

X-CABLE MANAGEMENT

X-FIBER TERMINATION

PORTS

X-FOTP-14

X-APC UPS

X-CABLE MANAGEMENT

NEW MANAGED SWITCH

BLANK

X-24 PORT PATCH PANEL

X-CABLE MANAGEMENT

X-FIBER TERMINATION

PORTS

48 PORT PATCH PANEL

X-FOTP-3

48 PORT PATCH PANEL

BLANK

48 PORT PATCH PANEL

BLANK

BLANK

BLANK

BLANK

BLANK

X-SERVER

NEW 48 PORT PATCH PANEL

NETWORK SWITCH

PORT LIST

NETWORK SWITCH

PORT LIST

NETWORK SWITCH

PORT LIST

NETWORK SWITCH

PORT LIST

X-FOTP-18

X-APC UPS

X-CABLE MANAGEMENT

NEW MANAGED SWITCH

BLANK

X-24 PORT PATCH PANEL

X-CABLE MANAGEMENT

X-FIBER TERMINATION

PORTS

CABLE MANAGEMENTCABLE MANAGEMENTCABLE MANAGEMENT

CODED NOTES:

1 NEW WALL MOUNTED CABINET MOUNTED UNDERNEATH EXISTING FOTP CABINET. 24" H x 21.25" W x 24.5"

D, 12 RMU WITH PLEXIGLASS DOOR, FULL PIANO HINGE, CENTER SWING-OUT SECTION FOR FRONT/REAR

CABLE ACCESS, FAN ACCESSORY KIT (2x75CFM), DUST RESISTANT KIT, AND GROUNDING KIT.

BASIS OF DESIGN: GREAT LAKES GL24WM W/ ACCESSORIES OR EQUAL.

SUBMIT SHOP DRAWINGS TO VA COR FOR REVIEW AND APPROVAL.

NEW MANAGED SWITCH TYPICAL FOR ALL EXISTING FOTPs. REFER TO SHEET T2.1, NEW NETWORK

BACKBONE.

PROVIDE NEW 48-PORT PATCH PANEL IN EXISTING RACK.

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS:

VAMC - WADE PARK

ARCHITECT:

Office of Facilities

Management

Upgrade Smart Building

System (Tridium)

05/31/19

541-19-201

100% CONSTRUCTION DOCUMENTS SUBMISSION 05/31/19

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 07/19/19

FOTP SWITCH PORT LISTS (1 OF 2)

T3.1

FOTP-15

UPS

CABLE MANAGEMENT

MANAGED SWITCH

BLANK

48 PORT PATCH PANEL

CABLE MANAGEMENT

FIBER TERMINATION

PORTS

FOTP-15 East Penthouse 2B480

Port Description

1 AHU_EAST_1_2 Netcontroller

2 AHU_EAST_0_1 Netcontroller

3 NUCMED_VAV_BCX bCX1 Controller

4 AHU_EAST_0_3 Netcontroller

5 AHU_EAST_0_2 Netcontroller

6 AHU_EAST_1_1 Netcontroller

7 East Penthouse BACnet Gateway

8 3355 bCX1 Controller

9 AHU_EAST_PENT Netcontroller

10 NUCMED_HX_BCX bCX1 Controller

11 East Penthouse Workstation

12 AHU_6 Netcontroller

13 Infinity30_Police Netcontroller

14 Cypress Wireless System Network 2

15 Liebert bCX1 Controller

2nd Flr Cypress Wireless System

Controller

NETWORK SWITCH

PORT LIST

FOTP-16

FOTP-16 West Penthouse 2E480

Port Description

1 West Penthouse Workstation

2 AHU_WEST_1_2 Netcontroller

3 AHU_WEST_1_3 Netcontroller

4 AHU_WEST_0_2 Netcontroller

5 AHU_WEST_0_1 Netcontroller

6 AHU_WEST_1_1 Netcontroller

7 AHU_WEST_PENT Netcontroller

8 AHU_3B122B

9 3356 bCX1 Controller

10 West Penthouse BACnet Gateway

11 AHU_56 Netcontroller

12 2F501B BACnet Gateway

13 2F501B Workstation

14 AHU_57 Netcontroller

15 PALMS_EF_PANEL Netcontroller

16 PALMS_ACV bCX1 Controller

17 Phoenix Controls Microserver

18 AHU_14 Netcontroller

NETWORK SWITCH

PORT LIST

FOTP-17

FOTP-17 Surgery Penthouse 3B162D

Port Description

1 AHU_S_2_2 Netcontroller

2 AHU_S_NET_PE Netcontroller

3 Surgery bCX1 Controller

4 AHU_S_2_3 Netcontroller

5 Surgery Penthouse Workstation

6 3352 bCX1 Controller

NETWORK SWITCH

PORT LIST

FOTP-01 FMS 3A135

Port Description

1 Master Supervisor

2 HVAC Supervisor

3 Metering Supervisor

4 INFINITY12_LAII

5 BACnet GATEWAY

6 INFINITY13_LAIID

7 Infinity14_3rdFl

NETWORK SWITCH

PORT LIST

FOTP-20 North Penthouse PAC302

Port Description

1 AHU-55 Netcontroller

2 AHU-54 Netcontroller

3 BACnet Gateway

4 3357 bCX1 Controller

5 Workstation

NETWORK SWITCH

PORT LIST

FOTP-19 Elec 3FLVC2

Port Description

1 CARES_LEVEL_A bCX1 Controller

2 CARES_LEVEL_B bCX1 Controller

3 CARES_LEVEL_1 bCX1 Controller

4 CARES_LEVEL_2 bCX1 Controller

5 CARES_LEVEL_3 bCX1 Controller

6 CARES_LEVEL_4 bCX1 Controller

7 CARES_LEVEL_5 bCX1 Controller

NETWORK SWITCH

PORT LIST

FOTP-20FOTP-01

UPS

CABLE MANAGEMENT

MANAGED SWITCH

48 PORT PATCH PANEL

CABLE MANAGEMENT

FIBER TERMINATION

PORTS

UPS

CABLE MANAGEMENT

MANAGED SWITCH

48 PORT PATCH PANEL

CABLE MANAGEMENT

FIBER TERMINATION

PORTS

FOTP-19

EXISTING

DATA

RACK

WALL MOUNT CABINET, 48" H x 24" W x 30.54" D, 25 RMU WITH

PLEXIGLASS DOOR, FULL PIANO HINGE, CENTER SWING-OUT

SECTION FOR FRONT/REAR CABLE ACCESS, FAN ACCESSORY KIT

(2x75CFM), DUST RESISTANT KIT, AND GROUNDING KIT.

BASIS OF DESIGN: GREAT LAKES GL48WM W/ ACCESSORIES OR

EQUAL.

SUBMIT SHOP DRAWINGS TO VA COR FOR REVIEW AND APPROVAL.

NAME

FOTP COMPONENT SCHEDULE

FIBER TERMINATION PORT

DESCRIPTION

MANAGED SWITCH

48 PORT PATCH PANEL 48 PORT CAT-6 PATCH PANEL

UPS

FIBER OPTIC HOUSING WITH MODULAR TERMINATION PORTS - REFER

TO T2.1 - NEW NETWORK BACKBONE.

CORE, INTERMEDIATE, OR EDGE MANAGED NETWORK SWITCH. REFER

TO T2.1 - NEW NETWORK BACKBONE.

FOTP CABINET

UPS

CABLE MANAGEMENT

MANAGED SWITCH

BLANK

48 PORT PATCH PANEL

CABLE MANAGEMENT

FIBER TERMINATION

PORTS

UPS

CABLE MANAGEMENT

MANAGED SWITCH

BLANK

48 PORT PATCH PANEL

CABLE MANAGEMENT

FIBER TERMINATION

PORTS

UPS

CABLE MANAGEMENT

MANAGED SWITCH

BLANK

48 PORT PATCH PANEL

CABLE MANAGEMENT

FIBER TERMINATION

PORTS

SERVER

SERVER

SERVER

BLANK

NEW 1KVA/ 700 W RACK MOUNTED UPS WITH INTEGRAL BATTERY AND 120V

1-PH INPUT.

FOTP

CABINET

FOTP

CABINET

FOTP

CABINET

FOTP

CABINET

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS:

VAMC - WADE PARK

ARCHITECT:

Office of Facilities

Management

Upgrade Smart Building

System (Tridium)

05/31/19

541-19-201

100% CONSTRUCTION DOCUMENTS SUBMISSION 05/31/19

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 07/19/19

FOTP SWITCH PORT LISTS (2 OF 2)

T3.2

NEW CAT6 PATCH CABLE, TYPICAL.

NEW CAT6 CABLES TO

DATA OUTLETS, TYPICAL.

NEW CAT6 PATCH CABLE TO

BUILDING SYSTEM DEVICE,

TYPICAL.

NEW SBS NETWORK SWITCH

NEW OR EXISTING

SBS PATCH PANEL

NOT TO SCALE

TYPICAL BUILDING SYSTEM

DEVICE CONNECTION SCHEMATIC

POSITION

JACK

TYPE

JACK

COLOR

CABLE

TYPE

CABLE

COLOR

CAT 6

RJ 45

BLUE CAT 6 BLUE

CAT 6

RJ 45

CAT 6

CAT 6

RJ 45

BLUE CAT 6

CAT 6

RJ 45

CAT 6

BLUE

XX-XXX-XX

XX-XXX-XX FACEPLATE ID

FOTP IDENTIFIER

XX-XXX-XX

FACEPLATE NUMBER IN ROOM

NUMBER

BUILDING/FLOOR IDENTIFIER

XX-XXX-FOTP-XX

FOTP NUMBER

FOTP ROOM NUMBER

FOTP BUILDING/FLOOR

IDENTIFIER

BLUE BLUE

BLUE BLUE

POSITION

JACK

TYPE

JACK

COLOR

CABLE

TYPE

CABLE

COLOR

CAT 6

RJ 45

CAT 6

CAT 6

RJ 45

BLUE CAT 6

2 BLANK

BLUE

XX-XXX-XX

XX-XXX-XX FACEPLATE ID

FOTP IDENTIFIER

XX-XXX-XX

FACEPLATE NUMBER IN ROOM

NUMBER

BUILDING/FLOOR IDENTIFIER

XX-XXX-FOTP-XX

FOTP NUMBER

FOTP ROOM NUMBER

FOTP BUILDING/FLOOR

IDENTIFIER

N/A

BLUE BLUE

N/A N/A

BLANK N/A N/A N/A

NOT TO SCALE

TYPICAL TWO-JACK FACEPLATE DETAIL

2 NOT TO SCALE

TYPICAL FOUR-JACK FACEPLATE DETAIL

EXISTING OR NEW BUILDING

SYSTEM NETWORK DEVICE,

TYPICAL.

NEW SMART BUILDING SYSTEM

DATA OUTLET, TYPICAL.

EXISTING ANDOVER

NETWORK WORKSTATION,

TYPICAL.

NEW OR EXISTING FOTP

CABINET OR RACK

LABEL PATCH PANEL PORTS

WITH FACEPLATE ID AND

FACEPLATE PORT NUMBER.

REFER TO TWO JACK AND

FOUR JACK FACEPLATE

DETAILS, THIS SHEET.

PORT NUMBER

48" AFF FOR

STANDARD

LOCATIONS

FINISHED FLOOR

1-1/4" EMT CONDUIT

INSULATED BUSHING

5" SQ. x 2-7/8"D BACK BOX WITH SINGLE

GANG PLASTER RING.

COVERPLATE AND COMMUNICATION

JACK TO BE PROVIDED BY

CONTRACTOR. INSTALL BLANK COVERS

ON ALL UNUSED COMMUNICATIONS

JUNCTION BOXES

CAT 6 CABLES

96"

AFF

MINIMUM

NOT TO SCALE

TYPICAL TELECOM ROUGH-IN

FOR EACH FOTP (WHETHER NEW OR

EXISTING), CONTRACTOR SHALL

INCLUDE IN BID ALL LABOR AND

MATERIALS TO PROVIDE (1) TWO-JACK

SBS DATA OUTLET IN ADDITION TO

THOSE SHOWN ON THE FLOOR PLANS.

LOCATION TO BE CHOSEN BY VA COR.

ASSUME 200 FT OF CABLING BETWEEN

PATCH PANEL AND DATA OUTLET.

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS:

VAMC - WADE PARK

ARCHITECT:

Office of Facilities

Management

Upgrade Smart Building

System (Tridium)

05/31/19

541-19-201

100% CONSTRUCTION DOCUMENTS SUBMISSION 05/31/19

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 07/19/19

TECHNOLOGY DETAILS

T3.3

PROVIDE END OF LINE

TERMINATION AS NEEDED

TO MATCH CABLE

IMPEDANCE

EXISTING BUILDING

DEVICE WITH MODBUS

COMMUNICATION OUTPUT

BSD.##

NEW MODBUS TO

BACNET/IP GATEWAY

CAT 6 PATCH CABLE TO

NEAREST SMART BUILDING

SYSTEM DATA OUTLET.

EXTEND POWER TO 120V

RECEPTACLE ON FOTP POWER

DISTRIBUTION UNIT. PROVIDE

TRANSFORMER AS NEEDED.

NOT TO SCALE

TYPICAL MODBUS DEVICE

CONNECTION DIAGRAM

NOTES:

1. CONTRACTOR SHALL TEST AND VERIFY PROPER OPERATION OF MODBUS

COMMUNICATION CARD. REPORT RESULTS TO VA COR PRIOR TO

INSTALLATION OF NEW GATEWAY AND CONNECTING CABLES.

PROVIDE END OF LINE

TERMINATION AS NEEDED

TO MATCH CABLE

IMPEDANCE

MODBUS RS485

CABLE, TYP.

10-CLE-001-E1KBSD.03

EXISTING ELECTRIC

METER

NEW MODBUS TO

BACNET/IP GATEWAY

CAT 6 PATCH CABLE TO

NEAREST SMART BUILDING

SYSTEM DATA OUTLET.

EXTEND POWER TO 120V

RECEPTACLE ON FOTP POWER

DISTRIBUTION UNIT. PROVIDE

TRANSFORMER AS NEEDED.

NOT TO SCALE

AMBULATORY CARE ELECTRIC

METER CONNECTION DIAGRAM

10-CLE-001-E1L

EXISTING ELECTRIC

METER

NOTES:

1. CONTRACTOR SHALL TEST AND VERIFY PROPER OPERATION OF MODBUS

COMMUNICATION CARD AND REPORT RESULTS TO VA COR PRIOR TO

INSTALLATION OF NEW GATEWAY AND CONNECTING CABLES.

PROVIDE END OF LINE

TERMINATION AS NEEDED

TO MATCH CABLE

IMPEDANCE

BSD.05

EXISTING ULTRASONIC

FLOWMETER

NEW MODBUS TO

BACNET/IP GATEWAY

CAT 6 PATCH CABLE TO

NEAREST SMART BUILDING

SYSTEM DATA OUTLET.

EXTEND POWER TO 120V

RECEPTACLE ON FOTP POWER

DISTRIBUTION UNIT. PROVIDE

TRANSFORMER AS NEEDED.

NOT TO SCALE

ENERGY CENTER ULTRASONIC

FLOWMETERS CONNECTION DIAGRAM

NOTES:

1. CONTRACTOR SHALL TEST AND VERIFY PROPER OPERATION OF MODBUS

COMMUNICATION CARDS. REPORT RESULTS TO VA COR PRIOR TO

INSTALLATION OF NEW GATEWAY AND CONNECTING CABLES.

EXISTING ULTRASONIC

FLOWMETER

10-CLE-001-BW-1

EXISTING ULTRASONIC

FLOWMETER

EXISTING CABLES TO

ULTRASONIC TRANSDUCERS

LOCATED ON PIPING, TYP.

MODBUS RS485

CABLE, TYP.

MODBUS RS485

CABLE, TYP.

10-CLE-ENC-CH-110-CLE-ENC-TW-1

REUSE EXISTING MODBUS

COMMUNICATION CABLE

NEW MODBUS

COMMUNICATION CABLE

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS:

VAMC - WADE PARK

ARCHITECT:

Office of Facilities

Management

Upgrade Smart Building

System (Tridium)

05/31/19

541-19-201

100% CONSTRUCTION DOCUMENTS SUBMISSION 05/31/19

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 07/19/19

DEVICE CONNECTION SCHEMATICS

T3.4

PROVIDE END OF LINE

TERMINATION AS NEEDED

TO MATCH CABLE

IMPEDANCE

BSD.06

EXISTING VORTEX

FLOWMETER

NEW MODBUS TO

BACNET/IP GATEWAY

CAT 6 PATCH CABLE TO

NEAREST SMART BUILDING

SYSTEM DATA OUTLET.

EXTEND POWER TO 120V

RECEPTACLE ON FOTP POWER

DISTRIBUTION UNIT. PROVIDE

TRANSFORMER AS NEEDED.

NOT TO SCALE

STEAM VORTEX FLOWMETERS

CONNECTION DIAGRAM

NOTES:

1. CONTRACTOR SHALL TEST AND VERIFY PROPER OPERATION OF MODBUS

COMMUNICATION CARDS. REPORT RESULTS TO VA COR PRIOR TO

INSTALLATION OF NEW GATEWAY AND CONNECTING CABLES.

MODBUS RS485

CABLE, TYP.

10-CLE-001-ST-1

10-CLE-001-NG-1 10-CLE-GSH-NG-1

10-CLE-001-ST-2 10-CLE-001-ST-3

PROVIDE END OF LINE

TERMINATION AS NEEDED

TO MATCH CABLE

IMPEDANCE

EXISTING VORTEX

FLOWMETER

EXISTING VORTEX

FLOWMETER

EXISTING VORTEX

FLOWMETER

EXISTING VORTEX

FLOWMETER

BSD.09

NEW MODBUS TO

BACNET/IP GATEWAY

CAT 6 PATCH CABLE TO

NEAREST SMART BUILDING

SYSTEM DATA OUTLET.

EXTEND POWER TO 120V

RECEPTACLE ON FOTP POWER

DISTRIBUTION UNIT. PROVIDE

TRANSFORMER AS NEEDED.

MODBUS RS485

CABLE, TYP.

NOT TO SCALE

NATURAL GAS VORTEX FLOWMETERS

CONNECTION DIAGRAM

NOTES:

1. CONTRACTOR SHALL TEST AND VERIFY PROPER OPERATION OF MODBUS

COMMUNICATION CARDS. REPORT RESULTS TO VA COR PRIOR TO

INSTALLATION OF NEW GATEWAY AND CONNECTING CABLES.

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS:

VAMC - WADE PARK

ARCHITECT:

Office of Facilities

Management

Upgrade Smart Building

System (Tridium)

05/31/19

541-19-201

100% CONSTRUCTION DOCUMENTS SUBMISSION 05/31/19

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 07/19/19 T3.5

DEVICE CONNECTION SCHEMATICS

400AF

400AT1500kVA

11,400V:480/277V

Z=5.65%

2500AF

2500AT

LSIG

MAIN

K

LAB WAREHOUSE SUBSTATION

2500A, 480/277V, 3Ø, 4W

600AF

600AT

600AF

600AT

400AF

400AT

400AF

150AT

150AF

100AT

2500AF

2500AT

LSIG

MAIN

1500kVA

11,400V:480/277V

Z=6.13%

100E

A

S

A

S

SUBSTATION - PALMS

2500A, 480/277V, 3Ø, 4W

K

2500AF

2500AT

LSIG

TIE

K

PT-3AHU-57

600AF

500AT

SPARE

PHDP1PDP4PDP2

400AF

350AT

(6)4"C

4#500, 6#350EG

150AF

125AT

PROV.

150AF

60AT

150AF

60AT

SPARE

RTU-65 STAIR

ELEV

2500AF

2500AT

LSIG

TIE

800AF

800AT

1200AF

1000AT

LSIG

MAIN

K

RAD2USSHV1 SUBSTATION

1000A, 480/277V, 3Ø, 4W

800AF

800AT

400AF

400AT

400AF

400AT

SPARE

160A

SPARE

40E

A

S

A

S

160A

SPARE

225AF

225AT 1000kVA

11,400V:480Y/277V

Z=5.99%

2000AF

2000AT

LSIG

MAIN

K

225AF

225AT

225AF

200AT

225AF

175AT

225AF

225AT

400AF

SPARE

100E

A

S

A

S

225AF

200AT

225AF

200AT

800AF

600AT

1200AF

1000AT

LSIG

TIE

K

RAD2

DPNH1

RAD1

DPNH1

ATS-42 RADB

DPNH1

400AF

400AT

100E

A

S

A

S

PROV.

500kVA

11,400V:480Y/277V

Z=5.73%

RAD2USSHV2 SUBSTATION

2000A, 480/277V, 3Ø, 4W

TO VS-8A

ON EOL-01

TO VS-18A

ON EOL-01

TO VS-8B

ON EOL-01

TO VS-18B

ON EOL-01

T-DPLFS1

RM 2F501DRM 2F501A

RM SUB PH

EPM EPM EPM EPM EPM EPMEPMEPMEPMEPMEPMEPMEPMEPMEPM EPM

S…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .