36C25019B0046-004.pdf
PDF 9 MB Posted
- Attached to
- Upgrade Smart Building System 541-19-201 Louis Stoke VA Medical Center Cleveland, Ohio 44106
- Solicitation number
- 36C25019B0046
About this file
36C25019B0046 541-19-201 - Project Drawings Combined Final-Part2.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25019C0255-000.docx | DOCX document | |
| 36C25019B0046-0001002.pdf | ||
| 36C25019B0046-0001001.pdf | ||
| 36C25019B0046-0001000.docx | DOCX document | |
| 36C25019B0046-0001000.docx | DOCX document | |
| 36C25019B0046-0001001.pdf | ||
| 36C25019B0046-0001002.pdf | ||
| 36C25019B0046-004.pdf | ||
| 36C25019B0046-003.pdf | ||
| 36C25019B0046-005.pdf | ||
| 36C25019B0046-007.pdf | ||
| 36C25019B0046-001.docx | DOCX document | |
| 36C25019B0046-002.pdf | ||
| 36C25019B0046-006.pdf | ||
| 36C25019B0046-006.pdf | ||
| 36C25019B0046-005.pdf | ||
| 36C25019B0046-003.pdf | ||
| 36C25019B0046-007.pdf | ||
| 36C25019B0046-001.docx | DOCX document | |
| 36C25019B0046-002.pdf | ||
| 36C25019B0046-000.docx | DOCX document | |
| 36C25019B0046-000.docx | DOCX document |
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DN
DN
OVENOVEN
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS:
VAMC - WADE PARK
ARCHITECT:
Office of Facilities
Management
Upgrade Smart Building
System (Tridium)
05/31/19
541-19-201
100% CONSTRUCTION DOCUMENTS SUBMISSION 05/31/19
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 07/19/19
LEARNING EXCHANGE KEY PLAN
X1.10
RPHMPL
REFER TO T1.16 FOR WORK IN
LEARNING EXCHANGE BUILDING
0'
SCALE: 1" = 60'-0"
30' 60' 120' 240'
LEARNING EXCHANGE KEY PLAN
G1. DEFINITION: "PROVIDE" - FURNISH, INSTALL AND CONNECT COMPLETE.
G2. ALL MOUNTING HEIGHTS ARE TO CENTER OF DEVICE UNLESS OTHERWISE NOTED.
G3. COORDINATE ALL SHUT-DOWNS OF EXISTING ELECTRICAL SYSTEMS WITH OWNER A MINIMUM OF SEVEN WORKING DAYS IN ADVANCE. ALL SHUT-DOWNS SHALL OCCUR DURING WEEKENDS OR UNOCCUPIED TIMES. INCLUDE ALL PREMIUM TIME CHARGES IN BID.
G4. ALL NOISE GENERATING OPERATIONS, INCLUDING CUTTING OF CEILINGS, WALLS AND FLOORS, CORING, DRILLING, ETC. SHALL BE SCHEDULED ON WEEKENDS
OR BETWEEN 8:00PM AND 7:00AM ON WEEKDAYS. INCLUDE ALL PREMIUM TIME CHARGES IN BID.
G5. VERIFY PRECISE LOCATION OF NEW OR RELOCATED WALL OR CEILING MOUNTED DEVICES PRIOR TO INSTALLATION.
G6. ALL NEW WALL MOUNTED ELECTRICAL DEVICES ARE TO BE INSTALLED FLUSH IN WALL UNLESS OTHERWISE NOTED. ALL ELECTRICAL CONDUIT SHALL BE CONCEALED BEHIND FINISHED WALLS AND ABOVE FINISHED CEILING UNLESS OTHERWISE NOTED. THE COST TO CUT AND PATCH WALLS SHALL BE THE
RESPONSIBILITY OF THE TRADE REQUIRING THE CUTTING.
G7. ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND REPLACEMENT OF CEILINGS REQUIRED FOR ELECTRICAL WORK. ELECTRICAL CONTRACTOR
SHALL REPLACE ANY DAMAGED CEILING MATERIAL.
G8. ALL FLUORESCENT LAMPS THAT WILL NOT BE REUSED SHALL BE DISPOSED OF IN ACCORDANCE WITH EPA STANDARDS, AND WRITTEN EVIDENCE OF PROPER
DISPOSAL SHALL BE FURNISHED TO THE OWNER.
G9. ALL WORK SHALL BE PERFORMED IN STRICT CONFORMANCE WITH THE PHASING REQUIREMENTS OF THE PROJECT. ALL COSTS ASSOCIATED WITH THESE
REQUIREMENTS SHALL BE INCLUDED IN THE BID SUBMITTAL.
G10. CIRCUIT ASSIGNMENTS ARE FOR REFERENCE ONLY. CONTRACTOR SHALL FIELD VERIFY AVAILABILITY OF ALL CIRCUITS PRIOR TO CONSTRUCTION.
AC ABOVE COUNTER AT 9" UNLESS OTHERWISE NOTED
AFC ABOVE FINISHED CEILING
AFF ABOVE FINISHED FLOOR
BFC BELOW FINISHED CEILING
BSD BUILDING SYSTEM NETWORK DEVICE
CM CEILING MOUNTED
EC ELECTRICAL CONTRACTOR
EG EQUIPMENT GROUND
GC GENERAL CONTRACTOR
GFCI GROUND FAULT CIRCUIT INTERRUPTER
IG ISOLATED GROUND
MC MECHANICAL CONTRACTOR
NEC NATIONAL ELECTRICAL CODE
NIC NOT IN CONTRACT
OFE OWNER FURNISHED EQUIPMENT
OIT OFFICE OF INFORMATION TECHNOLOGY
REF REFRIGERATOR
SBS SMART BUILDING SYSTEM
TC TECHNOLOGY CONTRACTOR
TCC TEMPERATURE CONTROLS CONTRACTOR
VFD VARIABLE FREQUENCY DRIVE
WM WIREMOLD
WP WEATHERPROOF ENCLOSURE - NEMA 4 TYPE
XBSD EXISTING BUILDING SYSTEM NETWORK DEVICE
XBSS EXISTING BUILDING SYSTEM NETWORK SWITCH
X EXISTING OUTLET, DEVICE, LIGHTING FIXTURE, CONDUIT, ETC. - TO REMAIN
XB INDICATES EXISTING OUTLET, LIGHTING FIXTURE, CONDUIT, ETC - TO BE REMOVED. PROVIDE BLANK COVER FOR OUTLET AND MAINTAIN CIRCUIT
CONTINUITY.
XL NEW LOCATION OF EXISTING OUTLET, DEVICE, LIGHTING FIXTURE, ETC.
XN EXISTING OUTLET, DEVICE, LIGHTING FIXTURE, ETC. - TO BE REPLACED WITH NEW OF SPECIFIED TYPE
XR EXISTING OUTLET, DEVICE, LIGHTING FIXTURE, CONDUIT, ETC. - TO BE REMOVED COMPLETE- MAINTAIN CIRCUIT CONTINUITY TO ADJACENT OUTLETS, EXTEND CONDUIT AND WIRING AS REQUIRED.
XRR EXISTING OUTLET, DEVICE, LIGHTING FIXTURE, ETC. - TO BE REMOVED AND REINSTALLED AT NEW LOCATION - EXTEND CONDUIT AND WIRING AS
REQUIRED
VA VETERANS AFFAIRS
SMART BUILDING SYSTEM DATA OUTLET - EC SHALL PROVIDE 2-GANG WALL MOUNTED BOX WITH SINGLE GANG BLANK COVER PLATE MOUNTED AT 48" AFF UNLESS OTHERWISE NOTED, 1-1/4"C WITH PULLWIRE FROM BOX TO MIN 96" ABOVE FINISHED FLOOR AT AN
ACCESSIBLE LOCATION AND PLASTIC BUSHING ON END OF CONDUIT.
## - DESIGNATES THE FOTP AT WHICH DATA CABLES SHALL BE TERMINATED.
# - DESIGNATES THE NUMBER OF DATA JACKS TO PROVIDE. PROVIDE (1) CAT-6 ETHERNET CABLE FROM EACH JACK TO THE
FOTP PATCH PANEL. REFER TO FACEPLATE DETAILS ON SHEET T3.3.
S - DESIGNATES OUTLET IS PART OF THE SMART BUILDING SYSTEM NETWORK.
TELECOMMUNICATIONS SYSTEM NOTES:
T1. ALL CONDUITS SHALL BE INSTALLED COMPLETE WITH PULLWIRE.
T2. THE NUMBER OF CABLES IN ANY PATHWAY SHALL NOT EXCEED 40% FILL.
T3. REFER TO "TELEPHONE/DATA FACEPLATE DETAIL" ON SUBSEQUENT DRAWING.
BUILDING SYSTEM NETWORK SYMBOLS
ABBREVIATIONS GENERAL ELECTRICAL INSTALLATION NOTES:
COORDINATE ALL MOUNTING HEIGHTS WITH OWNER PRIOR TO ROUGH-IN. MOUNTING HEIGHTS ARE TO THE CENTER OF DEVICES
UNLESS OTHERWISE NOTED.
NOTE MH:
CODED NOTE - "1" INDICATES NOTE NUMBER.
1-E01
VIEW REFERENCE - "1" INDICATES VIEW NUMBER, "1-E01" INDICATES DRAWINGS NUMBER.
GENERAL LEGEND
COLUMN LABEL
S#.##
XBSS.## - EXISTING ANDOVER NETWORK SWITCH TO BE DEMOLISHED COMPLETE WITH ALL CONNECTED ETHERNET CABLING.
MAINTAIN SWITCH AND CABLING IN PLACE FOR MINIMUM OF TWO WEEKS AFTER THE COORDINATED SBS SHUTDOWN AND CUTOVER OF BUILDING SYSTEM DEVICES TO SBS NETWORK. REFER TO PROJECT OBJECTIVES ON SHEET X0.1.
BUILDING SYSTEM DEVICE - CABINET, CONTROLLER, METER, OR GATEWAY (PROTOCOL CONVERTER).
BUILDING SYSTEM DEVICE - WORKSTATION.
XBSD.## LABEL INDICATES EXISTING BUILDING SYSTEM DEVICE WITH ETHERNET NETWORK CONNECTION.
BSD.## LABEL INDICATES NEW BUILDING SYSTEM NETWORK DEVICE WITH ETHERNET NETWORK CONNECTION.
480/277V-3Ø-4W PANELBOARD UNLESS OTHERWISE NOTED.
208/120V-3Ø-4W PANELBOARD UNLESS OTHERWISE NOTED.
TRANSFORMER - TYPE AS NOTED ON PLANS.
POWER DISTRIBUTION EQUIPMENT
SAME DEVICE TYPES AS INDICATED ABOVE EXCEPT CONNECTED TO EMERGENCY CRITICAL CIRCUIT - SEE NOTES EDC & MH.
20A-125V, HOSPITAL GRADE, GROUNDED DUPLEX RECEPTACLE MOUNTED AT 18" AFF UNLESS OTHERWISE NOTED. CONNECT TO
NORMAL CIRCUIT. SEE NOTES NDC & MH.
DOUBLE 20A-125V, HOSPITAL GRADE, GROUNDED DUPLEX RECEPTACLE - IN (2) GANG BOX. CONNECT TO NORMAL CIRCUIT. SEE
NOTES NDC & MH.
WIRING DEVICES
3/4" MINIMUM SIZE CONCEALED CONDUIT WITH #12 AWG, THWN STRANDED COPPER CONDUCTORS PLUS SEPARATE #12 GROUND ( ) AND CONDUIT WIRE FILLS IN ACCORDANCE WITH N.E.C. DEDICATED NEUTRAL CONDUCTORS ARE REQUIRED FOR ALL 120V AND 277V
BRANCH CIRCUITS. MULTIWIRE BRANCH CIRCUITS WITH SHARED NEUTRALS ARE NOT PERMITTED.) REFER TO SPECIFICATION
SECTION 16100 FOR CONDUIT TYPES PERMITTED.
BRANCH CIRCUIT WIRING
INFECTION CONTROL NOTES
THE FOLLOWING AREAS SHALL BE CONSIDERED INFECTION CONTROL CLASS III, UNLESS OTHERWISE INSTRUCTED BY COR:
1. ALL SURGERY RELATED AREAS
2. PHARMACY
3. ENDOSCOPY
4. PACU
5. MICU
6. PCU
7. CATH LABS
8. STERILE PROCESSING AND STORAGE
9. RADIOLOGY
10. DIALYSIS
COORDINATE EXACT LOCATIONS AND REQUIREMENTS WITH COR AND REFER TO SPECIFICATIONS SECTION "01 35 26 - SAFETY REQUIREMENTS" FOR ADDITIONAL
INFORMATION. CONTRACTOR SHALL INCLUDE ALL INFECTION CONTROL, MITIGATION AND REQUIRED CLEANING IN BID.
NORMAL DEVICE COLOR - ALL RECEPTACLES AND SWITCHES CONNECTED TO NORMAL POWER CIRCUITS SHALL BE GRAY WITH
STAINLESS STEEL FACEPLATES - EACH PLATE SHALL BE MACHINE ENGRAVED WITH THE PANEL AND CIRCUIT NUMBER OF THE POWER
SOURCE THAT SUPPLIES EACH DEVICE.
NOTE NDC:
EMERGENCY DEVICE COLOR - ALL RECEPTACLES AND SWITCHES CONNECTED TO EMERGENCY POWER CIRCUITS SHALL BE RED WITH
STAINLESS STEEL FACEPLATES. EACH EMERGENCY PLATE SHALL BE MACHINE ENGRAVED WITH THE PANEL AND CIRCUIT NUMBER OF
THE POWER SOURCE THAT SUPPLIES EACH DEVICE. THE ELECTRICAL CONTRACTOR SHALL CLOSELY REVIEW ALL PLANS TO
DETERMINE ALL EMERGENCY CIRCUITS AND SHALL PROVIDE ALL RED DEVICES AND ENGRAVED PLATES AS REQUIRED - NO
EXCEPTIONS.
NOTE EDC:
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS:
VAMC - WADE PARK
ARCHITECT:
Office of Facilities
Management
Upgrade Smart Building
System (Tridium)
05/31/19
541-19-201
100% CONSTRUCTION DOCUMENTS SUBMISSION 05/31/19
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 07/19/19
TECHNOLOGY LEGEND
T0.1
RPHMPL
CODED NOTES:
1 EXISTING NETWORK SWITCH TO REMAIN.
REFER TO X1.5 - THIRD FLOOR KEY PLAN FOR LOCATION OF FOTP-19.2
S2.19
XBSD.114
P17
P19K19 N19 O19
N17
XBSS.37 1
MARK
CARES_LEVEL_A
NAME
10.20.100.75
IP ADDRESS
T1.1 TEMPERATURE CONTROLS NETWORK DEVICE LIST
ROOM
XBSD.114 ELEC CLOSET AFLVC2bCX1 CONTROLLER
DESCRIPTION
GENERAL DEVICE NOTES:
A. CONNECT ALL LISTED DEVICES TO NEAREST SMART BUILDING SYSTEM DATA OUTLET. REFER TO TYPICAL BUILDING SYSTEM DEVICE CONNECTION
SCHEMATIC ON SHEET T3.3
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS:
VAMC - WADE PARK
ARCHITECT:
Office of Facilities
Management
Upgrade Smart Building
System (Tridium)
05/31/19
541-19-201
100% CONSTRUCTION DOCUMENTS SUBMISSION 05/31/19
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 07/19/19
SUB-BASEMENT AREA PLANS -
T1.1
RPHMPL
FOTP-19
0'
SCALE: 1/8" = 1'0"
4' 8' 16' 32'
SUB-BASEMENT AREA PLAN -
AFLVC2
NOT TO SCALE
SUB-BASEMENT KEY PLAN
T1.1
CODED NOTES:
1 EXISTING ULTRASONIC FLOWMETER 10-CLE-SIT-DW-2 FOR INCOMING DOMESTIC WATER. EXTEND
WIRING TO NEW MODBUS TO BACNET/IP GATEWAY BSD.01. REFER TO "TYPICAL MODBUS DEVICE
CONNECTION DIAGRAM" ON SHEET T3.4.
NEW MODBUS TO BACNET IP GATEWAY. CONNECT TO EXISTING ULTRASONIC FLOWMETER AND
NEAREST SMART BUILDING SYSTEM DATA OUTLET. REFER TO "TYPICAL MODBUS DEVICE CONNECTION
DIAGRAM" ON SHEET T3.4.
EXISTING ULTRASONIC FLOWMETER 10-CLE-SIT-DW-1 FOR INCOMING DOMESTIC WATER. EXTEND
WIRING TO NEW MODBUS TO BACNET/IP GATEWAY BSD.02 ON FIRST FLOOR. REFER TO SHEET T1.6 AND
"TYPICAL MODBUS DEVICE CONNECTION DIAGRAM" ON SHEET T3.4.
AFTER ENTIRE ANDOVER DEVICE CUTOVER TO THE SMART BUILDING SYSTEM IS COMPLETE, REMOVE
EXISTING NETWORK SWITCH COMPLETE WITH ALL CABLING. REFER TO "PROJECT OBJECTIVES" ON
SHEET X0.1.
REFER TO X1.3 - FIRST FLOOR KEY PLAN FOR LOCATION OF FOTP-4.
FOTP
XBSS.02
S2.10
S2.10
S2.10 S2.10
S2.10
XBSS.01
XBSS.03A
XBSS.03B
XBSD.01XBSD.02
XBSD.03
XBSD.04
XBSD.05
XBSS.14
XBSD.33
XBSD.25
S2.10
S2.10
BSD.01
S2.10
10-CLE-SIT-DW-2
S2.04
XBSS.04
XBSD.06
S4.04
XBSS.05
XBSD.08
XBSD.07
10-CLE-SIT-DW-1
MARK
INFINITY15_RES
NAME
10.20.100.24
IP ADDRESS
T1.2 TEMPERATURE CONTROLS NETWORK DEVICE LIST
ROOM
XBSD.01
XBSD.02
XBSD.03
XBSD.04
XBSD.05
MECHANICAL RM (STORAGE) BE260ANETCONTROLLER
DESCRIPTION
- -BACNET GATEWAY
- -WORKSTATION
3353 10.20.100.122 MECHANICAL RM BE260bCX1 CONTROLLER
AC_31 10.20.100.77 MECHANICAL RM BE260NETCONTROLLER
XBSD.06 LAB_WAREHOUSE 10.20.100.47 MECHANICAL RM (K16) BF412NETCONTROLLER
XBSD.07 AHU_26 10.20.100.46NETCONTROLLER
XBSD.08 CORRIDOR 10.20.100.107NETCONTROLLER HVAC BF467
XBSD.25 INFINITY1_NE102 10.20.100.10 ELECT RM BE361B
MECHANICAL RM (STORAGE) BE260A
MECHANICAL RM (STORAGE) BE260A
HVAC BF467
XBSD.33 RESEARCH_RPM 10.20.100.48 ELECT RM BE361BbCX1 CONTROLLER
NETCONTROLLER
BSD.01 - - MECHANICAL RM BE26010-CLE-SIT-DW-2 BACNET GATEWAY
GENERAL DEVICE NOTES:
A. CONNECT ALL LISTED DEVICES TO NEAREST SMART BUILDING SYSTEM DATA OUTLET. REFER TO TYPICAL BUILDING SYSTEM DEVICE CONNECTION
SCHEMATIC ON SHEET T3.3
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS:
VAMC - WADE PARK
ARCHITECT:
Office of Facilities
Management
Upgrade Smart Building
System (Tridium)
05/31/19
541-19-201
100% CONSTRUCTION DOCUMENTS SUBMISSION 05/31/19
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 07/19/19
BASEMENT AREA PLANS - FOTP-4
T1.2
RPHMPL
AND FOTP-10
0'
SCALE: 1/8" = 1'0"
4' 8' 16' 32'
BASEMENT AREA PLAN -
BF412
0'
SCALE: 1/8" = 1'0"
4' 8' 16' 32'
BASEMENT AREA PLAN -
BF467
0'
SCALE: 1/8" = 1'0"
4' 8' 16' 32'
BASEMENT AREA PLAN -
BE260, BE261, AND BE361B
NOT TO SCALE
BASEMENT KEY PLAN
T1.2
T1.2
T1.2X-FOTP-10
XBSS.07
FOTP
XBSS.09
XBSD.10
S2.08
210-CLE-ENC-CH-1
210-CLE-ENC-TW-1
BSD.06
BSD.07
BSD.09
S4.08 3
MARK
NAME
IP ADDRESS
T1.3 TEMPERATURE CONTROLS NETWORK DEVICE LIST
ROOM
XBSD.10
XBSD.32
SWITCH GEAR ROOM BE504NETCONTROLLER
DESCRIPTION
INFINITY_22 10.20.100.33NETCONTROLLER
XBSD.69 LinAccHEX_BCX 10.20.100.113 CHILLER BB234bCX1 CONTROLLER
CHILLER BB234
BSD.06 - - CHILLER PLANT BD603ENERGY CENTER FLOWMETERS GATEWAY
BSD.07 - -STEAM FLOWMETERS GATEWAY CHILLER PLANT BD603
GENERAL DEVICE NOTES:
A. CONNECT ALL LISTED DEVICES TO NEAREST SMART BUILDING SYSTEM DATA OUTLET. REFER TO TYPICAL BUILDING SYSTEM DEVICE CONNECTION
SCHEMATIC ON SHEET T3.3
BSD.09 - -NATURAL GAS FLOWMETERS GATEWAY CHILLER PLANT BD603
S2.06
XBSS.06
XBSD.32
S2.06
XBSS.21
XBSD.69
CODED NOTES:
1 AFTER ENTIRE ANDOVER DEVICE CUTOVER TO THE SMART BUILDING SYSTEM IS COMPLETE, REMOVE
EXISTING NETWORK SWITCH COMPLETE WITH ALL CABLING. REFER TO "PROJECT OBJECTIVES" ON
SHEET X0.1.
EXISTING ULTRASONIC FLOWMETER. EXTEND WIRING TO NEW MODBUS TO BACNET/IP GATEWAY, BSD.06
IN CHILLER PLANT BD603. REFER TO "ENERGY CENTER ULTRASONIC FLOWMETER CONNECTION
DIAGRAM" ON SHEET T3.4.
THREE NEW MODBUS TO BACNET IP GATEWAYS FOR NATURAL GAS, STEAM, AND ENERGY CENTER
FLOWMETERS. CONNECT EACH TO NEAREST SMART BUILDING SYSTEM DATA OUTLET. REFER TO
ENERGY CENTER ULTRASONIC, STEAM VORTEX, AND NATURAL GAS VORTEX FLOWMETER CONNECTION
DIAGRAMS ON T3.4 AND T3.5.
REFER TO X1.3 - FIRST FLOOR KEY PLAN FOR LOCATION OF FOTP-6.
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS:
VAMC - WADE PARK
ARCHITECT:
Office of Facilities
Management
Upgrade Smart Building
System (Tridium)
05/31/19
541-19-201
100% CONSTRUCTION DOCUMENTS SUBMISSION 05/31/19
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 07/19/19
BASEMENT AREA PLANS - FOTP-6
T1.3
RPHMPL
0'
SCALE: 1/8" = 1'0"
4' 8' 16' 32'
BASEMENT AREA PLAN -
BE503-504 AND BD603-604
0'
SCALE: 1/8" = 1'0"
4' 8' 16' 32'
BASEMENT AREA PLAN -
BB419
NOT TO SCALE
BASEMENT KEY PLAN
T1.3
T1.3
0'
SCALE: 1/8" = 1'0"
4' 8' 16' 32'
BASEMENT AREA PLAN -
BB234
AND FOTP-8
T1.3
X-FOTP-8
F O
T P
S4.09
S2.09
S2.09
S2.09
S4.09
S4.09
XBSS.11
XBSD.15
XBSD.14
XBSD.16
XBSD.17
XBSD.22
XBSD.23
XBSD.19
XBSD.20
XBSD.21
XBSD.18
BSD.03
BSD.04
BSD.05
410-CLE-01A-CH-1
510-CLE-01A-ST-1
S4.09
S2.09
XBSD.24
310-CLE-001-E1K
10-CLE-001-E1L
MARK
INFINITY2_NE212
NAME
10.20.100.11
IP ADDRESS
T1.4 TEMPERATURE CONTROLS NETWORK DEVICE LIST
ROOM
XBSD.14
XBSD.15
XBSD.16
XBSD.17
XBSD.18
XBSD.24
OFFICE BA109CNETCONTROLLER
DESCRIPTION
INFINITY9_AC 10.20.100.26 OFFICE BA109CNETCONTROLLER
- 10.20.100.25 OFFICE BA109CWORKSTATION
TAC SERVER 10.20.100.2 OFFICE BA109CSERVER
TAC SERVER BACKUP - OFFICE BA109CBACKUP SERVER
AHU_50 10.20.100.87 HVAC BAC241NETCONTROLLER
XBSD.19 AC_51 10.20.100.78 MECHANICAL RM BA109NETCONTROLLER
XBSD.20 AC-52 10.20.100.79NETCONTROLLER MECHANICAL RM BA109
XBSD.21 AC_53 10.20.100.80NETCONTROLLER MECHANICAL RM BA109
XBSD.22 3354 10.20.100.123bCX1 CONTROLLER MECHANICAL RM BA109
XBSD.23 - -BACNET GATEWAY MECHANICAL RM BA109
BSD.03 - - MECHANICAL RM BA10910-CLE-001-E1K,E1L BACNET GATEWAY
BSD.04 - - MECHANICAL RM BA10910-CLE-01A-CH-1 BACNET GATEWAY
BSD.05 - - MECHANICAL RM BA10910-CLE-01A-ST-1 BACNET GATEWAY
GENERAL DEVICE NOTES:
A. CONNECT ALL LISTED DEVICES TO NEAREST SMART BUILDING SYSTEM DATA OUTLET. REFER TO TYPICAL BUILDING SYSTEM DEVICE CONNECTION
SCHEMATIC ON SHEET T3.3
CODED NOTES:
1 AFTER ENTIRE ANDOVER DEVICE CUTOVER TO THE SMART BUILDING SYSTEM IS COMPLETE, REMOVE
EXISTING NETWORK SWITCH COMPLETE WITH ALL CABLING. REFER TO "PROJECT OBJECTIVES" ON
SHEET X0.1.
PROVIDE THREE NEW MODBUS TO BACNET/IP GATEWAYS (BSD.03, BSD.04, AND BSD.05) FOR
AMBULATORY CARE ELECTRIC, CHILLED WATER, AND STEAM METERS.
EXISTING ELECTRIC METER LOCATED IN EXISTING SUBSTATION. EXTEND WIRING TO NEW MODBUS TO
BACNET/IP GATEWAY, BSD.03 IN MECH ROOM BA-109. REFER TO "AMBULATORY CARE ELECTRIC METER
CONNECTION DIAGRAM" ON SHEET T3.4.
EXISTING ULTRASONIC FLOWMETER 10-CLE-01A-CH-1 FOR CHILLED WATER METERING. EXTEND WIRING
TO NEW MODBUS TO BACNET/IP GATEWAY BSD.04 IN MECH ROOM BA-109. REFER TO "TYPICAL MODBUS
DEVICE CONNECTION DIAGRAM" ON SHEET T3.4.
EXISTING VORTEX FLOWMETER 10-CLE-01A-ST-1 FOR STEAM METERING. EXTEND WIRING TO NEW
MODBUS TO BACNET/IP GATEWAY BSD.05 IN MECH ROOM BA-109. REFER TO "TYPICAL MODBUS DEVICE
CONNECTION DIAGRAM" ON SHEET T3.4.
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS:
VAMC - WADE PARK
ARCHITECT:
Office of Facilities
Management
Upgrade Smart Building
System (Tridium)
05/31/19
541-19-201
100% CONSTRUCTION DOCUMENTS SUBMISSION 05/31/19
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 07/19/19
BASEMENT AREA PLANS - FOTP-9
T1.4
RPHMPL
0'
SCALE: 1/8" = 1'0"
4' 8' 16' 32'
BASEMENT AREA PLAN -
BA109 AND BA109C
0'
SCALE: 1/8" = 1'0"
4' 8' 16' 32'
BASEMENT AREA PLAN -
BAC241 AND BA151
NOT TO SCALE
BASEMENT KEY PLAN
T1.4
T1.4
X-FOTP-9
FOTP
S2.11
XBSS.08
XBSD.09
BSD.08
XBSD.123, XBSD.124
XBSD.125, XBSD.126
XBSD.127
S2.11
S4.11
S4.11
S4.11
XBSS.10
XBSD.13
XBSD.12
XBSD.11
XBSD.128
S2.11
S2.11
S4.11
XBSD.129
XBSD.130
MARK
INFINITY3_NB835
NAME
10.20.100.12
IP ADDRESS
T1.5 TEMPERATURE CONTROLS NETWORK DEVICE LIST
ROOM
XBSD.09
XBSD.11
XBSD.12
XBSD.13
EC (G08A) BD470NETCONTROLLER
DESCRIPTION
ENHANCEBCX_AHU 10.20.100.130
ENHANCEBCX_MAP 10.20.100.129VA ENHANCE MED TRIDIUM bCX1 TRANSLATOR
AHU_WEST_0_3 10.20.100.128
VA ENHANCE MED bCX1 CONTROLLER MECHANICAL ROOM D20
MECHANICAL ROOM D20
MECHANICAL ROOM D20VA ENHANCE MED NETCONTROLLER
XBSD.77 LIEBERT 10.20.100.101 ENGINEERING CLOSET BB545bCX1 CONTROLLER
XBSD.112 CARES_LEVEL_B 10.20.100.73 ELEC CLOSET BFLVC2bCX1 CONTROLLER
BSD.08 - - SWITCH GEAR BD404STEAM TRAP MONITORING BACNET GATEWAY
XBSD.124 EGX-2 ADMITTING/PARKING ELECTRICAL METERS GATEWAY
XBSD.125 EGX-3 TRANSFORMER VAULT/RESEARCH ELECTRICAL METERS GATEWAY
XBSD.126 EGX-4 MICU/SURGERY ELECTRICAL METERS GATEWAY
XBSD.127 EGX-5 ENERGY CENTER/UTILITY MAINS ELECTRICAL METER GATEWAY
XBSD.123 EGX-1 PENTHOUSE ELECTRICAL METERS GATEWAY
- SWITCH GEAR BD404
- SWITCH GEAR BD404
- SWITCH GEAR BD404
- SWITCH GEAR BD404
- SWITCH GEAR BD404
XBSD.128 - FLOWMETER GATEWAY - MECHANICAL ROOM D20
XBSD.129 - HVAC SHOP WORKSTATION - HVAC SHOP BE430
XBSD.130 - HVAC SHOP WORKSTATION - HVAC SHOP SUPERVISOR BE430A
GENERAL DEVICE NOTES:
A. CONNECT ALL LISTED DEVICES TO NEAREST SMART BUILDING SYSTEM DATA OUTLET. REFER TO TYPICAL BUILDING SYSTEM DEVICE CONNECTION
SCHEMATIC ON SHEET T3.3XBSD.77
S2.15
S2.19
XBSD.112
XBSS.38
XBSS.39
CODED NOTES:
1 AFTER ENTIRE ANDOVER DEVICE CUTOVER TO THE SMART BUILDING SYSTEM IS COMPLETE, REMOVE
EXISTING NETWORK SWITCH COMPLETE WITH ALL CABLING. REFER TO "PROJECT OBJECTIVES" ON
SHEET X0.1.
REPLACE (2) EXISTING NIAGARA AX JACES (JACEEM2 AND JACEEM3) WITH VYKON NIAGARA N4 JACES.
REFER TO SPECIFICATIONS.
EXISTING RECEIVER FOR STEAM TRAP MONITORING SYSTEM. EXTEND WIRING TO NEW MODBUS TO
BACNET/IP GATEWAY BSD.08 IN ROOM BD-404. REFER TO "TYPICAL MODBUS DEVICE CONNECTION
DIAGRAM" ON SHEET T3.4.
EXISTING CABINET WITH SCHNEIDER NETWORK SWITCH, ROUTER, AND DEVICES. PROVIDE (2) QUAD SBS
DATA OUTLETS (S4.11) FOR EXISTING GATEWAYS EGX-1, EGX-2, EGX-3, EGX-4, AND EGX-5. PROVIDE (5)
CAT-6 PATCH CABLES FROM EGX GATEWAYS TO SBS OUTLETS. AFTER CUTOVER TO SBS NETWORK, REMOVE EXISTING SCHNEIDER NETWORK SWITCH AND ROUTER COMPLETE WITH ALL ABANDONED
CABLING AND DEVICES.
REFER TO X1.5 - THIRD FLOOR KEY PLAN FOR LOCATION OF FOTP-19.
REFER TO X1.4 - SECOND FLOOR KEY PLAN FOR LOCATION OF FOTP-15.
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS:
VAMC - WADE PARK
ARCHITECT:
Office of Facilities
Management
Upgrade Smart Building
System (Tridium)
05/31/19
541-19-201
100% CONSTRUCTION DOCUMENTS SUBMISSION 05/31/19
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 07/19/19
BASEMENT AREA PLANS -
T1.5
RPHMPL
0'
SCALE: 1/8" = 1'0"
4' 8' 16' 32'
BASEMENT AREA PLAN -
BD404 AND BD470
0'
SCALE: 1/8" = 1'0"
4' 8' 16' 32'
BASEMENT AREA PLAN -
D20, BE430, BE430A, BE440B
NOT TO SCALE
BASEMENT KEY PLAN
T1.5
T1.5
T1.5
0'
SCALE: 1/8" = 1'0"
4' 8' 16' 32'
BASEMENT AREA PLAN - BB545
FOTP-11, FOTP-15 AND FOTP-19
T1.5
0'
SCALE: 1/8" = 1'0"
4' 8' 16' 32'
BASEMENT AREA PLAN -
BFLVC2
X-FOTP-11
S4.10
XBSS.12
XBSD.28 XBSD.29
XBSD.30
S2.10
XBSD.31
S2.10
FOTP
XBSD.27
XBSD.26
S2.06
S2.06
XBSS.13
XBSD.79
S2.06
MARK
INFINITY6_NE246
NAME
10.20.100.15
IP ADDRESS
T1.6 TEMPERATURE CONTROLS NETWORK DEVICE LIST
ROOM
XBSD.26
XBSD.27
XBSD.28
XBSD.29
XBSD.30
MECHANICAL RM 107NETCONTROLLER
DESCRIPTION
- 10.20.100.4 MECHANICAL RM 107WORKSTATION
- - MECHANICAL RM (131) 1D123BACNET GATEWAY
INFINITY7_NE208 10.20.100.16NETCONTROLLER
SF-4 10.20.100.81NETCONTROLLER
XBSD.31 - -WORKSTATION
MECHANICAL RM (131) 1D123
MECHANICAL RM (131) 1D123
MECHANICAL RM (131) 1D123
XBSD.79 - -CYPRESS WIRELESS SYSTEM NETWORK 4 SPRINKLER SHUT-OFF 129E
XBSD.109 CARES_LEVEL_1 10.20.100.71bCX1 CONTROLLER ELEC CLOSET 1FLVC2
BSD.02 - - ELECTRICAL CLOSET 1F51610-CLE-SIT-DW-1 BACNET GATEWAY
XBSD.119 - -CYPRESS WIRELESS SYSTEM CONTROLLER ELEC 1B232
GENERAL DEVICE NOTES:
A. CONNECT ALL LISTED DEVICES TO NEAREST SMART BUILDING SYSTEM DATA OUTLET. REFER TO TYPICAL BUILDING SYSTEM DEVICE CONNECTION
SCHEMATIC ON SHEET T3.3
S2.19
XBSD.109
XBSS.40
XBSS.41
CODED NOTES:
1 AFTER ENTIRE ANDOVER DEVICE CUTOVER TO THE SMART BUILDING SYSTEM IS COMPLETE, REMOVE
EXISTING NETWORK SWITCH COMPLETE WITH ALL CABLING.
NEW MODBUS TO BACNET IP GATEWAY. CONNECT TO EXISTING ULTRASONIC FLOWMETER AND
NEAREST SMART BUILDING SYSTEM DATA OUTLET. REFER TO "TYPICAL ULTRASONIC FLOWMETER
CONNECTION DIAGRAM" ON SHEET T3.4.
EXISTING ANDOVER NETWORK SWITCH TO REMAIN.
REFER TO X1.2 - BASEMENT KEY PLAN FOR LOCATION OF FOTP-10.
REFER TO X1.5 - THIRD FLOOR KEY PLAN FOR LOCATION OF FOTP-19.
FOTP
FOTP
BSD.02
S2.04
S2.06
XBSD.119
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS:
VAMC - WADE PARK
ARCHITECT:
Office of Facilities
Management
Upgrade Smart Building
System (Tridium)
05/31/19
541-19-201
100% CONSTRUCTION DOCUMENTS SUBMISSION 05/31/19
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 07/19/19
0'
SCALE: 1/8" = 1'0"
4' 8' 16' 32'
PARTIAL FIRST FLOOR PLAN - 1D123
0'
SCALE: 1/8" = 1'0"
4' 8' 16' 32'
PARTIAL FIRST FLOOR PLAN - 107
0'
SCALE: 1/8" = 1'0"
4' 8' 16' 32'
PARTIAL FIRST FLOOR PLAN - 129E
NOT TO SCALE
FIRST FLOOR KEY PLAN
T1.6
T1.6
FIRST FLOOR AREA PLANS - FOTP-4
T1.6
RPHMPL
FOTP-6, FOTP-10 AND FOTP-19
T1.60'
SCALE: 1/8" = 1'0"
4' 8' 16' 32'
PARTIAL FIRST FLOOR PLAN - 1FLVC2
T1.6
X-FOTP-6
0'
SCALE: 1/8" = 1'0"
4' 8' 16' 32'
PARTIAL FIRST FLOOR PLAN - 1F516
T1.6
0'
SCALE: 1/8" = 1'0"
4' 8' 16' 32'
PARTIAL FIRST FLOOR PLAN - 1B232
T1.6
X-FOTP-4
XBSD.93
S2.15
MARK
NAME
IP ADDRESS
T1.7 TEMPERATURE CONTROLS NETWORK DEVICE LIST
ROOM
XBSD.78
XBSD.93
COMM 1B499CYPRESS WIRELESS SYSTEM NETWORK 2
DESCRIPTION
INFINITY30_POLICE 10.20.100.43 1B453NETCONTROLLER
XBSD.111 - - ENGINEERING WORKSHOP 1F191WORKSTATION
XBSD.118 MRIHEX_BCX 10.20.100.114 MRI EQUIP 1B539bCX1 CONTROLLER
BTU-1 - - BOILER ROOM G101BOILER ECONOMIZER BTU METER
BTU-2 -
BTU-3 -
- BOILER ROOM G101BOILER ECONOMIZER BTU METER
- BOILER ROOM G101BOILER ECONOMIZER BTU METER
GENERAL DEVICE NOTES:
A. CONNECT ALL LISTED DEVICES TO NEAREST SMART BUILDING SYSTEM DATA OUTLET. REFER TO TYPICAL BUILDING SYSTEM DEVICE CONNECTION
SCHEMATIC ON SHEET T3.3
XBSS.23
XBSS.22
XBSD.78
S2.15
XBSS.29
XBSS.30
FOTP
FOTP
XBSD.111
XBSS.42
S2.07
CODED NOTES:
1 AFTER ENTIRE ANDOVER DEVICE CUTOVER TO THE SMART BUILDING SYSTEM IS COMPLETE, REMOVE
EXISTING NETWORK SWITCH COMPLETE WITH ALL CABLING.
EXISTING ULTRASONIC FLOWMETER. EXTEND WIRING TO NEW MODBUS TO BACNET/IP GATEWAY, BSD.06
IN CHILLER PLANT BD603. REFER TO "ENERGY CENTER ULTRASONIC FLOWMETER CONNECTION
DIAGRAM" ON SHEET T3.4.
EXISTING VORTEX STEAM METER. EXTEND WIRING TO NEW MODBUS TO BACNET/IP GATEWAY BSD.07 IN
CHILLER PLANT BD603. REFER TO "STEAM VORTEX FLOWMETERS CONNECTION DIAGRAM" ON SHEET
T3.5.
EXISTING ANDOVER NETWORK SWITCH TO REMAIN.
PROVIDE NEW SBS DATA OUTLET ADJACENT TO NEW BOILER FLUE ECONOMIZER BTU METER.
COORDINATE OUTLET LOCATION WITH BTU METER INSTALLING CONTRACTOR. EXTEND CAT-6 PATCH
CABLE FROM BOILER FLUE ECONOMIZER METER TO SBS DATA OUTLET.
EXISTING VORTEX NATURAL GAS METER. EXTEND WIRING TO NEW MODBUS TO BACNET/IP GATEWAY
BSD.09 IN CHILLER PLANT BD603. REFER TO "NATURAL GAS VORTEX FLOWMETERS CONNECTION
DIAGRAM" ON SHEET T3.5.
REFER TO X1.4 - SECOND FLOOR KEY PLAN FOR LOCATION OF FOTP-15.
FOTP
FOTP
XBSD.118
S2.14
210-CLE-001-BW-1
10-CLE-001-NG-1
10-CLE-001-ST-1
10-CLE-001-ST-2
10-CLE-001-ST-3
5BTU-1
BTU-2
BTU-3
S2.14 S2.14 S2.14
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS:
VAMC - WADE PARK
ARCHITECT:
Office of Facilities
Management
Upgrade Smart Building
System (Tridium)
05/31/19
541-19-201
100% CONSTRUCTION DOCUMENTS SUBMISSION 05/31/19
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 07/19/19
0'
SCALE: 1/8" = 1'0"
4' 8' 16' 32'
PARTIAL FIRST FLOOR PLAN - 1B453
0'
SCALE: 1/8" = 1'0"
4' 8' 16' 32'
PARTIAL FIRST FLOOR PLAN - 1B499
0'
SCALE: 1/8" = 1'0"
4' 8' 16' 32'
PARTIAL FIRST FLOOR PLAN - 1A181
NOT TO SCALE
FIRST FLOOR KEY PLAN
FIRST FLOOR AREA PLANS -
T1.7
RPHMPL
FOTP-7, FOTP-14, AND FOTP-15
T1.7
T1.7
T1.7
T1.7
0'
SCALE: 1/8" = 1'0"
4' 8' 16' 32'
PARTIAL FIRST FLOOR PLAN - 1B100
T1.7
0'
SCALE: 1/8" = 1'0"
4' 8' 16' 32'
PARTIAL FIRST FLOOR PLAN - 1F191
X-FOTP-7
0'
SCALE: 1/8" = 1'0"
4' 8' 16' 32'
PARTIAL FIRST FLOOR PLAN - 1B539
T1.7
X-FOTP-14
0'
SCALE: 1/8" = 1'0"
4' 8' 16' 32'
PARTIAL FIRST FLOOR PLAN - G101
T1.7
| X1.10 LEARNING EXCHANGE KEY PLAN |
| 18079 SITE KEY PLAN |
| X1.10 LEARNING EXCHANGE KEY PLAN |
| T0.1 TECHNOLOGY LEGEND |
| 18079 LEGEND |
| T0.1 TECHNOLOGY LEGEND |
| T1.1 SUB-BASEMENT AREA PLANS - FOTP-19 Devices |
| 18079 SUBBASEMENT FLOOR PLANS |
| T1.1 SUB-BASEMENT AREA PLANS - FOTP-19 Devices |
| T1.2 BASEMENT AREA PLANS - FOTP-4 AND FOTP-10 Devices |
| 18079 BASEMENT FLOOR PLANS |
| T1.2 BASEMENT AREA PLANS - FOTP-4 AND FOTP-10 Devices |
| T1.3 BASEMENT AREA PLAN - FOTP-6 AND FOTP-8 DEVICES |
| 18079 BASEMENT FLOOR PLANS |
| T1.3 BASEMENT AREA PLAN - FOTP-6 AND FOTP-8 DEVICES |
| T1.4 BASEMENT AREA PLAN - FOTP-9 Devices |
| 18079 BASEMENT FLOOR PLANS |
| T1.4 BASEMENT AREA PLAN - FOTP-9 Devices |
| T1.5 BASEMENT AREA PLANS - FOTP-11 FOTP-15 AND FOTP-19 |
| 18079 BASEMENT FLOOR PLANS |
| T1.5 BASEMENT AREA PLANS - FOTP-11 FOTP-15 AND FOTP-19 |
| T1.6 FIRST FLOOR AREA PLANS - FOTP-4 FOTP-6 FOTP-10 AND FOTP-19 |
| 18079 FIRST FLOOR PLANS |
| T1.6 FIRST FLOOR AREA PLANS - FOTP-4 FOTP-6 FOTP-10 AND FOTP-19 |
| T1.7 FIRST FLOOR AREA PLANS - FOTP-7 FOTP-14 AND FOTP-15 |
| 18079 FIRST FLOOR PLANS |
| T1.7 FIRST FLOOR AREA PLANS - FOTP-7 FOTP-14 AND FOTP-15 |
| T1.8 SECOND FLOOR AREA PLANS - FOTP-6 AND FOTP-15 |
| 18079 SECOND FLOOR PLANS |
| T1.8 SECOND FLOOR AREA PLANS - FOTP-6 AND FOTP-15 |
File details come from the government source that posted it.