About this file

36C25019B0046 541-19-201 - Project Drawings Combined Final-Part2.pdf

View the file

Other files

File Type Posted
36C25019C0255-000.docx DOCX document
36C25019B0046-0001002.pdf PDF
36C25019B0046-0001001.pdf PDF
36C25019B0046-0001000.docx DOCX document
36C25019B0046-0001000.docx DOCX document
36C25019B0046-0001001.pdf PDF
36C25019B0046-0001002.pdf PDF
36C25019B0046-004.pdf PDF
36C25019B0046-003.pdf PDF
36C25019B0046-005.pdf PDF
36C25019B0046-007.pdf PDF
36C25019B0046-001.docx DOCX document
36C25019B0046-002.pdf PDF
36C25019B0046-006.pdf PDF
36C25019B0046-006.pdf PDF
36C25019B0046-005.pdf PDF
36C25019B0046-003.pdf PDF
36C25019B0046-007.pdf PDF
36C25019B0046-001.docx DOCX document
36C25019B0046-002.pdf PDF
36C25019B0046-000.docx DOCX document
36C25019B0046-000.docx DOCX document
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DN

DN

OVENOVEN

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS:

VAMC - WADE PARK

ARCHITECT:

Office of Facilities

Management

Upgrade Smart Building

System (Tridium)

05/31/19

541-19-201

100% CONSTRUCTION DOCUMENTS SUBMISSION 05/31/19

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 07/19/19

LEARNING EXCHANGE KEY PLAN

X1.10

RPHMPL

REFER TO T1.16 FOR WORK IN

LEARNING EXCHANGE BUILDING

0'

SCALE: 1" = 60'-0"

30' 60' 120' 240'

LEARNING EXCHANGE KEY PLAN

G1. DEFINITION: "PROVIDE" - FURNISH, INSTALL AND CONNECT COMPLETE.

G2. ALL MOUNTING HEIGHTS ARE TO CENTER OF DEVICE UNLESS OTHERWISE NOTED.

G3. COORDINATE ALL SHUT-DOWNS OF EXISTING ELECTRICAL SYSTEMS WITH OWNER A MINIMUM OF SEVEN WORKING DAYS IN ADVANCE. ALL SHUT-DOWNS SHALL OCCUR DURING WEEKENDS OR UNOCCUPIED TIMES. INCLUDE ALL PREMIUM TIME CHARGES IN BID.

G4. ALL NOISE GENERATING OPERATIONS, INCLUDING CUTTING OF CEILINGS, WALLS AND FLOORS, CORING, DRILLING, ETC. SHALL BE SCHEDULED ON WEEKENDS

OR BETWEEN 8:00PM AND 7:00AM ON WEEKDAYS. INCLUDE ALL PREMIUM TIME CHARGES IN BID.

G5. VERIFY PRECISE LOCATION OF NEW OR RELOCATED WALL OR CEILING MOUNTED DEVICES PRIOR TO INSTALLATION.

G6. ALL NEW WALL MOUNTED ELECTRICAL DEVICES ARE TO BE INSTALLED FLUSH IN WALL UNLESS OTHERWISE NOTED. ALL ELECTRICAL CONDUIT SHALL BE CONCEALED BEHIND FINISHED WALLS AND ABOVE FINISHED CEILING UNLESS OTHERWISE NOTED. THE COST TO CUT AND PATCH WALLS SHALL BE THE

RESPONSIBILITY OF THE TRADE REQUIRING THE CUTTING.

G7. ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND REPLACEMENT OF CEILINGS REQUIRED FOR ELECTRICAL WORK. ELECTRICAL CONTRACTOR

SHALL REPLACE ANY DAMAGED CEILING MATERIAL.

G8. ALL FLUORESCENT LAMPS THAT WILL NOT BE REUSED SHALL BE DISPOSED OF IN ACCORDANCE WITH EPA STANDARDS, AND WRITTEN EVIDENCE OF PROPER

DISPOSAL SHALL BE FURNISHED TO THE OWNER.

G9. ALL WORK SHALL BE PERFORMED IN STRICT CONFORMANCE WITH THE PHASING REQUIREMENTS OF THE PROJECT. ALL COSTS ASSOCIATED WITH THESE

REQUIREMENTS SHALL BE INCLUDED IN THE BID SUBMITTAL.

G10. CIRCUIT ASSIGNMENTS ARE FOR REFERENCE ONLY. CONTRACTOR SHALL FIELD VERIFY AVAILABILITY OF ALL CIRCUITS PRIOR TO CONSTRUCTION.

AC ABOVE COUNTER AT 9" UNLESS OTHERWISE NOTED

AFC ABOVE FINISHED CEILING

AFF ABOVE FINISHED FLOOR

BFC BELOW FINISHED CEILING

BSD BUILDING SYSTEM NETWORK DEVICE

CM CEILING MOUNTED

EC ELECTRICAL CONTRACTOR

EG EQUIPMENT GROUND

GC GENERAL CONTRACTOR

GFCI GROUND FAULT CIRCUIT INTERRUPTER

IG ISOLATED GROUND

MC MECHANICAL CONTRACTOR

NEC NATIONAL ELECTRICAL CODE

NIC NOT IN CONTRACT

OFE OWNER FURNISHED EQUIPMENT

OIT OFFICE OF INFORMATION TECHNOLOGY

REF REFRIGERATOR

SBS SMART BUILDING SYSTEM

TC TECHNOLOGY CONTRACTOR

TCC TEMPERATURE CONTROLS CONTRACTOR

VFD VARIABLE FREQUENCY DRIVE

WM WIREMOLD

WP WEATHERPROOF ENCLOSURE - NEMA 4 TYPE

XBSD EXISTING BUILDING SYSTEM NETWORK DEVICE

XBSS EXISTING BUILDING SYSTEM NETWORK SWITCH

X EXISTING OUTLET, DEVICE, LIGHTING FIXTURE, CONDUIT, ETC. - TO REMAIN

XB INDICATES EXISTING OUTLET, LIGHTING FIXTURE, CONDUIT, ETC - TO BE REMOVED. PROVIDE BLANK COVER FOR OUTLET AND MAINTAIN CIRCUIT

CONTINUITY.

XL NEW LOCATION OF EXISTING OUTLET, DEVICE, LIGHTING FIXTURE, ETC.

XN EXISTING OUTLET, DEVICE, LIGHTING FIXTURE, ETC. - TO BE REPLACED WITH NEW OF SPECIFIED TYPE

XR EXISTING OUTLET, DEVICE, LIGHTING FIXTURE, CONDUIT, ETC. - TO BE REMOVED COMPLETE- MAINTAIN CIRCUIT CONTINUITY TO ADJACENT OUTLETS, EXTEND CONDUIT AND WIRING AS REQUIRED.

XRR EXISTING OUTLET, DEVICE, LIGHTING FIXTURE, ETC. - TO BE REMOVED AND REINSTALLED AT NEW LOCATION - EXTEND CONDUIT AND WIRING AS

REQUIRED

VA VETERANS AFFAIRS

SMART BUILDING SYSTEM DATA OUTLET - EC SHALL PROVIDE 2-GANG WALL MOUNTED BOX WITH SINGLE GANG BLANK COVER PLATE MOUNTED AT 48" AFF UNLESS OTHERWISE NOTED, 1-1/4"C WITH PULLWIRE FROM BOX TO MIN 96" ABOVE FINISHED FLOOR AT AN

ACCESSIBLE LOCATION AND PLASTIC BUSHING ON END OF CONDUIT.

## - DESIGNATES THE FOTP AT WHICH DATA CABLES SHALL BE TERMINATED.

# - DESIGNATES THE NUMBER OF DATA JACKS TO PROVIDE. PROVIDE (1) CAT-6 ETHERNET CABLE FROM EACH JACK TO THE

FOTP PATCH PANEL. REFER TO FACEPLATE DETAILS ON SHEET T3.3.

S - DESIGNATES OUTLET IS PART OF THE SMART BUILDING SYSTEM NETWORK.

TELECOMMUNICATIONS SYSTEM NOTES:

T1. ALL CONDUITS SHALL BE INSTALLED COMPLETE WITH PULLWIRE.

T2. THE NUMBER OF CABLES IN ANY PATHWAY SHALL NOT EXCEED 40% FILL.

T3. REFER TO "TELEPHONE/DATA FACEPLATE DETAIL" ON SUBSEQUENT DRAWING.

BUILDING SYSTEM NETWORK SYMBOLS

ABBREVIATIONS GENERAL ELECTRICAL INSTALLATION NOTES:

COORDINATE ALL MOUNTING HEIGHTS WITH OWNER PRIOR TO ROUGH-IN. MOUNTING HEIGHTS ARE TO THE CENTER OF DEVICES

UNLESS OTHERWISE NOTED.

NOTE MH:

CODED NOTE - "1" INDICATES NOTE NUMBER.

1-E01

VIEW REFERENCE - "1" INDICATES VIEW NUMBER, "1-E01" INDICATES DRAWINGS NUMBER.

GENERAL LEGEND

COLUMN LABEL

S#.##

XBSS.## - EXISTING ANDOVER NETWORK SWITCH TO BE DEMOLISHED COMPLETE WITH ALL CONNECTED ETHERNET CABLING.

MAINTAIN SWITCH AND CABLING IN PLACE FOR MINIMUM OF TWO WEEKS AFTER THE COORDINATED SBS SHUTDOWN AND CUTOVER OF BUILDING SYSTEM DEVICES TO SBS NETWORK. REFER TO PROJECT OBJECTIVES ON SHEET X0.1.

BUILDING SYSTEM DEVICE - CABINET, CONTROLLER, METER, OR GATEWAY (PROTOCOL CONVERTER).

BUILDING SYSTEM DEVICE - WORKSTATION.

XBSD.## LABEL INDICATES EXISTING BUILDING SYSTEM DEVICE WITH ETHERNET NETWORK CONNECTION.

BSD.## LABEL INDICATES NEW BUILDING SYSTEM NETWORK DEVICE WITH ETHERNET NETWORK CONNECTION.

480/277V-3Ø-4W PANELBOARD UNLESS OTHERWISE NOTED.

208/120V-3Ø-4W PANELBOARD UNLESS OTHERWISE NOTED.

TRANSFORMER - TYPE AS NOTED ON PLANS.

POWER DISTRIBUTION EQUIPMENT

SAME DEVICE TYPES AS INDICATED ABOVE EXCEPT CONNECTED TO EMERGENCY CRITICAL CIRCUIT - SEE NOTES EDC & MH.

20A-125V, HOSPITAL GRADE, GROUNDED DUPLEX RECEPTACLE MOUNTED AT 18" AFF UNLESS OTHERWISE NOTED. CONNECT TO

NORMAL CIRCUIT. SEE NOTES NDC & MH.

DOUBLE 20A-125V, HOSPITAL GRADE, GROUNDED DUPLEX RECEPTACLE - IN (2) GANG BOX. CONNECT TO NORMAL CIRCUIT. SEE

NOTES NDC & MH.

WIRING DEVICES

3/4" MINIMUM SIZE CONCEALED CONDUIT WITH #12 AWG, THWN STRANDED COPPER CONDUCTORS PLUS SEPARATE #12 GROUND ( ) AND CONDUIT WIRE FILLS IN ACCORDANCE WITH N.E.C. DEDICATED NEUTRAL CONDUCTORS ARE REQUIRED FOR ALL 120V AND 277V

BRANCH CIRCUITS. MULTIWIRE BRANCH CIRCUITS WITH SHARED NEUTRALS ARE NOT PERMITTED.) REFER TO SPECIFICATION

SECTION 16100 FOR CONDUIT TYPES PERMITTED.

BRANCH CIRCUIT WIRING

INFECTION CONTROL NOTES

THE FOLLOWING AREAS SHALL BE CONSIDERED INFECTION CONTROL CLASS III, UNLESS OTHERWISE INSTRUCTED BY COR:

1. ALL SURGERY RELATED AREAS

2. PHARMACY

3. ENDOSCOPY

4. PACU

5. MICU

6. PCU

7. CATH LABS

8. STERILE PROCESSING AND STORAGE

9. RADIOLOGY

10. DIALYSIS

COORDINATE EXACT LOCATIONS AND REQUIREMENTS WITH COR AND REFER TO SPECIFICATIONS SECTION "01 35 26 - SAFETY REQUIREMENTS" FOR ADDITIONAL

INFORMATION. CONTRACTOR SHALL INCLUDE ALL INFECTION CONTROL, MITIGATION AND REQUIRED CLEANING IN BID.

NORMAL DEVICE COLOR - ALL RECEPTACLES AND SWITCHES CONNECTED TO NORMAL POWER CIRCUITS SHALL BE GRAY WITH

STAINLESS STEEL FACEPLATES - EACH PLATE SHALL BE MACHINE ENGRAVED WITH THE PANEL AND CIRCUIT NUMBER OF THE POWER

SOURCE THAT SUPPLIES EACH DEVICE.

NOTE NDC:

EMERGENCY DEVICE COLOR - ALL RECEPTACLES AND SWITCHES CONNECTED TO EMERGENCY POWER CIRCUITS SHALL BE RED WITH

STAINLESS STEEL FACEPLATES. EACH EMERGENCY PLATE SHALL BE MACHINE ENGRAVED WITH THE PANEL AND CIRCUIT NUMBER OF

THE POWER SOURCE THAT SUPPLIES EACH DEVICE. THE ELECTRICAL CONTRACTOR SHALL CLOSELY REVIEW ALL PLANS TO

DETERMINE ALL EMERGENCY CIRCUITS AND SHALL PROVIDE ALL RED DEVICES AND ENGRAVED PLATES AS REQUIRED - NO

EXCEPTIONS.

NOTE EDC:

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS:

VAMC - WADE PARK

ARCHITECT:

Office of Facilities

Management

Upgrade Smart Building

System (Tridium)

05/31/19

541-19-201

100% CONSTRUCTION DOCUMENTS SUBMISSION 05/31/19

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 07/19/19

TECHNOLOGY LEGEND

T0.1

RPHMPL

CODED NOTES:

1 EXISTING NETWORK SWITCH TO REMAIN.

REFER TO X1.5 - THIRD FLOOR KEY PLAN FOR LOCATION OF FOTP-19.2

S2.19

XBSD.114

P17

P19K19 N19 O19

N17

XBSS.37 1

MARK

CARES_LEVEL_A

NAME

10.20.100.75

IP ADDRESS

T1.1 TEMPERATURE CONTROLS NETWORK DEVICE LIST

ROOM

XBSD.114 ELEC CLOSET AFLVC2bCX1 CONTROLLER

DESCRIPTION

GENERAL DEVICE NOTES:

A. CONNECT ALL LISTED DEVICES TO NEAREST SMART BUILDING SYSTEM DATA OUTLET. REFER TO TYPICAL BUILDING SYSTEM DEVICE CONNECTION

SCHEMATIC ON SHEET T3.3

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS:

VAMC - WADE PARK

ARCHITECT:

Office of Facilities

Management

Upgrade Smart Building

System (Tridium)

05/31/19

541-19-201

100% CONSTRUCTION DOCUMENTS SUBMISSION 05/31/19

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 07/19/19

SUB-BASEMENT AREA PLANS -

T1.1

RPHMPL

FOTP-19

0'

SCALE: 1/8" = 1'0"

4' 8' 16' 32'

SUB-BASEMENT AREA PLAN -

AFLVC2

NOT TO SCALE

SUB-BASEMENT KEY PLAN

T1.1

CODED NOTES:

1 EXISTING ULTRASONIC FLOWMETER 10-CLE-SIT-DW-2 FOR INCOMING DOMESTIC WATER. EXTEND

WIRING TO NEW MODBUS TO BACNET/IP GATEWAY BSD.01. REFER TO "TYPICAL MODBUS DEVICE

CONNECTION DIAGRAM" ON SHEET T3.4.

NEW MODBUS TO BACNET IP GATEWAY. CONNECT TO EXISTING ULTRASONIC FLOWMETER AND

NEAREST SMART BUILDING SYSTEM DATA OUTLET. REFER TO "TYPICAL MODBUS DEVICE CONNECTION

DIAGRAM" ON SHEET T3.4.

EXISTING ULTRASONIC FLOWMETER 10-CLE-SIT-DW-1 FOR INCOMING DOMESTIC WATER. EXTEND

WIRING TO NEW MODBUS TO BACNET/IP GATEWAY BSD.02 ON FIRST FLOOR. REFER TO SHEET T1.6 AND

"TYPICAL MODBUS DEVICE CONNECTION DIAGRAM" ON SHEET T3.4.

AFTER ENTIRE ANDOVER DEVICE CUTOVER TO THE SMART BUILDING SYSTEM IS COMPLETE, REMOVE

EXISTING NETWORK SWITCH COMPLETE WITH ALL CABLING. REFER TO "PROJECT OBJECTIVES" ON

SHEET X0.1.

REFER TO X1.3 - FIRST FLOOR KEY PLAN FOR LOCATION OF FOTP-4.

FOTP

XBSS.02

S2.10

S2.10

S2.10 S2.10

S2.10

XBSS.01

XBSS.03A

XBSS.03B

XBSD.01XBSD.02

XBSD.03

XBSD.04

XBSD.05

XBSS.14

XBSD.33

XBSD.25

S2.10

S2.10

BSD.01

S2.10

10-CLE-SIT-DW-2

S2.04

XBSS.04

XBSD.06

S4.04

XBSS.05

XBSD.08

XBSD.07

10-CLE-SIT-DW-1

MARK

INFINITY15_RES

NAME

10.20.100.24

IP ADDRESS

T1.2 TEMPERATURE CONTROLS NETWORK DEVICE LIST

ROOM

XBSD.01

XBSD.02

XBSD.03

XBSD.04

XBSD.05

MECHANICAL RM (STORAGE) BE260ANETCONTROLLER

DESCRIPTION

- -BACNET GATEWAY

- -WORKSTATION

3353 10.20.100.122 MECHANICAL RM BE260bCX1 CONTROLLER

AC_31 10.20.100.77 MECHANICAL RM BE260NETCONTROLLER

XBSD.06 LAB_WAREHOUSE 10.20.100.47 MECHANICAL RM (K16) BF412NETCONTROLLER

XBSD.07 AHU_26 10.20.100.46NETCONTROLLER

XBSD.08 CORRIDOR 10.20.100.107NETCONTROLLER HVAC BF467

XBSD.25 INFINITY1_NE102 10.20.100.10 ELECT RM BE361B

MECHANICAL RM (STORAGE) BE260A

MECHANICAL RM (STORAGE) BE260A

HVAC BF467

XBSD.33 RESEARCH_RPM 10.20.100.48 ELECT RM BE361BbCX1 CONTROLLER

NETCONTROLLER

BSD.01 - - MECHANICAL RM BE26010-CLE-SIT-DW-2 BACNET GATEWAY

GENERAL DEVICE NOTES:

A. CONNECT ALL LISTED DEVICES TO NEAREST SMART BUILDING SYSTEM DATA OUTLET. REFER TO TYPICAL BUILDING SYSTEM DEVICE CONNECTION

SCHEMATIC ON SHEET T3.3

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS:

VAMC - WADE PARK

ARCHITECT:

Office of Facilities

Management

Upgrade Smart Building

System (Tridium)

05/31/19

541-19-201

100% CONSTRUCTION DOCUMENTS SUBMISSION 05/31/19

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 07/19/19

BASEMENT AREA PLANS - FOTP-4

T1.2

RPHMPL

AND FOTP-10

0'

SCALE: 1/8" = 1'0"

4' 8' 16' 32'

BASEMENT AREA PLAN -

BF412

0'

SCALE: 1/8" = 1'0"

4' 8' 16' 32'

BASEMENT AREA PLAN -

BF467

0'

SCALE: 1/8" = 1'0"

4' 8' 16' 32'

BASEMENT AREA PLAN -

BE260, BE261, AND BE361B

NOT TO SCALE

BASEMENT KEY PLAN

T1.2

T1.2

T1.2X-FOTP-10

XBSS.07

FOTP

XBSS.09

XBSD.10

S2.08

210-CLE-ENC-CH-1

210-CLE-ENC-TW-1

BSD.06

BSD.07

BSD.09

S4.08 3

MARK

NAME

IP ADDRESS

T1.3 TEMPERATURE CONTROLS NETWORK DEVICE LIST

ROOM

XBSD.10

XBSD.32

SWITCH GEAR ROOM BE504NETCONTROLLER

DESCRIPTION

INFINITY_22 10.20.100.33NETCONTROLLER

XBSD.69 LinAccHEX_BCX 10.20.100.113 CHILLER BB234bCX1 CONTROLLER

CHILLER BB234

BSD.06 - - CHILLER PLANT BD603ENERGY CENTER FLOWMETERS GATEWAY

BSD.07 - -STEAM FLOWMETERS GATEWAY CHILLER PLANT BD603

GENERAL DEVICE NOTES:

A. CONNECT ALL LISTED DEVICES TO NEAREST SMART BUILDING SYSTEM DATA OUTLET. REFER TO TYPICAL BUILDING SYSTEM DEVICE CONNECTION

SCHEMATIC ON SHEET T3.3

BSD.09 - -NATURAL GAS FLOWMETERS GATEWAY CHILLER PLANT BD603

S2.06

XBSS.06

XBSD.32

S2.06

XBSS.21

XBSD.69

CODED NOTES:

1 AFTER ENTIRE ANDOVER DEVICE CUTOVER TO THE SMART BUILDING SYSTEM IS COMPLETE, REMOVE

EXISTING NETWORK SWITCH COMPLETE WITH ALL CABLING. REFER TO "PROJECT OBJECTIVES" ON

SHEET X0.1.

EXISTING ULTRASONIC FLOWMETER. EXTEND WIRING TO NEW MODBUS TO BACNET/IP GATEWAY, BSD.06

IN CHILLER PLANT BD603. REFER TO "ENERGY CENTER ULTRASONIC FLOWMETER CONNECTION

DIAGRAM" ON SHEET T3.4.

THREE NEW MODBUS TO BACNET IP GATEWAYS FOR NATURAL GAS, STEAM, AND ENERGY CENTER

FLOWMETERS. CONNECT EACH TO NEAREST SMART BUILDING SYSTEM DATA OUTLET. REFER TO

ENERGY CENTER ULTRASONIC, STEAM VORTEX, AND NATURAL GAS VORTEX FLOWMETER CONNECTION

DIAGRAMS ON T3.4 AND T3.5.

REFER TO X1.3 - FIRST FLOOR KEY PLAN FOR LOCATION OF FOTP-6.

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS:

VAMC - WADE PARK

ARCHITECT:

Office of Facilities

Management

Upgrade Smart Building

System (Tridium)

05/31/19

541-19-201

100% CONSTRUCTION DOCUMENTS SUBMISSION 05/31/19

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 07/19/19

BASEMENT AREA PLANS - FOTP-6

T1.3

RPHMPL

0'

SCALE: 1/8" = 1'0"

4' 8' 16' 32'

BASEMENT AREA PLAN -

BE503-504 AND BD603-604

0'

SCALE: 1/8" = 1'0"

4' 8' 16' 32'

BASEMENT AREA PLAN -

BB419

NOT TO SCALE

BASEMENT KEY PLAN

T1.3

T1.3

0'

SCALE: 1/8" = 1'0"

4' 8' 16' 32'

BASEMENT AREA PLAN -

BB234

AND FOTP-8

T1.3

X-FOTP-8

F O

T P

S4.09

S2.09

S2.09

S2.09

S4.09

S4.09

XBSS.11

XBSD.15

XBSD.14

XBSD.16

XBSD.17

XBSD.22

XBSD.23

XBSD.19

XBSD.20

XBSD.21

XBSD.18

BSD.03

BSD.04

BSD.05

410-CLE-01A-CH-1

510-CLE-01A-ST-1

S4.09

S2.09

XBSD.24

310-CLE-001-E1K

10-CLE-001-E1L

MARK

INFINITY2_NE212

NAME

10.20.100.11

IP ADDRESS

T1.4 TEMPERATURE CONTROLS NETWORK DEVICE LIST

ROOM

XBSD.14

XBSD.15

XBSD.16

XBSD.17

XBSD.18

XBSD.24

OFFICE BA109CNETCONTROLLER

DESCRIPTION

INFINITY9_AC 10.20.100.26 OFFICE BA109CNETCONTROLLER

- 10.20.100.25 OFFICE BA109CWORKSTATION

TAC SERVER 10.20.100.2 OFFICE BA109CSERVER

TAC SERVER BACKUP - OFFICE BA109CBACKUP SERVER

AHU_50 10.20.100.87 HVAC BAC241NETCONTROLLER

XBSD.19 AC_51 10.20.100.78 MECHANICAL RM BA109NETCONTROLLER

XBSD.20 AC-52 10.20.100.79NETCONTROLLER MECHANICAL RM BA109

XBSD.21 AC_53 10.20.100.80NETCONTROLLER MECHANICAL RM BA109

XBSD.22 3354 10.20.100.123bCX1 CONTROLLER MECHANICAL RM BA109

XBSD.23 - -BACNET GATEWAY MECHANICAL RM BA109

BSD.03 - - MECHANICAL RM BA10910-CLE-001-E1K,E1L BACNET GATEWAY

BSD.04 - - MECHANICAL RM BA10910-CLE-01A-CH-1 BACNET GATEWAY

BSD.05 - - MECHANICAL RM BA10910-CLE-01A-ST-1 BACNET GATEWAY

GENERAL DEVICE NOTES:

A. CONNECT ALL LISTED DEVICES TO NEAREST SMART BUILDING SYSTEM DATA OUTLET. REFER TO TYPICAL BUILDING SYSTEM DEVICE CONNECTION

SCHEMATIC ON SHEET T3.3

CODED NOTES:

1 AFTER ENTIRE ANDOVER DEVICE CUTOVER TO THE SMART BUILDING SYSTEM IS COMPLETE, REMOVE

EXISTING NETWORK SWITCH COMPLETE WITH ALL CABLING. REFER TO "PROJECT OBJECTIVES" ON

SHEET X0.1.

PROVIDE THREE NEW MODBUS TO BACNET/IP GATEWAYS (BSD.03, BSD.04, AND BSD.05) FOR

AMBULATORY CARE ELECTRIC, CHILLED WATER, AND STEAM METERS.

EXISTING ELECTRIC METER LOCATED IN EXISTING SUBSTATION. EXTEND WIRING TO NEW MODBUS TO

BACNET/IP GATEWAY, BSD.03 IN MECH ROOM BA-109. REFER TO "AMBULATORY CARE ELECTRIC METER

CONNECTION DIAGRAM" ON SHEET T3.4.

EXISTING ULTRASONIC FLOWMETER 10-CLE-01A-CH-1 FOR CHILLED WATER METERING. EXTEND WIRING

TO NEW MODBUS TO BACNET/IP GATEWAY BSD.04 IN MECH ROOM BA-109. REFER TO "TYPICAL MODBUS

DEVICE CONNECTION DIAGRAM" ON SHEET T3.4.

EXISTING VORTEX FLOWMETER 10-CLE-01A-ST-1 FOR STEAM METERING. EXTEND WIRING TO NEW

MODBUS TO BACNET/IP GATEWAY BSD.05 IN MECH ROOM BA-109. REFER TO "TYPICAL MODBUS DEVICE

CONNECTION DIAGRAM" ON SHEET T3.4.

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS:

VAMC - WADE PARK

ARCHITECT:

Office of Facilities

Management

Upgrade Smart Building

System (Tridium)

05/31/19

541-19-201

100% CONSTRUCTION DOCUMENTS SUBMISSION 05/31/19

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 07/19/19

BASEMENT AREA PLANS - FOTP-9

T1.4

RPHMPL

0'

SCALE: 1/8" = 1'0"

4' 8' 16' 32'

BASEMENT AREA PLAN -

BA109 AND BA109C

0'

SCALE: 1/8" = 1'0"

4' 8' 16' 32'

BASEMENT AREA PLAN -

BAC241 AND BA151

NOT TO SCALE

BASEMENT KEY PLAN

T1.4

T1.4

X-FOTP-9

FOTP

S2.11

XBSS.08

XBSD.09

BSD.08

XBSD.123, XBSD.124

XBSD.125, XBSD.126

XBSD.127

S2.11

S4.11

S4.11

S4.11

XBSS.10

XBSD.13

XBSD.12

XBSD.11

XBSD.128

S2.11

S2.11

S4.11

XBSD.129

XBSD.130

MARK

INFINITY3_NB835

NAME

10.20.100.12

IP ADDRESS

T1.5 TEMPERATURE CONTROLS NETWORK DEVICE LIST

ROOM

XBSD.09

XBSD.11

XBSD.12

XBSD.13

EC (G08A) BD470NETCONTROLLER

DESCRIPTION

ENHANCEBCX_AHU 10.20.100.130

ENHANCEBCX_MAP 10.20.100.129VA ENHANCE MED TRIDIUM bCX1 TRANSLATOR

AHU_WEST_0_3 10.20.100.128

VA ENHANCE MED bCX1 CONTROLLER MECHANICAL ROOM D20

MECHANICAL ROOM D20

MECHANICAL ROOM D20VA ENHANCE MED NETCONTROLLER

XBSD.77 LIEBERT 10.20.100.101 ENGINEERING CLOSET BB545bCX1 CONTROLLER

XBSD.112 CARES_LEVEL_B 10.20.100.73 ELEC CLOSET BFLVC2bCX1 CONTROLLER

BSD.08 - - SWITCH GEAR BD404STEAM TRAP MONITORING BACNET GATEWAY

XBSD.124 EGX-2 ADMITTING/PARKING ELECTRICAL METERS GATEWAY

XBSD.125 EGX-3 TRANSFORMER VAULT/RESEARCH ELECTRICAL METERS GATEWAY

XBSD.126 EGX-4 MICU/SURGERY ELECTRICAL METERS GATEWAY

XBSD.127 EGX-5 ENERGY CENTER/UTILITY MAINS ELECTRICAL METER GATEWAY

XBSD.123 EGX-1 PENTHOUSE ELECTRICAL METERS GATEWAY

- SWITCH GEAR BD404

- SWITCH GEAR BD404

- SWITCH GEAR BD404

- SWITCH GEAR BD404

- SWITCH GEAR BD404

XBSD.128 - FLOWMETER GATEWAY - MECHANICAL ROOM D20

XBSD.129 - HVAC SHOP WORKSTATION - HVAC SHOP BE430

XBSD.130 - HVAC SHOP WORKSTATION - HVAC SHOP SUPERVISOR BE430A

GENERAL DEVICE NOTES:

A. CONNECT ALL LISTED DEVICES TO NEAREST SMART BUILDING SYSTEM DATA OUTLET. REFER TO TYPICAL BUILDING SYSTEM DEVICE CONNECTION

SCHEMATIC ON SHEET T3.3XBSD.77

S2.15

S2.19

XBSD.112

XBSS.38

XBSS.39

CODED NOTES:

1 AFTER ENTIRE ANDOVER DEVICE CUTOVER TO THE SMART BUILDING SYSTEM IS COMPLETE, REMOVE

EXISTING NETWORK SWITCH COMPLETE WITH ALL CABLING. REFER TO "PROJECT OBJECTIVES" ON

SHEET X0.1.

REPLACE (2) EXISTING NIAGARA AX JACES (JACEEM2 AND JACEEM3) WITH VYKON NIAGARA N4 JACES.

REFER TO SPECIFICATIONS.

EXISTING RECEIVER FOR STEAM TRAP MONITORING SYSTEM. EXTEND WIRING TO NEW MODBUS TO

BACNET/IP GATEWAY BSD.08 IN ROOM BD-404. REFER TO "TYPICAL MODBUS DEVICE CONNECTION

DIAGRAM" ON SHEET T3.4.

EXISTING CABINET WITH SCHNEIDER NETWORK SWITCH, ROUTER, AND DEVICES. PROVIDE (2) QUAD SBS

DATA OUTLETS (S4.11) FOR EXISTING GATEWAYS EGX-1, EGX-2, EGX-3, EGX-4, AND EGX-5. PROVIDE (5)

CAT-6 PATCH CABLES FROM EGX GATEWAYS TO SBS OUTLETS. AFTER CUTOVER TO SBS NETWORK, REMOVE EXISTING SCHNEIDER NETWORK SWITCH AND ROUTER COMPLETE WITH ALL ABANDONED

CABLING AND DEVICES.

REFER TO X1.5 - THIRD FLOOR KEY PLAN FOR LOCATION OF FOTP-19.

REFER TO X1.4 - SECOND FLOOR KEY PLAN FOR LOCATION OF FOTP-15.

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS:

VAMC - WADE PARK

ARCHITECT:

Office of Facilities

Management

Upgrade Smart Building

System (Tridium)

05/31/19

541-19-201

100% CONSTRUCTION DOCUMENTS SUBMISSION 05/31/19

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 07/19/19

BASEMENT AREA PLANS -

T1.5

RPHMPL

0'

SCALE: 1/8" = 1'0"

4' 8' 16' 32'

BASEMENT AREA PLAN -

BD404 AND BD470

0'

SCALE: 1/8" = 1'0"

4' 8' 16' 32'

BASEMENT AREA PLAN -

D20, BE430, BE430A, BE440B

NOT TO SCALE

BASEMENT KEY PLAN

T1.5

T1.5

T1.5

0'

SCALE: 1/8" = 1'0"

4' 8' 16' 32'

BASEMENT AREA PLAN - BB545

FOTP-11, FOTP-15 AND FOTP-19

T1.5

0'

SCALE: 1/8" = 1'0"

4' 8' 16' 32'

BASEMENT AREA PLAN -

BFLVC2

X-FOTP-11

S4.10

XBSS.12

XBSD.28 XBSD.29

XBSD.30

S2.10

XBSD.31

S2.10

FOTP

XBSD.27

XBSD.26

S2.06

S2.06

XBSS.13

XBSD.79

S2.06

MARK

INFINITY6_NE246

NAME

10.20.100.15

IP ADDRESS

T1.6 TEMPERATURE CONTROLS NETWORK DEVICE LIST

ROOM

XBSD.26

XBSD.27

XBSD.28

XBSD.29

XBSD.30

MECHANICAL RM 107NETCONTROLLER

DESCRIPTION

- 10.20.100.4 MECHANICAL RM 107WORKSTATION

- - MECHANICAL RM (131) 1D123BACNET GATEWAY

INFINITY7_NE208 10.20.100.16NETCONTROLLER

SF-4 10.20.100.81NETCONTROLLER

XBSD.31 - -WORKSTATION

MECHANICAL RM (131) 1D123

MECHANICAL RM (131) 1D123

MECHANICAL RM (131) 1D123

XBSD.79 - -CYPRESS WIRELESS SYSTEM NETWORK 4 SPRINKLER SHUT-OFF 129E

XBSD.109 CARES_LEVEL_1 10.20.100.71bCX1 CONTROLLER ELEC CLOSET 1FLVC2

BSD.02 - - ELECTRICAL CLOSET 1F51610-CLE-SIT-DW-1 BACNET GATEWAY

XBSD.119 - -CYPRESS WIRELESS SYSTEM CONTROLLER ELEC 1B232

GENERAL DEVICE NOTES:

A. CONNECT ALL LISTED DEVICES TO NEAREST SMART BUILDING SYSTEM DATA OUTLET. REFER TO TYPICAL BUILDING SYSTEM DEVICE CONNECTION

SCHEMATIC ON SHEET T3.3

S2.19

XBSD.109

XBSS.40

XBSS.41

CODED NOTES:

1 AFTER ENTIRE ANDOVER DEVICE CUTOVER TO THE SMART BUILDING SYSTEM IS COMPLETE, REMOVE

EXISTING NETWORK SWITCH COMPLETE WITH ALL CABLING.

NEW MODBUS TO BACNET IP GATEWAY. CONNECT TO EXISTING ULTRASONIC FLOWMETER AND

NEAREST SMART BUILDING SYSTEM DATA OUTLET. REFER TO "TYPICAL ULTRASONIC FLOWMETER

CONNECTION DIAGRAM" ON SHEET T3.4.

EXISTING ANDOVER NETWORK SWITCH TO REMAIN.

REFER TO X1.2 - BASEMENT KEY PLAN FOR LOCATION OF FOTP-10.

REFER TO X1.5 - THIRD FLOOR KEY PLAN FOR LOCATION OF FOTP-19.

FOTP

FOTP

BSD.02

S2.04

S2.06

XBSD.119

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS:

VAMC - WADE PARK

ARCHITECT:

Office of Facilities

Management

Upgrade Smart Building

System (Tridium)

05/31/19

541-19-201

100% CONSTRUCTION DOCUMENTS SUBMISSION 05/31/19

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 07/19/19

0'

SCALE: 1/8" = 1'0"

4' 8' 16' 32'

PARTIAL FIRST FLOOR PLAN - 1D123

0'

SCALE: 1/8" = 1'0"

4' 8' 16' 32'

PARTIAL FIRST FLOOR PLAN - 107

0'

SCALE: 1/8" = 1'0"

4' 8' 16' 32'

PARTIAL FIRST FLOOR PLAN - 129E

NOT TO SCALE

FIRST FLOOR KEY PLAN

T1.6

T1.6

FIRST FLOOR AREA PLANS - FOTP-4

T1.6

RPHMPL

FOTP-6, FOTP-10 AND FOTP-19

T1.60'

SCALE: 1/8" = 1'0"

4' 8' 16' 32'

PARTIAL FIRST FLOOR PLAN - 1FLVC2

T1.6

X-FOTP-6

0'

SCALE: 1/8" = 1'0"

4' 8' 16' 32'

PARTIAL FIRST FLOOR PLAN - 1F516

T1.6

0'

SCALE: 1/8" = 1'0"

4' 8' 16' 32'

PARTIAL FIRST FLOOR PLAN - 1B232

T1.6

X-FOTP-4

XBSD.93

S2.15

MARK

NAME

IP ADDRESS

T1.7 TEMPERATURE CONTROLS NETWORK DEVICE LIST

ROOM

XBSD.78

XBSD.93

COMM 1B499CYPRESS WIRELESS SYSTEM NETWORK 2

DESCRIPTION

INFINITY30_POLICE 10.20.100.43 1B453NETCONTROLLER

XBSD.111 - - ENGINEERING WORKSHOP 1F191WORKSTATION

XBSD.118 MRIHEX_BCX 10.20.100.114 MRI EQUIP 1B539bCX1 CONTROLLER

BTU-1 - - BOILER ROOM G101BOILER ECONOMIZER BTU METER

BTU-2 -

BTU-3 -

- BOILER ROOM G101BOILER ECONOMIZER BTU METER

- BOILER ROOM G101BOILER ECONOMIZER BTU METER

GENERAL DEVICE NOTES:

A. CONNECT ALL LISTED DEVICES TO NEAREST SMART BUILDING SYSTEM DATA OUTLET. REFER TO TYPICAL BUILDING SYSTEM DEVICE CONNECTION

SCHEMATIC ON SHEET T3.3

XBSS.23

XBSS.22

XBSD.78

S2.15

XBSS.29

XBSS.30

FOTP

FOTP

XBSD.111

XBSS.42

S2.07

CODED NOTES:

1 AFTER ENTIRE ANDOVER DEVICE CUTOVER TO THE SMART BUILDING SYSTEM IS COMPLETE, REMOVE

EXISTING NETWORK SWITCH COMPLETE WITH ALL CABLING.

EXISTING ULTRASONIC FLOWMETER. EXTEND WIRING TO NEW MODBUS TO BACNET/IP GATEWAY, BSD.06

IN CHILLER PLANT BD603. REFER TO "ENERGY CENTER ULTRASONIC FLOWMETER CONNECTION

DIAGRAM" ON SHEET T3.4.

EXISTING VORTEX STEAM METER. EXTEND WIRING TO NEW MODBUS TO BACNET/IP GATEWAY BSD.07 IN

CHILLER PLANT BD603. REFER TO "STEAM VORTEX FLOWMETERS CONNECTION DIAGRAM" ON SHEET

T3.5.

EXISTING ANDOVER NETWORK SWITCH TO REMAIN.

PROVIDE NEW SBS DATA OUTLET ADJACENT TO NEW BOILER FLUE ECONOMIZER BTU METER.

COORDINATE OUTLET LOCATION WITH BTU METER INSTALLING CONTRACTOR. EXTEND CAT-6 PATCH

CABLE FROM BOILER FLUE ECONOMIZER METER TO SBS DATA OUTLET.

EXISTING VORTEX NATURAL GAS METER. EXTEND WIRING TO NEW MODBUS TO BACNET/IP GATEWAY

BSD.09 IN CHILLER PLANT BD603. REFER TO "NATURAL GAS VORTEX FLOWMETERS CONNECTION

DIAGRAM" ON SHEET T3.5.

REFER TO X1.4 - SECOND FLOOR KEY PLAN FOR LOCATION OF FOTP-15.

FOTP

FOTP

XBSD.118

S2.14

210-CLE-001-BW-1

10-CLE-001-NG-1

10-CLE-001-ST-1

10-CLE-001-ST-2

10-CLE-001-ST-3

5BTU-1

BTU-2

BTU-3

S2.14 S2.14 S2.14

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS:

VAMC - WADE PARK

ARCHITECT:

Office of Facilities

Management

Upgrade Smart Building

System (Tridium)

05/31/19

541-19-201

100% CONSTRUCTION DOCUMENTS SUBMISSION 05/31/19

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 07/19/19

0'

SCALE: 1/8" = 1'0"

4' 8' 16' 32'

PARTIAL FIRST FLOOR PLAN - 1B453

0'

SCALE: 1/8" = 1'0"

4' 8' 16' 32'

PARTIAL FIRST FLOOR PLAN - 1B499

0'

SCALE: 1/8" = 1'0"

4' 8' 16' 32'

PARTIAL FIRST FLOOR PLAN - 1A181

NOT TO SCALE

FIRST FLOOR KEY PLAN

FIRST FLOOR AREA PLANS -

T1.7

RPHMPL

FOTP-7, FOTP-14, AND FOTP-15

T1.7

T1.7

T1.7

T1.7

0'

SCALE: 1/8" = 1'0"

4' 8' 16' 32'

PARTIAL FIRST FLOOR PLAN - 1B100

T1.7

0'

SCALE: 1/8" = 1'0"

4' 8' 16' 32'

PARTIAL FIRST FLOOR PLAN - 1F191

X-FOTP-7

0'

SCALE: 1/8" = 1'0"

4' 8' 16' 32'

PARTIAL FIRST FLOOR PLAN - 1B539

T1.7

X-FOTP-14

0'

SCALE: 1/8" = 1'0"

4' 8' 16' 32'

PARTIAL FIRST FLOOR PLAN - G101

T1.7

X1.10 LEARNING EXCHANGE KEY PLAN
18079 SITE KEY PLAN
X1.10 LEARNING EXCHANGE KEY PLAN
T0.1 TECHNOLOGY LEGEND
18079 LEGEND
T0.1 TECHNOLOGY LEGEND
T1.1 SUB-BASEMENT AREA PLANS - FOTP-19 Devices
18079 SUBBASEMENT FLOOR PLANS
T1.1 SUB-BASEMENT AREA PLANS - FOTP-19 Devices
T1.2 BASEMENT AREA PLANS - FOTP-4 AND FOTP-10 Devices
18079 BASEMENT FLOOR PLANS
T1.2 BASEMENT AREA PLANS - FOTP-4 AND FOTP-10 Devices
T1.3 BASEMENT AREA PLAN - FOTP-6 AND FOTP-8 DEVICES
18079 BASEMENT FLOOR PLANS
T1.3 BASEMENT AREA PLAN - FOTP-6 AND FOTP-8 DEVICES
T1.4 BASEMENT AREA PLAN - FOTP-9 Devices
18079 BASEMENT FLOOR PLANS
T1.4 BASEMENT AREA PLAN - FOTP-9 Devices
T1.5 BASEMENT AREA PLANS - FOTP-11 FOTP-15 AND FOTP-19
18079 BASEMENT FLOOR PLANS
T1.5 BASEMENT AREA PLANS - FOTP-11 FOTP-15 AND FOTP-19
T1.6 FIRST FLOOR AREA PLANS - FOTP-4 FOTP-6 FOTP-10 AND FOTP-19
18079 FIRST FLOOR PLANS
T1.6 FIRST FLOOR AREA PLANS - FOTP-4 FOTP-6 FOTP-10 AND FOTP-19
T1.7 FIRST FLOOR AREA PLANS - FOTP-7 FOTP-14 AND FOTP-15
18079 FIRST FLOOR PLANS
T1.7 FIRST FLOOR AREA PLANS - FOTP-7 FOTP-14 AND FOTP-15
T1.8 SECOND FLOOR AREA PLANS - FOTP-6 AND FOTP-15
18079 SECOND FLOOR PLANS
T1.8 SECOND FLOOR AREA PLANS - FOTP-6 AND FOTP-15

File details come from the government source that posted it.