36C25019B0046-003.pdf
PDF Posted
- Attached to
- Upgrade Smart Building System 541-19-201 Louis Stoke VA Medical Center Cleveland, Ohio 44106
- Solicitation number
- 36C25019B0046
About this file
36C25019B0046 541-19-201 - Project Drawings Combined Final-Part1.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25019C0255-000.docx | DOCX document | |
| 36C25019B0046-0001002.pdf | ||
| 36C25019B0046-0001001.pdf | ||
| 36C25019B0046-0001000.docx | DOCX document | |
| 36C25019B0046-0001000.docx | DOCX document | |
| 36C25019B0046-0001001.pdf | ||
| 36C25019B0046-0001002.pdf | ||
| 36C25019B0046-004.pdf | ||
| 36C25019B0046-005.pdf | ||
| 36C25019B0046-007.pdf | ||
| 36C25019B0046-001.docx | DOCX document | |
| 36C25019B0046-002.pdf | ||
| 36C25019B0046-006.pdf | ||
| 36C25019B0046-006.pdf | ||
| 36C25019B0046-005.pdf | ||
| 36C25019B0046-003.pdf | ||
| 36C25019B0046-007.pdf | ||
| 36C25019B0046-001.docx | DOCX document | |
| 36C25019B0046-002.pdf | ||
| 36C25019B0046-004.pdf | ||
| 36C25019B0046-000.docx | DOCX document | |
| 36C25019B0046-000.docx | DOCX document |
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
10701 EAST BLVD. CLEVELAND, OH. 44106
DEPARTMENT OF VETERANS AFFAIRS MEDICAL CENTER - WADE PARK
Upgrade Smart Building System (Tridium)
DRAWING INDEX
GENERAL
X0.1 COVER SHEET
X1.1 SUB BASEMENT KEY PLAN
X1.2 BASEMENT KEY PLAN
X1.3 FIRST FLOOR KEY PLAN
X1.4 SECOND FLOOR KEY PLAN
X1.5 THIRD FLOOR KEY PLAN
X1.6 FOURTH FLOOR KEY PLAN
X1.7 FIFTH FLOOR KEY PLAN
X1.8 SIXTH FLOOR KEY PLAN
X1.9 SEVENTH FLOOR KEY PLAN
X1.10 LEARNING EXCHANGE KEY PLAN
TECHNOLOGY
T0.1 TECHNOLOGY LEGEND
T1.1 SUB-BASEMENT AREA PLANS - FOTP-19
T1.2 BASEMENT AREA PLANS - FOTP-4 AND FOTP-10
T1.3 BASEMENT AREA PLANS - FOTP-6 AND FOTP-8
T1.4 BASEMENT AREA PLANS - FOTP-9
T1.5 BASEMENT AREA PLANS - FOTP-11, FOTP-15 AND FOTP-19
T1.6 FIRST FLOOR AREA PLANS - FOTP-4, FOTP-6, FOTP-10 AND FOTP-19
T1.7 FIRST FLOOR AREA PLANS - FOTP-7, FOTP-14, AND FOTP-15
T1.8 SECOND FLOOR AREA PLANS - FOTP-6, FOTP-15 AND FOTP-19
T1.9 SECOND FLOOR AREA PLANS - FOTP-15 AND FOTP-16
T1.10 THIRD FLOOR AREA PLANS - FOTP-01, FOTP-17 AND FOTP-19
T1.11 FOURTH FLOOR AREA PLANS - FOTP-3 AND FOTP-19
T1.12 FIFTH FLOOR AREA PLANS - FOTP-3, FOTP-19, AND FOTP-20
T1.13 SIXTH FLOOR AREA PLANS - FOTP-12
T1.14 SEVENTH FLOOR AREA PLANS - FOTP-3
T1.15 SEVENTH FLOOR AREA PLANS - FOTP-12
T1.16 LEARNING EXCHANGE FLOOR PLANS - FOTP-18
T2.1 NEW NETWORK BACKBONE
T2.2 ANDOVER NETWORK DEMOLITION SCHEMATIC
T2.3 ANDOVER NETWORK FOTP CONNECTION SCHEMATIC
T2.4 CARES TOWER ANDOVER NETWORK DEMOLITION SCHEMATIC
T2.5 CARES TOWER ANDOVER NETWORK FOTP CONNECTION SCHEMATIC
T3.1 FOTP SWITCH PORT LISTS (1 OF 2)
T3.2 FOTP SWITCH PORT LISTS (2 OF 2)
T3.3 TECHNOLOGY DETAILS
T3.4 DEVICE CONNECTION SCHEMATICS
T3.5 DEVICE CONNECTION SCHEMATICS
T3.6 ELECTRICAL METER CONNECTION DETAILS
MECHANICAL
M1.1 BOILER FLUE ECONOMIZER ENERGY METER PLAN
Fredrick, Fredrick & Heller Engineers Mechanical & Electrical Engineer 672 E. Royalton Rd., Broadview Hgts, Ohio 44147
100% CONSTRUCTION DOCUMENTS
May 31, 2019
PROJECT OBJECTIVES:
1. UPGRADE TRIDIUM SERVER FROM NIAGARA AX TO NIAGARA N4.
1.1. REMAP ALL EXISTING POINTS AFTER UPGRADE
1.2. CONVERT DATA GATHERING TO STORE ALL LONG TERM DATA ON TRIDIUM DATABASE
1.3. REPLACE EXISTING NIAGARA A4 JACES WITH NIAGARA 8000 VYKON N4 (TOTAL 7)
1.4. ESTABLISH A FACILITY-WIDE NAMING CONVENTION FOR ALL DEVICE POINTS.
2. INTEGRATE SCHNEIDER, EATON, AND FLEXIM ELECTRIC AND MECHANICAL METERING SYSTEMS INTO THE TRIDIUM NETWORK.
2.1. PROVIDE NEW MODBUS TO BACNET/IP GATEWAYS ADJACENT TO FOTPs.
2.2. EXTEND COMMUNICATION CABLING FROM EXISTING METERING DEVICES TO NEW GATEWAYS.
2.3. PROVIDE NEW SMART BUILDING SYSTEM DATA OUTLETS ADJACENT TO GATEWAYS. EXTEND PATCH CABLE FROM DATA
JACK TO GATEWAY.
3. UPGRADE ANDOVER BAS NETWORK - ANDOVER BUILDING AUTOMATION DEVICES EXIST ON AN ISOLATED DATA NETWORK
CONSISTING OF UNMANAGED NETWORK SWITCHES OPERATING IN A PEER-TO-PEER CONFIGURATION. THIS NETWORK
COMMUNICATES DATA TO THE EXISTING SMART BUILDING SYSTEM (SBS) NETWORK VIA ONE CROSSOVER CONNECTION. THIS
PROJECT WILL EXPAND THE SBS NETWORK AND MOVE THE ANDOVER NETWORK TO A VIRTUAL SUB-NETWORK OPERATING ON
THE SAME HARDWARE AS THE SBS BY:
3.1. ADDING NEW FIBER OPTIC TERMINATION PANELS (FOTPs) TO THE SBS NETWORK AT VARIOUS LOCATIONS THROUGHOUT
THE CAMPUS.
3.2. EXTENDING NEW DATA CABLES FROM THE EXISTING AND NEW FOTPs TO NEW SMART BUILDING SYSTEM DATA OUTLETS
AT THE EXISTING ANDOVER DEVICE LOCATIONS.
3.3. PROVIDING NEW PATCH CABLES BETWEEN THE DATA JACKS AND EXISTING ANDOVER DEVICES.
3.4. PROVIDING A NEW VIRTUAL SUBNET ON THE SBS HARDWARE OVER WHICH THE ANDOVER DEVICES WILL COMMUNICATE.
THE ANDOVER DEVICES CURRENTLY HAVE STATIC IP ADDRESSES. THE NEW VIRTUAL NETWORK SHALL BE CONFIGURED
TO MAINTAIN THE EXISTING DEVICE IP ADDRESSES.
3.5. FINALLY, REMOVE ALL ABANDONED ANDOVER NETWORK SWITCHES AFTER CUTOVER HAS OCCURRED.
4. INTEGRATE EXISTING MAIN SECONDARY ELECTRICAL METER AND SUB BREAKER ELECTRICAL METERS INTO SMART BUILDING
SYSTEM.
4.1. MAP AND TAG WITH HISTORY AND GRAPHICS INTO TRIDIUM SBS.
5. TIE STEAM TRAP MONITORING SYSTEM INTO THE TRIDIUM SBS.
5.1. PROVIDE NEW MODBUS TO BACNET/IP GATEWAY ADJACENT TO FOTP.
5.2. EXTEND COMMUNICATION CABLING FROM EXISTING SYSTEM RECEIVER TO NEW GATEWAY.
5.3. PROVIDE NEW SMART BUILDING SYSTEM DATA OUTLETS ADJACENT TO GATEWAY. EXTEND PATCH CABLE FROM DATA
JACK TO GATEWAY.
5.4. MAP AND TAG TRAPS WITH HISTORY AND GRAPHICS INTO TRIDIUM SBS. ALLOW 6 POINTS PER STEAM TRAP FOR 68 STEAM
TRAPS.
6. INSTALL BTU METERS TO MEASURE ENERGY SAVINGS ON EACH BOILER ECONOMIZER SYSTEM.
6.1. MAP AND TAG WITH HISTORY AND GRAPHICS INTO TRIDIUM SBS.
th re e i n c h e s o n e f o o tA o n e -q u a rt e r in c h o n e f o o t o n e -e ig h th i n c h o n e f o o t
Revisions th re e -e ig h th s i n c h o n e f o o t
F o n e -h a lf i n c h o n e f o o t
E
2 3 4 5 o n e a n d o n e -h a lf i n c h e s o n e f o o t
C o n e i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t
D
B
1 2 3 4 5
CheckedApproved: Division Chief
Approved: Service Director
Drawing Title
6 7
Location
Building Number
Project Title
Dwg. Of
Drawn
Project No.
DRAWING NO.
Date
F E
6 7 8
C D
B
A
COVER SHEET
10701 EAST BLVD. CLEVELAND, OHIO
DATE
CHIEF Planning and Construction
CHIEF, Occupational Health & Safety
CHIEF, IRM
ASSOCIATE DIRECTOR 00A (B)
CHIEF, ENGINEERING 138
DIRECTOR 00
APPROVALS DATE
FACILITY MANAGER
SHOP FOREMAN 138
APPROVALS DATE APPROVALS
05-15-19 Office of
Facilities Management
SITE PLAN
1 MPL RPH
NORTH
Scale = None
VA
Upgrade Smart Building
System (Tridium) 541-19-201
X0.1
T1.1
F.10 AND F.04 TO
THIRD FLOOR
F.10 TO BASEMENT
F.04 TO BASEMENT
ROUTE F.04 AND F.10 IN
EXISTING CABLE TRAY
ROUTE F.04 AND F.10 IN
NEW J-HOOKS.
ROUTE F.04 IN
EXISTING CABLE TRAY
ROUTE F.10 IN NEW
J-HOOKS
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS:
VAMC - WADE PARK
ARCHITECT:
Office of Facilities
Management
Upgrade Smart Building
System (Tridium)
05/31/19
541-19-201
100% CONSTRUCTION DOCUMENTS SUBMISSION 05/31/19
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 07/19/19
0'
SCALE: 1" = 40'-0"
20' 40' 80' 160'
SUB-BASEMENT KEY PLAN
SUB-BASEMENT KEY PLAN
X1.1
RPHMPL
CABLE ROUTING NOTE
FIBER OPTIC CABLE ROUTING SHOWN ON THIS DRAWING IS APPROXIMATE TO INDICATE GENERAL SCOPE OF
WORK. CONTRACTOR SHALL FIELD VERIFY ACTUAL ROUTING AND SUBMIT SHOP DRAWINGS TO VA COR FOR
APPROVAL AND COORDINATION. SHOP DRAWINGS SHALL INDICATE PROPOSED ROUTE, FLOOR PENETRATION
LOCATIONS, LIFE SAFETY BARRIER PENETRATIONS, ETC.
T1.2
T1.4
T1.4
X-FOTP-11
X-FOTP-8
X-FOTP-10
X-FOTP-9
T1.5
T1.5
T1.3
T1.2
T1.2
T1.3
T1.3
T1.5
T1.5
F.10 TO
SUB-BASEMENT
F.17 TO FIRST
FLOOR
F.19 TO THIRD
FLOOR
F.17
F.10
F.19
F.09
F.04
F.04 TO FIRST
FLOOR 1F-516
F.04 TO SUB-BASEMENT
F.09 TO THIRD FLOOR
F.04 AND F.10 FROM SUB-BASEMENT TO THIRD FLOOR.
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS:
VAMC - WADE PARK
ARCHITECT:
Office of Facilities
Management
Upgrade Smart Building
System (Tridium)
05/31/19
541-19-201
100% CONSTRUCTION DOCUMENTS SUBMISSION 05/31/19
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 07/19/19
0'
SCALE: 1" = 40'-0"
20' 40' 80' 160'
BASEMENT KEY PLAN
BASEMENT KEY PLAN
X1.2
RPHMPL
LEGEND
CABLE ROUTING NOTE
FIBER OPTIC CABLE ROUTING SHOWN ON THIS DRAWING IS APPROXIMATE TO INDICATE GENERAL SCOPE OF
WORK. CONTRACTOR SHALL FIELD VERIFY ACTUAL ROUTING AND SUBMIT SHOP DRAWINGS TO VA COR FOR
T1.6
T1.6
T1.6
X-FOTP-6
X-FOTP-4
X-FOTP-7
X-FOTP-14
M1.1
T1.7
T1.7
T1.7
T1.7
T1.6
T1.7
F.16 TO SECOND
FLOOR WEST
PENTHOUSE
F.16
F.14
F.15
F.14 AND F.15 TO
SECOND FLOOR
EAST PENTHOUSE
F.15 TO THIRD FLOOR.
F.09 FROM BASEMENT TO THIRD FLOOR
F.04 AND F.10 RISER FROM SUB-BASEMENT TO THIRD FLOOR.
F.17 TO SECOND FLOOR
F.17 TO BASEMENT
F.19 FROM
BASEMENT TO
THIRD FLOOR
T1.6
T1.7
T1.7
0'
SCALE: 1" = 40'-0"
20' 40' 80' 160'
FIRST FLOOR KEY PLAN
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS:
VAMC - WADE PARK
ARCHITECT:
Office of Facilities
Management
Upgrade Smart Building
System (Tridium)
05/31/19
541-19-201
100% CONSTRUCTION DOCUMENTS SUBMISSION 05/31/19
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 07/19/19
FIRST FLOOR KEY PLAN
X1.3
RPHMPL
CABLE ROUTING NOTE
FIBER OPTIC CABLE ROUTING SHOWN ON THIS DRAWING IS APPROXIMATE TO INDICATE GENERAL SCOPE OF
WORK. CONTRACTOR SHALL FIELD VERIFY ACTUAL ROUTING AND SUBMIT SHOP DRAWINGS TO VA COR FOR
T1.8
T1.9
T1.8
T1.9
NEW
FOTP-15
NEW
FOTP-16
T1.8
F.17
F.17 TO FIRST FLOOR
F.17 TO THIRD FLOOR
F.16 TO FIRST FLOOR
F.16
F.14 AND
F.15 TO
FIRST
FLOOR
F.15 TO THIRD FLOOR.
F.09 FROM BASEMENT TO THIRD FLOOR
F.04 AND F.10 RISER FROM SUB-BASEMENT TO THIRD FLOOR.
F.19 FROM
BASEMENT TO
THIRD FLOOR
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS:
VAMC - WADE PARK
ARCHITECT:
Office of Facilities
Management
Upgrade Smart Building
System (Tridium)
05/31/19
541-19-201
100% CONSTRUCTION DOCUMENTS SUBMISSION 05/31/19
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 07/19/19
0'
SCALE: 1" = 40'-0"
20' 40' 80' 160'
SECOND FLOOR KEY PLAN
SECOND FLOOR KEY PLAN
X1.4
RPHMPL
CABLE ROUTING NOTE
FIBER OPTIC CABLE ROUTING SHOWN ON THIS DRAWING IS APPROXIMATE TO INDICATE GENERAL SCOPE OF
WORK. CONTRACTOR SHALL FIELD VERIFY ACTUAL ROUTING AND SUBMIT SHOP DRAWINGS TO VA COR FOR
FOTP
NEW
FOTP-17
NEW
FOTP-01
T1.10
FOTP
NEW
FOTP-19
T1.10
T1.10
T1.10
FOTP
F.17 DOWN TO
SECOND FLOOR
F.04, F.09, F.10 AND F.15
DOWN TO SECOND
FLOOR.
F.20 TO
FOURTH
FLOOR.
F.19 DOWN TO
SECOND
FLOOR
F.20
T1.10
TAGNUMBER
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS:
VAMC - WADE PARK
ARCHITECT:
Office of Facilities
Management
Upgrade Smart Building
System (Tridium)
05/31/19
541-19-201
100% CONSTRUCTION DOCUMENTS SUBMISSION 05/31/19
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 07/19/19
0'
SCALE: 1" = 40'-0"
20' 40' 80' 160'
THIRD FLOOR KEY PLAN
THIRD FLOOR KEY PLAN
X1.5
RPHMPL
LEGEND
CABLE ROUTING NOTE
FIBER OPTIC CABLE ROUTING SHOWN ON THIS DRAWING IS APPROXIMATE TO INDICATE GENERAL SCOPE OF
WORK. CONTRACTOR SHALL FIELD VERIFY ACTUAL ROUTING AND SUBMIT SHOP DRAWINGS TO VA COR FOR
T1.11
T1.11
F.20 TO FIFTH FLOOR
F.20 TO THIRD FLOOR
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS:
VAMC - WADE PARK
ARCHITECT:
Office of Facilities
Management
Upgrade Smart Building
System (Tridium)
05/31/19
541-19-201
100% CONSTRUCTION DOCUMENTS SUBMISSION 05/31/19
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 07/19/19
0'
SCALE: 1" = 40'-0"
20' 40' 80' 160'
FOURTH FLOOR KEY PLAN
FOURTH FLOOR KEY PLAN
X1.6
RPHMPL
CABLE ROUTING NOTE
FIBER OPTIC CABLE ROUTING SHOWN ON THIS DRAWING IS APPROXIMATE TO INDICATE GENERAL SCOPE OF
WORK. CONTRACTOR SHALL FIELD VERIFY ACTUAL ROUTING AND SUBMIT SHOP DRAWINGS TO VA COR FOR
Xref .\Reference\18079 ARCH 5 COLS.dwg
NEW
FOTP-20
T1.12
T1.12
T1.12
F.20 TO FIFTH FLOOR
T1.12
EQ-HMP3
EQ-LMP3
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS:
VAMC - WADE PARK
ARCHITECT:
Office of Facilities
Management
Upgrade Smart Building
System (Tridium)
05/31/19
541-19-201
100% CONSTRUCTION DOCUMENTS SUBMISSION 05/31/19
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 07/19/19
0'
SCALE: 1" = 40'-0"
20' 40' 80' 160'
FIFTH FLOOR KEY PLAN
FIFTH FLOOR KEY PLAN
X1.7
RPHMPL
LEGEND
CABLE ROUTING NOTE
FIBER OPTIC CABLE ROUTING SHOWN ON THIS DRAWING IS APPROXIMATE TO INDICATE GENERAL SCOPE OF
WORK. CONTRACTOR SHALL FIELD VERIFY ACTUAL ROUTING AND SUBMIT SHOP DRAWINGS TO VA COR FOR
T1.13
T1.13
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS:
VAMC - WADE PARK
ARCHITECT:
Office of Facilities
Management
Upgrade Smart Building
System (Tridium)
05/31/19
541-19-201
100% CONSTRUCTION DOCUMENTS SUBMISSION 05/31/19
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 07/19/19
0'
SCALE: 1" = 40'-0"
20' 40' 80' 160'
SIXTH FLOOR KEY PLAN
SIXTH FLOOR KEY PLAN
X1.8
RPHMPL
LIFE SAFETY LEGEND
T1.14
X-FOTP-3
X-FOTP-12
T1.15
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS:
VAMC - WADE PARK
ARCHITECT:
Office of Facilities
Management
Upgrade Smart Building
System (Tridium)
05/31/19
541-19-201
100% CONSTRUCTION DOCUMENTS SUBMISSION 05/31/19
FINAL CONSTRUCTION DOCUMENTS SUBMISSION 07/19/19
0'
SCALE: 1" = 40'-0"
20' 40' 80' 160'
SEVENTH FLOOR KEY PLAN
SEVENTH FLOOR KEY PLAN
X1.9
RPHMPL
LIFE SAFETY LEGEND
| X0.1 COVER SHEET |
| X01 - COVER SHEET |
| X0.1 COVER SHEET |
| X1.1 SUBBASEMENT KEY PLAN |
| 18079 SUBBASEMENT FLOOR PLANS |
| X1.1 SUBBASEMENT KEY PLAN |
| X1.2 BASEMENT KEY PLAN |
| 18079 BASEMENT FLOOR PLANS |
| X1.2 BASEMENT KEY PLAN |
| X1.3 FIRST FLOOR KEY PLAN |
| 18079 FIRST FLOOR PLANS |
| X1.3 FIRST FLOOR KEY PLAN |
| X1.4 SECOND FLOOR KEY PLAN |
| 18079 SECOND FLOOR PLANS |
| X1.4 SECOND FLOOR KEY PLAN |
| X1.5 THIRD FLOOR KEY PLAN |
| 18079 THIRD FLOOR PLANS |
| X1.5 THIRD FLOOR KEY PLAN |
| X1.6 FOURTH FLOOR KEY PLAN |
| 18079 FOURTH FLOOR PLANS |
| X1.6 FOURTH FLOOR KEY PLAN |
| X1.7 FIFTH FLOOR KEY PLAN |
| 18079 FIFTH FLOOR PLANS |
| X1.7 FIFTH FLOOR KEY PLAN |
| X1.8 SIXTH FLOOR KEY PLAN |
| 18079 SIXTH FLOOR PLANS |
| X1.8 SIXTH FLOOR KEY PLAN |
| X1.9 SEVENTH FLOOR KEY PLAN |
| 18079 SEVENTH FLOOR PLANS |
| X1.9 SEVENTH FLOOR KEY PLAN |
File details come from the government source that posted it. Updated .