About this file

36C25019B0046 541-19-201 - Project Drawings Combined Final-Part1.pdf

View the file

Other files

File Type Posted
36C25019C0255-000.docx DOCX document
36C25019B0046-0001002.pdf PDF
36C25019B0046-0001001.pdf PDF
36C25019B0046-0001000.docx DOCX document
36C25019B0046-0001000.docx DOCX document
36C25019B0046-0001001.pdf PDF
36C25019B0046-0001002.pdf PDF
36C25019B0046-004.pdf PDF
36C25019B0046-003.pdf PDF
36C25019B0046-005.pdf PDF
36C25019B0046-007.pdf PDF
36C25019B0046-001.docx DOCX document
36C25019B0046-002.pdf PDF
36C25019B0046-006.pdf PDF
36C25019B0046-006.pdf PDF
36C25019B0046-005.pdf PDF
36C25019B0046-007.pdf PDF
36C25019B0046-001.docx DOCX document
36C25019B0046-002.pdf PDF
36C25019B0046-004.pdf PDF
36C25019B0046-000.docx DOCX document
36C25019B0046-000.docx DOCX document
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

10701 EAST BLVD. CLEVELAND, OH. 44106

DEPARTMENT OF VETERANS AFFAIRS MEDICAL CENTER - WADE PARK

Upgrade Smart Building System (Tridium)

DRAWING INDEX

GENERAL

X0.1 COVER SHEET

X1.1 SUB BASEMENT KEY PLAN

X1.2 BASEMENT KEY PLAN

X1.3 FIRST FLOOR KEY PLAN

X1.4 SECOND FLOOR KEY PLAN

X1.5 THIRD FLOOR KEY PLAN

X1.6 FOURTH FLOOR KEY PLAN

X1.7 FIFTH FLOOR KEY PLAN

X1.8 SIXTH FLOOR KEY PLAN

X1.9 SEVENTH FLOOR KEY PLAN

X1.10 LEARNING EXCHANGE KEY PLAN

TECHNOLOGY

T0.1 TECHNOLOGY LEGEND

T1.1 SUB-BASEMENT AREA PLANS - FOTP-19

T1.2 BASEMENT AREA PLANS - FOTP-4 AND FOTP-10

T1.3 BASEMENT AREA PLANS - FOTP-6 AND FOTP-8

T1.4 BASEMENT AREA PLANS - FOTP-9

T1.5 BASEMENT AREA PLANS - FOTP-11, FOTP-15 AND FOTP-19

T1.6 FIRST FLOOR AREA PLANS - FOTP-4, FOTP-6, FOTP-10 AND FOTP-19

T1.7 FIRST FLOOR AREA PLANS - FOTP-7, FOTP-14, AND FOTP-15

T1.8 SECOND FLOOR AREA PLANS - FOTP-6, FOTP-15 AND FOTP-19

T1.9 SECOND FLOOR AREA PLANS - FOTP-15 AND FOTP-16

T1.10 THIRD FLOOR AREA PLANS - FOTP-01, FOTP-17 AND FOTP-19

T1.11 FOURTH FLOOR AREA PLANS - FOTP-3 AND FOTP-19

T1.12 FIFTH FLOOR AREA PLANS - FOTP-3, FOTP-19, AND FOTP-20

T1.13 SIXTH FLOOR AREA PLANS - FOTP-12

T1.14 SEVENTH FLOOR AREA PLANS - FOTP-3

T1.15 SEVENTH FLOOR AREA PLANS - FOTP-12

T1.16 LEARNING EXCHANGE FLOOR PLANS - FOTP-18

T2.1 NEW NETWORK BACKBONE

T2.2 ANDOVER NETWORK DEMOLITION SCHEMATIC

T2.3 ANDOVER NETWORK FOTP CONNECTION SCHEMATIC

T2.4 CARES TOWER ANDOVER NETWORK DEMOLITION SCHEMATIC

T2.5 CARES TOWER ANDOVER NETWORK FOTP CONNECTION SCHEMATIC

T3.1 FOTP SWITCH PORT LISTS (1 OF 2)

T3.2 FOTP SWITCH PORT LISTS (2 OF 2)

T3.3 TECHNOLOGY DETAILS

T3.4 DEVICE CONNECTION SCHEMATICS

T3.5 DEVICE CONNECTION SCHEMATICS

T3.6 ELECTRICAL METER CONNECTION DETAILS

MECHANICAL

M1.1 BOILER FLUE ECONOMIZER ENERGY METER PLAN

Fredrick, Fredrick & Heller Engineers Mechanical & Electrical Engineer 672 E. Royalton Rd., Broadview Hgts, Ohio 44147

100% CONSTRUCTION DOCUMENTS

May 31, 2019

PROJECT OBJECTIVES:

1. UPGRADE TRIDIUM SERVER FROM NIAGARA AX TO NIAGARA N4.

1.1. REMAP ALL EXISTING POINTS AFTER UPGRADE

1.2. CONVERT DATA GATHERING TO STORE ALL LONG TERM DATA ON TRIDIUM DATABASE

1.3. REPLACE EXISTING NIAGARA A4 JACES WITH NIAGARA 8000 VYKON N4 (TOTAL 7)

1.4. ESTABLISH A FACILITY-WIDE NAMING CONVENTION FOR ALL DEVICE POINTS.

2. INTEGRATE SCHNEIDER, EATON, AND FLEXIM ELECTRIC AND MECHANICAL METERING SYSTEMS INTO THE TRIDIUM NETWORK.

2.1. PROVIDE NEW MODBUS TO BACNET/IP GATEWAYS ADJACENT TO FOTPs.

2.2. EXTEND COMMUNICATION CABLING FROM EXISTING METERING DEVICES TO NEW GATEWAYS.

2.3. PROVIDE NEW SMART BUILDING SYSTEM DATA OUTLETS ADJACENT TO GATEWAYS. EXTEND PATCH CABLE FROM DATA

JACK TO GATEWAY.

3. UPGRADE ANDOVER BAS NETWORK - ANDOVER BUILDING AUTOMATION DEVICES EXIST ON AN ISOLATED DATA NETWORK

CONSISTING OF UNMANAGED NETWORK SWITCHES OPERATING IN A PEER-TO-PEER CONFIGURATION. THIS NETWORK

COMMUNICATES DATA TO THE EXISTING SMART BUILDING SYSTEM (SBS) NETWORK VIA ONE CROSSOVER CONNECTION. THIS

PROJECT WILL EXPAND THE SBS NETWORK AND MOVE THE ANDOVER NETWORK TO A VIRTUAL SUB-NETWORK OPERATING ON

THE SAME HARDWARE AS THE SBS BY:

3.1. ADDING NEW FIBER OPTIC TERMINATION PANELS (FOTPs) TO THE SBS NETWORK AT VARIOUS LOCATIONS THROUGHOUT

THE CAMPUS.

3.2. EXTENDING NEW DATA CABLES FROM THE EXISTING AND NEW FOTPs TO NEW SMART BUILDING SYSTEM DATA OUTLETS

AT THE EXISTING ANDOVER DEVICE LOCATIONS.

3.3. PROVIDING NEW PATCH CABLES BETWEEN THE DATA JACKS AND EXISTING ANDOVER DEVICES.

3.4. PROVIDING A NEW VIRTUAL SUBNET ON THE SBS HARDWARE OVER WHICH THE ANDOVER DEVICES WILL COMMUNICATE.

THE ANDOVER DEVICES CURRENTLY HAVE STATIC IP ADDRESSES. THE NEW VIRTUAL NETWORK SHALL BE CONFIGURED

TO MAINTAIN THE EXISTING DEVICE IP ADDRESSES.

3.5. FINALLY, REMOVE ALL ABANDONED ANDOVER NETWORK SWITCHES AFTER CUTOVER HAS OCCURRED.

4. INTEGRATE EXISTING MAIN SECONDARY ELECTRICAL METER AND SUB BREAKER ELECTRICAL METERS INTO SMART BUILDING

SYSTEM.

4.1. MAP AND TAG WITH HISTORY AND GRAPHICS INTO TRIDIUM SBS.

5. TIE STEAM TRAP MONITORING SYSTEM INTO THE TRIDIUM SBS.

5.1. PROVIDE NEW MODBUS TO BACNET/IP GATEWAY ADJACENT TO FOTP.

5.2. EXTEND COMMUNICATION CABLING FROM EXISTING SYSTEM RECEIVER TO NEW GATEWAY.

5.3. PROVIDE NEW SMART BUILDING SYSTEM DATA OUTLETS ADJACENT TO GATEWAY. EXTEND PATCH CABLE FROM DATA

JACK TO GATEWAY.

5.4. MAP AND TAG TRAPS WITH HISTORY AND GRAPHICS INTO TRIDIUM SBS. ALLOW 6 POINTS PER STEAM TRAP FOR 68 STEAM

TRAPS.

6. INSTALL BTU METERS TO MEASURE ENERGY SAVINGS ON EACH BOILER ECONOMIZER SYSTEM.

6.1. MAP AND TAG WITH HISTORY AND GRAPHICS INTO TRIDIUM SBS.

th re e i n c h e s o n e f o o tA o n e -q u a rt e r in c h o n e f o o t o n e -e ig h th i n c h o n e f o o t

Revisions th re e -e ig h th s i n c h o n e f o o t

F o n e -h a lf i n c h o n e f o o t

E

2 3 4 5 o n e a n d o n e -h a lf i n c h e s o n e f o o t

C o n e i n c h o n e f o o t th re e -q u a rt e rs i n c h o n e f o o t

D

B

1 2 3 4 5

CheckedApproved: Division Chief

Approved: Service Director

Drawing Title

6 7

Location

Building Number

Project Title

Dwg. Of

Drawn

Project No.

DRAWING NO.

Date

F E

6 7 8

C D

B

A

COVER SHEET

10701 EAST BLVD. CLEVELAND, OHIO

DATE

CHIEF Planning and Construction

CHIEF, Occupational Health & Safety

CHIEF, IRM

ASSOCIATE DIRECTOR 00A (B)

CHIEF, ENGINEERING 138

DIRECTOR 00

APPROVALS DATE

FACILITY MANAGER

SHOP FOREMAN 138

APPROVALS DATE APPROVALS

05-15-19 Office of

Facilities Management

SITE PLAN

1 MPL RPH

NORTH

Scale = None

VA

Upgrade Smart Building

System (Tridium) 541-19-201

X0.1

T1.1

F.10 AND F.04 TO

THIRD FLOOR

F.10 TO BASEMENT

F.04 TO BASEMENT

ROUTE F.04 AND F.10 IN

EXISTING CABLE TRAY

ROUTE F.04 AND F.10 IN

NEW J-HOOKS.

ROUTE F.04 IN

EXISTING CABLE TRAY

ROUTE F.10 IN NEW

J-HOOKS

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS:

VAMC - WADE PARK

ARCHITECT:

Office of Facilities

Management

Upgrade Smart Building

System (Tridium)

05/31/19

541-19-201

100% CONSTRUCTION DOCUMENTS SUBMISSION 05/31/19

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 07/19/19

0'

SCALE: 1" = 40'-0"

20' 40' 80' 160'

SUB-BASEMENT KEY PLAN

SUB-BASEMENT KEY PLAN

X1.1

RPHMPL

CABLE ROUTING NOTE

FIBER OPTIC CABLE ROUTING SHOWN ON THIS DRAWING IS APPROXIMATE TO INDICATE GENERAL SCOPE OF

WORK. CONTRACTOR SHALL FIELD VERIFY ACTUAL ROUTING AND SUBMIT SHOP DRAWINGS TO VA COR FOR

APPROVAL AND COORDINATION. SHOP DRAWINGS SHALL INDICATE PROPOSED ROUTE, FLOOR PENETRATION

LOCATIONS, LIFE SAFETY BARRIER PENETRATIONS, ETC.

T1.2

T1.4

T1.4

X-FOTP-11

X-FOTP-8

X-FOTP-10

X-FOTP-9

T1.5

T1.5

T1.3

T1.2

T1.2

T1.3

T1.3

T1.5

T1.5

F.10 TO

SUB-BASEMENT

F.17 TO FIRST

FLOOR

F.19 TO THIRD

FLOOR

F.17

F.10

F.19

F.09

F.04

F.04 TO FIRST

FLOOR 1F-516

F.04 TO SUB-BASEMENT

F.09 TO THIRD FLOOR

F.04 AND F.10 FROM SUB-BASEMENT TO THIRD FLOOR.

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS:

VAMC - WADE PARK

ARCHITECT:

Office of Facilities

Management

Upgrade Smart Building

System (Tridium)

05/31/19

541-19-201

100% CONSTRUCTION DOCUMENTS SUBMISSION 05/31/19

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 07/19/19

0'

SCALE: 1" = 40'-0"

20' 40' 80' 160'

BASEMENT KEY PLAN

BASEMENT KEY PLAN

X1.2

RPHMPL

LEGEND

CABLE ROUTING NOTE

FIBER OPTIC CABLE ROUTING SHOWN ON THIS DRAWING IS APPROXIMATE TO INDICATE GENERAL SCOPE OF

WORK. CONTRACTOR SHALL FIELD VERIFY ACTUAL ROUTING AND SUBMIT SHOP DRAWINGS TO VA COR FOR

T1.6

T1.6

T1.6

X-FOTP-6

X-FOTP-4

X-FOTP-7

X-FOTP-14

M1.1

T1.7

T1.7

T1.7

T1.7

T1.6

T1.7

F.16 TO SECOND

FLOOR WEST

PENTHOUSE

F.16

F.14

F.15

F.14 AND F.15 TO

SECOND FLOOR

EAST PENTHOUSE

F.15 TO THIRD FLOOR.

F.09 FROM BASEMENT TO THIRD FLOOR

F.04 AND F.10 RISER FROM SUB-BASEMENT TO THIRD FLOOR.

F.17 TO SECOND FLOOR

F.17 TO BASEMENT

F.19 FROM

BASEMENT TO

THIRD FLOOR

T1.6

T1.7

T1.7

0'

SCALE: 1" = 40'-0"

20' 40' 80' 160'

FIRST FLOOR KEY PLAN

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS:

VAMC - WADE PARK

ARCHITECT:

Office of Facilities

Management

Upgrade Smart Building

System (Tridium)

05/31/19

541-19-201

100% CONSTRUCTION DOCUMENTS SUBMISSION 05/31/19

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 07/19/19

FIRST FLOOR KEY PLAN

X1.3

RPHMPL

CABLE ROUTING NOTE

FIBER OPTIC CABLE ROUTING SHOWN ON THIS DRAWING IS APPROXIMATE TO INDICATE GENERAL SCOPE OF

WORK. CONTRACTOR SHALL FIELD VERIFY ACTUAL ROUTING AND SUBMIT SHOP DRAWINGS TO VA COR FOR

T1.8

T1.9

T1.8

T1.9

NEW

FOTP-15

NEW

FOTP-16

T1.8

F.17

F.17 TO FIRST FLOOR

F.17 TO THIRD FLOOR

F.16 TO FIRST FLOOR

F.16

F.14 AND

F.15 TO

FIRST

FLOOR

F.15 TO THIRD FLOOR.

F.09 FROM BASEMENT TO THIRD FLOOR

F.04 AND F.10 RISER FROM SUB-BASEMENT TO THIRD FLOOR.

F.19 FROM

BASEMENT TO

THIRD FLOOR

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS:

VAMC - WADE PARK

ARCHITECT:

Office of Facilities

Management

Upgrade Smart Building

System (Tridium)

05/31/19

541-19-201

100% CONSTRUCTION DOCUMENTS SUBMISSION 05/31/19

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 07/19/19

0'

SCALE: 1" = 40'-0"

20' 40' 80' 160'

SECOND FLOOR KEY PLAN

SECOND FLOOR KEY PLAN

X1.4

RPHMPL

CABLE ROUTING NOTE

FIBER OPTIC CABLE ROUTING SHOWN ON THIS DRAWING IS APPROXIMATE TO INDICATE GENERAL SCOPE OF

WORK. CONTRACTOR SHALL FIELD VERIFY ACTUAL ROUTING AND SUBMIT SHOP DRAWINGS TO VA COR FOR

FOTP

NEW

FOTP-17

NEW

FOTP-01

T1.10

FOTP

NEW

FOTP-19

T1.10

T1.10

T1.10

FOTP

F.17 DOWN TO

SECOND FLOOR

F.04, F.09, F.10 AND F.15

DOWN TO SECOND

FLOOR.

F.20 TO

FOURTH

FLOOR.

F.19 DOWN TO

SECOND

FLOOR

F.20

T1.10

TAGNUMBER

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS:

VAMC - WADE PARK

ARCHITECT:

Office of Facilities

Management

Upgrade Smart Building

System (Tridium)

05/31/19

541-19-201

100% CONSTRUCTION DOCUMENTS SUBMISSION 05/31/19

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 07/19/19

0'

SCALE: 1" = 40'-0"

20' 40' 80' 160'

THIRD FLOOR KEY PLAN

THIRD FLOOR KEY PLAN

X1.5

RPHMPL

LEGEND

CABLE ROUTING NOTE

FIBER OPTIC CABLE ROUTING SHOWN ON THIS DRAWING IS APPROXIMATE TO INDICATE GENERAL SCOPE OF

WORK. CONTRACTOR SHALL FIELD VERIFY ACTUAL ROUTING AND SUBMIT SHOP DRAWINGS TO VA COR FOR

T1.11

T1.11

F.20 TO FIFTH FLOOR

F.20 TO THIRD FLOOR

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS:

VAMC - WADE PARK

ARCHITECT:

Office of Facilities

Management

Upgrade Smart Building

System (Tridium)

05/31/19

541-19-201

100% CONSTRUCTION DOCUMENTS SUBMISSION 05/31/19

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 07/19/19

0'

SCALE: 1" = 40'-0"

20' 40' 80' 160'

FOURTH FLOOR KEY PLAN

FOURTH FLOOR KEY PLAN

X1.6

RPHMPL

CABLE ROUTING NOTE

FIBER OPTIC CABLE ROUTING SHOWN ON THIS DRAWING IS APPROXIMATE TO INDICATE GENERAL SCOPE OF

WORK. CONTRACTOR SHALL FIELD VERIFY ACTUAL ROUTING AND SUBMIT SHOP DRAWINGS TO VA COR FOR

Xref .\Reference\18079 ARCH 5 COLS.dwg

NEW

FOTP-20

T1.12

T1.12

T1.12

F.20 TO FIFTH FLOOR

T1.12

EQ-HMP3

EQ-LMP3

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS:

VAMC - WADE PARK

ARCHITECT:

Office of Facilities

Management

Upgrade Smart Building

System (Tridium)

05/31/19

541-19-201

100% CONSTRUCTION DOCUMENTS SUBMISSION 05/31/19

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 07/19/19

0'

SCALE: 1" = 40'-0"

20' 40' 80' 160'

FIFTH FLOOR KEY PLAN

FIFTH FLOOR KEY PLAN

X1.7

RPHMPL

LEGEND

CABLE ROUTING NOTE

FIBER OPTIC CABLE ROUTING SHOWN ON THIS DRAWING IS APPROXIMATE TO INDICATE GENERAL SCOPE OF

WORK. CONTRACTOR SHALL FIELD VERIFY ACTUAL ROUTING AND SUBMIT SHOP DRAWINGS TO VA COR FOR

T1.13

T1.13

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS:

VAMC - WADE PARK

ARCHITECT:

Office of Facilities

Management

Upgrade Smart Building

System (Tridium)

05/31/19

541-19-201

100% CONSTRUCTION DOCUMENTS SUBMISSION 05/31/19

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 07/19/19

0'

SCALE: 1" = 40'-0"

20' 40' 80' 160'

SIXTH FLOOR KEY PLAN

SIXTH FLOOR KEY PLAN

X1.8

RPHMPL

LIFE SAFETY LEGEND

T1.14

X-FOTP-3

X-FOTP-12

T1.15

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS:

VAMC - WADE PARK

ARCHITECT:

Office of Facilities

Management

Upgrade Smart Building

System (Tridium)

05/31/19

541-19-201

100% CONSTRUCTION DOCUMENTS SUBMISSION 05/31/19

FINAL CONSTRUCTION DOCUMENTS SUBMISSION 07/19/19

0'

SCALE: 1" = 40'-0"

20' 40' 80' 160'

SEVENTH FLOOR KEY PLAN

SEVENTH FLOOR KEY PLAN

X1.9

RPHMPL

LIFE SAFETY LEGEND

X0.1 COVER SHEET
X01 - COVER SHEET
X0.1 COVER SHEET
X1.1 SUBBASEMENT KEY PLAN
18079 SUBBASEMENT FLOOR PLANS
X1.1 SUBBASEMENT KEY PLAN
X1.2 BASEMENT KEY PLAN
18079 BASEMENT FLOOR PLANS
X1.2 BASEMENT KEY PLAN
X1.3 FIRST FLOOR KEY PLAN
18079 FIRST FLOOR PLANS
X1.3 FIRST FLOOR KEY PLAN
X1.4 SECOND FLOOR KEY PLAN
18079 SECOND FLOOR PLANS
X1.4 SECOND FLOOR KEY PLAN
X1.5 THIRD FLOOR KEY PLAN
18079 THIRD FLOOR PLANS
X1.5 THIRD FLOOR KEY PLAN
X1.6 FOURTH FLOOR KEY PLAN
18079 FOURTH FLOOR PLANS
X1.6 FOURTH FLOOR KEY PLAN
X1.7 FIFTH FLOOR KEY PLAN
18079 FIFTH FLOOR PLANS
X1.7 FIFTH FLOOR KEY PLAN
X1.8 SIXTH FLOOR KEY PLAN
18079 SIXTH FLOOR PLANS
X1.8 SIXTH FLOOR KEY PLAN
X1.9 SEVENTH FLOOR KEY PLAN
18079 SEVENTH FLOOR PLANS
X1.9 SEVENTH FLOOR KEY PLAN

File details come from the government source that posted it.