36C25018B0817-009.pdf

PDF 16 MB Posted

Attached to
Expand 8th Floor - Mental Health 506-330
Solicitation number
36C25018B0817
Issued by

About this file

36C25018B0817 S02 - Drawings VOL2-Part 4 - 506330.pdf

View the file

Other files

File Type Posted
36C25018B0817-0005000.docx DOCX document
36C25018B0817-0005001.pdf PDF
36C25018B0817-0005003.pdf PDF
36C25018B0817-0005002.pdf PDF
36C25018B0817-0004000.docx DOCX document
36C25018B0817-0003001.docx DOCX document
36C25018B0817-0003000.docx DOCX document
36C25018B0817-0002000.docx DOCX document
36C25018B0817-0001000.docx DOCX document
36C25018B0817-011.pdf PDF
36C25018B0817-005.pdf PDF
36C25018B0817-003.pdf PDF
36C25018B0817-007.pdf PDF
36C25018B0817-008.pdf PDF
36C25018B0817-012.pdf PDF
36C25018B0817-001.docx DOCX document
36C25018B0817-010.pdf PDF
36C25018B0817-013.docx DOCX document
36C25018B0817-016.docx DOCX document
36C25018B0817-006.pdf PDF
36C25018B0817-014.pdf PDF
36C25018B0817-015.pdf PDF
36C25018B0817-002.pdf PDF
36C25018B0817-004.pdf PDF
36C25018B0817-000.docx DOCX document
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LOBBY

B184

KIOSK ALCOVE

CB184A

CR1B-1 R1B-1

L1B-1

CL1B-1

LS1B-1

I J

J

K

K

I I

I'

17 17

H''F''E''

A B C D E F G H

G'F'E' H' J'

1.9

4.1

B.3

1W-EF-1

WAITING

CB184

CR1B-1-1

COFFEE SHOP

B184A

R1B-1-19

ICE

R1B-1-21 R1B-1-23

R1B-1-25

REFRIG

R1B-1-27 R1B-1-29

R1B-1-31,33

R1B-1-35,37 6

R1B-1-18 R1B-1-18

R1B-1-30

R1B-1-17

R1B-1-17

R1B-1-20

R1B-1-20

R1B-1-20

CR1B-1-8

R1B-1-22

R1B-1-24 R1B-1-24

R1B-1-24

R1B-1-26

SHADES

(TYP)

R1B-1-26

SHADES

(TYP)

1W-AHU-1

(ON ROOF ABOVE)

REFER TO

ONE-LINE DIAGRAM

ON DRAWING E501

R1B-1-24

(AT UNIT

ON ROOF)

R1B-1-28

3R

CR1B-1-30,32

ACU-3

(ON ROOF)

15/2 CB, 2#12,#12G,3/4"C

1W-AC-1

R1B-1-30

R1B-1-39

R1B-1-30

CR1B-1-6 CR1B-1-6

7 7

UNIT 'B'

UNIT 'A'

UNIT 'B'

UNIT 'A'

R1B-1-30 R1B-1-30

R1B-1-22

1W-CUH-1

A. ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR WIRING ALL ELECTRICAL

ITEMS SHOWN ON THIS DRAWING.

B. WHERE CONNECTED TO A 20A. BRANCH CIRCUIT SUPPLYING AN INDIVIDUAL

RECEPTACLE (SIMPLEX OR DUPLEX), THE RECEPTACLE SHALL BE RATED AT 20A.

C. VERIFY LOCATIONS AND ROUGH-IN REQUIREMENTS OF ALL OWNER FURNISHED

EQUIPMENT PRIOR TO ROUGH-IN.

D. CIRCUIT WIRING IS NOT SHOWN EXCEPT FOR SWITCHING INTENT OF FIXTURES AND

CONTROL OF DEVICES.

E. PROVIDE PROPER NUMBER OF CONDUCTORS TO ACHIEVE CIRCUITING AND

SWITCHING SHOWN.

F. CIRCUIT NUMBERS AT DEVICES CORRESPOND TO PANELBOARD BREAKERS (SEE

PANELBOARD SCHEDULE). BRANCH CIRCUITS SHALL BE SIZED ACCORDING TO THE

CIRCUIT BREAKER RATING, UNLESS INDICATED OTHERWISE.

G. USE #10 AWG CONDUCTORS FOR 20 AMPERE, 120 VOLT BRANCH CIRCUITS LONGER

THAN 75 FEET, UNLESS SPECIFICALLY INDICATED OTHERWISE. THIS SHALL BE

REQUIRED FOR THE ENTIRE LENGTH OF THE CIRCUIT.

H. USE #10 AWG CONDUCTORS FOR 20 AMPERE, 277 VOLT BRANCH CIRCUITS LONGER

THAN 175 FEET, UNLESS SPECIFICALLY INDICATED OTHERWISE. THIS SHALL BE

REQUIRED FOR THE ENTIRE LENGTH OF THE CIRCUIT.

I. ALL RECEPTACLE LOADS TO BE FED FROM EXISTING RECEPTACLE PANEL(S) IN THE

EXISTING ELECTRICAL ROOM SERVING THE AREA. INSTALL NEW CIRCUIT BREAKERS

AS REQURIED.

POWER GENERAL NOTES

POWER KEYNOTES

1. ALL PANELBOARDS IN THIS ROOM ARE EXISTING TO REMAIN. ADD CIRCUIT BREAKERS

AS REQUIRED.

2. PROVIDE POWER TO TRANSFORMER FOR FLUSH VALVE/AUTO FAUCETS.

TRANSFORMER SUPPLIED BY PLUMBING CONTRACTOR.

3. COORDINATE EXACT LOCATION OF FURNITURE FEEDS WITH FURNITURE

PROVIDER/INSTALLER.

4. EXISTING SECURITY AND COMMUNICATIONS EQUIPMENT IN THIS AREA TO REMAIN.

COORDINATE AS REQUIRED TO KEEP EQUIPMENT OPERATIONAL THROUGHOUT.

5. 40/2 CB, 2#8,#10G, 3/4" C.

6. 35/2 CB, 3#8, #10G, 3/4"C.

7. DOOR OPERATOR. COMPONENTS PROVIDED WITH DOOR HARDWARE. EC SHALL

PROVIDE ALL WIRING AND FINAL CONNECTIONS FOR A COMPLETE INSTALLATION.

8. REUSE EXISTING RECEPTACLE AND CIRCUIT FOR NEW EWC.

9. EXTEND EXISTING CIRCUIT(S) AS REQUIRED TO RELOCATE CONDUIT RUNS. ROUTE

CONDUIT IN ENCLOSURE TIGHT TO WALL.

10. SHADE CONTROLS INSTALLED IN COFFEE SHOP B203. LABEL SWITCHES FOR SHADE

CONTROLS "SHADES".

N

1811 4 Mile Rd N.E., Grand Rapids, MI 49525 www.progressiveae.com

616 361 2664 OFFICE 616 361 1493 FAX

architecture +engineering

SEVEN

GENERATIONS

4664 Campus Drive, Suite 101

Kalamazoo, MI 49008

P: 269.927.0144 www.7GenAE.com

2 3 4 5 6 7 8 9

2 3 4 5 6 7 8 91

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANTS ARCHITECT/ENGINEERS

DRAWING TITLE:

APPROVED: PROJECT DIRECTOR LOCATION

PROJECT TITLE:

DATE: CHECKED: DRAWN:

PROJECT NUMBER:

BUILDING NUMBER:

DRAWING NUMBER:

DWG. ___ OF ___

7GAE PROJECT NO.: XXXXXX FILE NAME: TITL-BLK-3042-VA.DWG

Office of

Construction and Facilities

Management

VA FORM 08-6231

o n e e ig h th i n c h o n e o e q u a rt e r in c h o th re e e ig h th s in c h o e h a lf i n c h o e q u a rt e rs i n c h o e i n c h o e a n d o n e h a lf i n c h e s o e i n c h e s o

6 "

Department of Veterans

68 East Michigan Ave.

Battle Creek, MI 49017

P: 269.224.3182 www.wbkengineering.com

451 Hungerford Dr. 4th Floor

Rockville, MD 20850

P: 301.770.3520 F: 301.770.3521 www.nikasolutions.com 205

SCALE: As indicated

EP101A

506-330

ANN ARBOR VAMC

OCT. 27, 2017

1W

SDT SCG

POWER PLAN - 1ST FLOOR -

UNIT A

EXPAND 8TH FLOOR

MENTAL HEALTH

NORTH

SCALE: 1/4" = 1'-0"

FIRST FLOOR POWER

PLAN - UNIT A

REVISIONS DATE

Revision 1 Date 1

A. ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR WIRING ALL ELECTRICAL

ITEMS SHOWN ON THIS DRAWING.

B. WHERE CONNECTED TO A 20A. BRANCH CIRCUIT SUPPLYING AN INDIVIDUAL

RECEPTACLE (SIMPLEX OR DUPLEX), THE RECEPTACLE SHALL BE RATED AT 20A.

C. VERIFY LOCATIONS AND ROUGH-IN REQUIREMENTS OF ALL OWNER FURNISHED

EQUIPMENT PRIOR TO ROUGH-IN.

D. CIRCUIT WIRING IS NOT SHOWN EXCEPT FOR SWITCHING INTENT OF FIXTURES AND

CONTROL OF DEVICES.

E. PROVIDE PROPER NUMBER OF CONDUCTORS TO ACHIEVE CIRCUITING AND

SWITCHING SHOWN.

F. CIRCUIT NUMBERS AT DEVICES CORRESPOND TO PANELBOARD BREAKERS (SEE

PANELBOARD SCHEDULE). BRANCH CIRCUITS SHALL BE SIZED ACCORDING TO THE

CIRCUIT BREAKER RATING, UNLESS INDICATED OTHERWISE.

G. USE #10 AWG CONDUCTORS FOR 20 AMPERE, 120 VOLT BRANCH CIRCUITS LONGER

THAN 75 FEET, UNLESS SPECIFICALLY INDICATED OTHERWISE. THIS SHALL BE

REQUIRED FOR THE ENTIRE LENGTH OF THE CIRCUIT.

H. USE #10 AWG CONDUCTORS FOR 20 AMPERE, 277 VOLT BRANCH CIRCUITS LONGER

THAN 175 FEET, UNLESS SPECIFICALLY INDICATED OTHERWISE. THIS SHALL BE

REQUIRED FOR THE ENTIRE LENGTH OF THE CIRCUIT.

I. ALL RECEPTACLE LOADS TO BE FED FROM EXISTING RECEPTACLE PANEL(S) IN THE

EXISTING ELECTRICAL ROOM SERVING THE AREA. INSTALL NEW CIRCUIT BREAKERS

AS REQURIED.

POWER GENERAL NOTES

POWER KEYNOTES

1. ALL PANELBOARDS IN THIS ROOM ARE EXISTING TO REMAIN. ADD CIRCUIT BREAKERS

AS REQUIRED.

2. PROVIDE POWER TO TRANSFORMER FOR FLUSH VALVE/AUTO FAUCETS.

TRANSFORMER SUPPLIED BY PLUMBING CONTRACTOR.

3. COORDINATE EXACT LOCATION OF FURNITURE FEEDS WITH FURNITURE

PROVIDER/INSTALLER.

4. EXISTING SECURITY AND COMMUNICATIONS EQUIPMENT IN THIS AREA TO REMAIN.

COORDINATE AS REQUIRED TO KEEP EQUIPMENT OPERATIONAL THROUGHOUT.

5. 40/2 CB, 2#8,#10G, 3/4" C.

6. 35/2 CB, 3#8, #10G, 3/4"C.

7. DOOR OPERATOR. COMPONENTS PROVIDED WITH DOOR HARDWARE. EC SHALL

PROVIDE ALL WIRING AND FINAL CONNECTIONS FOR A COMPLETE INSTALLATION.

8. REUSE EXISTING RECEPTACLE AND CIRCUIT FOR NEW EWC.

9. EXTEND EXISTING CIRCUIT(S) AS REQUIRED TO RELOCATE CONDUIT RUNS. ROUTE

CONDUIT IN ENCLOSURE TIGHT TO WALL.

10. SHADE CONTROLS INSTALLED IN COFFEE SHOP B203. LABEL SWITCHES FOR SHADE

CONTROLS "SHADES".

STAIR

CORRIDOR

CB184C

J K L I I

I

I'

22'

L

A B C D E F G H

G'F'E' H' K'

4.1

B.3

1W-EF-1

COFFEE SHOP

B184A

R1B-1-19

ICE

R1B-1-21 R1B-1-23

R1B-1-29

R1B-1-17

R1B-1-17

R1B-1-17

R1B-1-24 R1B-1-24

R1B-1-28

3R

CR1B-1-30,32

ACU-3

(ON ROOF)

15/2 CB, 2#12,#12G,3/4"C

UNIT 'B'

UNIT 'A'

UNIT

'B'

UNIT

'A'

N

1811 4 Mile Rd N.E., Grand Rapids, MI 49525 www.progressiveae.com

616 361 2664 OFFICE 616 361 1493 FAX

architecture +engineering

SEVEN

GENERATIONS

4664 Campus Drive, Suite 101

Kalamazoo, MI 49008

P: 269.927.0144 www.7GenAE.com

2 3 4 5 6 7 8 9

2 3 4 5 6 7 8 91

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANTS ARCHITECT/ENGINEERS

DRAWING TITLE:

APPROVED: PROJECT DIRECTOR LOCATION

PROJECT TITLE:

DATE: CHECKED: DRAWN:

PROJECT NUMBER:

BUILDING NUMBER:

DRAWING NUMBER:

DWG. ___ OF ___

7GAE PROJECT NO.: XXXXXX FILE NAME: TITL-BLK-3042-VA.DWG

Office of

Construction and Facilities

Management

VA FORM 08-6231

o n e e ig h th i n c h o e q u a rt e r in c h o e e ig h th s in c h o e h a lf i n c h o e q u a rt e rs i n c h o e i n c h o e a n d o n e h a lf i n c h e s o e i n c h e s o

6 "

Department of Veterans

68 East Michigan Ave.

Battle Creek, MI 49017

P: 269.224.3182 www.wbkengineering.com

451 Hungerford Dr. 4th Floor

Rockville, MD 20850

P: 301.770.3520 F: 301.770.3521 www.nikasolutions.com 205

SCALE: As indicated

EP101B

506-330

ANN ARBOR VAMC

OCT. 27, 2017

1W

SDT SCG

POWER PLAN - 1ST FLOOR -

UNIT B

EXPAND 8TH FLOOR

MENTAL HEALTH

NORTH

SCALE: 1/4" = 1'-0"

FIRST FLOOR POWER

PLAN - UNIT B

HAC

B805

OFFICE

B804

CHIEF

B822a

SECRETARY

B822

OFFICE

B824

OFFICE

B825

OFFICE

B827

OFFICE

B826

OFFICE

B803

OFFICE

B802

OFFICE

B828

OFFICE

B801

OFFICE

B800

EXAM

B829

ACOS

A837

PIMS

A838

CACS & INFOMATICS

A839

FELLOWS ROOM

A831A

WOMEN'S RESTROOM

A830A

MEN'S RESTROOM

A830

J K IH''F''

15 15 15

L

G'F' POM N QE' H' SR

4'

7'

J'

3.9

K'

CL8C-1

LS8C-1

L8C-1

EM8C-1

R8C-1

R8C-2

CR8C-1

COPY/BREAK

A843B

SERVICE ELEV

A843

UTILIZ. MGMT.

A841

SWING OFFICE

A842

FLOAT

A844

FLOAT

A845

Q. MGMT.

A846

TEAM ROOM

A846A

SWING OFFICE

A848

CORRIDOR

COMMUNICATIONS

A843A

R8D-1 R8D-2

CR8D-1

CL8D-1

LS8D-1

L8D-1

1W-FCU-6

1W-FCU-5

1W-FCU-7

1W-FCU-8

1W-FCU-24

1W-FCU-25

1W-FCU-26

1W-FCU-27

1W-FCU-29

1W-FCU-23

1W-FCU-22

1W-FCU-21

1W-FCU-20

1W-FCU-33

1W-FCU-31

1W-FCU-32

1W-FCU-30

1W-FCU-39

1W-FCU-40

1W-FCU-41

1W-FCU-42

1W-FCU-34

EXIST 8DD

R8B-1-18 R8B-1-26R8B-1-28

R8B-1-28

R8C-1-13

R8C-1-13 R8C-1-13

R8C-1-13 R8C-1-13

R8C-1-15

R8C-1-15

R8C-1-15

R8C-1-15R8C-1-15

R8C-1-17

R8C-1-17

R8C-1-17

R8C-1-17 R8C-1-17

R8C-1-19 R8C-1-19

R8C-1-19

R8C-1-19

R8C-1-8

R8C-1-8

R8C-1-10

R8C-1-10

R8C-1-10

R8C-1-8 R8C-1-8

R8C-1-8

R8C-1-10

R8C-1-10

R8C-1-12

R8C-1-12

R8C-1-12

R8C-1-12

R8C-1-12

R8C-1-14

R8C-1-14

R8C-1-14

R8C-1-14 R8C-1-14

R8C-1-16 R8C-1-16

R8C-1-16

R8C-1-16

R8C-1-16

R8C-1-18

R8C-1-18

R8C-1-18

R8C-1-18

R8C-1-20 R8C-1-22

R8C-1-22 R8C-1-20

R8C-1-24 R8C-1-26

R8C-1-30

R8C-1-28

R8C-1-28R8C-1-26 R8C-1-26

R8D-1-13

R8D-1-13

R8D-1-13 R8D-1-9

R8D-1-9

R8D-1-7

R8D-1-7

R8D-1-11 R8D-1-3

R8D-1-11

R8D-1-11

R8D-1-11

R8D-1-5

R8D-1-5

R8D-1-3

R8D-1-3

R8D-1-3

R8D-1-12

R8D-1-12

R8D-1-12

R8D-1-10

R8D-1-8

R8D-1-10R8D-1-10

R8D-1-10

R8D-1-8

R8D-1-8 R8D-1-8

R8D-1-8

R8D-1-6

R8D-1-6

R8D-1-6

R8D-1-6

R8D-1-6

L8D-1-12 L8D-1-12

L8D-1-12

L8D-1-12

L8D-1-12

L8D-1-12

L8D-1-12

L8D-1-12

L8D-1-12

R8C-1-29

R8C-1-292

R8C-1-292

R8C-1-29

L8C-1-12

L8C-1-12

L8C-1-12 L8C-1-12

L8C-1-12

L8C-1-12

L8C-1-12

L8C-1-12

L8C-1-12

L8C-1-12

L8C-1-12

L8C-1-12

R8C-1-21R8C-1-21

R8C-1-21

R8C-1-21

R8C-1-21

1W-FCU-45

1W-FCU-44

L8C-1-12

L8C-1-12

ALTD-7

UNIT 'B'

UNIT 'A'

UNIT 'B'

UNIT 'A'

1W-FCU-46

L8C-1-12

R8C-1-16

A. ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR WIRING ALL ELECTRICAL

ITEMS SHOWN ON THIS DRAWING.

B. WHERE CONNECTED TO A 20A. BRANCH CIRCUIT SUPPLYING AN INDIVIDUAL

RECEPTACLE (SIMPLEX OR DUPLEX), THE RECEPTACLE SHALL BE RATED AT 20A.

C. VERIFY LOCATIONS AND ROUGH-IN REQUIREMENTS OF ALL OWNER FURNISHED

EQUIPMENT PRIOR TO ROUGH-IN.

D. CIRCUIT WIRING IS NOT SHOWN EXCEPT FOR SWITCHING INTENT OF FIXTURES AND

CONTROL OF DEVICES.

E. PROVIDE PROPER NUMBER OF CONDUCTORS TO ACHIEVE CIRCUITING AND

SWITCHING SHOWN.

F. CIRCUIT NUMBERS AT DEVICES CORRESPOND TO PANELBOARD BREAKERS (SEE

PANELBOARD SCHEDULE). BRANCH CIRCUITS SHALL BE SIZED ACCORDING TO THE

CIRCUIT BREAKER RATING, UNLESS INDICATED OTHERWISE.

G. USE #10 AWG CONDUCTORS FOR 20 AMPERE, 120 VOLT BRANCH CIRCUITS LONGER

THAN 75 FEET, UNLESS SPECIFICALLY INDICATED OTHERWISE. THIS SHALL BE

REQUIRED FOR THE ENTIRE LENGTH OF THE CIRCUIT.

H. USE #10 AWG CONDUCTORS FOR 20 AMPERE, 277 VOLT BRANCH CIRCUITS LONGER

THAN 175 FEET, UNLESS SPECIFICALLY INDICATED OTHERWISE. THIS SHALL BE

REQUIRED FOR THE ENTIRE LENGTH OF THE CIRCUIT.

I. ALL RECEPTACLE LOADS TO BE FED FROM EXISTING RECEPTACLE PANEL(S) IN THE

EXISTING ELECTRICAL ROOM SERVING THE AREA. INSTALL NEW CIRCUIT BREAKERS

AS REQURIED.

POWER GENERAL NOTES

POWER KEYNOTES

1. ALL PANELBOARDS IN THIS ROOM ARE EXISTING TO REMAIN. ADD CIRCUIT BREAKERS

AS REQUIRED.

2. PROVIDE POWER TO TRANSFORMER FOR FLUSH VALVE/AUTO FAUCETS.

TRANSFORMER SUPPLIED BY PLUMBING CONTRACTOR.

3. COORDINATE EXACT LOCATION OF FURNITURE FEEDS WITH FURNITURE

PROVIDER/INSTALLER.

4. EXISTING SECURITY AND COMMUNICATIONS EQUIPMENT IN THIS AREA TO REMAIN.

COORDINATE AS REQUIRED TO KEEP EQUIPMENT OPERATIONAL THROUGHOUT.

5. 40/2 CB, 2#8,#10G, 3/4" C.

6. 35/2 CB, 3#8, #10G, 3/4"C.

7. DOOR OPERATOR. COMPONENTS PROVIDED WITH DOOR HARDWARE. EC SHALL

PROVIDE ALL WIRING AND FINAL CONNECTIONS FOR A COMPLETE INSTALLATION.

8. REUSE EXISTING RECEPTACLE AND CIRCUIT FOR NEW EWC.

9. EXTEND EXISTING CIRCUIT(S) AS REQUIRED TO RELOCATE CONDUIT RUNS. ROUTE

CONDUIT IN ENCLOSURE TIGHT TO WALL.

10. SHADE CONTROLS INSTALLED IN COFFEE SHOP B203. LABEL SWITCHES FOR SHADE

CONTROLS "SHADES".

1811 4 Mile Rd N.E., Grand Rapids, MI 49525 www.progressiveae.com

616 361 2664 OFFICE 616 361 1493 FAX

architecture +engineering

SEVEN

GENERATIONS

4664 Campus Drive, Suite 101

Kalamazoo, MI 49008

P: 269.927.0144 www.7GenAE.com

2 3 4 5 6 7 8 9

2 3 4 5 6 7 8 91

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANTS ARCHITECT/ENGINEERS

DRAWING TITLE:

APPROVED: PROJECT DIRECTOR LOCATION

PROJECT TITLE:

DATE: CHECKED: DRAWN:

PROJECT NUMBER:

BUILDING NUMBER:

DRAWING NUMBER:

DWG. ___ OF ___

7GAE PROJECT NO.: XXXXXX FILE NAME: TITL-BLK-3042-VA.DWG

Office of

Construction and Facilities

Management

VA FORM 08-6231

o n e e ig h th i n c h o e q u a rt e r in c h o e e ig h th s in c h o e h a lf i n c h o e q u a rt e rs i n c h o e i n c h o e a n d o n e h a lf i n c h e s o e i n c h e s o

6 "

Department of Veterans

A

68 East Michigan Ave.

Battle Creek, MI 49017

P: 269.224.3182 www.wbkengineering.com

451 Hungerford Dr. 4th Floor

Rockville, MD 20850

P: 301.770.3520 F: 301.770.3521 www.nikasolutions.com 205

SCALE: As indicated

EP108A

506-330

ANN ARBOR VAMC

OCT. 27, 2017

1W

SDT SCG

POWER PLAN - 8TH FLOOR -

UNIT A

EXPAND 8TH FLOOR

MENTAL HEALTH

NORTH

SCALE: 1/8" = 1'-0"

EIGHTH FLOOR

POWER PLAN A

KITCHENETTE

B816

HAC

B805

SHARED OFFICE

B814

LARGE CONF.

B810

BLUE TEAM

B807

COPY

B806

OFFICE

B804

COMMUNICATIONS

B812

OFFICE

B820

SHARED OFFICE

B821

CORRIDOR

C8-2

CHIEF

B822a

SECRETARY

B822

OFFICE

B824

OFFICE

B825

J K

I

H''F''E''

L

A B C D E F G H

G'F' POM N QE' H'D' SRJ' K'

1.9

4.1

B.3

CR8B-1

R8B-1

L8B-1

CL8B-1

LS8B-1

1W-FCU-21

1W-FCU-43

1W-FCU-17

1W-FCU-16

1W-FCU-15

RESTROOM

C800

RESTROOM

C801

EEO PROGRAM

MANAGER

C803A

CONFERENCE/MEDIATION

C804

CARE CORD.

B818

TEAM ROOM

B815

OFFICE

C803

1W-FCU-19 1W-FCU-36

1W-FCU-37

1W-FCU-38

1W-FCU-14

R8B-1-13

COPIER

R8B-1-15

R8B-1-15

R8B-1-15

R8B-1-15

R8B-1-17

R8B-1-17

R8B-1-17

R8B-1-17

R8B-1-19

REFRIG

R8B-1-21 R8B-1-21

R8B-1-21

R8B-1-12 R8B-1-12

R8B-1-12

REFRIG

R8B-1-17

R8B-1-17

R8B-1-23

R8B-1-25,27

R8B-1-21

R8B-1-29

R8B-1-29

R8B-1-29

R8B-1-31

R8B-1-31

R8B-1-31

R8B-1-31

R8B-1-29

R8B-1-33

R8B-1-33

R8B-1-33

R8B-1-33

R8B-1-14

R8B-1-14

R8B-1-14

R8B-1-14

R8B-1-16

R8B-1-18

R8B-1-18

R8B-1-18

R8B-1-20

R8B-1-16

R8B-1-22

R8B-1-22 R8B-1-22

R8B-1-22

R8B-1-24

R8B-1-26

R8B-1-26

R8B-1-26

R8B-1-24

R8B-1-24

R8B-1-28 R8B-1-26

R8B-1-28

R8B-1-26R8B-1-28

R8B-1-28

R8B-1-28

R8B-1-24

R8C-1-13 R8C-1-8

R8C-1-8

R8C-1-8 R8C-1-8

R8C-1-8

L8C-1-12

L8B-1-12 L8B-1-12

L8B-1-12

L8B-1-12L8B-1-12

L8B-1-12

L8B-1-12

L8B-1-12

L8B-1-12

R8B-1-30 R8B-1-302 2

1W-FCU-18

L8B-1-12

ALTD-5

UNIT 'B'

UNIT 'A'

UNIT 'B'

UNIT 'A'

R8B-1-15

A. ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR WIRING ALL ELECTRICAL

ITEMS SHOWN ON THIS DRAWING.

B. WHERE CONNECTED TO A 20A. BRANCH CIRCUIT SUPPLYING AN INDIVIDUAL

RECEPTACLE (SIMPLEX OR DUPLEX), THE RECEPTACLE SHALL BE RATED AT 20A.

C. VERIFY LOCATIONS AND ROUGH-IN REQUIREMENTS OF ALL OWNER FURNISHED

EQUIPMENT PRIOR TO ROUGH-IN.

D. CIRCUIT WIRING IS NOT SHOWN EXCEPT FOR SWITCHING INTENT OF FIXTURES AND

CONTROL OF DEVICES.

E. PROVIDE PROPER NUMBER OF CONDUCTORS TO ACHIEVE CIRCUITING AND

SWITCHING SHOWN.

F. CIRCUIT NUMBERS AT DEVICES CORRESPOND TO PANELBOARD BREAKERS (SEE

PANELBOARD SCHEDULE). BRANCH CIRCUITS SHALL BE SIZED ACCORDING TO THE

CIRCUIT BREAKER RATING, UNLESS INDICATED OTHERWISE.

G. USE #10 AWG CONDUCTORS FOR 20 AMPERE, 120 VOLT BRANCH CIRCUITS LONGER

THAN 75 FEET, UNLESS SPECIFICALLY INDICATED OTHERWISE. THIS SHALL BE

REQUIRED FOR THE ENTIRE LENGTH OF THE CIRCUIT.

H. USE #10 AWG CONDUCTORS FOR 20 AMPERE, 277 VOLT BRANCH CIRCUITS LONGER

THAN 175 FEET, UNLESS SPECIFICALLY INDICATED OTHERWISE. THIS SHALL BE

REQUIRED FOR THE ENTIRE LENGTH OF THE CIRCUIT.

I. ALL RECEPTACLE LOADS TO BE FED FROM EXISTING RECEPTACLE PANEL(S) IN THE

EXISTING ELECTRICAL ROOM SERVING THE AREA. INSTALL NEW CIRCUIT BREAKERS

AS REQURIED.

POWER GENERAL NOTES

POWER KEYNOTES

1. ALL PANELBOARDS IN THIS ROOM ARE EXISTING TO REMAIN. ADD CIRCUIT BREAKERS

AS REQUIRED.

2. PROVIDE POWER TO TRANSFORMER FOR FLUSH VALVE/AUTO FAUCETS.

TRANSFORMER SUPPLIED BY PLUMBING CONTRACTOR.

3. COORDINATE EXACT LOCATION OF FURNITURE FEEDS WITH FURNITURE

PROVIDER/INSTALLER.

4. EXISTING SECURITY AND COMMUNICATIONS EQUIPMENT IN THIS AREA TO REMAIN.

COORDINATE AS REQUIRED TO KEEP EQUIPMENT OPERATIONAL THROUGHOUT.

5. 40/2 CB, 2#8,#10G, 3/4" C.

6. 35/2 CB, 3#8, #10G, 3/4"C.

7. DOOR OPERATOR. COMPONENTS PROVIDED WITH DOOR HARDWARE. EC SHALL

PROVIDE ALL WIRING AND FINAL CONNECTIONS FOR A COMPLETE INSTALLATION.

8. REUSE EXISTING RECEPTACLE AND CIRCUIT FOR NEW EWC.

9. EXTEND EXISTING CIRCUIT(S) AS REQUIRED TO RELOCATE CONDUIT RUNS. ROUTE

CONDUIT IN ENCLOSURE TIGHT TO WALL.

10. SHADE CONTROLS INSTALLED IN COFFEE SHOP B203. LABEL SWITCHES FOR SHADE

CONTROLS "SHADES".

1811 4 Mile Rd N.E., Grand Rapids, MI 49525 www.progressiveae.com

616 361 2664 OFFICE 616 361 1493 FAX

architecture +engineering

SEVEN

GENERATIONS

4664 Campus Drive, Suite 101

Kalamazoo, MI 49008

P: 269.927.0144 www.7GenAE.com

2 3 4 5 6 7 8 9

2 3 4 5 6 7 8 91

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANTS ARCHITECT/ENGINEERS

DRAWING TITLE:

APPROVED: PROJECT DIRECTOR LOCATION

PROJECT TITLE:

DATE: CHECKED: DRAWN:

PROJECT NUMBER:

BUILDING NUMBER:

DRAWING NUMBER:

DWG. ___ OF ___

7GAE PROJECT NO.: XXXXXX FILE NAME: TITL-BLK-3042-VA.DWG

Office of

Construction and Facilities

Management

VA FORM 08-6231

o n e e ig h th i n c h o e q u a rt e r in c h o e e ig h th s in c h o e h a lf i n c h o e q u a rt e rs i n c h o e i n c h o e a n d o n e h a lf i n c h e s o e i n c h e s o

6 "

Department of Veterans

B

68 East Michigan Ave.

Battle Creek, MI 49017

P: 269.224.3182 www.wbkengineering.com

451 Hungerford Dr. 4th Floor

Rockville, MD 20850

P: 301.770.3520 F: 301.770.3521 www.nikasolutions.com 205

SCALE: As indicated

EP108B

506-330

ANN ARBOR VAMC

OCT. 27, 2017

1W

SDT SCG

POWER PLAN - 8TH FLOOR -

UNIT B

EXPAND 8TH FLOOR

MENTAL HEALTH

NORTH

SCALE: 1/8" = 1'-0"

EIGHTH FLOOR

POWER PLAN

J K I L

MJ' K'

1W-ACCH-1

1W-CHP-1A 1W-CHP-1B

10B A/C

EXIST PANEL

3#1/0, #6G, 2" C

TO NEW 150/3 CB IN EXISTING EMMC4-D1

REFER TO PARTIAL ONE-LINE DIAGRAM

ON DRAWING E501

PROVIDE LIGHTNING PROTECTION

ON NEW ROOF MOUNTED EQUIPMENT

CONNECT TO EXISTING LIGHTNING

PROTECTION SYSTEM

10B A/C 19/21/23

20/3 CB, 3#10, #10G, 3/4"C

PROVIDE NEW CB IN PANEL

10B A/C 20/22/24

20/3 CB, 3#10, #10G, 3/4"C

PROVIDE NEW CB IN PANEL

EX1-CU1

EX1-AHU1

ALL ASSOCIATED EQUIPMENT AND WIRING TO BE REMOVED IN DEMO OF EX1-AHU1.

ALL ASSOCIATED EQUIPMENT AND WIRING TO BE REMOVED.

REFER TO MECHANICAL DRAWINGS FOR LOCATION OF EX1-CU1.

1811 4 Mile Rd N.E., Grand Rapids, MI 49525 www.progressiveae.com

616 361 2664 OFFICE 616 361 1493 FAX

architecture +engineering

SEVEN

GENERATIONS

4664 Campus Drive, Suite 101

Kalamazoo, MI 49008

P: 269.927.0144 www.7GenAE.com

2 3 4 5 6 7 8 9

2 3 4 5 6 7 8 91

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANTS ARCHITECT/ENGINEERS

DRAWING TITLE:

APPROVED: PROJECT DIRECTOR LOCATION

PROJECT TITLE:

DATE: CHECKED: DRAWN:

PROJECT NUMBER:

BUILDING NUMBER:

DRAWING NUMBER:

DWG. ___ OF ___

7GAE PROJECT NO.: XXXXXX FILE NAME: TITL-BLK-3042-VA.DWG

Office of

Construction and Facilities

Management

VA FORM 08-6231

o n e e ig h th i n c h o e q u a rt e r in c h o e e ig h th s in c h o e h a lf i n c h o e q u a rt e rs i n c h o e i n c h o e a n d o n e h a lf i n c h e s o e i n c h e s o

6 "

Department of Veterans

68 East Michigan Ave.

Battle Creek, MI 49017

P: 269.224.3182 www.wbkengineering.com

451 Hungerford Dr. 4th Floor

Rockville, MD 20850

P: 301.770.3520 F: 301.770.3521 www.nikasolutions.com 205

SCALE: 1/4" = 1'-0"

EP110

506-330

ANN ARBOR VAMC

OCT. 27, 2017

1W

SDT SCG

ELECTRICAL ENLARGED

PLANS

EXPAND 8TH FLOOR

MENTAL HEALTH

NORTH

SCALE: 1/4" = 1'-0"

10TH FLOOR POWER

PLAN

A. ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR WIRING ALL ELECTRICAL

ITEMS SHOWN ON THIS DRAWING.

B. ALL RECESSED LIGHTING FIXTURES IN LAY-IN CEILINGS SHALL BE INSTALLED WITH 6'

LONG FLEXIBLE METAL CONDUIT.

C. ALL MOUNTING HEIGHTS FOR LIGHTING FIXTURES ARE TO THE BOTTOM OF THE

FIXTURES UNLESS INDICATED OTHERWISE.

D. SEE ARCHITECTURAL EXTERIOR ELEVATIONS FOR MOUNTING HEIGHTS OF EXTERIOR

LIGHTING FIXTURES.

E. CONDUIT AND WIRE SHALL NOT BE INSTALLED BELOW FLOOR SLAB UNLESS

INDICATED ON PLAN BY DASHED CONDUIT.

F. CIRCUIT NUMBERS AT DEVICES CORRESPOND TO PANELBOARD BREAKERS (SEE

PANELBOARD SCHEDULE). BRANCH CIRCUITS SHALL BE SIZED ACCORDING TO THE

CIRCUIT BREAKER RATING, UNLESS INDICATED OTHERWISE ON THE ELECTRICAL

EQUIPMENT SCHEDULE.

G. USE #10 AWG CONDUCTORS FOR 20 AMPERE, 120 VOLT BRANCH CIRCUITS LONGER

THAN 75 FEET, UNLESS SPECIFICALLY INDICATED OTHERWISE. THIS SHALL BE

REQUIRED FOR THE ENTIRE LENGTH OF THE CIRCUIT.

H. USE #10 AWG CONDUCTORS FOR 20 AMPERE, 277 VOLT BRANCH CIRCUITS LONGER

THAN 175 FEET, UNLESS SPECIFICALLY INDICATED OTHERWISE. THIS SHALL BE

REQUIRED FOR THE ENTIRE LENGTH OF THE CIRCUIT.

I. LIGHTING SHALL BE FED FROM EXISTING LIGHTING PANEL(S) IN EXISTING LOCAL

ELECTRICAL ROOMS.

J. LIGHT FIXTURES INDICATED AS "EMERGENCY" IN CORRIDORS AND LARGE PUBLIC

SPACES SHALL BE ON NIGHT LIGHT (UNSWITCHED) CIRCUITS FED FROM THE

NEAREST LIFE SAFETY LIGHTING PANEL.

K. LIGHT FIXTURES IN SMALLER ENCLOSED ROOMS WHERE LIGHTING IS CONTROLLED

LOCALLY, SHALL BE FED FROM A LIFE SAFETY CIRCUIT FROM THE NEAREST

AVAILABLE LIFE SAFETY LIGHTING PANEL. THIS CIRCUIT SHALL BE FED THROUGH A

REMOTE GENERATOR TRANSFER DEVICE WHICH SENSES LOSS OF NORMAL CIRCUIT

AND TRANSFERS TO THE LIFE SAFETY CIRCUIT IN THAT CASE.

LIGHTING GENERAL NOTES

BREAK RM

BB30C

STAFF GYM

BB70

ARMS OFFICE

BB72A

ADMIN

BB72

BIOMED OFFICE

BB32

OFFICE CHIEF

BB111

OFFICE DEPUTY

BB113

OFFICE TRAINING

BB115

INTERVIEW

BB110

HOLDING

BB112

TRAINING/BREAK

BB118

MEN'S LOCKER

BB120A

WOMEN'S LOCKER

BB119 CORRIDOR

CB114

WOMEN'S SHOWER

BB119A

ALCOVE

CB72

MEN'S SHOWER

BB120

I J K

I I

I

I'

H''F''E''

A B C D E F G H

G'F'E' H' J'

1.9

4.1

B.3

C2

C2

D3

H2

H2

C1C1

C1C1

C2C2

C1C1

C1C1

C1C1

A4

A2A2

A2

A2

A2

A4

A4

A4

A4

A4

A4

A4 A4

C1

F1

A2

C1

C1

C1

CRBB-1 RBB-1

LBB-1

CLBB-1

LSBB-1

EMBB-1

A1

A1

A1

A1A1A1

A1 A1 A1 A1

A1A1

A1 A1

A1A1

C1

W2

X1 X1

X1 X1

NL

LBB-1-9

LBB-1-9

LBB-1-9

LBB-1-9

LBB-1-7

LBB-1-7

LBB-1-7

LBB-1-9

LBB-1-7

LSBB-1-1

LSBB-1-1

LSBB-1-1

LSBB-1-1

LSBB-1-1

A1

LBB-1-9

LBB-1-9

LBB-1-9

LBB-1-9

LBB-1-9

LBB-1-9

LBB-1-7 LBB-1-7

LBB-1-7

CLBB-1-2

LBB-1-9

LSBB-1-1

LSBB-1-1

C1

D3

D3

W2

W2

W2

W2

D3

D3

LSBB-1-1

LSBB-1-1

LBB-1-9

OPEN OFFICE

BB117

UNIT 'B'

UNIT 'A'

UNIT 'B'

UNIT 'A'

LSBB-1-1

LSBB-1-1

ALTD-8

F1 F1 F1

F1F1F1

LIGHTING KEYNOTES

1. SUSPEND LIGHT FIXTURES WITH METAL RODS. ALL LIGHT FIXTURES IN THE ROOM TO

BE MOUNTED AT THE SAME HEIGHT ABOVE FINISHED FLOOR. MOUNT LIGHT FIXTURES

AS HIGH AS POSSIBLE WITH ALL FIXTURES BEING BELOW DUCTWORK.

N

1811 4 Mile Rd N.E., Grand Rapids, MI 49525 www.progressiveae.com

616 361 2664 OFFICE 616 361 1493 FAX

architecture +engineering

SEVEN

GENERATIONS

4664 Campus Drive, Suite 101

Kalamazoo, MI 49008

P: 269.927.0144 www.7GenAE.com

2 3 4 5 6 7 8 9

2 3 4 5 6 7 8 91

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANTS ARCHITECT/ENGINEERS

DRAWING TITLE:

APPROVED: PROJECT DIRECTOR LOCATION

PROJECT TITLE:

DATE: CHECKED: DRAWN:

PROJECT NUMBER:

BUILDING NUMBER:

DRAWING NUMBER:

DWG. ___ OF ___

7GAE PROJECT NO.: XXXXXX FILE NAME: TITL-BLK-3042-VA.DWG

Office of

Construction and Facilities

Management

VA FORM 08-6231

o n e e ig h th i n c h o e q u a rt e r in c h o e e ig h th s in c h o e h a lf i n c h o e q u a rt e rs i n c h o e i n c h o e a n d o n e h a lf i n c h e s o e i n c h e s o

6 "

Department of Veterans

68 East Michigan Ave.

Battle Creek, MI 49017

P: 269.224.3182 www.wbkengineering.com

451 Hungerford Dr. 4th Floor

Rockville, MD 20850

P: 301.770.3520 F: 301.770.3521 www.nikasolutions.com 205

SCALE: As indicated

EL100A

506-330

ANN ARBOR VAMC

OCT. 27, 2017

1W

SDT KEZ

LIGHTING PLAN - BASEMENT -

UNIT A

EXPAND 8TH FLOOR

MENTAL HEALTH

NORTH

SCALE: 1/4" = 1'-0"

BASEMENT LIGHTING

PLAN - UNIT A

NORTH

SCALE: 12" = 1'-0"

94 - Lighting Keynotes Copy 1

101 - GI002 - COVER SHEET VOL- 2
Sheets
AE200 - EXTERIOR ELEVATIONS
AE300 - BUILDING SECTIONS
AE301 - BUILDING SECTIONS
AE320 - WALL SECTIONS
AE321 - WALL SECTIONS
AE322 - WALL SECTIONS
AE323 - WALL SECTIONS
AE324 - WALL SECTIONS
AE330 - PLAN DETAILS
AE331 - PLAN DETAILS
AE332 - SECTION DETAILS
AE410 - VERTICAL CIRCULATION
AE411 - VERTICAL CIRCULATION
AE412 - VERTICAL CIRCULATION
AI420 - INTERIOR ELEVATIONS
AI421 - INTERIOR ELEVATIONS
AI500 - WALL TYPES
AI520 - CASEWORK DETAILS
AI521 - CASEWORK DETAILS
AI530 - INTERIOR DETAILS
AI531 - INTERIOR DETAILS
AI540 - INTERIOR FINISH DETAILS
AI600 - DOOR AND FRAME SCHEDULE
AW001 - INTERIOR SIGNAGE TYPES
AW002 - INTERIOR SIGNAGE TYPES
AW100 - SIGNAGE PLAN & SCHEDULE - BASEMENT
AW101 - SIGNAGE PLAN & SCHEDULE - FIRST FLOOR
GC100 - CONSTRUCTION PHASING - BASEMENT
GC101 - CONSTRUCTION PHASING - 1ST FLOOR
GC102 - CONSTRUCTION PHASING - 2ND FLOOR
GI001 - COVER SHEET VOL. 1
GI002 - COVER SHEET VOL. 2
GI003 - GENERAL INFORMATION & SYMBOL LEGEND
ID001 - INTERIOR FINISH KEY
ID002 - INTERIOR FINISH SCHEDULE - BASEMENT & FIRST FLOOR
ID100 - INTERIOR FINISH PLAN - BASEMENT
ID101 - INTERIOR FINISH PLAN - 1ST FLOOR
102 - FX001 - FIRE SPRINKLER GENERAL
Sheets
FA001 - FIRE ALARM GENERAL
FA100 - FIRE ALARM DEMO - BASEMENT
FA101 - FIRE ALARM DEMO - 1ST FLOOR
FA200 - FIRE ALARM NEW - BASEMENT
FA201 - FIRE ALARM NEW - 1ST FLOOR
FX001 - FIRE SPRINKLER GENERAL
FX100 - FIRE SPRINKLER DEMO - BASEMENT
FX102 - FIRE SPRINKLER DEMO - 1ST FLOOR
FX200 - FIRE SPRINKLER NEW - BASEMENT
FX201 - FIRE SPRINKLER NEW - 1ST FLOOR
GI001 - LIFE SAFETY CODE ANALYSIS
GI100 - LIFE SAFETY ANALYSIS - BASEMENT
GI102 - LIFE SAFETY ANALYSIS - 1ST FLOOR
103 - FX100 - FIRE SPRINKLER DEMO - BASEMENT
Sheets
FA001 - FIRE ALARM GENERAL
FA100 - FIRE ALARM DEMO - BASEMENT
FA101 - FIRE ALARM DEMO - 1ST FLOOR
FA200 - FIRE ALARM NEW - BASEMENT
FA201 - FIRE ALARM NEW - 1ST FLOOR
FX001 - FIRE SPRINKLER GENERAL
FX100 - FIRE SPRINKLER DEMO - BASEMENT
FX102 - FIRE SPRINKLER DEMO - 1ST FLOOR
FX200 - FIRE SPRINKLER NEW - BASEMENT
FX201 - FIRE SPRINKLER NEW - 1ST FLOOR
GI001 - LIFE SAFETY CODE ANALYSIS
GI100 - LIFE SAFETY ANALYSIS - BASEMENT
GI102 - LIFE SAFETY ANALYSIS - 1ST FLOOR
104 - FX102 - FIRE SPRINKLER DEMO - 1ST FLOOR
Sheets
FA001 - FIRE ALARM GENERAL
FA100 - FIRE ALARM DEMO - BASEMENT
FA101 - FIRE ALARM DEMO - 1ST FLOOR
FA200 - FIRE ALARM NEW - BASEMENT
FA201 - FIRE ALARM NEW - 1ST FLOOR
FX001 - FIRE SPRINKLER GENERAL
FX100 - FIRE SPRINKLER DEMO - BASEMENT
FX102 - FIRE SPRINKLER DEMO - 1ST FLOOR
FX200 - FIRE SPRINKLER NEW - BASEMENT
FX201 - FIRE SPRINKLER NEW - 1ST FLOOR
GI001 - LIFE SAFETY CODE ANALYSIS
GI100 - LIFE SAFETY ANALYSIS - BASEMENT
GI102 - LIFE SAFETY ANALYSIS - 1ST FLOOR
105 - FX108 - FIRE SPRINKLER DEMO - EIGHT FLOOR
Sheets
FA108 - FIRE ALARM DEMO - EIGHT FLOOR
FA208 - FIRE ALARM NEW - EIGHT FLOOR
FX108 - FIRE SPRINKLER DEMO - EIGHT FLOOR
FX208 - FIRE SPRINKLER NEW - EIGHT FLOOR
GI108 - LIFE SAFETY ANALYSIS - EIGHT FLOOR
106 - FX200 - FIRE SPRINKLER NEW - BASEMENT
Sheets
FA001 - FIRE ALARM GENERAL
FA100 - FIRE ALARM DEMO - BASEMENT
FA101 - FIRE ALARM DEMO - 1ST FLOOR
FA200 - FIRE ALARM NEW - BASEMENT
FA201 - FIRE ALARM NEW - 1ST FLOOR
FX001 - FIRE SPRINKLER GENERAL
FX100 - FIRE SPRINKLER DEMO - BASEMENT
FX102 - FIRE SPRINKLER DEMO - 1ST FLOOR
FX200 - FIRE SPRINKLER NEW - BASEMENT
FX201 - FIRE SPRINKLER NEW - 1ST FLOOR
GI001 - LIFE SAFETY CODE ANALYSIS
GI100 - LIFE SAFETY ANALYSIS - BASEMENT
GI102 - LIFE SAFETY ANALYSIS - 1ST FLOOR
107 - FX201 - FIRE SPRINKLER NEW - 1ST FLOOR
Sheets
FA001 - FIRE ALARM GENERAL
FA100 - FIRE ALARM DEMO - BASEMENT
FA101 - FIRE ALARM DEMO - 1ST FLOOR
FA200 - FIRE ALARM NEW - BASEMENT
FA201 - FIRE ALARM NEW - 1ST FLOOR
FX001 - FIRE SPRINKLER GENERAL
FX100 - FIRE SPRINKLER DEMO - BASEMENT
FX102 - FIRE SPRINKLER DEMO - 1ST FLOOR
FX200 - FIRE SPRINKLER NEW - BASEMENT
FX201 - FIRE SPRINKLER NEW - 1ST FLOOR
GI001 - LIFE SAFETY CODE ANALYSIS
GI100 - LIFE SAFETY ANALYSIS - BASEMENT
GI102 - LIFE SAFETY ANALYSIS - 1ST FLOOR
108 - FX208 - FIRE SPRINKLER NEW - EIGHT FLOOR
Sheets
FA108 - FIRE ALARM DEMO - EIGHT FLOOR
FA208 - FIRE ALARM NEW - EIGHT FLOOR
FX108 - FIRE SPRINKLER DEMO - EIGHT FLOOR
FX208 - FIRE SPRINKLER NEW - EIGHT FLOOR
GI108 - LIFE SAFETY ANALYSIS - EIGHT FLOOR
109 - FA001 - FIRE ALARM GENERAL
Sheets
FA001 - FIRE ALARM GENERAL
FA100 - FIRE ALARM DEMO - BASEMENT
FA101 - FIRE ALARM DEMO - 1ST FLOOR
FA200 - FIRE ALARM NEW - BASEMENT
FA201 - FIRE ALARM NEW - 1ST FLOOR
FX001 - FIRE SPRINKLER GENERAL
FX100 - FIRE SPRINKLER DEMO - BASEMENT
FX102 - FIRE SPRINKLER DEMO - 1ST FLOOR
FX200 - FIRE SPRINKLER NEW - BASEMENT
FX201 - FIRE SPRINKLER NEW - 1ST FLOOR
GI001 - LIFE SAFETY CODE ANALYSIS
GI100 - LIFE SAFETY ANALYSIS - BASEMENT
GI102 - LIFE SAFETY ANALYSIS - 1ST FLOOR
110 - FA100 - FIRE ALARM DEMO - BASEMENT
Sheets
FA001 - FIRE ALARM GENERAL
FA100 - FIRE ALARM DEMO - BASEMENT
FA101 - FIRE ALARM DEMO - 1ST FLOOR
FA200 - FIRE ALARM NEW - BASEMENT
FA201 - FIRE ALARM NEW - 1ST FLOOR
FX001 - FIRE SPRINKLER GENERAL
FX100 - FIRE SPRINKLER DEMO - BASEMENT
FX102 - FIRE SPRINKLER DEMO - 1ST FLOOR
FX200 - FIRE SPRINKLER NEW - BASEMENT
FX201 - FIRE SPRINKLER NEW - 1ST FLOOR
GI001 - LIFE SAFETY CODE ANALYSIS
GI100 - LIFE SAFETY ANALYSIS - BASEMENT
GI102 - LIFE SAFETY ANALYSIS - 1ST FLOOR
111 - FA101 - FIRE ALARM DEMO - 1ST FLOOR
Sheets
FA001 - FIRE ALARM GENERAL
FA100 - FIRE ALARM DEMO - BASEMENT
FA101 - FIRE ALARM DEMO - 1ST FLOOR
FA200 - FIRE ALARM NEW - BASEMENT
FA201 - FIRE ALARM NEW - 1ST FLOOR
FX001 - FIRE SPRINKLER GENERAL
FX100 - FIRE SPRINKLER DEMO - BASEMENT
FX102 - FIRE SPRINKLER DEMO - 1ST FLOOR
FX200 - FIRE SPRINKLER NEW - BASEMENT
FX201 - FIRE SPRINKLER NEW - 1ST FLOOR
GI001 - LIFE SAFETY CODE ANALYSIS
GI100 - LIFE SAFETY ANALYSIS - BASEMENT
GI102 - LIFE SAFETY ANALYSIS - 1ST FLOOR
112 - FA108 - FIRE ALARM DEMO - EIGHT FLOOR
Sheets
FA108 - FIRE ALARM DEMO - EIGHT FLOOR
FA208 - FIRE ALARM NEW - EIGHT FLOOR
FX108 - FIRE SPRINKLER DEMO - EIGHT FLOOR
FX208 - FIRE SPRINKLER NEW - EIGHT FLOOR
GI108 - LIFE SAFETY ANALYSIS - EIGHT FLOOR
113 - FA200 - FIRE ALARM NEW - BASEMENT
Sheets
FA001 - FIRE ALARM GENERAL
FA100 - FIRE ALARM DEMO - BASEMENT
FA101 - FIRE ALARM DEMO - 1ST FLOOR
FA200 - FIRE ALARM NEW - BASEMENT
FA201 - FIRE ALARM NEW - 1ST FLOOR
FX001 - FIRE SPRINKLER GENERAL
FX100 - FIRE SPRINKLER DEMO - BASEMENT
FX102 - FIRE SPRINKLER DEMO - 1ST FLOOR
FX200 - FIRE SPRINKLER NEW - BASEMENT
FX201 - FIRE SPRINKLER NEW - 1ST FLOOR
GI001 - LIFE SAFETY CODE ANALYSIS
GI100 - LIFE SAFETY ANALYSIS - BASEMENT
GI102 - LIFE SAFETY ANALYSIS - 1ST FLOOR
114 - FA201 - FIRE ALARM NEW - 1ST FLOOR
Sheets
FA001 - FIRE ALARM GENERAL
FA100 - FIRE ALARM DEMO - BASEMENT
FA101 - FIRE ALARM DEMO - 1ST FLOOR
FA200 - FIRE ALARM NEW - BASEMENT
FA201 - FIRE ALARM NEW - 1ST FLOOR
FX001 - FIRE SPRINKLER GENERAL
FX100 - FIRE SPRINKLER DEMO - BASEMENT
FX102 - FIRE SPRINKLER DEMO - 1ST FLOOR
FX200 - FIRE SPRINKLER NEW - BASEMENT
FX201 - FIRE SPRINKLER NEW - 1ST FLOOR
GI001 - LIFE SAFETY CODE ANALYSIS
GI100 - LIFE SAFETY ANALYSIS - BASEMENT
GI102 - LIFE SAFETY ANALYSIS - 1ST FLOOR
115 - FA208 - FIRE ALARM NEW - EIGHT FLOOR
Sheets
FA108 - FIRE ALARM DEMO - EIGHT FLOOR
FA208 - FIRE ALARM NEW - EIGHT FLOOR
FX108 - FIRE SPRINKLER DEMO - EIGHT FLOOR
FX208 - FIRE SPRINKLER NEW - EIGHT FLOOR
GI108 - LIFE SAFETY ANALYSIS - EIGHT FLOOR
116 - PP001 - GENERAL PLUMBING INFORMATION
Sheets
PD010 - PLUMBING DEMO PLANS - U.G. AND PIPE BASEMENT
PD100 - PLUMBING DEMOLITION PLAN - BASEMENT
PD101 - PLUMBING DEMOLITION PLAN - 1ST FLOOR
PD107A - PLUMBING DEMOLITION PLAN - 7TH FLOOR - UNIT A
PD108A - PLUMBING DEMOLITION PLAN - 8TH FLOOR - UNIT A
PD108B - PLUMBING DEMOLITION PLAN - 8TH FLOOR - UNIT B
PL010A - ENLARGED PLUMBING PLAN - PIPE BASEMENT - UNIT A
PL010B - ENLARGED PLUMBING PLAN - PIPE BASEMENT - UNIT B
PL100A - ENLARGED PLUMBING PLAN - BASEMENT - UNIT A
PL100B - ENLARGED PLUMBING PLAN - BASEMENT - UNIT B
PL101A - ENLARGED PLUMBING PLAN - 1ST FLOOR - UNIT A
PL101B - ENLARGED PLUMBING PLAN - 1ST FLOOR - UNIT B
PL107A - PLUMBING PLAN - 7TH FLOOR - UNIT A
PL107B - PLUMBING PLAN - 7TH FLOOR - UNIT B
PL108A - PLUMBING PLAN - 8TH FLOOR - UNIT A
PL108B - PLUMBING PLAN - 8TH FLOOR - UNIT B
PL140 - PLUMBING ROOF PLAN
PL200 - PLUMBING PLAN - ENLARGED CAFE
PL300 - PLUMBING RISER DIAGRAMS
PL400 - PLUMBING DETAILS
PL500 - PLUMBING SCHEDULES
PP001 - GENERAL PLUMBING INFORMATION
PS100 - PLUMBING SITE PLAN
117 - PS100 - PLUMBING SITE PLAN
Sheets
PD010 - PLUMBING DEMO PLANS - U.G. AND PIPE BASEMENT
PD100 - PLUMBING DEMOLITION PLAN - BASEMENT
PD101 - PLUMBING DEMOLITION PLAN - 1ST FLOOR
PD107A - PLUMBING DEMOLITION PLAN - 7TH FLOOR - UNIT A
PD108A - PLUMBING DEMOLITION PLAN - 8TH FLOOR - UNIT A
PD108B - PLUMBING DEMOLITION PLAN - 8TH FLOOR - UNIT B
PL010A - ENLARGED PLUMBING PLAN - PIPE BASEMENT - UNIT A
PL010B - ENLARGED PLUMBING PLAN - PIPE BASEMENT - UNIT B
PL100A - ENLARGED PLUMBING PLAN - BASEMENT - UNIT A
PL100B - ENLARGED PLUMBING PLAN - BASEMENT - UNIT B
PL101A - ENLARGED PLUMBING PLAN - 1ST FLOOR - UNIT A
PL101B - ENLARGED PLUMBING PLAN - 1ST FLOOR - UNIT B
PL107A - PLUMBING PLAN - 7TH FLOOR - UNIT A
PL107B - PLUMBING PLAN - 7TH FLOOR - UNIT B
PL108A - PLUMBING PLAN - 8TH FLOOR - UNIT A
PL108B - PLUMBING PLAN - 8TH FLOOR - UNIT B
PL140 - PLUMBING ROOF PLAN
PL200 - PLUMBING PLAN - ENLARGED CAFE
PL300 - PLUMBING RISER DIAGRAMS
PL400 - PLUMBING DETAILS
PL500 - PLUMBING SCHEDULES
PP001 - GENERAL PLUMBING INFORMATION
PS100 - PLUMBING SITE PLAN
118 - PD010 - PLUMBING DEMO PLANS - U-G- AND PIPE BASEMENT
Sheets
PD010 - PLUMBING DEMO PLANS - U.G. AND PIPE BASEMENT
PD100 - PLUMBING DEMOLITION PLAN - BASEMENT
PD101 - PLUMBING DEMOLITION PLAN - 1ST FLOOR
PD107A - PLUMBING DEMOLITION PLAN - 7TH FLOOR - UNIT A
PD108A - PLUMBING DEMOLITION PLAN - 8TH FLOOR - UNIT A
PD108B - PLUMBING DEMOLITION PLAN - 8TH FLOOR - UNIT B
PL010A - ENLARGED PLUMBING PLAN - PIPE BASEMENT - UNIT A
PL010B - ENLARGED PLUMBING PLAN - PIPE BASEMENT - UNIT B
PL100A - ENLARGED PLUMBING PLAN - BASEMENT - UNIT A
PL100B - ENLARGED PLUMBING PLAN - BASEMENT - UNIT B
PL101A - ENLARGED PLUMBING PLAN - 1ST FLOOR - UNIT A
PL101B - ENLARGED PLUMBING PLAN - 1ST FLOOR - UNIT B
PL107A - PLUMBING PLAN - 7TH FLOOR - UNIT A
PL107B - PLUMBING PLAN - 7TH FLOOR - UNIT B
PL108A - PLUMBING PLAN - 8TH FLOOR - UNIT A
PL108B - PLUMBING PLAN - 8TH FLOOR - UNIT B
PL140 - PLUMBING ROOF PLAN
PL200 - PLUMBING PLAN - ENLARGED CAFE
PL300 - PLUMBING RISER DIAGRAMS
PL400 - PLUMBING DETAILS
PL500 - PLUMBING SCHEDULES
PP001 - GENERAL PLUMBING INFORMATION
PS100 - PLUMBING SITE PLAN
119 - PD100 - PLUMBING DEMOLITION PLAN - BASEMENT
Sheets
PD010 - PLUMBING DEMO PLANS - U.G. AND PIPE BASEMENT
PD100 - PLUMBING DEMOLITION PLAN - BASEMENT
PD101 - PLUMBING DEMOLITION PLAN - 1ST FLOOR
PD107A - PLUMBING DEMOLITION PLAN - 7TH FLOOR - UNIT A
PD108A - PLUMBING DEMOLITION PLAN - 8TH FLOOR - UNIT A
PD108B - PLUMBING DEMOLITION PLAN - 8TH FLOOR - UNIT B
PL010A - ENLARGED PLUMBING PLAN - PIPE BASEMENT - UNIT A
PL010B - ENLARGED PLUMBING PLAN - PIPE BASEMENT - UNIT B
PL100A - ENLARGED PLUMBING PLAN - BASEMENT - UNIT A
PL100B - ENLARGED PLUMBING PLAN - BASEMENT - UNIT B
PL101A - ENLARGED PLUMBING PLAN - 1ST FLOOR - UNIT A
PL101B - ENLARGED PLUMBING PLAN - 1ST FLOOR - UNIT B
PL107A - PLUMBING PLAN - 7TH FLOOR - UNIT A
PL107B - PLUMBING PLAN - 7TH FLOOR - UNIT B
PL108A - PLUMBING PLAN - 8TH FLOOR - UNIT A
PL108B - PLUMBING PLAN - 8TH FLOOR - UNIT B
PL140 - PLUMBING ROOF PLAN
PL200 - PLUMBING PLAN - ENLARGED CAFE
PL300 - PLUMBING RISER DIAGRAMS
PL400 - PLUMBING DETAILS
PL500 - PLUMBING SCHEDULES
PP001 - GENERAL PLUMBING INFORMATION
PS100 - PLUMBING SITE PLAN
120 - PD101 - PLUMBING DEMOLITION PLAN - 1ST FLOOR
Sheets
PD010 - PLUMBING DEMO PLANS - U.G. AND PIPE BASEMENT
PD100 - PLUMBING DEMOLITION PLAN - BASEMENT
PD101 - PLUMBING DEMOLITION PLAN - 1ST FLOOR
PD107A - PLUMBING DEMOLITION PLAN - 7TH FLOOR - UNIT A
PD108A - PLUMBING DEMOLITION PLAN - 8TH FLOOR - UNIT A
PD108B - PLUMBING DEMOLITION PLAN - 8TH FLOOR - UNIT B
PL010A - ENLARGED PLUMBING PLAN - PIPE BASEMENT - UNIT A
PL010B - ENLARGED PLUMBING PLAN - PIPE BASEMENT - UNIT B
PL100A - ENLARGED PLUMBING PLAN - BASEMENT - UNIT A
PL100B - ENLARGED PLUMBING PLAN - BASEMENT - UNIT B
PL101A - ENLARGED PLUMBING PLAN - 1ST FLOOR - UNIT A
PL101B - ENLARGED PLUMBING PLAN - 1ST FLOOR - UNIT B
PL107A - PLUMBING PLAN - 7TH FLOOR - UNIT A
PL107B - PLUMBING PLAN - 7TH FLOOR - UNIT B
PL108A - PLUMBING PLAN - 8TH FLOOR - UNIT A
PL108B - PLUMBING PLAN - 8TH FLOOR - UNIT B
PL140 - PLUMBING ROOF PLAN
PL200 - PLUMBING PLAN - ENLARGED CAFE
PL300 - PLUMBING RISER DIAGRAMS
PL400 - PLUMBING DETAILS
PL500 - PLUMBING SCHEDULES
PP001 - GENERAL PLUMBING INFORMATION
PS100 - PLUMBING SITE PLAN
121 - PD107A - PLUMBING DEMOLITION PLAN - 7TH FLOOR - UNIT A
Sheets
PD010 - PLUMBING DEMO PLANS - U.G. AND PIPE BASEMENT
PD100 - PLUMBING DEMOLITION PLAN - BASEMENT
PD101 - PLUMBING DEMOLITION PLAN - 1ST FLOOR
PD107A - PLUMBING DEMOLITION PLAN - 7TH FLOOR - UNIT A
PD108A - PLUMBING DEMOLITION PLAN - 8TH FLOOR - UNIT A
PD108B - PLUMBING DEMOLITION PLAN - 8TH FLOOR - UNIT B
PL010A - ENLARGED PLUMBING PLAN - PIPE BASEMENT - UNIT A
PL010B - ENLARGED PLUMBING PLAN - PIPE BASEMENT - UNIT B
PL100A - ENLARGED PLUMBING PLAN - BASEMENT - UNIT A
PL100B - ENLARGED PLUMBING PLAN - BASEMENT - UNIT B
PL101A - ENLARGED PLUMBING PLAN - 1ST FLOOR - UNIT A
PL101B - ENLARGED PLUMBING PLAN - 1ST FLOOR - UNIT B
PL107A - PLUMBING PLAN - 7TH FLOOR - UNIT A
PL107B - PLUMBING PLAN - 7TH FLOOR - UNIT B
PL108A - PLUMBING PLAN - 8TH FLOOR - UNIT A
PL108B - PLUMBING PLAN - 8TH FLOOR - UNIT B
PL140 - PLUMBING ROOF PLAN
PL200 - PLUMBING PLAN - ENLARGED CAFE
PL300 - PLUMBING RISER DIAGRAMS
PL400 - PLUMBING DETAILS
PL500 - PLUMBING SCHEDULES
PP001 - GENERAL PLUMBING INFORMATION
PS100 - PLUMBING SITE PLAN
122 - PD108A - PLUMBING DEMOLITION PLAN - 8TH FLOOR - UNIT A
Sheets
PD010 - PLUMBING DEMO PLANS - U.G. AND PIPE BASEMENT
PD100 - PLUMBING DEMOLITION PLAN - BASEMENT
PD101 - PLUMBING DEMOLITION PLAN - 1ST FLOOR
PD107A - PLUMBING DEMOLITION PLAN - 7TH FLOOR - UNIT A
PD108A - PLUMBING DEMOLITION PLAN - 8TH FLOOR - UNIT A
PD108B - PLUMBING DEMOLITION PLAN - 8TH FLOOR - UNIT B
PL010A - ENLARGED PLUMBING PLAN - PIPE BASEMENT - UNIT A
PL010B - ENLARGED PLUMBING PLAN - PIPE BASEMENT - UNIT B
PL100A - ENLARGED PLUMBING PLAN - BASEMENT - UNIT A
PL100B - ENLARGED PLUMBING PLAN - BASEMENT - UNIT B
PL101A - ENLARGED PLUMBING PLAN - 1ST FLOOR - UNIT A
PL101B - ENLARGED PLUMBING PLAN - 1ST FLOOR - UNIT B
PL107A - PLUMBING PLAN - 7TH FLOOR - UNIT A
PL107B - PLUMBING PLAN - 7TH FLOOR - UNIT B
PL108A - PLUMBING PLAN - 8TH FLOOR - UNIT A
PL108B - PLUMBING PLAN - 8TH FLOOR - UNIT B
PL140 - PLUMBING ROOF PLAN
PL200 - PLUMBING PLAN - ENLARGED CAFE
PL300 - PLUMBING RISER DIAGRAMS
PL400 - PLUMBING DETAILS
PL500 - PLUMBING SCHEDULES
PP001 - GENERAL PLUMBING INFORMATION
PS100 - PLUMBING SITE PLAN
123 - PD108B - PLUMBING DEMOLITION PLAN - 8TH FLOOR - UNIT B
Sheets
PD010 - PLUMBING DEMO PLANS - U.G. AND PIPE BASEMENT
PD100 - PLUMBING DEMOLITION PLAN - BASEMENT
PD101 - PLUMBING DEMOLITION PLAN - 1ST FLOOR
PD107A - PLUMBING DEMOLITION PLAN - 7TH FLOOR - UNIT A
PD108A - PLUMBING DEMOLITION PLAN - 8TH FLOOR - UNIT A
PD108B - PLUMBING DEMOLITION PLAN - 8TH FLOOR - UNIT B
PL010A - ENLARGED PLUMBING PLAN - PIPE BASEMENT - UNIT A
PL010B - ENLARGED PLUMBING PLAN - PIPE BASEMENT - UNIT B
PL100A - ENLARGED PLUMBING PLAN - BASEMENT - UNIT A
PL100B - ENLARGED PLUMBING PLAN - BASEMENT - UNIT B
PL101A - ENLARGED PLUMBING PLAN - 1ST FLOOR - UNIT A
PL101B - ENLARGED PLUMBING PLAN - 1ST FLOOR - UNIT B
PL107A - PLUMBING PLAN - 7TH FLOOR - UNIT A
PL107B - PLUMBING PLAN - 7TH FLOOR - UNIT B
PL108A - PLUMBING PLAN - 8TH FLOOR - UNIT A
PL108B - PLUMBING PLAN - 8TH FLOOR - UNIT B
PL140 - PLUMBING ROOF PLAN
PL200 - PLUMBING PLAN - ENLARGED CAFE
PL300 - PLUMBING RISER DIAGRAMS
PL400 - PLUMBING DETAILS
PL500 - PLUMBING SCHEDULES
PP001 - GENERAL PLUMBING INFORMATION
PS100 - PLUMBING SITE PLAN
124 - PL010A - ENLARGED PLUMBING PLAN - PIPE BASEMENT - UNIT A
Sheets
PD010 - PLUMBING DEMO PLANS - U.G. AND PIPE BASEMENT
PD100 - PLUMBING DEMOLITION PLAN - BASEMENT
PD101 - PLUMBING DEMOLITION PLAN - 1ST FLOOR
PD107A - PLUMBING DEMOLITION PLAN - 7TH FLOOR - UNIT A
PD108A - PLUMBING DEMOLITION PLAN - 8TH FLOOR - UNIT A
PD108B - PLUMBING DEMOLITION PLAN - 8TH FLOOR - UNIT B
PL010A - ENLARGED PLUMBING PLAN - PIPE BASEMENT - UNIT A
PL010B - ENLARGED PLUMBING PLAN - PIPE BASEMENT - UNIT B
PL100A - ENLARGED PLUMBING PLAN - BASEMENT - UNIT A
PL100B - ENLARGED PLUMBING PLAN - BASEMENT - UNIT B
PL101A - ENLARGED PLUMBING PLAN - 1ST FLOOR - UNIT A
PL101B - ENLARGED PLUMBING PLAN - 1ST FLOOR - UNIT B
PL107A - PLUMBING PLAN - 7TH FLOOR - UNIT A
PL107B - PLUMBING PLAN - 7TH FLOOR - UNIT B
PL108A - PLUMBING PLAN - 8TH FLOOR - UNIT A
PL108B - PLUMBING PLAN - 8TH FLOOR - UNIT B
PL140 - PLUMBING ROOF PLAN
PL200 - PLUMBING PLAN - ENLARGED CAFE
PL300 - PLUMBING RISER DIAGRAMS
PL400 - PLUMBING DETAILS
PL500 - PLUMBING SCHEDULES
PP001 - GENERAL PLUMBING INFORMATION
PS100 - PLUMBING SITE PLAN
125 - PL010B - ENLARGED PLUMBING PLAN - PIPE BASEMENT - UNIT B
Sheets
PD010 - PLUMBING DEMO PLANS - U.G. AND PIPE BASEMENT
PD100 - PLUMBING DEMOLITION PLAN - BASEMENT
PD101 - PLUMBING DEMOLITION PLAN - 1ST FLOOR
PD107A - PLUMBING DEMOLITION PLAN - 7TH FLOOR - UNIT A
PD108A - PLUMBING DEMOLITION PLAN - 8TH FLOOR - UNIT A
PD108B - PLUMBING DEMOLITION PLAN - 8TH FLOOR - UNIT B
PL010A - ENLARGED PLUMBING PLAN - PIPE BASEMENT - UNIT A
PL010B - ENLARGED PLUMBING PLAN - PIPE BASEMENT - UNIT B
PL100A - ENLARGED PLUMBING PLAN - BASEMENT - UNIT A
PL100B - ENLARGED PLUMBING PLAN - BASEMENT - UNIT B
PL101A - ENLARGED PLUMBING PLAN - 1ST FLOOR - UNIT A
PL101B - ENLARGED PLUMBING PLAN - 1ST FLOOR - UNIT B
PL107A - PLUMBING PLAN - 7TH FLOOR - UNIT A
PL107B - PLUMBING PLAN - 7TH FLOOR - UNIT B
PL108A - PLUMBING PLAN - 8TH FLOOR - UNIT A
PL108B - PLUMBING PLAN - 8TH FLOOR - UNIT B
PL140 - PLUMBING ROOF PLAN
PL200 - PLUMBING PLAN - ENLARGED CAFE
PL300 - PLUMBING RISER DIAGRAMS
PL400 - PLUMBING DETAILS
PL500 - PLUMBING SCHEDULES
PP001 - GENERAL PLUMBING INFORMATION
PS100 - PLUMBING SITE PLAN
126 - PL100A - ENLARGED PLUMBING PLAN - BASEMENT - UNIT A
Sheets
PD010 - PLUMBING DEMO PLANS - U.G. AND PIPE BASEMENT
PD100 - PLUMBING DEMOLITION PLAN - BASEMENT
PD101 - PLUMBING DEMOLITION PLAN - 1ST FLOOR
PD107A - PLUMBING DEMOLITION PLAN - 7TH FLOOR - UNIT A
PD108A - PLUMBING DEMOLITION PLAN - 8TH FLOOR - UNIT A
PD108B - PLUMBING DEMOLITION PLAN - 8TH FLOOR - UNIT B
PL010A - ENLARGED PLUMBING PLAN - PIPE BASEMENT - UNIT A
PL010B - ENLARGED PLUMBING PLAN - PIPE BASEMENT - UNIT B
PL100A - ENLARGED PLUMBING PLAN - BASEMENT - UNIT A
PL100B - ENLARGED PLUMBING PLAN - BASEMENT - UNIT B
PL101A - ENLARGED PLUMBING PLAN - 1ST FLOOR - UNIT A
PL101B - ENLARGED PLUMBING PLAN - 1ST FLOOR - UNIT B
PL107A - PLUMBING PLAN - 7TH FLOOR - UNIT A
PL107B - PLUMBING PLAN - 7TH FLOOR - UNIT B
PL108A - PLUMBING PLAN - 8TH FLOOR - UNIT A
PL108B - PLUMBING PLAN - 8TH FLOOR - UNIT B
PL140 - PLUMBING ROOF PLAN
PL200 - PLUMBING PLAN - ENLARGED CAFE
PL300 - PLUMBING RISER DIAGRAMS
PL400 - PLUMBING DETAILS
PL500 - PLUMBING SCHEDULES
PP001 - GENERAL PLUMBING INFORMATION
PS100 - PLUMBING SITE PLAN
127 - PL100B - ENLARGED PLUMBING PLAN - BASEMENT - UNIT B
Sheets
PD010 - PLUMBING DEMO PLANS - U.G. AND PIPE BASEMENT
PD100 - PLUMBING DEMOLITION PLAN - BASEMENT
PD101 - PLUMBING DEMOLITION PLAN - 1ST FLOOR
PD107A - PLUMBING DEMOLITION PLAN - 7TH FLOOR - UNIT A
PD108A - PLUMBING DEMOLITION PLAN - 8TH FLOOR - UNIT A
PD108B - PLUMBING DEMOLITION PLAN - 8TH FLOOR - UNIT B
PL010A - ENLARGED PLUMBING PLAN - PIPE BASEMENT - UNIT A
PL010B - ENLARGED PLUMBING PLAN - PIPE BASEMENT - UNIT B
PL100A - ENLARGED PLUMBING PLAN - BASEMENT - UNIT A
PL100B - ENLARGED PLUMBING PLAN - BASEMENT - UNIT B
PL101A - ENLARGED PLUMBING PLAN - 1ST FLOOR - UNIT A
PL101B - ENLARGED PLUMBING PLAN - 1ST FLOOR - UNIT B
PL107A - PLUMBING PLAN - 7TH FLOOR - UNIT A
PL107B - PLUMBING PLAN - 7TH FLOOR - UNIT B
PL108A - PLUMBING PLAN - 8TH FLOOR - UNIT A
PL108B - PLUMBING PLAN - 8TH FLOOR - UNIT B
PL140 - PLUMBING ROOF PLAN
PL200 - PLUMBING PLAN - ENLARGED CAFE
PL300 - PLUMBING RISER DIAGRAMS
PL400 - PLUMBING DETAILS
PL500 - PLUMBING SCHEDULES
PP001 - GENERAL PLUMBING INFORMATION
PS100 - PLUMBING SITE PLAN
128 - PL101A - ENLARGED PLUMBING PLAN - 1ST FLOOR - UNIT A
Sheets
PD010 - PLUMBING DEMO PLANS - U.G. AND PIPE BASEMENT
PD100 - PLUMBING DEMOLITION PLAN - BASEMENT
PD101 - PLUMBING DEMOLITION PLAN - 1ST FLOOR
PD107A - PLUMBING DEMOLITION PLAN - 7TH FLOOR - UNIT A
PD108A - PLUMBING DEMOLITION PLAN - 8TH FLOOR - UNIT A
PD108B - PLUMBING DEMOLITION PLAN - 8TH FLOOR - UNIT B
PL010A - ENLARGED PLUMBING PLAN - PIPE BASEMENT - UNIT A
PL010B - ENLARGED PLUMBING PLAN - PIPE BASEMENT - UNIT B
PL100A - ENLARGED PLUMBING PLAN - BASEMENT - UNIT A
PL100B - ENLARGED PLUMBING PLAN - BASEMENT - UNIT B
PL101A - ENLARGED PLUMBING PLAN - 1ST FLOOR - UNIT A
PL101B - ENLARGED PLUMBING PLAN - 1ST FLOOR - UNIT B
PL107A - PLUMBING PLAN - 7TH FLOOR - UNIT A
PL107B - PLUMBING PLAN - 7TH FLOOR - UNIT B
PL108A - PLUMBING PLAN - 8TH FLOOR - UNIT A
PL108B - PLUMBING PLAN - 8TH FLOOR - UNIT B
PL140 - PLUMBING ROOF PLAN
PL200 - PLUMBING PLAN - ENLARGED CAFE
PL300 - PLUMBING RISER DIAGRAMS
PL400 - PLUMBING DETAILS
PL500 - PLUMBING SCHEDULES
PP001 - GENERAL PLUMBING INFORMATION
PS100 - PLUMBING SITE PLAN
129 - PL101B - ENLARGED PLUMBING PLAN - 1ST FLOOR - UNIT B
Sheets
PD010 - PLUMBING DEMO PLANS - U.G. AND PIPE BASEMENT
PD100 - PLUMBING DEMOLITION PLAN - BASEMENT
PD101 - PLUMBING DEMOLITION PLAN - 1ST FLOOR
PD107A - PLUMBING DEMOLITION PLAN - 7TH FLOOR - UNIT A
PD108A - PLUMBING DEMOLITION PLAN - 8TH FLOOR - UNIT A
PD108B - PLUMBING DEMOLITION PLAN - 8TH FLOOR - UNIT B
PL010A - ENLARGED PLUMBING PLAN - PIPE BASEMENT - UNIT A
PL010B - ENLARGED PLUMBING PLAN - PIPE BASEMENT - UNIT B
PL100A - ENLARGED PLUMBING PLAN - BASEMENT - UNIT A
PL100B - ENLARGED PLUMBING PLAN - BASEMENT - UNIT B
PL101A - ENLARGED PLUMBING PLAN - 1ST FLOOR - UNIT A
PL101B - ENLARGED PLUMBING PLAN - 1ST FLOOR - UNIT B
PL107A - PLUMBING PLAN - 7TH FLOOR - UNIT A
PL107B - PLUMBING PLAN - 7TH FLOOR - UNIT B
PL108A - PLUMBING PLAN - 8TH FLOOR - UNIT A
PL108B - PLUMBING PLAN - 8TH FLOOR - UNIT B
PL140 - PLUMBING ROOF PLAN
PL200 - PLUMBING PLAN - ENLARGED CAFE
PL300 - PLUMBING RISER DIAGRAMS
PL400 - PLUMBING DETAILS
PL500 - PLUMBING SCHEDULES
PP001 - GENERAL PLUMBING INFORMATION
PS100 - PLUMBING SITE PLAN
130 - PL107A - PLUMBING PLAN - 7TH FLOOR - UNIT A
Sheets
PD010 - PLUMBING DEMO PLANS - U.G. AND PIPE BASEMENT
PD100 - PLUMBING DEMOLITION PLAN - BASEMENT
PD101 - PLUMBING DEMOLITION PLAN - 1ST FLOOR
PD107A - PLUMBING DEMOLITION PLAN - 7TH FLOOR - UNIT A
PD108A - PLUMBING DEMOLITION PLAN - 8TH FLOOR - UNIT A
PD108B - PLUMBING DEMOLITION PLAN - 8TH FLOOR - UNIT B
PL010A - ENLARGED PLUMBING PLAN - PIPE BASEMENT - UNIT A
PL010B - ENLARGED PLUMBING PLAN - PIPE BASEMENT - UNIT B
PL100A - ENLARGED PLUMBING PLAN - BASEMENT - UNIT A
PL100B - ENLARGED PLUMBING PLAN - BASEMENT - UNIT B
PL101A - ENLARGED PLUMBING PLAN - 1ST FLOOR - UNIT A
PL101B - ENLARGED PLUMBING PLAN - 1ST FLOOR - UNIT B
PL107A - PLUMBING PLAN - 7TH FLOOR - UNIT A
PL107B - PLUMBING PLAN - 7TH FLOOR - UNIT B
PL108A - PLUMBING PLAN - 8TH FLOOR - UNIT A
PL108B - PLUMBING PLAN - 8TH FLOOR - UNIT B
PL140 - PLUMBING ROOF PLAN
PL200 - PLUMBING PLAN - ENLARGED CAFE
PL300 - PLUMBING RISER DIAGRAMS
PL400 - PLUMBING DETAILS
PL500 - PLUMBING SCHEDULES
PP001 - GENERAL PLUMBING INFORMATION
PS100 - PLUMBING SITE PLAN
131 - PL107B - PLUMBING PLAN - 7TH FLOOR - UNIT B
Sheets
PD010 - PLUMBING DEMO PLANS - U.G. AND PIPE BASEMENT
PD100 - PLUMBING DEMOLITION PLAN - BASEMENT
PD101 - PLUMBING DEMOLITION PLAN - 1ST FLOOR
PD107A - PLUMBING DEMOLITION PLAN - 7TH FLOOR - UNIT A
PD108A - PLUMBING DEMOLITION PLAN - 8TH FLOOR - UNIT A
PD108B - PLUMBING DEMOLITION PLAN - 8TH FLOOR - UNIT B
PL010A - ENLARGED PLUMBING PLAN - PIPE BASEMENT - UNIT A
PL010B - ENLARGED PLUMBING PLAN - PIPE BASEMENT - UNIT B
PL100A - ENLARGED PLUMBING PLAN - BASEMENT - UNIT A
PL100B - ENLARGED PLUMBING PLAN - BASEMENT - UNIT B
PL101A - ENLARGED PLUMBING PLAN - 1ST FLOOR - UNIT A
PL101B - ENLARGED PLUMBING PLAN - 1ST FLOOR - UNIT B
PL107A - PLUMBING PLAN - 7TH FLOOR - UNIT A
PL107B - PLUMBING PLAN - 7TH FLOOR - UNIT B
PL108A - PLUMBING PLAN - 8TH FLOOR - UNIT A
PL108B - PLUMBING PLAN - 8TH FLOOR - UNIT B
PL140 - PLUMBING ROOF PLAN
PL200 - PLUMBING PLAN - ENLARGED CAFE
PL300 - PLUMBING RISER DIAGRAMS
PL400 - PLUMBING DETAILS
PL500 - PLUMBING SCHEDULES
PP001 - GENERAL PLUMBING INFORMATION
PS100 - PLUMBING SITE PLAN
132 - PL108A - PLUMBING PLAN - 8TH FLOOR - UNIT A
Sheets
PD010 - PLUMBING DEMO PLANS - U.G. AND PIPE BASEMENT
PD100 - PLUMBING DEMOLITION PLAN - BASEMENT
PD101 - PLUMBING DEMOLITION PLAN - 1ST FLOOR
PD107A - PLUMBING DEMOLITION PLAN - 7TH FLOOR - UNIT A
PD108A - PLUMBING DEMOLITION PLAN - 8TH FLOOR - UNIT A
PD108B - PLUMBING DEMOLITION PLAN - 8TH FLOOR - UNIT B
PL010A - ENLARGED PLUMBING PLAN - PIPE BASEMENT - UNIT A
PL010B - ENLARGED PLUMBING PLAN - PIPE BASEMENT - UNIT B
PL100A - ENLARGED PLUMBING PLAN - BASEMENT - UNIT A
PL100B - ENLARGED PLUMBING PLAN - BASEMENT - UNIT B
PL101A - ENLARGED PLUMBING PLAN - 1ST FLOOR - UNIT A
PL101B - ENLARGED PLUMBING PLAN - 1ST FLOOR - UNIT B
PL107A - PLUMBING PLAN - 7TH FLOOR - UNIT A
PL107B - PLUMBING PLAN - 7TH FLOOR - UNIT B
PL108A - PLUMBING PLAN - 8TH FLOOR - UNIT A
PL108B - PLUMBING PLAN - 8TH FLOOR - UNIT B
PL140 - PLUMBING ROOF PLAN
PL200 - PLUMBING PLAN - ENLARGED CAFE
PL300 - PLUMBING RISER DIAGRAMS
PL400 - PLUMBING DETAILS
PL500 - PLUMBING SCHEDULES
PP001 - GENERAL PLUMBING INFORMATION
PS100 - PLUMBING SITE PLAN
133 - PL108B - PLUMBING PLAN - 8TH FLOOR - UNIT B
Sheets
PD010 - PLUMBING DEMO PLANS - U.G. AND PIPE BASEMENT
PD100 - PLUMBING DEMOLITION PLAN - BASEMENT
PD101 - PLUMBING DEMOLITION PLAN - 1ST FLOOR
PD107A - PLUMBING DEMOLITION PLAN - 7TH FLOOR - UNIT A
PD108A - PLUMBING DEMOLITION PLAN - 8TH FLOOR - UNIT A
PD108B - PLUMBING DEMOLITION PLAN - 8TH FLOOR - UNIT B
PL010A - ENLARGED PLUMBING PLAN - PIPE BASEMENT - UNIT A
PL010B - ENLARGED PLUMBING PLAN - PIPE BASEMENT - UNIT B
PL100A - ENLARGED PLUMBING PLAN - BASEMENT - UNIT A
PL100B - ENLARGED PLUMBING PLAN - BASEMENT - UNIT B
PL101A - ENLARGED PLUMBING PLAN - 1ST FLOOR - UNIT A
PL101B - ENLARGED PLUMBING PLAN - 1ST FLOOR - UNIT B
PL107A - PLUMBING PLAN - 7TH FLOOR - UNIT A
PL107B - PLUMBING PLAN - 7TH FLOOR - UNIT B
PL108A - PLUMBING PLAN - 8TH FLOOR - UNIT A
PL108B - PLUMBING PLAN - 8TH FLOOR - UNIT B
PL140 - PLUMBING ROOF PLAN
PL200 - PLUMBING PLAN - ENLARGED CAFE
PL300 - PLUMBING RISER DIAGRAMS
PL400 - PLUMBING DETAILS
PL500 - PLUMBING SCHEDULES
PP001 - GENERAL PLUMBING INFORMATION
PS100 - PLUMBING SITE PLAN
134 - PL140 - PLUMBING ROOF PLAN
Sheets
PD010 - PLUMBING DEMO PLANS - U.G. AND PIPE BASEMENT
PD100 - PLUMBING DEMOLITION PLAN - BASEMENT
PD101 - PLUMBING DEMOLITION PLAN - 1ST FLOOR
PD107A - PLUMBING DEMOLITION PLAN - 7TH FLOOR - UNIT A
PD108A - PLUMBING DEMOLITION PLAN - 8TH FLOOR - UNIT A
PD108B - PLUMBING DEMOLITION PLAN - 8TH FLOOR - UNIT B
PL010A - ENLARGED PLUMBING PLAN - PIPE BASEMENT - UNIT A
PL010B - ENLARGED PLUMBING PLAN - PIPE BASEMENT - UNIT B
PL100A - ENLARGED PLUMBING PLAN - BASEMENT - UNIT A
PL100B - ENLARGED PLUMBING PLAN - BASEMENT - UNIT B
PL101A - ENLARGED PLUMBING PLAN - 1ST FLOOR - UNIT A
PL101B - ENLARGED PLUMBING PLAN - 1ST FLOOR - UNIT B
PL107A - PLUMBING PLAN - 7TH FLOOR - UNIT A
PL107B - PLUMBING PLAN - 7TH FLOOR - UNIT B
PL108A - PLUMBING PLAN - 8TH FLOOR - UNIT A
PL108B - PLUMBING PLAN - 8TH FLOOR - UNIT B
PL140 - PLUMBING ROOF PLAN
PL200 - PLUMBING PLAN - ENLARGED CAFE
PL300 - PLUMBING RISER DIAGRAMS
PL400 - PLUMBING DETAILS
PL500 - PLUMBING SCHEDULES
PP001 - GENERAL PLUMBING INFORMATION
PS100 - PLUMBING SITE PLAN
135 - PL200 - PLUMBING PLAN - ENLARGED CAFE
Sheets
PD010 - PLUMBING DEMO PLANS - U.G. AND PIPE BASEMENT
PD100 - PLUMBING DEMOLITION PLAN - BASEMENT
PD101 - PLUMBING DEMOLITION PLAN - 1ST FLOOR
PD107A - PLUMBING DEMOLITION PLAN - 7TH FLOOR - UNIT A

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.