This document is a Statement of Offer Items for a construction project involving multiple infrastructure improvements. The base offer (Item I) includes general construction work with four sub-items: Sanitary Improvements (180 calendar days), Waterline Improvements (280 calendar days), Storm Sewer Improvements (80 calendar days), and an option to complete all three concurrently within 540 calendar days. Additionally, there are five add alternate options covering channel improvements, backflow preventer replacement, water demolition, full depth pavement replacement, and a sanitary improvement plan, each with varying completion timelines ranging from 20 to 120 calendar days. A note indicates a 60-calendar day period for submittals will be added to the overall Performance of Performance.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF OFFER ITEM(S)
A. BASE OFFER ITEM I, GENERAL CONSTRUCTION: Work includes general construction, alterations, walks, electrical, mechanical, plumbing, site utility, and necessary removal of existing structures and construction and certain other items.
Reference contract drawings and specifications. Pricing shall be provided separately for all items listed below. Award may be made on as few as 1 item or as many as all the items based on their individual pricing.
a. ITEM IA: Work to complete: Sanitary Improvements – 180 calendar days.
b. ITEM IB: Work to complete: Waterline Improvements – 280 calendar days.
c. ITEM IC: Work to complete: Storm Sewer Improvements – 80 calendar days.
d. ITEM ID: Work to complete all of ITEM IA, IB and IC concurrently together - 540 calendar days.
B. ADD ALTERNATE 1: Labor, equipment, and materials necessary to complete: Channel
Improvements Add Alternate as shown in design – 120 calendar days.
C. ADD ALTERNATE 2 Labor, equipment, and materials necessary to complete replacement of Backflow Preventer Add Alternate as shown in design – 60 calendar days.
D. ADD ALTERNATE 3: Labor, equipment, and materials necessary to complete Water
Demolition Add Alternate as shown in design – 60 calendar days.
E. ADD ALTERNATE 4: Labor, equipment, and materials necessary to complete the Full
Depth Pavement Replacement Add Alternate as shown in design – 20 calendar days.
F. ADD ALTERNATE 5: Labor, equipment, and materials necessary to complete the
Sanitary Improvement Plan – Add Alternate as shown in design – 60 calendar days.
*NOTE, a 60-calendar day period for submittals will be added to the overall Period of
Performance.