This document contains answers to contractor questions regarding federal contract number 621-23-126 to install a VERDA sterile processing supply (SPS) water filtration system at the James H. Quillen VA Medical Center in Mountain Home, Tennessee. The project involves demolishing an existing housekeeping aids closet and installing the new VERDA SPS water filtration system, including connecting utilities and commissioning the equipment. Key details include that copper piping must be used for water line connections, the contractor is responsible for coordinating installation and startup support from VERDA, and the scope does not require providing a temporary mobile SPS facility as originally stated in specifications.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contractor Questions & Answers
621-23-126 INSTALL SPS WATER FILTRATION UNIT
1) Could you provide the data sheet on the SPS water filtration system to include:
1) Weight
2) All dimensions
3) Input and output water flow rate requirements
4) Inlet and outlet size
5) Electrical requirements
6) Drawings and or pictures to show locations of connection points on the filtration system
Government Response: See attached spec. titled VA mountain Home VERDA Utility Water System Specification.
2) Could you please provide a pictures of the connection point that will feed the new water filtration system?
3) Could you please provide pictures for connection point / points that the filtration system will tie into the VA SPS systems?
4) Could you please provide scalable prints showing all work locations and routs?
Government Response: See attached floor plans for Building 77 Ground Titled “MTH-77-0GAR”.
Work area Approximate distances have been provided on the revised scope of work. Routes to be determined by the contractor as the contractor’s means and methods. The work area will also encompass the crawl space below building 77.
5) Can PVC pipe be used for the water lines? If not, what type is required?
Government Response: Copper Pipe shall be used to tie in equipment to the existing utility (i.e., from main water supply line to the equipment inlet and from the equipment outlet to the tie in locations). All piping between the equipment inlet and outlet shall be determined by the equipment manufacturer.
6) Will the manufacture be providing the VA with a start-up technician?
Government Response: The contractor shall engage the equipment manufacture and contract with them to install and commission / start up the equipment.
7) Will the VA be responsible for moving the filtration system to the HAC room from wherever it’s stored when needed? If not, what will be needed by the contractor to facilitate this?
Government Response: No, the VA will not be responsible for moving the filtration system to the HAC room. Contractor shall engage the equipment manufacturer to determine any logistical requirements.
8) In the combined specs under 1.3 statement of bid items, it states "This will involve renting and setting up a fully functional on-site mobile SPS facility, removal of all the SPS equipment and other equipment in the SPS area, removal of all equipment from scope room, storage of the equipment, demolition, and removal of old flooring, installing the new flooring in SPS area and scope room area, reinstalling the SPS equipment, commissioning of the equipment, and removal of the mobile SPS facility, and complete cleanup of site".
Is this an accurate statement? During the site visit, providing a mobile SPS facility was not discussed and the SPS was currently operating. If this is accurate, what are the SPS requirements? When and how long would the mobile unit be needed? Where would it be located? And, What utilities are available for the mobile unit?
Government Response: Spec section 01 00 00 1.3 verbiage shall be replaced with the following verbiage :
“The Sterile Processing Supply (SPS) area is used to sterilize medical equipment for the VA hospital. The scope of this project is to perform a complete installation of a VERDA SPS Water Filtration System.
This project will involve construction services that include, at a minimum, the demolition and restoration of a HAC closet, and the installation and tie-in of the VERDA SPS Water Filtration System to create a fully functional SPS Water Filtration System to feed the current capacity of the SPS facility that meets all current codes and standards. This will also include commissioning of the equipment and complete cleanup of site.”
9) In the solicitation document, under site investigation, 1.1.6. states "Contractor shall Contract with VERDA to commission the filtration system". Dose this fulfill the requirements of 1.18 Tests and other commission requirements in the combined specs?
Government Response: Yes, this will satisfy 1.18 Tests and other commission requirements in the combined specs