S05 - Amendment 0004 - Attachment 5 - Fire Alarm and HVAC facility preferred contractor.pdf
PDF 783 KB Posted
- Solicitation number
- 36C24922R0058
About this file
This document summarizes a federal contract opportunity notice for installing miscellaneous high-tech, high-cost equipment in a cardiac cath lab. The Department of Veterans Affairs Network Contracting Office 9 is seeking proposals for a two-phase design-build contract valued between $1,000,000 to $2,000,000. The contractor will renovate approximately 1,560 square feet at the Memphis VA Medical Center to install equipment in the cardiac cath lab. The project is set aside for service-disabled veteran-owned small businesses and will use the best value evaluation method. Proposals are due in May 2022 in response to a solicitation available on SAM.gov. The contractor must provide performance and payment bonds and a bid guarantee with the proposal.
View the file
Other files
Show 40 more
Latest 50 of 59 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
87 9 10 11 1211.58.7 9.5
K 3
G
J
K
L
M
L.5
H
DN
COURTYARD
OPEN
ELECTRICAL
G224A
SCRUB
G225
CORRIDOR
C2-21
CORRIDOR
C2-25
CORRIDOR
C2-23
CATH
LAB
G224
CORRIDOR
G225A
CONT/DATA
G221B
CATH
LAB
G221
SU
G221C
ELECTRICAL
G221A
FILM
VIEW
STG
G225B
HAC
G235
STAFF
TOILET
G227
S U G226
TOILET
G225E
LOCKER
G225F
LOCKER
G225C
TOILET
G225D
STRESS
LAB
G231
STUDY
G229
CONF
G230
RES OFF
STUDY
G228
OFFICE
G210
SPUTUM
G204
SPUTUM
G203
PATIENT
TOILET
G202
COMM
G234
PATIENT
FILE
G201
PATIENT
FILE
G205A
REPORT
G205
BREAK RM
G200
LOUNGE
G206
CORRIDOR
C2-24
SEC
G207A
SUPERVISORS
G209
STG
G208
CHIEF
G207
CLEAN
SUPPLY
G212
STOR
G211
SUPPLIES
G211A
SPEC
PROC
BRONCH
G216
VIEWING
G216A
S U G215A
STRETCH
C2-21A
BRONCHOSCOPY
G215
SPIRO
G213
SPIRO
G214
C2-22A
C U G222
OFFICE
G223
ELECTRICAL
G219
NUR/
TECH
OFFICE
G220
MECH
G218
C2-2
G232
CORRIDOR
C2-22
CATH LAB
STRESS
LAB
SHAFT
CA
TH
LA
B
ELECTRICAL
G224A
SCRUB
G225
CORRIDOR
C2-21
CORRIDOR
C2-25
CORRIDOR
C2-23
CATH
LAB
G224
CORRIDOR
G225A
CONT/DATA
G221B
CATH
LAB
G221
SU
G221C
ELECTRICAL
G221A
FILM
VIEW
STG
G225B
HAC
G235
STAFF
TOILET
G227
S U G226
TOILET
G225E
LOCKER
G225F
LOCKER
G225C
TOILET
G225D
STRESS
LAB
G231
STUDY
G229
ELECTRICAL
G233
CONF
G230
RES OFF
STUDY
G228
OFFICE
G210
SPUTUM
G204
SPUTUM
G203
COMM
G234
PATIENT
FILE
G201
PATIENT
FILE
G205A
REPORT
G205
BREAK RM
G200
LOUNGE
G206
CORRIDOR
C2-24
SEC
G207A
SUPERVISORS
G209
STG
G208
CHIEF
G207
CLEAN
SUPPLY
G212
STOR
G211
SUPPLIES
G211A
SPEC
PROC
BRONCH
G216
VIEWING
G216A
S U G215A
STRETCH
C2-21A
BRONCHOSCOPY
G215
SPIRO
G213
SPIRO
G214
C2-22A
C U G222
OFFICE
G223
ELECTRICAL
G219
NUR/
TECH
OFFICE
G220
MECH
G218
STAIR
CORRIDOR
G232
CORRIDOR
C2-22
CATH LAB
STRESS
LAB
SHAFT
CA
TH
LA
B
S X4:L2:067
S
X4:L1:063
S
X4:L2:065
S X4:L2:074
S
X4:L2:076
S X4:L2:079
S X4:L2:082
S
X4:L2:073
S
X4:L2:075
S
X4:L2:066
S X4:L1:065
S
X4:L2:078 S
X4:L2:077
X4:N16:04 X4:S16:04 15cd 0.5w
X4:N16:10 X4:S16:09 15cd 0.5w
X4:N16:07 X4:S16:08 15cd 0.5w
X4:N16:08 15cd
X4:N16:11 15cd
X4:N16:09 15cd
X4:N16:16 X4:S16:16 15cd 0.5w
X4:N16:17 X4:S16:17 75cd 0.5w
X4:N16:13 X4:S16:13 15cd 0.5w
X4:N16:14 X4:S16:14 15cd 0.5w
X4:N16:15 X4:S16:15 15cd 0.5w
X4:N16:18 X4:S16:19 15cd 0.5w
X4:N16:12 X4:S16:11 15cd 0.5w
X4:N16:03 X4:S16:02 15cd 0.5w
X4:N16:01 15cd
X4:N12:01 X4:S12:01 15cd 0.5w
X4:N16:02 X4:S16:01 15cd 0.5w
X4:N16:05 X4:S16:05 15cd 0.5w
X4:N14:01 X4:S14:01 15cd 0.5w
X4:N16:06 X4:S16:06 30cd 0.5w
S X4:L2:080
S X4:L2:081
DH
DH
DH
DH
X4:L2:071
S
X4:L2:072
AIM
X4:L2:083 4-I/0
AOM
X4:L2:064
AOM X4:L1:064
X4:N12:02 X4:S12:04 185cd 1w
WP
S X4:S16:07 0.5w
S
X4:S16:18 0.5w
S
X4:S12:03 0.5w
S
X4:S12:02 0.5w
S
X4:S16:12 0.5w
S
X4:S16:10 0.5w
S
X4:S16:03 0.5w
FACP X4
S X4:L1:001
DH DH
AOM
X4:L2:069
MAGNETIC
LOCK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
Architecture Engineering Design-Build paradigm
AutoCAD SHX Text F
AutoCAD SHX Text
1A.FA102B
AutoCAD SHX Text
KMB
AutoCAD SHX Text
NEW FIRE ALARM PLAN BUILDING 1A SECOND FLOOR AREA B
AutoCAD SHX Text
WLM
AutoCAD SHX Text 200 Envoy Circle, Suite 201, Louisville, KY 40299 www.paradigmusa.com
AutoCAD SHX Text
100% CONSTRUCTION DOCUMENTS
AutoCAD SHX Text
FULLY SPRINKLERED
AutoCAD SHX Text
REPLACE FIRE ALARM SYSTEM
AutoCAD SHX Text 614-19-111
AutoCAD SHX Text 06-24-2020
AutoCAD SHX Text
1030 JEFFERSON AVE, MEMPHIS, TN 38104
AutoCAD SHX Text
MEMPHIS VA MEDICAL CENTER
AutoCAD SHX Text 1A
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
KEY PLAN - SECOND FLOOR
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text F1
AutoCAD SHX Text F1
AutoCAD SHX Text N
AutoCAD SHX Text
MATCHLINE - REFER TO 1A.FA102D
AutoCAD SHX Text
MATCHLINE - REFER TO 1A.FA102A
AutoCAD SHX Text
MATCHLINE - REFER TO 1A.FA102D
AutoCAD SHX Text
MATCHLINE - REFER TO 1A.FA102A
AutoCAD SHX Text
SCALE 1/8'' = 1'-0''
AutoCAD SHX Text
NEW FIRE ALARM PLAN BUILDING NO. 1A - SECOND FLOOR AREA "B"
AutoCAD SHX Text GENERAL NOTES A. REFER TO SHEET FA001 FOR LEGEND, ABBREVIATIONS, REFER TO SHEET FA001 FOR LEGEND, ABBREVIATIONS, SCHEDULES AND GENERAL NOTES. B. THE FIRE ALARM CONTRACTOR SHALL PROVIDE FINISH COVER THE FIRE ALARM CONTRACTOR SHALL PROVIDE FINISH COVER PLATE AT EACH FIRE ALARM DEVICE. C. THE FIRE ALARM CONTRACTOR SHALL PROVIDE NEW JUNCTION THE FIRE ALARM CONTRACTOR SHALL PROVIDE NEW JUNCTION BOX AT EACH FIRE ALARM DEVICE INDICATED ON FLOOR PLANS. D. THE FIRE ALARM CONTRACTOR SHALL ROUTE NEW 3/4" THE FIRE ALARM CONTRACTOR SHALL ROUTE NEW 3/4" CONDUIT FROM EACH FIRE ALARM DEVICE TO NEW FACP OR NAC PANELS. E. CONDUIT SYSTEM SHALL BE 3/4" MINIMUM. 1/2" CONDUIT CONDUIT SYSTEM SHALL BE 3/4" MINIMUM. 1/2" CONDUIT SHALL NOT BE ALLOWED. F. THE FIRE ALARM CONTRACTOR SHALL PROVIDE FINISH COVER THE FIRE ALARM CONTRACTOR SHALL PROVIDE FINISH COVER PLATES AT EACH FIRE ALARM DEVICE. G. THE FIRE ALARM CONTRACTOR SHALL PAINT NEW FIRE ALARM THE FIRE ALARM CONTRACTOR SHALL PAINT NEW FIRE ALARM CONDUIT SYSTEM RED IN COLOR. H. ALL NEW CONDUITS INSTALLED INSIDE SHALL BE EMT ALL NEW CONDUITS INSTALLED INSIDE SHALL BE EMT (ELECTRICAL METALLIC TUBING). I. ALL CONDUITS INSTALLED ON EXTERIOR OF BUILDING SHALL BE ALL CONDUITS INSTALLED ON EXTERIOR OF BUILDING SHALL BE RIGID STEEL, NON-METALLIC TUBING SHALL NOT BE PERMITTED. J. THE FIRE ALARM CONTRACTOR SHALL PROVIDE CUTTING AND THE FIRE ALARM CONTRACTOR SHALL PROVIDE CUTTING AND PATCHING ON ALL WALL OR CEILING OPENINGS. K. THE FIRE ALARM CONTRACTOR SHALL PROVIDE FULLY THE FIRE ALARM CONTRACTOR SHALL PROVIDE FULLY ENGINEERED SHOP DRAWINGS SUBMITTALS OF THE PROPOSED WORK PRIOR TO BEGINNING CONSTRUCTION. THE SHOP DRAWING SUBMITTALS SHALL INCLUDE BUT NOT LIMITED TO: VOLTAGE DROP CALCULATIONS, BATTERY CALCULATIONS, INSULATION VALUE, LENGTH OF WIRE, SLC WIRING DIAGRAM, NAC WIRING DIAGRAM ETC. L. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO PROVIDE PARADIGM ENGINEERING COMPLETED COORDINATION DRAWINGS AT CONCLUSION OF PROJECT, PARADIGM ENGINEERING WILL BEGIN AS-BUILT DRAWINGS WITHOUT COMPLETED COORDINATION DRAWINGS FROM CONTRACTOR. M. REFER TO DRAWING FA514.1A AND FA515.1A FOR BATTERY REFER TO DRAWING FA514.1A AND FA515.1A FOR BATTERY AND VOLT DROP CALCULATIONS. N. REFER TO DRAWING FA501.1A-FA513.1A FOR FIRE ALARM REFER TO DRAWING FA501.1A-FA513.1A FOR FIRE ALARM RISER DIAGRAM.
AutoCAD SHX Text SCOPE OF WORK:: A. THE FIRE ALARM CONTRACTOR SHALL INSTALL NEW FIRE THE FIRE ALARM CONTRACTOR SHALL INSTALL NEW FIRE ALARM DEVICES THROUGHOUT, UNLESS NOTED OTHERWISE. REFER TO FLOOR PLANS FOR ADDITIONAL INFORMATION. B. THE FIRE ALARM CONTRACTOR SHALL INSTALL NEW THE FIRE ALARM CONTRACTOR SHALL INSTALL NEW CONDUIT AND FIRE ALARM CABLING THROUGHOUT, REFER TO FLOOR PLANS FOR ADDITIONAL INFORMATION. C. THE FIRE ALARM CONTRACTOR SHALL PROVIDE MONITOR THE FIRE ALARM CONTRACTOR SHALL PROVIDE MONITOR MODULES AS INDICATED ON FLOOR PLANS TO EXISTING TO REMAIN FIRE ALARM DEVICES. REFER TO FLOOR PLANS FOR ADDITIONAL INFORMATION. D. THE FIRE ALARM CONTRACTOR SHALL USE TAMPER THE FIRE ALARM CONTRACTOR SHALL USE TAMPER PROOF SCREWS THROUGHOUT. E. THE FIRE ALARM CONTRACTOR SHALL INSTALL EMT THE FIRE ALARM CONTRACTOR SHALL INSTALL EMT (ELECTRICAL METALLIC TUBING) WHEN INSTALLING CONDUIT INDOORS. F. THE FIRE ALARM CONTRACTOR SHALL INSTALL RIGID THE FIRE ALARM CONTRACTOR SHALL INSTALL RIGID ALUMINUM OR RIGID STEEL WHEN INSTALLING CONDUIT OUTDOORS.
AutoCAD SHX Text THE EXISTING CEILING GRID SYSTEM IS EXISTING TO REMAIN. THE CONTRACTOR SHALL REMOVE TILE AS REQUIRED TO INSTALL NEW CONDUIT. THE REMOVAL OF CEILING TILE AND INSTALLATION OF CONDUIT SHALL BE COORDINATED WITH VAMC AND SHALL COMPLY WITH INFECTION CONTROL STANDARDS SET BY THE VAMC. REFER REFER TO FLOOR PLAN FOR ROUTING OF NEW CONDUIT AND CIRCUITING INFORMATION.
AutoCAD SHX Text
CEILING WORK NOTE
AutoCAD SHX Text F6
File details come from the government source that posted it. Updated .