36C24919R0128-0003006.pdf

PDF 948 KB Posted

Attached to
626-19-3-3303-0029 - 626-308 - USP 800 Pharmacy Compliance ACY
Solicitation number
36C24919R0128
Issued by

About this file

36C24919R0128 0003 05-18-262_Plumb_FCD USP 800 ACY VAMC.pdf

View the file

Other files

File Type Posted
36C24919R0128-0004001.pdf PDF
36C24919R0128-0004000.docx DOCX document
36C24919R0128-0003004.pdf PDF
36C24919R0128-0003005.pdf PDF
36C24919R0128-0003000.docx DOCX document
36C24919R0128-0003008.pdf PDF
36C24919R0128-0003001.pdf PDF
36C24919R0128-0003003.pdf PDF
36C24919R0128-0003007.pdf PDF
36C24919R0128-0003002.pdf PDF
36C24919R0128-0003009.pdf PDF
36C24919R0128-0002000.docx DOCX document
36C24919R0128-0001005.pdf PDF
36C24919R0128-0001002.pdf PDF
36C24919R0128-0001008.pdf PDF
36C24919R0128-0001000.docx DOCX document
36C24919R0128-0001006.pdf PDF
36C24919R0128-0001004.pdf PDF
36C24919R0128-0001007.pdf PDF
36C24919R0128-0001003.pdf PDF
36C24919R0128-0001001.pdf PDF
36C24919R0128-000.docx DOCX document
36C24919R0128-003.pdf PDF
36C24919R0128-005.xlsx XLSX spreadsheet
36C24919R0128-002.pdf PDF
36C24919R0128-001.docx DOCX document
36C24919R0128-004.docx DOCX document
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ANNOTATION ABBREVIATIONS

PLUMBING SYMBOLS & ABBREVIATIONS

3-WAY CONTROL VALVE

ANGLE GATE VALVE

ANGLE GLOBE VALVE

BALANCING/SHUTOFF VALVE

BALL VALVE

BUTTERFLY VALVE

CHECK VALVE

CALIBRATED BALANCING VALVE

CONTROL VALVE

EXPANSION VALVE

GATE VALVE

GLOBE VALVE

QUICK OPEN VALVE

SAFETY RELIEF VALVE

SOLENOID VALVE

BACKFLOW PREVENTER

ECCENTRIC REDUCER

CONCENTRIC REDUCER

FLOW ARROW

HOSE BIBB / SILLCOCK

VACUUM RELIEF VALVE

GAS COCK

PLUG VALVE

PLUMBING SYMBOLS

PRESSURE REDUCING VALVE (WATER)

PRESSURE REGULATOR (GAS)

PIPE ANCHOR

PIPE GUIDES

WALL CLEANOUT

SUSPENDED CLEANOUT

WCO

WYE STRAINER

WYE STRAINER W/DRAIN VALVE

FLOOR DRAIN - ROUND OR SQUARE

FLOOR CLEANOUT - ROUND OR SQUARE

PIPE CAP

PIPE TURNING DOWN

PIPE TURNING UP

TEE UP

TEE DOWN

DROP AND RUN

DROP AND TURN

TEE OFF TOP

TEE OFF BOTTOM

CROSS AND RISER

PLAN 90° ELBOW

PIPE TEE

PIPE UNION

FLEXIBLE PIPE CONNECTOR

WATER METER

PUMP

AUTOMATIC AIR VENT

PRESSURE SWITCH

PRESSURE GAUGE

THERMOMETER

FLOW SWITCH

TEMPERATURE SWITCH

OR

OR

CO

PIPE SLOPE ARROW

F

P

T

M

CWR

HW

PIPING SYSTEM

NG NATURAL GAS

ST STORM

PD PUMP DISCHARGE

OFD OVERFLOW STORM DRAIN

GW GREASE WASTE

OW OIL WASTE

SAN SANITARY WASTE

CD CONDENSATE DRAIN

CA COMPRESSED AIR

AW ACID WASTE

N2 NITROGEN

N2O NITROUS OXIDE

MA MEDICAL AIR

O2 OXYGEN

WAGD WASTE ANESTHETIC GAS DISPOSAL

VAC VACUUM

V SANITARY VENT

OV OIL VENT

AV ACID VENT

NPCW NONPOTABLE COLD WATER

DI DE-IONIZED WATER

SCW SOFTENED COLD WATER

CW DOMESTIC COLD WATER

RO REVERSE OSMOSIS WATER

DOMESTIC CW RECIRCULATION

DOMESTIC HOT WATER

CO2 CARBON DIOXIDE

HW 140 DOMESTIC HOT WATER (OTHER TEMP)

PG PROPANE GAS

PLUMBING SYMBOLS

ANNOTATION SYMBOLS

(E)EXISTING

NEW KEYNOTE

DEMO KEYNOTE

NEW BOLD TEXT INDICATES NEW ITEM

TEXT INDICATES EXISTING ITEM

PLUMBING EQUIPMENT DESIGNATION

DETAIL OR SECTION MARK

SHOWN ON DRAWING

DETAIL MODULE NUMBER

CONNECT TO EXISTING

LIMITS OF DEMOLITION

P-###

HWR DOMESTIC HW RECIRCULATION

PLUMBING GENERAL NOTES

PLUMBING DEMOLITION GENERAL NOTES

1. VERIFY EXISTING CONDITIONS PRIOR TO BEGINNING WORK. NOTIFY COR REGARDING CONFLICTS BEFORE

PROCEEDING WITH WORK.

2. REMOVED ITEMS REMAIN PROPERTY OF GOVERNMENT UNTIL COR DETERMINES THAT THEY ARE NOT REQUIRED. REMOVE FROM SITE ITEMS NOT BEING RETAINED BY GOVERNMENT OR REINSTALLED AS PART OF

THIS WORK.

3. DO NOT DISTURB ITEMS NOT INDICATED FOR DEMOLITION.

4. VERIFY SIZE AND LOCATION OF EXISTING UTILITIES PRIOR TO START OF DEMOLITION. RELOCATE, REMOVE AND

ADJUST MECHANICAL AND ELECTRICAL ITEMS AS NECESSARY TO COORDINATE WITH NEW WORK.

5. AFTER DEMOLITION IS COMPLETE, PATCH AND REPAIR FINISHES TO MATCH EXISTING ADJACENT CONDITIONS.

6. COORDINATE DEMOLITION WITH COR. SUBMIT SHUDTOWN PLAN AND SCHEDULE TO COR FOR REVIEW AND

APPROVAL.

7. PROTECT EXISTING UTILITIES TO REMAIN FROM DAMAGE DURING DEMOLITION. REPAIR UTILITIES AND SERVICES

DAMAGED AT NO ADDITIONAL COST.

8. TEMPORARILY MOVE OR TAKE EQUIPMENT OUT OF SERVICE AS NECESSARY TO COMPLETE WORK.

9. SAWCUT CONCRETE FLOOR AS REQUIRED FOR DEMOLITION WORK INDICATED. COORDINATE WITH NEW

PLUMBING AND WORK OF OTHER TRADES.

1. WORK SHALL CONFORM TO APPLICABLE LOCAL, STATE, AND NATIONAL CODES AND APPLICABLE VA

STANDARDS.

2. INSTALL EQUIPMENT IN ACCORDANCE WITH MANUFACTURER'S WRITTEN RECOMMENDATIONS.

3. OBTAIN AND PAY FOR PERMITS, FEES, AND INSPECTIONS REQUIRED FOR THIS WORK.

4. PROVIDE NEW MATERIALS, EQUIPMENT AND PRODUCTS INCORPORATED IN THE WORK, OF A SUITABLE

GRADE FOR THE PURPOSES INTENDED.

5. EQUIPMENT OR MATERIAL DEVIATIONS FROM INDICATED CONTRACT REQUIREMENTS ARE SUBJECT TO THE APPROVAL OF THE COR. SUBMIT PROPOSED EQUIPMENT DEVIATIONS THAT ARE SIMILAR BOTH IN QUALITY

AND CAPACITY TO THAT EQUIPMENT SPECIFIED, AS SOLELY DETERMINED BY THE COR.

6. INSTALL EQUIPMENT AS INDICATED, ALLOWING FOR SUFFICIENT ACCESS AND CLEARANCE SPACE FOR

EQUIPMENT MAINTENANCE, REPAIRS, AND REPLACEMENT.

7. AT EACH PLUMBING FIXTURE, PROVIDE A PISTON TYPE WATER HAMMER ARRESTOR SIZED ACCORDING TO

MANUFACTURER'S RECOMMENDATIONS.

8. SANITARY DRAINAGE PIPING INDICATED IS LOCATED BELOW FLOOR SLAB OR WITHIN WALLS UNLESS NOTED OTHERWISE. SANITARY VENT PIPING INDICATED IS ABOVE THE CEILING OR WITHIN WALLS UNLESS NOTED

OTHERWISE.

9. SUPPORT PIPING SYSTEM AS REQUIRED BY APPLICABLE LOCAL, STATE, AND NATIONAL CODES ALONG WITH

SPECIFICATIONS, VA STANDARDS AND MANUFACTURER'S RECOMMENDATIONS.

10. FIRESTOP AND SEAL PIPING PENETRATIONS THROUGH WALLS AND FLOORS EQUAL TO THE RATING OF

WALLS AND FLOORS.

11. TEST PLUMBING SYSTEM IN ACCORDANCE WITH APPLICABLE LOCAL, STATE AND NATIONAL CODES AND

APPLICABLE VA STANDARDS.

12. COORDINATE PLUMBING PIPING WITH WORK OF OTHER DISCIPLINES.

13. DISINFECT DOMESTIC WATER SYSTEM IN ACCORDANCE WITH APPLICABLE LOCAL, STATE, AND NATIONAL

CODES AND APPLICABLE VA STANDARDS.

14. PROVIDE SHUT OFF VALVES AT BRANCH PIPING TO FIXTURES.

15. COORDINATE PLUMBING WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION. COORDINATE ROUTING

OF PIPING WITH EXISTING CONDITIONS.

16. PROVIDE ALL NECESSARY OFFSETS, TEES, ELBOWS, ETC. FOR A COMPLETE AND COORDINATED WORKING PLUMBING SYSTEM. DRAWING PLANS, SCHEMATICS, AND DIAGRAMS INDICATE GENERAL LOCATION AND

ARRANGEMENT OF PIPING SYSTEMS.

17. CONTRACTOR SHALL COORDINATE ANY PLUMBING SYSTEM REQUIRED SHUTDOWN WITH THE OWNER 1

WEEK IN ADVANCE.

18. PATCH, PAINT AND CLEAN SURFACES SUSTAINING DAMAGE ASSOCIATED WITH PLUMBING WORK OF THIS

CONTRACT, UNLESS NOTED OTHERWISE.

19. SUBMIT BOUND SET OF OPERATING AND MAINTENANCE INSTRUCTIONS FOR EQUIPMENT AT COMPLETION OF

PROJECT.

20. INSTALL ESCUTCHEONS IN ALL PLACES WHERE PIPING PENETRATES A WALL IN AN EXPOSED LOCATION.

21. DO NOT INSTALL PIPES ABOVE TELECOM OR ELECTRICAL EQUIPMENT.

A/E ARCHITECT/ENGINEER

AC ABOVE CEILING

AD AREA DRAIN

AFF ABOVE FINISHED FLOOR

AG AIR GAP

AP ACCESS PANEL

AS AUTOMATIC SPRINKLER

AFG ABOVE FINISHED GRADE

ASD ADJUSTABLE SPEED DRIVE

ASHRAE AMERICAN SOCIETY HEATING,

REGRIGERATING, AIR CONDITIONING

ENGINEERS

ASME AMERICAN SOCIETY OF MECHANICAL

ENGINEERS

ASPE AMERICAN SOCIETY PLUMBING

ENGINEERS

ASR AUTOMATIC SPRINKLER RISER

AV ACID VENT

AW ACID WASTE

BAS BUILDING AUTOMATION SYSTEM

BF BELOW FLOOR

BFP BACKFLOW PREVENTER

BG BELOW GRADE

BH BOOSTER HEATER

BHP BREAK HORSEPOWER

BJ BETWEEN JOISTS

BOP BOTTOM OF PIPE

BSP BLACK STEEL PIPE

BT BATHTUB

BTUH BRITISH THERMAL UNITS PER HOUR

C CELSIUS

CF COMBINATION FIXTURE

CGA COMPRESSED GAS ASSOCIATION

CI CAST IRON

CO CLEANOUT

COND CONDENSATE

CP CONDENSATE PUMP

CS CLINICAL SINK

CV CONTROL VALVE

DCW DOMESTIC COLD WATER

DHW DOMESTIC HOT WATER

DHWR DOMESTIC HOT WATER RETURN

DHWS DOMESTIC HOT WATER SUPPLY

DF DRINKING FOUNTAIN

DI DEIONIZED WATER

DN DOWN

DOE DEPARTMENT OF ENERGY

DS DOWNSPOUT

DW DISHWASHER

DWG DRAWING

DWH DOMESTIC WATER HEATER

DWR DRINKING WATER RETURN

DWS DRINKING WATER SUPPLY

DWV DRAIN WASTE VENT

EC ELECTRICAL CONTRACTOR

EL ELEVATION

EMCS ENERGY MONOSERRAT AND CENTRAL

SYSTEM

EPA ENVIRONMENTAL PROTECTION

AGENCY

EPACT ENERGY POLICY ACT

ESC ESCUTCHEON

ESH EMERGENCY SHOWER

ET EXPANSION TANK

EWC ELECTRIC WATER COOLER

EWH ELECTRIC WATER HEATER

EWS EYEWASH STATION

EX EXISTING

F FAHRENHEIT

FA FROM ABOVE

FB FROM BELOW

FBO FURNISHED BY OTHERS

FCO FLOOR CLEANOUT

FCW FILTERED COLD WATER

FD FLOOR DRAIN

FDC FIRE DEPARTMENT (HOSE)

CONNECTION

FM FLOW METER

FOP FUEL OIL PUMP

FOR FUEL OIL RETURN

FOS FUEL OIL SUPPLY

FOV FUEL OIL VENT

FS FLOOR SINK

FU FIXTURE UNITS

G GALLON

GC GENERAL CONTRACTOR

GCO GRADE CLEANOUTS

GD GARBAGE DISPOSAL

GPD GALLONS PER DAY

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

GPR GAS PRESSURE REGULATOR

GRS GAS REGULATOR STATION

GT GREASE TRAP

GVTR GAS VENT THROUGH ROOF

GWH GAS FIRED WATER HEATER

H&CW HOT AND COLD WATER

HB HOSE BIBB (INTERIOR)

HD HUB DRAIN

HEX HEAT EXCHANGER

HP HORSEPOWER

HS HAND SINK

HST HOT WATER STORAGE TANK

(DOMESTIC)

HWB HOT WATER BOILER

HWCP HOT WATER CIRCULATING PUMP

HWP HOT WATER PUMP

HYD HYDRANT

ICW INDUSTRIAL COLD WATER

INV INVERT

IPC INTERNATIONAL PLUMBING CODE

IRW IRRIGATION WATER

IW INDIRECT WASTE

IWH INSTANTANEOUS WATER HEATER

IWR INDUSTRIAL WATER RETURN

IWS INDUSTRIAL WATER SUPPLY

KW KILOWATT

KWHR KILOWATT-HOUR

L/S LITER PER SECOND

LA LABORATORY AIR

LAV LAVATORY

LBS/HR POUNDS PER HOUR

LCW LABORATORY COLD WATER

LHW LABORATORY HOT WATER

LNG LIQUID NATURAL GAS

LOX LIQUID OXYGEN

LV LABORATORY VACUUM

LW LOW WATER

M METER

MA MEDICAL AIR

MAV MANUAL AIR VENT

MBH THOUSANDS OF BTU PER HOUR

MC MECHANICAL CONTRACTOR

MED MEDICAL

MER MECHANICAL EQUIPMENT ROOM

MH MANHOLE

MOU MEMORANDUM OF UNDERSTANDING

MSB MOP SINK BASIN

MV MEDICAL VACUUM

N2 NITROGEN

N2O NITROUS OXIDE

NC NORMALLY CLOSED

NG NATURAL GAS

NIC NOT IN CONTRACT

NO NORMALLY OPEN

NOM NOMINAL

NPW NON POTABLE WATER

NTS NOT TO SCALE

O2 OXYGEN

OC ON CENTER

OD OUTSIDE DIAMETER

OFD OVERFLOW DRAIN

OR OPERATING ROOM

OVFL OVERFLOW

PA PACAL

PC PLUMBING CONTRACTOR

PD PRESSURE DROP

PDI PLUMBING AND DRAINAGE INSTITUTE

PG PRESSURE GAUGE

PP PLUMBING PUMP

PPM PARTS PER MILLION

PRS PRESSURE REDUCING STATION

PRV PRESSURE REDUCING VALVE

PSI POUNDS PER SQUARE INCH

PSIA POUNDS PER SQUARE INCH

ATMOSPHERE

PSIG POUNDS PER SQUARE INCH GAUGE

PTRV PRESSURE TEMPERATURE RELIEF

VALVE

PW POTABLE WATER

RD ROOF DRAIN

RDL ROOF DRAIN LEADER

RL ROOF LEADER

RO REVERSE OSMOSIS

RWL RAIN WATER LEADER

SAN SANITARY SEWER

SCFM STANDARD CUBIC FOOT/MIN

SCW SOFTENED COLD WATER

SDMH STORM DRAIN MANHOLE

SP SUMP PUMP

SPR SPRINKLER LINE

SQFT SQUARE FOOT

SS STAINLESS STEEL

ST STORAGE TANK

SW STORM WATER

TCV TEMPERATURE CONTROL VALVE

TD TRENCH DRAIN

TDH TOTAL DYNAMIC HEAD

TDL TEMPERATURE DIFFERENTIAL

TEMP TEMPERATURE

TMV THERMOSTATIC MIXING VALVE

TP TRAP PRIMER

TSTAT THERMOSTAT

TWR TEMPERED WATER RETURN

TWS TEMPERED WATER SUPPLY

TYP TYPICAL

UPC UNIFORM PLUMBING CODE

V SANITARY VENT

VAC VACUUM

VB VACUUM BREAKER

VCO VACUUM CLEANER OUTLET

VP VACUUM PUMP

VS VENT STACK

VTR VENT THROUGH ROOF

W WASTE

WC WATER CLOSET

WCO WALL CLEANOUT

WG WATER GAUGE

WH WATER HEATER

WHA WATER HAMMER ARRESTOR

WHD WALL HYDRANT

WL WATER LINE

WM WATER METER

WPD WATER PRESSURE DROP

WS WASTE STACK

YCO YARD CLEANOUT

YH YARD HYDRANT

1-1/2" P-TRAP WITH CLEANOUT

(JT-150 P-TRAP)

NOTES:

1. BASIS OF DESIGN: JUST MANUFACTURING COMPANY.

AC OUTLET LOCATION FOR AC

FAUCET. (ON EMERGENCY

CIRCUIT ONLY)

COVER REMOVED

FOR CLARITY

SENSOR OPERATED DECXK

MOUNT GOOSENECK FAUCET

WITH ADJUSTABLE

TEMPERATURE CONTROL

WITH AC PLUG. (JSGN-6-AC)

STAINLESS

STEEL DRAIN

(J-35-SSF DRAIN)

SCRUB SINK

(J-770-1-S)

FINISHED FLOOR

THERMOSTATIC MIXING

VALVE BRONZE WITH 1/2"

SWEAT UNION INLET AND

OUTLET CONECTIONS.

(JTM-47LF)

HOT & COLD

WATER

CONNECTIONS

TEMPERED

WATER & COLD

WATER

CONNECTIONS

TO FAUCET

DIGITAL TIMER

(-DTC)

TOP VIEW

FRONT VIEW

/2

2'-10"

SCRUB SINK

(J-770-1-S)

WALL MOUNTED

EYEWASH LOCATION.

SEE DETAIL FOR

INSTALLTION.

FAUCET CONTROL BOX.

AC OUTLET LOCATION FOR AC

FAUCET.

FRONT VIEW

TOP VIEW GUAGE

INLINE FILTER

COLD WATER LINE

GUAGE

INLINE FILTER

SHUT OFF VALVE (TYP.)

COLD WATER LINE

NOTES:

1. BASIS OF DESIGN: PREMIERE BG-20BIV

SHUT OFF VALVE (TYP.)

1-1/4" P-TRAP (JT-125 P-TRAP)

NOTES:

1. BASIS OF DESIGN: JUST MANUFACTURING COMPANY.

AC OUTLET LOCATION FOR AC

FAUCET. (ON EMERGENCY

CIRCUIT ONLY)

COVER REMOVED

FOR CLARITY

STAINLESS STEEL

DRAIN

(J-ADA-115-FS DRAIN)

LAVATORY

(A-33338-S)

FINISHED FLOOR

THERMOSTATIC MIXING

VALVE BRONZE WITH 1/2"

SWEAT UNION INLET AND

OUTLET CONECTIONS.

(JTM-47LF)

HOT & COLD

WATER

CONNECTIONS

TEMPERED

WATER & COLD

WATER

CONNECTIONS

TO FAUCET

TOP VIEW

FRONT VIEW

" FAUCET CONTROL BOX.

AC OUTLET LOCATION FOR AC

FAUCET.

20"

AGRICULTURE

S

IL

AS

P. GEORG

E

R E G

IS

T E

RED ENG

IN

E E R

C O M M E R C E

N o . 12 0 6 3 4

S T A

T E

OF T ENNE

S

S E E

Revisions: Date

Drawing Title:

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/7

/2

:0

:5

P M

P-001

PLUMBING GENERAL INFORMATION

1 3SPG PA

USP 800 PHARMACY

COMPLIANCE FOR YORK

VAMC - TVHS

3400 LEBANON RD, MURFREESBORO,

TN 37129

05/07/2019

FINAL CONSTRUCTION DOCUMENTS

626-30818-262

PLUMBING FIXTURE SCHEDULE

MARK DESCRIPTON DFU EACH CW WSFU HW WSFU TOTAL WSFU WASTE PIPE VENT PIPE COLD WATER HOT WATER

WRIST BLADE

HANDLES

ELECTRIC

SENSOR REMARKS

POINT OF ENTRY FILTER 0.02 MICRON FILTER WITH GUAGE

P-405 LAVATORY WALL HUNG, PUBLIC 3 1.5 1.5 1 1/2" 0" 3/8" 3/8" No Yes STAINLESS STEEL

P-519 SCRUB SINK WALL HUNG, PUBLIC 3 1.5 1.5 1 1/2" 0" 3/8" 3/8" No Yes STAINLESS STEEL

P-708 EYEWASH, SINK WALL MOUNTED EYEWASH, WALL MOUNTED AUTO-FLOW, 90º SWING DOWN, RIGHT HAND MOUNTING

PLUMBING LOAD SUMMARY

MARK DESCRIPTION QUANTITY DFU EACH DFU

CW WSFU

EACH

CW WSFU

HW WSFU

EACH HW WSFU

TOTAL WSFU

EACH TOTAL WSFU

P-405 LAVATORY WALL HUNG, PUBLIC 1 3 3 1.5 1.5 1.5 1.5 2 2

P-519 SCRUB SINK WALL HUNG, PUBLIC 3 3 9 1.5 4.5 1.5 4.5 2 6

P-708 EYEWASH, SINK WALL MOUNTED 3 0 0 0 0

7 12 6 6 8

Scale: N.T.S.

EYEWASH DETAIL - WALL MOUNTED

Scale: N.T.S.

SCRUB SINK DETAIL - SENSOR OPERATED P-519 WITH EYEWASH LOCATION

Scale: N.T.S.

POINT OF ENTRY FILTER

20 GPM

Scale: N.T.S.

LAVATORY DETAIL - SENSOR OPERATED P-405

DocuSign Envelope ID: 875E8CD5-6CD7-4ABE-92BE-ECC5B74C69DB

5/8/2019

3/4" DCW

3/4" DHW

1/2" HWR

1/2" HWR

3/4" DHW

2" DCW

RECEIVING

TEARDOWN

G12V

DELIVERY/

RECYCLING

/WASTE

PICKUP

G12U

CORRIDOR

G12W

HD

STAGING

G12X

HD

BUFFER

G12HH

HD

ANTEROOM

G12GG

IV

BUFFER

G12CC

OFFICE

G12AA

IV

ANTEROOM

G12DD

OPEN

STORAGE

G12Z

P-519

P-405

P-519

P-519

P-708

P-708

1/2" HWR

3/4" DHW

3/4" DCW

1/2" DHW

1/2" DCW

/2

H

W R

1/2" HWR

1/2" DCW

/4

D

C W

/4

D

H W

/2

H

W R

1/2" DHW

AA

BB

EE

FF

GG

13 25 27 30 34 37 402625.5

IV PREP

G12R

88 SF

ANTE

G12S

63 SF

CHEMO

G12T

58 SF

POINT OF

ENTRY FILTER

P-708

IV

BUFFER

G12MM

73 SF

OFFICE

G12AA

77 SF

OPEN

STORAGE

G12Z

567 SF

COORDINATE WORK WITH OTHER

TRADES AND THE COR TO

MINIMIZE DISRUPTION OF AREAS.

A.

AGRICULTURE

S

IL

AS

P. GEORG

E

R E G

IS

T E

RED ENG

IN

E E R

C O M M E R C E

N o . 12 0 6 3 4

S T A

T E

OF T ENNE

S

S E E

## KEY NOTES:

Revisions: Date

Drawing Title:

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER:

SHEET NOTES:

WALL RATING LEGEND

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREAS S S S

/7

/2

:0

:5

P M

PP101

GROUND FLOOR DOMESTIC WATER

PLAN

2 3SPG PA

USP 800 PHARMACY

COMPLIANCE FOR YORK

VAMC - TVHS

3400 LEBANON RD, MURFREESBORO,

TN 37129

05/07/2019

FINAL CONSTRUCTION DOCUMENTS

626-30818-262

0 2 4 8

NORTH

TRUE

1 DOMESTIC WATER LINES BASED ON EXISTING

BASEMENT PLAN. BELOW SLAB IN THIS PLAN.

2 BALANCING VALVE SET 5 GPM.

3 SEE DETAIL 3/P-001.

N

AREA OF WORK

SCOPE OUTLINE

KEY PLAN

SCALE: NO SCALE

Scale: 1/4" = 1'-0"

FIRST FLOOR DOMESTIC WATER PLAN

RECEIVING

TEARDOWN

G12V

DELIVERY/

RECYCLING

/WASTE

PICKUP

G12U

CORRIDOR

G12W

HD

STAGING

G12X

HD

BUFFER

G12HH

HD

ANTEROOM

G12GG

IV

BUFFER

G12CC

OFFICE

G12AA

3" S

A N

3" SAN

2" SAN

S A

N

S A

N

4" S A N

S A

N

4" SAN

P-519

P-405

P-519

P-519

P-708

P-708

IV

ANTEROOM

G12DD

OPEN

STORAGE

G12Z

OPEN

STORAGE

G12Z

4" SAN

/2

V

2" SAN

1 1/2" V

FCO

IV PREP

G12R

ANTE

G12S

CHEMO

G12T

PAT ED

BOOTHS

G13

S A

N

S A

N

S

A N

CO

2" SAN

AA

BB

EE

FF

GG

13 25 27 30 34 37 402625.5

P-708

OFFICE

G12AA

77 SF

IV

BUFFER

G12MM

73 SF

/2

V

1 1/2" V

2" SAN

COORDINATE WORK WITH OTHER

TRADES AND THE COR TO

MINIMIZE DISRUPTION OF AREAS.

A.

AGRICULTURE

S

IL

AS

P. GEORG

E

R E G

IS

T E

RED ENG

IN

E E R

C O M M E R C E

N o . 12 0 6 3 4

S T A

T E

OF T ENNE

S

S E E

## KEY NOTES:

Revisions: Date

Drawing Title:

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER:

SHEET NOTES:

WALL RATING LEGEND

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREAS S S S

/7

/2

:0

:5

P M

PW101

UNDERSLAB FLOOR DRAIN, WASTE,

AND VENT PLAN

3 3SPG PA

USP 800 PHARMACY

COMPLIANCE FOR YORK

VAMC - TVHS

3400 LEBANON RD, MURFREESBORO,

TN 37129

05/07/2019

FINAL CONSTRUCTION DOCUMENTS

626-30818-262

Scale: 1/4" = 1'-0"

UNDERSLAB FLOOR DRAIN, WASTE, AND VENT PLAN 0 2 4 8

NORTH

TRUE

N

AREA OF WORK

SCOPE OUTLINE

KEY PLAN

SCALE: NO SCALE

1 SANITARY PIPE IS BELOW FLOOR.

2 VENT UP THROUGH SIDEWALL JUST BELOW

ROOF.

3 CONNECT NEW SANITARY PIPE TO EXISTING

CLEANOUT AT LOCATION INDICATED.

PROVIDE CLEANOUT WITH NEW PIPE.

Sheets
P-001 - PLUMBING GENERAL INFORMATION
PP101 - GROUND FLOOR DOMESTIC WATER PLAN
PW101 - UNDERSLAB FLOOR DRAIN, WASTE, AND VENT PLAN
2019-05-13T14:35:15-0700
Digitally verifiable PDF exported from www.docusign.com

File details come from the government source that posted it.