SHOP DRAWINGS HIGH PRESSURE STEAM PUMPED ROVANCO PIPING SYSTEM.pdf

PDF 5 MB Posted

Attached to
Z1DZ--FY27 NRM (PROJ 516-26-117) BB Repair Steam Piping in Manhole Near Building 1
Solicitation number
36C24827Q0004
Issued by

About this file

This document is a specification and installation manual for a high-pressure steam and pumped condensate piping system. The specification section 33 63 00 includes complete shop drawings for the system's design, along with comprehensive field installation instructions for the Rovanco Insul-800 High Temperature Conduit System.

The Insul-800 system is designed for underground high-temperature applications (210°F and above) and consists of a steel, copper, or stainless steel carrier pipe with mineral wool or high-temp foam insulation, enclosed in a 10-gauge steel inner conduit casing with a polyethylene outer jacket. The system is drainable, dryable, and air-testable. Installation requirements include carrier pipe welding with hydrostatic testing at 1.5 times operating pressure (not exceeding 250 psig), cold springing procedures for expansion loops, field joint insulation using sectional or poured-in-place foam, connector band welding and air testing at 15 psig, and concrete anchor placement. The specification mandates all carrier pipes undergo hydrostatic testing and conduits undergo air testing prior to pouring thrust blocks or backfilling. Additional requirements cover test can application, inner conduit casing insulation and sealing, concrete anchor pouring, system backfilling with clean material, inner conduit casing drying procedures, manhole and building entry details, and annual maintenance including drain plug inspection, yearly air testing at 15 psig, and insulation leak detection. The standard specifications reference ANSI B31.1 standards and require certification testing by independent agencies for insulation materials.

View the file

Other files

File Type Posted
Base Offer Price Breakdown - 1 page.xlsx XLSX spreadsheet
36C24827Q0004_1.pdf PDF
516-26-117 Specifications 00 01 10.pdf PDF
05_SOW 516-26-117.pdf PDF
PPQ.pdf PDF
EMR 1 page.docx DOCX document
WD-FL20260222 DATED 5-18-26.pdf PDF
05_Drawings SECTION LP302- 516-26-117.pdf PDF
05_ASBUILTS-516-26-117.pdf PDF
PPQ.pdf PDF
Base Offer Price Breakdown - 1 page.xlsx XLSX spreadsheet
ASBUILTS-516-26-117.pdf PDF
SHOP DRAWINGS HIGH PRESSURE STEAM PUMPED ROVANCO PIPING SYSTEM.pdf PDF
PPQ -Request form.docx DOCX document
05_Drawings SECTION LP302- 516-26-117.pdf PDF
WD-FL20260222 DATED 5-18-26.pdf PDF
36C24827Q0004_1.pdf PDF
516-26-117 Specifications 00 01 10.pdf PDF
EMR 1 page.docx DOCX document
SHOP DRAWINGS HIGH PRESSURE STEAM PUMPED CONDENSATE ROVANCO PIPING SYSTEM.pdf PDF
05_Drawings LP302- 516-26-117.pdf PDF
36C24827Q0004.docx DOCX document
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

S p e c S e c t i o n

C B

C o m p l e t e D e s i g n D r a w i n g s y s t e m

S P E C I F I C A T I O N S E C T I O N

S H O P D R A W I N G S H I G H P R E S S U R E S T E A M P U M P E D

C O N D E N S A T E

P E C I F I C A T I O N S E C T I O N

S H O P D R A W I N G S H I G H P R E S S U R E S T E A M P U M P E D C O N D E N S A

E C I F I C A T I O N S E C T I O N

S H O P D R A W I N G S H I G H P R E S S U R E S T E A M P U M P E D C O N D E N S A

E C I F I C A T I O N

S E C T I O N

S H O P D R A W I N G S H I G H P R E S S U R E S T E A M P U M P E D C O N D E N S A

E C I F I C A T I O N S E C T I O N

S H O P D R A W I N G S H I G H P R E S S U R E

S T E A M P U M P E D

C O N D E N S A

Spec Section: 33 63 00 1.5 C.1.B:

Field installation instructions

Rev-1 Rev-2 Section 002

Spec Section: 33 63 00 1.5 C.1.B:

Field installation instructions

Rev-1 Section 001 Rev-2 Section 002