Base Offer Price Breakdown - 1 page.xlsx

XLSX spreadsheet 23 KB Posted

Attached to
Z1DZ--FY27 NRM (PROJ 516-26-117) BB Repair Steam Piping in Manhole Near Building 1
Solicitation number
36C24827Q0004
Issued by

About this file

This is a pricing template for submission of a base offer cost breakdown on a VA construction project. The spreadsheet is structured to capture labor costs, material costs, and total costs organized by the 34 CSI (Construction Specifications Institute) divisions, including General Requirements, Concrete, Masonry, Metals, Wood and Plastic, Thermal & Moisture Protection, Doors and Windows, Finishes, Specialties, Equipment, Furnishings, Special Construction, Conveying Equipment, Fire Suppression, Plumbing, HVAC, Electrical, Communications, Electronic Safety & Security, Earthwork, Exterior Improvements, Utilities, and Transportation. Offerors must enter all labor and material costs by division, with the template automatically calculating division subtotals. The template also includes fields for Overhead percentage, Profit percentage, and Bond percentage, which are applied sequentially to generate the Total Base Offer Cost. The instructions emphasize that offerors must provide additional detailed price breakdowns to avoid lump sum pricing and that the completed price offer breakdown represents the overall base offer price for government price analysis. This template corresponds to the VA's presolicitation notice for BB Repair Steam Piping in Manhole Near Building 1 (Project 516-26-117) at Bay Pines VAMC in St. Petersburg, Florida, which is set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) and is anticipated to involve several months of repair work on an active steam leak in a critical manhole serving multiple buildings.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Offer Base Offer Cost Breakdown

Project Number: N/A Edward L Roy: VA assigned project #

Date:
Project Title
Edward L Roy: VA assigned Project TitleProject Location
Offeror Name
Offeror Street
Offeror CityStateZip

Item Description Labor Cost Edward L Roy: Enter all Labor Costs by Division

Material Cost
Edward L Roy: Enter all Material Costs by DivisionTotal Cost

Edward L Roy: This Column is the sum of the Division's Labor and Material Costs

Division 1General Requirements
Division 2Existing Conditions- 0
Division 3Concrete- 0- 0
Division 4Masonry- 0
Division 5Metals- 0- 0
Division 6Wood and Plastic- 0
Division 7Thermal & Moisture Protect- 0- 0
Division 8Doors and Windows- 0- 0- 0
Division 9Finishes- 0- 0- 0
Division 10Specialties- 0- 0- 0
Division 11Equipment- 0- 0- 0
Division 12Furnishings- 0- 0- 0
Division 13Special Construction- 0- 0
Division 14Conveying Equipment- 0- 0- 0
Division 21Fire Suppression- 0- 0- 0
Division 22Plumbing- 0- 0- 0
Division 23HVAC- 0- 0- 0
Division 26Electrical- 0- 0- 0
Division 27Communications- 0- 0- 0
Division 28Electronic Safety & Security- 0- 0- 0
Division 31Earthwork- 0- 0- 0
Division 32Exterior Improvements- 0- 0- 0
Division 33Utilities- 0- 0- 0
Division 34Transportation Subtotal- 0- 0- 0
Division Subtotals :$ - 0$ - 0$ - 0

Overhead % Edward L Roy: Enter Overhead % here. This % will be multiplied by the Division Total Cost Subtotal (cell F36).

Edward L Roy: Date Offer Prepared/Submitted

- 0
Profit %
Edward L Roy: Enter Profit % here.This % will be multiplied by the sum of the Division Total Cost subtotal (cell F36) plus the calculated Overhead (cell F38).- 0
Bond %

Edward L Roy: Enter Bond % here. This % will be multiplied by the sum of the Division Total Cost Subtotal (cell F36), the amount of calculated Overhead (cell F38) and the amount of calculated Profit (cell F39).

Edward L Roy: Enter all Labor Costs by Division

- 0
Overhead/Profit Subtotals :$ - 0

Edward L Roy: Sum of Overhead, Profit and Bond %.

Edward L Roy: Enter all Material Costs by Division Edward L Roy: This Column is the sum of the Division's Labor and Material Costs Total Base Offer Cost $ - 0 $ - 0 $ - 0

Offerors shall provide additional price breakdown to avoiding lump sum, etc. This price offer breakdown is the overall base offer price for Government price analysis

File details come from the government source that posted it. Updated .