Base Offer Price Breakdown - 1 page.xlsx
XLSX spreadsheet 23 KB Posted
- Solicitation number
- 36C24827Q0004
About this file
This is a pricing template for submission of a base offer cost breakdown on a VA construction project. The spreadsheet is structured to capture labor costs, material costs, and total costs organized by the 34 CSI (Construction Specifications Institute) divisions, including General Requirements, Concrete, Masonry, Metals, Wood and Plastic, Thermal & Moisture Protection, Doors and Windows, Finishes, Specialties, Equipment, Furnishings, Special Construction, Conveying Equipment, Fire Suppression, Plumbing, HVAC, Electrical, Communications, Electronic Safety & Security, Earthwork, Exterior Improvements, Utilities, and Transportation. Offerors must enter all labor and material costs by division, with the template automatically calculating division subtotals. The template also includes fields for Overhead percentage, Profit percentage, and Bond percentage, which are applied sequentially to generate the Total Base Offer Cost. The instructions emphasize that offerors must provide additional detailed price breakdowns to avoid lump sum pricing and that the completed price offer breakdown represents the overall base offer price for government price analysis. This template corresponds to the VA's presolicitation notice for BB Repair Steam Piping in Manhole Near Building 1 (Project 516-26-117) at Bay Pines VAMC in St. Petersburg, Florida, which is set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) and is anticipated to involve several months of repair work on an active steam leak in a critical manhole serving multiple buildings.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PPQ.pdf | ||
| SHOP DRAWINGS HIGH PRESSURE STEAM PUMPED ROVANCO PIPING SYSTEM.pdf | ||
| 516-26-117 Specifications 00 01 10.pdf | ||
| 05_SOW 516-26-117.pdf | ||
| EMR 1 page.docx | DOCX document | |
| WD-FL20260222 DATED 5-18-26.pdf | ||
| 36C24827Q0004_1.pdf | ||
| 05_Drawings SECTION LP302- 516-26-117.pdf | ||
| SHOP DRAWINGS HIGH PRESSURE STEAM PUMPED ROVANCO PIPING SYSTEM.pdf | ||
| WD-FL20260222 DATED 5-18-26.pdf | ||
| 05_Drawings SECTION LP302- 516-26-117.pdf | ||
| PPQ -Request form.docx | DOCX document | |
| PPQ.pdf | ||
| Base Offer Price Breakdown - 1 page.xlsx | XLSX spreadsheet | |
| 05_ASBUILTS-516-26-117.pdf | ||
| ASBUILTS-516-26-117.pdf | ||
| 36C24827Q0004_1.pdf | ||
| 516-26-117 Specifications 00 01 10.pdf | ||
| EMR 1 page.docx | DOCX document | |
| SHOP DRAWINGS HIGH PRESSURE STEAM PUMPED CONDENSATE ROVANCO PIPING SYSTEM.pdf | ||
| 05_Drawings LP302- 516-26-117.pdf | ||
| 36C24827Q0004.docx | DOCX document |
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base Offer Base Offer Cost Breakdown
Project Number: N/A Edward L Roy: VA assigned project #
| Date: | |
| Project Title |
| Edward L Roy: VA assigned Project Title | Project Location | ||
| Offeror Name | |||
| Offeror Street | |||
| Offeror City | State | Zip |
Item Description Labor Cost Edward L Roy: Enter all Labor Costs by Division
| Material Cost | |
| Edward L Roy: Enter all Material Costs by Division | Total Cost |
Edward L Roy: This Column is the sum of the Division's Labor and Material Costs
| Division 1 | General Requirements | |||
| Division 2 | Existing Conditions | - 0 | ||
| Division 3 | Concrete | - 0 | - 0 | |
| Division 4 | Masonry | - 0 | ||
| Division 5 | Metals | - 0 | - 0 | |
| Division 6 | Wood and Plastic | - 0 | ||
| Division 7 | Thermal & Moisture Protect | - 0 | - 0 | |
| Division 8 | Doors and Windows | - 0 | - 0 | - 0 |
| Division 9 | Finishes | - 0 | - 0 | - 0 |
| Division 10 | Specialties | - 0 | - 0 | - 0 |
| Division 11 | Equipment | - 0 | - 0 | - 0 |
| Division 12 | Furnishings | - 0 | - 0 | - 0 |
| Division 13 | Special Construction | - 0 | - 0 | |
| Division 14 | Conveying Equipment | - 0 | - 0 | - 0 |
| Division 21 | Fire Suppression | - 0 | - 0 | - 0 |
| Division 22 | Plumbing | - 0 | - 0 | - 0 |
| Division 23 | HVAC | - 0 | - 0 | - 0 |
| Division 26 | Electrical | - 0 | - 0 | - 0 |
| Division 27 | Communications | - 0 | - 0 | - 0 |
| Division 28 | Electronic Safety & Security | - 0 | - 0 | - 0 |
| Division 31 | Earthwork | - 0 | - 0 | - 0 |
| Division 32 | Exterior Improvements | - 0 | - 0 | - 0 |
| Division 33 | Utilities | - 0 | - 0 | - 0 |
| Division 34 | Transportation Subtotal | - 0 | - 0 | - 0 |
| Division Subtotals : | $ - 0 | $ - 0 | $ - 0 |
Overhead % Edward L Roy: Enter Overhead % here. This % will be multiplied by the Division Total Cost Subtotal (cell F36).
Edward L Roy: Date Offer Prepared/Submitted
| - 0 | ||
| Profit % | ||
| Edward L Roy: Enter Profit % here.This % will be multiplied by the sum of the Division Total Cost subtotal (cell F36) plus the calculated Overhead (cell F38). | - 0 | |
| Bond % |
Edward L Roy: Enter Bond % here. This % will be multiplied by the sum of the Division Total Cost Subtotal (cell F36), the amount of calculated Overhead (cell F38) and the amount of calculated Profit (cell F39).
Edward L Roy: Enter all Labor Costs by Division
| - 0 | ||
| Overhead/Profit Subtotals : | $ - 0 |
Edward L Roy: Sum of Overhead, Profit and Bond %.
Edward L Roy: Enter all Material Costs by Division Edward L Roy: This Column is the sum of the Division's Labor and Material Costs Total Base Offer Cost $ - 0 $ - 0 $ - 0
Offerors shall provide additional price breakdown to avoiding lump sum, etc. This price offer breakdown is the overall base offer price for Government price analysis