This is a pricing template for the Base Offer Price Breakdown required for submission on the BB Repair Steam Piping in Manhole Near Building 1 project (Solicitation Number 36C24827Q0004) at Bay Pines VAMC in St. Petersburg, Florida. The template is structured according to the Construction Specifications Institute (CSI) MasterFormat divisions and requires offerors to provide detailed cost breakdowns organized by 27 construction divisions, including General Requirements, Concrete, Masonry, Metals, HVAC, Electrical, Plumbing, and Earthwork, among others. For each division, contractors must separately itemize labor costs and material costs, with the template automatically calculating total costs per division.

The pricing template includes mechanisms for calculating overhead, profit, and bond percentages applied sequentially to the division subtotals. Offerors must enter their overhead percentage (applied to total division costs), profit percentage (applied to division costs plus overhead), and bond percentage (applied to division costs, overhead, and profit). The template computes a final Total Base Offer Cost by summing all divisions and applied markups. Instructions embedded in the template indicate that offerors must avoid lump-sum pricing and provide granular cost breakdowns by division to enable government price analysis. This pricing breakdown represents the complete base offer price for the steam piping repair project and should be submitted by the deadline specified in the RFP when posted on or about August 5, 2026.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Offer Base Offer Cost Breakdown

Project Number: N/A Edward L Roy: VA assigned project #

Date:
Project Title
Edward L Roy: VA assigned Project TitleProject Location
Offeror Name
Offeror Street
Offeror CityStateZip

Item Description Labor Cost Edward L Roy: Enter all Labor Costs by Division

Material Cost
Edward L Roy: Enter all Material Costs by DivisionTotal Cost

Edward L Roy: This Column is the sum of the Division's Labor and Material Costs

Division 1General Requirements
Division 2Existing Conditions- 0
Division 3Concrete- 0- 0
Division 4Masonry- 0
Division 5Metals- 0- 0
Division 6Wood and Plastic- 0
Division 7Thermal & Moisture Protect- 0- 0
Division 8Doors and Windows- 0- 0- 0
Division 9Finishes- 0- 0- 0
Division 10Specialties- 0- 0- 0
Division 11Equipment- 0- 0- 0
Division 12Furnishings- 0- 0- 0
Division 13Special Construction- 0- 0
Division 14Conveying Equipment- 0- 0- 0
Division 21Fire Suppression- 0- 0- 0
Division 22Plumbing- 0- 0- 0
Division 23HVAC- 0- 0- 0
Division 26Electrical- 0- 0- 0
Division 27Communications- 0- 0- 0
Division 28Electronic Safety & Security- 0- 0- 0
Division 31Earthwork- 0- 0- 0
Division 32Exterior Improvements- 0- 0- 0
Division 33Utilities- 0- 0- 0
Division 34Transportation Subtotal- 0- 0- 0
Division Subtotals :$ - 0$ - 0$ - 0

Overhead % Edward L Roy: Enter Overhead % here. This % will be multiplied by the Division Total Cost Subtotal (cell F36).

Edward L Roy: Date Offer Prepared/Submitted

- 0
Profit %
Edward L Roy: Enter Profit % here.This % will be multiplied by the sum of the Division Total Cost subtotal (cell F36) plus the calculated Overhead (cell F38).- 0
Bond %

Edward L Roy: Enter Bond % here. This % will be multiplied by the sum of the Division Total Cost Subtotal (cell F36), the amount of calculated Overhead (cell F38) and the amount of calculated Profit (cell F39).

Edward L Roy: Enter all Labor Costs by Division

- 0
Overhead/Profit Subtotals :$ - 0

Edward L Roy: Sum of Overhead, Profit and Bond %.

Edward L Roy: Enter all Material Costs by Division Edward L Roy: This Column is the sum of the Division's Labor and Material Costs Total Base Offer Cost $ - 0 $ - 0 $ - 0

Offerors shall provide additional price breakdown to avoiding lump sum, etc. This price offer breakdown is the overall base offer price for Government price analysis

File details come from the government source that posted it. Updated .