This is a pricing template for the Base Offer Price Breakdown required for submission on the BB Repair Steam Piping in Manhole Near Building 1 project (Solicitation Number 36C24827Q0004) at Bay Pines VAMC in St. Petersburg, Florida. The template is structured according to the Construction Specifications Institute (CSI) MasterFormat divisions and requires offerors to provide detailed cost breakdowns organized by 27 construction divisions, including General Requirements, Concrete, Masonry, Metals, HVAC, Electrical, Plumbing, and Earthwork, among others. For each division, contractors must separately itemize labor costs and material costs, with the template automatically calculating total costs per division.
The pricing template includes mechanisms for calculating overhead, profit, and bond percentages applied sequentially to the division subtotals. Offerors must enter their overhead percentage (applied to total division costs), profit percentage (applied to division costs plus overhead), and bond percentage (applied to division costs, overhead, and profit). The template computes a final Total Base Offer Cost by summing all divisions and applied markups. Instructions embedded in the template indicate that offerors must avoid lump-sum pricing and provide granular cost breakdowns by division to enable government price analysis. This pricing breakdown represents the complete base offer price for the steam piping repair project and should be submitted by the deadline specified in the RFP when posted on or about August 5, 2026.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 05_Drawings SECTION LP302- 516-26-117.pdf | ||
| EMR 1 page.docx | DOCX document | |
| WD-FL20260222 DATED 5-18-26.pdf | ||
| 36C24827Q0004_1.pdf | ||
| PPQ.pdf | ||
| SHOP DRAWINGS HIGH PRESSURE STEAM PUMPED ROVANCO PIPING SYSTEM.pdf | ||
| Base Offer Price Breakdown - 1 page.xlsx | XLSX spreadsheet | |
| 516-26-117 Specifications 00 01 10.pdf | ||
| 05_SOW 516-26-117.pdf | ||
| PPQ -Request form.docx | DOCX document | |
| PPQ.pdf | ||
| 05_ASBUILTS-516-26-117.pdf | ||
| 36C24827Q0004_1.pdf | ||
| 516-26-117 Specifications 00 01 10.pdf | ||
| EMR 1 page.docx | DOCX document | |
| ASBUILTS-516-26-117.pdf | ||
| SHOP DRAWINGS HIGH PRESSURE STEAM PUMPED ROVANCO PIPING SYSTEM.pdf | ||
| WD-FL20260222 DATED 5-18-26.pdf | ||
| 05_Drawings SECTION LP302- 516-26-117.pdf | ||
| SHOP DRAWINGS HIGH PRESSURE STEAM PUMPED CONDENSATE ROVANCO PIPING SYSTEM.pdf | ||
| 05_Drawings LP302- 516-26-117.pdf | ||
| 36C24827Q0004.docx | DOCX document |
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base Offer Base Offer Cost Breakdown
Project Number: N/A Edward L Roy: VA assigned project #
| Date: | |
| Project Title |
| Edward L Roy: VA assigned Project Title | Project Location | ||
| Offeror Name | |||
| Offeror Street | |||
| Offeror City | State | Zip |
Item Description Labor Cost Edward L Roy: Enter all Labor Costs by Division
| Material Cost | |
| Edward L Roy: Enter all Material Costs by Division | Total Cost |
Edward L Roy: This Column is the sum of the Division's Labor and Material Costs
| Division 1 | General Requirements | |||
| Division 2 | Existing Conditions | - 0 | ||
| Division 3 | Concrete | - 0 | - 0 | |
| Division 4 | Masonry | - 0 | ||
| Division 5 | Metals | - 0 | - 0 | |
| Division 6 | Wood and Plastic | - 0 | ||
| Division 7 | Thermal & Moisture Protect | - 0 | - 0 | |
| Division 8 | Doors and Windows | - 0 | - 0 | - 0 |
| Division 9 | Finishes | - 0 | - 0 | - 0 |
| Division 10 | Specialties | - 0 | - 0 | - 0 |
| Division 11 | Equipment | - 0 | - 0 | - 0 |
| Division 12 | Furnishings | - 0 | - 0 | - 0 |
| Division 13 | Special Construction | - 0 | - 0 | |
| Division 14 | Conveying Equipment | - 0 | - 0 | - 0 |
| Division 21 | Fire Suppression | - 0 | - 0 | - 0 |
| Division 22 | Plumbing | - 0 | - 0 | - 0 |
| Division 23 | HVAC | - 0 | - 0 | - 0 |
| Division 26 | Electrical | - 0 | - 0 | - 0 |
| Division 27 | Communications | - 0 | - 0 | - 0 |
| Division 28 | Electronic Safety & Security | - 0 | - 0 | - 0 |
| Division 31 | Earthwork | - 0 | - 0 | - 0 |
| Division 32 | Exterior Improvements | - 0 | - 0 | - 0 |
| Division 33 | Utilities | - 0 | - 0 | - 0 |
| Division 34 | Transportation Subtotal | - 0 | - 0 | - 0 |
| Division Subtotals : | $ - 0 | $ - 0 | $ - 0 |
Overhead % Edward L Roy: Enter Overhead % here. This % will be multiplied by the Division Total Cost Subtotal (cell F36).
Edward L Roy: Date Offer Prepared/Submitted
| - 0 | ||
| Profit % | ||
| Edward L Roy: Enter Profit % here.This % will be multiplied by the sum of the Division Total Cost subtotal (cell F36) plus the calculated Overhead (cell F38). | - 0 | |
| Bond % |
Edward L Roy: Enter Bond % here. This % will be multiplied by the sum of the Division Total Cost Subtotal (cell F36), the amount of calculated Overhead (cell F38) and the amount of calculated Profit (cell F39).
Edward L Roy: Enter all Labor Costs by Division
| - 0 | ||
| Overhead/Profit Subtotals : | $ - 0 |
Edward L Roy: Sum of Overhead, Profit and Bond %.
Edward L Roy: Enter all Material Costs by Division Edward L Roy: This Column is the sum of the Division's Labor and Material Costs Total Base Offer Cost $ - 0 $ - 0 $ - 0
Offerors shall provide additional price breakdown to avoiding lump sum, etc. This price offer breakdown is the overall base offer price for Government price analysis