36C24818R0737-025.pdf

PDF 26 MB Posted

Attached to
Project 546-16-104 Renovate Ambulatory Surgery
Solicitation number
36C24818R0737
Issued by

About this file

36C24818R0737 546-16-104 Final Submittal Drawings_Part2.pdf

View the file

Other files

File Type Posted
36C24818R0737-0003000.docx DOCX document
36C24818R0737-0002000.docx DOCX document
36C24818R0737-0002003.pdf PDF
36C24818R0737-0002001.pdf PDF
36C24818R0737-0002002.pdf PDF
36C24818R0737-0001001.pdf PDF
36C24818R0737-0001000.docx DOCX document
36C24818R0737-026.pdf PDF
36C24818R0737-024.pdf PDF
36C24818R0737-021.pdf PDF
36C24818R0737-029.pdf PDF
36C24818R0737-023.pdf PDF
36C24818R0737-019.docx DOCX document
36C24818R0737-020.pdf PDF
36C24818R0737-022.pdf PDF
36C24818R0737-027.pdf PDF
36C24818R0737-028.pdf PDF
36C24818R0737-000.docx DOCX document
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

11 TYP.

J K P Q R R.4M.3K.8

10.8

J.9

10.5

9.5

8.8

9.8

Prep/Recovery

C702CC

Prep/Recovery C702I

Prep/Recovery

C702HH

Prep/Recovery

C702GC702G

Prep/Recovery C702F

Prep/Recovery C702E

Prep/Recovery

C702DD

Prep/Recovery C702B

Sterile Supply C711

Clean Linen C710

Toilet C705

Prep/Recovery

C702NN

Prep/Recovery

C702MC702M

Prep/Recovery C702L

Prep/Recovery

C702KK

Prep/Recovery C702J

Nurse Manager

C707

Storage C712

Soiled Utility C706

Staff Lounge/ Lockers

B732

Elece

B732AB732

Toilet C703703C

Isolation

C702AA

Nurse Station C708 oilet C704

HAC

C709

Prep Recovery

Area C702

Stair S7-6

Corridor C7-3-1

Elec

Comm 72T727272Elec

E72 ElecElec

Elec 713713C713713713

CorridorCorrido C7-8-1

CorridoCorrido

LAV-1 LAV-1 LAV-1

LAV-1LAVV 1

LAV-1LALLAALLLLLLLLL

WC-111--

S-1

SS-1S

S-2

LAV-1 LAV-1

LAV-1

WC-1WWWWW

WC-1CC

LAV-1

LAV-1

LAV-1

leToilletet oile C

S ff /

C702DDDCC02C70C

Prepp//R/R/R

HH2H70C7GG2G70CC

S-3S

FD-1

FD-1

CCCCCC77CCCCCC77

ile

C7CCCCCCC7C7CCC7C7CCCC

FD-1 C7

FD-11ToTo

FD-1FD-1

C705C

PPrep/Reecooveeryy

L

WCO

WCOCO

LAV-1

WCOWWWCOWWWWWWWWWW

WCO

WCO

C7CCC7CCC 07770C7CC 0C7C7CCC707

FD-1

77777

J K P Q R R.4M.3K.8

10.8

J.9

10.5

9.5

8.8

9.8

Prep/Recovery

C702CC

Prep/Recovery C702I

Prep/Recovery

C702HH

Prep/Recovery

C702GC702G

Prep/Recovery C702F

Prep/Recovery C702E

Prep/Recovery

C702DD

Prep/Recovery C702B

Sterile Supply C711

Clean Linen C710

Toilet C705

Prep/Recovery

C702NN

Prep/Recovery

C702MC702M

Prep/Recovery C702L

Prep/Recovery

C702KK

Prep/Recovery C702J

Nurse Manager

C707

Storage C712

Soiled Utility C706

Staff Lounge/ Lockers

B732

Elece

B732AB732

Toilet C703C703

Isolation

C702AA

Nurse Station C708

Toilet C704

HAC

C709

Prep Recovery

Area C702

Stair S7-6

Corridor C7-3-1

Elec

Comm 72T727272Elec

E72 ElecElec

Elec 713713C713713713

CorridorCorrido C7-8-1

CorridoCorrido

LAV-1 LAV-1 LAV-1

LAV-1LAV-1LAVV 1

LAV-1LALLAALLLLLLLLLL

WC-11

S-1

SS-1

le

S-2222-222--

T C y

LAV-1 LAV-1

LAV-1

WC-1WWWWW

WC-1CC

LAV-1

LAV 1LAV 1LAV-1LAV 1LAV 1

er

LAV-1AV-VVV-

S-3

IB-1

IB-1

RECOVERY

C709

RECOVERY

C710

PATIENT ROOM

C711

C711A C710A C709A

OUTPATIENT RECOVERY

C707

C707A

Comm T72

Elec E72

Elec C713

LOUNGE

C706

LINEN

C705

PROGRAM MANAGER

C705B

NURSE MANAGER

C704B

ENGINEERING STORAGE

B732

SOILED UTILITY

C702

OFFICE

C703

FOYER

C704

C706AC705A

SUPPLY

C712

Toilet B701

11 TYP.PP

22 22

79392 Ryan E. Morriss, PE

KEY PLAN

COA # 8304 Project # 2016627

550 North Reo Street Suite 203, Tampa, FL 33609 813.289.4700

A R C H I T E C T SJ O H N P O E

3131 NEWMARK DRIVE

SUITE 200

MIAMISBURG, OHIO 45342

937 461 3290 PHONE

jpa@johnpoe.com

GENERAL NOTES

A. ALL SERVICE INTERRUPTIONS TO THIS EXISTING

FACILITY MUST BE SCHEDULED AT LEAST 3

WEEKS IN ADVANCE AND BE KEPT TO A

MINIMUM. COORDINATE ALL DISRUPTIVE WORK

AND OUTAGE REQUIREMENTS WITH THE COR.

B. EXISTING EQUIPMENT, PIPING, AND ASSOCIATED

COMPONENTS SHOWN ON DRAWINGS ARE

APPROXIMATE LOCATIONS AND IS PROVIDED

FOR REFERENCE USE ONLY. FIELD VERIFY AND

COORDINATE WITH EXACT LOCATIONS,

ELEVATIONS, SIZES, AND CONDITIONS OF

EXISTING COMPONENTS.

C. CONTRACTOR TO FIELD VERIFY ALL

CONNECTION POINTS TO EXISTING SYSTEM

PIPING AND IDENTIFY ALL RISERS AFFECTED.

D. COMPLETE LAYOUT DRAWINGS SHALL BE

REQUIRED PER SPECIFICATION SECTION 220511,

PARAGRAPH "SUBMITTALS." CONSTRUCTION

WORK SHALL NOT START ON ANY SYSTEM UNTIL

THE LAYOUT DRAWINGS HAVE BEEN APPROVED

BY VA.

E. REFER TO SHEET G200 FOR PHASING PLAN.

Scale:2 SEVENTH FLOOR RENOVATION PLAN - SANITARY

Scale: 1/8" = 1'-0"3 SEVENTH FLOOR DEMOLITION PLAN - PLUMBING

1/8" = 1'-0"

RENOVATION KEYNOTES--

1. PROVIDE NEW PLUMBING FIXTURES AND

CONNECT TO EXISTING COLD WATER, HOT

WATER, SANITARY WASTE, AND VENT PIPING.

2. PIPING DOWN TO 6TH FLOOR CEILING SPACE.

REFER TO PL117 FOR CONTINUATION.

3. SANITARY PIPING UP TO 8TH FLOOR SUBFLOOR

SPACE. REFER TO PL117 FOR CONTINUATION.

4. SANITARY PIPING OCCURS WITHIN SIXTH FLOOR

CEILING SPACE.

Scale: 1/8" = 1'-0"1 SEVENTH FLOOR RENOVATION PLAN - PRESSURE PIPING

DEMOLITION KEYNOTES--

1. REMOVE EXISTING PLUMBING FIXTURES AND

ASSOCIATED PIPING. CAP PIPING BEHIND WALL,

ABOVE CEILING, OR BELOW FLOOR.

2. CONTRACTOR SHALL INSPECT AND VERIFY

EXISTING SANITARY, VENT, AND PRESSURE

PIPING SIZES WITHIN CHASES TO BE REMOVED

ON SEVENTH FLOOR.

11 TYP.

11 TYP.

79392 Ryan E. Morriss, PE

KEY PLAN

COA # 8304 Project # 2016627

550 North Reo Street Suite 203, Tampa, FL 33609 813.289.4700

A R C H I T E C T SJ O H N P O E

3131 NEWMARK DRIVE

SUITE 200

MIAMISBURG, OHIO 45342

937 461 3290 PHONE

jpa@johnpoe.com

GENERAL NOTES

A. ALL SERVICE INTERRUPTIONS TO THIS EXISTING

FACILITY MUST BE SCHEDULED AT LEAST 3

WEEKS IN ADVANCE AND BE KEPT TO A

MINIMUM. COORDINATE ALL DISRUPTIVE WORK

AND OUTAGE REQUIREMENTS WITH THE COR.

B. EXISTING EQUIPMENT, PIPING, AND ASSOCIATED

COMPONENTS SHOWN ON DRAWINGS ARE

APPROXIMATE LOCATIONS AND IS PROVIDED

FOR REFERENCE USE ONLY. FIELD VERIFY AND

COORDINATE WITH EXACT LOCATIONS,

ELEVATIONS, SIZES, AND CONDITIONS OF

EXISTING COMPONENTS.

C. CONTRACTOR TO FIELD VERIFY ALL

CONNECTION POINTS TO EXISTING SYSTEM

PIPING AND IDENTIFY ALL RISERS AFFECTED.

D. COMPLETE LAYOUT DRAWINGS SHALL BE

REQUIRED PER SPECIFICATION SECTION 220511,

PARAGRAPH "SUBMITTALS." CONSTRUCTION

WORK SHALL NOT START ON ANY SYSTEM UNTIL

THE LAYOUT DRAWINGS HAVE BEEN APPROVED

BY VA.

E. REFER TO SHEET G200 FOR PHASING PLAN.

F. CONTRACTOR SHALL COORDINATE WITH C.O.R.

FOR SCHEDULING ACCESS TO THE SIXTH AND

EIGHTH FLOORS.

Scale:1 SIXTH FLOOR CEILING PLAN - PLUMBING 1/8" = 1'-0"

RENOVATION KEYNOTES--

1. REROUTE SANITARY, VENT, AND PRESSURE

PIPING AROUND COLUMN AS NECESSARY.

2. PIPING CONTINUES TO SEVENTH FLOOR PLAN.

REFER TO SHEET PL107 FOR CONTINUATION.

Scale:2 EIGHTH FLOOR SUBFLOOR PLAN - PLUMBING 1/8" = 1'-0"

J K P Q R R.4M.3K.8

10.8

J.9

10.5

9.5

8.8

9.8

Prep/Recovery

C702CC

Prep/Recovery C702I

Prep/Recovery

C702HH

Prep/Recovery

C702GC702G

Prep/Recovery C702F

Prep/Recovery C702E

Prep/Recovery

C702DD

Prep/Reco C702B erile

Clean Linen C710

Toilet C705

Prep/Recovery

C702NN

Prep/Recovery

C702MC702M

Prep/Recovery C702L

Prep/Recovery

C702KK

Prep/Recovery C702J

Nurse Manager

C707

Storage C712

Soiled Utility C706

Staff Lounge/ Lockers

B732

Elece

B732AB732

Toilet C703C703

Isolation

C702AA

Nurse Station C708

Toilet C704

HAC

C709

Prep Recovery

Area C702

Stair S7-6

Corridor C7-3-1

Elec

Comm 72T727272Elec

E72 ElecElec

Elec 713713C713713713 orridorCorrido C7-8-1 orridoCC

C orridoCorridoC

C

CoCoCo C

Co

ZVBBVVBBBBBBBBBBZV

ZVB

lyy ylyy eeeeeee lylyly e lylyly eeeee l e e eeeeee ee

1111111 eeeeeeeeeeeee l eeeee

AAPAAP

P

1/2" MAA

1/2" MO2

3/4" MV

TYP.y

3/4" MA3/4" MA

3/4" MO2

3/4" MV

1/2" MA

1/2" MO2

3/4" MVVyyPP

3/4" MAAMAMMMAMAMAMMMMMAAAMAAMMAAAAAAAAMMMMAAMMMMMMMMM4 "44444444"444444/444/4/4

3/4" MOOMOMM4"4 OMO MMM"44 O444 MMOOOO444 MOO"" MMOOOOOMM444 OOMMMM"4 OOOOOMM44"/4/4// 22222222222

1" MVVMVMVMVMMMVVMVVVMMMMVVMMMVVVMMVVVVVVVVVMMMMMMVVV" MVMVMMV

3/4" MA

3/4" MO33//4 MMOO22

3/4" MV

3/4" MA

3/4" MO2

1" MV

3/4" MAA

3/4" MO22

1" MVV1

Isolation

C702AA

1/2" MA1/202B02B

1/2" MO22

3/4" MV

TYP.Toveryovery

33 TYP.

22 TYP.P.TTTTT

eri pppppppppp r pppp44

MGO-1MMGO 1MGO 1 MGO-11MGO 1MGO 1 MGO-1MMGO 1MGO 1MM MGO-1MMGO 1MGO 1MGO-11MGO 1MGO 1 MGO-11MGO 1MGO 111 MGO-1MMGO 1MGO 1MM MGO-11MGO 1MGO 111MGO-1GGMMGO 1G

MGO-1MGO 1MGO 1111MGO 1MGO 1111 MGO-1MMGO 1MGO 1MMMMGO 1MGO 1MM MGO-11MGO 1MGO 1111MGO 1MGO 111 MGO-1MMGO 1MGO 1MMMMGO 1MGO 1MM MGO-11MGO 1MGO 1111MGO 1MGO 111

S AS-1

S

AS-1111111SSSSSSSSSAASAAAAAAAAAA -

AA

BBBBB

C y Area

N

DD

EE

F

RECOVERY

C709

RECOVERY

C710

PATIENT ROOM

C711

C711A C710A C709A

OUTPATIENT RECOVERY

C707

C707A

Comm T72

Elec E72

Elec C713

LOUNGE

C706

LINEN

C705

PROGRAM MANAGER

C705B

NURSE MANAGER

C704B

ENGINEERING STORAGE

B732

SOILED UTILITY

C702

OFFICE

C703

FOYER

C704

C706AC705A

SUPPLY

C712

Toilet B701

PROGRAM MANAGER

705BC

5A

C70

LINENPPROROOGRGRRAMMM

MAMAA

BB

NAAAGEEER LILIIN

CC7C7

ENEN

7 5A5A

PRPRPP OGOOO

70C7C

RARARR

7 BBB

M MMM

B

ANANAA AGAGAA EREE

7 A5A55A5

CCCC 5050

INNII

NNENN

CCCCC

11 TYP.

79392 Ryan E. Morriss, PE

KEY PLAN

COA # 8304 Project # 2016627

550 North Reo Street Suite 203, Tampa, FL 33609 813.289.4700

A R C H I T E C T SJ O H N P O E

3131 NEWMARK DRIVE

SUITE 200

MIAMISBURG, OHIO 45342

937 461 3290 PHONE

jpa@johnpoe.com

1. ALL EQUIPMENT WITHIN HATCHED AREA SHALL

BE REMOVED AND DISCARDED.

2. FURNISH AND INSTALL SHUT-OFF VALVES

PRIOR TO DEMOLITION. REFER TO GENERAL

NOTES FOR ANT NECESSARY SHUT-DOWNS

FOR THIS WORK.

A. ALL SERVICE INTERRUPTIONS TO THIS

EXISTING FACILITY MUST BE SCHEDULED AT

LEAST 3 WEEKS IN ADVANCE AND BE KEPT TO

A MINIMUM. COORDINATE ALL DISRUPTIVE

WORK AND OUTAGE REQUIREMENTS WITH THE

COR.

B. EXISTING EQUIPMENT, PIPING, DUCTWORK,

DIFFUSERS, GRILLES, AND ASSOCIATED

COMPONENTS SHOWN ON DRAWINGS ARE

APPROXIMATE LOCATIONS AND IS PROVIDED

FOR REFERENCE USE ONLY. FIELD VERIFY

AND COORDINATE WITH EXACT LOCATIONS,

ELEVATIONS, SIZES, AND CONDITIONS OF

EXISTING COMPONENTS.

C. REFER TO SHEET G200 FOR PHASING PLAN.

D. IT IS THE SOLE RESPONSIBILITY OF THE

PLUMBING CONTRACTOR TO COORDINATE

WITH ELECTRICAL TO ENSURE PROPERLY

SIZED CONTROL WIRING HAS BEEN FURNISHED

AND INSTALLED BY ELECTRICAL CONTRACTOR.

XXX

GENERAL NOTES

DEMOLITION KEYNOTES

Scale:1 SEVENTH FLOOR RENOVATION PLAN - MEDICAL GAS

Scale: 1/8" = 1'-0"2 SEVENTH FLOOR DEMOLITION PLAN - MEDICAL GAS

1/8" = 1'-0"

1. PROVIDE ALL REQUIRED ACCESSORIES FOR A

COMPLETE INSTALLATION.

2. COORDINATE MEDICAL GAS PIPING WITH HEAD

WALL LOCATIONS.

3. AAP TO BE POWERED BE CRITICAL

EMERGENCY POWER.

4. FIELD VERIFY EXACT CONDITION, LOCATION

AND SIZE OF THE EXISTING MEDICAL GAS

PIPING. CONNECT TO EXISTING OF EQUAL SIZE

OR LARGER.

XX RENOVATION KEYNOTES

File details come from the government source that posted it.