36C24818R0737-025.pdf
PDF 26 MB Posted
- Attached to
- Project 546-16-104 Renovate Ambulatory Surgery
- Solicitation number
- 36C24818R0737
About this file
36C24818R0737 546-16-104 Final Submittal Drawings_Part2.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24818R0737-0003000.docx | DOCX document | |
| 36C24818R0737-0002000.docx | DOCX document | |
| 36C24818R0737-0002003.pdf | ||
| 36C24818R0737-0002001.pdf | ||
| 36C24818R0737-0002002.pdf | ||
| 36C24818R0737-0001001.pdf | ||
| 36C24818R0737-0001000.docx | DOCX document | |
| 36C24818R0737-026.pdf | ||
| 36C24818R0737-024.pdf | ||
| 36C24818R0737-021.pdf | ||
| 36C24818R0737-029.pdf | ||
| 36C24818R0737-023.pdf | ||
| 36C24818R0737-019.docx | DOCX document | |
| 36C24818R0737-020.pdf | ||
| 36C24818R0737-022.pdf | ||
| 36C24818R0737-027.pdf | ||
| 36C24818R0737-028.pdf | ||
| 36C24818R0737-000.docx | DOCX document |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
11 TYP.
J K P Q R R.4M.3K.8
10.8
J.9
10.5
9.5
8.8
9.8
Prep/Recovery
C702CC
Prep/Recovery C702I
Prep/Recovery
C702HH
Prep/Recovery
C702GC702G
Prep/Recovery C702F
Prep/Recovery C702E
Prep/Recovery
C702DD
Prep/Recovery C702B
Sterile Supply C711
Clean Linen C710
Toilet C705
Prep/Recovery
C702NN
Prep/Recovery
C702MC702M
Prep/Recovery C702L
Prep/Recovery
C702KK
Prep/Recovery C702J
Nurse Manager
C707
Storage C712
Soiled Utility C706
Staff Lounge/ Lockers
B732
Elece
B732AB732
Toilet C703703C
Isolation
C702AA
Nurse Station C708 oilet C704
HAC
C709
Prep Recovery
Area C702
Stair S7-6
Corridor C7-3-1
Elec
Comm 72T727272Elec
E72 ElecElec
Elec 713713C713713713
CorridorCorrido C7-8-1
CorridoCorrido
LAV-1 LAV-1 LAV-1
LAV-1LAVV 1
LAV-1LALLAALLLLLLLLL
WC-111--
S-1
SS-1S
S-2
LAV-1 LAV-1
LAV-1
WC-1WWWWW
WC-1CC
LAV-1
LAV-1
LAV-1
leToilletet oile C
S ff /
C702DDDCC02C70C
Prepp//R/R/R
HH2H70C7GG2G70CC
S-3S
FD-1
FD-1
CCCCCC77CCCCCC77
ile
C7CCCCCCC7C7CCC7C7CCCC
FD-1 C7
FD-11ToTo
FD-1FD-1
C705C
PPrep/Reecooveeryy
L
WCO
WCOCO
LAV-1
WCOWWWCOWWWWWWWWWW
WCO
WCO
C7CCC7CCC 07770C7CC 0C7C7CCC707
FD-1
77777
J K P Q R R.4M.3K.8
10.8
J.9
10.5
9.5
8.8
9.8
Prep/Recovery
C702CC
Prep/Recovery C702I
Prep/Recovery
C702HH
Prep/Recovery
C702GC702G
Prep/Recovery C702F
Prep/Recovery C702E
Prep/Recovery
C702DD
Prep/Recovery C702B
Sterile Supply C711
Clean Linen C710
Toilet C705
Prep/Recovery
C702NN
Prep/Recovery
C702MC702M
Prep/Recovery C702L
Prep/Recovery
C702KK
Prep/Recovery C702J
Nurse Manager
C707
Storage C712
Soiled Utility C706
Staff Lounge/ Lockers
B732
Elece
B732AB732
Toilet C703C703
Isolation
C702AA
Nurse Station C708
Toilet C704
HAC
C709
Prep Recovery
Area C702
Stair S7-6
Corridor C7-3-1
Elec
Comm 72T727272Elec
E72 ElecElec
Elec 713713C713713713
CorridorCorrido C7-8-1
CorridoCorrido
LAV-1 LAV-1 LAV-1
LAV-1LAV-1LAVV 1
LAV-1LALLAALLLLLLLLLL
WC-11
S-1
SS-1
le
S-2222-222--
T C y
LAV-1 LAV-1
LAV-1
WC-1WWWWW
WC-1CC
LAV-1
LAV 1LAV 1LAV-1LAV 1LAV 1
er
LAV-1AV-VVV-
S-3
IB-1
IB-1
RECOVERY
C709
RECOVERY
C710
PATIENT ROOM
C711
C711A C710A C709A
OUTPATIENT RECOVERY
C707
C707A
Comm T72
Elec E72
Elec C713
LOUNGE
C706
LINEN
C705
PROGRAM MANAGER
C705B
NURSE MANAGER
C704B
ENGINEERING STORAGE
B732
SOILED UTILITY
C702
OFFICE
C703
FOYER
C704
C706AC705A
SUPPLY
C712
Toilet B701
11 TYP.PP
22 22
79392 Ryan E. Morriss, PE
KEY PLAN
COA # 8304 Project # 2016627
550 North Reo Street Suite 203, Tampa, FL 33609 813.289.4700
A R C H I T E C T SJ O H N P O E
3131 NEWMARK DRIVE
SUITE 200
MIAMISBURG, OHIO 45342
937 461 3290 PHONE
jpa@johnpoe.com
GENERAL NOTES
A. ALL SERVICE INTERRUPTIONS TO THIS EXISTING
FACILITY MUST BE SCHEDULED AT LEAST 3
WEEKS IN ADVANCE AND BE KEPT TO A
MINIMUM. COORDINATE ALL DISRUPTIVE WORK
AND OUTAGE REQUIREMENTS WITH THE COR.
B. EXISTING EQUIPMENT, PIPING, AND ASSOCIATED
COMPONENTS SHOWN ON DRAWINGS ARE
APPROXIMATE LOCATIONS AND IS PROVIDED
FOR REFERENCE USE ONLY. FIELD VERIFY AND
COORDINATE WITH EXACT LOCATIONS,
ELEVATIONS, SIZES, AND CONDITIONS OF
EXISTING COMPONENTS.
C. CONTRACTOR TO FIELD VERIFY ALL
CONNECTION POINTS TO EXISTING SYSTEM
PIPING AND IDENTIFY ALL RISERS AFFECTED.
D. COMPLETE LAYOUT DRAWINGS SHALL BE
REQUIRED PER SPECIFICATION SECTION 220511,
PARAGRAPH "SUBMITTALS." CONSTRUCTION
WORK SHALL NOT START ON ANY SYSTEM UNTIL
THE LAYOUT DRAWINGS HAVE BEEN APPROVED
BY VA.
E. REFER TO SHEET G200 FOR PHASING PLAN.
Scale:2 SEVENTH FLOOR RENOVATION PLAN - SANITARY
Scale: 1/8" = 1'-0"3 SEVENTH FLOOR DEMOLITION PLAN - PLUMBING
1/8" = 1'-0"
RENOVATION KEYNOTES--
1. PROVIDE NEW PLUMBING FIXTURES AND
CONNECT TO EXISTING COLD WATER, HOT
WATER, SANITARY WASTE, AND VENT PIPING.
2. PIPING DOWN TO 6TH FLOOR CEILING SPACE.
REFER TO PL117 FOR CONTINUATION.
3. SANITARY PIPING UP TO 8TH FLOOR SUBFLOOR
SPACE. REFER TO PL117 FOR CONTINUATION.
4. SANITARY PIPING OCCURS WITHIN SIXTH FLOOR
CEILING SPACE.
Scale: 1/8" = 1'-0"1 SEVENTH FLOOR RENOVATION PLAN - PRESSURE PIPING
DEMOLITION KEYNOTES--
1. REMOVE EXISTING PLUMBING FIXTURES AND
ASSOCIATED PIPING. CAP PIPING BEHIND WALL,
ABOVE CEILING, OR BELOW FLOOR.
2. CONTRACTOR SHALL INSPECT AND VERIFY
EXISTING SANITARY, VENT, AND PRESSURE
PIPING SIZES WITHIN CHASES TO BE REMOVED
ON SEVENTH FLOOR.
11 TYP.
11 TYP.
79392 Ryan E. Morriss, PE
KEY PLAN
COA # 8304 Project # 2016627
550 North Reo Street Suite 203, Tampa, FL 33609 813.289.4700
A R C H I T E C T SJ O H N P O E
3131 NEWMARK DRIVE
SUITE 200
MIAMISBURG, OHIO 45342
937 461 3290 PHONE
jpa@johnpoe.com
GENERAL NOTES
A. ALL SERVICE INTERRUPTIONS TO THIS EXISTING
FACILITY MUST BE SCHEDULED AT LEAST 3
WEEKS IN ADVANCE AND BE KEPT TO A
MINIMUM. COORDINATE ALL DISRUPTIVE WORK
AND OUTAGE REQUIREMENTS WITH THE COR.
B. EXISTING EQUIPMENT, PIPING, AND ASSOCIATED
COMPONENTS SHOWN ON DRAWINGS ARE
APPROXIMATE LOCATIONS AND IS PROVIDED
FOR REFERENCE USE ONLY. FIELD VERIFY AND
COORDINATE WITH EXACT LOCATIONS,
ELEVATIONS, SIZES, AND CONDITIONS OF
EXISTING COMPONENTS.
C. CONTRACTOR TO FIELD VERIFY ALL
CONNECTION POINTS TO EXISTING SYSTEM
PIPING AND IDENTIFY ALL RISERS AFFECTED.
D. COMPLETE LAYOUT DRAWINGS SHALL BE
REQUIRED PER SPECIFICATION SECTION 220511,
PARAGRAPH "SUBMITTALS." CONSTRUCTION
WORK SHALL NOT START ON ANY SYSTEM UNTIL
THE LAYOUT DRAWINGS HAVE BEEN APPROVED
BY VA.
E. REFER TO SHEET G200 FOR PHASING PLAN.
F. CONTRACTOR SHALL COORDINATE WITH C.O.R.
FOR SCHEDULING ACCESS TO THE SIXTH AND
EIGHTH FLOORS.
Scale:1 SIXTH FLOOR CEILING PLAN - PLUMBING 1/8" = 1'-0"
RENOVATION KEYNOTES--
1. REROUTE SANITARY, VENT, AND PRESSURE
PIPING AROUND COLUMN AS NECESSARY.
2. PIPING CONTINUES TO SEVENTH FLOOR PLAN.
REFER TO SHEET PL107 FOR CONTINUATION.
Scale:2 EIGHTH FLOOR SUBFLOOR PLAN - PLUMBING 1/8" = 1'-0"
J K P Q R R.4M.3K.8
10.8
J.9
10.5
9.5
8.8
9.8
Prep/Recovery
C702CC
Prep/Recovery C702I
Prep/Recovery
C702HH
Prep/Recovery
C702GC702G
Prep/Recovery C702F
Prep/Recovery C702E
Prep/Recovery
C702DD
Prep/Reco C702B erile
Clean Linen C710
Toilet C705
Prep/Recovery
C702NN
Prep/Recovery
C702MC702M
Prep/Recovery C702L
Prep/Recovery
C702KK
Prep/Recovery C702J
Nurse Manager
C707
Storage C712
Soiled Utility C706
Staff Lounge/ Lockers
B732
Elece
B732AB732
Toilet C703C703
Isolation
C702AA
Nurse Station C708
Toilet C704
HAC
C709
Prep Recovery
Area C702
Stair S7-6
Corridor C7-3-1
Elec
Comm 72T727272Elec
E72 ElecElec
Elec 713713C713713713 orridorCorrido C7-8-1 orridoCC
C orridoCorridoC
C
CoCoCo C
Co
ZVBBVVBBBBBBBBBBZV
ZVB
lyy ylyy eeeeeee lylyly e lylyly eeeee l e e eeeeee ee
1111111 eeeeeeeeeeeee l eeeee
AAPAAP
P
1/2" MAA
1/2" MO2
3/4" MV
TYP.y
3/4" MA3/4" MA
3/4" MO2
3/4" MV
1/2" MA
1/2" MO2
3/4" MVVyyPP
3/4" MAAMAMMMAMAMAMMMMMAAAMAAMMAAAAAAAAMMMMAAMMMMMMMMM4 "44444444"444444/444/4/4
3/4" MOOMOMM4"4 OMO MMM"44 O444 MMOOOO444 MOO"" MMOOOOOMM444 OOMMMM"4 OOOOOMM44"/4/4// 22222222222
1" MVVMVMVMVMMMVVMVVVMMMMVVMMMVVVMMVVVVVVVVVMMMMMMVVV" MVMVMMV
3/4" MA
3/4" MO33//4 MMOO22
3/4" MV
3/4" MA
3/4" MO2
1" MV
3/4" MAA
3/4" MO22
1" MVV1
Isolation
C702AA
1/2" MA1/202B02B
1/2" MO22
3/4" MV
TYP.Toveryovery
33 TYP.
22 TYP.P.TTTTT
eri pppppppppp r pppp44
MGO-1MMGO 1MGO 1 MGO-11MGO 1MGO 1 MGO-1MMGO 1MGO 1MM MGO-1MMGO 1MGO 1MGO-11MGO 1MGO 1 MGO-11MGO 1MGO 111 MGO-1MMGO 1MGO 1MM MGO-11MGO 1MGO 111MGO-1GGMMGO 1G
MGO-1MGO 1MGO 1111MGO 1MGO 1111 MGO-1MMGO 1MGO 1MMMMGO 1MGO 1MM MGO-11MGO 1MGO 1111MGO 1MGO 111 MGO-1MMGO 1MGO 1MMMMGO 1MGO 1MM MGO-11MGO 1MGO 1111MGO 1MGO 111
S AS-1
S
AS-1111111SSSSSSSSSAASAAAAAAAAAA -
AA
BBBBB
C y Area
N
DD
EE
F
RECOVERY
C709
RECOVERY
C710
PATIENT ROOM
C711
C711A C710A C709A
OUTPATIENT RECOVERY
C707
C707A
Comm T72
Elec E72
Elec C713
LOUNGE
C706
LINEN
C705
PROGRAM MANAGER
C705B
NURSE MANAGER
C704B
ENGINEERING STORAGE
B732
SOILED UTILITY
C702
OFFICE
C703
FOYER
C704
C706AC705A
SUPPLY
C712
Toilet B701
PROGRAM MANAGER
705BC
5A
C70
LINENPPROROOGRGRRAMMM
MAMAA
BB
NAAAGEEER LILIIN
CC7C7
ENEN
7 5A5A
PRPRPP OGOOO
70C7C
RARARR
7 BBB
M MMM
B
ANANAA AGAGAA EREE
7 A5A55A5
CCCC 5050
INNII
NNENN
CCCCC
11 TYP.
79392 Ryan E. Morriss, PE
KEY PLAN
COA # 8304 Project # 2016627
550 North Reo Street Suite 203, Tampa, FL 33609 813.289.4700
A R C H I T E C T SJ O H N P O E
3131 NEWMARK DRIVE
SUITE 200
MIAMISBURG, OHIO 45342
937 461 3290 PHONE
jpa@johnpoe.com
1. ALL EQUIPMENT WITHIN HATCHED AREA SHALL
BE REMOVED AND DISCARDED.
2. FURNISH AND INSTALL SHUT-OFF VALVES
PRIOR TO DEMOLITION. REFER TO GENERAL
NOTES FOR ANT NECESSARY SHUT-DOWNS
FOR THIS WORK.
A. ALL SERVICE INTERRUPTIONS TO THIS
EXISTING FACILITY MUST BE SCHEDULED AT
LEAST 3 WEEKS IN ADVANCE AND BE KEPT TO
A MINIMUM. COORDINATE ALL DISRUPTIVE
WORK AND OUTAGE REQUIREMENTS WITH THE
COR.
B. EXISTING EQUIPMENT, PIPING, DUCTWORK,
DIFFUSERS, GRILLES, AND ASSOCIATED
COMPONENTS SHOWN ON DRAWINGS ARE
APPROXIMATE LOCATIONS AND IS PROVIDED
FOR REFERENCE USE ONLY. FIELD VERIFY
AND COORDINATE WITH EXACT LOCATIONS,
ELEVATIONS, SIZES, AND CONDITIONS OF
EXISTING COMPONENTS.
C. REFER TO SHEET G200 FOR PHASING PLAN.
D. IT IS THE SOLE RESPONSIBILITY OF THE
PLUMBING CONTRACTOR TO COORDINATE
WITH ELECTRICAL TO ENSURE PROPERLY
SIZED CONTROL WIRING HAS BEEN FURNISHED
AND INSTALLED BY ELECTRICAL CONTRACTOR.
XXX
GENERAL NOTES
DEMOLITION KEYNOTES
Scale:1 SEVENTH FLOOR RENOVATION PLAN - MEDICAL GAS
Scale: 1/8" = 1'-0"2 SEVENTH FLOOR DEMOLITION PLAN - MEDICAL GAS
1/8" = 1'-0"
1. PROVIDE ALL REQUIRED ACCESSORIES FOR A
COMPLETE INSTALLATION.
2. COORDINATE MEDICAL GAS PIPING WITH HEAD
WALL LOCATIONS.
3. AAP TO BE POWERED BE CRITICAL
EMERGENCY POWER.
4. FIELD VERIFY EXACT CONDITION, LOCATION
AND SIZE OF THE EXISTING MEDICAL GAS
PIPING. CONNECT TO EXISTING OF EQUAL SIZE
OR LARGER.
XX RENOVATION KEYNOTES