- Project 546-16-104 Renovate Ambulatory Surgery
- Solicitation number
- 36C24818R0737
About this file
36C24818R0737 0001 36C24818R0737 0001.docx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24818R0737-0003000.docx | DOCX document | |
| 36C24818R0737-0002000.docx | DOCX document | |
| 36C24818R0737-0002003.pdf | ||
| 36C24818R0737-0002001.pdf | ||
| 36C24818R0737-0002002.pdf | ||
| 36C24818R0737-0001001.pdf | ||
| 36C24818R0737-026.pdf | ||
| 36C24818R0737-024.pdf | ||
| 36C24818R0737-021.pdf | ||
| 36C24818R0737-029.pdf | ||
| 36C24818R0737-023.pdf | ||
| 36C24818R0737-019.docx | DOCX document | |
| 36C24818R0737-020.pdf | ||
| 36C24818R0737-022.pdf | ||
| 36C24818R0737-027.pdf | ||
| 36C24818R0737-025.pdf | ||
| 36C24818R0737-028.pdf | ||
| 36C24818R0737-000.docx | DOCX document |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE
OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
BY
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 06-07-2018 546-18-1-6872-0002 546-16-104 Y Department of Veterans Affairs Network Contracting Office 8 (NCO 8) FOR: Miami VA Medical Center 8875 Hidden River Pkwy Suite 525 Tampa
FL
33637 36C248 Department of Veterans Affairs Network Contracting Office 8 (NCO 8) 8875 Hidden River Pkwy Tampa
FL
33637 To all Offerors/Bidders
36C24818R0737 06-01-2018
X X X X
The purpose of this amendment is to provide the pre-bid site visit sheet,incorporate a new Statement of Work (SOW), incorporate revised proposal preparation and evaluation information, and incorporate an updated Wage Determination.
The original SOW, Wage Determination and Proposal and Evaluation information is deleted in its entirety.
Requests for Information (RFIs) are still due by June 13 per the original solicitation.
All other terms and conditions remain unchanged.
Melissa Keene
NCO815L2-4714
See attached document: Sign in Sheet Ambulatory Surgery.
VA Medical Center 1201 NW 16th Street Miami, FL 33125 October 30, 2017 revised June 6th, 2018 Project Title: Renovate Ambulatory Surgery VA Project Number: 546-16-104 Project Type: Construction Phase Period of Performance 180 days from NTP
1) PROJECT GOAL:
This project will renovate ambulatory surgery located in Building 1 Main Hospital. Construction Phase must be in accordance with the 100% Final Submission construction documents developed by the AE Firm during Design Phase. Contractor must comply with all construction sequence, notes, sketches, deductibles professional advice and consultation provided by the AE Firm during the lifecycle of the construction project.
2) STATEMENT OF WORK:
The scope of this project is to renovate ambulatory surgery, in Building 1 Main Hospital. Please note that most work will be performed during the nights and weekends due to the location of the project within Ambulatory Surgery. Existing Work includes but it’s not limited to:
· Construction activities as per supplied 100% construction documents and specifications.
Contractor must:
· Coordinate all work with project COR.
· Provide a schedule of values to COR after issuance of NTP and before commencement of work.
· Performance period for this contract, to include all mobilizing and construction, is a total of 180 calendar days.
· The project has 4 phases: Phase one as noted on the plans, Phase 2A, which is the nurse’s station (this area must be done in one weekend). Phase 2B as noted on the plans and Phase 3 as noted on the plans.
· Secure area before commencement of work per MVAMC Infection Control and Construction Policy requirements.
· Contractor responsibility to include but not limited to:
a. Compliance with all construction sequence, notes, sketches, professional advice and consultation provided by the AE Firm during the lifecycle of the construction project.
b. Performance of all necessary site survey work such as verifying record drawings and all construction documents provided by AE Firm prior to submittal of proposal.
c. Development of means and methods of construction as well as development of construction sequence.
d. The Contractor shall furnish sufficient technical, supervisory, and administrative personnel to assure the expeditious accomplishment of the work as specified in the 100% Final Submission construction documents and in compliance with all construction sequence, notes, sketches, professional advice and consultation provided by the AE Firm during the lifecycle of the construction project.
e. Submission as part of the proposal a detailed schedule of adequate construction phases including activities with corresponding timeline for each activity and phase as necessary to complete the project within the period of performance required by the customer while keeping the suite open and ready to serve patients daily from 6:30AM to 4:00PM.
f. Coordination of all work with Contracting Officer (CO), Contracting Officer Representative (COR) and Miami VA Healthcare System (MVAHS) customer of Ambulatory Surgery suite. All communication and correspondence must be addressed through the CO in writing.
g. Participation in project planning and pre-construction meeting as required; communicate with the CO, COR, Planning and Analysis Team, customer of the Ambulatory Surgery Suite, and MVAHS personnel in writing; and is expected to coordinate so that the final documents and construction services include all requirements in accordance with industry standard practices, VA standards, VA design manuals, and review comments of the AE Firm responsible for the Design Phase of this construction project.
h. Contractor must submit meetings minutes to CO, COR no later than one business day after meeting.
i. Submission of weekly review of the progress schedules including cost.
j. Continuous coordination with the customer of the AMBULATORY SURGERY suite on the seventh floor and accommodation of construction sequence, schedule, activities, and timelines to benefit normal daily operation of the AMBULATORY SURGERY suite on the seventh floor.
k. Safety and security of construction area within AMBULATORY SURGERY suite on the seventh floor before commencement of work according to MVAMC Construction Policy and Infection Control requirements.
l. All work performed shall be fully documented by the Contractor and/or the subcontractors hired by the primary general contractor. All project work and material installations performed shall be in compliance with manufacturers’ recommendations and all applicable latest national codes, manuals and standards including but not limited to: NEMA, NEC, ANSI, ASA, VA Standards and The Joint Commission Standards.
m. All work shall be performed at the Miami VA Medical Center and shall conform with current codes and standards as they relate to the facility.
n. All required licenses and permits shall be the responsibility of the Contractor.
o. The employees working on the project site under the primary general contractor and all subcontractors will have the 10 hours OSHA safety course; the project supervisor shall have the 30 hours course. General Contractor shall provide copies of certification to the contracting officer for every employee who works on the job site. In carrying out this project the Contractor shall follow all applicable VA Directives and Specifications, including but not limited to GEMS, Safety, Fire Protection and Infection Control.
p. Contractor shall visually validate the area for all site conditions prior to starting work, to clarify any questions regarding space or any special requirements. The Contractor is responsible for the professional quality, technical accuracy and coordination required of all equipment, work, and materials utilized to perform work herein. Any corrections and changes resulting from review by the Government of the Contractor work will be at the Contractor own expense.
q. Contractor responsibilities include but are not limited to: provide full certification that work performed meets all applicable codes and regulations; perform work in a way that minimizes day to day operational delays to the Medical facility; cleanup work areas upon completion of work in each individual area; ensure all work performed is in accordance with manufacturer recommendations for products to be used and is executed by certified personnel; prepare As-Built drawings and details for project completion.
Contractor must:
· Coordinate all work with project COR.
· Secure area before commencement of work per MVAMC Infection Control and Construction Policy requirements inside OR Suite due to the location of project.
· Contractor shall coordinate work with MVAMC COR in order to maintain at all times all services in operation at the AMBULATORY SURGERY Suite on the seventh floor and all areas surrounding construction work during demolition and construction.
· Contractor shall be responsible for providing all labor, materials, and manpower.
· Demolition of walls, floors, and ceilings as needed
· Repairs of demolished walls, floors and ceilings
· ICRA Partitions
· Debris removal and recycling final site clean-up
· Perform design calculation as needed
· All deficiencies discovered will be reported along with a proposed solution to correct the deficiencies during the design phase.
· The CONTRACTOR shall take into consideration all necessary life safety measures and infection control as well as hospital flow when designing the construction phases. A justification shall be provided.
· All walls or slab penetrations for new work shall comply with latest NFPA Codes.
· Some of this activity will require shut downs. Shut down will be coordinated with the MVAHS Engineering Department.
· Identify and document all structural issues during construction phase
3) SPECIAL REQUIREMENTS:
· VA Police will issue identification badges to contractors, employees and subcontractors which must be worn always when on VA Property.
· Contractor shall provide a list of all personnel who will participate on the project. Personnel shall be subjected to a background investigation previous to commencement. After background check has been completed identification badges will be issued.
· Contractor shall keep the area cleaned daily and haul away all construction debris. All materials and construction debris must be in covered cart when entering and exiting the building.
4) QUALIFICATION / CERTIFICATION:
· The Contractor shall be a licensed Certified General Contractor.
· The Electrical Subcontractor shall be a Certified Electrical Contractor.
· The contractor and all contractor employees must have taken the OSHA Certified 30/ 10 hour construction safety course and show documented proof. The contractor shall designate a “competent person” in accordance with 29 CFR 1926. 32(f) which states, “One who is capable of identifying existing and predictable hazards in the surroundings or working conditions which are unsanitary, hazardous or dangerous to employees and who has authorization to take prompt corrective measures to eliminate them”. The contractor shall instruct each of his employees in the recognition and avoidance of unsafe conditions and the regulations applicable to this work environment to control or eliminate any hazards or other exposure to illness or injury.
Additionally, the contractor shall comply with the following requirements:
· Develop a plan detailing project specific fire-safety measures.
· Maintain site and building access free and unobstructed to facility emergency services.
· Separate temporary facilities from existing buildings and new construction by appropriate distances.
· All temporary construction partitions must meet fire-safety requirements.
· Temporary heating and electrical installations must comply with OSHA 1926, NFPA 241 and NFPA 70.
· Means of egress shall not be blocked.
· Egress routes for construction workers must be maintained free and unobstructed.
· Contractor furnished fire extinguishers must be provided and maintained in construction areas and in temporary storage areas.
· Flammable and combustible liquids must be stored, disposed and used in accordance with OSHA 1926, NFPA 241 and NFPA 30.
· Existing fire protection must not be impaired. Provide fire watch for impairments more than four (4) hours in a 24 hour period.
· Prevent accidental smoke detector operation.
· Perform Hot Work in accordance with NFPA 241 and NFPA 51B.
· Maintain all construction permits visible and updated as required by the MVAMC Safety Office and Infection Control Department.
· Prohibit smoking in and adjacent to construction areas.
· Dispose of waste and debris from buildings DAILY.
· Provide daily Quality Control Report due 10:00 am to COR from the day before.;
· Provide a two week look ahead by 10:00am Thursday (weekly).
· Provide a micro schedule of each schedule before starting that phase to COR and CO.
· Provide weekly project meeting.
· Follow all additional requirements as specified in the MVAMC Construction Policy.
5) EQUIPMENT:
· All Equipment, tools, etc., shall be maintained while on the project and shall be adequate, in quality and capacity for proper execution of work.
· Under no circumstances tools or equipment shall be left unattended.
6) SCHEDULING AND HOURS OF WORK:
· All work in areas involved shall be scheduled with the VA Engineering COTR. Work shall be scheduled for proper execution to completion of this contract.
· Hours of Work: The contractor will perform work from 8:00 pm – 7:00 am Monday thru Friday or nights and weekends as necessary. Work can be performed during weekdays if there are no disruptions to patient care and medical staff, this will be coordinated with COTR, if approved the work hours will be from 7:00am to 3:30 pm. All Weekend and holiday hours will be from 7:00 am – 3:30 pm, this will be coordinated through the COR.
· All shutdowns involving temporary impairment of utilities shall be requested in writing to the MVAMC COR three (3) weeks in advance. Shutdowns shall be considered as an activity in the contractor schedule. The following list addresses the kind of shutdowns or service interruptions that shall require advanced notice:
· Electrical Systems shutdown including Normal or emergency Power.
· Fire Suppression Systems: Sprinkler shutdowns lasting over four (4) hours require notification and concurrence from the VISN Safety office. Fire Alarm work shall be conducted by Simplex.
· Cranes: Prior to crane arriving on site contractor shall submit: Crane maintenance logs, crane operator’s license, drawings showing crane’s operational and exclusion zone. All documents shall be revised and approved by the MVAMC Safety Office prior to scheduling the work.
7) SITE VISITS:
· Job site shall be visited to verify all existing conditions and dimensions and the extent of work involved with the MVAMC COTR. Visits to site may be made by appointment only and be previously approved by CO.
8) INSPECTIONS:
· All work shall be inspected daily, during installation and at final completion by MVAMC COR.
9) SAFETY REGULATIONS:
· All applicable Safety Regulations shall be observed during all work of this contract.
· The MVAMC Safety Officer shall have full authority to see that the contractor obeys all safety rules and regulations relative to the fulfillment of this contract.
· Provide all necessary barricades / signage where required.
· Isolate the area to prevent the spread of debris into adjacent area.
· Follow Infection Control regulations. Maintained the area negatively pressurized if required.
· Perform field test and participate on final acceptance tests for new equipment or systems installed.
· Provide a written certified statement indicating that the construction project meets the life safety code requirements. For those maintenance and repair projects where the life / safety code requirements is not applicable, a written statement shall also be provided accordingly.
10) SUBMITTALS:
· Submit documented proof of OSHA construction safety course.
· General Contractor License and Insurance.
· Submit as per Construction Documents and Specifications.
· Warranties
· Weekly work schedule (By Thursday by 10:00 am the week before)
· Phasing Plan
· Commissioning Plan (will be in conjunction with the IT and Bio- medical Departments)
· List of subcontractors before work begins
11) APPLICABLE PUBLICATIONS:
· .AE Specifications
12) MATERIALS:
· Contractor to provide all materials required, remove and replace finishes in accordance with Specifications.
13) EXECUTION:
· After scheduling with COR all construction activities (according to 100% Final Submission construction documents produced by the A&E during Design Phase including phasing according to General Requirements), provide the required signage and barricades to maintain safety and protection of work and around construction site.
· The contractor shall have all required equipment, tools and materials on site before any work stars.
· After Substantial Completion request Final Inspection from MVAMC COR
14) Construction/Demolition Period Service Requirements:
· Review of Submittals: Contractor shall review all submittals, shop drawings and test reports that are required, etc. Review shall be completed and submittals returned to Engineering Services within 10 working days.
· Review Analysis of Change Orders and Costs: Contractor shall provide prompt response when contacted by the COR to review and provide analysis of Change Orders and costs within 5 working days.
15) PROJECT CLASSIFICATION:
a. Class III
· During Construction Project
· Remove or Isolate HVAC system in area where work is being done to prevent contamination of duct system.
1. Complete all critical barriers, e.g., sheetrock, plywood, plastic, to seal area from non-work area or implement control cube method (cart with plastic covering and sealed connection to work site with HEPA vacuum for vacuuming prior to exit) before construction begins.
2. Maintain negative air pressure within work site utilizing HEPA equipped air filtration units.
3. Contain construction waste before transport in tightly covered containers.
· Upon Completion of Construction Project
1. Do not remove barriers from work area until completed project is inspected by Safety Department and Infection Control Department and thoroughly cleaned.
2. Vacuum work area with HEPA filtered vacuums.
3. Wet mop area with disinfectant.
4. Remove isolation HVAC system in areas where work is being performed.
5. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.
b. Type C
Work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies Includes, but is not limited to:
1. Sanding of walls for painting or wall covering
2. Removal of floor coverings, ceiling tiles and casework
3. New wall construction
4. Minor duct work or electrical work above ceilings
5. Major cabling activities
6. Any activity which cannot be completed within a single work shift
15) CONSTRUCTION / DEMOLITION PERIOD SERVICE REQUIREMENTS
A. Review of Submittals: CONTRACTOR shall review all material submittals, shop drawings and tester ports that are required, etc. Reviews shall be completed and submittals returned to Engineering Service within ten (10) working days.
B. Certification: Ensure all work performed meets all applicable codes and regulations.
C. Review Analysis of Change Orders and Costs: CONTRACTOR shall provide prompt response when contacted by the COTR to review and provide analysis of Change Orders and Costs within five (5) working days.
D. Record Drawing Requirements: CONTRACTOR shall provide one (1) complete finished set of AS- BUILT drawing reflecting all changes incorporated during the actual construction. These AS Built are to be drawn on a CADD and highlighting all changes. The complete set will all be dated the same with “RECORD AS-BUILT DRAWINGS” on each page’s title block. The CONTRACTOR shall include a requirement note for the contractor to provide marked up prints directed to the CONTRACTOR showing actual construction and any changes, which occurred during construction. These shall be verified by the CONTRACTOR. CONTRACTOR shall also provide a complete updated set of record as-built drawing files as produced on (CADD) system compatible with AutoCAD 2010 on CD-ROM. CONTRACTOR shall update drawings such that they shall meet the complete approval of the Engineering Service.
Certified Independent Third- Party Design Reviews (CITP)
A. The contractor will hire a Certified Independent Third-Party (CITP) Safety Professional or Professional Credential to provide the necessary design reviews for compliance with national and local codes, standards, and federal and state regulations included but not limited to:
· OSHA Standards
· JCAHO Standards
· Handicap Accessibility Standards
· NFPA Codes
· National and Local Building Codes
Page of
· EPA Regulations
· Emergency Preparedness infrastructure vulnerabilities
· Security infrastructure vulnerabilities
· Others as applicable
1. Requirement for acquiring and incorporating a Certified Independent Third-Party (CITP) Safety Professional or Professional Credential review of design documents VA must comply with national and local codes, standards and regulatory requirements in order to comply with Public Law 100-678, Public Buildings Amendment Act of 1988 and Public Law 102-522, Federal Fire Safety Act of 1992.
2. Like other federal agencies with real property and construction authority, VA acts as its own building and code enforcing official or as the “Authority Having Jurisdiction” (AHJ) for meeting code requirements. As such, the VA has overall responsibility of ensuring compliance with codes.
3. The contractor will hire a CITP consultant(s) as necessary for the review of design and construction documents for compliance with applicable national and local codes, standards, federal and state regulations. The Design CONTRACTOR will take into consideration and incorporate all third-party consultant comments/recommendations into the design documents prior to advertising for a construction contract award.
4. CITP or Professional Credential Review and Approval Project plans must have a signature block or a letter on third-party Company’s letterhead, a third party certified safety professional or professional credentials as applicable to the nature of review certifying and verifying the plans and specifications have been reviewed for compliance with applicable codes, standards and regulatory requirements. At the time of review, the CITP should identify all corrections necessary for the contractor to bring the design into compliance. The contractor is required to incorporate and make necessary corrections to the design to bring the design into compliance prior to the final design documents being issued for a construction contract award.
16) PERIOD OF PERFORMANCE:
The objective of this project is to renovate the Ambulatory Surgery located in the seventh floor of the main building while keeping the Ambulatory Surgery in operation always during the construction project lifecycle having minimum impact on the project duration. The location of this construction project within the Ambulatory Surgery Suite on the seventh floor currently providing direct patient care from 7:00AM to 8:00PM Monday through Friday requires a Period of Performance not to exceed 180 calendar days including mobilization.
17) VA RESPONSIBILITY:
The VA will coordinate meetings with the representative of medical stakeholders and the CONTRACTOR as requested. Any site visit and/or meetings shall be requested one (1) week in advance for proper coordination with the VA stakeholders.
18) RESOURCES:
VA AE Specifications provided.
PROPOSAL PREPARATION AND EVALUATION INFORMATION
This part describes the precise mechanism for evaluating and selecting offers for this bid build procurement for Project No. 546-16-104, Renovate Ambulatory Surgery – Miami VAMC.
1. Proposal Preparation Instruction: To assure timely and equitable evaluation of proposals, offeror must follow the instructions contained herein. Proposals must be complete, self-sufficient, and respond directly to the requirement of this solicitation. Offerors proposals shall consist of both a technical and price proposal, as described below, and will be submitted by email to the attention of: melissa.keene2@va.gov.
A. TAB A: GENERAL INFORMATION
· Cover Page with Solicitation Number, Project Title,
· Table of Contents
· Signed Offer/Acknowledgement of Amendments (SF1442)
· Copy of Current SDVOSB certification, vetbiz.gov
· DUNS Number
· Cage Code
· Tax ID Number
· EMR
· Offer Guarantee Bond
B. TAB B: TECHNICAL PROPOSAL
· Factor 1 – Relevant and Recent Past Performance
· Factor 2 – Technical Qualifications
· Factor 3 – Draft Project Schedule
C. TAB C: PRICE PROPOSAL
2. Technical Evaluation Factors and Proposal Requirements:
I. TECHNICAL FACTOR 1: RELEVANT AND RECENT PAST PERFORMANCE (Tab B):
a. A minimum of 1 but no more than 3 references.
b. Relevant performance means construction projects similar in scope and magnitude, which were issued by the VA, Federal, State, Local Government agencies, and/or commercial facilities.
c. Recent is defined as performance within the last five (5) years, to include ongoing projects.
d. For each of the submitted Relevant and Recent Past Experience contracts, provide the following information:
i. Project name and the contract number;
ii. The name of the contracting agency or organization the contract was awarded by
iii. The date of the construction contract award and the contract award amount in dollars;
iv. Provide a brief description of the construction contract scope of work
v. Identification of at least one point-of-contact at the organization that awarded the submitted contract, including: the name of the point-of-contact; their current mailing address; phone number; and email address (if applicable).
II. TECHNICAL FACTOR 2: TECHNICAL QUALIFICATIONS (Tab B):
a. Briefly describe the firms specialized experience and technical competence working in ambulatory surgery type area involving health care facilities.
b. Provide a brief narrative which describes the relevant experience of the firm’s key personnel, to include at least:
i. Project Manager
ii. Superintendent
iii. Other relevant firm employees
iv. Sub-contractors
III. TECHNICAL FACTOR 3: DRAFT PROJECT SCHEDULE (Tab B):
a. Submit in a Gantt chart format for 180 calendar day performance period.
3. Evaluation and Selection Criteria: Technical Factors one (1) thru three (3), as described above will be rated as Acceptable or Unacceptable.
4. Price Proposal Submission Requirements (Tab C):
a. The following cost elements shall be addressed:
i. Labor (Direct & Indirect),
ii. Materials, Material Markups, Materials overhead,
iii. Equipment
iv. Subcontractor Cost
v. Other Direct Costs
vi. Overhead expenses
vii. Indirect Cost
viii. Profit
*** Price breakdown shall be indicative of showing at least 15 percent of the cost of the contract performance incurred for personnel will be spent on the concern's employees or the employees of other eligible service-disabled veteran-owned small business concerns in accordance with VAAR 852.219-10.***
5. Evaluation and Award Determination:
a. Source Selection Using Lowest Price Technically Acceptable Process (LPTA): This is a competitive Request for Proposal (RFP) that represents the best value to the Government conducted under FAR Part 15, Lowest Price Technically Acceptable (LPTA) source selection process. Award will be made on the basis of the lowest evaluated price of proposals meeting or exceeding the acceptability standards for non-cost factors.
b. Evaluation Overview: Proposals will be evaluated and ranked according to price, from lowest to highest. The Government reserves the right to evaluate only the technical proposal of the lowest price offeror. Other technical proposals may not be evaluated unless the Government determines the lowest price offeror to be unacceptable or non-responsive. In the event the Government determines the lowest price offeror to be unacceptable, the technical proposal of the next lowest price offeror will be evaluated. This process will continue until a technical proposal is determined to be acceptable. This is a firm-fixed price award. It is the Offeror’s responsibility to ensure the submitted cost proposal includes all costs for total project requirements and completion in accordance with the specifications and drawings herein. The Offeror assumes all risk for omissions in subcontractor proposals.
c. The Government intends to evaluate proposals and award a contract without discussions. Communication between the Government and offerors will be limited to exchanges for clarification as described in FAR 15.306(a). Communication conducted to resolve minor or clerical errors would not constitute discussions and the Contracting Officer reserves the right to award a contract without the opportunity for proposals revisions or discussions. However, the Government reserves the right to enter into discussions if deemed necessary.
d. To assure timely and equitable evaluation of proposals, offerors must follow the instructions contained herein. Offerors are required to meet all solicitation requirements, including terms and conditions, representations and certifications. Failure to meet a requirement may result in an offer being ineligible for award and being considered non-responsive.
e. SDVOSB Verification- The Government will review VetBiz (https://www.vip.vetbiz.gov/) to confirm Service Disabled Veteran-owned Small Business (SDVOSB) status verification for the submitted proposals. Evaluations will be performed on proposals submitted by verified SDVOSBs only. Subsequent confirmation of SDVOSB verification status will be performed for the apparent awardee.
f. Safety or Environmental Violations and Experience Modification Rate (EMR)
0. All Offerors shall submit the following information pertaining to their past Safety and Environmental record. The information shall contain, at a minimum, a certification that the offeror has no more than three (3) serious, or one (1) repeat or one (1) willful OSHA or any EPA violations(s) in the past three years.
0. All Offerors shall submit information regarding their current Experience Modification Rate (EMR) equal to or less than 1.0. This information shall be obtained from the offeror’s insurance company and be furnished on the insurance carrier’s letterhead.
0. Self-insured contractors or other contractors that cannot provide their EMR rating on insurance letterhead must obtain a rating from the National Council on Compensation Insurance, Inc. (NCCI) by completing/submitting form ERM-6 and providing the rating on letterhead from NCCI. Note: Self-insured contractors or other contractors that cannot provide EMR rating on insurance letterhead from the states or territories of CA, DE, MI, NJ, ND, OH, PA, WA, WY, and PR shall obtain their EMR rating from their state run worker’s compensation insurance rating bureau.
0. A Determination of Responsibility will be accomplished for the apparent awardee prior to processing the award. If the apparent awardee fails to provide required documentation, then the matter will be referred to the Small Business Administration (SBA) for a certificate of competency or a determination of responsibility by the SBA.
0. This requirement is applicable to all subcontracting tiers, and prospective prime contractors are responsible for determining the responsibility of their prospective subcontractors.
Past Safety and Environmental Record
(SAMPLE FORM FOR BIDDER/OFFEROR TO COMPLETE & SUBMIT WITH PROPOSAL)
Pre-Award Contractor Evaluation Form Company Name:
Address:
Telephone: Fax:
Email:
Contact:
1. Utilizing your OSHA 300 Forms, please complete the following information:
| Category |
| 2015 |
| 2016 |
| 2017 |
Number of man hours (jobsite and office).
Number of cases involving days away from work, restricted activity, or both (Column H and I of OSHA 300).
Days away, restricted, or transferred rate (# of days away, restricted, or transferred cases x 200,000/# of man hours) (DART Rate).
Number of serious, willful, or repeat violations from OSHA within the last 3 years. Please attach explanation for any violations. (Four serious, one repeat, or one willful disqualifies the contractor.)
Please attach copies of the following documents: OSHA 300 and 300a Forms. These forms can be accessed through the OSHA publications search page: http://www.osha.gov/pls/publications/publication.html.
Provide your six-digit North American Industrial Classification System (NAICS) Code for this Acquisition: __ Who administers your company’s Safety and Health Program? ____________________________ Company’s Insurance Experience Modification Rate (EMR) for the past 3 years (an EMR of greater than 1.0 disqualifies the contractor): ___________
Signature / Date
General Decision Number: FL180260 06/01/2018 FL260
Superseded General Decision Number: FL20170260
State: Florida
Construction Type: Building
County: Miami-Dade County in Florida.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.35 for calendar year 2018 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.35 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2018. The EO minimum wage rate will be adjusted annually.
Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/05/2018 1 01/12/2018 2 04/20/2018 3 06/01/2018
ASBE0060-001 03/02/2016
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR........................$ 34.58 12.57
CARP1809-002 08/01/2016
Rates Fringes
CARPENTER: PILEDRIVERMAN.........$ 25.20 10.36
ELEV0071-002 01/01/2018
Rates Fringes
ELEVATOR MECHANIC................$ 43.07 32.645
FOOTNOTE:
A: Employer contributes 8% basic hourly rate for 5 years or more of service or 6% basic hourly rate for 6 months to 5 years of service as Vacation Pay Credit; Paid Holidays:
New Year's Day; Memorial Day; Independence Day; Labor Day;
Veteran's Day; Thanksgiving Day; plus the Friday after Thanksgiving; and Christmas Day.
ENGI0487-019 07/01/2016
Rates Fringes
OPERATOR:
Backhoe/Excavator/Trackhoe.......$ 23.75 9.20
ENGI0487-020 05/01/2016
Rates Fringes
OPERATOR: Concrete Pump.........$ 26.04 9.23
ENGI0487-021 07/01/2016
Rates Fringes
OPERATOR: Crane All Cranes 160 Ton Capacity and Over...........$ 33.05 9.20 All Cranes Over 15 Ton Capacity....................$ 32.05 9.20 OPERATOR: Forklift..............$ 23.25 9.20 OPERATOR: Mechanic..............$ 32.05 9.20 OPERATOR: Oiler.................$ 23.50 9.20
IRON0272-001 10/01/2017
Rates Fringes
IRONWORKER, STRUCTURAL...........$ 24.89 10.10
IRON0402-001 02/01/2017
Rates Fringes
IRONWORKER, ORNAMENTAL...........$ 23.00 10.99
* PLUM0519-001 04/01/2018
Rates Fringes
PLUMBER..........................$ 29.13 10.89
PLUM0725-001 07/16/2017
Rates Fringes
PIPEFITTER (Includes HVAC Pipe, Unit and Temperature Controls Installations)..........$ 34.48 13.47
SFFL0821-004 01/01/2018
Rates Fringes
SPRINKLER FITTER (Fire Sprinklers)......................$ 27.68 18.89
SHEE0032-001 12/01/2013
Rates Fringes
SHEET METAL WORKER, Includes HVAC Duct Installation...........$ 23.50 12.18
SUFL2014-024 08/16/2016
Rates Fringes
CARPENTER, Includes Acoustical Ceiling Installation, Drywall Finishing/Taping, Drywall Hanging, Form Work, Metal Stud Installation................$ 18.04 3.24
CEMENT MASON/CONCRETE FINISHER...$ 13.06 0.70
ELECTRICIAN, Includes Low Voltage Wiring...................$ 29.60 9.38
IRONWORKER, REINFORCING..........$ 17.72 0.00
LABORER: Common or General, Including Cement Mason Tending...$ 11.79 0.70
LABORER: Pipelayer..............$ 13.56 1.34
OPERATOR: Bulldozer.............$ 15.40 1.90
OPERATOR: Grader/Blade..........$ 18.97 0.00
OPERATOR: Loader................$ 16.00 2.82
OPERATOR: Roller................$ 14.43 4.78
PAINTER: Brush, Roller and Spray............................$ 16.00 3.48
ROOFER...........................$ 19.98 4.77
TILE SETTER......................$ 18.01 0.00
TRUCK DRIVER: Dump Truck........$ 13.22 2.12
TRUCK DRIVER: Lowboy Truck......$ 14.24 0.00
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION