This document is a material sampling plan and key plan drawing for a federal construction project at Carl Vinson VA Medical Center in Dublin, Georgia. The project, titled "Correct Critical Roof and Wall Deficiencies" (Project No. 557-21-103), is prepared by West Point Engineers LLC as the Architect/Engineer of Record and is dated May 6, 2024, at the 100% Bid Documents phase.
The drawing identifies 10 material sampling locations across multiple buildings and corridors within the medical center complex, documenting existing roof and wall conditions through detailed cross-sectional analysis. Samples reveal significant deficiencies including moisture saturation, delaminating plywood with rot, unbonded roofing materials, failed sealants, and compromised structural integrity in wood decking. Specific findings include Building 6 with spongy roofing and moisture-damaged decking, Building 10 with structural rot and framing degradation, and Building 7 with chemical failure in wall flashing sealants. The scope encompasses repairs to flat roofs with various compositions (tar build-up, TPO, torch-down materials), foam and fiber insulation replacement, wood deck restoration, and wall flashing sealant remediation across Buildings 1-4, 25-27, 29, 41, 62, and Corridors 2, 6, 7, and 9. This assessment documentation supports the bid phase for VA contract execution under the U.S. Department of Veterans Affairs.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SLAB
SLAB
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CARL VINSON
VA MEDICAL
CENTER
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
CARL VINSON VA MEDICAL CENTER
1826 VETERANS BLVD., DUBLIN, GA 31021
CORRECT CRITICAL ROOF AND
WALL DEFICIENCIES
557-21-103
6-MAY-2024
100% BID DOCUMENTS
(502)890-2210 * WESTPOINTENGINEERS.COM
1941 BISHOP LANE, STE. 400 * LOUISVILLE KY 40218
SCMBVG
HA100
ALL
MATERIAL SAMPLING AREAS
CAMPUS SITE PLAN TEST AREASF1 1/64" = 1'-0"
LEGEND
IN CONTRACT / IN SCOPE
KEY PLAN
1. BUILDING 1 - FLAT
2. BUILDING 2 - FLAT
3. BUILDING 3 - FLAT
4. BUILDING 4 - FLAT
25. BUILDING 25 - FLAT
26. BUILDING 26 - FLAT
27. BUILDING 27 - FLAT
29. BUILDING 29 - FLAT
41. BUILDING 41 - FLAT
62. BUILDING 62 - FLAT
C2 CORRIDOR 2 - FLAT
C6 CORRIDOR 6 - FLAT
C7 CORRIDOR 7 - FLAT
C9 CORRIDOR 9 - FLAT
N
N
TRUE PLAN
C9
C9
C2
C7
C6
C6
1 4
SAMPLE TAKEN AT ROOF EDGE.
MATERIAL WAS DRY AND DECK WAS
IN GOOD CONDITION.
1" - STONE
5/8" - TAR BUILD UP
1" - FIBER INSULATION
1/4" - TAR MASTIC
CONCRETE DECK FLAT
2 SAMPLE TAKEN AT ROOF EDGE.
MATERIAL WAS DRY AND DECK WAS
IN GOOD CONDITION.
1/8" - TPO
2" FOAM INSULATION
3/8" - TAR MASTIC
3 SAMPLE TAKEN AT ROOF EDGE.
ROOFING WAS NOT BONDED TO
WOOD DECK
3/8" - TORCH DOWN
BUILD UP GRANULAR
ROOF
WOOD DECK - SLOPED
CONCRETE DECK FLAT
4 SAMPLE TAKEN AT ROOF EDGE.
MATERIAL WAS DRY AND DECK WAS
IN GOOD CONDITION.
1" - STONE
1" - TAR BUILD UP WITH
SEVERAL SEAL COATS
CONCRETE DECK FLAT
5 SAMPLE TAKEN AT WALL EDGE.
MATERIAL WAS SATURATED WITH
WATER. DECK WAS IN GOOD
CONDITION.
CONCRETE DECK FLAT
1/8" - TPO
2" FOAM INSULATION
3/8" - TAR MASTIC
6 SAMPLE TAKEN CENTER OF ROOF.
ROOF WAS SPONGY TO WALK ON.
DECKING HAD MOISTURE PRESENT
AS WELL AS ROT WAS PRESENT IN
PLYWOOD WITH DELAMINATING
LAYERS IN SAMPLE CORE.
WOOD DECK - SLOPED
1" - STONE
1/4" - TAR BUILD UP
1" - FIBER INSULATION
FELT BARRIER SHEET
SEALANT SAMPLE TAKEN FROM WALL FLASHING. OUTER SEALANTS CURRENT
STATE IS IN FAILURE WITH SEVER WEATHERING. INNER SEALANT DISPLAYED
CHEMICAL FAILURE.
8 SAMPLE TAKEN AT CENTER OF ROOF
STONE CAP HAS BEEN SEALED
SEVERAL TIMES AND IS FULLY
BONDED TO THE BUILDUP. WOOD IS 1
X 8 TONGUE AND GROVE (T&G)
1" - BUILD UP / STONE CAP
WOOD DECK - SLOPED
TAR SAMPLE TAKEN FROM SURFACE OF SLATE AT AN APPARENT ATTEMPT TO
PATCH OR PATCHES OF AN LEAK. THIS REPAIR WAS FOR THE BUILD UP ROOF
AND SLATE TRANSITION.
OBSERVATION 1 X 8 SLAT BOARDS WITH 3" +/- OPEN AIR SPACING IS PRESENT
AND ROOFING BACK SIDES ARE VISIBLE AND IS NORMAL FOR TIME PERIOD
CONSTRUCTION. ATTIC WAS VENTILATED. FRAMING AND DECKING ROT IS
PRESENT.