This document is a Questions and Answers (Q&A) section from a Request for Information (RFI) for Project 557-21-103: Correct Critical Roof and Exterior Wall Deficiencies, solicitation number 36C24726R0030. The Q&A addresses contractor inquiries regarding hazardous materials, specifically asbestos, associated with roof work on multiple buildings. The Architect/Engineer (AE) responses clarify that Building 27 requires appropriate asbestos mitigation in compliance with Specification Section 02 82 13.21, with asbestos detected in Sample #4 dated 4/22/2026 per West Point Engineers testing. No other buildings in scope currently show detected asbestos from sample areas taken. Contractors are directed to reference attached documentation including "Asbestos Testing - West Point Engineers, Carl Vinson VA, 1826 Veterans Blvd, Dublin, GA.PDF" and "Addendum HA100-GI002-2.PDF" for detailed sampling and core sampling information conducted on or about 4/18/2026.

The document does not establish specific response dates, award dates, pricing terms, or set-asides, as it consists solely of clarifying questions and AE responses regarding project conditions. Contractors should assume that asbestos abatement is required only for Building 27 based on testing results, while other roofs noted for renovation do not currently require asbestos mitigation based on available sample data. Core sampling details regarding roof depths and deck types are referenced in the addendum but not detailed within this Q&A document.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project 557-21-103: Correct Critical Roof and Exterior Wall Deficiencies- RFI’s 36C24726R0030

Hazardous Materials:

44. Are we to assume all roofs contain hazardous material and are to be abated?

AE RESPONSE: BUILDING 27 REQUIRES APPROPRIATE ASBESTOS

MITIGATION. COMPLY WITH SPECIFICATION SECTION 02 82 13.21.

REFER TO ATTACHED “ASBESTOS TESTING - WEST POINT ENGINEERS,

CARL VINSON VA, 1826 VETERANS BLVD, DUBLIN, GA.PDF” SAMPLE

#4 DATED 4/22/2026. NOTE: ALSO REFER TO “ADDENDUM HA100-

GI002-2.PDF” INDICATING FURTHER SAMPLING DETAILS FOR ROOFS

TESTED. ASBESTOS IS DETECTED ON BUILDING 27. NO OTHER

BUILDINGS CURRENTLY SHOW DETECTED ASBESTOS FROM SAMPLE

AREAS TAKEN.

45. Are there any known areas of asbestos associated with any of the areas where work is to be performed?

AE RESPONSE: BUILDING 27 REQUIRES APPROPRIATE ASBESTOS

MITIGATION. COMPLY WITH SPECIFICATION SECTION 02 82 13.21.

REFER TO ATTACHED “ASBESTOS TESTING - WEST POINT ENGINEERS,

CARL VINSON VA, 1826 VETERANS BLVD, DUBLIN, GA.PDF” SAMPLE

#4 DATED 4/22/2026. NOTE: ALSO REFER TO “ADDENDUM HA100-

GI002-2.PDF” INDICATING FURTHER SAMPLING DETAILS FOR ROOFS

TESTED. ASBESTOS IS DETECTED ON BUILDING 27. NO OTHER

BUILDINGS CURRENTLY SHOW DETECTED ASBESTOS FROM SAMPLE

AREAS TAKEN.

46. Seeing as how we were not able to access all the roofs is there any core information as to what the roofs contain?

AE RESPONSE: REFER TO “ADDENDUM HA100-GI002-2.PDF”

INDICATING CORE SAMPLING DETAILS FOR ROOFS TESTED ON OR

ABOUT 4/18/2026. NOTE: ALSO REFER TO ATTACHED “ASBESTOS

TESTING - WEST POINT ENGINEERS, CARL VINSON VA, 1826

VETERANS BLVD, DUBLIN, GA.PDF” SAMPLE #4 DATED 4/22/2026.

BUILDING 27 REQUIRES APPROPRIATE ASBESTOS MITIGATION.

COMPLY WITH SPECIFICATION SECTION 02 82 13.21. NO OTHER IN

SCOPE BUILDING ROOFS CURRENTLY SHOW DETECTED ASBESTOS

FROM SAMPLE AREAS TAKEN.

47. Are we to assume all roofs described in the project document contain hazardous material, or should we provide test results for all the roofs noted for renovation?

Project 557-21-103: Correct Critical Roof and Exterior Wall Deficiencies- RFI’s 36C24726R0030

AE RESPONSE: BUILDING 27 REQUIRES APPROPRIATE ASBESTOS

MITIGATION. COMPLY WITH SPECIFICATION SECTION 02 82 13.21.

REFER TO ATTACHED “ASBESTOS TESTING - WEST POINT ENGINEERS,

CARL VINSON VA, 1826 VETERANS BLVD, DUBLIN, GA.PDF” SAMPLE

#4 DATED 4/22/2026. NOTE: ALSO REFER TO “ADDENDUM HA100-

GI002-2.PDF” INDICATING FURTHER SAMPLING DETAILS FOR ROOFS

TESTED. ASBESTOS IS DETECTED ON BUILDING 27. NO OTHER

BUILDINGS CURRENTLY SHOW DETECTED ASBESTOS FROM SAMPLE

AREAS TAKEN.

48. Have the roofs been checked for asbestos?

AE RESPONSE: BUILDING 27 REQUIRES APPROPRIATE ASBESTOS

MITIGATION. COMPLY WITH SPECIFICATION SECTION 02 82 13.21.

REFER TO ATTACHED “ASBESTOS TESTING - WEST POINT ENGINEERS,

CARL VINSON VA, 1826 VETERANS BLVD, DUBLIN, GA.PDF” SAMPLE

#4 DATED 4/22/2026. NOTE: ALSO REFER TO “ADDENDUM HA100-

GI002-2.PDF” INDICATING FURTHER SAMPLING DETAILS FOR ROOFS

TESTED. ASBESTOS IS DETECTED ON BUILDING 27. NO OTHER

BUILDINGS CURRENTLY SHOW DETECTED ASBESTOS FROM SAMPLE

AREAS TAKEN.

49. Has there been any core samples done on the roofs, and if so, what are the depths, and deck types?

AE RESPONSE: REFER TO “ADDENDUM HA100-GI002-2.PDF”

INDICATING CORE SAMPLING DETAILS FOR ROOFS TESTED ON OR

ABOUT 4/18/2026.