This is a Request for Quote (RFQ) for patient ceiling lifts and installation at the Department of Veterans Affairs (VA) Coastal Healthcare System in Fayetteville, North Carolina. The solicitation (36C24626Q0199) seeks Guldmann Patient Ceiling Lifts or equivalent for Cottage 72, with a total of 10 lift systems required for patient rooms and bathrooms. Each lift system must have a 650-pound capacity, and the contract is set aside exclusively for Service-Disabled Veteran-Owned Small Businesses (SDVOSB).
The RFQ requires a comprehensive installation approach, including structural evaluation, shop drawings, manufacturer certification, training for staff, and maintenance support. Offerors must attend a mandatory site visit on 01/07/2026 and submit complete quotes by 9:00 a.m. EST on 01/22/2026. The contract will be firm-fixed-price with a performance period from 01/30/2026 to 07/29/2026. Key evaluation factors include technical approach, past performance, and pricing, with a focus on lift system compatibility, weight capacities, service support, and proven experience in similar VA medical facility installations.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C24626Q0199
PAGE 1 OF
1. REQUISITION NO.
2. CONTRACT NO.
3. AWARD/EFFECTIVE DATE
4. ORDER NO.
5. SOLICITATION NUMBER
6. SOLICITATION ISSUE DATE
a. NAME
b. TELEPHONE NO. (No Collect Calls)
8. OFFER DUE DATE/LOCAL
TIME
9. ISSUED BY
CODE
10. THIS ACQUISITION IS
UNRESTRICTED OR
SET ASIDE:
% FOR:
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
WOMEN-OWNED SMALL BUSINESS
(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
8(A)
NAICS:
SIZE STANDARD:
11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
13a. THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
13b. RATING
14. METHOD OF SOLICITATION
RFQ
IFB
RFP
15. DELIVER TO
CODE
16. ADMINISTERED BY
CODE
17a. CONTRACTOR/OFFEROR
CODE
FACILITY CODE
18a. PAYMENT WILL BE MADE BY
CODE
TELEPHONE NO.
UEI:
EFT:
PHONE:
FAX:
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER 18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS CHECKED
SEE ADDENDUM
19.
20.
21.
22.
23.
24.
ITEM NO.
SCHEDULE OF SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA
26. TOTAL AWARD AMOUNT (For Govt. Use Only) 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA
ARE
ARE NOT ATTACHED.
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
ARE
ARE NOT ATTACHED
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN _______________
29. AWARD OF CONTRACT: REF. ___________________________________ OFFER
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
DATED ________________________________. YOUR OFFER ON SOLICITATION
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED
SET FORTH HEREIN IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER) 30b. NAME AND TITLE OF SIGNER (TYPE OR PRINT) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (TYPE OR PRINT) 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION
(REV. NOV 2021)
PREVIOUS EDITION IS NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.212
7. FOR SOLICITATION
INFORMATION CALL:
STANDARD FORM 1449
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
12-11-2025 Chellry Whittier 757-728-7125 01-22-2026 09:00
EST
36C246
Department of Veterans Affairs Network Contracting Office 6 100 Emancipation Drive Hampton VA 23667-0001 chellry.whittier@va.gov 757-728-7125
X
Y 339113 800 Employees
N/A
36C565 Department of Veterans Affairs Fayetteville Coastal VA HCS Cottage 72 2300 Ramsey Street Fayetteville NC 28301-3856 36C246
Department of Veterans Affairs Network Contracting Office 6 100 Emancipation Drive Hampton VA 23667-0001
Financial Services Center
PO BOX 149971
Austin TX 78714-9971 512-460-5049 512-460-5221 X See CONTINUATION Page Guldmann Patient Ceiling Lifts, Installation, and training (Brand Name or Equal) for the Cottage 72 (CLC) Activation
Please refer to Section E.1 - Instructions to Offerors (pgs.
30 - 35) on how to complete and submit your response.
ALL Offerors must attend the site visit on 01/07/2026 from 10:00 a.m. – 12:00 p.m. (noon); THERE WILL BE ONLY ONE SITE
VISIT ***ANY OFFEROR THAT DOES NOT ATTEND THE SITE VISIT
WILL NOT BE CONSIDERED FOR AWARD***
ALL offerors must complete VAAR 852.219-76 (pgs. 24 - 26) ALL Offerors must complete FAR 52.222-52 (pg. 36)
Incomplete responses will be considered as "No-response."
No telephonic (verbal) questions will be addressed.
See CONTINUATION Page one (1)
Chellry Whittier Contracting Officer
Table of Contents
| SECTION A | 1 |
| A.1 SF 1449 SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES | 1 |
| SECTION B - CONTINUATION OF SF 1449 BLOCKS | 3 |
| B.1 CONTRACT ADMINISTRATION DATA | 3 |
| B.2 STATEMENT OF WORK | 4 |
| B.3 SPECIAL CONTRACT REQUIREMENTS | 16 |
| B.4 PRICE/COST SCHEDULE | 18 |
| ITEM INFORMATION | 18 |
| SECTION C - CONTRACT CLAUSES | 20 |
| C.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998) | 20 |
| C.2 52.222-42 STATEMENT OF EQUIVALENT RATES FOR FEDERAL HIRES (MAY 2014) | 21 |
| C.3 VAAR 852.219-73 VA NOTICE OF TOTAL SET-ASIDE FOR CERTIFIED SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESSES (JAN 2023) (DEVIATION) | 21 |
| C.4 VAAR 852.219-76 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—CERTIFICATE OF COMPLIANCE FOR SUPPLIES AND PRODUCTS (JAN 2023) (DEVIATION) | 24 |
| C.5 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2018) | 26 |
| C.6 VAAR 852.242-71 ADMINISTRATIVE CONTRACTING OFFICER (OCT 2020) | 27 |
| C.7 VAAR 852.247-73 PACKING FOR DOMESTIC SHIPMENT (OCT 2018) | 28 |
| SECTION D - CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS | 29 |
| SECTION E - SOLICITATION PROVISIONS | 30 |
| E.1 INSTRUCTIONS TO OFFERORS - COMMERCIAL ITEMS | 30 |
| E.2 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998) | 35 |
| E.3 52.216-1 TYPE OF CONTRACT (APR 1984) | 35 |
| E.4 52.222-52 EXEMPTION FROM APPLICATION OF THE SERVICE CONTRACT LABOR STANDARDS TO CONTRACTS FOR CERTAIN SERVICES—CERTIFICATION (MAY 2014) | 36 |
SECTION B - CONTINUATION OF SF 1449 BLOCKS
B.1 CONTRACT ADMINISTRATION DATA
1. Contract Administration: All contract administration matters will be handled by the following individuals:
a. CONTRACTOR:
b. GOVERNMENT: Contracting Officer 36C246 Chellry Whittier
Network Contracting Office 6 100 Emancipation Drive Hampton VA 23667-0001
2. CONTRACTOR REMITTANCE ADDRESS: All payments by the Government to the contractor will be made in accordance with:
| [X] |
| 52.232-33, Payment by Electronic Funds Transfer—System For Award Management, or |
| [] |
| 52.232-36, Payment by Third Party |
3. INVOICES: Invoices shall be submitted in arrears:
| a. Quarterly | [] |
| b. Semi-Annually | [] |
| c. Other | [X] Upon Government Acceptance |
4. GOVERNMENT INVOICE ADDRESS: All Invoices from the contractor shall be submitted electronically in accordance with VAAR Clause 852.232-72 Electronic Submission of Payment Requests.
VA Financial Service Center (FSC) Electronic Invoice Presentment and Payment System https://www.fsc.va.gov/einvoice.asp ACKNOWLEDGMENT OF AMENDMENTS: The offeror acknowledges receipt of amendments to the Solicitation numbered and dated as follows:
| AMENDMENT NO |
| DATE |
B.2 STATEMENT OF WORK
Patient Ceiling Lift, Installation, and Training for Cottage 72 Activation A. General Information
1. Title of Project: Patient Ceiling Lift, Installation, and Training in Fayetteville North Carolina VAMC CLC 72.
2. Scope of Work: The contractor shall provide all labor, tools, materials, transportation, equipment, parts, supervision, and personnel to perform the full replacement of patient lifts and all other resources required to deliver the requirements stated herein, except as may otherwise be specified in this statement of work. No work and/or repairs outside of the Statement of Work are authorized without permission from the Contracting Officer.
3. Qualifications: Contractor shall provide personnel who have the knowledge, qualifications, and experience to perform the functions outlined in the Performance Requirements. All personnel shall have at a minimum, an understanding of operations, maintenance procedures, and regulatory requirements associated with patient ceiling lifts.
4. Background and Justification: New ceiling lifts are needed in CLC 72. Patient ceiling lifts provide staff with a means to safely and efficiently handle and effectively transport within the patient’s room. The patient ceiling lifts are utilized to prevent injuries to the patients from being dropped from mishandling by staff and injuries to the staff from improper patient handling practices.
5. Performance Period/Schedule:
I. Contractor will be required to provide a construction schedule timeline for replacement. Installation dates and designs must be coordinated with Contracting Officer Representative (COR), and dates for installation in remodeling projects may be adjusted by the Government as required if engineering changes are required and delayed.
6. Type of Contract: Firm-Fixed-Price
B. Contract Award Meeting:
I. The contractor shall not commence performance on the tasks in this SOW until the CO has conducted a kick-off meeting or has advised the contractor that a kickoff meeting is waived.
C. General Requirements:
I. All installation must comply with requirements of Patient Safety Alert AL14-07, including the Checklist for Installation and Relocation. The installation checklist must be filled out for each installed lift, in addition to any checklist required by the manufacturer, and supplied to the COR.
1. Installers must have current certification to work on overhead lift and rail systems.
2. Contractor will provide evaluation of existing structure where ceiling lifts are needed and submission of plans to VA Coastal Healthcare System Engineering service, to ensure that workable systems are installed and comply with VA design requirements and relevant standards.
3. Contractor will coordinate with Engineering service to verify access to engineering mechanical, HVAC, and fire systems components within the mounting area of the lift units.
4. Shop drawings shall show structural supports to the underside of structure. Structural calculations for the support of the track and its attachment to ceiling structure shall be submitted. Shop drawings used in the quoting phase shall be PDFs, and either 2D CAD files or 3D BIM files showing structural support to underside of structure. Shop drawings shall also provide general room layout with bed position and all obstructions to ceiling lift.
5. The contractor shall provide a set of stamped drawings by the vendor. Shop drawings and structural calculations shall be signed and stamped by a registered structural engineer and shall meet all code requirements in the jurisdiction having authority. Structural engineer shall ensure ceiling minimum structure capacity shall support the loads specified in the shop and installation drawings and be in compliance with local structural and seismic codes.
6. Contractor shall provide BIM (Building Information Model) for clash detection at the request of the Resident Engineer (RE), VA Construction Agent, or General Contractor.
a. Certificates of Compliance from Manufacturer
b. Manufacturer's Literature and Data:
i. Lifting Capacity
ii. Lifting Speed
iii. Vertical Axis Motor
iv. Emergency Brake
v. Emergency Lowering Device
vi. Emergency Stopping Device
vii. Electronic Soft-Start and Soft-Stop Motor Control
viii. Current Limiter for Circuit Protection
ix. Strap Length
c. All equipment anchors and supports. Submittals shall include weights, dimensions, center of gravity of the structural support, standard connections, manufacturer's recommendations and behavior problems (e.g., vibration, thermal expansion,) associated with equipment or piping so that the proposed installation can be properly reviewed
7. Install ceiling mounted patient lift system as per manufacturer's instruction and under the supervision of manufacturer's qualified representative and as shown on drawings. If the distance in between the suspended ceiling and anchors is more than 12” consult with manufacturer to determine if lateral braces will be required.
8. Contractor will coordinate with Contracting Officer Representative (COR) to schedule installations.
9. Contractor will provide information on minimum clearances for operation of each lift, to be presented with the bid.
10. Contractor will provide a list of all construction, or modifications required to install these lifts, to be presented with the bid. The goal is to install around any obstructions without requiring VA to make construction modifications.
11. Contractor will provide all qualified personnel, materials, equipment and services necessary to install ceiling lifts for the rooms described below under Location, including lifts, tracks, spreader bars, attachment hardware, and all other equipment necessary for safe operation. Lift systems may be configured in any way that covers the rooms best and meets the requirements.
12. Contractor will provide installation and testing of all equipment for ceiling lifts, according to VA checklist requirements, resulting in a turnkey system.
13. Contractor will provide training on equipment use for all new types of equipment included in this contract, one session per shift for up to 2 shifts of personnel in each affected area and for onsite trainers (up to 10 sessions scheduled after installation and before use), in coordination with COR.
14. Contractor will provide Biomed maintenance training
15. Contractor will provide evidence of testing of all lift systems provided and schedule testing when it can be overseen by COR.
16. Contractor will mitigate any new hazards created by installation, such as ramps over interstitial support beams that create trip hazards.
17. Contractor will meet construction safety requirements, including construction orientation, safety training requirements, TB testing, electrical safety requirements, and Above Ceiling Permit requirements including re-sealing any penetrations of fire barriers.
18. Contractor will be responsible for adhering/implementing all infection control requirements as determined by the infection control risk assessment (ICRA).
19. The contractor is responsible for the removal of all trash and debris from the property. The contractor cannot dispose of items in VA dumpsters
20. The contractor is responsible for providing and replacing all damaged ceiling tiles. Ensuring the ceiling grid is returned to its original condition. VA Engineering team will provide the type of ceiling tiles required.
21. Contractor must attend a pre-offer walkthrough (site visit) of the space.
D. NARA Records Management Language Clause:
1. Contractor shall comply with all applicable records management laws and regulations, as well as National Archives and Records Administration (NARA) records policies, including but not limited to the Federal Records Act (44 U.S.C. chs. 21, 29, 31, 33), NARA regulations at 36 CFR Chapter XII Subchapter B, and those policies associated with the safeguarding of records covered by the Privacy Act of 1974 (5 U.S.C. 552a). These policies include the preservation of all records, regardless of form or characteristics, mode of transmission, or state of completion.
2. In accordance with 36 CFR 1222.32, all data created for Government use and delivered to, or falling under the legal control of, the Government are Federal records subject to the provisions of 44 U.S.C. chapters 21, 29, 31, and 33, the Freedom of Information Act (FOIA) (5 U.S.C. 552), as amended, and the Privacy Act of 1974 (5 U.S.C. 552a), as amended and must be managed and scheduled for disposition only as permitted by statute or regulation.
3. In accordance with 36 CFR 1222.32, Contractor shall maintain all records created for Government use or created while performing the contract and/or delivered to, or under the legal control of the Government and must be managed in accordance with Federal law. Electronic records and associated metadata must be accompanied by sufficient technical documentation to permit understanding and use of the records and data.
4. Fayetteville VAMC and its contractors are responsible for preventing the alienation or unauthorized destruction of records, including all forms of mutilation. Records may not be removed from the legal custody of Fayetteville VAMC or destroyed except for in accordance with the provisions of the agency records schedules and with the written concurrence of the Head of the Contracting Activity. Willful and unlawful destruction, damage or alienation of Federal records is subject to the fines and penalties imposed by 18 U.S.C. 2701.
In the event of any unlawful or accidental removal, defacing, alteration, or destruction of records, Contractor must report to Fayetteville VAMC. The agency must report promptly to NARA in accordance with 36 CFR 1230.
5. The Contractor shall immediately notify the appropriate Contracting Officer upon discovery of any inadvertent or unauthorized disclosures of information, data, documentary materials, records or equipment. Disclosure of non-public information is limited to authorized personnel with a need-to-know as described in the [contract vehicle]. The Contractor shall ensure that the appropriate personnel, administrative, technical, and physical safeguards are established to ensure the security and confidentiality of this information, data, documentary material, records and/or equipment are properly protected. The Contractor shall not remove material from Government facilities or systems, or facilities or systems operated or maintained on the Government’s behalf, without the express written permission of the Head of the Contracting Activity. When information, data, documentary material, records and/or equipment is no longer required, it shall be returned to Fayetteville VAMC control, or the Contractor must hold it until otherwise directed. Items returned to the Government shall be hand carried, mailed, emailed, or securely electronically transmitted to the Contracting Officer or address prescribed in the Purchase Order (contract). Destruction of records is EXPRESSLY PROHIBITED unless in accordance with Paragraph (4).
6. The Contractor is required to obtain the Contracting Officer's approval prior to engaging in any contractual relationship (sub-contractor) in support of this contract requiring the disclosure of information, documentary material and/or records generated under, or relating to, contracts. The Contractor is required to abide by Government and Fayetteville VAMC guidance for protecting sensitive, proprietary information, classified, and controlled unclassified information.
7. The Contractor shall only use Government IT equipment for purposes specifically tied to or authorized by the contract and in accordance with Fayetteville VAMC policy.
8. The Contractor shall not create or maintain any records containing any non-public Fayetteville VAMC information that are not specifically tied to or authorized by the contract.
9. The Contractor shall not retain, use, sell, or disseminate copies of any deliverable that contains information covered by the Privacy Act of 1974 or that which is generally protected from public disclosure by an exemption to the Freedom of Information Act.
10. The Fayetteville VAMC owns the rights to all data and records produced as part of this contract. All deliverables under the contract are the property of the U.S. Government for which Fayetteville VAMC shall have unlimited rights to use, dispose of, or disclose such data contained therein as it determines to be in the public interest. Any Contractor rights in the data or deliverables must be identified as required by FAR 52.227-11 through FAR 52.227-20.
11. Training. All Contractor employees assigned to this contract who create, work with, or otherwise handle records are required to take VHA-provided records management training, Talent Management System (TMS) Item #3873736, Records Management for Records Officers and Liaisons. The Contractor is responsible for confirming training has been completed according to agency policies, including initial training and any annual or refresher training.
E. Specific Mandatory Tasks and Associated Deliverables
1. Location of Ceiling Lift Installations: VA Coastal Healthcare System, Fayetteville VA Medical Center (2300 Ramsey Street, Fayetteville, NC 28301) CLC72. Rooms are listed below, along with the required capacity, whether scale is required, and details of design:
| Item # |
| Bldg. |
| Lbs. |
| Scale |
| Design |
| 1 |
| CLC 72 |
| 650 |
| No |
| Patient Room and bathroom |
| 2 |
| CLC 72 |
| 650 |
| No |
| Patient Room and bathroom |
| 3 |
| CLC 72 |
| 650 |
| No |
| Patient Room and bathroom |
| 4 |
| CLC 72 |
| 650 |
| No |
| Patient Room and bathroom |
| 5 |
| CLC 72 |
| 650 |
| No |
| Patient Room and bathroom |
| 6 |
| CLC 72 |
| 650 |
| No |
| Patient Room and bathroom |
| 7 |
| CLC 72 |
| 650 |
| No |
| Patient Room and bathroom |
| 8 |
| CLC 72 |
| 650 |
| No |
| Patient Room and bathroom |
| 9 |
| CLC 72 |
| 650 |
| No |
| Patient Room and bathroom |
| 10 |
| CLC 72 |
| 650 |
| No |
| Patient Room and bathroom |
2. Description of Tasks and Associated Deliverables: The contractor shall provide the specific deliverables described below within the performance period stated in Section A. 5 of this SOW.
3. Standards:
a. Ceiling Lift Performance Requirements:
i. Ceiling Lifts shall meet all Underwriters Laboratory requirements, life safety codes, national electric codes, fire safety codes, and all other applicable federal, state, and local codes. Appropriate documentation should be provided.
ii. The Ceiling Track shall be made from high strength extruded aluminum or VA approved equal. Provide anchor support at ceiling substrate. Installed rail shall be security tested 1.5 times greater than the motor’s weight capacity and maximum allowable deflection of a horizontal rail is no more than 1mm (1/16th inch) per 200mm (7.87 inch) of track length. (As per ISO 10535 standards.)
iii. Ceiling Lifts, straps, and slings shall comply with ISO 10535 (Hoists for the transfer of disabled persons – Requirements and test methods).
iv. Ceiling lifts must include a 2-point hanger bar, suitable and allowable for use with the full range of loop-based slings, with 2 hooks facing different directions on each end of the bar and without easily breakable parts such as rubber flaps.
v. Ceiling lift manufacturer must allow and warrant the use of their lifts with the full range of slings available to the facility.
vi. The lifts shall be mounted (using ceiling, wall, or floor support as determined by building structure and room covering layout needs) to provide lifting capability for the maximum area possible within each room which means wall to wall – not just over the bed.
vii. Lifts must be capable of picking patients up off the floor.
viii. The lifts are equipped with a current limiter for circuit protection in case of overload.
ix. Lift must have an integrated patient scale with accuracy that meets or exceeds +/- 0.5% at max load that does not decrease the lifting height.
x. The lift hand control must be attached to the lift in a way that allows it not to be lost.
xi. Lifts must not beep or flash during normal operation.
xii. Lifts must be able to lift a full-capacity load at least 21 times on a full, new battery charge.
xiii. Contractor must install lifts without relocating or interfering with operations of existing sprinkler heads, lights, HVAC grills, curtain tracks, IV tracks, televisions, permanent furniture, or other permanent structure. Contractor must describe any such fixtures that must be moved during contract bid and pre-construction meetings. Installation may be delayed, canceled, or moved to a mutually acceptable location if building changes cannot be made in ways that allow lift installation.
xiv. Contractor shall not breach any firewalls during installation of these lifts. Any fire barrier that must be penetrated must be discussed with VA safety personnel and must immediately have fire barrier repaired. An Above Ceiling Permit must be filled out before ceiling work, and the COR will check the ceiling after ceiling work, to make sure any fire barrier penetration was repaired.
xv. Each room where lifts are installed shall be returned to original condition, excluding the newly installed ceiling lift. Holes in the wall must be patched with appropriate materials. Any damaged ceiling tiles must be provided and replaced by the contractor. New ceiling tiles must match existing. Ceiling tile information will be provided by VA engineering team.
xvi. Ceilings must not be slotted exposing space above ceiling to the room below.
xvii. Ceiling lift motors shall be capable of lifting at least 650, or more pounds, as specified on the Location list.
xviii. A specific opportunity for Service Agreements, Preventive Maintenance Agreements, and Extended Warranty Agreements should be presented.
xix. Maintenance and inspection shall be provided for three years from date of final acceptance.
xx. Warranty shall include all travel or shipping associated with any warranty repair.
xxi. New lifts shall accept generic type replacement batteries without voiding any warranties.
xxii. Motors shall be GFCI-protected.
xxiii. Ceiling lifts’ vertical motion must be motorized.
xxiv. Ceiling lifts that connect from one room to another must be designed so that they cannot come off the rail system while in use, and the connecting rail and the systems in both room must all hold at least as much weight as the lift motor.
xxv. Ceiling lifts must recharge automatically, by recharging at any location on the rail without employee action.
xxvi. Ceiling lifts must include safeguards to prevent patients from being trapped or hurt, such as emergency stop buttons and emergency lowering devices in case of power failure. Use of emergency lowering devices must not require tools or ladders.
xxvii. Ceiling lifts must not be combined with rails or hardware from different manufacturers.
xxviii. Have the capability for displaying data in the hand controller that provides the time of lift, amount of weight of the lift, duration of lift total lift count, total hours, last/next service plus visual alerts for preventative maintenance inspections.
xxix. Motors and railing must have a min of 10-year average life span.
xxx. Install ceiling mounted patient lift system as per manufacturer's instruction and under the supervision of manufacturer's qualified representative and as shown on drawings. If the distance in between the suspended ceiling and anchors is more than 12” consult with manufacturer to determine if lateral braces will be required.
4. Contractor shall provide the following with the bid:
a. Provide proof of multiple ceiling lift installations of the room covering style with continuous charge, direct connections between two traverse systems in different rooms, and minimum 20’x12’ coverage in this or other Veterans Administration Hospitals.
b. Provide proof of ongoing service quality and consistent management, including failure reports and any other applicable documentation.
c. Provide proof of current certification to work on overhead lift equipment.
5. Training:
a. Contractor shall provide certified in-service training for all shifts of direct patient care staff in units where lifts are installed at no additional cost to the Government, for any equipment new to this facility (up to 10 sessions in coordination with the COR). This training must include hands-on lift use and be extensive enough to prepare participants to train others.
b. Training must include each new type of equipment and sling used in an area.
c. Contractor shall provide certified in-service training on each site, multiple times in a day, for biomedical engineering staff in coordination with the COR.
d. Biomed technical service training must be included
6. Manuals: Contractor shall provide electronic copies of the user manuals and repair manuals for each different model of lift installed under this order or contract at no additional cost to the government.
7. Inspection:
a. Each room’s lift system shall be weight and function tested after installation in compliance with the VHA checklist required by Patient Safety Alert AL14-07. Each checklist shall be provided to Contracting Officer Technical Representative within 7 days of installation along with any checklist required by the manufacturer. Any changes in inspection requirements during the period of installation will be communicated to the Contractor immediately.
b. In accordance with Patient Safety Alert AL14-07, design and structural drawings must be provided, and VA Fayetteville stakeholders must have an opportunity to approve or ask for changes before installation.
c. Conduct performance test, in the presence of the Resident Engineer (RE) and/or Inspector of Record (IOR), and a manufacturer's field representative, to show that the patient lift system equipment and control devices operate properly and in accordance with design, specification, and code requirements.
8. Contractor conduct requirements:
a. Equipment and supplies must not be shipped before designs are approved and contractor has approval to install. VA Coastal Healthcare System cannot store uninstalled equipment for a significant length of time.
b. All employees and subcontractors must wear a visible name and company identification when onsite. When more than one person is onsite performing work under this contract, one must be designated as a supervisor and must be fully responsible for the work to be performed.
c. The Contractor shall provide all supplies, materials, equipment, qualified personnel, supervision, management, and transportation to perform all tasks as identified herein. All work is to be performed in accordance with the guidelines established by Federal, State, and local ordinances and The Joint Commission. The Contractor’s procedures and quality control procedures shall conform to these guidelines.
d. Contractor personnel must conduct their work so as not to interfere with the normal functioning of the facility and will stop work if asked by VA Coastal Healthcare System personnel. Hours of work will need to be limited to daytime on units where patients sleep or to nighttime or weekends in areas where patients would be exposed by daytime work.
e. The Contractor shall take all precautions necessary to protect the lives and health of occupants of the building.
f. The Contractor must follow procedures required by VA Coastal Healthcare System Infection Control personnel and the construction safety committee, to include any required dust control specified in the Infection Control Risk Assessment.
g. The Contractor must state what efforts will be made to minimize noise during installation of equipment.
h. The Contractor shall immediately correct any fire and safety deficiencies caused by his personnel. If the contractor fails or refuses to correct deficiencies promptly, the Contracting Officer may issue an order stopping all or any part of the work and may hold the contractor in default of the contract.
i. The Contractor shall comply with applicable Federal, State, and local safety and fire regulations and codes which are in effect at the beginning of the contract period. The contractor shall keep abreast of any changes in these regulations and codes applicable to the contract.
j. All material and equipment will be removed from the facility or stored properly at the end of each workday and secured during the workday in the areas specified by the Contracting Officer’s Technical Representative.
k. The Contractor is responsible for supplying, completing, and submitting all reports required or requested by Federal, State, or local ordinances which pertain to any duties contained in the contract.
l. The Contractor will be required to furnish the VA Coastal Healthcare System with material safety data sheets for all chemicals used during installation. This information is required by the VA for emergency treatment in the event of ingestion of and/or contact with the material by humans and is required by OSHA regulations.
m. The Contractor’s onsite lead installer must attend a VACHCS construction safety orientation and supply job hazard analyses as required by Construction Safety Officer to show how hazards to Contractor and VACHCS personnel are being minimized.
n. All Contractor personnel must have OSHA 10-hour construction safety training cards.
o. The Contractor’s personnel shall follow applicable policies of the VA Coastal Healthcare System, to include policies concerning fire and disaster preparedness programs.
p. The contractor shall furnish at his own expense all labor, materials, machinery, and appliances which may be necessary or appropriate in the performance of this contract.
q. The contractor is responsible for the removal of all trash, debris, and de-installed lifts from the property. The contractor cannot dispose of items in VA dumpsters.
9. Special Requirements:
a. The contractor must have visited the site and assessed the structure of each ceiling lift location to ensure safe installation of the equipment and shall supply the installation plans to the VA Coastal Healthcare System Engineering Service and Construction Safety Group, who must accept them before installation.
b. Ceiling lift installations shall comply with NFPA 13 for fire sprinklers and with NFPA 99 and NFPA 70 for proper grounding and bonding and access to electrical and safety systems.
c. The contractor should not require movement of any lights, sprinklers, televisions, or other fixtures to install ceiling lifts. If movement of preexisting fixtures is unavoidable, the contractor must include such notice when the bid is submitted.
d. Wall mounted lifts are acceptable in the place of ceiling mounts where they are more effective or cause less risk to install.
e. Ceiling lifts must not add obstacles or impair any normal operations in patient care rooms.
f. It is permissible to raise the lifting height or extend the range of a lift system that is being replaced, so long as designs are approved by the facility in advance and all obstacles are avoided to avoid interference with the operation of curtains, ventilation, or other moving or ceiling mounted items.
g. All installation that affects existing areas and electrical work shall be coordinated with the VA Coastal Healthcare System Engineering service.
h. The contractor will install all necessary mounts, braces, and any other components needed for full lift function and safety.
10. Schedule for Deliverables: If for any reason any deliverable cannot be delivered within the scheduled time frame, the contractor is required to explain why in writing to the CO and POC, including a firm commitment of when the work shall be completed. This notice shall cite the reasons for the delay, and the impact on the overall project. The CO will then review the facts and issue a response, in accordance with applicable regulations.
11. Changes to Statement of Work: Any changes to this SOW shall be authorized and approved only through written correspondence from the CO. A copy of each change will be kept in a project folder along with all other products of the project. Costs incurred by the contractor through the actions of parties other than the CO shall be borne by the contractor.
12. Reporting Requirements: The VHA checklist and any manufacturer’s checklist are the sole report and must be provided to the COR by 1 week after installation. Lift installation is not considered complete and cannot be paid for until the checklist is complete and provided to the COR.
13. Government Responsibilities: VA Coastal Healthcare System will provide:
a. Guidance for contractor site visits and information on which rooms need lifts. (COR in association with affected services.)
b. Coordination to allow for lift installation as rooms are available. (COR in association with affected services.)
c. Technical information on the building and requirements for construction. (Engineering service.)
d. Coordination and scheduling for training efforts. (COR in association with affected services.)
e. Oversight of installation testing.
f. Coordination for electrical outlet installation where necessary. (COR in association with Engineering.)
g. Answers to Contractor questions during the purchasing and installation process. (CO and COR.)
EVALUATION FACTOR CRITERIA:
1. TECHNICAL
a. For structure alterations: Ceiling lifts, curtain compatibility, and continuous-charge rail must be proven to work, approved by the manufacturer of the lifts, supports and/or rail system; otherwise, new supports will be required.
b. The contractor must offer a warranty for and take responsibility and liability for the function of the rail system on which they install their lifts. The contractor will resolve any issues with the current structure or compatibility within the firm-fixed price offered for this contract.
c. Provide ceiling lift weight capacities and scales as specified, with 2-point hanger bars that are quickly removable without tools.
d. Ceiling lifts that are specified as requiring scales must include a scale holding the capacity of the lift, operable in pounds or kilograms, with the weight visible on the hand control, which is attached to the lift in a way that prevents loss, and no decrease in working height.
e. For any new rail design: Specify solutions that cover rooms as fully as practical given room shape while allowing privacy and not blocking vents, sprinklers, lights, or other fixtures. Room coverage (also known as H, X-Y, or traverse) systems are required unless other system types are approved by COR for reasons of design practicality. Designs should avoid requiring the VA Coastal Health Care System to move preexisting fixtures or equipment.
f. Free-standing rail systems must be adjustable to a height of up to 9 feet.
g. Lifts must be intended to lift patients at least 21 times per full charge at the capacity of the lift.
h. Lifts must charge anywhere on the rail system and must not require return to a charging station.
i. Hanger bars must not include pieces that can break off easily, such as rubber flaps.
j. Provide ceiling lift rails that can charge the lift anywhere in the room.
k. Provide ceiling lifts that can lift at speeds up to 6 cm/second and have speed adjusted if necessary.
l. Ceiling lifts must be compatible and warranted for use with slings available within the facility.
m. Ceiling lifts must be able to lower patients easily in an emergency without the use of a ladder or tools, with a sustained pull on a red cord.
n. Ceiling lifts must not make warning beeps when malfunctioning or display flashing lights during normal operation.
o. Provide three (3) years of warranty on tracks, installation, motors, and other parts, including the price of parts, labor and travel, or ten (10 ) years of warranty as long as the manufacturer is performing the preventive maintenance annually.
p. Provide fast support and parts for equipment.
q. Provide ongoing education and support for users.
r. Bid must include all parts, rails, hardware, and equipment to result in a safe and working system regardless of the condition of any existing rails or supports.
s. Bid must be presented as firm fixed price with no expectation of later price changes.
2. PAST PERFORMANCE:
Contractors will provide references indicating prior satisfactory services for similar installations, including room-coverage systems mounted both by wall and by ceiling, curtain crossing, and connections between rooms.
3. PRICE
B.3 SPECIAL CONTRACT REQUIREMENTS
A. WORK HOURS
The Contractor shall furnish the services covered by this contract as defined herein. The Contractor shall not be required, except in case of emergency, to furnish such services on Federal Holidays or during off-duty hours as described below.
The following terms have the following meanings:
Normal working hours: Monday through Friday, 8:00 a.m. – 4:30 p.m., excluding federal holidays.
New Year’s Day Martin Luther King’s Day Memorial Day President’s Day Independence Day Labor Day Columbus Day Veterans Day Thanksgiving Christmas Juneteenth Any other day specifically declared by the President of the United States to be a federal holiday.
When one of the holidays falls on Sunday, the following Monday shall be observed as a Federal Holiday. When a holiday falls on a Saturday, the preceding Friday shall be observed as a Federal Holiday.
B. BILLING AND PAYMENT
Invoices shall be submitted monthly, in arrears, to the VA’S Electronic Invoice Presentment and Payment System (see website at http://www.tungsten-network.com/customer-campaigns/veterans-affairs/) and shall include at a minimum:
Date of invoice Contract Number Purchase Order Number Vendor Name Invoice Number CLIN & Date of service
C. CONTRACTOR PERFORMANCE ASSESSMENT REPORTING SYSTEM (CPARS)
a) FAR 42.1502 directs all Federal agencies to collect past performance information on contracts. The Department of Veterans Affairs has implemented the use of the Contractor Performance Assessment Reporting System (CPARS) to comply with this regulation. One or more past performance evaluations will be conducted to record your contract performance as required by FAR 42.15.
b) The past performance evaluation process is a paperless process using CPARS. CPARS is a web-based system that allows for electronic processing of the performance evaluation report. Once the report is processed, it is available in the Past Performance Information Retrieval System (PPIRS) for the Government to evaluate past performance as part of a source selection action.
c) Please furnish the Contracting Officer with the name, position title, phone number, and email address of each person designated to have access to your firm’s past performance evaluation(s) for the contract no later than 30 days after award. Each person granted access will have the ability to provide comments in the Contractor portion of the report and state whether the Contractor agrees with the evaluation before returning the report to the Assessing Official. The report information must be protected as source selection sensitive information not releasable to the public.
d) When your Contractor Representative(s) (Past Performance Points of Contact) are registered in CPARS, they will receive an automatically generated email with detailed login instructions. Further details, system requirements, and training information for CPARS are available at www.cpars.gov. The CPARS User Manual, registration for online training for Contractor Representatives, may be found at this site.
e) Within 60 days after the end of a performance period, the Contracting Officer will complete an interim or final past performance evaluation. The report will be accessible at www.cpars.gov Contractor Representatives may then provide comments in response to the evaluation or return the evaluation without comment. Comments are limited to the space provided in Block 22. Your comments should focus on objective facts in the Assessing Official’s narrative and should provide your views on the causes and ramifications of the assessed performance. In addition to the ratings and supporting narratives blocks 1-17 should be reviewed for accuracy, as these include key fields that the Government will use to identify your firm in future source selection evaluations. If you elect not to provide comments, please acknowledge receipt of the evaluation by indicating “No Comment” in Block 22 and then signing and dating Block 23 of the form. Without a statement in Block 22, you will be unable to sign and submit the evaluation back to the Government. If you do not sign and submit the CPAR within 30 days, it will automatically be returned to the Government and annotated: “The report was delivered/received by the Contractor on (date). The Contractor neither signed nor offered comment in response to this assessment.” Your response is due within 30 calendar days after receipt of the CPAR.
f) The following guidelines apply concerning your use of past performance evaluation:
a. Protect the evaluation as “source selection information.” After review, transit the evaluation by completing and submitting the form through CPARS. If, for some reason, you are unable to view and/or submit the form through CPARS, contact the Contracting Officer for instructions.
b. Strictly control access to the evaluation within your organization. Ensure the evaluation is never released to persons or entities outside of your control.
c. Prohibit the use of or reference to evaluation data for advertising, promotional material, pre-award surveys, responsibility determination, production readiness reviews, or other similar purposes.
g) If you wish to discuss a past performance evaluation, you should request a meeting in writing to the Contracting Officer no later than seven days following your receipt of the evaluation. The meeting will be held in person or via telephone or other means during your 30-day review period.
h) A copy of the completed past performance evaluation will be available in CPARS for your viewing and for Government use supporting source selection actions after it has been completed.
D. CONTRACT ADMINISTRATION
Notwithstanding the Contractor's responsibility for total management during the performance of this contract, the administration of the contract will require maximum coordination between the Government and the Contractor.
The Contracting Officer is the only person authorized to approve changes or modify any of the requirements of this contract. The Contractor shall communicate with the Contracting Officer on all matters pertaining to contract administration. Only the Contracting Officer is authorized to make commitments or issue changes that shall affect the price, quantity, or quality of performance of this contract.
In the event the contractor affects any such change at the direction of any person other than the contracting officer without authority, no adjustment shall be made in the contract price to cover an increase in costs incurred as a result thereof.
B.4 PRICE/COST SCHEDULE
ITEM INFORMATION
| ITEM NUMBER |
| DESCRIPTION OF SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 9.00 |
| EA |
| __________________ |
| __________________ |
XY system in both patient room and bathroom, GH3+ 605 lbs. WiFi, CLM, 3 year warranty (5 years on batteries) Contract Period: Base POP Begin: 01-30-2026 POP End: 07-29-2026 PRINCIPAL NAICS CODE: 339113 - Surgical Appliance and Supplies Manufacturing PRODUCT/SERVICE CODE: 6515 - Medical and Surgical Instruments, Equipment, and Supplies
| 1.00 |
| EA |
| __________________ |
| __________________ |
XY system in both patient room and bathroom, GH3+ 825 lbs. WiFi, CLM, 3 year warranty (5 years on batteries)
POP Begin: 01-30-2026 POP End: 07-29-2026
| 10.00 |
| EA |
| __________________ |
| __________________ |
GULDMANN CERTIFIED INSTALLATION. Non-Union Labor and hardware to install lifts in 1 room. [1] room per day, [2] mobilization(s) of the installation team. Electrical work, existing structure demo, modification, or reinstallation including but not limited to ceilings, walls, tile, patching, painting, acoustic caulking, asbestos abatement, smoke/firewall repair, fireproofing reapplication, sprinkler relocation and door header modification is outside the scope of work for Guldmann installers and Guldmann is not Especific contractors/trades to perform such work. ICRA up to level II provided; additional is responsibility of facility. Guldmann will perform light cleaning of the area but returning room to original condition is outside of scope of work for Guldmann installers. If an Above Ceiling Work Permit is required, facility must provide.
POP Begin: 01-30-2026 POP End: 07-29-2026
| 1.00 |
| EA |
| __________________ |
| __________________ |
Engineer Stamped Drawings
POP Begin: 01-30-2026 POP End: 07-29-2026
| GRAND TOTAL |
| __________________ |
Page 1 of Page 1 of
SECTION C - CONTRACT CLAUSES
ADDENDUM to FAR 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES Clauses that are incorporated by reference (by Citation Number, Title, and Date), have the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available.
The following clauses are incorporated into 52.212-4 as an addendum to this contract:
C.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
https://www.acquisition.gov/browse/index/far https://www.va.gov/oal/library/vaar/
(End of Clause)
| FAR Number |
| Title |
| Date |
| 52.203-17 |
| CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS |
| NOV 2023 |
| 52.204-10 |
| REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT AWARDS |
| JUN 2020 |
| 52.204-13 |
| SYSTEM FOR AWARD MANAGEMENT MAINTENANCE |
| OCT 2018 |
| 52.209-6 |
| PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH CONTRACTORS DEBARRED, SUSPENDED, PROPOSED FOR DEBARMENT, OR VOLUNTARILY EXCLUDED |
| JAN 2025 |
| 52.209-10 |
| PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC CORPORATIONS |
| NOV 2015 |
| 52.219-6 |
| NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE |
| NOV 2020 |
| 52.219-28 |
| POSTAWARD SMALL BUSINESS PROGRAM REREPRESENTATION |
| JAN 2025 |
| 52.219-33 |
| NONMANUFACTURER RULE |
| SEP 2021 |
| 52.222-3 |
| CONVICT LABOR |
| JUN 2003 |
| 52.222-19 |
| CHILD LABOR—COOPERATION WITH AUTHORITIES AND REMEDIES |
| JAN 2025 |
| 52.222-35 |
| EQUAL OPPORTUNITY FOR VETERANS |
| JUN 2020 |
| 52.222-37 |
| EMPLOYMENT REPORTS ON VETERANS |
| JUN 2020 |
| 52.222-40 |
| NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS ACT |
| DEC 2010 |
| 52.222-41 |
| SERVICE CONTRACT LABOR STANDARDS |
| AUG 2018 |
| 52.222-50 |
| COMBATING TRAFFICKING IN PERSONS |
| OCT 2025 |
| 52.222-55 |
| MINIMUM WAGES FOR CONTRACTOR WORKERS UNDER EXECUTIVE ORDER 14026 |
| JAN 2022 |
| 52.222-62 |
| PAID SICK LEAVE UNDER EXECUTIVE ORDER 13706 |
| JAN 2022 |
| 52.223-23 |
| SUSTAINABLE PRODUCTS AND SERVICES |
| MAY 2024 |
| 52.225-1 |
| BUY AMERICAN—SUPPLIES |
| OCT 2022 |
| 52.225-3 |
| BUY AMERICAN—FREE TRADE AGREEMENTS—ISRAELI TRADE ACT |
| NOV 2023 |
| 52.226-8 |
| ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING WHILE DRIVING |
| MAY 2024 |
| 52.232-33 |
| PAYMENT BY ELECTRONIC FUNDS TRANSFER—SYSTEM FOR AWARD MANAGEMENT |
| OCT 2018 |
| 52.233-3 |
| PROTEST AFTER AWARD |
| AUG 1996 |
| 852.201-70 |
| CONTRACTING OFFICER'S REPRESENTATIVE |
| DEC 2022 |
| 852.203-70 |
| COMMERCIAL ADVERTISING |
| MAY 2018 |
| 852.212-71 |
| GRAY MARKET AND COUNTERFEIT ITEMS |
| FEB 2023 |
| 852.246-71 |
| REJECTED GOODS |
| OCT 2018 |
C.2 52.222-42 STATEMENT OF EQUIVALENT RATES FOR FEDERAL HIRES (MAY 2014)
In compliance with the Service Contract Labor Standards statute and the regulations of the Secretary of Labor (29 CFR part 4), this clause identifies the classes of service employees expected to be employed under the contract and states the wages and fringe benefits payable to each if they were employed by the contracting agency subject to the provisions of 5 U.S.C. 5341 or 5332.
This Statement is for Information Only:
It is not a Wage Determination
| Employee Class |
| Monetary Wage—Fringe Benefits |
| 09040 |
| WG-3 |
(End of Clause) C.3 VAAR 852.219-73 VA NOTICE OF TOTAL SET-ASIDE FOR CERTIFIED SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESSES (JAN 2023) (DEVIATION)
(a) Definition. for the Department of Veterans Affairs, ‘‘Service-disabled Veteran-owned small business concern…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .