This document is an architectural plan for replacing an MRI 1.5T system at the Durham VA Health Care System. The 65% design development drawing includes detailed plans for demolition and new work in the MRI suite, featuring comprehensive architectural details for walls, windows, doors, and RF shielding. The equipment schedule lists four key components to be supplied and installed by the VA contractor: an MRI Imaging Machine (Siemens Magnetom Sola), MRI Electronics Cabinet, MRI SEP Cabinet, and MRI UPS with Battery. The architectural plans specify precise technical requirements for RF shielding, including modular copper shielding wall panels, floor systems, and ceiling paneling, with detailed specifications for construction materials, insulation, and installation methods. The project involves extensive modifications to the existing MRI room, including removing existing walls, flooring, and infrastructure, and installing new radio-frequency shielded components to accommodate the new medical imaging equipment.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24626B0001 0006.docx | DOCX document | |
| Bid Abstract 36C24626B0001.pdf | ||
| Base Bid Cost Breakdown.xlsx | XLSX spreadsheet | |
| 36C24626B0001 0005.docx | DOCX document | |
| 08 34 46 RADIO-FREQUENCY-INTERFERENCE SHIELDING DOORS_r1.pdf | ||
| 36C24626B0001 0004.docx | DOCX document | |
| 36C24626B0001 0003.docx | DOCX document | |
| 36C24626B0001 0002.docx | DOCX document | |
| Pre-Bid Conference-Site Vist_Replace MRI 1.5T_Attendees.pdf | ||
| Addendum 1 Narrative.pdf | ||
| 08 34 46 RADIO-FREQUENCY-INTERFERENCE SHIELDING DOORS.pdf | ||
| 36C24626B0001 0001.docx | DOCX document | |
| 558-CSI-400 Replace MRI 1.5T Specs.pdf | ||
| 558-CSI-400 Replace MRI 1.5T Drawings.pdf | ||
| 558-CSI-400 Replace MRI 1.5T Specs.docx | DOCX document | |
| 36C24626B0001_2.docx | DOCX document |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R Q P
5.6
MRI Exam
FG184A
MRI Scan Room 2
FG184B
Control
FG184
Vestibule
C02
Alcove
C01
Corridor
A
A102
A101
A101
184BB 184BA
Equipment
FG184C
3.09
3.09
A
A101
Sim
A101
Sim
R Q P
5.6
MRI Exam
FG184A
MRI Scan Room 2
FG184B
Control
FG184
Vestibule
C02
Alcove
C01
Corridor
V .I
.F
/8
W x
H
2.52
2.04
2.04
2.03
2.03
Align
2.59
2.55 2.55
2.51
2.51
2.58
2.56
2.57
2.07 2.53
2.03
2.03
2.06
2.542.54
Area of Work
N
2.04
9.21
5.07
5.10
6.19
7.17
9.24
2.08
7.04
7.81
7.247.24
7 1/4" V.I.F.
2 1/2"
3 1/8" V.I.F.
7.82
7.14
9.219.21
9.02 7.35
7.82
9.21
6.01
6.09
7.35
7.16
6.01
109'-0"
9.419.41
13.01
9.13
7.82
Construct Metal Stud wall only at wall opening used to bring MRI equipment in.
112'-0"
13.02
13.0313.03
13.01
6.01
4 7/8"
2" Isolation Air Space 1 3/4" RF Wall Panel
4 1/8"
EXTERIOR ELEVATION
INTERIOR ELEVATION
SECTION/DETAIL NUMBER
DRAWING NUMBER
EQUIPMENT TAG
COLUMN GRID
NOTE
WINDOW OPENING
DOOR OPENING
ROOM NAME
ROOM NUMBER
WALL TYPE
CEILING HEIGHT
FINISH DESIGNATION101
X
10'-8"
X
X
XX.X-X
XX
X
1/A101
X
A101
X
X
A101
SIM
DEMOLITION LEGEND
Wall to be Demolished
Existing Wall to Remain
Door and Frame to be Demolished
SEE SCHED.
S E
E S
C H
E D
U L E
F
SEE PLAN
H1 J1
13.01
6.01
7.359.21
6.01
6.10
7.82
9.21
9.02 7.35
9.08
7.82
MRI Side
SEE PLAN
13.01
6.01 7.35
9.21
7.82
9.21
9.02 7.35
9.09
7.82
MRI Side
6.14
S1
2.01
9.208.14
9.20
13.02
7.16
8.10 8.10
7.16 9.16
9.17
13.0513.05
13.04
9.19
9.20
MRI Side
13.01
6.01 7.35
9.21
6.01
6.10
7.84
8.09
9.219.21
9.02 7.35
9.08
6.03
7.84
MRI Side
13.01
9.21
6.01 7.35
6.14
7.84
8.09
9.219.21
9.02 7.35
9.09
7.84
6.03
MRI Side
8.09
7.84
7.84
9.21
6.01
6.01 7.35
9.21
13.01
9.21
7.35 6.03
6.03
E x is ti n g
V .I
.F
R
.O
V.I.F.
4'-0" R.O.A
9.419.41
13.0313.03
9.44
9.43 9.42
5.17
5.18
S T A
T E
OF FLO
R
I D A
R E G
IS
TERED ARC
H
IT
E C T
J A S
ON
H. RO
S S
AR101907
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
GENERAL NOTES:
SYMBOL LEGEND:
Watson Engineering, P.C.
782 Johnnie Dodds Blvd, Suite I-2
Mount Pleasant, SC 29464
(607)223-4334 Durham VA Health Care System
KEYED NOTES:
Vangie Miller
FULLY SPRINKLERED
A u to d e s k D o c s /5
-C S
I-
R e p la c e M
R I
.5 T i n B u ild in g
/2
.0
D u rh a m
M R
I_ R
R
D C
J P
A .r v t
/1 /2
:2
:3
P M
A101
ARCHITECTURAL PLANS, DETAILS,
AND SECTIONS
65% Design Development
BRJR12/01/2024
Replace MRI 1.5T 558-CSI-400
N Scale: 1/8" = 1'-0"2 New Work Plan
A. All dimensions are taken to face of gypsum wallboard or unit masonry.
B. Edge of all door jambs at hinge side not otherwise indicated are to be 6" from the face of intersecting walls.
Edge of all door jambs at strike side not otherwise located are to be 18" minimum from the face of intersecting walls.
C. All wood blocking to be fire retardent treated.
D. First floor level 100'-0" equals XXXXX.
E. All partitions shall be type 'S1.0' unless noted otherwise.
F. All walls to be P-1 unless noted otherwise.
G. All flooring to be installed underneath all casework and storage cabinets.
H. Where new finishes would match existing finishes, or new finishes are not required, maintain existing finishes where possible during demolition and constuction phase for reuse. Patch, repair, and match existing finishes where disturbed by construction.
2.01 Existing construction to remain.
2.03 Existing gypsum board on metal stud wall to remain. Patch and install gypsum board wall, as necessary, for 'Like New' appearance before erection of new metal stud wall or installation of new finishes.
2.04 Existing masonry on metal stud wall to remain.
2.06 Existing exterior door to remain.
2.07 Existing ACT Ceiling, and Lighting Fixtures to remain. Protect ACT Tiles and Tracks, as needed, from demolition and construction damage. Coordinate storage of existing ACT tiles and tracks with the VA, as needed.
2.08 Existing steel lintel to remain.
2.51 Remove existing Gypsum Board, Wood Stud, and RF Shielding wall.
2.52 Remove existing EIFS, weather barriers, gypsum substrate, metal stud, insulation, and gypsum wall board.
Protect adjacent masonry, masonry lintels, metal stud, insulation, metal studs, wall finishes from damage during demolition of existing wall and construction of new wall. See New Work Plan.
2.53 Remove existing Vinyl Tile Flooring and prepare substrate to receive new finishes.
2.54 Remove existing Vinyl Tile Flooring, fiber-reinforced raised concrete slab, and RF Sheilding. Prepare existing concrete slab to receive new RF Shielding and Finishes.
2.55 Remove existing RF Shielded Wood Door and Frame.
2.56 Remove existing window. Prepare wall opening to receive new RF Shielded hollow metal window and frame.
2.57 Remove existing ACT Ceiling System, lighting fixtures, mechanical diffusers, and RF Shielding.
2.58 Remove existing Casework.
2.59 Remove existing Gypsum on Metal Stud wall.
3.09 Slope up finish floor with high-strength concrete, to be be level with top of modular RF Shielding floor. Max slope: 1/20.
5.07 6" cold formed metal framing @ 16" O.C. Verify in Field.
5.10 Attach metal stud to existing metal stud structure. Allow for movement between structurers. Min. 1/4", Max 1/2".
5.17 All-thread, as required by Radio-Frequency (RF) ceiling panel manufacturer.
5.18 Fasten unistrut to structure above.
6.01 2" x 4" wood stud
6.03 2" x ___" wood blocking.
6.09 1-3/4" x 1-3/4" preserative treated wood blocking continuous mounting rail.
6.10 2" x 4" wood header
6.14 2" x 4" wood jack and kings studs, as needed.
6.19 5/8" exterior glass matt gypsum board sheathing. Seal all joints.
7.04 Two-piece break metal sill.
7.14 Batt thermal wall insulation. R-19 min.
7.16 Vapor retarder. Seal all joints and penetratons.
7.17 Air and moisture barrier. Lap air and moisture barrier over break metal sill flashing and adjacent air and moisture barriers to manufacturer's recommendations.
7.24 2-1/2" Exterior Insulation Finish System (EIFS) with Finish Coat on Base Coat with Reinforcing Mesh, on approved Insulation Board. Adhere approved Insulation Board to the Air and Moisture Barrier. Complete EIFS install to be to Manufacturer's Recommendations.
7.35 3-1/2" Acoustical batt insulation.
7.81 Continuous sealant over backer rod.
7.82 Continuous acoustic sealant @ non-rated walls / fire-rated sealant @ rated walls each side.
7.84 Acoustic sealant.
8.09 Radio-Frequency (RF) Shielding safety glass window and aluminum framing.
8.10 Aluminum door jamb, provided by RF door manufacturer.
8.14 Flush aluminum sill.
9.02 3 5/8" non-structural metal framing @ 16" o.c.
9.08 Metal framing box header.
9.09 Double metal framing at jambs, typ.
9.13 Attach to Structure above.
9.16 1/8" Hardboard Leveling Layer
9.17 1/8" Sub-Floor
9.19 1/8" Vinly Tile Filler
9.20 Scheduled finish flooring. See Finish Plan.
9.21 5/8" Type X gypsum board.
9.24 Gypsum Control Joint along perimeter of new infill wall.
9.41 Suspended acoustic ceiling tile/grid. See Finish Legend.
9.42 Aluminum wire hangers, as required by ACT Ceiling Manufacturer.
9.43 Aluminum angle
9.44 Aluminum screw.
13.01 1-3/4" thick continuous modular Radio-Frequency (RF) copper shielding wall panel with 1-1/2" acoustical batt insulation. Install to Manufacturer's Specifications.
13.02 1-1/8" total thickness modular Radio-Frequency (RF) Shielding floor system. Install to Manufacturer's Specifications.
13.03 1-3/4" thick continuous modular Radio-Frequency (RF) copper shielding ceiling paneling with 1-1/2" acoustical batt insulation. Install to Manufacturer's Specifications.
13.04 Bronze sprayed structural and electrical seam clamp with flat head self-threading screw. Install to Manufacturer's Specifications.
13.05 3/4" Cell panel with 3oz. copper on top side and polybak on bottom side.
N Scale: 1/8" = 1'-0"1 Demolition Plan
524 Fernwood Drive, Altamonte Springs, Florida 32701 |www.rdcjpa.com| 800.362.1523
GENERALCONSTRUCTION NOTES
A. Remove all existing partitions shown with dashed line. Repair wall and floor finishes to match adjacent surfaces at areas of removal or scheduled new surfaces as required.
B. Remove all existing borrowed lights, doors and hollow metal frames where indicated with dashed line. Unused hardware shall be turned over to Owner. Box hardware before giving to Owner.
C. Remove wall-hung toilet room accessories and medical equipment as required and turn over to Owner.
D. See Plumbing, HVAC and Electrical Drawings for removal work associated with those trades.
E. Computer and communication cables and/or other wiring, piping, tubing, etc. serving other areas and functions located above ceiling or in walls of area to be remodeled shall be maintained during demolition/construction process. Coordinate any required changes to these systems with the C.O.R.
F. Repair existing walls to match adjacent undisturbed wall where cabinets, countertops, etc. are shown to be removed.
G. Prepare walls and floor slabs as required to receive new fininsh materials where existing finish is indicated to be removed.
H. Remove existing corner guards in areas to be remodeled.
GENERAL DEMOLITION NOTES
Key Plan Scale: 3/4" = 1'-0"4 Wall Section - Exterior
Scale: 1 1/2" = 1'-0"3 Wall Section - Interior
DOOR SCHEDULE
DOOR
BETWEEN DOOR DESCRIPTION FRAME DESCRIPTION
FIRE
RATING REMARKSRM RM TYPE MAT'L
SIZE
TYPE MAT'L HEAD JAMB Sill Detail# W H T
184BA C02 FG184B F WD 1 4'-0" 7'-0" 1 3/4" 1 HM H1 J1 S1 - RF Shielding / Access Control
184BB FG184C FG184B F WD 1 3'-0" 7'-0" 1 3/4" 1 HM H1 J1 S1 - RF Shielding / Access Control
N.T.S.Scale:
Door Types N.T.S.Scale:
H.M. Door Frame Details
Scale: 3" = 1'-0"5 Section Detail - RF Flooring
N.T.S.Scale:
Window Detail - Header
N.T.S.Scale:
Window Detail - Jamb N.T.S.Scale:
Window Detail - Sill
N.T.S.Scale:
Window Type
EQUIPMENT SCHEDULE
TAG Description Manufacturer Model
Supplied By Installed By
VA Contractor VA Contractor
1 MRI Imaging Machine Siemens Magnetom Sola X X
2 MRI Electronics Cabinet Siemens X X
3 MRI SEP Cabinet Siemens X X
4 MRI UPS with Battery Siemens X X
Section Detail - Ceiling
Revisions: Date:
Addendum 01 12/18/2025
| Sheets |
| A101 - ARCHITECTURAL PLANS, DETAILS, AND SECTIONS |