36C24619B0040-0003004.pdf

PDF Posted

Attached to
652-318 Construct Cancer Center (VA-19-00013696)
Solicitation number
36C24619B0040
Issued by

About this file

This document contains a federal contract opportunity solicitation for construction services and related quality control reporting requirements. The Department of Veterans Affairs is seeking a Service Disabled Veteran Owned Small Business to construct a two story, 15,000 square foot cancer center addition at the H.H. McGuire VA Medical Center in Richmond, Virginia for an estimated cost between $5-10 million. The contractor will have 630 days from notice to proceed to complete the project in accordance with construction drawings and specifications by Miller-Remick, LLC. The NAICS code is 236220 with a $36.5 million small business size standard. A pre-proposal site visit will be held on or around August 15, 2019, and the solicitation questions deadline is August 22, 2019. The contractor must utilize the included quality control report form and adhere to all federal, state, and local permitting and safety requirements.

36C24619B0040 0003 014500.10 (01-2018) Attach A - QCR Example Form.pdf

View the file

Other files

File Type Posted
36C24619B0040-0003007.pdf PDF
36C24619B0040-0003001.pdf PDF
36C24619B0040-0003006.pdf PDF
36C24619B0040-0003003.pdf PDF
36C24619B0040-0003005.pdf PDF
36C24619B0040-0003000.docx DOCX document
36C24619B0040-0003002.pdf PDF
36C24619B0040-0003000.docx DOCX document
36C24619B0040-0003004.pdf PDF
36C24619B0040-0003001.pdf PDF
36C24619B0040-0003007.pdf PDF
36C24619B0040-0003002.pdf PDF
36C24619B0040-0003003.pdf PDF
36C24619B0040-0003006.pdf PDF
36C24619B0040-0003005.pdf PDF
36C24619B0040-0002000.docx DOCX document
36C24619B0040-0002000.docx DOCX document
36C24619B0040-0001000.docx DOCX document
36C24619B0040-0001000.docx DOCX document
36C24619B0040-008.pdf PDF
36C24619B0040-003.pdf PDF
36C24619B0040-004.pdf PDF
36C24619B0040-010.pdf PDF
36C24619B0040-001.docx DOCX document
36C24619B0040-013.pdf PDF
36C24619B0040-005.pdf PDF
36C24619B0040-007.pdf PDF
36C24619B0040-011.pdf PDF
36C24619B0040-006.pdf PDF
36C24619B0040-012.pdf PDF
36C24619B0040-009.pdf PDF
36C24619B0040-002.docx DOCX document
36C24619B0040-003.pdf PDF
36C24619B0040-009.pdf PDF
36C24619B0040-008.pdf PDF
36C24619B0040-011.pdf PDF
36C24619B0040-013.pdf PDF
36C24619B0040-002.docx DOCX document
36C24619B0040-007.pdf PDF
36C24619B0040-004.pdf PDF
36C24619B0040-012.pdf PDF
36C24619B0040-001.docx DOCX document
36C24619B0040-010.pdf PDF
36C24619B0040-006.pdf PDF
36C24619B0040-005.pdf PDF
36C24619B0040-000.docx DOCX document
36C24619B0040-000.docx DOCX document
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACTOR'S QUALITY CONTROL REPORT (QCR)

D A T E: R E P O R T N O.:

C O N T R A C T N U M B E R A N D N A M E O F C O N T R A C T O R: D E S C R I P T I ON A N D L O C A T I O N O F T H E W O R K:

W E A T H E R C L A S S I F I C A T I O N :

CLASS A

CLASS B

CLASS C

CLASS D

CLASS E

OTHER

C L A S S I F I C A T I O N :

C L A S S

T E M P E R A T U R E :

M A X M I N

P R E C I P I T A T I O N :

I N C H E S

(ER 1180-1-6)

No interruptions of any kind from weather conditions occurring on this or previous shifts.

Weather occurred during this shift that caused a complete stoppage of all work.

Weather occurred during this shift that caused a partial stoppage of work.

Weather overhead excellent or suitable during shift. Work completely stopped due to results of previous adverse weather.

Weather overhead excellent or suitable during shift but work partially stopped due to previous adverse manner.

Explain.

CONTRACTOR/SUBCONTRACTORS AND AREA OF RESPONSIBILITY FOR WORK PERFORMED TODAY: (Attach list of items of equipment either idle or working as appropriate.)

1. WORK PERFORMED TODAY: (Indicate location and description of work performed. Refer to work performed by prime and/or subcontractors by letter in Table above.)

2. TYPE AND RESULTS OF INSPECTION: (Indicate whether: P - Preparatory, I - Initial, or F - Follow-up and include satisfactory work completed or deficiencies with action to be taken.)

3. TESTS REQUIRED BY PLANS AND/OR SPECIFICATIONS PERFORMED AND RESULTS OF TESTS:

SAM 696FORM

1 SEP 79 Previous Edition May Be Used Until Exhausted

PURPOSE: Contractors Daily QC Report. Revision necessitated by EIG recommendation

MONTHLY USAGE: 1,500

PRESCRIBING DIRECTIVE: ER 1180-1-6

FUNCTIONAL CODE: 1180 Series - Engineer Contracts a.

b.

c.

d.

e.

f.

g.

vacobofint Rectangle vacobofint Rectangle vacobofint Sticky Note Accepted set by vacobofint

4. VERBAL INSTRUCTIONS RECEIVED: (List any instructions given by Government personnel on construction deficiencies.

retesting required, etc., with action to be taken.)

5. REMARKS: (Cover any conflicts in plans, specifications or instructions: acceptability of incoming materials: offsite surveillance activities; progress of work, delays, causes and extent thereof; days of no work with reasons for same.)

6. SAFETY: (Include any infractions of approved safety plan, safety manual or instructions from Government personnel.

Specify corrective action taken.)

CONTRACTOR'S CERTIFICATION: I certify that the above report is complete and correct and that all material and equipment used, work performed and tests conducted during this reporting period were in strict compliance with the contract plans and specifications except as noted above.

INSPECTOR

CONTRACTOR'S APPROVED AUTHORIZED REPRESENTATIVE

17-R-0002 Amendment 0003 Volume I (Phase II)
Amendment 0003 Narrative
Phase Two - Volume 1 of 3
Table of Contents
Bidding Requirements
DIVISION 1 - GENERAL REQUIREMENTS
01 00 00
LIST OF PERMITS REQUIRED
PROJECT SIGNS
WAGE RATES
01 00 01.02 DoVA CEMP
01 10 10 DESIGN REQUIREMENTS
1 DESCRIPTION OF FACILTIY AND SCOPE
2 DESIGN REQUIREMENTS
3 GENERAL REQS for PERMITTING, LIFE SAFETY and SECURITY REQUIREMENTS
4 SITE
5 ARCHITECTURE
6 CONVEYING SYSTEMS
7 INTERIOR DESIGN, SIGNAGE & F, F & E
8 STRUCTURAL DESIGN
9 HVAC
10 (not used)
11 PLUMBING
12 (not used)
13 FIRE PROTECTION & LIFE SAFETY
14 (not used)
15 ELECTRICAL
16 SECURITY SYSTEMS
17 COMMUNICATIONS
18 CORROSION AND CATHODIC PROTECTION
19 ENVIRONMENTS - HAZARDOUS MATERIALS
20 SUSTAINABLE DESIGN
21COMMSSIONING
01 10 12 DESIGN AFTER AWARD
01 14 00 WORK RESTRICTIONS
01 32 00.00 10 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
Submittal Register
Standard Form 4025
01 33 29 SUSTAINABILITY REPORTING
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00.10 QUALITY CONTROL
QCR-SAM FORM 696
01 45 00.15.01 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
01 45 35 SPECIAL INSPECTIONS
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
01 57 19.01 20 SUPPLEMENTAL TEMPORARY ENVINROMENTAL CONTROLS
01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
01 78 23 OPERATION AND MAINTENANCE DATA
17-R-0002 Amendment 0003 Volume II (Phase II)
Phase Two - Volume 2 of 3
Table of Contents
APPENDIX A - WORK RESTRICITIONS DOCUMENTS
APPENDIX B - PRESCIPTIVE SPECIFICATIONS
01 81 13 SUSTAINABLE CONSTRUCTION REQUIREMENTS
01 81 16 HEALTHCARE SUSTAINABLE DESIGN REQUIREMENTS
01 81 21 IAQ MANAGEMENT DURING CONSTRUCTION
01 81 22 IAQ PROTECTION BEFORE OCCUPANCY
01 91 00 GENERAL COMMISSIONING REQUREMENTS
07 08 00 FACILITY EXTERIOR CLOSURE COMMISSIONING
14 21 00 ELECTRIC TRACTION ELEVATOR
14 24 00 HYDRAULIC ELEVATOR
14 92 19 SIX (6") PNEUMATIC TUBES
21 09 00 COMMSSIONING OF FIRE SUPPRESION SYSTEM
22 08 00 COMMSSIONING OF PLUMBING SYSTEM
23 08 00 COMMSSIONING OF HVAC SYSTEM
26 08 00 COMMSSIONING OF ELECTRICAL SYSTEM
26 09 13 ELECTRICAL POWER MONITORING AND CONTROL
26 09 14 SCADA MONITORING SYSTEM
27 08 00 COMMSSIONING OF COMMUNICATIONS SYSTEMS
28 08 00 COMMSSIONING OF ELECTRONIC SAFETY AND SECURITY SYSTEMS
33 08 00 COMMISSIONING OF SITE UTILITY SYSTEMS
APPENDIX C - SITE ANALYSIS CONTEXT DRAWINGS
APPENDIX D - 2015 VA CFM PHYSICAL SECURITY DESIGN MANUAL
APPENDIX E - SPACE PROGRAM FOR DESIGN AND ROOM GUIDEPLATES
APPENDIX F - CONCEPTUAL PLANNING DIAGRAMS
APPENDIX G - LEGACY MEDICAL CENTER SYSTEMS TIE-IN MATRIX
APPENDIX H - 2014 TRANSPORTATION AND LOGISTICS REPORT & PNEUMATIC TUBE SYSTEM
APPENDIX I - LEED OWNER'S PROJECT REQUIREMENTS
17-R-0002 Amendment 0003 Volume III (Phase II)
Phase Two - Volume 3 of 3
Table of Contents
APPENDIX J - SITE PHASING & CPM SCHEDULE
APPENDIX K - 2014 SITE BOUNDARY, TOPOGRAPHIC AND UTILITY SURVEYS
APPENDIX L - GEOTECHNICAL & GEOPHYSICAL REPORTS
APPENDIX M - HVAC UTILITY SYSTEM CONNECTIONS
APPENDIX N - FIRE PROTECTION
APPENDIX O - WATER QUALITY REPORTS, WELL TESTS and CIVIL SITE POTABLE & SANITARY PLAN
APPENDIX P - EXISTING SITE UTILITY INFORMATION
APPENDIX Q - CIVIL SITE LIFT STATION INFORMATION
APPENDIX R - SITE ELECTRICAL / IT/COMMUNICATIONS & SECURITY SYSTEMS
APPENDIX S - EXISTING BUILDING 54 GENERATOR PLANT -
APPENDIX T - EXISTING BUILDING 1 - HAZARDOUSE MATERIALS DRAWINGS
APPENDIX U - EQUIPMENT INFORMATION
APPENDIX V - INTERIOR DESIGN INFORMATION
APPENDIX W - EXISTING EXTERIOR SIGNAGE INFORMATION
APPENDIX X - ENVIRONMENTAL INFORMATION
APPENDIX Y - INDEX OF ELECTRONIC EXISITNG BUILDING INFORMATION
APPENDIX Z - LARGE FORMAT SITE AND BUILDING DRAWINGS

File details come from the government source that posted it. Updated .