This is a detailed plumbing engineering drawing (P-401) for a Legionella Eradication project at the Louis A. Johnson VA Medical Center in Clarksburg, West Virginia. The drawing focuses on an enlarged domestic water plan for Mechanical Room B125, showing complex piping schematics with multiple valve configurations, pipe sizes, and connections. Key technical elements include chlorine sensors, backflow preventers, isolation valves, temperature sensors, and recirculation pumps, with specific annotations for demolition and modification of existing water infrastructure. The drawing indicates work on domestic cold water (DCW), domestic hot water (DHW), and domestic hot water return (DHWR) systems, with detailed routing through various building risers and connections to heat exchangers, chlorine injectors, and water monitoring systems.

The project is part of a broader effort to address potential Legionella risks, with specific requirements including demolishing dead legs, installing end-of-loop water temperature monitoring stations, connecting to the existing Metasys Building Automation System, and insulating uninsulated domestic hot water return piping. The drawing is part of bid documents dated April 22, 2025, with an addendum issued on September 12, 2025, and is prepared by Apogee Consulting Group for the VA Office of Construction and Facilities Management.

View the file

Other files

File Type Posted
P-402 Revised Enlarged Plumbing Plan.pdf PDF
EP102D Revised Second Floor Power Plan - Clinical addition East.pdf PDF
221123 Revised Specification DomesticWaterPumps.pdf PDF
36C24525B0008 0011 Eradicate Legionella.docx DOCX document
EP100B Revised Basement Power Plan - Area B.pdf PDF
P-601 Revised Plumbing Schedule.pdf PDF
36C24525B0008 0010.docx DOCX document
36C24525B0008 0009.docx DOCX document
36C24525B0008 0008.docx DOCX document
36C24525B0008 0007 Legionella Eradication.docx DOCX document
36C24525B0008 0006.docx DOCX document
36C24525B0008 0005.docx DOCX document
230593 TAB for HVAC.pdf PDF
36C24525B0008 0004 - Building 1 and Clinical Add. Legionella Eradication.docx DOCX document
36C24525B0008 0003.docx DOCX document
36C24525B0008 0002.docx DOCX document
Record of Attendance - Eradicate Legionella Construction Site Visit.pdf PDF
36C24525B0008 0001.docx DOCX document
Record of Attendance - Site Visit - 6-30-2025 - Legionella Eradication.docx DOCX document
S02_LIMITATIONS ON SUBCONTRACTING-CERTIFICATE OF COMPLIANCE.pdf PDF
DB Wage Determination 5-30-2025.pdf PDF
22-144 Drawings BD 20250414.pdf PDF
540-20-103_VHA PCRA 2023.docx DOCX document
36C24525B0008.docx DOCX document
22-144 Specs 100 percent BD 20250414.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

10 12

B

C

10 12

B

C

PRESSURE

GAUGE, 116 PSI

S

CHLORINE SENSOR

BACKFLOW

PREVENTER

PRV WITH BYPASS

VALVE NC

NC

TO FD

NC

3/8'' CHLORINE

CONNECTION

3/4'' TO DRAIN

1/2'' DCW TO EX. WQMS

VALVE IN VERTICAL

TO CHLORINE INJECTOR

BALANCING VALVE IN RISE

S

CHLORINE SENSOR

ISOLATION AND

PRESSURE REGULATING

VALVES IN VERTICAL

2'' DCW UP TO 1ST FLR

ISOLATION VALVE IN VERTICAL

DL

0-042

CHLORINE CONNECTION

WITH ISOLATION AND CHECK

VALVES IN VERTICAL

3/4'' TO HEATING WATER

MAKE-UP

ISOLATION VALVE IN VERTICAL

TO / FROM HEAT EXCHANGER #1

TO / FROM HEAT EXCHANGER #2

ISOLATION VALVE IN

VERTICAL

NC

DL

0-041

DL

0-040

NC

4" DCW

2" DCW

D C

W

D C

W

D C

W

1/2" DCW

1/2" DCW

DL

0-027

2"

2"

2"

2"

NC

TO CHLORINE INJECTOR

2"ISOLATION VALVE IN

VERTICAL

S

CHLORINE SENSOR

1 1/4"

4"

2"

VALVE IN VERTICAL DL

0-039

D H

W

D H

W

D H

W

1 1/4'' DHW UP TO 1ST FLR

D H

W

1 1/4" DHWR

2" DHW

2" DHW

1 1/4" DHWR

3" DHW

1" DHWR

1 1/4" DHWR

1/2" DCW

3/4" DHWR

3/4'' DHWR FROM 1ST FLR

VALVE IN VERTICAL, NC

ISOLATION

VALVE IN

VERTICAL, NC

#1

NC

S

TEMPERATURE

SENSOR

3/4" DHWR

1" DHWR

DL

0-044

DL

0-045

MECH

B 125

B 126

RECIRCULATION PUMP

1-WTMS-3

"TO KITCHEN"

TO B 128 PIPE CHASE

"BOILER PLANT/LAUNDRY"

FROM RISER 26

FROM RISER 32

1-WTMS-2

FROM RISER 29

FROM RISER 33

FROM RISER 27

FROM RISER 20

FROM RISER 37

FROM RISER 21

FROM RISER 39

FROM RISER 7

FROM RISER 2

FROM RISER 58

FROM RISER 55

VALVE NC

AFTER NEW

WATER

HEATER IS

INSTALLED IN

BLDG. 7

1-WTMS-1

EXISTING CHLORINE INJECTOR

4'' DCW TO TUNNEL

3/4'' TO HEATING WATER

MAKE-UP

BACKFLOW PREVENTER

4" DCW

D C

W

2'' DCW, 4'' DHW, 3/4''

DHWR THROUGH WALL

4'' SERVICE WATER FROM WALL

BACKFLOW

PREVENTER

PRESSURE REDUCING VALVE

2'' TO FLOOR DRAIN

BYPASS VALVE, NC

4'' DCW & 3/4'' DHWR

INTO WALL

74 PSI

3/4'' DHWR FROM 1ST FLR

1 1/4'' DHW TO 1ST FLR

2'' DCW TO 1ST FLR

3/4'' DHWR FROM 1ST FLR

TO CHLORINE INJECTOR

3" DHW

2" DHW

2" DHW

4" DHW

1" D

HW

R 1 1/4" D

HW

R

D H

W

D H

W

2" DHW

2" D

HW

2" D

HW

3" DCW

3/4" DHW

R

4" DCW 2" DCW

TO / FROM HEAT

EXCHANGER #2

TO / FROM HEAT

EXCHANGER #1

3/8'' CHLORINE

CONNECTION

3/4'' TO DRAIN

CHLORINE

CONNECTION

116 PSI

84 PSI

90 PSI

#4

#3

#2

1" DHWR

1 1/4" DHWR

1/2" DCW

EX. DHWR

PUMP

EX. DHWR

PUMP

EX. DHWR

PUMP

EX. DHWR

PUMP

EXISTING CHLORINE INJECTOR

WQMS

EX. DHWR

PUMP

1/4'' DHWR TO

PULSATRON

ELECTRONIC METERING

PUMP

1/2" D

CW

1 1/4" D

HW

3/4" D

HWR 3/4" D

HWR

2" D

CW

2'' DHW INTO WALL

2'' DHW TO TUNNEL

1 1/4'' DHWR FROM TUNNEL

3'' DHW TO TUNNEL

1'' DHWR FROM TUNNEL

DL

0-039

DL

0-045

DL

0-041

DL

0-044

NC

#1

DL

0-040

Engineers Architects

# KEY NOTES:

# KEY NOTES:

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/1

/2

:2

:4

A

M C

U s e rs \w x ia

\D o c u m e n ts

\P

-1

-V A

C la rk s b u rg -L e g io n e lla E ra d ic a ti o n

B L D

G w x ia

T D

W

X .r v t

P-401

ENLARGED PLUMBING PLANS

34 48SMR

ERADICATE LEGIONELLA

LOUIS A. JOHNSON VA MEDICAL CENTER

1 MEDICAL CENTER DRIVE

CLARKSBURG, WV 23601 APRIL 22, 2025

BID DOCUMENTS

540-20-10322-144

WX

Scale: 1/2" = 1'-0"

ENLARGED DOMESTIC WATER PLAN - MECH RM B125

Scale: No Scale

ISOMETRIC DOMESTIC WATER PLAN - MECH RM B125

N O

R T

H

0 1 2 4

1 DEMOLISH DEAD LEG PER PLUMBING DEMOLITION

GENERAL NOTE 13.

2 DEMOLISH RISER ON THIS FLOOR PER PLUMBING

DEMOLITION GENERAL NOTE 13.

3 DEMOLISH DCW AS INDICATED AND CAP WITHIN

TWO PIPE DIAMETERS OF MAIN.

1 PROVIDE END-OF-LOOP WATER TEMPERATURE

MONITORING STATION. CONNECT THE STATION

TO EXISTING METASYS BAS.

3 INSULATE UNINSULATED DHWR PIPING.

1 ADDENDUM 03 09/12/2025

Docusign Envelope ID: 84578B55-FD2C-4A6A-B1EE-BF60E6B04311

Sheets
P-401 - ENLARGED PLUMBING PLANS
2025-09-18T08:28:04-0700
Digitally verifiable PDF exported from www.docusign.com

File details come from the government source that posted it. Updated .