This document is an Amendment to a Solicitation for the Department of Veterans Affairs (VA) Louis A. Johnson VAMC Legionella Eradication Construction Project. The amendment extends the bid due date from August 27, 2025, to September 3, 2025, at 3:00 p.m. EDT, and provides detailed responses to 69 contractor questions covering various project aspects such as commissioning, testing, insurance requirements, work scheduling, asbestos abatement, ICRA barriers, water monitoring equipment, and site access.

Key project details include night shift work in a 24/7 operational facility, requiring careful phasing to minimize disruptions, with work primarily focused on domestic water system modifications, piping demolition, and water quality improvements across multiple building levels. The project involves complex requirements for infection control, potential asbestos abatement, specific insurance coverage, water temperature monitoring, and strict adherence to VA specifications for construction activities in clinical areas. The total project is valued under solicitation number 36C24525B0008 for project number 540-20-103, located at the Clarksburg, West Virginia VA Medical Center.

View the file

Other files

File Type Posted
36C24525B0008 0011 Eradicate Legionella.docx DOCX document
P-601 Revised Plumbing Schedule.pdf PDF
P-402 Revised Enlarged Plumbing Plan.pdf PDF
EP102D Revised Second Floor Power Plan - Clinical addition East.pdf PDF
221123 Revised Specification DomesticWaterPumps.pdf PDF
P-401 Revised Enlarged Plumbing Plan.pdf PDF
EP100B Revised Basement Power Plan - Area B.pdf PDF
36C24525B0008 0010.docx DOCX document
36C24525B0008 0009.docx DOCX document
36C24525B0008 0008.docx DOCX document
36C24525B0008 0007 Legionella Eradication.docx DOCX document
36C24525B0008 0006.docx DOCX document
230593 TAB for HVAC.pdf PDF
36C24525B0008 0004 - Building 1 and Clinical Add. Legionella Eradication.docx DOCX document
36C24525B0008 0003.docx DOCX document
36C24525B0008 0002.docx DOCX document
Record of Attendance - Eradicate Legionella Construction Site Visit.pdf PDF
36C24525B0008 0001.docx DOCX document
Record of Attendance - Site Visit - 6-30-2025 - Legionella Eradication.docx DOCX document
540-20-103_VHA PCRA 2023.docx DOCX document
22-144 Specs 100 percent BD 20250414.pdf PDF
S02_LIMITATIONS ON SUBCONTRACTING-CERTIFICATE OF COMPLIANCE.pdf PDF
DB Wage Determination 5-30-2025.pdf PDF
22-144 Drawings BD 20250414.pdf PDF
36C24525B0008.docx DOCX document
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

08-25-2025

540-20-103

Department of Veterans Affairs Louis A Johnson, VAMC Contracting Office (90C) 1 Med Center DR Clarksburg WV 26301-4199

Department of Veterans Affairs Louis A Johnson, VAMC Contracting Office (90C) 1 Med Center DR Clarksburg WV 26301-4199 To all Offerors/Bidders

36C24525B0008 06-24-2025

X

X

** HOUR & DATE for Receipt of Offers is EXTENDED to: 09-03-2025 3pm EDT

One The purpose of this amendment to the Eradicate Legionella construction project is to provide responses to the requests for information, an additional design specification and an extension to the bid due date.

The bid due date is extended from August 27, 2025 to September 3, 2025 at 3:00 p.m.

A public bid opening will be held at the contracting offices at 513 Rosebud Plaza, Clarksburg, WV 26301.

All other terms and conditions remain unchanged.

Rebecca Besten Contracting Officer

CONTINUATION PAGE

Solicitation: 36C24525B0008 Project#: 540-20-103 – Building 1 and Clinical Addition Legionella Eradication

Responses to Questions Received and Clarifications

1. QUESTION: Are there any Commissiong requirements? Section 019100 is not included in the Specification Manual. If required, will the Commissioning agent be appointed by the VA?

VA RESPONSE: Commissioning is not required

2. QUESTION: There is not a specification for Testing, Adjusting and Balancing provided in the Manual. Please verify that TAB will be needed and provide a Spec.

VA RESPONSE: Plumbing tests are specified in Section 22 05 11, Part 3.10. For HVAC, we understand that some supply and return grilles may be affected during plumbing installation. In such cases, the contractor shall ensure that airflow rates remain unchanged. To verify this, the contractor shall measure the airflow at all impacted grilles both before and after the plumbing work is completed. TAB Spec will be provided.

3. QUESTION: Please confirm that and all Basis of Design items and materials that the VA has satisfied all Buy American Waivers, if applicable, and sole source requirements as needed. Please provide us any Buy American Act Waivers that would be provided under this contract. This is not currently in the plans, documents, or specifications?

VA RESPONSE: No Sole source requirements or Buy American Waivers are required for this project. The basis of design is for reference only. The specifications are performance specifications.

4. QUESTION: Will the VA pay for the engineering and design submittals, as well as applicable deposits required by various manufacturers to put equipment into design and/or production?

VA RESPONSE: Payment for the project will follow work completed by an approved schedule of values and cost loaded schedule.

5. QUESTION: Is the new VA memorandum on bolts for steam and hot water systems applicable to this project? To our understanding A307 bolts are no longer allowed.

VA RESPONSE: Yes. The bolt specifications are for Master Specification Hydronic Piping (Specification 23 21 13, Section 2.3) and Steam and Condensate Heating Piping (Specification 23 22 13, Section 2.3). The sections are not in this project but still note that A307 bolts will no be allowed.

6. QUESTION: TAX Exemption: Is this project sales tax-exempt? If so, can the government provide a tax exemption certificate for materials purchased?

VA RESPONSE: This project is not exempt from the payment of sales taxes.

7. QUESTION: Notice to Proceed NTP) How soon after a contract award is the NTP expected to be issued.

VA RESPONSE: The issuance of the notice to proceed is contingent upon receipt of bonds, both performance and payment along with a certificate of insurance from the firm in which the project is awarded to. Once received, a notice to proceed can be issued within a week.

8. QUESTION: Submittal Platform: Will the VA accept use of Procore software or equivalent as the primary submittal platform?

VA RESPONSE: Yes, VA will accept the use of Procore software or equivalent as the primary submittal platform, so long as it meets the requirements outlined in the contract specifications, specifically 01 33 23-8 1.6.

9. QUESTION: Payment for Stored Materials: Will payment applications for materials stored onsite or in a bonded warehouse be approved?

VA RESPONSE: Payment for materials that are stored off-site is not authorized for this contract.

10. QUESTION: Bid Hold Period: Will the government consider reducing the bid hold period to 30 days due to current inflation risks?

VA RESPONSE: The government is unable to shorten the bid acceptance period for this project. The acceptance period will remain 120 days from bid submission.

11. QUESTION: Economic Price Adjustment Clause: Will the government include an Economic Price Adjustment Clause in the contract to address price fluctuations in materials?

VA RESPONSE: The Economic Price Adjustment Clause will not be included.

12. QUESTION: SSHO and Superintendent Roles: Can the SSHO, QCM and superintendent positions be fulfilled by the same individual, provided qualifications are met? If not, can the superintendent double as the SSHO or QCM?

VA RESPONSE: No, the superintendent cannot double as the SSHO. 01 35 26 – 14 1.9 (A) Site Safety and Health Officer (SSHO) requires at a minimum one “full time” SSHO at each project site, for each shift (with no other duties).

13. QUESTION: Temporary Facilities: Are contractors required to provide a temporary site office or trailer, or will space be allocated withing the existing facility?

VA RESPONSE: The facility does not have a specific space internal to the building to set up a job office. As work will be conducted on night shift, parking will be better available in general parking areas at the facility. A location for a job site trailer can be coordinated with the COR, but the trailer is to be provided by the contractor.

14. QUESTION: Parking and Staging: Will there be designated parking and staging area for contractor personnel? How many parking spaces will be provided if there is on-site parking?

VA RESPONSE: As work will be conducted on night shift parking will be better available in general parking areas at the facility. Staging areas are limited at the Clarksburg facility. Coordination can be done to create space but is not guaranteed at time of bid.

15. QUESTION: Site Access and Badging: Will the government provide a detailed badging and access protocol for contractor personnel?

VA RESPONSE: Temp badging will need to be coordinated with the PIV office. Submission of those that will need access, can take place. If contactor already had a PIV badge we will need to coordinate with police services for access to facility.

16. QUESTION: Schedule: There are no requirements for a project schedule. Will the VA require a project schedule for this project?

VA RESPONSE: The VA will require a Critical Path Method (CPM) Schedule as outlined in specification 01 32 16.15.

17. QUESTION: Fire Watch: If impairments to fire alarm systems exceed four hours, will the VA provide support for fire watch personnel, or is the contractor solely responsible?

VA RESPONSE: Contractor is responsible.

18. QUESTION: Environmental Protection Plan: Are there specific templates or guidelines required for the Environmental Protection Plan, or is a contractor developed plan sufficient?

VA RESPONSE: No specific template for submission. EPP just needs to meet spec requirement

19. QUESTION: As-Built Drawings: Are as-built drawings available for existing conditions, or will the contractor need to verify all dimensions on-site?

VA RESPONSE: Design drawings are based on available as-builts and a whole facility onsite walkthrough from the A&E.

20. QUESTION: For the building risk insurance requirement please provide the dollar limit that you require for this as it not listed anywhere in the documents.

VA RESPONSE: Contractors are to follow the guidance in FAR 52.228-5 to ensure that there are provisions to cover insurance for specific risks that may require loss of or damage to government property.

21. QUESTION: For the professional liability insurance requirement please provide the dollar limit that your require for this as it is not listed anywhere in the documents.

4.13 SUPPLEMENTAL INSURANCE REQUIREMENTS

In accordance with FAR 28.307-2 and FAR 52.228-5, the following minimum coverage shall apply to this contract:

(a) Workers' compensation and employers liability: Contractors are required to comply with applicable Federal and State workers' compensation and occupational disease statutes. If occupational diseases are not compensable under those statutes, they shall be covered under the employer's liability section of the insurance policy, except when contract operations are so commingled with a Contractor's commercial operations that it would not be practical to require this coverage. Employer's liability coverage of at least $100,000 is required, except in States with exclusive or monopolistic funds that do not permit workers' compensation to be written by private carriers.

(b) General Liability: $500,000.00 per occurrences.

(c) Automobile liability: $200,000.00 per person; $500,000.00 per occurrence and $20,000.00 property damage.

(d) The successful bidder must present to the Contracting Officer, prior to award, evidence of general liability insurance without any exclusionary clauses for asbestos that would void the general liability coverage.

VA RESPONSE: Contractors are only required to provide the insurance coverage outlined in FAR 52.228-5 and the supplemental guidance above.

22. QUESTION: Spec Section 02 82 13.13, Glovebag Asbestos Abatement. Under the paragraph for “Extent of Work” the quantities are To be Determined. What is the scope of asbestos abatement we are to include in our proposal?

VA RESPONSE: Please refer to General Work and Phasing Note 8 on P-001.

8. ASBESTOS IS WITHIN THE AREA OF WORK, INCLUDING, BUT NOT LIMITED TO, PIPING INSULATION AND MASTIC. ALL EXISTING PIPING LOCATED INSIDE THE WALLS, DEAD LEGS IN THE CEILING SPACE OF OFFICES 2178, 2180, 2176 AND ROOM 2175, AND INSIDE THE TUNNEL OF BUILDING 1 SHALL BE CONSIDERED TO CONTAIN ASBESTOS. ABATE ALL ASBESTOS WITHIN THE AREA OF WORK. REFER TO ASBESTOS SAMPLING REPORT.

23. QUESTION: Spec Section 02 83 33.13, Lead-Based Paint Removal and Disposal. What are the quantities of lead-based paint removal we are to include in our proposal?

VA RESPONSE: the VA does not have any known quantities of lead in the facility. If any lead is found, stop work and refer to specifications.

24. QUESTION: Drawing page P-001. Plumbing Demo Note #13 states “No piping is to be removed from inside walls or chases. General Work and Phasing Note #7 states “Demolished domestic water piping within areas of work shall be removed, including piping concealed in chases, shafts and within walls. Please clarify.

VA RESPONSE: Follow Plumbing Demo General Note 13

25. QUESTION: Drawing page PP100A, Note 1. Provide a specification for the below lavatory, TMV.

VA RESPONSE:

A. Thermostatic Mixing Valves shall comply with the following general performance requirements:

1. Shall meet ASSE requirements for water temperature control.

The body shall be cast bronze or brass with corrosion resistant internal parts preventing scale and biofilm build-up. Provide chrome-plated finish in exposed areas.

No special tool shall be required for temperature adjustment, maintenance, replacing parts and disinfecting operations.

Valve shall be able to be placed in various positions without making temperature adjustment or reading difficult.

Valve finish shall be chrome plated in exposed areas.

Valve shall allow easy temperature adjustments to allow hot water circulation. Internal parts shall be able to withstand disinfecting operations of chemical and thermal treatment of water temperatures up to 82°C (180°F) for 30 minutes or 50 mg/L (50 ppm) chlorine residual concentration for 24 hours.

Parts shall be easily removed or replaced without dismantling the valves, for easy scale removal and disinfecting of parts.

Valve shall have a manual adjustable temperature control with locking mechanism to prevent tampering by end user. Provide mixing valves with integral check valves with screens and stop valves.

Application: Single plumbing fixture point-of-use such as sinks or lavatories.

Standard: ASSE 1070.

Pressure Rating: 861 kPa (125 psig).

Type: Thermostatically controlled water mixing valve set at 43 degrees C (110 degrees F).

Connections: Threaded union, compression or soldered inlets and outlet.

Upon cold water supply failure the hot water flow shall automatically be reduced to 0.2 gpm maximum.

26. QUESTION: Drawing page P-501, detail 3. Provide a specification for the TMV shown for the antiligature faucet retrofit.

VA RESPONSE: Please refer to the response to question 25.

27. QUESTION: Will press fittings be allowed on the copper domestic cold and hot water?

VA RESPONSE: No

28. QUESTION: Have all the dead legs been verified as to if they are still feeding active fixtures or equipment on site visually?

VA RESPONSE: Existing conditions shown on plans have been verified in field to the extent possible. However, the contractor is responsible for verifying piping indicated for demolition does not serve any fixtures or is intended for future use before demolition. Please refer to Plumbing Demolition General Note 1.

1. VERIFY EXISTING CONDITIONS PRIOR TO BEGINNING WORK. NOTIFY COR REGARDING CONFLICTS BEFORE PROCEEDING WITH WORK.

29. QUESTION: What are the parameters for requesting an outage for domestic hot or cold water? What forms are required, and a copy of these forms is requested? What days of the week will outages be allowed? How long will outages be allowed to last? What is the days notification that the facility needs for outages? Will the contractor be compensated if the facility cancels an outage or does not allow the outage to happen once give proper notification and required forms?

VA RESPONSE: Coordination with COR will be required on case by case basis. Building shut downswill need to be cordinated 2 weeks in advance. Specific zone isolations may be coordinated sooner. Preferribly mid week if possible for shut downs. Outages should not last for more than the working shift. Each shut down request should specify time frame for outage needed and discussions can take place for coordination.

30. QUESTION: Is the VA a certified water treatment operator to be able to do consistent chlorine injection?

VA RESPONSE: A certified water treatment operator will not be needed for this project.

31. QUESTION: Will the VA need a water treatment license?

32. QUESTION: Will the VA need to link up the treatment system to the local water treatment plant via SCADA?

VA RESPONSE: No

33. QUESTION: Has a NESHAP survey been completed of the work areas? Please provide a copy of this survey.

VA RESPONSE: The faciity does not have NESHAP survey on file.

34. QUESTION: Specification Section 01-00-00.1.4.A Operations and Storage Areas states: “The Contractor shall confine all operations (including storage or materials) on Government premises to areas authorized or approved by the Contracting Officer.

Section D states: Working space and space available for storing materials shall be as determined by the COR.

Where will the storage / laydown area be for this project?

Where will the dumpster area be for this project?

VA RESPONSE: Depending on the timing of construction to begin, areas for materials and dumpsters will be coordinated.

35. QUESTION: Specification 01-00-00.1.7 1.7.D states Refer to FAR clause 52.236-7, "Permits and Responsibilities," which is included in General Conditions. A National Pollutant Discharge Elimination System (NPDES) permit is required for this project.

Does this project require a NPDES permit as there is not exterior work in excess of one acre work being performed?

If a NPDES permit is required, what are the associated costs for bidding purposes.

VA RESPONSE: NPDES should not be needed for this project.

36. QUESTION: Specification section 01-01-01.17.A states Contractor shall complete a space as determined by COR in building accessible from ground level without use of elevators for storage of certain materials and equipment by Department of Veterans Affairs.

Is this a requirement for this project?

37. QUESTION: Specification section 01-00-00.1.20 Photographic Documentation references a commercial photographer.

Is this a requirement for this project or would pictures taken from a smart phone by the on-site superintendent be sufficient?

VA RESPONSE: Photos will need to be documented and coordinated to show where they were taken.

38. QUESTION: Specification 01-35-26.1.9 states The Prime Contractor shall provide a minimum of one “Full-Time” SSHO at each project site, for each shift (with no other duties).

Can the on-site superintendent fulfill the role of the SSHO?

VA RESPONSE: No, the superintendent cannot double as the SSHO.

39. QUESTION: Specification section 01-35-26.1.10.B.3 states OR hold as current, a Certified Safety Professional (CSP) or a Construction Health and Safety Technician (CHST) certification and five (3) years of construction industry safety related experience.

Is the requirement five years or three years?

VA RESPONSE: The specification should state five (5) years.

40. QUESTION: Specification section 02-41-19.1.6.D (and D.1) states Hazardous Materials: It is not expected that hazardous materials will be encountered in the Work. If suspected hazardous materials are encountered, do not disturb immediately notify Architect and Owner. Hazardous materials will be removed by Owner under a separate contract.

There are specifications to address glove-bag abatement and lead based paint removal. Also included in the specifications is an asbestos survey as well as lab results.

Is hazardous material abatement such as asbestos and lead based paint removal to be included in the bid?

If these items are to be included can an exact description and quantity be provided?

a. VA RESPONSE: Please refer to Plumbing Demolition General Note 10 and General Work and Phasing Note 8 on P-001.

b. 10. CONTRACTOR SHALL BE AWARE THAT ASBESTOS IS PRESENT IN AREAS OF DEMOLITION AND SHALL BE ABATED PER SPECIFICATION SECTION 02 82 13.

8. ASBESTOS IS WITHIN THE AREA OF WORK, INCLUDING, BUT NOT LIMITED TO, PIPING INSULATION AND MASTIC. ALL EXISTING PIPING LOCATED INSIDE THE WALLS, DEAD LEGS IN THE CEILING SPACE OF OFFICES 2178, 2180, 2176 AND ROOM 2175, AND INSIDE THE TUNNEL OF BUILDING 1 SHALL BE CONSIDERED TO CONTAIN ASBESTOS. ABATE ALL ASBESTOS WITHIN THE AREA OF WORK. REFER TO ASBESTOS SAMPLING REPORT.

41. QUESTION: Specification section 02-41-19.3.1.B states Perform an engineering survey of condition of building to determine whether removing any element might result in structural deficiency or unplanned collapse of any portion of structure or adjacent structures during selective building demolition operations.

Is this a requirement for this project?

VA RESPONSE: Demo should not affect the structural integrity of the building but if concern arrises contact COR for path forward.

42. QUESTION: Specification section 02-82-13.13-1.1.1.B.1 states Removal, clean-up and disposal of ACM piping and fittings and asbestos contaminated elements in an appropriate regulated area in the following approximate quantities: To be Determined.

For bidding purposes, what quantities should be anticipated for the ACM piping and fittings and asbestos contaminated elements?

VA RESPONSE: See response to 40

43. QUESTION: Specification section 02-82-13-1.1.2.3.B.4 references a contractor’s CPIH / CIH.

If abatement is part of this contract is the contractor to provide their own CPIH / CIH or will the VAMC provide the air monitoring?

VA RESPONSE: Contractor will provide their own CPIH. VA is required to provide an additional independent air monitoring service.

44. QUESTION: Can an existing finish schedule be provided that shows the type and color of the wall tile, floor tile, ceiling tile?

VA RESPONSE: Areas identfied to have building material replaced will go through submittal process as some material may not be in poduction to have replaced in kind and a new material will need to be chosen.

45. QUESTION: Drawing G-004 shows a key note #1 & #4 in Room #1172.

a) Key Note #1: Temporary ICRA Barrier – Plastic Sheet with zippered entry.

b) Key Note #3: ICRA Class III

What ICRA Level is this area as Class III is usually hard barrier, but note #1 states plastic barrier?

a. VA RESPONSE: The work in Room 1172 is anticipated to be ICRA Class III because it is considered a patient risk group 3 (due to its location within a clinical suite) and construction activity type B - small scale, short duration (one or two days), within one room. A plastic sheet barrier is acceptable for type B short-term construction activities within ICRA Class III precautions. Plastic barriers must be affixed to the floor and ceiling and secure from movement or damage. If the contractor determines that the work in this room will take a few days or longer: the construction activity type will need to be upgraded to type C, the ICRA Class upgraded to type IV, and the barrier would then need to be a hard barrier. If hazardous materials are encountered and need to be abated, the construction activity will need to be upgraded to Type D, and the precautions will need to be ICRA Class IV and a hard barrier would be needed.

46. QUESTION: Drawing G-005 shows a key note #1 & #4 in Room #2168 & #2172.

a. Key Note #1: Temporary ICRA Barrier – Plastic Sheet with zippered entry.

b. Key Note #4: ICRA Class III

What ICRA Level is this area as Class IV is usually hard barrier, but note #1 states plastic barrier?

a. VA RESPONSE: The work in Rooms 2168 and 2172 falls within a patient group 3 (due to its location within a clinical suite). If the work takes only a day or two, it can be considered construction activity type B - small scale, short duration, and ICRA Class III. A plastic sheet barrier would be acceptable for type B short-term construction activities within ICRA Class III precautions. Plastic barriers must be affixed to the floor and ceiling and secure from movement or damage. If the contractor determines that the work in this room will take a few days or longer: the construction activity type will need to be upgraded to type C, the ICRA Class upgraded to type IV, and the barrier would then need to be a hard barrier. If hazardous materials are encountered and need to be abated, the construction activity will need to be upgraded to Type D, and the precautions will need to be ICRA Class IV and a hard barrier would be needed.

47. QUESTION: Drawing G-006 shows a key note #1 & #4 in Room #3B-106.

b. Key Note #4: ICRA Class IV

What ICRA Level is this area as Class III is usually hard barrier, but note #1 s states plastic barrier?

a. VA RESPONSE: The work in Room 3B-106 falls within a patient risk group 3 (due to its location within a clinical suite). If the work takes only a day or two, it can be considered construction activity type B - small scale, short duration, and ICRA Class III. A plastic sheet barrier would be acceptable for type B short-term construction activities within ICRA Class III precautions. Plastic barriers must be affixed to the floor and ceiling and secure from movement or damage. If the contractor determines that the work in this room will take a few days or longer: the construction activity type will need to be upgraded to type C, the ICRA Class upgraded to type IV, and the barrier would then need to be a hard barrier. If hazardous materials are encountered and need to be abated, the construction activity will need to be upgraded to Type D, and the precautions will need to be ICRA Class IV and a hard barrier would be needed.

48. QUESTION: Drawing G-006 shows a key note #1 & #3 in Room #3B-152.

b. Key Note #3: ICRA Class III

What ICRA Level is this area as Class III is usually hard barrier, but note #1 states plastic barrier?

a. VA RESPONSE: The work in Room 3B-151 falls within a patient risk group 2 (due to its location in a medium risk area adjacent to a waiting room). If the construction work takes only a day or two, it can be considered construction activity type B - small scale, short duration, and ICRA Class II. If the contractor determines that the work in this room will take a few days or longer: the construction activity type will need to be upgraded to type C, and the ICRA Class upgraded to type III. For either Class II or III, a plastic sheet barrier is acceptable. Plastic barriers must be affixed to the floor and ceiling and secure from movement or damage. If hazardous materials are encountered and need to be abated, the construction activity will need to be upgraded to Type D, and the precautions will need to be ICRA Class IV and a hard barrier would be needed.

49. QUESTION: Drawing G-004 shows a key note #1 & #3 in Rooms 4A-107, 4B-24A & 4B24C

What ICRA Level is this area as Class III is usually hard barrier, but note #1 states plastic barrier?

a. VA RESPONSE: The work in Rooms 4A-107, 4B-24A, and 4B-24C falls within a patient group 3 (due to its location within a clinical suite). If the work in each room takes only a day or two, it can be considered construction activity type B - small scale, short duration, and ICRA Class III. A plastic sheet barrier would be acceptable for type B short-term construction activities within ICRA Class III precautions. Plastic barriers must be affixed to the floor and ceiling and secure from movement or damage. If the contractor determines that the work in these rooms will take a few days or longer: the construction activity type will need to be upgraded to type C, the ICRA Class upgraded to type IV, and the barrier would then need to be a hard barrier. If hazardous materials are encountered and need to be abated, the construction activity will need to be upgraded to Type D and the precautions will need to be ICRA Class IV and a hard barrier would be needed.

50. QUESTION: Drawing G-008 shows a key note #1 & #3 in Rooms 5A-110A

b. Key Note #3: ICRA Class III

What ICRA Level is this area as Class III is usually hard barrier, but note #1 states plastic barrier?

a. VA RESPONSE: The work in Room 5A-110A falls within a patient group 3 (due to its location within a clinical suite). If the work in each room takes only a day or two, it can be considered construction activity type B - small scale, short duration, and ICRA Class III. A plastic sheet barrier would be acceptable for type B short-term construction activities within ICRA Class III precautions. Plastic barriers must be affixed to the floor and ceiling and secure from movement or damage. If the contractor determines that the work in this room will take a few days or longer: the construction activity type will need to be upgraded to type C, the ICRA Class upgraded to type IV, and the barrier would then need to be a hard barrier. If hazardous materials are encountered and need to be abated, the construction activity will need to be upgraded to Type D and the precautions will need to be ICRA Class IV and a hard barrier would be needed.

51. QUESTION: Drawing G009 shows Class III and IV ICRA. These are usually hard barriers.

Can plastic barriers be utilized in these work areas?

VA RESPONSE: The work on level 6 falls within a patient group 3 (due to its location within a clinical suite). If the work in each room takes only a day or two, it can be considered construction activity type B - small scale, short duration, and ICRA Class III. A plastic sheet barrier would be acceptable for type B short-term construction activities within ICRA Class III precautions. Plastic barriers must be affixed to the floor and ceiling and secure from movement or damage. If the contractor determines that the work in this room will take a few days or longer: the construction activity type will need to be upgraded to type C, the ICRA Class upgraded to type IV, and the barrier would then need to be a hard barrier. If hazardous materials are encountered and need to be abated, the construction activity will need to be upgraded to Type D and the precautions will need to be ICRA Class IV and a hard barrier would be needed.

52. QUESTION: Can a reflected ceiling plan be provided for each work area?

a. VA RESPONSE: The materials of the existing ceilings in areas of work include:

a. Ground floor:

i. Room 1B103: no ceiling

ii. Room B141: suspended ACT ceiling

iii. Room 82A: gypsum board ceiling

b. First floor:

i. Room 1172: suspended ACT ceiling

ii. Room 1230C: gypsum board ceiling

iii. Room 1232: suspended ACT ceiling

iv. Room 1232A: suspended ACT ceiling

c. Second floor

i. Room 2168: suspended ACT ceiling

ii. Room 2172A: suspended ACT ceiling

d. Third floor

i. Room 3B106: suspended ACT ceiling

ii. Room 3B151: suspended ACT ceiling

e. Fourth floor

i. Room 4A407: suspended ACT ceiling

53. QUESTION: Drawing P001 shows a phasing schedule for the project.

For Bidding purposes, how much down time on the VAMC’s side should be anticipated between phases?

VA RESPONSE: Water flow should be up and running at the end of each work shift. So there should be no down time between phases.

54. QUESTION: Drawing P-001 General work and phasing notes #1 states: “This facility operates 24 hours a day, 7 days per week. Construction work shall be phased to minimize both quantity and duration of shutdowns. To minimize downtown where demolition is required, parallel installation of new work shall be implemented.”

For bidding purposes, is there any off hours or weekend work that should be anticipated?

VA RESPONSE: Most of the work will need to be done after hours. Please refer to P-602.

55. QUESTION: Drawing P-001 General Work and phasing notes #3 states “To minimize shutdowns, make connections to existing piping via “hot tapping” and pipe freeze methods whenever possible, in order to allow the piping to remain active.”

For bidding purposes, are there any areas of piping that will not be able to be “hot topped” or frozen to accommodate connections?

56. QUESTION: The below drawings have Water Quality and Water Temperature Monitoring equipment called out on them, however these units are not reflected on the equipment schedule on P601.

Are these existing units that are being relocated or are they to be new and were not included on the equipment schedule?

Drawing #EP100B – Unit # CAWTMS41, CAWTMS37 Drawing #EP100D – Unit# CAWQMS32 Drawing #EP103C – Unit# CAWTMS34

a. VA RESPONSE: Drawing #EP100B – Unit # CAWTMS41, CAWTMS37 – Please disregard CA-WTMS-40, CA-WTMS-41 tags shown on EP100B. These are the existing water heaters. Mark CA-WTMS-37 is for the existing Water Quality Monitoring Station.

b. Drawing #EP100D – Unit# CAWQMS32 – Please disregard CA-WTMS-32 mark shown on EP100D. This is an existing water quality monitoring station.

c. Drawing #EP103C – Unit# CAWTMS34 – Please disregard CA-WTMS-34 shown on EP103C. This is an existing recirculating pump.

57. QUESTION: How proximate are the following groupings: Are they within 100-150 feet. Can they be wired to a single central location?

1-WTMS-1, 1-WTMS-2, 1-WTMS-3

1-WTMS-6, 1-WTMS-7, 1-WTMS-8

CA-WTMS-6, CA-WTMS-7

VA RESPONSE: Yes they can be wired to a single central location

58. QUESTION: Does both the clinic and building 1 have a single hot water loop needing chlorination? If not how many loops?

VA RESPONSE: Both building 1 and the clinical addition building will need a separate single chlorinator in the mechanical rooms B125 and 2183.

59. QUESTION: On the water temperature monitoring Schedule Per Remark 3: - Can an equivalent be used in place of Intuition 9 Controller if it also has BACnet/IP capabilities?

VA RESPONSE: Intuition 9 controller is indicated as a basis of design. An equivalent can be used in place of Intuition 9 that satisfies project requirements.

60. QUESTION: Drawing P-504 Note A states: This sheet is for reference only.

Drawing P-504 Note B states: Provide pre-tab and post-tab for the entire HVAC system after completion of work in the area where supply diffusers, or return / exhaust registers are being isolated.

Drawing P-504 Note C states: In lieu of pre-tab and post-tab, construct ICRA Barriers so that supply / return / exhaust diffusers/registers are located outside of the ICRA barrier.

For clarification, does for reference only mean that there is no work to be performed in regards to this drawing, if not see the below questions.

What is meant by the items in note B being isolated?

Will the whole system that the isolated items are connected to, need to have pre-TAB and post-TAB performed? Yes

VA RESPONSE: This sheet indicates the extent of each HVAC system in case a pre-TAB and post-TAB is performed.

Please refer to detail 1 / G-001. Where area of work includes any diffusers / grilles / registers, a pre-TAB and post-TAB will have to be performed on the entire system affected. Alternatively (note C), ICRA barriers can be installed in a manner so that the area of work enclosed by the walls and the ICRA barriers do not include any diffusers / grilles / registers. When no diffusers / grilles / registers are affected by the work, no pre-TAB and post-TAB is required. Suggested ICRA placement is provided on general sheets to avoid pre-TAB and post-TAB.

Please also refer to Sheet note A on G-003 throgh G-009:

A. USE A HEPA CART MOBILE CONTAINMENT SYSTEM FOR ALL ABOVE-CEILING WORK AND ALL AREAS OF WORK UNLESS OTHERWISE NOTED BY KEYNOTE 1 BELOW.

61. QUESTION: Drawing P-001 Plumbing Demolition General Notes #13 states: Unless otherwise noted, cut out indicated dead leg piping at limits of demolition and within two pipe diameters of the main/riser and cap waterside piping. Remove all excess piping that has been cut along with its associated insulation, hangers and valves. No piping is to be removed from inside walls and chase. Leave the piping in place, drain, cap both ends and label as abandoned. Patch hanger rod penetration to match existing adjacent conditions. Piping penetrating the floor above or below is to be cut close to the slab.

Drawing P-001 General Work and Phasing Notes #7 states: All designed to be demolished domestic water piping within the areas of work shall be removed, including piping concealed in chases, shafts, and within walls. Verify piping indicated for demolition does not service any fixtures or is not intended for future use.

Do these two notes contradict each other?

Is the piping that is to be demolished out, to be abandoned in place in walls, chases and shafts?

VA RESPONSE: Please follow Plumbing Demolition General Note 13.

62. QUESTION: Does the VAMC want a service agreement included for the new water monitoring equipment to be installed? If so for what time length (1 year, 18 months, etc.)

VA RESPONSE: Not beyond the construction warranty period.

63. QUESTION: Are any additional continuous water monitoring units required beyond those shown on the contract drawings?

64. QUESTION: If additional units are required, how many should be included in our bid, and should they be installed on hot water lines, cold water lines, or both?

VA RESPONSE: No additional units required

65. QUESTION: What specific parameters must be continuously monitored? (e.g., temperature, free chlorine, total chlorine, pH, conductivity, pressure, etc.).

VA RESPONSE: Temperature

66. QUESTION: Is there a particular vendor or contractor currently servicing and maintaining the Building Automation and Temperature Controls System?

VA RESPONSE: Johnson Controls, (JCI)

67. QUESTION: Given that some of the existing finishes (Such as Ceramic Wall & Floor Tile) found in the hospital may no longer be available due to the age of the existing materials, will access panels be acceptable to install in openings created to cut and cap dead-legs?

VA RESPONSE: Depending on area of install on a case by case basis

68. QUESTION: Will pro-press fittings be accepted for installation of new caps & valves?

69. QUESTION: Will the VA have a staff member available to close valves on risers/mains for scheduled outages?

VA RESPONSE: Depending on the outage and timing of available staff.

ATTACHMENT:

See attached document: 230593 TAB for HVAC.