36C24525B0008 0007 Legionella Eradication.docx

DOCX document 121 KB Posted

Attached to
Z1DA--CONS BLDG 1 and Clinical Addition Legionella Eradication Project Number 540-20-103
Solicitation number
36C24525B0008
Issued by

About this file

This document is a Standard Form 30 Amendment of Solicitation/Modification of Contract for the Department of Veterans Affairs' Legionella Eradication Construction Project at the Louis A. Johnson VA Medical Center in Clarksburg, WV. The amendment extends the bid due date to September 11, 2025 at 3:00 p.m. EDT, with a public bid opening at 513 Rosebud Plaza, Clarksburg, WV, and provides clarifications to previous Request for Information (RFI) responses.

Key technical clarifications include requirements for a certified water treatment operator during construction, asbestos abatement guidelines for specific building areas, photographic documentation using project management software, and pre- and post-Testing and Balancing (TAB) requirements for four HVAC systems. The project involves eradicating Legionella in Building 1 and the Clinical Addition, with specific instructions on pipe demolition, asbestos handling, and HVAC system modifications. The VA is in the process of acquiring a water treatment permit and expects it to be in place by project completion.

View the file

Other files

File Type Posted
EP102D Revised Second Floor Power Plan - Clinical addition East.pdf PDF
221123 Revised Specification DomesticWaterPumps.pdf PDF
EP100B Revised Basement Power Plan - Area B.pdf PDF
36C24525B0008 0011 Eradicate Legionella.docx DOCX document
P-402 Revised Enlarged Plumbing Plan.pdf PDF
P-601 Revised Plumbing Schedule.pdf PDF
P-401 Revised Enlarged Plumbing Plan.pdf PDF
36C24525B0008 0010.docx DOCX document
36C24525B0008 0009.docx DOCX document
36C24525B0008 0008.docx DOCX document
36C24525B0008 0006.docx DOCX document
36C24525B0008 0005.docx DOCX document
230593 TAB for HVAC.pdf PDF
36C24525B0008 0004 - Building 1 and Clinical Add. Legionella Eradication.docx DOCX document
36C24525B0008 0003.docx DOCX document
36C24525B0008 0002.docx DOCX document
Record of Attendance - Eradicate Legionella Construction Site Visit.pdf PDF
36C24525B0008 0001.docx DOCX document
Record of Attendance - Site Visit - 6-30-2025 - Legionella Eradication.docx DOCX document
22-144 Specs 100 percent BD 20250414.pdf PDF
540-20-103_VHA PCRA 2023.docx DOCX document
S02_LIMITATIONS ON SUBCONTRACTING-CERTIFICATE OF COMPLIANCE.pdf PDF
DB Wage Determination 5-30-2025.pdf PDF
22-144 Drawings BD 20250414.pdf PDF
36C24525B0008.docx DOCX document
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

09-05-2025

540-20-103

Department of Veterans Affairs Louis A Johnson, VAMC Contracting Office (90C) 1 Med Center DR Clarksburg WV 26301-4199

Department of Veterans Affairs Louis A Johnson, VAMC Contracting Office (90C) 1 Med Center DR Clarksburg WV 26301-4199 To all Offerors/Bidders

36C24525B0008 06-24-2025

X

X

** HOUR & DATE for Receipt of Offers is EXTENDED to: 09-11-2025 3pm EDT

One The purpose of this amendment to the Eradicate Legionella construction project is to provide clarification to items from the RFI responses.

The bid due date will be extended to September 11, 2025 at 3:00 p.m. at which time a public bid opening will occur at contracting offices at 513 Rosebud Plaza, Clarksburg, WV 26301

All other terms and conditions remain unchanged.

Rebecca Besten Contracting Officer

CONTINUATION PAGE

Eradicate Legionella in Building 1 and Clinical Addition – Construction Project 36C24525B0008

1. In reference to a certified water treatment operator - Contractors will be required to provide a certified water treatment operator during construction and start up of the chlorine injection system. VA is working toward training staff for the system.

2. In reference to a water treatment license – The VA is in the process of acquiring the water treatment permit with expectations that permit will be in place by the start up of the injectors at the end of the project.

3. Clarifications to the responses to RFI’s 22, 40 and 42.

a) What is defined as within the area of work (i.e. immediately surrounding the connection/demotion points, anywhere there is a potential of disturbing ACM while reaching the immediate area of connection/demolition?

VA Response: “The area of work” only includes the piping indicated on plans as being demolished and immediately surrounding the connection. Minor variations (+/- 10 percent) in quantities of ACM within the area of demolition indicated on the drawings are considered as having no impact on contract price and time requirements of the contract. See spec 02 82 13.13 part 1.2.

b) What size piping would be impacted as part of the area of work?

VA Response: Please refer to the pipe sizes indicated on the drawings for pipes shown as being demolished. Pipes not shown as being demolished should not be included in the “area of work”.

c) Is the contractor to abate the entire tunnel area?

VA Response: No, only piping marked as being demolished should be included.

d) The response states that all existing piping located inside the walls of 2178, 2180, 2176, 2175 shall be considered to contain asbestos. Abate all asbestos within the scope of work. Plumbing P-001 Note 13 states “No piping is to be removed from inside walls or chases.” Bidders were instructed to follow note #13 via RFI response #24.

Note: General work and phasing note 7 states that any piping located inside the walls of building 1 shall be considered to contain asbestos. Additionally, piping in the ceiling space of OFFICES 2178, 2180, 2176 AND ROOM 2175 and all piping in the tunnel shall be considered to contain asbestos.

Is the contractor to abate the asbestos in the walls of the rooms noted about or leave it in place?

VA Response: Piping inside the walls of the above mentioned rooms shall be abandoned in place. PP102C demo key note 1 states demolish dead ends per plumbing demolition note 13, meaning no piping is to be removed from inside the walls.

e) Would this be the same throughout the project as far as piping abandoned in place per note # 13?

VA Response: Generally yes, unless otherwise noted on drawings. There are several instances where pipes will need to be removed from inside the walls to allow for new balancing valve assembly installation. Examples include Basement of Building 1 (P100C, demo key note 7).

f) The response states to reference the asbestos report. This is assumed to be for the entire project. The report is 30 years old. Is the contractor to assume all piping insulation that is not going to be abandoned in place according to P-001 Note 13 is to be abated according to the provided quantities?

VA Response: No, the quantities in the report shall not be used. The quantities shall be estimated based on General work and phasing note 7 and response to question d) above.

g) Clarification for work within the tunnels, where piping is located and how it is to be accessed.

VA Response: Access panels are generally located in the basement floor for access to piping under the basement floor. The contractor will need to verify existing conditions and available floor access panels located in the basement of Building 1. When the piping is located so that it is not accessible and cannot be demolished as shown on the drawings, the contractor shall bring this condition up to the COR for further instructions.

4. Clarification to RFI response # 37 for photographic documentation. Utilization of software such as Procore has the capability to store project photos taken via smartphone by the on-site superintendent and can be indexed in individual work area folders. That is acceptable to meet the requirement for photo documentation with the proper organization.

5. Clarification to the requirement for a CPIH. The government would be acceptable to allowing a CIH instead of a CPIH.

6. Clarification to RFI # 60 response for pre and post tab work. There is no reflected ceiling plan showing diffuser location in all areas of the hospital. However, the diffuser locations are shown on G-003 and G-009 where ICRA barriers are expected to be erected. 6th floor rooms don’t have diffusers shown and pre-tab and post-tab shall be included for the 6th Floor (2 AHU’s). Please also include two (2) additional pre and post TAB (2 AHU’s) to account for other areas where it will not be possible to erect ICRA barriers as shown on G-sheets. Total of 4 systems that will require post and pre-TAB shall be included in the bid.

a) Can mechanical drawings that show the design CFM for the registers, grilles, diffusers be provided?

VA Response: There are no existing drawings showing the design CFM. Contractor to perform pre-TAB to determine existing conditions.

b) When does the VAMC anticipate needing to see the post TAB readings (i.e. before the specific work areas are to be opened back up for hospital use, or when the complete work area that is serviced by a particular AHU is completed)?

VA Response: Post TAB results will need to be reviewed before patient care can take place in an area that was under construction.

c) Is it the intent of the post TAB reading to show that the project completion did not impact the HVAC system(s)?

VA Response: The intent of the post TAB is to show that the project completion did not impact the HVAC systems.

Solicitation 36C245B0008 Legionella Eradication Construction

File details come from the government source that posted it. Updated .