22-144 Drawings BD 20250414.pdf
PDF 31 MB Posted
- Attached to
- Z1DA--CONS BLDG 1 and Clinical Addition Legionella Eradication Project Number 540-20-103
- Solicitation number
- 36C24525B0008
About this file
These are technical design and construction drawings for the Legionella Eradication Project at the Louis A. Johnson VA Medical Center in Clarksburg, West Virginia, specifically addressing domestic water systems in Building 1 and the Clinical Addition. The project involves comprehensive modifications to domestic water distribution systems across six floors, including removing dead leg piping, installing new water temperature monitoring stations, implementing sensor-operated faucets, adding bottle filling stations, and installing chlorination systems. Key technical elements include new water heaters with steam control, recirculation pumps, water quality monitoring systems, and detailed infection control risk assessment (ICRA) plans to minimize disruption during construction.
The drawings provide extensive technical specifications for electrical and plumbing work, covering power connections for new equipment, receptacle placements, circuit routing, and comprehensive riser diagrams showing water distribution modifications. The project is phased, with work planned across multiple building areas and floors, and includes provisions for maintaining hospital operations during construction. Specific technical interventions include installing thermostatic mixing valves, temperature sensors, new piping configurations, and systems to mitigate Legionella risk in the VA medical facility's domestic water infrastructure.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
PROJECT SITE MAP PROJECT LOCATION MAP
PROJECT IMAGE PROJECT IMAGE PROJECT IMAGE
/1
/2
:2
:5
A
M C
U s e rs
\s m is e v ic h \D o c u m e n ts \P
-1
-V
A C la rk s b u rg -L e g io n e lla
E ra d ic a ti o n
B
L D
G s m is e v ic h .r v t
G-001
COVER
1 9SMR
ERADICATE LEGIONELLA
LOUIS A. JOHNSON VA MEDICAL CENTER
1 MEDICAL CENTER DRIVE
CLARKSBURG, WV 23601 APRIL 22, 2025
BID DOCUMENTS
540-20-10322-144
ERADICATE LEGIONELLA
LOUIS A. JOHNSON VA MEDICAL CENTER
1 MEDICAL CENTER DRIVE
CLARKSBURG, WV 23601
VA PROJECT #: 540-20-103
WX
No. Description Dwg of Dwg
GENERAL
G-001 COVER 1 9
G-002 ICRA INFORMATION AND DETAILS 2 9
G-003 BASEMENT FLOOR ICRA PLAN 3 9
G-004 FIRST FLOOR ICRA PLAN 4 9
G-005 SECOND FLOOR ICRA PLAN 5 9
G-006 THIRD FLOOR ICRA PLAN 6 9
G-007 FOURTH FLOOR ICRA PLAN 7 9
G-008 FIFTH FLOOR ICRA PLAN 8 9
G-009 SIXTH FLOOR ICRA PLAN 9 9
PLUMBING
P-001 PLUMBING GENERAL INFORMATION 1 48
PP010A TUNNEL PLAN- AREA A 2 48
PP010B TUNNEL PLAN - AREA B 3 48
PP010C TUNNEL PLAN - AREA C 4 48
PP100A BASEMENT FLOOR PLAN - AREA A 5 48
PP100B BASEMENT FLOOR PLAN - AREA B 6 48
PP100C BASEMENT FLOOR PLAN - AREA C 7 48
PP100D BASEMENT FLOOR PLAN - CLIN ADD - EAST 8 48
PP100E BASEMENT FLOOR PLAN - CLIN ADD - WEST 9 48
PP101A FIRST FLOOR PLAN - AREA A 10 48
PP101B FIRST FLOOR PLAN - AREA B 11 48
PP101C FIRST FLOOR PLAN - AREA C 12 48
PP101D FIRST FLOOR PLAN - CLIN ADD EAST 13 48
PP101E FIRST FLOOR PLAN - CLIN ADD WEST 14 48
PP102A SECOND FLOOR PLAN - AREA A 15 48
PP102B SECOND FLOOR PLAN - AREA B 16 48
PP102C SECOND FLOOR PLAN - AREA C 17 48
PP102D SECOND FLOOR PLAN - CLIN ADD EAST 18 48
PP102E SECOND FLOOR PLAN - CLIN ADD WEST 19 48
PP103A THIRD FLOOR PLAN - AREA A NORTH 20 48
PP103B THIRD FLOOR PLAN - AREA A SOUTH 21 48
PP103C THIRD FLOOR PLAN - AREA C 22 48
PP103D THIRD FLOOR PLAN - CLIN ADD EAST 23 48
PP103E THIRD FLOOR PLAN - CLIN ADD WEST 24 48
PP104A FOURTH FLOOR PLAN - AREA A 25 48
PP104B FOURTH FLOOR PLAN - AREA B 26 48
PP104C FOURTH FLOOR PLAN - AREA C 27 48
PP104D FOURTH FLOOR PLAN - CLIN ADD 28 48
PP105A FIFTH FLOOR PLAN - AREA A & B 29 48
PP105B FIFTH FLOOR PLAN - AREA C 30 48
PP106A SIXTH FLOOR PLAN - AREA A & B 31 48
PP106B SIXTH FLOOR PLAN - AREA C 32 48
PP107 LOWER LEVEL DOMESTIC WATER PLAN - BLDG 7 33 48
P-401 ENLARGED PLUMBING PLANS 34 48
P-402 ENLARGED PLUMBING PLANS 35 48
P-501 PLUMBING DETAILS 36 48
P-502 PLUMBING DETAILS AND CONTROLS 37 48
P-503 PLUMBING CONTROLS 38 48
P-504 EXISTING HVAC MAP 39 48
P-601 PLUMBING SCHEDULES 40 48
P-602 PLUMBING SCHEDULES 41 48
P-901 DOMESTIC WATER RISER DIAGRAM - CLIN ADD 42 48
P-902 DOMESTIC WATER DEMOLITION RISER DIAGRAM - RISER 12 AND AREA C 43 48
P-903 DOMESTIC WATER RISER DIAGRAM - RISER 12 AND AREA C 44 48
P-904 DOMESTIC WATER RISER DEMOLITION DIAGRAM - AREA B & C 45 48
P-905 DOMESTIC WATER RISER DIAGRAM - AREA B & C 46 48
P-906 DOMESTIC WATER DEMOLITION RISER DIAGRAM - AREA A 47 48
P-907 DOMESTIC WATER RISER DIAGRAM - AREA A 48 48
ELECTRICAL
E-001 ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS 1 22
EP100B BASEMENT POWER PLAN - AREA B 2 22
EP100C BASEMENT POWER PLAN - AREA C 3 22
EP100D BASEMENT POWER PLAN - CLIN ADD - EAST 4 22
EP100E BASEMENT POWER PLAN - CLIN ADD - WEST 5 22
EP101A FIRST FLOOR POWER PLAN - AREA A 6 22
EP101B FIRST FLOOR POWER PLAN - AREA B 7 22
EP101D FIRST FLOOR POWER PLAN - CLIN ADD 8 22
EP102A SECOND FLOOR POWER PLAN - AREA A 9 22
EP102B SECOND FLOOR POWER PLAN - AREA B 10 22
EP102C SECOND FLOOR POWER PLAN - AREA C 11 22
EP102D SECOND FLOOR POWER PLAN - CLIN ADD - EAST 12 22
EP102E SECOND FLOOR POWER PLAN - CLIN ADD - WEST 13 22
EP103B THIRD FLOOR POWER PLAN - AREA B 14 22
EP103C THIRD FLOOR POWER PLAN - AREA C 15 22
EP103D THIRD FLOOR POWER PLAN - CLIN ADD - EAST 16 22
EP103E THIRD FLOOR POWER PLAN - CLIN ADD - WEST 17 22
EP104A FOURTH FLOOR POWER PLAN - AREA B AND C 18 22
EP105A FIFTH FLOOR POWER PLAN - AREA A 19 22
EP105B FIFTH FLOOR POWER PLAN - AREA B AND C 20 22
EP106B SIXTH FLOOR POWER PLAN - AREA B 21 22
7.EP101 FIRST FLOOR POWER PLAN - BUILDING 7 22 22
LOUIS A. JOHNSON VA MEDICAL CENTER
1 MEDICAL CENTER DRIVE
CLARKSBURG, WV 23601
BLDG. 1
CLINICAL ADDITION
BLDG. 7
Docusign Envelope ID: D6ECC24D-2259-48CA-96F3-2741CB2454FD
4/14/2025
INFECTION CONTROL RISK MITIGATION RECOMMENDATIONS MATRIX OF
PRECAUTIONS FOR CONSTRUCTION AND RENOVATION
INFECTION CONTROL RISK MITIGATION RECOMMENDATIONS MATRIX OF
PRECAUTIONS FOR CONSTRUCTION AND RENOVATION
3 5/8" INSULATED WALL WITH
16 GAUGE METAL STUDS @
16" O.C. WALL TO EXTEND TO
UNDERSIDE OF DECK
5/8" FIRE RESISTANT GYPSUM
BOARD - BOTH SIDES
EXISTING CEILING SYSTEM
BASE - TO MATCH
EXISTING AREA
EXISTING FLOOR
UNDERSIDE OF EXISTING
DECK
C E
IL
IN
G H
E
IG
H T
V A
R
IE
S F
IE
L D
V E
R
IF
Y
W A
L L
H E
IG
H
T V
A R
IE
S
F
IE
L D
V E
R
IF
Y
4 7/8"
5/8" GYPSUM BOARD - BOTH
SIDES
EXISTING CEILING SYSTEM
BASE - TO MATCH
EXISTING AREA
EXISTING FLOOR
UNDERSIDE OF EXISTING
DECK
C E
IL
IN
G H
E
IG
H T
V A
R
IE
S F
IE
L D
V E
R
IF
Y
/2
4 7/8"
3 5/8" 16 GAUGE METAL
STUDS @ 16" O.C. WALL TO
EXTEND TO UNDERSIDE OF
DECK
A B
3 5/8" INSULATED WALL WITH
16 GAUGE METAL STUDS @
16" O.C. (2) LAYERS 5/8"
GYPSUM BOARD EACH SIDE.
WALL TO EXTEND TO
UNDERSIDE OF DECK
5/8" FIRE RESISTANT GYPSUM
BOARD - BOTH SIDES
EXISTING CEILING SYSTEM
BASE - TO MATCH
EXISTING AREA
EXISTING FLOOR
UNDERSIDE OF EXISTING
DECK
C E
IL
IN
G H
E
IG
H T
V A
R
IE
S F
IE
L D
V E
R
IF
Y
W A
L L
H E
IG
H
T V
A R
IE
S
F
IE
L D
V E
R
IF
Y
6 1/8"
C
FIRE RESISTANT SEALANT,
BOTH SIDES
FIRE RESISTANT SEALANT,
BOTH SIDES
SEALANT, BOTH SIDES
1-HR RATED AND SMOKE RATED
U.L. DESIGN NO. U419
NON RATED 2-HR RATED AND SMOKE RATED
U.L. DESIGN NO. U419
ILSM TEMPORARY BARRIER TAG
PROJECT:
PRIME CONTRACTOR:
SUB CONTRACTOR:
EMERGENCY CONTACT NO.:
BARRIER INSTALLATION DATE:
BARRIER EXPIRATION DATE:
FIRE EXTINGUISHER ON
PORTABLE FLOOR
BRACKET (ILSM MAY
REQUIRE MORE THAN
ONE).
PROVIDE STICKY MATS
(CHANGED END OF
SHIFT OR MORE IF
NECESSARY TO
MAINTAIN
CLEANLINESS).
HEPA NEGATIVE
AIR UNIT
ISOLATE AND COVER ALL
SUPPLY DIFFUSERS NOT
IN OPERATION DURING
PROJECT - COORDINATE
W/ COR
COVER ALL RETURNS
AT THE
GRATE/DIFFUSERS
SUSPENDED PLASTIC
ZIPPER WALL
CURTAIN BARRIER
POST ICRA, ILSM, FIRE
INSPECTION SHEETS
VISIBLE TO PUBLIC
FIRE PULL STATION
WITH AUDIO /
VISUAL
EXISTING WALL
BARRIER
NOTE:
A. TURN UP EXHAUST ON EXTERIOR ON SIDE. CONTRACTOR SHALL VERIFY
LOCATION OF AIR INTAKES ARE AT THE PROPER DISTANCE FROM
EXHAUST. VERIFY LOCAL JURISDICTION CODE AND VA REQUIREMENTS
FOR DISTANCE PRIOR TO STARTING WORK.
EXHAUST LOCATION
- SEE NOTE A
G-002
_____3
G-002
G-003
FLEX DUCT
ILSM SIGNAGE
INTERIM LIFE SAFETY MEASURES IN EFFECT
ERADICATE LEGIONELLA
THIS EXIT IS CLOSED AND LEADS TO A
CONSTRUCTION AREA.
PLEASE USE ALL ALTERNATE EXITS AS MARKED.
1' - 5"
1/2"1/2"
/2
/2
/2
/2
/2
/2
EQ.EQ.
DUST CONTROL PLAN NOTES
1. THE VAMC INFECTION CONTROL GROUP HAS CONFIRMED
THE DESIGNATION FOR THIS PROJECT IS LEVEL IV FOR THE
CLASS OF PRECAUTIONS OR LEVEL OF INFECTION
CONTROL ACTIVITIES. HARD SURFACE BARRIERS SHALL BE
USED EXCEPT IN THE AREA INDICATED ON THE PHASING
PLAN WITH PLASTIC BARRIERS (MINIMUM 4MIL) TO SEAL
AREA FROM NON-WORK AREA AS LONG AS THE SPRINKLER
SYSTEM IS INTACT AND ACTIVE.
2. THIS PROJECT NEEDS AN ENTRY VESTIBULE FOR
CLOTHING CHANGES (PROVIDE AND LOCATE A STAGING
AREA FOR HAZMAT SUITS NEAR THE PLASTIC BARRIER
ENTRANCE SPACES - CONSTRUCTION ANTEROOM. THEY
SHALL BE USED WHEN GOING INTO CONSTRUCTION AREA
AND LEAVING THE CONSTRUCTION AREA) AND TOOL
STORAGE AND TIGHT SEALS SHALL BE MAINTAINED AT THE
FULL PERIMETER OF WALLS AND WALL PENETRATIONS.
ANY DUST SHALL BE IMMEDIATELY CLEANED IF TRACKED
OUTSIDE OF THE CONSTRUCTION BARRIER. UPON
COMPLETION OF THE CONSTRUCTION PHASE, DUST
BARRIERS SHALL BE REMOVED CAREFULLY TO MINIMIZE
SPREADING OF DUST AND THE CONTRACTOR SHALL HAVE
TEMPORARY DUST PROTECTION IN PLACE BEFORE
REMOVAL OF A PERMANENT BARRIER. [AFTER EACH
PHASE, PERFORM TASKS STATED IN CONTAMINATION OF
PATIENT ROOMS, SUPPLIES, EQUIPMENT AND RELATED
AREAS NOTE 2.
3. PROVIDE STICKY MATS AND BLANKET AT THE PLASTIC
BARRIER ENTRANCE SPACES (CONSTRUCTION
ANTEROOM) AND CHANGE DAILY OR MORE OFTEN AS
NEEDED TO PREVENT THE SPREAD OF DUST AND DEBRIS
INTO ADJACENT CLEAN SPACE.
INTERNAL DEMOLITION AND CONSTRUCTION ACTIVITIES DUST AND
DEBRIS CONTROL
1. USE CORRIDORS AS PRIMARY CONSTRUCTION ACCESS.
2. TRAFFIC CONTROL: DESIGNATED ENTRY AND EXIT
PROCEDURES SHALL BE DEFINED. EGRESS PATHS SHALL
BE FREE OF DEBRIS; DESIGNATED ELEVATORS SHALL BE
USED DURING SCHEDULED TIMES; AND ONLY
AUTHORIZED PERSONNEL SHALL BE ALLOWED TO ENTER
THE CONSTRUCTION ZONE. SIGNAGE SHALL DIRECT
PEDESTRIAN TRAFFIC AWAY FROM THE CONSTRUCTION
AREA AND MATERIALS.
3. CONTRACTOR SHALL USE TWO CARTS TO TRANSFER
CONSTRUCTION MATERIAL IN AND OUT OF THE PROJECT -
A CLEAN CART SHALL BE USED; THE NOT-SO-CLEAN CART
SHALL BE USED BETWEEN THE MAIN ENTRY AND THE
CONSTRUCTION STAGING/PREP AREA.
4. DEMOLITION DEBRIS: DEBRIS SHALL BE REMOVED IN
CARTS WITH TIGHTLY FITTED COVERS, USING DESIGNATED
TRAFFIC ROUTES. EFFORTS SHALL BE MADE TO MINIMIZE
USE OF ELEVATORS WITH AN EMPHASIS ON TRANSPORT
DURING THE LOWEST PERIOD OF ACTIVITY. DEBRIS SHALL
BE REMOVED DAILY AND AT TIMES SPECIFIED BY THE
VAMC. IF CHUTES ARE USED TO DIRECT DEBRIS OUTSIDE,
HIGH EFFICIENCY PARTICULATE AIR (HEPA) FILTERED
NEGATIVE AIR MACHINES SHALL BE USED, AND THE CHUTE
OPENING SHALL BE SEALED WHEN NOT IN USE. FILTERS
SHALL BE BAGGED AND SEALED BEFORE BEING
TRANSPORTED OUT OF THE CONSTRUCTION AREA. THE
CONTRACTOR SHALL NOT HAUL DEBRIS THROUGH
PATIENT-CARE AREAS WITHOUT PRIOR APPROVAL OF THE
COR.
5. EXTERIOR WINDOWS: WINDOWS SHALL BE SEALED TO
MINIMIZE INFILTRATION FROM ANY ADJACENT EXCAVATION
DEBRIS.
6. ALL EQUIPMENT REMAIN IN THE ORs AND ASSOCIATED
ROOMS SHALL BE COVERED AND PROTECTED PRIOR
STARTING EACH CONSTRUCTION PHASE.
VENTILATION AND ENVIRONMENTAL CONTROLS
1. AIR SYSTEM FLOW: THE COR VERIFY AND ACKNOWLEDGE
CONTRACTOR WHETHER THE CONSTRUCTION AREA USES
FRESH/OUTSIDE OR RE-CIRCULATED AIR; FILTERS SHALL
BE ADDED OR RETURN VENTS COVERED AS NEEDED WITH
FILTER MATERIAL OR PLASTIC. AIR MUST FLOW FROM
CLEAN TO DIRTY AREAS.
2. NEGATIVE AIR PRESSURE: THE AIR WITHIN THE
CONSTRUCTION AREA SHALL BE NEGATIVE WITH RESPECT
TO SURROUNDING AREAS AND WITH NO DISRUPTION OF
AIR SYSTEMS OF ADJACENT AREAS. USE OF THE NEGATIVE
AIR PRESSURE SYSTEM WITHIN THE ENCLOSURE TO
REMOVE DUST SHALL PASS AIR THROUGH AN INDUSTRIAL
GRADE, PORTABLE HEPA FILTER CAPABLE OF FILTRATION
RATES OF 300-800 CUBIC FEET PER MINUTE (FT3/MIN), OR
EXHAUST AIR DIRECTLY TO THE OUTSIDE IF APPROVED BY
VAMC. IF EXHAUST SHALL BE TIED INTO A RE-CIRCULATED
AIR SYSTEM, A PRE-FILTER AND HEPA FILTER SHALL BE
USED BEFORE EXHAUST TO PREVENT CONTAMINATION OF
THE DUCTS.
3. FOR EXHAUST DUCT ROUTING THRU CORRIDOR: INSTALL
HARD DUCT WITH NON-FLANGE HANGER HUNG FROM
CEILING ABOVE, BOTTOM OF DUCT SHALL BE A MINIMUM
OF 7'-2" A.F.F.
4. ADJACENT AREAS: THE STATUS OF SEALED
PENETRATIONS AND INTACT CEILING SHALL BE VERIFIED
DAILY.
5. AIR EXCHANGE RATES AND PRESSURE RELATIONSHIPS:
VAMC AND CONTRACTOR SHALL VERIFY AND MAINTAIN
PROPER RATES IN CRITICAL AREAS NEAR CONSTRUCTION
ACTIVITY AND ENSURE AIR IS NOT BEING RE-CIRCULATED
WITHOUT FILTRATION FROM THE CONSTRUCTION AREA
ELSEWHERE. PROVIDE AIR PRESSURE TESTING
THROUGHOUT THE PROJECT IN THE FREQUENCY AS
IDENTIFIED BY THE COR.
CONTAMINATION OF PATIENT ROOMS, SUPPLIES, EQUIPMENT AND
RELATED AREAS
1. WORKSITE CLOTHING: CONTRACTOR PERSONNEL
CLOTHING SHALL BE FREE OF LOOSE SOIL AND DEBRIS
BEFORE LEAVING THE CONSTRUCTION AREA. IF
PROTECTIVE APPAREL IS NOT WORN (E.G., COVERALLS,
FOOTGEAR AND HEADGEAR) A HEPA-FILTERED VACUUM
SHALL BE USED TO REMOVE DUST FROM CLOTHING
BEFORE LEAVING THE BARRICADE. IF PROTECTIVE
APPAREL IS UTILIZED, THE CONTRACTOR SHALL
CONSTRUCT A SPACE OR ANTEROOM FOR CHANGING
CLOTHING AND STORING EQUIPMENT (DESIGNATED AREA.
ALL EQUIPMENT, TOOLS, TOOL CARTS, AND MATERIALS
TRANSPORTED THROUGH OCCUPIED AREAS SHALL BE
MADE FREE FROM DUST AND MOISTURE BY VACUUMING
AND WET WIPING BEFORE THEIR REMOVAL FROM THE
CONSTRUCTION ZONE OR WORK AREA.
2. POST CONSTRUCTION: DO NOT REMOVE BARRIERS AND
KEEP ALL HVAC ISOLATION UNTIL CONTRACTOR HAS
CLEANED CONSTRUCTION SITE, VA EMS STAFF HAS DONE
A TERMINAL CLEANING, AND VA INFECTIOUS DISEASE
CONTROL HAS INSPECTED AND APPROVED THE CLEANING.
PRE-TAB AND POST-TAB
1. PROVIDE PRE-TAB AND POST-TAB FOR THE ENTIRE HVAC
SYSTEM AFTER COMPLETION OF WORK IN THE AREA
WHERE SUPPLY DIFFUSERS OR RETURN/EXHAUST
GRATES/REGISTERS ARE BEING ISOLATED.
2. IN LIEU OF PRE-TAB AND POST-TAB, CONSTRUCT ICRA
BARRIER SO THAT SUPPLY/RETURN/EXHAUST DIFFUSERS
ARE LOCATED OUTSIDE OF THE ICRA BARRIER.
ICRA NOTES
IIILOW Risk Group 1
Class III
Note: Infection Control approval will be required when the Construction Activity and Risk Level indicate that
It is the Contractor's Responsibility to provide the following Infection Control Precautions depending upon the Area Class Designation
I
I
III
MEDIUM Risk Group 2
HIGH Risk Group 3
HIGHEST Risk Group 4 IV
IV
IV
IV
IV
III
IV
II
III
Patient Risk Group Table
Infection Control Matrix - Class of Precautions: Construction Project by Patient Risk
TYPE A
Construction Project Type
Large-scale construction, renovation, or maintenance generally defined as follows:
• Work exceeding 6 months in duration.
• Patients and employees are not to be in the area until activity is completed.
• Large-scale demolition of building components and infrastructure including removal of multiple doors, walls, framing, ceilings, flooring, piping, electrical and HVAC.
• The installation building components such as new walls, ceilings and doors including framing, drywall and associated plaster work.
• Plumbing work such as the installation of:
a. new medical gas systems,
b. steam/heating hot water, condensate systems,
c. multiple sinks, showers and toilets including associated plumbing.
• Shutdown of potable water, steam/heating hot water, condensate, and medical gas systems.
• Electrical work such as installation of electrical feeders, distribution panels, conduit and wire for lighting, receptacles and switches for an area, the installation of conduit and wire for new devices such as terminal units, fans etc.
• Installation of fire alarm and suppression systems.
• Electrical shutdown of multiple panels.
• Mechanical work such as the installation of air handling equipment, associated ductwork, diffusers, heat exchangers, terminal units and controls.
Small-scale construction, renovation, or maintenance generally defined as follows:
• Work requiring longer than a single week to complete but not exceeding 6 months.
• Patients and employees are not to be in the area until activity is completed.
• Demolition/removal of preexisting floor covering, casework, lay-in ceiling, or other architectural elements.
• Demolition/removal of more than 32 ft2 of drywall/framing, hard ceilings, and doors/framing and minimal infrastructure such as electrical circuits and branch piping.
• Installation of new walls, ceilings and doors including framing, drywall/plaster and associated work.
• Plumbing work such as the installation of new sinks, showers and toilets and associated plumbing.
• Shut down of sections of potable water systems.
• Electrical work such as installation of conduit and wire for lighting, receptacles and switches for an area, the installation of conduit and wire for new devices such as terminal units, fans etc.
• Modification of existing fire alarm and suppression systems.
• Mechanical work such as the installation of ductwork, diffusers, and terminal units for an area.
General maintenance and repair work generally defined as follows:
• Prolonged inspection and work that may take longer than a single shift but not exceeding a week.
• Patients and employees are not to be in the area until activity is completed.
• Work that creates minimal dust and debris.
• Interior finish or surface repairs, updates, or modifications such as repair of firewalls and barriers, and new flooring that produces minimal dust and debris. Controlled sanding activities (e.g., wet or dry sanding) that produce minimal dust and debris.
• Plumbing work such as installation or replacement of a single fixture or piping for a single fixture. Any work on sanitary plumbing including snaking of drains.
• Electrical work such as installation of cabling/wiring/conduit for a single device, installation of new device such as a light fixture that produces minimal dust and debris.
• Air Handler and/or fan shutdown/startup and HVAC work such as replacement of a single diffuser, single terminal unit or a single device that produces minimal dust and debris.
Inspection and/or facility upkeep generally defined as follows:
• Work can be completed in a single shift, not to exceed 10 hours.
• Patients and/or employees may be in the area depending on the activity.
• Work that does not create dust or debris.
• Removal of ceiling tile or access to mechanical or electrical chase for visual inspection limited to 1 tile per 50 square feet with limited exposure time (not to exceed an hour for each tile) within the shift.
• Minor interior updates (e.g., replacing floor or ceiling tiles, carpentry work to include hanging signage, and painting without sanding) that do not create dust or debris.
• Limited building system maintenance such as plumbing on potable systems limited to faucet replacement etc. and electrical work such as replacement of bulbs, receptacles, or switches.
Type of Construction / Project Activity Table
Group 2 Medium Risk
Group 1 Low Risk
• Waiting areas
• Clinical engineering
(biomedical)
• Materials management
• Sterile processing department – dirty side
• Kitchen, cafeteria, gift shop, coffee shop, and food kiosks
• Public hallways and
• gathering areas (non-clinical)
• Office areas (non-clinical)
• Breakrooms (non-clinical)
• Bathrooms or locker rooms (non-clinical)
• Mechanical/electrical rooms (non-clinical)
• FES/EMS areas
I
Patient Risk Group
TYPE D
TYPE C
TYPE B
TYPE A
Group 4 Highest Risk
Group 3 High Risk
• Patient care rooms and areas
• All acute care units
• All outpatient units and clinics
• Emergency department
• Community Living Centers, domiciliaries, and transitional residences
• Employee health
• Pharmacy – general work zone
• Medication rooms and clean utility rooms
• Radiology departments
• Laboratory
• All transplant units
• All intensive care units
• All oncology units and chemotherapy/infusion centers
• OR theaters and restricted areas
• Hemodialysis units
• Procedural rooms
• Pharmacy compounding area
• Sterile processing department – clean side
IIII
TYPE DTYPE CTYPE B
Class IV or control procedures are necessary.
C
LA
S S
IV
During Construction Project Upon Completion of Project
1. Includes all activities required by Class I, II, and III
2. Barriers must be hard barriers unless temporary to install final barrier.
3. Containment must include an anteroom to ensure pressure control, Anteroom must be large enough for equipment staging, cart cleaning, workers’ PPE and cleaning.
4. Worker clothing and/or PPE must be removed or clean and free of visible dust before leaving the work area anteroom. HEPA vacuuming of clothing or use of cover suits is acceptable.
5. Workers must wear shoe covers or have a method to clean shoes in anteroom Shoe covers must be removed prior to exiting the anteroom to the occupied space (non-work area). Damaged shoe covers must be changed immediately.
It is the Contractor's Responsibility to provide the following Infection Control Precautions depending upon the Area Class Designation
During Construction Project
C
LA
S S
I
Cleaning:
1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.
2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.
HVAC Systems:
1. Remove isolation of HVAC system in areas where work is being performed. Verify that HVAC systems are clean and operational.
2. Verify the HVAC systems meet original airflow and air exchange design specifications.
Water systems:
1. Until the potable water system is activated and in use, flushing shall continue at least twice per week in accordance with VHA Directive 1061.
Upon Completion of Project
1. Perform work activity in a manner that does not create dust.
2. Immediately replace any ceiling tile, close access panels, etc., upon completion of work.
3. Any materials and equipment being brought into the facility must be free of contaminants and loose material.
C
LA
S S
II
1. Includes all activities required by Class I
2. Provide active means to control airborne dust from dispersing into occupied areas and/or water mist surface to control dust (e.g., Mobile Dust Containment Cart or some other system).
3. Ensure worker clothing is clean and free of visible dust before leaving the work area.
4. Remove or isolate air diffusers (supply and return) to protect the HVAC system from dust and reduce air turbulence. Rebalance system to address diffuser isolation.
5. When the work involves or impacts potable water systems including stagnation due to reduced usage, the piping shall be flushed twice a week or isolated from the main system
6. Seal doors, to prevent dust migration.
7. Contain all trash and debris in the work area. Perform daily cleaning and disposal of trash (covered) from work area using an identified exit route.
8. Any equipment, tools, or materials removed from the work area must be in sealed containers and/or cleaned of dust and debris prior to removal from the area.
9. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.
10. Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats must be changed routinely and when visibly soiled.
11. Maintain clean surroundings when area is not contained by damp mopping or HEPA vacuuming surfaces at least daily.
Construction areas must be inspected by an infection preventionist and engineering representative (and others as determined by the facility) for final activity/project close out and removal of infection prevention and control measures.
Work Area Cleaning:
1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.
2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.
Removal of Critical Barriers:
1. Critical barriers must remain in place during all work involving drywall removal, creation of dust and activities beyond simple touch-up work. The barrier may NOT be removed until a work area cleaning has been performed. Additional cleaning may be needed after removal of barrier.
2. All (plastic or hard) barrier removal activities must be completed in a manner that prevents dust release. Use the following precautions when removing hard barriers:
i. Carefully remove screws and painter tape.
ii. If dust will be generated during screw removal, use hand-held HEPA vacuum.
iii. Drywall cutting is prohibited during removal process.
iv. Clean all stud tracks with HEPA vacuum before removing outer hard barrier.
v. Use a plastic barrier to enclose area if dust could be generated.
Negative Air Requirements:
1. The use of negative air must be designed to remove contaminants from the work area.
2. Negative air devices (fans, filters, monitoring and documentation equipment) must remain operational at all times and in place for a period after completion of dust creating activities to remove contaminants from the work area and before removal of critical barriers.
HVAC systems:
1. Upon removal of critical barriers, remove isolation of HVAC system in areas where work is being performed.
2. Verify that HVAC systems are clean and operational.
3. Verify and document through a TAB the HVAC systems meets original airflow and air exchange design specifications.
Water systems:
1. Until the potable water system is activated and in use, flushing shall continue at least twice per week in accordance with VHA Directive 1061.
CONSTRUCTION ACTIVITIES SHALL BE CLASSIFIED AS FOLLOWS UNLESS NOTED OTHERWISE:
1. INSTALLATION OF CABLE TRAY IN CORRIDOR CEILINGS SHALL BE CONSIDERED CONSTRUCITON ACTIVITY TYPE B.
2. ALL CONDUIT SPECIFIED TO BE INSTALLED IN WALL SHALL BE CONSIDERED CONSTRUCTION ACTIVITY TYPE C.
3. CONSTRUCTION OF NEW ROOMS SHALL BE CONSIDERED CONSTRUCTION ACTIVITY TYPE D.
4. INSTALLATION OF NEW DOORS TO OR FROM EXISTING SPACES SHALL BE CONSIDERED CONSTRUCTION ACTIVITY TYPE C.
C
LA
S S
II
I
1. Includes all activities required by Class I and II
2. Ensure availability of equipment for cleaning hands.
3. Construct and complete critical barriers meeting NFPA 241 requirements. Barriers must extend to the ceiling or if ceiling tile is removed, to the deck above.
4. All (plastic or hard) barrier construction activities must be completed in a manner that prevents dust release. Plastic barriers must be effectively affixed to floor and ceiling (or floor/roof deck above) and secure from movement or damage.
5. Seal all penetrations in containment barriers, including floors and ceiling, using approved materials (UL schedule firestop if applicable for barrier type).
6. Maintain .01 inches /water gauge negative pressurization of the entire workspace by use of HEPA exhaust air systems directed outdoors (unless a work specific waiver is approved by VHA’s Office of Healthcare Engineering); this must be maintained continuously 24/7 for the duration of the project. Exhaust discharged directly to the outdoors that is 25 feet or greater from entrances, air intakes and windows is not required to be HEPA-filtered. Exhausting discharged air into shared or recirculating HVAC systems, or other shared exhaust systems (e.g., bathroom exhaust) is prohibited.
7. Install a differential pressure sensing device (e.g., magnehelic, manometer, or digital monitoring) on exterior of work containment to continually monitor and document negative pressurization. The “ball in the wall” or similar apparatus are not acceptable.
• Transfusion services
• Imaging suites – interventional imaging
• Dedicated isolation wards/units for infectious diseases
Cleaning:
1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.
2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.
HVAC Systems:
1. Remove isolation of HVAC system in areas where work is being performed. Verify that HVAC systems are clean and operational.
2. Verify the HVAC systems meet original airflow and air exchange design specifications.
Water systems:
1. Until the potable water system is activated and in use, flushing shall continue at least twice per week in accordance with VHA Directive 1061.
Construction areas must be inspected by an infection preventionist and engineering representative (and others as determined by the facility) for final activity/project close out and removal of infection prevention and control measures.
Work Area Cleaning:
1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.
2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.
Removal of Critical Barriers:
1. Critical barriers must remain in place during all work involving drywall removal, creation of dust and activities beyond simple touch-up work. The barrier may NOT be removed until a work area cleaning has been performed. Additional cleaning may be needed after removal of barrier.
2. All (plastic or hard) barrier removal activities must be completed in a manner that prevents dust release. Use the following precautions when removing hard barriers:
i. Carefully remove screws and painter tape.
ii. If dust will be generated during screw removal, use hand-held HEPA vacuum.
iii. Drywall cutting is prohibited during removal process.
iv. Clean all stud tracks with HEPA vacuum before removing outer hard barrier.
v. Use a plastic barrier to enclose area if dust could be generated.
Negative Air Requirements:
1. The use of negative air must be designed to remove contaminants from the work area.
2. Negative air devices (fans, filters, monitoring and documentation equipment) must remain operational at all times and in place for a period after completion of dust creating activities to remove contaminants from the work area and before removal of critical barriers.
HVAC systems:
1. Upon removal of critical barriers, remove isolation of HVAC system in areas where work is being performed.
2. Verify that HVAC systems are clean and operational.
3. Verify and document through a TAB the HVAC systems meets original airflow and air exchange design specifications.
Water systems:
1. Until the potable water system is activated and in use, flushing shall continue at least twice per week in accordance with VHA Directive 1061.
SEE ICRA PLANS
FOR INDICATION OF
WHICH CLASS OF
PRECAUTIONS
NEED TO BE
FOLLOWED FOR
EACH AREA
SEE ICRA
PLANS FOR
INDICATION
OF WHICH
CLASS OF
PRECAUTIONS
NEED TO BE
FOLLOWED
FOR EACH
AREA
A .F
.F
A P
P R
O X
SUSPENDED
PLASTIC ZIPPER
WALL CURTAIN
BARRIER
POST ICRA, ILSM, FIRE
INSPECTION SHEETS
VISIBLE TO PUBLIC
HEPA NEGATIVE
AIR UNIT
FINISHED FLOORING TO BE KEPT
CLEAN. FLOORS NOT BEING REPLACED
MUST BE PROTECTED. COVER WITH
ROSIN PAPER / FIRE RATED PLYWOOD.
FIRE RATED PLYWOOD,
TEMPORARY. SALVAGE
PROTECT AND STORE
EXISTING WINDOW TO
BE RE-INSTALLED
AFTER CONSTRUCTION
IS COMPLETE.
V .I
.F
E X
IS
T
IN
G
W A
L L
FLOOR SLAB ABOVE
CEILING
PLASTIC
WINDOW
SWIVEL CASTERS
WITH TWO
LOCKING BRAKES
MOBILE CART
A D
J U
S T
A B
L E
H
E
IG
H T
HEPA NEGATIVE
AIR UNIT
EXISTING
WALL
EXISTING
CEILING
FLEX DUCT
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2
/2
:2
:4
P
M C
U s e rs
\r c la rk e
\D o c u m e n ts
\A
-1
-V
A C la rk s b u rg
-L e g io n e lla
E ra d ic a ti o n
B
L D
G rc la rk e H
N G
A .r v t
G-002
ICRA INFORMATION AND DETAILS
2 9RMC
ERADICATE LEGIONELLA
LOUIS A. JOHNSON VAMC1 MEDICAL
CENTER DRIVE
CLARKSBURG, WV 23601 , 2025
BID DOCUMENTS
540-20-10322-144
RMC
Scale: 3/4" = 1'-0"
ICRA BARRIER WALL TYPE
Scale: 1/4" = 1'-0"
TYPICAL CONSTRUCTION PLAN LAYOUT
Scale: 3" = 1'-0"
ILSM CONSTRUCTION EGRESS SIGNAGE
Scale: 1/4" = 1'-0"
ICRA ROOM ELEVATION
Scale: 1/4" = 1'-0"
CROSS SECTION "A"
Scale: 1/4" = 1'-0"
ICRA MOBILE CONTAINMENT CART
24514
LICENSED
ARCHITECT
APRIL 22,
Docusign Envelope ID: 0D606A27-3766-4B0F-A164-7EF734395E07
B 118 B 119
B 118A B 117
B 120
STAIR-B
B 115
B 112
MECH
B 113
OFFICE
B 111A
B 111
SLIDE STOR.
1B 101
STOR.
B 110
CLO.
1B 109
VEST.
AUTOPSY
1B 100
SOILED
B102
HSKP
1B 103
COOLER
UTILITY
1B100
1B 106
4A
STAIR A
B 105
MECH
1B 107
SERVER ROOM
B 108 4E
B 123
4D
21B
122A
KITCHEN
NUTRITION AND FOOD SERV.
B 122C
B 122F
W. TLT.
B 129
31 24
B 124
4B
4C
MECH
B 125
B 126
36C
36B
DOCK
BIOFECTIOUS
40A
ELECTRICAL
MECH STOR.
35A
FREEZER
FREEZER
B 122J
FREEZER
B 122J
COOLER
B 122N
COOLER
B 122M
COOLER
FREEZER
B 122K
B 122L
B 122C
39A
ELEC
B 127
FAC. STOR.
B 128
EMS SUPPLY
B 138
IT STOR.
B 139
STAIR C
B 137
OFFICE
B 131
B 130 B 130F
B 130A
B 130E
B 130D
B 130CB 130B45D
N AND
FS STOR.
MECH
45B
S
CALL CENTER
B 141
B 142
B 140 B 143
B 143A
OFFICE
B 144
82A
B 156
LOCKER
ROOM
CANTEEN STORAGE
B 163 B 160
SOILED
B 161
STAIR
B 158
OFFICE
B 155
OFFICE
B 162
LOCKER ROOM
B 165
OFFICE
B 146
B 147
61A
HOMELESS VETS
B 149
MECH
B 150
STORE
B 151
STAIR D
B 153
OFFICE
B 154
ELEC. RM.
BF 103
BF 104
B204A
ELEC
B205
B204
STAIR "C"
B210
TEL
B209
ELEC
B208
B207
MECH
B206
B 108B
B 108A
B 108
M. LOCKER
B 212
BF 109
BF 110
F. LOCKER
B 213
B 219A
B 219B B 219C
B 219F
HSKP
B 219E
B 219 B 217
STAIR-H
B 221B 220A
B 220B
B 220C
B 220D
B 220BF 116ABF 116
OFF.
B 224
OFF.
B 226
OFF.
B 228
OFF.
B 229
OFF.
B 230AB 230
OFF.
B 231A
OFF.
B 231
OFF.
B 232
OFF.
B 233
OFF.
B 234
MCCF OFF.
B 227A
MCCF OFF.
B 227B
STORE
B 225
ELEC.
B 223
TEL.
B 222
B 235C
OFF.
B 235B
B 235
B 234A
B 235A
HSKP
B 236
B 237 B 238
RECORDS RM. + MECH.
B 241
OFF.
B 239
OFF.
B 240
FILE RM.
B 218B
OFF.
B 218A
MED REC
B 218C
B 215B
B 215A
HSKP
B 216
B 215
PHAR. ADMIN.
B 214
B 214A
BF 111E
BF 111C
ANTEROOM
B 215D
IV LAB
B 215E HAZ. STOR.
B 215G
ONCOLOGY
B 215F
MECHANICAL
B 215C
P-2
P-1
S-1 B 202
STOR
B 201
B 200
1220FF
1220EE
MED
SUPPLY
STOR.
OFFICE
OFFICE OFFICE
CUBICLES
OFFICE
OFFICE
DATA
B247
STAIR 'J'
B246
STORAGE
B243
ELECTRICAL
B245
PHARMACY
PLUMBING
SHOP
GYPSUM BOARD WALL
AND/OR GYPSUM BOARD
CEILING WILL NEED TO BE
PARTIALLY DEMOLISHED AND
PATCHED AND/OR NEW
GYPSUM BOARD INSTALLED IN
THIS AREA TO COMPLETE THE
REQUIRED WORK.
LEGEND
Engineers Architects
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/1
/2
:1
:5
P
M C
U s e rs
\r c la rk e
\D o c u m e n ts
\A
-1
-V
A C la rk s b u rg
-L e g io n e lla
E ra d ic a ti o n
B
L D
G rc la rk e H
N G
A .r v t
G-003
BASEMENT FLOOR ICRA PLAN
3 9RMC
ERADICATE LEGIONELLA
LOUIS A. JOHNSON VAMC1 MEDICAL
CENTER DRIVE
CLARKSBURG, WV 23601 , 2025
BID DOCUMENTS
540-20-10322-144
RMC
Scale: 1/16" = 1'-0"
BASEMENT ICRA PLAN
1 TEMPORARY ICRA BARRIER - PLASTIC SHEET
WITH ZIPPERED ENTRY
2 ICRA CLASS II
A. USE A HEPA CART MOBILE CONTAINMENT SYSTEM
FOR ALL ABOVE-CEILING WORK AND ALL AREAS OF
WORK UNLESS OTHERWISE NOTED BY KEYNOTE 1
BELOW.
B. PROVIDE A CRITICAL PATH SCHEDULE FOR THE
WORK AND DOCUMENT WHEN THE WORK WILL
OCCUR IN EACH ROOM. COORDINATE WITH THE COR
REGARDING POTENTIAL WORK DURING EVENINGS
AND WEEKENDS. THE VA WILL MOVE FURNITURE
AND MEDICAL EQUIPMENT AS REQUIRED SO THAT
THE WORK MAY BE COMPLETED.
0 4 8 16
N O
R T
H
24514
LICENSED
ARCHITECT
APRIL 22,
OFFICE
1109F
TOILET
1109G
STOR.
1109H
EXAM
1109I
BIOPSY/ULTRAS
132B
MAMMO
1109E
EXAM
1109J
EXAM
1109K
CORR
138B
STAIR
1109C
EXAM
1109L
SOILED
1109B
EDUC
1109A
CORRIDOR
WAITING
RECEPT
1109M
OFFICE
1109N
CORRIDOR
138ACLASSROOM
1100A
CLASSROOM
1100B
CLASSROOM
1100C
OFFICE
1100D
CORRIDOR
NURSE OFFICE
1100E
RECEPTION
BREAK AREA
1100F
CORRIDOR
125A
STORAGE
OFFICE
124A
OFFICE
124B
TOILET
CHASE
B 203
STAIR
UTILITY CLO.
TLT
1115K
MEDS
1115J
SOILED UTILITY
1115H
TREATMENT AREA
1115I
CORRIDOR
CORRIDOR
ONCOLOGY
1115A
CLEAN
1115G
EXAM
1115F
EXAM
1115E
OFFICE
1115D
CONSULT
1115C
CHECK-IN
1115AB
WAITING AREA
CORRIDOR
WHEELCHAIR STORAGE
REPAIR
1112 PROSTHETICS
CLERKS
EX
1114A
HAC
PIPE CHASE
MEDIA CENTER
1125D
STORAGE
1125A
CORRIDOR
CORRIDOR
CORRDIOR
CORRIDOR
ELEV
ELEV
ELEV
WORK AREA
LUNCH
CORRIDOR
1122A
TLT
GYM
TREATMENT STATIONS
113F
STORAGE
1122B
CORRIDOR
1124Z
EXAM ROOM
1124W
EXAM ROOM
1124X
EXAM ROOM
1124Y
EXAM ROOM
1124V
EXAM ROOM
1124Q
EXAM ROOM
1124O
CORRIDOR
116T
CONSULTATION / WORK AREA
1124U
MED PREP
1124R
PATIENT TOILET
1124N
LASER
1124M
PHOTO
1124L
CORR.
116N
CLEAN
1124K
SOIL
1124J
CORRIDOR
116BB
EXAM ROOM
1124T
EXAM ROOM
1124S
TRTMNT
1122C
WAIT
1124H
CORRIDOR
113K
PRETEST ROOM
1124G
PRETEST ROOM
1124E
TRTMNT
1122D
VISUAL
1124F
ADL
1122E
US
1122F
FITTING
1122G
LOCKERS
1124C
RECEPTION
1124A
WAITING
CORRIDOR
116B
ELEC
1124AA
STAIR
WOMEN
MEN
1129A
1129B
NURSE'S STATION
EX
PIPE CHASE
1125B
EX
EX
EX
EXAM
EXAM
EXAM
EXAM
EXAM
EXAM
EXAM
EXAM
EXAM
1143A
STAIR-D
EXAM
LINEN SOILED
OFF
1200C
OFF
1200B
1200A
1200D
RETAIL STORE
REF
1202B
REFRIGATOR
1202A
CANTEEN ROOM
1210F
CAFE
1210C
KITCHEN
STOR
HSKP
ELEC CLOSET
MECH SHAFT
X1207
ELEC. CLOSET
ELEVATOR
S-1
ELEVATOR
P-1
ELEVATOR
P-2
ELEV LOBBY
B 204
HSKP
W. TLT
VENDING STORAGE
1210E
M. TLT
CORRIDOR
1210B
CAFE STORAGE
1210A
OFFICE
OFFICE
ELEC. CLOSET
1210D
ELEC
TEL
TOILET
102FOYER
IV
CONTROL RM
MRI
STOR
AMBLULANCE BAY
TLT
X1223
MOD
1220N
EQUIPMENT
X1225
LKRS
1220M
SOILED
1220H
TLT
1220I
CLEAN ROOM
1220J
MED ROOM
1220K
TLT
X1231
CORRIDOR
X1232
BED 8
X1233
NURSE STATION
X1234
CORRIDOR
X1235
CORRIDOR
X1236
BED 7
1220G
BED 6
1220F
BED 5
1220E
BED 4
1220D
BED 3
1220C
CLERK/ AOD
X1242 TRIAGE
X1243
BED 2
X1244
BED 1
X1245
1229B
PHARMACY
1229AOFF
1226 1225 1224
LOBBY
1215 STAIR-6
HSKP
TLT
EX
EX
EX
EX
N.STATION
EX
EX
EX
EX
EX
EX
EX
1270 1271
WORK RM
1272 1284 1285
NURSE'S STATION
EX
HALLWAY
1 HALLWAY
HALLWAY
HALLWAY
POLICE
12301230B Room
1230C
CHIEF POLICE
OFFICE
OFFICE
OFFICE
OFFICE
1232B
MECHANICAL
OFFICE
1232C
TLT
1232F
OFFICE
1232EOFFICE
1232D
1230A
CASHIER
OFFICE
MEN
1173WOMENS RESTROOM
OFFICE
TELE CABLE CHASE RM
EX
1278 TLT
1278A
ELEC
TEL
1291B
1291A
EX
EX
EX
C1
14B
OFF
EX
OFF
BREAK ROOM
EX
EX
EX
MED RM
EX
EX
1268A
M TLT
1264B
N. CLINIC
W. TLT
1264A
EX
1253 1F153
EX
CLEAN ULTITY
STAIR H
EXAM TOILET
1257A
EXAM
WORK STATION
1249J
EXAM
1249I
PHARM
1249H
EXAM
1249G
EXAM
1249E
EXAM
1249C
EXAM
1249A
EXAM
CLERKS
SOCIAL WORK
EXAM
EXAM
MECH
1249B
TOILET
1249D
EXAM
1249F
STAIR 'J'
LOBBY
VESTIBULE
INFORMATION
ELECTRICAL
1241A
HSKP
1241B
DIAB
C&P
CORRIDOR
102.7
ANTI-COAG
C&P
C&P
DIAB
C&P CLERK
NEPH
NURSE
102.9
PIPE CHASE
TR
HEP C
CALL CENTER
1155A
EXAM
EXAM
EXAM
STAIR-E
1220MMM
EQUIP'T. RM
GYPSUM BOARD WALL
AND/OR GYPSUM BOARD
CEILING WILL NEED TO BE
PARTIALLY DEMOLISHED AND
PATCHED AND/OR NEW
GYPSUM BOARD INSTALLED IN
THIS AREA TO COMPLETE THE
REQUIRED WORK.
LEGEND
Engineers Architects
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/1
/2
:1
:5
P
M C
U s e rs
\r c la rk e
\D o c u m e n ts
\A
-1
-V
A C la rk s b u rg
-L e g io n e lla
E ra d ic a ti o n
B
L D
G rc la rk e H
N G
A .r v t
G-004
FIRST FLOOR ICRA PLAN
4 9RMC
ERADICATE LEGIONELLA
LOUIS A. JOHNSON VAMC1 MEDICAL
CENTER DRIVE
CLARKSBURG, WV 23601 , 2025
BID DOCUMENTS
540-20-10322-144
RMC
Scale: 1/16" = 1'-0"
LEVEL 1 ICRA PLAN
1 TEMPORARY ICRA BARRIER - PLASTIC SHEET
WITH ZIPPERED ENTRY
2 ICRA CLASS II
3 ICRA CLASS III
4 STICKY MAT
0 4 8 16
A. USE A HEPA CART MOBILE CONTAINMENT SYSTEM
FOR ALL ABOVE-CEILING WORK AND ALL AREAS OF
WORK UNLESS OTHERWISE NOTED BY KEYNOTE 1
BELOW.
B. PROVIDE A CRITICAL PATH SCHEDULE FOR THE
WORK AND DOCUMENT WHEN THE WORK WILL
OCCUR IN EACH ROOM. COORDINATE WITH THE COR
REGARDING POTENTIAL WORK DURING EVENINGS
AND WEEKENDS. THE VA WILL MOVE FURNITURE
AND MEDICAL EQUIPMENT AS REQUIRED SO THAT
THE WORK MAY BE COMPLETED.
N O
R T
H
24514
LICENSED
ARCHITECT
APRIL 22,
MECHANICAL
STAIR H
ELEC.
TEL.
OFFICE
OFFICE
OFFICE
S-1
P-1
P-2
READING
ROOM
SERVER
SOIL
SUPPLY
TOILET
DRESS
DRESS
DRESS
TLT.
TLT.
WAITING
2190A
CT SCAN
OFFICE
2204B
ELEC.
HSKP
STAIR-G
STORAGE
2233A
OFFICE
OFFICE
OFFICE
LAB
WORK RM
2236A
LOUNGE
2240C
M. LOCKER
2240A
F. LOCKER
2240BWORK RM
2241A
OFFICE
2241D
COOLER
STOR.
2F 140
OFFICE
STORAGE
OFFICE
OFFICE
SHOWER
TOILET
TOILET
OFF.
ELEC.
CONF. RM
STORAGE
PHLEBOTOMY
TLT
TLT
X-RAY
STORAGE
2208A
TOILET
CLEAN
UTILTY
DRESSING
RM-D
DRESSING
RM-E
X-RAY
X-RAY
TLT
2198A
X-RAY
X-RAY
TLT
2200A
HSKP
ULTRA
SOUND
2F122
2208D
LOCKER
ROOM
AUDIOLOGY TEST BOOTH
2179B
AUDIOLOGY TEST BOOTH
2179A
LOBBY
WORK
2177A
STORAGE
WAITING
OFFICE
OFFICE
EKG LAB
STAIR D
ECHO LAB
PULMONARY TEST
2157A
OFFICE
2155A
OFFICE
OFFICE
PULMONARY LAB
ECHO LAB
STRESS LAB
STOR
STORAGE
WRK
2147A
WAITING
OFFICE
OFFICE
OFFICE
BREAK ROOM
2175F.CC0
STAIR E
HOT LAB
2172A
NUCLEAR MED.
JANITOR
RR
EXAM ROOM
ELECTRICAL CLOSET
OFFICE
STORAGE
2145A
STORAGE
OFFICE
OFFICE
OFFICE
OFFICE
BOOTH
2147B
BOOTH
2147C
BOOTH
2147D
BOOTH
2147E
STAIR-C
MECH
MECH
STORAGE
2129 2131
2131A
F.CCO
TEL. CLO.
2131B
PIPE CHASE
WORKSTATION OFFICE
2133A
OFFICES
2133B
HOUSEKEEPING
2133D
2133C
PIPE
CHASE
OFFICE
TOILET
2124B
2124A
LIBRARY
21202120A
OFFICE
OFFICE
OFFICE
CONFERENCE ROOM
STORAGE
OP-4
2106B
OP-3
2106C
OP-2
2106D
OP-1
2106E
STORAGE
2106A
DENTAL LAB
EDUCATION RM.
STORAGE
F.CLO
STAIR-B
2101F 2101G
EX
2101D
EX
2101C
OFF.
2101B
RECEPTION
2101A
CONFERENCE
2100A
HSKP
2112 F.CCO
STAIRS
OFFICE
2115A
2116A
TRAINING ROOM-B
F.CCO
MECH
ELECTRICAL
SERVICE
ELEVATOR
LOBBY
EQUIP
2204A
VESTIBU
2204C
GYPSUM BOARD WALL
AND/OR GYPSUM BOARD
CEILING WILL NEED TO BE
PARTIALLY DEMOLISHED AND
PATCHED AND/OR NEW
GYPSUM BOARD INSTALLED IN
THIS AREA TO COMPLETE THE
REQUIRED WORK.
LEGEND
Engineers Architects
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2
/2
:3
:3
P
M C
U s e rs
\r c la rk e
\D o c u m e n ts
\A
-1
-V
A C la rk s b u rg
-L e g io n e lla
E ra d ic a ti o n
B
L D
G rc la rk e H
N G
A .r v t
G-005
SECOND FLOOR ICRA PLAN
5 9RMC
ERADICATE LEGIONELLA
LOUIS A. JOHNSON VAMC1 MEDICAL
CENTER DRIVE
CLARKSBURG, WV 23601 , 2025
BID DOCUMENTS
540-20-10322-144
RMC
Scale: 1/16" = 1'-0"
LEVEL 2 ICRA PLAN
1 TEMPORARY ICRA BARRIER - PLASTIC SHEET
WITH ZIPPERED ENTRY
2 STICKY MAT
4 ICRA CLASS IV
0 4 8 16
A. USE A HEPA CART MOBILE CONTAINMENT SYSTEM
FOR ALL ABOVE-CEILING WORK AND ALL AREAS OF
WORK UNLESS OTHERWISE NOTED BY KEYNOTE 1
BELOW.
B. PROVIDE A CRITICAL PATH SCHEDULE FOR THE
WORK AND DOCUMENT WHEN THE WORK WILL
OCCUR IN EACH ROOM. COORDINATE WITH THE COR
REGARDING POTENTIAL WORK DURING EVENINGS
AND WEEKENDS. THE VA WILL MOVE FURNITURE
AND MEDICAL EQUIPMENT AS REQUIRED SO THAT
THE WORK MAY BE COMPLETED.
N O
R T
H
24514
LICENSED
ARCHITECT
APRIL 22,
PAT RM
3A121
TLT
3A121A
PAT RM
3A122
TLT
122B
NOUR
3A124
PAT TLT
3A120 TLT
3A120A
ISOL
3A119
TLT
3A119A
CHASE
SOILED UTILITY
3A117
3A198
PHSICIAN WORK RM
3A115
SEMI-PRIVSTE PATIENT RM
3A114
SEMI-PRIVATE PAIENT RM
3A113
TLT
3A114A
TLT
3A113A
TLT
3A112
DIET TECH
3A111
3A110
NURSE STATION
3A109
3A109A
PAT RM
3A108
TLT
3A108A
PATIENT RM
3A107
TLT
3A107A
MED RM
3A106
HEAD NURSE
3A104
3A103
MECH RM
3A102
CORRIDOR
300A
DAYROOM
3A137
X
3A136
TLT
3A125
TLT
3A125A
PAT RM
3A134
TLT
3A134A
PAT RM
3A133
TOILET/SHOWER
3A133A
TLT
3A126
TLT
3A126A
PAT RM
3A128
PAT RM
3A132
TLT
3A135
TLT
3A128A
SEMI-PRIVATE PATIENT RM
3A129
SEMI-PRIVATE PATIENT RM
3A130
TOILET/SHOWER
3A130A
TLT
3A129A
CLEAN
3A138
PATIENT RM
3A139
PATIENT RM
3A140 EXAM RM
3A141
PIPE CHASE
TLT
3A140A
TLT
3A139A
GURNEY ALCOVE
100E
OFFICE
3A144 ELEC
3A143
PATIENT RM
3A145
PATIENT RM
3A146
PATIENT RM
3A152
PATIENT RM
3A151
CLEAN UTILITY
3A150
SOILED UTILITY
3A147
NURSE STATION
3A153
EQUIP STORAGE
3A153A
TLT
3A154
CHIEF OFFICE
3A156
TLT
3A156A
TLT
3A196
STAFF LOUNGE
3A158
EX
3B119
EXAM 9
3B118
EXAM 8
3B117
EXAM 12
3B122
EXAM 11
3B121
EXAM 13
3B123
EXAM 14
3B124
3B125
PRIVATE RM 1
3B127
MECH
372CORRIDOR
C317
CORRIDOR
C319
EXAM 7
3B116
NURSE
3B114
MED RM
3B115
NOUR
3B113
CORRIDOR
C316 EXAM 1
3B106
EXAM 6
3B112
EXAM 5
3B111
EXAM 4
3B110
EXAM 3
3B108
EXAM2
3B107
STORAGE
3B109
3A100H
STAIR B
NS
3A131
CORRIDOR
300F
PATIENT ROOM
3A148 PATIENT ROOM
3A149
X
B 208
WOMEN'S
3B150
MEN'S
3B151
SCHEDULING OFFICE
3B152
REGISTRATION
3B153
WAITING
3B100
OFFICE
3B102
3B103
SOILED
3B104 OFFICE
3B101
STOR
3A146P
STAFF LOCKER
3B146
TLT
3B147
TLT
3B145
DRESS
3B144
PRIVATE RM 2
3B128
CORRIDOR
C318
PRIVATE RM 3
3B129
PRIVATE RM 4
3B130
NURSE
3B142
STAIR D
3B141
SUB WAIT
3B139
EQUIP
3B140
FC
B 209
JAN
3B131
CLEAN SCOPE
3B132
PROCESSING
3B133
TLT
3B137
SOIL
3B138
GI #2
3B136
GI #1
3B134
ANES WORK
3B135
DATA CLOSET
3A101
STAIR C
CORRIDOR
300E359
CORRIDOR
C315
STAIR E
3B105
CORRIDOR
C3-2
STAIR F
F-1
MECH. SHAFT
B 210
ELECTRICAL
3303 ELEVATOR LOBBY
C3-1
O.R./WAITING
C3-6
S-1
B 211
P-1
B 218
SERVICE ELEVATOR LOBBY
P-2
B 227
CONSULT
ANES OFFICE
NURSE
CORRIDOR
C33
CHART/NOURISH
C3-15
CRNA
3320A
PRESIDENT OFFICE
NURSE MGR.
COPY/FAX
CORRIDOR
C3CB
PRIVATE RM 1
PRIVATE RM 2
B 242
PRIVATE RM 3
PRIVATE RM 4
STAIR H
F-2
ELECT.
B 243
TEL.
PAT. TLT.
B 244
PAT. LOOKERS
CORRIDOR
C33A
STORAGE
B 245
WOMEN
WOMEN'S TOILET
3308A
MEN'S TOILET
3309A
MEN
ANES WORK
STAFF TLT.
LAB
3321B
OR-4
STORAGE
3321C
MEN LOCKER
3309B
WOMEN LOCKER
3308B
CLEAN WORK
SUB-STERILE
3319B
X-RAY
33211
EQUIPMENT STORAGE
RECOVERY
C3-47
CRNA
B 246
SOILED UTILITY
3315B
CLEAN UTILITY
3315C
CORRIDOR
B 247
OR-3
OR-2
LAB
3316B
HAC
3316A
ENDO STORAGE
3319A
LOUNGE
CLEAN STORAGE
X
3323A
CART LIFT
B 248
STAIR G
F-3SCRUB
3325B
HAC
3325A
OR-1
X
3315GRECOVERY
3F1119
CORRIDOR
C37
NURSE
C37A
MED. RM
3315D
ANTE
3315E
TOILET
3315F
Room
C3-72
CORRIDOR
C3-8
CORRIDOR
C3-9
CORRIDOR
300B
STAIR A
OFFICE
BED 1
BED 2
C3-11
CORRIDOR
C3-14
OFFICE
EQIPMENT STORAGE
WAITING
TOILET
3329A
CORRIDOR
C3-12
NOURISH
CLEAN LINEN
SOILED UTILITY
MED RM
HAC
CONTROL
BED 3
ANTE
ISOLATION
338A
BED 5
BED 6
BED 7
BED 8
BED 9
BED 10
BED 11
ISOLATION
3353A
BED 13
BED 14
CORRIDOR
B 249
CONTROL
CORRIDOR
C3-10
ANTE
CORRIDOR
C3-13
MECH SHAFT
B 250
SOILED UTILITY
TOILET
357A
LOUNGE
LOCKER
ELEC
TEL
BED 15
OFFICE
TOILET
3358A
2 GYPSUM BOARD WALL
AND/OR GYPSUM BOARD
CEILING WILL NEED TO BE
PARTIALLY DEMOLISHED AND
PATCHED AND/OR NEW
GYPSUM BOARD INSTALLED IN
THIS AREA TO COMPLETE THE
REQUIRED WORK.
LEGEND
Engineers Architects
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2
/2
:4
:1
P
M C
U s e rs
\r c la rk e
\D o c u m e n ts
\A
-1
-V
A C la rk s b u rg
-L e g io n e lla
E ra d ic a ti o n
B
L D
G rc la rk e H
N G
A .r v t
G-006
THIRD FLOOR ICRA PLAN
6 9RMC
ERADICATE LEGIONELLA
LOUIS A. JOHNSON VAMC1 MEDICAL
CENTER DRIVE
CLARKSBURG, WV 23601 , 2025
BID DOCUMENTS
540-20-10322-144
RMC
Scale: 1/16" = 1'-0"
LEVEL 3 ICRA PLAN
1 TEMPORARY ICRA BARRIER - PLASTIC SHEET
WITH ZIPPERED ENTRY
2 STICKY MAT
3 ICRA CLASS III
4 ICRA CLASS IV
0 4 8 16
A. USE A HEPA CART MOBILE CONTAINMENT SYSTEM
FOR ALL ABOVE-CEILING WORK AND ALL AREAS OF
WORK UNLESS OTHERWISE NOTED BY KEYNOTE 1
BELOW.
B. PROVIDE A CRITICAL PATH SCHEDULE FOR THE
WORK AND DOCUMENT WHEN THE WORK WILL
OCCUR IN EACH ROOM. COORDINATE WITH THE COR
REGARDING POTENTIAL WORK DURING EVENINGS
AND WEEKENDS. THE VA WILL MOVE FURNITURE
AND MEDICAL EQUIPMENT AS REQUIRED SO THAT
THE WORK MAY BE COMPLETED.
N O
R T
H
24514
LICENSED
ARCHITECT
APRIL 22,
OFFICE 20
4A429
OFFICE 19
4A430
OFFICE 18
4A431
OFFICE 17
4A432
OFFICE 16
4A433
STAFF TOILET
4A435
HC TOILET
4A434
OFFICE 22
4A426
OFFICE 21
4A427
OFFICE 23
4A425
OFFICE 24
4A424
VIDEO TESTING
4A422
MECH SHAFT
4A423
HSKP
4A410
GROUP RM
4A407
ELEC
4A405
TREATMENT
4A403
RECEPTION
4A402
STAFF BREAK
4A412
STAIR A
4A421
COPY
4A457
GROUP RM
4A458
GROUP RM
4A459
OFFICE 1
4A436
OFFICE
4A455
VIDEO TESTING
4A454
STAIR B
4A440
PSYCH OFFICE 2
4A420
SECRATARY
4A415
PSYCH OFFICE
4A413
CORRIDOR
4A409
ADMIN/COPY
4A417
HALLWAY
4A418
OFFICE
4A416
CHEIF OFFICE
4A414
STORAGE
4A404
CLOSET
4A408
WC ALCOVE
4A406
HC TOILET
4A461
HC TOILET
4A460
TRIAGE/PSYCH NURSE
4A463
MECH SHAFT
4A464
WAITING
4A401
MECHANICAL RM
4C469
CLOSET
4C466
ELEC CLO
4C467
ELEV
B 257
ELEV
4B 258
ELEV
4B 259
STAIR C
B 260
SHARED SOCIAL WORKER OFFICE
4B39
OFFICE
4B38
STAFF LOUGE
4B11
ELEC CLO
4B10
STAFF TOILET
4B11A
CHEIF SOCIAL
4B09
STAFF CONFERENCE
4B37
MED RM
4B13
PATIENT STORAGE
4B12 NURSE STATION
4B14
HOLDING RM
4B23A
HOLDING TOILET
4B23B
ANTE RM
4B23
MECH SHAFT
4B40SOILED UTILITY
4B35
CLEAN UTILITY
4B36
HOUSEKEEPING
4B34
SOILED LINEN
4B28 CLEAN LINEN
4B27
EXAM
4B26PATIENT TOILET
4B29
MECH STORAGE
4B24A
UNISEX PUBLIC TOILET
4B24C
BARIATRIC PATIENT RM
4B22
SINGLE PATIENT RM
4B15
DAY RM
4B33B
STAIR E
4B45
NOURISHMENT
4B30
DOUBLE PATIENT RM
4B16
BATH
4B22A
STAIR D
4B42
BATH
4B15A
BATH
4B16A
CORRIDOR
4C473
CWT OFFICE 1
4C476
CWT STUDENT
4C475
HC TOILET
4C474
REC THERAPY STORAGE
4C489
ELEC
4C492
CORRIDOR
4C501
CORRIDOR
4C493 CRAFT
4C488
REC THERAPY
4C486
RESOURCE RM
4C487
CWT OFFICE 2
4C477
HOMELESS CORRD
4C478SPS OFFICE 2
4C497
SPS OFFICE 3
4C498
X
B 261
CCHV CRAFT
4C500
CHAPLAIN RESIDENTS
4C482
CHEIF CHAPLAIN
4C481
CHAPLAIN OFFICE
4C480
HUD/BASH
4C479
CHAPLAIN OFFICE 2
4C494
CHAPLAIN OFFICE 3
4C495
SPS OFFICE
4C496
COPY
4C484
CORRIDOR
4C485
F. P.
4C483
LAB COATS
4A456
OFFICE
4A444
OFFICE
4A443
OFFICE
4A442
OFFICE
4A450
OFFICE
4A449
OFFICE
4A448
OFFICE
4A451
OFFICE
4A452
OFFICE 3
4A438
Room
OFFICE 2
4A437
CORRIDOR
4A446
OFFICE
4A445
OFFICE
4A447
VISITATION AREA
4B24
MECH CLO
4B21
QUIET RM
4B20
DOUBLE PATIENT RM
4B19
BATH
4B18D
DOUBLE PATIENT RM
4B18
BATH
4B18A
BATH
4B17A
DOUBLE PATIENT RM
4B17
CLOSET
4B47
CORRIDOR
4B02
CORRIDOR
4B04
GROUP RM
4B33A
DINNING
4B31
STORAGE
4B32
NURSE MGR OFFICE
B 267
X
B 268
MECH
4B 269
MECH
4B 270
MECH
4B 271
LAUNDRY CHUTE
B 272
CORRIDOR
4A400
GYPSUM BOARD WALL
AND/OR GYPSUM BOARD
CEILING WILL NEED TO BE
PARTIALLY DEMOLISHED AND
PATCHED AND/OR NEW
GYPSUM BOARD INSTALLED IN
THIS AREA TO COMPLETE THE
REQUIRED WORK.
LEGEND
Engineers Architects
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/1
/2
:1
:0
P
M C
U s e rs
\r c la rk e
\D o c u m e n ts
\A
-1
-V
A C la rk s b u rg
-L e g io n e lla
E ra d ic a ti o n
B
L D
G rc la rk e H
N G
A .r v t
G-007
FOURTH FLOOR ICRA PLAN
7 9RMC
ERADICATE LEGIONELLA
LOUIS A. JOHNSON VAMC1 MEDICAL
CENTER DRIVE
CLARKSBURG, WV 23601 , 2025
BID DOCUMENTS
540-20-10322-144
RMC
Scale: 1/16" = 1'-0"
LEVEL 4 ICRA PLAN
1 TEMPORARY ICRA BARRIER - PLASTIC SHEET
WITH ZIPPERED ENTRY
2 STICKY MAT
3 ICRA CLASS III
0 4 8 16
A. USE A HEPA CART MOBILE CONTAINMENT SYSTEM
FOR ALL ABOVE-CEILING WORK AND ALL AREAS OF
WORK UNLESS OTHERWISE NOTED BY KEYNOTE 1
BELOW.
B. PROVIDE A CRITICAL PATH SCHEDULE FOR THE
WORK AND DOCUMENT WHEN THE WORK WILL
OCCUR IN EACH ROOM. COORDINATE WITH THE COR
REGARDING POTENTIAL WORK DURING EVENINGS
AND WEEKENDS. THE VA WILL MOVE FURNITURE
AND MEDICAL EQUIPMENT AS REQUIRED SO THAT
THE WORK MAY BE COMPLETED.
N O
R T
H
24514
LICENSED
ARCHITECT
APRIL 22,
TWO BEDROOM
5A151
TWO BEDROOM
5A149
BATH
5A151A
BATH
5A152A
ONE BEDROOM
5A152
5A153
ELEC
5A157
TWO BEDROOM
5A156TEAM OFFICES
5A155
STAIR D
5S02 BATH
5A156A
LINENS
5A158
ONE BEDROOM
5A159
BATH
5A159A
ONE BEDROOM
5A160
BATH
5A161A
TWO BEDROOM
5A161
MEDICATION RM
5A143
TWO BEDROOM
5A144
BATH
5A144A
ONE BEDROOM
5A145
SUPPLIES
5A146
BATH
5A149A
5A150
I.T.
5A141
STAFF BATH
5A140
ELEC
5A138
STAFF VESTIBULE
5A139
STAFF BREAKROOM
5A136
STORAGE
5A133
CORRIDOR
5A101
STAFF LOUNGE
B 273
LIVING ROOM
5A110
COPY
5A110A
BATH
5A111A
5A109
STAIR A
5S01
NOURISHHMENT
5A131
MECHNICAL RM
5A130
TWO BEDROOM
5A129
ONE BEDROOM
5A112
BARIATRIC BEDROOM
5A111
ONE BEDROOM
5A113
BATH
5A112A
DEN
5A114
BATH
5A129A VISTIOR TLT
5A128
BATH
5A127A
BEDROOM
5A124
BATH
5A124A
SOILED
5A519
HAC
5A120
STORAGE
B 275 B 276
BATH
5A116A
ISO BARIATRIC BEDROOM
5A116
STAIR B
5S03
CORRIDOR
5A102
X
5A126
TWO BEDROOM
5A125
TWO BEDROOM
5A127
ELEV
B 277
ELEV
B 278
ELEV
B 279
B 280
X
B 281
CORRIDOR
5A104
CORRIDOR
5A118
P-2
B 282
P-1
B 283
ELEVATOR LOBBY
C039
SERVICE HALL
5B102
MECH
5B 284
MECH
5B 285
OFFIC…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .