This document is an electrical power plan drawing for a Legionella Eradication project at the Louis A. Johnson VA Medical Center in Clarksburg, WV. The second floor power plan details four key electrical modifications: (1) installing a new 120V circuit with a 20A/1P breaker to power a new water heater, (2) adding a 208V circuit with a 20A/2P breaker for a new water temperature monitoring system, (3) providing another 208V circuit with a 20A/2P breaker for new recirculation pumps CA-P-01 and CA-P-02, and (4) powering a new bottle filling station using an existing water fountain circuit. The drawing is part of bid documents dated September 12, 2025, with the VA's Office of Construction and Facilities Management overseeing the project, and Apogee Consulting Group serving as the consulting engineers.

View the file

Other files

File Type Posted
36C24525B0008 0011 Eradicate Legionella.docx DOCX document
P-402 Revised Enlarged Plumbing Plan.pdf PDF
221123 Revised Specification DomesticWaterPumps.pdf PDF
P-401 Revised Enlarged Plumbing Plan.pdf PDF
EP100B Revised Basement Power Plan - Area B.pdf PDF
P-601 Revised Plumbing Schedule.pdf PDF
36C24525B0008 0010.docx DOCX document
36C24525B0008 0009.docx DOCX document
36C24525B0008 0008.docx DOCX document
36C24525B0008 0007 Legionella Eradication.docx DOCX document
36C24525B0008 0006.docx DOCX document
36C24525B0008 0005.docx DOCX document
230593 TAB for HVAC.pdf PDF
36C24525B0008 0004 - Building 1 and Clinical Add. Legionella Eradication.docx DOCX document
36C24525B0008 0003.docx DOCX document
36C24525B0008 0002.docx DOCX document
Record of Attendance - Eradicate Legionella Construction Site Visit.pdf PDF
36C24525B0008 0001.docx DOCX document
Record of Attendance - Site Visit - 6-30-2025 - Legionella Eradication.docx DOCX document
540-20-103_VHA PCRA 2023.docx DOCX document
S02_LIMITATIONS ON SUBCONTRACTING-CERTIFICATE OF COMPLIANCE.pdf PDF
DB Wage Determination 5-30-2025.pdf PDF
22-144 Drawings BD 20250414.pdf PDF
36C24525B0008.docx DOCX document
22-144 Specs 100 percent BD 20250414.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

G

FI

G

FI

M

E

E

M

G

FI

MECHANICAL

SERVICE

ELEVATOR

LOBBY

S-1

S-1

P-1

P-1

P-2

P-2

OFFICE

OFFICE

OFFICE

ELECTRICAL

MECH

WAITING

2190A

TLT.

DRESS

DRESS

DRESS

TLT.

TOILET

SOIL

SUPPLY

SERVER

2201 2202

READING

ROOM

VESTIBU

2204C

EQUIP

2204A

CT SCAN

TLT

2200A

X-RAY

X-RAY

TLT

2198A

WAITING

2190A

ELEC.

TEL.

STAIR H

EXISTING

PANEL '1-2LNB'

CA-WTMS-10

CA-WTMS-9

CA-WTMS-5

'1-2LNB'- 19,21

'1-2LNB'- 20,22

F J L M N O

C

D

G

H

K

L-

M-

N-

P-611

P-606

E P

C

/1 EP102E

Engineers Architects

# KEY NOTES:

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/1

/2

:4

:4

P

M C

U s e rs

\l s ta rn e s \D o c u m e n ts \E

-1

-V A

C la rk s b u rg

-L e g io n e lla

E ra d ic a ti o n

B

L D

G ls ta rn e s C

B U

M B

.r v t

EP102D

SECOND FLOOR POWER PLAN - CLIN

ADD - EAST

12 22LAS

ERADICATE LEGIONELLA

LOUIS A. JOHNSON VA MEDICAL

CENTER 1 MEDICAL CENTER DRIVE

CLARKSBURG, WV 23601 SEPTEMBER 12, 2025

BID DOCUMENTS

540-20-10322-144

GRG

Scale: 1/8" = 1'-0"

SECOND FLOOR POWER PLAN - CLIN ADD - EAST

1 PROVIDE NEW 120V CIRCUIT WITH NEW 20A/1P

BREAKER FROM PANEL '1-2LNB' TO POWER NEW

WATER HEATER 'CA-DWH-01'. COORDINATE

LOCATION OF EQUIPMENT WITH MECHANICAL

DRAWINGS.

2 PROVIDE NEW 208V CIRCUIT WITH NEW 20A/2P

BREAKER FROM PANEL '1-2LNB' TO POWER NEW

WATER TEMPERATURE MONITORING SYSTEM.

COORDINATE LOCATION OF EQUIPMENT WITH

MECHANICAL DRAWINGS.

3 PROVIDE NEW 208V CIRCUIT WITH NEW 20A/2P

BREAKER FROM PANEL '1-2LNB' TO POWER NEW

RECIRCULATION PUMPS CA-P-01 AND CA-P-02.

COORDINATE LOCATION OF EQUIPMENT WITH

MECHANICAL DRAWINGS.

4 NEW BOTTLE FILLING STATION TO BE POWERED

BY EXISTING WATER FOUNTAIN CIRCUIT AND

RECEPTACLE.

N O

R T

H

0 4 8 16

A. THE CONTRACTOR SHALL COORDINATE THE FINAL

PLACEMENT OF THE RECEPTACLES AND

EQUIPMENT WITH THE MECHANICAL DRAWINGS.

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

1 ADDENDUM 03 09/12/2025

Docusign Envelope ID: 9914C1CA-6D38-4C12-A070-3A2D053482BB

9/15/2025

Sheets
EP102D - SECOND FLOOR POWER PLAN - CLIN ADD - EAST
2025-09-15T08:50:29-0700
Digitally verifiable PDF exported from www.docusign.com