This document is an Amendment to a Previous Combined Solicitation (36C24524Q0607) for contractor services to provide inspection, testing, and maintenance services for electrical power system components at the Martinsburg VA Medical Center in West Virginia.

The key details are: the solicitation number is 36C24524Q0607, the response due date is extended to 07-15-2024 at 10:00 AM Eastern Time, the contractor must be qualified to provide NETA testing, and the services required include testing and maintenance of 12 kV vacuum switchgear breakers, automatic transfer switches, 480V switchgear, transformers, and other electrical equipment. The contractor must submit a schedule, inspection/testing report, and identify any deficiencies. The government will provide the facility site, lighting, and lockout/tagout procedures. Additional line items have been added including generator rental and after-hours emergency call rates.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBJECT*

AMENDMENT TO RFQ - TO EXTEND RFQ DUE DATE - INCLUDE ANSWERS TO VENDOR QUESTIONS - ADD ADDITIONAL LINE ITEMS 613-24-3-653-0042

GENERAL INFORMATION

CONTRACTING OFFICE’S ZIP CODE*
21902
SOLICITATION NUMBER*
36C24524Q0607
RESPONSE DATE/TIME/ZONE
07-15-2024 10:00 AM EASTERN TIME, NEW YORK, USA
ARCHIVE
60 DAYS AFTER THE RESPONSE DATE
RECOVERY ACT FUNDS
N
SET-ASIDE
SDVOSBC
PRODUCT SERVICE CODE*
J059
NAICS CODE*
238210
CONTRACTING OFFICE ADDRESS
Department of Veterans Affairs

NCO 5 Contracting Office Services Team 1 Bldg. 101 Perry Point MD 21902

POINT OF CONTACT*

Contracting Officer Bill Pratt Billie.Pratt@va.gov 410-642-2411 ext. 33320 Services Team 1

PLACE OF PERFORMANCE

ADDRESS
Department of Veterans Affairs

Martinsburg VA Medical Center

510 Butler Ave.

Martinsburg WV

POSTAL CODE
25405
COUNTRY
USA

ADDITIONAL INFORMATION

AGENCY’S URL

URL DESCRIPTION

AGENCY CONTACT’S EMAIL ADDRESS
Billie.Pratt@va.gov
EMAIL DESCRIPTION
NCO 5 - Service Team 1

DESCRIPTION

AMENDMENT TO RFQ 36C24524Q0607

TO EXTEND DATE OF RFQ 36C24524Q0607 TO 7/15/2024 10:00 AM, TO INCLUDE UPDATED SOW, TO INCLUDE ANSWERS TO VENDOR QUESTIONS AND TO ADD ADDITIONAL LINE ITEMS, ONE TO INCLUDE GENERATOR RENTAL, ANTHOR TO ADD AFTER HOURS RATE FOR EMERGENCY CALLS DURING INSPECTION SERVICE AND OPTION YEAR LINE ITEM FOR THIRD YEAR FULL SERVICE AND INSPECTION

See attached document: 36C24524Q0607 0002 AMENDMENT.

Amendment to a Previous Combined Solicitation

Amendment to a Previous Combined Solicitation See attached document: Pre-Bid RFIs Test Facility Electrical Sysstem 2024 07 08 -.

*= Required Field
Amendment to a Previous Combined Solicitation

Page 1 of

Amendment to a Previous Combined Solicitation

STATEMENT OF WORK

TEST FACILITY ELECTRICAL POWER SYSTEM

PROJECT # 613-22-148

SCOPE OF WORK

I. STATEMENT OF PROJECT OBJECTIVE:

This project will provide inspection, testing and maintenance services for 12 kV vacuum switchgear breakers, automatic transfer switches, cable, 480V switchgear breakers, automatic and manual transfer switches, molded case breakers, and 12 kV/480V pad mounted transformers at the Veteran’s Affairs Medical Center in Martinsburg, WV.

a. Location: Martinsburg VA Medical Center, 510 Butler Ave, Martinsburg, WV 25405

II. STATEMENT OF TASK:

A. This contract shall be for conducting inspection/ testing operations and preparation of documents. The documents will include the test data, corrective action recommendations (if any) and final report. The contractor shall prepare and provide to the VA 100% complete inspection/ testing documents as further described below.

B. The type of test required for the circuit breakers is a primarysecondary injection test where feasible and a secondary injection test accompanied by a check of the CT/PT ratios where a primary injection test is not feasible. This test will verify the performance of the breaker in comparison to its trip settings. The contractor shall provide competent electrical inspection and testing services utilizing personnel adequately knowledgeable of the procedure. The contractor shall examine the existing conditions and tests to comply with all federal, state and local requirements. The contractor shall examine the overall inspection/ testing plan, identify clearance/lockouts, make suggestions to minimize disruptions, and provide a schedule for approval with minimum 30 days for VA to plan outages. The contractor will thoroughly survey the existing conditions of the facility and provide all necessary input to provide a superior product to the VA.

III. QUALIFICATIONS OF CONTRACTOR:

A. The contractor shall be qualified to provide InterNational Electrical Testing Association (NETA) testing with each having completed the Occupational Safety & Health Administration (OSHA) approved 10 hour construction safety training.

B. The contractor shall have technical training, and track record of working experience in maintenance, inspection, and testing of the Facilities Electrical Power Systems and its components in healthcare, industrial, educational, and commercial facilities for a minimum of five (5) continuous years.

C. The contractor shall have safety training – either on-the-job or class-room type - in electrical safety outlined in the OSHA Standard 29 Code of Federal Regulations (CFR) 1910 Subpart S – Electrical, and the NFPA 70E – Standard for Electrical Safety in the Workplace. Training certifications shall be submitted to the VA Contracting Officer prior to work. If no training certifications are available, the contractor’s Employer shall certify that he/she has met this requirement in writing and submit it to the VA Contracting Officer for approval prior to work.

D. The contractor shall be familiar with, and have ready access to the latest versions of the following references:

1) NFPA 70, National Electrical Code

2) NFPA 70B, Recommended Practice for Electrical Equipment Maintenance

3) NFPA 70E, Standard for Electrical Safety for the Workplace

4) NFPA 110, Standard for Emergency and Standby Power System

5) OSHA Standard 29 CFR 1910, Subparts I & S

6) International Electrical Testing Association, Inc. (NETA) – Maintenance and Testing Specifications.

7) Operating/Maintenance manuals, and specifications of the electrical equipment to be maintained and tested. These documents may be obtained from the VHA Medical Center, or the equipment manufacturers.

8) Department of Veterans Affairs VHA Directive 1028 Facility Electrical Power Systems

E. The contractor shall be equipped with all necessary tools, equipment, and Personal Protective Equipment (PPE) to perform the work safely, effectively, and timely. Tools, equipment, and PPE shall comply with the requirements of OSHA Standard 29 CFR 1910, Subpart I, and NFPA 70E. Prior to initiating work, Contractor shall provide documentation that all instruments, test equipment, and tools have current calibration. Dated calibration labels shall be visible on all instruments, test equipment, tools and PPE as appropriate.

F. The contractor shall be prepared to provide expedited procurement support for replacement/repair parts or equipment in the event of failure under testing. This support shall include identification of source point(s) of contact, identification of repair/replacement requirements, identification of equipment substitutions or temporary configurations, incident report, and schedule impact support as necessary.

IV. TYPES OF TESTS:

A. Transformers

1) Perform Infra-Red scanning/thermographic survey (IR) testing/survey

2) Check the tank and associated devices for excessive corrosion or oil leaks.

3) Check the external porcelain/bushings for cracks or contamination.

4) Test an oil sample for dissolved gases, dielectric strength, acid, color, water content, power factor, density, and Oxidation inhibitor.

5) Measure winding resistance

6) Measure insulation resistance to ground.

7) Cable connections resistance or IR hot spot testing

B. Breakers

1) Perform IR testing.

2) Direct Injection tTrip levels and times corresponding to each setting and

3) Inspect, clean and lubricate per mfgs or NETA recommendations.

4) Measure contact resistance

5) Cable connections resistance or IR hot spot testing.

C. Automatic Transfer Switches (ATSs)

1) Perform IR testing/survey

2) Measure contact resistance or mV drop (Normal & Alternate)

3) Measure load current (Normal & Alternate)

4) Measure normal voltage.

5) Measure alternate voltage.

6) Measure drop out voltage (Normal & Alternate)

7) Measure pick up voltage & time

8) Verify and measure generator start.

D. Manual Transfer Switches (MTSs)

1) Perform IR testing/survey.

2) Measure contact resistance or mV drop (Normal & Alternate)

3) Measure load current (Normal & Alternate)

4) Measure normal voltage.

5) Measure alternate voltage.

E. Ground System

1) Perform ground resistance test on main grounding electrode/system

2) Perform point to point resistance tests between main grounding system and all major electrical equipment frames, system neutral and/or derived neutral points.

Note that the above Types of Tests are typical and NETA and/or the manufacturer recommendations may include additional tests, checks, or maintenance steps.

V. SUBMITTALS:

A. Schedule – The contractor shall provide task durations, groupings with suggested order of completion, lock out requirements, preparation expectations and Contractor availability for approval a minimum of 30 days prior to commencing work.

B. Report - The contractor will provide a written report of the work. Information shown in the report shall be as follows:

1) Company’s name, address, telephone & FAX numbers

2) Name and signature of contractors who perform the inspection and testing

3) VA Work Contract Number, name and number of VA Contracting Officer

4) Date and Time of work

5) Copies of contractors’ valid licenses, professional and training certificates

6) Descriptions and model number of specialized tools and equipment used

7) Location, Type, Name, and nameplate information of equipment to be maintained and tested

8) Test data

9) Remarks on conditions of electrical equipment. List all deficiencies, if any

10) Recommended corrective actions, if any.

C. Submit four (4) hard copies and an electronic copy on CD of the complete written report to VA Contracting Officer within thirty (30) calendar days of test completion. All reference materials shall be included in the electronic version of the report, either through scanning or other means of electronic text import methods.

D. Contractor shall identify breaker settings that do not match the settings list provided to the Contracting Officer’s Representative and, assuming Contracting Officer’s Representative agrees, revise settings prior to testing.

E. Include a line item in the proposal for primary injection test set generator However, lighting will be provided by the VA

F. Contractors shall report deficiencies that are deemed critical or catastrophic immediately to the Contracting Officer’s Representative, Contracting Officer, and Chief of Engineering Service for immediate action.

VI. EQUIPMENT TO BE TESTED AND MAINTAINED:

A. Station Air Switches (12.47 kV) Electrical Substation “Building” 505

1) Air Switch #1, Substation West

2) Air Switch #2, Substation East

B. Station ATSs (12.47 kV) Building 522A

1) ATS #1

2) ATS #2

C. Station Vacuum Circuit Breakers (12.47 kV) Switchgear Building 503A

1) 1200 A Main Breaker, Circuit 1

2) 1200 A Main Breaker, Circuit 2

3) 1200 A Tie Breaker

4) 1200 A Breaker, Circuit 1, Main Hospital Loop

5) 1200 A Breaker, Circuit 2, Main Hospital Loop

6) 1200 A Breaker, Circuit 1, Chiller Plant Loop

7) 1200 A Breaker, Circuit 2, Chiller Plant Loop

8) 1200 A Breaker, Circuit 1, Out Buildings Loop

9) 1200 A Breaker, Circuit 2, Out Buildings Loop

D. Station Standby Switchgear Breakers (12.47kV) MSGE Building 522

1) Generator G2A 150 A Breaker

2) Generator G3A 150 A Breaker

3) Generator G4A 150 A Breaker

4) ATS #1 Alt Feed 300 A Breaker

5) ATS #2 Alt Feed 300 A Breaker

E. Main Hospital TSs and associated line and load circuit breakers, Building 500

No.
Room
Equip No.
Type
Qty Line Bkrs
Generator
Qty Load Breakers
1)
GA-137A
ATS-1
ATS
2
G1
2
2)
GA-137A
ATS-2
ATS
2
G1
2
3)
GA-137A
ATS-3
ATS
2
G1
2
4)
GA-137A
ATS-4
ATS
2
G1
2
5)
GA-137A
ATS-5
ATS
2
G1
2
6)
GA-137A
ATS-6
ATS
2
G1
2
7)
GA-137A
ATS-7
ATS
2
G1
2
8)
GA-137A
ATS-8
ATS
2
G1
2
9)
GA-137A
ATS-9
ATS
2
G1
2
10)
GA-137A
ATS-10
ATS
2
G1
2
11)
GE-104
Elevator ATS
ATS
Note 1
G1
1
12)
GE-102
OR Backup MTS
MTS
Note 2
G1

Note 3

13)
4C
4C Wing Norm vs OR Power
MTS
-
G1/G2

Note 3

14)
2C-156A
OR ATS
ATS
-
G2
-

Note 1: See Building Main Equipment for Normal and Alternate feed.

Note 2: See Building Main Equipment for Normal feed, do not test Alternate feed breaker Note 3: This TS doesn’t auto start generator.

F. ATSs Associated with Site Generators

No.
Building Location
Generator No.
Generator Size (KW) Note 2
ATS Quantity
1)
501 CLC
G4
300
2
2)
502 Domiciliary& E-pod
G3
155
2
3)
504 Water Treatment
G14
500
1
4)
207 Dom Cat 5
G6
175
2
5)
320 Boiler Plant also 503 Chiller
G13
275
2
6)
307
G7
150
1
7)
217A
G9
260
1
8)
217B
G10
200
1
9)
306A Contracting
G12
200 (208/120)
1
10)
317 Post Theater
-
(208/120)
-
11)
318 Fire Station
G11
150
1
12)
513 Tranquility & 516 Serenity
G5
340
5

Note 1: See Main Hospital TSs above for Bldg 500 TSs.

Note 2: Generators are 480/277 3 phase unless noted otherwise.

G. Transformers

No.
Designation
Location
KVA
Sec Volt 3ph UON
Qty Bkrs
1)
A
314 Eng, M&R Shops
112.5
480/277
-
2)
B
314 Eng, M&R Shops
300
208/120
11
3)
C
Well #4
45
240/120 3ph
-
4)
D
320 Boiler Plant
300
480/277
3
5)
DE
519 Warehouse (in front of 308B)
300
480/277

(208/120) (1)

6)
E
519 Warehouse (in front of 308B)

(Bldgs 308, 328, 330 & 509)

225
208/120
2
7)
F
306 MAS Records
112.5
208/120
*3
8)
G
217 Fitness Center/PIV
500
208/120
11
9)
GH
331
300
208/120
1
10)
H
400 Row Between 407B & 409B
500
208/120
5
11)
J
317 Post Theater
225
208/120
*2
12)
L
300 Row Between 307B & 309B
225
208/120
*2
13)
LM
213 Hope Center
500
480/277
2
14)
M
200 Row Between 205B & 207B
300
208/120
14
15)
N
117 Chapel
150
208/120
1
16)
O
21 Baker House
37.5
240/120 1ph
-
17)
P
19 Main Gate
45
480/240 1ph
-
18)
Q
334 GAC
300
480/277
2
19)
R
504 Water Treatment
300
480/277
6
20)
500A
500 Room GE 103 loading dock
2000
480/277
Note 1
21)
500B
500 Room GE 103 loading dock
2000
480/277
Note 1
22)
501
501 CLC
500
480/277
Note 1
23)
502
502 Domiciliary
500
480/277
Note 1
24)
503
503 Chiller Plant
2000
480/277
Note 1
25)
508
508 Laundry
750
480/277
Note 1
26)
T
513 Tranquility
750
480/277
Note 1
27)
S
516 Serenity
300
480/277
Note 1
28)
U
518 Dental
300
480/277
Note 1

Note 1: See Building Main Equipment below for associated breakers.

*: Breaker located in transformer housing

H. Building Main Equipment

No.
Building
Room
Type
Qty
1)
500 Main Hospital
GE-103
MV Air Switch
3
2)
‘’
GE-102
Switchgear w/A & B side
1
3)
‘’
GE-102
LV Air Circuit Breakers
31
4)
‘’
Multiple
Molded Case Circuit Breakers
29
5)
‘’
GE-102
Ground Fault System
1
6)
501 CLC
Outside
MV Air Switch
1
7)
‘’
Elect Rm
Switchgear
1
8)
‘’
Elect Rm
LV Air Circuit Breakers
2
9)
‘’
Multiple
Molded Case Circuit Breakers
5
10)
502 Domiciliary
Outside
MV Air Switch
1
11)
‘’
Elect Rm
Switchgear
1
12)
‘’
Elect Rm
LV Insulated Case Circuit Bkr
2
13)
‘’
Multiple
Molded Case Circuit Breakers
5
14)
503 Chiller
Outside
MV Air Switch
1
15)
‘’
Elect Rm
Switchgear
1
16)
‘’
Elect Rm
LV Insulated Case Circuit Bkr
7
17)
‘’
Multiple
Molded Case Circuit Breakers
10
18)
‘’
Elect Rm
Ground Fault System
1
19)
508 Laundry
Outside
LV Air Circuit Breaker
1
20)
‘’
Elect Rm
Molded Case Circuit Breakers
7
21)
512 Heroes Health & Wellness
Elect Rm
Molded Case Circuit Breakers
2
22)
513 Tranquility
Outside
Air Switch
1
23)
‘’
Elect Rm
Molded Case Circuit Breakers
11
24)
516 Serenity
Outside
Air Switch
1
25)
‘’
Elect Rm
Molded Case Circuit Breakers
2
26)
518 Dental
Outside
Air Switch
1
27)
‘’
Elect Rm
Molded Case Circuit Breakers
3
28)
‘’
Elect Rm
Ground Fault System
1

See attached document: Appendix G - One-lines - MRTN 100.

See attached document: 4.2 - Breaker Settings.

See attached document: Maintenance Report 2014.

See attached document: Draft Schedule 2024-07-01 02.

See attached document: Master Site Electrical Dist System_30x42.

See attached document: Master Site Plan.

See attached document: Oil Samples 2014.

See attached document: Draft Schedule 2024-07-01.